A kind of dislocated pre-fixed lattice column for subway construction
By connecting the second lattice column and the third lattice column at the top and bottom ends of the lattice column, and using the enclosure and cutting structure to form a groove space, the bolts are easily removed, which solves the problem that the lattice columns for subway construction are not easy to remove and The problem of lifting stability has achieved convenient dismantling of lattice columns and improved lifting stability.
Patent Information
- Application Number
- CN202411070690.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-08-06
AI Technical Summary
The existing lattice columns for subway construction are not easy to easily remove after the structural slab is poured, and the risk of lattice columns being broken due to bolts during the lifting process is easy to cause the risk of lattice columns being broken.
A dislocation pre-fixed lattice column is designed. By connecting the second lattice column and the third lattice column at the top and bottom ends of the lattice column, and forming a groove space using the enclosure structure to facilitate the removal of bolts. The cuttings and plug block structures fix the enclosure, and use the connecting plate and bolts to withstand shear forces, and adjustable pads are provided to accommodate settlement or bulge.
It realizes convenient dismantling of lattice columns and improves lifting stability, avoids bolts breakage, and improves the horizontal force strength and anti-concrete slurry impact capability of lattice columns.
Smart Images

Figure CN118581927B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of lattice columns for subway construction, in particular to a dislocated pre-fixed lattice column for subway construction. Background Art
[0002] In subway foundation pit construction, lattice columns are often used as temporary vertical supports for horizontal reinforced concrete supports to increase the stability of the internal support system.
[0003] A Chinese patent with relevant announcement number CN210315658U discloses a lattice column structure, including a first lattice column, which is configured to be buried in a structural plate layer, wherein the height of the first lattice column is less than the thickness of the structural plate layer, a first positioning frame is provided on the upper end face of the first lattice column, and a second positioning frame is provided on the lower end face of the first lattice column; the second lattice column is detachably connected to the upper end face of the first lattice column and is snapped into the first positioning frame; and the third lattice column is detachably connected to the lower end face of the first lattice column and is snapped into the second positioning frame.
[0004] With regard to the above-mentioned related technologies, after the structural slab is cast, the height of the first lattice column is less than the thickness of the structural slab, so the bolt connection structure at at least one end of the first lattice column will be cast into the structural slab, which may easily lead to the first lattice column and the pre-fixed lattice column being unable to be smoothly disassembled, and the cutting of the lattice column cannot be avoided. In addition, the two sections of the lattice columns are only connected to each other by multiple bolts on the horizontally arranged perforated steel plate, and the axis of the bolts is parallel to the length direction of the lattice column. As the length of the lattice column splicing increases, the gravity of the lattice column itself is applied to the multiple groups of bolts at the top of the column body, which may easily cause the lattice column to break during the lattice column hoisting process due to the bolts at the top of the column body being pulled apart. In summary, it is not easy to conveniently remove the lattice columns on the top and bottom surfaces of the structural slab after the structural slab is cast. Summary of the invention
[0005] Based on this, the purpose of the present invention is to provide a staggered pre-fixed lattice column for subway construction to solve the technical problem that the lattice columns on the top and bottom surfaces of the structural plate layers of the existing subway construction lattice are not easy to remove conveniently.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a lattice column for subway construction with offset pre-fixation, comprising a first lattice column located in a structural plate layer, the top and bottom ends of the first lattice column are respectively connected to a second lattice column and a third lattice column, the first lattice column, the second lattice column and the third lattice column all include four angle steels and multiple joining plates, a panel is clamped between the joining plate at the top end of the first lattice column and the outer connecting plate connected to the bottom end of the second lattice column, there are four panels at the top end of the first lattice column, and the panels are in an inverted cone structure, the same panel is clamped between the joining plate at the bottom end of the first lattice column and the outer connecting plate connected to the top end of the third lattice column, the panel at the bottom end of the first lattice column is in the opposite direction to the top end, and the height between the panel at the top end of the first lattice column and the panel at the top end is greater than the thickness of the structural plate layer.
[0007] By adopting the above technical solution, a groove space sufficient for removing the bolts is formed on the upper and lower surfaces of the structural slab. After the concrete structural slab is poured, multiple panels are removed to conveniently remove the bolts, thereby conveniently realizing the removal of the lattice columns on the upper and lower surfaces of the structural slab.
