A lever-type expansion joint for balancing straight pipe pressure
Through the design of the lever-type expansion joint, the combination of the working pipe assembly, the lever assembly and the balance pipe assembly is used to solve the problems of large axial size, high manufacturing cost and poor precision of the straight pipe pressure balance expansion joint in the existing technology, and achieve Improved accuracy and precision of pressure balancing.
Patent Information
- Application Number
- CN202411054763.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-08-02
AI Technical Summary
The existing straight pipe pressure balanced expansion joint has problems such as large axial size, high manufacturing cost and poor accuracy, especially the poor accuracy caused by the friction and compression nonlinearity of the disc spring group.
Lever-type expansion joint design is adopted. Through the combination of working pipe assembly, lever assembly, balance pipe assembly and pin assembly, the hose and exhaust parts are used to achieve pressure balance, and the lever assembly is used to provide a force arm to offset the pressure thrust generated by the medium. , ensuring balance accuracy.
The axial volume of the expansion joint is reduced, the manufacturing cost is reduced, the balance accuracy is improved, the friction and compression nonlinear problems of the disc spring group are avoided, and the accurate balance of the medium pressure thrust is achieved.
Smart Images

Figure CN118582619B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of metal bellows, and in particular to a lever-type expansion joint for balancing the pressure of a straight pipe. Background Art
[0002] The expansion joint with metal bellows as flexible element is mainly used to compensate for the change of pipe or equipment size caused by installation or thermal expansion and contraction, and is widely used in various industries. The core content of the design of the expansion joint is the design of the bellows. Generally speaking, the bellows used in the pipeline are in service under pressure. The resulting pressure thrust is calculated according to the formula F p =pA y Calculation, where: p is the bearing pressure; A y The effective area of the bellows. The pressure thrust is mostly borne by the main fixed pipe rack set at a certain position of the pipeline, and sometimes it may be borne by the equipment connected to the pipeline. Setting up the main fixed pipe rack will increase the investment cost. In order to resist the pressure thrust caused by the flowing medium in the pipeline, it is also necessary to increase the investment to strengthen the equipment foundation. Therefore, in order to reduce investment, the pressure thrust generated by the bellows is eliminated within the range of the expansion joint device, and the force is not applied to the pipeline and equipment. The typical balanced expansion joint structure in the prior art is as follows:
[0003] The classic straight tube pressure balanced expansion joint is introduced in US Patent US2485370A and Chinese Standard GB / T12777-2019. The expansion joint consists of three bellows, generally including two working bellows and one balancing bellows. The design criterion is that the effective area of the balancing bellows is twice that of the working bellows. The shortcomings of this type of expansion joint are long axial dimension and large axial volume, which leads to increased manufacturing cost. In addition, Chinese patent CN203231017U provides a method of balancing the pressure thrust of the bellows by using a disc spring group, but the shortcoming of the disc spring group is that the friction between the disc springs and the nonlinearity of compression make the accuracy poor. It can be seen that the straight tube thrust balanced expansion joints in the prior art all have shortcomings.
[0004] To this end, the present application provides a lever-type expansion joint for balancing the pressure of a straight pipe. Summary of the invention
[0005] 1. Technical issues to be resolved
[0006] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a lever-type expansion joint for balancing the pressure of a straight pipe, which solves the technical problems of the prior art.
[0007] (II) Technical solution
[0008] In order to achieve the above-mentioned purpose, the present invention provides a lever-type expansion joint for balancing the pressure of a straight pipe, and the technical scheme adopted includes: a working pipe assembly, which is arranged between straight pipes; a lever assembly, which is arranged on the side of the working pipe assembly; a working pin assembly, which is passed through the lever assembly, so that the lever assembly is connected to the working pipe assembly; a balancing pipe assembly, which is arranged above the working pipe assembly and connected to the lever assembly; a balancing pin assembly, which is passed through the lever assembly, so that the lever assembly is connected to the balancing pipe assembly; an exhaust member, which is arranged above the balancing pipe assembly; a hose, which is arranged between the working pipe assembly and the balancing pipe assembly, so that the working pipe assembly and the balancing pipe assembly are connected; wherein, the plane where the axial line of the balancing pipe assembly and the axial line of the working pipe assembly are located is the first plane, the plane where the axial line of the balancing pin assembly is located is the second plane, and the plane where the axial line of the working pin assembly is located is the third plane, the second plane is perpendicular to the first plane, and the third plane is perpendicular to the first plane; the midpoint of the line between the axial line of the balancing pipe assembly and the axial line of the working pipe assembly is equidistant from the second plane and the third plane.