[0008] The present invention is further configured such that inner walls of the bottom end of the second lattice column and the top end of the third lattice column are welded with inner connecting plates, and middle connecting plates with the same height as the inner connecting plates are welded between adjacent angle steels, outer connecting plates are connected to the position where the first lattice column contacts the second lattice column, and outer connecting plates are also connected to the position where the first lattice column connects to the third lattice column, and first bolts pass through the outer connecting plates, the inner connecting plates and the middle connecting plates.
[0009] By adopting the above technical solution, when the lattice column is hoisted, the connection between the second lattice column at the top of the lattice column and the first lattice column is subjected to shear force by the bare rod parts of a large number of first bolts, thereby effectively avoiding the lattice column from being disconnected.
[0010] The present invention is further configured such that the middle connecting plates on the second lattice column and the third lattice column can be inserted between adjacent angle steels of the first lattice column, and the outer connecting plate and the inner connecting plate can clamp the end of the first lattice column therebetween.
[0011] By adopting the above technical solution, the horizontal force strength of the lattice column can also be greatly improved, avoiding the bending of the lattice column at the connection.
[0012] The present invention is further configured such that an insert strip is connected to the edge of the enclosure toward the direction of the first lattice column, and the enclosure is slidably connected to a plug-in block in the opposite direction of the extension direction of the insert strip, and the plug-in block can be slidably plugged between the outer connecting plate and the enclosure.
[0013] By adopting the above technical solution, when the plug-in block is slidably inserted between the outer connecting plate and the enclosure, the pressure between the plug-in block and the outer connecting plate is directed toward the enclosure, pressing the enclosure toward the connecting plate of the first lattice column, making the insertion strips on the edge of the enclosure unable to move, thereby playing the role of fixing the enclosure.
[0014] The present invention is further configured such that adjacent enclosure panels are fixedly connected at positions away from the structural plate layer by second bolts.
[0015] By adopting the above technical solution, the impact force of the concrete slurry can be effectively resisted when the structural slab is poured, preventing the enclosure from being deformed.
[0016] The present invention is further configured such that both ends of the inner wall of the first lattice column are welded with sealing plates, the edges of the sealing plates are in contact with the inner wall of the angle steel and the inner wall of the gusset plate, and are closer to the center of the first lattice column than the enclosure plate.
[0017] By adopting the above technical solution, the situation that the first bolt cannot be screwed out smoothly can be prevented from occurring.
[0018] The present invention is further configured such that a connecting pipe is connected between the sealing plates.
[0019] By adopting the above technical solution, the connecting pipes between the sealing plates play a role in connecting and stabilizing the materials.
[0020] The present invention is further configured such that a bottom plate is welded to the bottom end of the third lattice column, a positioning column is welded to the bottom end of the center of the bottom plate, an inclined plate for guiding is welded around the positioning column, and a plurality of pads are connected to the bottom end of the bottom plate by a third bolt.
[0021] By adopting the above technical solution, the staggered installation of the lattice column in the vertical direction is achieved to adapt to the settlement or uplift of the lattice column.
[0022] The present invention is further configured such that a base is inserted into the bottom end of the third lattice column, four angle steels whose projections coincide with the angle steels of the third lattice column are welded to the top end of the base, and multiple layers of mutually parallel positioning plates are welded between the four angle steels of the base along the height direction, and notches are provided on the positioning plates to match the positioning columns.
[0023] By adopting the above technical solution, the multiple positioning plates on the base can facilitate the insertion of the third lattice column and cooperate with the positioning column connected to the bottom end of the third lattice column to guide and position the third lattice column.
[0024] The present invention is further configured such that a columnar protective cap is sleeved on the nut end of the first bolt, and an inner wall of the protective cap is in close contact with an outer wall of the nut of the first bolt.
[0025] By adopting the above technical solution, the first bolt can be smoothly screwed off after the protective cap is removed.
[0026] In summary, the present invention mainly has the following beneficial effects:
[0027] The present invention provides a partially clamped enclosure structure with connecting bolts on the lattice column, and uses the space enclosed by the enclosure structure to separate the concrete of the structural plate layer, so that a groove space sufficient for removing the bolts is formed on both the upper and lower surfaces of the structural plate layer. After the concrete structural plate layer is poured, multiple enclosures are removed, and the bolts can be removed conveniently, thereby conveniently realizing the removal of the lattice columns on the upper and lower surfaces of the structural plate layer.