[0009] Optionally, the working tube assembly and the balancing tube assembly are made of the same material, and have the same size as the balancing tube assembly.
[0010] Optionally, the working pipe assembly includes: a pipe body, which is arranged between the straight pipes and connected to the straight pipes; and a working bellows, which is arranged between the pipe bodies and connected to the pipe bodies.
[0011] Optionally, the lever assembly includes: a first connecting rod, which is arranged on a first side surface of the tube body and connected to the tube body; a second connecting rod, which is arranged on a second side surface of the tube body and connected to the tube body; wherein the first side surface and the second side surface are respectively arranged on two opposite sides of the tube body.
[0012] Optionally, the lever assembly also includes: a first cross bar, which is arranged on the first side and connected to the first connecting rod through a pin, the first cross bar is perpendicular to the first connecting rod, and the point at which the first cross bar is connected to the first connecting rod is the midpoint of the first connecting rod; a first limiting connecting rod, which is arranged on the first side and connected to both the first cross bar and the tube body; a second cross bar, which is arranged on the second side and connected to the second connecting rod through a pin, the second cross bar is perpendicular to the second connecting rod, and the point at which the second cross bar is connected to the second connecting rod is the midpoint of the second connecting rod; a second limiting connecting rod, which is arranged on the second side and connected to both the second cross bar and the tube body.
[0013] Optionally, the balancing pipe assembly includes: a first end pipe, arranged between the first connecting rod and the second connecting rod, and connected to both the first connecting rod and the second connecting rod; a second end pipe, arranged between the first limiting connecting rod and the second limiting connecting rod, and connected to both the first limiting connecting rod and the second limiting connecting rod; a balancing bellows, arranged between the first end pipe and the second end pipe, and connected to both the first end pipe and the second end pipe, and the size of the balancing bellows is the same as that of the working bellows; a first flat cover, arranged on the side of the first end pipe away from the balancing bellows, and connected to the first end pipe; a second flat cover, arranged on the side of the second end pipe away from the balancing bellows, and connected to the second end pipe.
[0014] Optionally, the lever assembly also includes: a first guide groove, which is opened in the first limit connecting rod, and the position of the first guide groove is set on the side of the working bellows; a second guide groove, which is opened in the first limit connecting rod, and the position of the second guide groove is set on the side of the balancing bellows; a first lever, which is arranged on the outside of the first limit connecting rod; a first movable groove, which is opened in the first lever, and a pin is used to pass through the first movable groove and the first guide groove, so that the first lever and the first limit connecting rod are connected to the tube body; a second movable groove, which is opened in the first lever, and a pin is used to pass through the second movable groove and the second guide groove, so that the first lever, the first limit connecting rod and The second end tube is connected; the third guide groove is opened in the second limiting connecting rod, and the position of the third guide groove is set on the side of the working bellows; the fourth guide groove is opened in the second limiting connecting rod, and the position of the fourth guide groove is set on the side of the balancing bellows; the second lever is arranged on the outside of the second limiting connecting rod; the third movable groove is opened in the second lever, and the pin shaft is passed through the third movable groove and the third guide groove, so that the second lever and the second limiting connecting rod are connected to the tube body; the fourth movable groove is opened in the second lever, and the pin shaft is passed through the fourth movable groove and the fourth guide groove, so that the second lever, the second limiting connecting rod are connected to the second end tube.
[0015] Optionally, the working pin assembly includes: a first connecting rod pin, which is passed through the first connecting rod and connected to the tube body; a second connecting rod pin, which is passed through the second connecting rod and connected to the tube body; a first lever pin, which is passed through the first lever and the first limiting connecting rod and connected to the tube body; a second lever pin, which is passed through the second lever and the second limiting connecting rod and connected to the tube body.
[0016] Optionally, the balancing pin assembly also includes: a third connecting rod pin, which is passed through the first connecting rod and connected to the first end tube; a fourth connecting rod pin, which is passed through the second connecting rod and connected to the first end tube; a third lever pin, which is passed through the first lever and the first limiting connecting rod and connected to the second end tube; a fourth lever pin, which is passed through the second lever and the second limiting connecting rod and connected to the second end tube.
[0017] Optionally, the length of the first guide groove along the axial direction of the tube body is equal to the sum of the displacements of the working bellows and the balancing bellows; the length of the second guide groove along the axial direction of the second end tube is equal to the sum of the displacements of the working bellows and the balancing bellows.
[0018] (III) Beneficial effects
[0019] The beneficial effects of the present invention are:
[0020] The present invention provides a lever-type expansion joint for balancing the pressure of a straight pipe. A working pipe assembly is arranged between straight pipes and is connected to the straight pipes. During use, a medium flows through the straight pipes, and the medium generates pressure in the straight pipes, that is, pressure exists in the working pipe assembly. A balancing pipe assembly arranged above the working pipe assembly is connected to the working pipe assembly through a hose, so that the circulating medium in the working pipe assembly flows into the balancing pipe assembly through the hose. In addition, since an exhaust member is arranged, the balancing pipe assembly can exhaust air from the exhaust member above when the circulating medium flows into the balancing pipe assembly, so that the pressure in the balancing pipe assembly is equal to the pressure in the working pipe assembly.
[0021] Moreover, due to the provision of a working pin assembly, the lever assembly is connected to the working tube assembly from both sides of the working tube assembly, and due to the provision of a balancing pin assembly, the lever assembly is connected to the balancing tube assembly from both sides of the balancing tube assembly. The provision of the lever assembly provides a force arm for the balancing tube assembly and the working tube assembly, and since the plane where the line between the axial line of the balancing tube assembly and the axial line of the working tube assembly is located is defined as the first plane, the plane where the axial line of the balancing pin assembly is located is the second plane, and the plane where the axial line of the working pin assembly is located is the third plane, the second plane is perpendicular to the first plane, so that the force arms provided by the lever assembly to both sides of the balancing tube assembly are equal, the third plane is perpendicular to the first plane, and the lever assembly is provided on both sides of the working tube assembly, so that the force arms provided by the lever assembly to both sides of the working tube assembly are equal, and since the distances from the midpoint of the line between the axial line of the balancing tube assembly and the axial line of the working tube assembly to the second plane and the third plane are equal, it is ensured that the force arm of the working tube assembly is equal to the force arm of the balancing tube assembly and has opposite directions.
[0022] Therefore, the pressure in the working tube assembly is equal to the pressure in the balancing tube assembly, thereby making the pressure thrust of the working tube assembly equal to the pressure thrust of the balancing tube assembly, and since the force arm of the working tube assembly is equal to the force arm of the balancing tube assembly, in the process of operation and use of the straight pipe pipeline, the balancing tube assembly in the present invention can balance and offset the pressure thrust of the working tube assembly caused by the circulating medium because the pressure thrust generated by the internal flowing medium is equal and the force arm provided by the lever assembly is equal and opposite in direction. On the one hand, the axial dimension of the balancing tube assembly is the same as that of the working tube assembly, so there is no need to increase the axial dimension in the expansion joint structure, which reduces the axial volume of the expansion joint and reduces the manufacturing cost; on the other hand, since the pressure between the inner cavity of the set balancing expansion joint and the inner cavity of the working expansion joint is equal, and the force arm provided by the lever assembly is equal and opposite in direction, the balancing tube assembly can be completely and accurately balanced and offset by the balancing tube assembly, which improves the balancing accuracy, and finally solves the technical problems of poor accuracy caused by the friction between the disc springs and the nonlinearity of compression.
[0023] Furthermore, the working tube assembly and the balancing tube assembly are made of the same material and have the same size. This arrangement makes the pressure thrust between the working tube assembly and the balancing tube assembly completely equal, that is, the balancing tube assembly can completely and accurately balance and offset the pressure thrust of the working tube assembly.