[0028] The present invention utilizes the insertion strips provided on the enclosure to be inserted between the connecting plate and the gusset plate of the first lattice column, and simultaneously slides the plug-in structure in the enclosure, utilizes the mutual extrusion between the multiple partitions surrounding the first lattice column and the plug-in structure clamped between the gusset plate and the connecting plate to conveniently realize the stable connection of the enclosure;
[0029] The present invention arranges connecting plate structures on both inner and outer sides of the connection between the first lattice column and the upper and lower lattice columns, and connects two adjacent lattice columns by connecting bolts in the horizontal direction. When the lattice column is hoisted, the gravity of the lattice column itself acts on the side wall of the connecting bolt, and the connecting bolt uses its own bare rod part to resist the shear force between the lattice columns to prevent the connecting bolt from loosening, thereby effectively avoiding the situation where the lattice column is disconnected due to its own large gravity when it is hoisted.
[0030] The present invention arranges a pad structure with adjustable height between the bottom end of the third lattice column and the base, and realizes height dislocation of the lattice column by adjusting the number of pad structures, conveniently adjusts the top surface elevation of the first lattice column after the lattice column is installed, and installs a required number of pads according to the settlement or uplift of the lattice column in the actual construction situation, thereby realizing the dislocation setting of the lattice column, and making the first lattice column section of the lattice column settle or uplift to the corresponding height of the structural plate layer during construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 A perspective view of the present invention;
[0032] Figure 2 An exploded view of the connection between the first lattice column and the second lattice column of the present invention;
[0033] Figure 3 For the present invention Figure 2 A magnified view of middle;
[0034] Figure 4 It is an exploded view of the connection between the third lattice column and the base of the present invention;
[0035] Figure 5 For the present invention Figure 4 Enlarged view of middle B;
[0036] Figure 6 is a three-dimensional diagram of a first lattice column of the present invention;
[0037] Figure 7 It is an internal stereoscopic view of the connection between the first lattice column, the second lattice column and the third lattice column of the present invention;
[0038] Figure 8 For the present invention Figure 7 Enlarged view of middle C;
[0039] Fig. 9 A three-dimensional diagram of a hoarding board of the present invention;
[0040] Fig.10 Another perspective view of the enclosure of the present invention;
[0041] Fig.11 It is a three-dimensional diagram of the internal structure of the protective cap sleeved on the first bolt of the present invention.
[0042] In the figure: 1. first lattice column; 2. second lattice column; 3. third lattice column; 4. base; 5. gusset plate; 6. inner connecting plate; 7. outer connecting plate; 8. middle connecting plate; 9. first bolt; 10. protective cap; 11. enclosure; 12. insert; 13. fixing frame; 14. plug-in block; 15. second bolt; 16. pull ring; 17. sealing plate; 18. connecting pipe; 19. bottom plate; 20. positioning column; 21. pad; 22. third bolt; 23. positioning plate; 24. guide table. DETAILED DESCRIPTION
[0043] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0044] The following describes an embodiment of the present invention based on its overall structure.
[0045] Embodiment 1
[0046] A staggered pre-fixed lattice column for subway construction, such as Figure 1-11As shown, it includes a first lattice column 1 located in the structural plate layer. Specifically, the height of the first lattice column 1 is lower than the thickness of the structural plate layer. The top and bottom ends of the first lattice column 1 are respectively connected to the second lattice column 2 and the third lattice column 3. Specifically, the number of the first lattice column 1 is the same as the number of structural plate layers required for subway construction. The first lattice column 1, the second lattice column 2 and the third lattice column all include four angle steels and multiple gussets 5. A panel 11 is clamped between the gusset 5 at the top end of the first lattice column 1 and the outer connecting plate 7 connected to the bottom end of the second lattice column 2. There are four panels 11 located at the top end of the first lattice column 1, and the panels are in an inverted cone structure. The same panel 11 is clamped between the gusset 5 at the bottom end of the first lattice column 1 and the outer connecting plate 7 connected to the top end of the third lattice column 3. The panel 11 at the bottom end of the first lattice column 1 is opposite to the top end. The height between the panel 11 at the top end of the first lattice column 1 and the panel 11 at the top end is greater than the thickness of the structural plate layer.