[0024] Furthermore, the working tube assembly and the balancing tube assembly are made of the same material and have the same size as the balancing tube assembly. This arrangement ensures that the pressure thrust generated by the circulating medium transmitted to the working tube assembly is equal to the pressure thrust transmitted to the balancing tube assembly, thereby increasing the accuracy of balancing the straight tube pressure through the lever assembly. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of the lever-type expansion joint of the present invention;
[0026] Figure 2 For Figure 1 A schematic cross-sectional view at HH of ;
[0027] Figure 3 It is a schematic diagram of the overall structure of the lever-type expansion joint from another angle of the present invention;
[0028] Figure 4 It is a schematic diagram of the structure of the lever-type expansion joint of the present invention when the working bellows is stretched;
[0029] Figure 5 It is a schematic diagram of the structure of the lever-type expansion joint of the present invention when the working bellows is compressed.
[0030] Description of reference numerals:
[0031] 1. First flat cover; 2. Straight pipe; 3. First end pipe; 4. Balance bellows; 5. Second end pipe; 6. Working pin assembly; 7. Lever assembly; 8. Balance pin assembly; 9. Exhaust member; 10. Second flat cover; 11. Working bellows; 12. Elastic retaining ring; 15. Hose; 16. Pipe body; 17. First plane; 18. Second plane; 19. Third plane; 20. First connecting rod; 21. Second connecting rod; 22. First cross bar; 23. First limit connecting rod; 24. Second cross bar; 25. Two limit links; 26, first guide groove; 27, second guide groove; 28, first lever; 29, first movable groove; 30, second movable groove; 31, third guide groove; 32, fourth guide groove; 33, second lever; 34, third movable groove; 35, fourth movable groove; 36, first connecting rod pin; 37, second connecting rod pin; 38, first lever pin; 39, second lever pin; 40, third connecting rod pin; 41, fourth connecting rod pin; 42, third lever pin; 43, fourth lever pin. DETAILED DESCRIPTION
[0032] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.
[0033] In order to better understand the above technical solution, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a clearer and more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0034] Embodiment:
[0035] An embodiment of the present invention provides a lever-type expansion joint for balancing the pressure of a straight pipe, such as Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5As shown, it includes: a working pipe assembly, which is arranged between the straight pipes 2; a lever assembly 7, which is arranged on the side of the working pipe assembly; a working pin assembly 6, which is passed through the lever assembly 7, so that the lever assembly 7 is connected to the working pipe assembly; a balancing pipe assembly, which is arranged above the working pipe assembly and connected to the lever assembly 7; a balancing pin assembly 8, which is passed through the lever assembly 7, so that the lever assembly 7 is connected to the balancing pipe assembly; an exhaust member 9, which is arranged above the balancing pipe assembly; a hose 15, which is arranged between the working pipe assembly and the balancing pipe assembly, so that the working pipe assembly The working tube assembly is connected with the balancing tube assembly; wherein, the plane where the axial line of the balancing tube assembly and the axial line of the working tube assembly lie is the first plane 17, the plane where the axial line of the balancing pin assembly 8 lies is the second plane 18, and the plane where the axial line of the working pin assembly 6 lies is the third plane 19, the second plane 18 is perpendicular to the first plane 17, and the third plane 19 is perpendicular to the first plane 17; the midpoint of the line between the axial line of the balancing tube assembly and the axial line of the working tube assembly is equidistant from the second plane 18 and the third plane 19.
[0036] Exemplarily, the two ends of the working tube assembly are connected to the straight pipe 2, the inner cavity of the working tube assembly circulates the medium, the balancing tube assembly is arranged above the working tube assembly, and the hose 15 is arranged between the working tube assembly and the balancing tube assembly. The hose 15 connects the inner cavity of the working tube assembly with the inner cavity of the balancing tube assembly, ensuring that the circulating medium can flow to the inner cavity of the balancing tube assembly through the hose 15, thereby making the pressure of the inner cavity of the working tube assembly equal to the pressure of the inner cavity of the balancing tube assembly. In addition, an exhaust member 9 is arranged above the balancing tube assembly, so that when the circulating medium flows from the working tube assembly to the balancing tube assembly, the original gas in the inner cavity of the balancing tube assembly is discharged from the exhaust member 9 above as soon as possible, thereby ensuring that the pressure of the inner cavity of the working tube assembly is equal to the pressure of the inner cavity of the balancing tube assembly. It is ensured that the pressure thrust of the working tube assembly can be completely and accurately balanced and offset by the balancing tube assembly. On the one hand, the axial dimension of the balancing tube assembly is the same as that of the working tube assembly, so there is no need to increase the axial dimension in the expansion joint structure, which reduces the axial volume of the expansion joint and reduces the manufacturing cost; on the other hand, since the pressure between the inner cavity of the balancing expansion joint and the inner cavity of the working expansion joint is equal, the lever arms provided by the lever assembly are equal and opposite in direction, the balancing tube assembly can be completely and accurately balanced and offset by the balancing tube assembly, thereby improving the balancing accuracy and ultimately solving the technical problems of poor accuracy caused by the friction between disc springs and the nonlinearity of compression.
[0037] Exemplarily, the lever assembly 7 is connected to the balancing pipe assembly through the balancing pin assembly 8. The balancing pin assembly 8 includes four balancing pins, which are horizontally passed through the connecting rod assembly and connected to the balancing pipe assembly. The four balancing pins are in the same plane, and the plane where the axial line of the balancing pin assembly 8 is located is the second plane 18. The lever assembly 7 is connected to the working pipe assembly through the working pin assembly 6. The working pin assembly 6 includes four working pins, which are horizontally passed through the connecting rod assembly and connected to the working pipe assembly. The four working pins are in the same plane, and the plane where the axial line of the working pin assembly 6 is located is the third plane 19. The midpoint of the line connecting the axial line of the balancing pipe assembly and the axial line of the working pipe assembly is equal to the distance from the second plane 18 and the third plane 19, so that the pressure thrust generated by the circulating medium transmitted to the working pipe assembly is equal to the pressure thrust transmitted to the balancing pipe assembly, thereby increasing the accuracy of balancing the pressure of the straight pipe 2 through the lever assembly 7.
[0038] Exemplarily, the hose 15 in this embodiment is a metal hose with a mesh sleeve. The metal hose with a mesh sleeve can adapt to the distance between the balancing pipe assembly and the working pipe assembly, and can ensure that the hose 15 has a certain strength to adapt to the pressure generated by the circulating medium and meet the multiple requirements of pressure resistance, displacement, and life.
[0039] Illustratively, the pin in the lever-type expansion joint in this embodiment is also equipped with an elastic retaining ring 12 during the connection process to facilitate the installation and fixation of the pin used in this embodiment. The specific material of the elastic retaining ring 12 is prior art and is not limited here.
[0040] In a possible embodiment, Figure 1 , Figure 2 and Figure 3 As shown, the working tube assembly and the balancing tube assembly are made of the same material and have the same size as the balancing tube assembly.
[0041] Exemplarily, since the working tube assembly and the balancing tube assembly are made of the same material and have the same size, such as the tube diameter, tube wall thickness, tube wall material and other parameters of the working tube assembly are exactly the same, which are not listed one by one here, and since the hose 15 connects the inner cavity of the working tube assembly with the inner cavity of the balancing tube assembly, this arrangement makes it possible for the size of the pressure thrust generated by the circulating medium transmitted to the working tube assembly to be equal to the size transmitted to the balancing tube assembly, thereby increasing the accuracy of balancing the pressure of the straight pipe 2 through the lever assembly 7.
[0042] In a possible embodiment, Figure 1 , Figure 2 and Figure 3As shown, the working pipe assembly includes: a pipe body 16, which is arranged between the straight pipe pipelines 2 and connected to the straight pipe pipelines 2; and a working bellows 11, which is arranged between the pipe bodies 16 and connected to the pipe bodies 16.
[0043] Exemplarily, the pipe body 16 and the straight pipes 2 at both ends are welded, and the connection between the working bellows 11 and the pipe bodies 16 at both ends is also welded to ensure the connection strength of the working pipe assembly.
[0044] In a possible embodiment, Figure 2 As shown, the lever assembly 7 includes: a first connecting rod 20, which is arranged on the first side of the tube body 16 and connected to the tube body 16; a second connecting rod 21, which is arranged on the second side of the tube body 16 and connected to the tube body 16; wherein the first side and the second side are respectively arranged on two opposite sides of the tube body 16.