[0047] See also Figure 4-5 A bottom plate 19 is welded to the bottom end of the third lattice column 3, a positioning column 20 is welded to the bottom end of the center of the bottom plate 19, and inclined plates for guiding are welded around the positioning column 20. The bottom end of the bottom plate 19 is connected to multiple pads 21 by third bolts 22. The positioning columns 20 are used to guide the lattice column to be hoisted into the pile hole. Specifically, before installing the lattice column, it is necessary to lower the steel cage into the pile hole and pour the concrete base. The third lattice column 3 at the bottom end of the lattice column cooperates with the base 4 fixed on the concrete base through the positioning column 20 to achieve stable installation of the lattice column. The length of the third lattice column at the bottom end of the lattice column is adjusted by adjusting the number of pads 21 to achieve staggered installation of the lattice column in the vertical direction to adapt to the settlement or uplift of the lattice column.
[0048] See also Figure 4-5 The bottom end of the third lattice column 3 is plugged with a base 4, and four angle steels whose projections coincide with the angle steels of the third lattice column 3 are welded to the top of the base 4. Multiple layers of mutually parallel positioning plates 23 are welded between the four angle steels of the base 4 along the height direction, and notches are provided on the positioning plates 23 to match the positioning columns 20. Specifically, a guide platform 24 is also provided on the topmost positioning plate 23, and the bottom end of the positioning column 20 is a columnar structure that matches the guide platform 24, so that the positioning column 20 can be inserted into the base 4 more smoothly. The multiple positioning plates 23 on the base 4 can facilitate the insertion of the third lattice column 3, and cooperate with the positioning column 20 connected to the bottom end of the third lattice column 3 to achieve the guidance and positioning of the third lattice column 3.
[0049] See also Figure 7-8The edge of the enclosure 11 is connected with an insertion strip 12 toward the direction of the gusset plate 5 of the first lattice column 1. Specifically, the length of the insertion strip 12 is less than the spacing between the two angle steels of the first lattice column 1. The enclosure 11 is slidably connected with a plug-in block 14 in the opposite direction of the extension direction of the insertion strip 12. The plug-in block 14 can be slidably plugged between the outer connecting plate 7 and the enclosure 11. Specifically, a fixing frame 13 is fixedly connected to the enclosure 11, and the plug-in block 14 is slidably connected to the fixing frame 13. When the plug-in block 14 is slidably plugged between the outer connecting plate 7 and the enclosure 11, the pressure between the plug-in block 14 and the outer connecting plate 7 is directed toward the enclosure 11, pressing the enclosure 11 toward the gusset plate 5 of the first lattice column 1, so that the insertion strip 12 at the edge of the enclosure 11 cannot move, thereby playing the role of fixing the enclosure 11. Specifically, in order to stably plug the plug-in block 14 between the outer connecting plate 7 and the enclosure 11, the plug-in block 14 has a wedge-shaped structure, and the side facing the outer connecting plate 7 is an inclined surface.
[0050] See also Figure 7-10 In order to further improve the structural strength of the combination of the enclosures 11, the positions of adjacent enclosures 11 away from the structural plate layer are fixedly connected by the second bolts 15, the enclosures 11 are in contact and squeezed with each other, and are connected to each other by the second bolts 15 at the edges away from the insertion strips 12, thereby effectively improving the structural strength of the empty groove surrounded by the enclosures 11. When the structural plate layer is poured, it can effectively resist the impact force of the concrete slurry, and prevent the structure composed of the enclosures 11 from being deformed when the structural plate layer is poured. Specifically, in order to make the enclosures 11 more smoothly disassembled after the structural plate layer is poured, multiple layers of concrete release agent are coated on the side of the enclosure 11 facing the structural plate layer. In order to better pull the enclosure 11 when it is removed, a pull ring 16 is fixedly connected to the edge of the enclosure 11. When pulling out the enclosure 11, a rope can be passed through the pull ring 16 to easily pull the enclosure 11 and separate it from the structural plate layer.
[0051] See also Figure 6-8 Both ends of the inner wall of the first lattice column 1 are welded with sealing plates 17, the edges of the sealing plates 17 are in contact with the inner wall of the angle steel and the inner wall of the gusset plate 5, and are closer to the center of the first lattice column 1 than the enclosure 11. Specifically, the sealing plate 17 is assembled by welding two symmetrical plates, and the width of a single plate is smaller than the spacing between the lattice column gusset plates 5, so that the sealing plate 17 can be smoothly placed in the first lattice column 1 for welding. The sealing plate 17 can effectively prevent the concrete of the structural plate layer from entering the connection position of the first bolt 9 along the gap of the gusset plate 5 of the first lattice column 1 during pouring, thereby preventing the first bolt 9 from being unable to be smoothly screwed out.