[0045] Exemplarily, the first connecting rod 20 and the second connecting rod 21 are respectively arranged on both sides of the tube body 16, which can be understood as the first connecting rod 20 and the second connecting rod 21 are completely symmetrically arranged on both sides of the tube body 16. In this way, the force arm provided by the first connecting rod 20 on the first side is equal to the force arm provided by the second connecting rod 21 on the second side, which facilitates the balance pipe assembly to offset the pressure thrust of the working pipe assembly through the force arm provided by the connecting rod assembly.
[0046] In a possible embodiment, Figure 1 , Figure 3 , Figure 4 and Figure 5 As shown, the lever assembly 7 also includes: a first cross bar 22, which is arranged on the first side surface and connected to the first connecting rod 20 through a pin shaft, the first cross bar 22 is perpendicular to the first connecting rod 20, and the point where the first cross bar 22 and the first connecting rod 20 are connected is the midpoint of the first connecting rod 20; a first limiting connecting rod 23, which is arranged on the first side surface and connected to both the first cross bar 22 and the tube body 16; a second cross bar 24, which is arranged on the second side surface and connected to the second connecting rod 21 through a pin shaft, the second cross bar 24 is perpendicular to the second connecting rod 21, and the point where the second cross bar 24 and the second connecting rod 21 are connected is the midpoint of the second connecting rod 21; a second limiting connecting rod 25, which is arranged on the second side surface and connected to both the second cross bar 24 and the tube body 16.
[0047] Exemplarily, the first cross bar 22 and the first limit link 23 are integrally connected, and the first cross bar 22 and the first link 20 are rotatably connected by a pin. The point where the first cross bar 22 and the first link 20 are connected by the pin is point C, the point where the first link 20 and the tube body 16 are connected is point E, and the point where the first link 20 and the balance pipe assembly are connected is point A. Point C is defined as the midpoint between point A and point E, that is, AC=CE, and since the midpoint of the line connecting the axial line of the balance pipe assembly and the axial line of the working pipe assembly is at the same distance from the second plane 18 and the third plane 19, the plane where the first cross bar 22 is located and the plane where the midpoint of the line connecting the axial line of the balance pipe assembly and the axial line of the working pipe assembly is located are the same plane, thus ensuring that the force arm of the working pipe assembly is equal to the force arm of the balance pipe assembly and the direction is opposite, so that the pressure thrust of the inner cavity of the working pipe assembly due to the circulating medium can be completely balanced and offset by the balance pipe assembly.
[0048] In addition, the second cross bar 24, the second connecting rod 21 and the second limiting connecting rod 25 are the same as described above, but are only located on the second side surface of the tube body 16, and will not be described again here.
[0049] In a possible embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the balancing pipe assembly includes: a first end pipe 3, which is arranged between the first connecting rod 20 and the second connecting rod 21, and is connected to both the first connecting rod 20 and the second connecting rod 21; a second end pipe 5, which is arranged between the first limiting connecting rod 23 and the second limiting connecting rod 25, and is connected to both the first limiting connecting rod 23 and the second limiting connecting rod 25; a balancing bellows 4, which is arranged between the first end pipe 3 and the second end pipe 5, and is connected to both the first end pipe 3 and the second end pipe 5, and the size of the balancing bellows 4 is the same as that of the working bellows 11; a first flat cover 1, which is arranged on the side of the first end pipe 3 away from the balancing bellows 4, and is connected to the first end pipe 3; a second flat cover 10, which is arranged on the side of the second end pipe 5 away from the balancing bellows 4, and is connected to the second end pipe 5.
[0050] Exemplarily, the first flat cover 1, the first end pipe 3, the balancing bellows 4, the second end pipe 5 and the second flat cover 10 are welded to ensure the strength of the connection, increase the compressive strength of the balancing pipe assembly, and thereby increase the service life of the lever-type expansion joint in this embodiment.
[0051] In a possible embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5As shown, the lever assembly 7 also includes: a first guide groove 26, which is opened in the first limit connecting rod 23, and the position of the first guide groove 26 is set on the side of the working bellows 11; a second guide groove 27, which is opened in the first limit connecting rod 23, and the position of the second guide groove 27 is set on the side of the balancing bellows 4; a first lever 28, which is arranged on the outside of the first limit connecting rod 23; a first movable groove 29, which is opened in the first lever 28, and the first movable groove 29 and the first guide groove 26 are passed through by a pin shaft, so that the first lever 28, the first limit connecting rod 23 and the pipe body 16 are connected; a second movable groove 30, which is opened in the first lever 28, and the second movable groove 30 and the second guide groove 27 are passed through by a pin shaft, so that the first lever 28, the first limit connecting rod 23 and the second The end tube 5 is connected; the third guide groove 31 is opened in the second limit link 25, and the position of the third guide groove 31 is set on the side of the working bellows 11; the fourth guide groove 32 is opened in the second limit link 25, and the position of the fourth guide groove 32 is set on the side of the balancing bellows 4; the second lever 33 is arranged on the outer side of the second limit link 25; the third movable groove 34 is opened in the second lever 33, and the third movable groove 34 and the third guide groove 31 are passed through by the pin shaft, so as to connect the second lever 33 and the second limit link 25 with the tube body 16; the fourth movable groove 35 is opened in the second lever 33, and the fourth movable groove 35 and the fourth guide groove 32 are passed through by the pin shaft, so as to connect the second lever 33 and the second limit link 25 with the second end tube 5.
[0052] Exemplarily, the two ends of the first limit link 23 are respectively connected to the working pipe assembly and the balancing pipe assembly, and a first guide groove 26 is provided at the middle position of the first limit link 23 corresponding to the side of the pipe body 16, and the distance between the middle position and the upper edge of the pipe body 16 is equal to the distance between the middle position and the lower edge of the pipe body 16. With this arrangement, the fitting area between the first limit link 23 and the pipe body 16 is maximized. On the one hand, the connection between the first limit link 23 and the pipe body 16 is made stronger, thereby increasing the stability of the lever-type straight pipe pressure balancing expansion joint in this embodiment during use. On the other hand, due to the increase in the contact area, the pressure thrust brought by the circulating medium is maximized through the pipe wall of the pipe body 16, so that the balancing pipe assembly can balance and offset the most pressure thrust.
[0053] In addition, the third guide groove 31 is the same as the first guide groove 26, and is only provided on the second side surface of the working bellows 11, which will not be described in detail here.
[0054] The fourth guide groove 32 is the same as the second guide groove 27, and is only provided on the second side surface of the working bellows 11, which will not be described in detail here.
[0055] A total of three pins are provided on the first lever 28, such as Figure 1 and Figure 3As shown, the top balancing pin passes through the second movable groove 30 and the second guide groove 27, and then is connected to the second end tube 5, the middle pin connects the first lever 28 and the first limit link 23, and the bottom working pin passes through the first movable groove 29 and the first guide groove 26, and then is connected to the tube body 16. Among them, the top pin is located at point B, the middle pin is located at point D, and the bottom pin is located at point F. Since the midpoint of the line connecting the axial line of the balancing tube assembly and the axial line of the working tube assembly is the same distance from the second plane 18 and the third plane 19, point D is the midpoint between point B and point F, that is, BD=DF. In this arrangement, the force arm provided by the first lever 28 to the working tube assembly is equal to the force arm provided by the first lever 28 to the balancing tube assembly, that is, BD=DF, and the force directions of the force arms are opposite, thereby ensuring that the pressure thrust of the working tube assembly can be completely and accurately balanced and offset by the balancing tube assembly. There is no need to add additional components to the expansion joint structure, and the technical problem of poor precision caused by the friction between the disc springs and the nonlinearity of compression can be well solved.
[0056] In addition, the second lever 33 is the same as the first lever 28 , and is only disposed on the second side surface of the tube body 16 , which will not be described in detail herein.
[0057] In a possible embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the working pin assembly 6 includes: a first connecting rod pin 36, which is passed through the first connecting rod 20 and connected to the tube body 16; a second connecting rod pin 37, which is passed through the second connecting rod 21 and connected to the tube body 16; a first lever pin 38, which is passed through the first lever 28 and the first limiting link 23 and connected to the tube body 16; a second lever pin 39, which is passed through the second lever 33 and the second limiting link 25 and connected to the tube body 16.