[0052] Embodiment 2
[0053] A staggered pre-fixed lattice column for subway construction, such as Figure 1-11As shown, on the basis of Example 1, the difference from Example 1 is that the inner walls of the bottom end of the second lattice column 2 and the top end of the third lattice column are welded with inner connecting plates 6, and a middle connecting plate 8 with the same height as the inner connecting plate 6 is welded between adjacent angle steels, the position where the first lattice column 1 contacts the second lattice column 2 is connected with an outer connecting plate 7, and the position where the first lattice column 1 and the third lattice column 3 are connected is also connected with an outer connecting plate 7, and the first bolt 9 passes through the outer connecting plate 7, the inner connecting plate 6 and the middle connecting plate 8, and the connection of the lattice column is clamped by the mounting plate structure inside and outside between the first lattice column 1 and the second lattice column 2, so that the angle steel at the top end of the first lattice column 1 and the second lattice column 2 transmits pressure in the vertical direction. When the lattice column is hoisted, the connection between the second lattice column 2 at the top of the lattice column and the first lattice column 1 is subjected to shear force by the bare rod part of a large number of first bolts 9, which effectively avoids the lattice column from being disconnected.
[0054] See also Figure 1-8 The middle connecting plates 8 on the second lattice column 2 and the third lattice column 3 can be inserted between the adjacent angle steels of the first lattice column 1. Specifically, the middle connecting plates 8 welded between the adjacent angle steels of the second lattice column 2 and the third lattice column 3 can not only strengthen the structural strength of the ends of the second lattice column 2 and the third lattice column 3, but also when inserted between the angle steels of the first lattice column 1, the inner connecting plate 6 and the outer connecting plate 7 are connected to each other, and the outer connecting plate 7 and the inner connecting plate 6 clamp the end of the first lattice column 1 therebetween, which can also greatly improve the horizontal force strength of the lattice column and avoid the lattice column from bending at the connection.
[0055] Embodiment 3
[0056] A staggered pre-fixed lattice column for subway construction, such as Figure 1-11 As shown, on the basis of Example 2, the difference from Example 2 is that a connecting pipe 18 is connected between the sealing plates 17. Specifically, after the lattice column is installed, before the foundation pit of the subway station is excavated, under some construction conditions, stabilizing materials such as cement, soil, and gravel will be added to the pile holes where the lattice columns are located. The connecting pipe 18 between the sealing plates 17 serves to connect the stabilizing materials added to the pile holes, so that the stabilizing materials can be smoothly passed into the lowered lattice columns. The nut end of the first bolt 9 is sleeved with a columnar protective cap 10. Specifically, the protective cap 10 is a plastic shell, and the inner wall of the protective cap 10 is in close contact with the outer wall of the nut of the first bolt 9. The protective cap 10 is sleeved on the nut of the first bolt 9, which can effectively prevent the stabilizing materials from remaining in the thread of the first bolt 9, so that the first bolt 9 can be smoothly unscrewed after the protective cap 10 is removed. Specifically, after the foundation pit of the subway station is excavated, when the stabilizing materials in the lattice column are removed, the protective cap 10 is removed after the stabilizing materials around the protective cap 10 are removed.
[0057] The working principle of the present invention is as follows: the second lattice column 2 and the third lattice column 3 are connected to the top and bottom of the first lattice column 1 respectively, the inserting strip 12 of the enclosure 11 is inserted into the first lattice column 1 from the gap between the outer connecting plate 7 and the gusset plate 5 of the first lattice column 1 in the horizontal direction, and then the enclosure 11 is slid in the direction close to the gusset plate 5 in the vertical direction, at this time, the inserting strip 12 contacts the inner wall of the gusset plate 5, and then the plug-in block 14 on the enclosure 11 is pushed to be inserted between the outer connecting plate 7 and the enclosure 11, and the enclosure 11 is inserted into the gap between the outer connecting plate 7 and the enclosure 11. The edge of 11 is pressed tightly between the outer connecting plate 7 and the gusset plate 5, and then the remaining panels 11 are connected in this way, and then the second bolts 15 are connected between the panels 11 away from the first lattice column 1 to further strengthen the structural strength of the space formed by the panels 11. After the structural slab layer is poured, the plug-in block 14 is slid out from between the outer connecting plate 7 and the panels 11, and the panels 11 are pulled away from the first lattice column 1 and the gusset plate 5 to separate the concrete of the panels 11 from the structural slab layer, and then the panels 11 are tilted out. After removing the connectors between the first lattice column 1 and the second lattice column 2 and the third lattice column 3, the pits at both ends of the first lattice column 1 can be filled with concrete.
[0058] Although an embodiment of the present invention has been shown and described, this specific embodiment is only an explanation of the present invention and is not a limitation of the invention. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contribution as needed without departing from the principles and purpose of the present invention. However, as long as they are within the scope of the claims of the present invention, they are protected by patent law.
Claims
1. A lattice column for subway construction with dislocation pre-fixation, comprising a first lattice column (1) located in a structural plate layer, wherein the top and bottom ends of the first lattice column (1) are respectively connected to a second lattice column (2) and a third lattice column (3), wherein the first lattice column (1), the second lattice column (2) and the third lattice column all comprise four angle steels and a plurality of tie plates (5), characterized in that: A shroud (11) is clamped between the gusset plate (5) at the top end of the first lattice column (1) and the outer connecting plate (7) connected to the bottom end of the second lattice column (2); there are four shroud plates (11) located at the top end of the first lattice column (1), and the shroud plates are in an inverted cone-shaped structure; a similar shroud plate (11) is clamped between the gusset plate (5) at the bottom end of the first lattice column (1) and the outer connecting plate (7) connected to the top end of the third lattice column (3); the shroud plates (11) at the bottom end of the first lattice column (1) are The plate (11) is oriented in the opposite direction to the top end, the height between the enclosure plate (11) at the top end of the first lattice column (1) and the enclosure plate (11) at the bottom end is greater than the thickness of the structural plate layer, the inner wall of the bottom end of the second lattice column (2) and the top end of the third lattice column are welded with an inner connecting plate (6), and a middle connecting plate (8) with the same height as the inner connecting plate (6) is welded between adjacent angle steels, and the position where the first lattice column (1) contacts the second lattice column (2) is connected with an outer connecting plate (8). The connecting plate (7) is also connected to the position where the first lattice column (1) and the third lattice column (3) are connected. A first bolt (9) passes through the outer connecting plate (7), the inner connecting plate (6) and the middle connecting plate (8). The middle connecting plates (8) on the second lattice column (2) and the third lattice column (3) can be inserted between adjacent angle steels of the first lattice column (1). The outer connecting plate (7) and the inner connecting plate (6) can be connected to the inner connecting plate (6). The end of the first lattice column (1) is clamped between the two, the edge of the enclosure (11) is connected with an insertion strip (12) in the direction of the first lattice column (1) connecting plate (5), the enclosure (11) is slidably connected with an insertion block (14) in the opposite direction of the extension direction of the insertion strip (12), the insertion block (14) can be slidably inserted between the outer connecting plate (7) and the enclosure (11), and the adjacent enclosures (11) are fixedly connected at positions away from the structural plate layer by second bolts (15).
2. The displaced pre-fixed lattice column for subway construction according to claim 1 is characterized in that: Both ends of the inner wall of the first lattice column (1) are welded with sealing plates (17), the edges of the sealing plates (17) are in contact with the inner wall of the angle steel and the inner wall of the gusset plate (5), and are closer to the center of the first lattice column (1) than the enclosure plate (11).
3. The displaced pre-fixed lattice column for subway construction according to claim 2, characterized in that: A communication pipe (18) is connected between the sealing plates (17).
4. The displaced pre-fixed lattice column for subway construction according to claim 1, characterized in that: A bottom plate (19) is welded to the bottom end of the third lattice column (3), a positioning column (20) is welded to the bottom end of the center of the bottom plate (19), and a slanted plate for guiding is welded around the positioning column (20), and the bottom end of the bottom plate (19) is connected to a plurality of pads (21) via a third bolt (22).
5. The displaced pre-fixed lattice column for subway construction according to claim 4, characterized in that: The bottom end of the third lattice column (3) is plugged with a base (4), and the top end of the base (4) is welded with four angle steels whose projections overlap with the angle steels of the third lattice column (3), and multiple layers of mutually parallel positioning plates (23) are welded between the four angle steels of the base (4) along the height direction, and the positioning plates (23) are provided with notches that match the positioning columns (20).
6. The displaced pre-fixed lattice column for subway construction according to claim 1, characterized in that: The nut end of the first bolt (9) is sleeved with a columnar protective cap (10), and the inner wall of the protective cap (10) is in close contact with the outer wall of the nut of the first bolt (9).