[0058] The position of the first connecting rod pin 36 corresponds to the second connecting rod pin 37, which are respectively located on both sides of the tube body 16. The position of the first lever pin 38 corresponds to the second lever pin 39, which are respectively located on both sides of the tube body 16. The first connecting rod pin 36, the second connecting rod pin 37, the first lever pin 38 and the second lever pin 39 are all horizontally arranged, and the four pins are in the same plane, i.e., the third plane 19, thereby ensuring that the force arms on both sides of the working tube assembly are equal, thereby providing a guarantee for the balancing tube assembly to balance and offset the pressure thrust of the working tube assembly.
[0059] In a possible embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the balancing pin assembly 8 also includes: a third connecting rod pin 40, which is passed through the first connecting rod 20 and connected to the first end tube 3; a fourth connecting rod pin 41, which is passed through the second connecting rod 21 and connected to the first end tube 3; a third lever pin 42, which is passed through the first lever 28 and the first limiting link 23, and connected to the second end tube 5; a fourth lever pin 43, which is passed through the second lever 33, the second limiting link 25, and connected to the second end tube 5.
[0060] The position of the third connecting rod pin 40 corresponds to the fourth connecting rod pin 41, and they are respectively located on both sides of the first end tube 3. The position of the third lever pin 42 corresponds to the fourth lever pin 43, and they are respectively located on both sides of the second end tube 5. The third connecting rod pin 40, the fourth connecting rod pin 41, the third lever pin 42 and the fourth lever pin 43 are all horizontally arranged, and the four pins are in the same plane, i.e., the second plane 18, thereby ensuring that the force arms on both sides of the balancing pipe assembly are equal, thereby providing a guarantee for the balancing pipe assembly to balance and offset the pressure thrust of the working pipe assembly.
[0061] In a possible embodiment, Figure 4 and Figure 5 As shown, the length of the first guide groove 26 along the axial direction of the tube body 26 is equal to the sum of the displacement of the working bellows 11 and the displacement of the balancing bellows 4; the length of the second guide groove 27 along the axial direction of the second end tube 5 is equal to the sum of the displacement of the working bellows 11 and the displacement of the balancing bellows 4.
[0062] For example, Figure 4 As shown, when the working bellows 11 is in a tensile state and the balancing bellows 4 is in a compressed state, the length of the first guide groove 26 along the axial direction of the tube body 16 is equal to the sum of the tensile displacement of the working bellows 11 and the compressive displacement of the balancing bellows 4, and the setting direction of the first guide groove 26 is the same as the axial direction of the working bellows 11. With this arrangement, when the working bellows 11 is stretched, the balancing bellows 4 is correspondingly compressed, and the end of the first lever 28 connected to the working tube assembly moves along the first guide groove 26 in a direction away from the working bellows 11. At the same time, correspondingly, the end of the first lever 28 connected to the balancing tube assembly moves along the second guide groove 27 in a direction close to the balancing bellows 4, and the first lever 28 rotates with the pin at point D as the rotating axis, so that the length of the first guide groove 26 can meet the tensile requirement of the working bellows 11. And, in Figure 4 Points B2 and F2 are limit displacement points, i.e., point B2 limits the maximum compression displacement of the balancing bellows 4, and point F2 limits the maximum tensile displacement of the working bellows 11, thereby limiting the displacement of the balancing bellows 4 and the working bellows 11 within a reasonable range, thereby ensuring the service life of the balancing bellows 4 and the working bellows 11.
[0063] In addition, the third guide groove 31 is the same as the first guide groove 26 and will not be described in detail herein.
[0064] For example, Figure 5 As shown, when the working bellows 11 is in a compressed state and the balancing bellows 4 is in a stretched state, the length of the second guide groove 27 along the axial direction of the second end tube 5 is equal to the sum of the stretching displacement of the balancing bellows 4 and the compressing displacement of the working bellows, and the setting direction of the second guide groove 27 is the same as the axial direction of the balancing bellows 4. With this setting, when the working bellows 11 is compressed, the balancing bellows 4 is stretched accordingly, and the end of the first lever 28 connected to the working tube assembly moves along the first guide groove 26 toward the working bellows 11. At the same time, correspondingly, the end of the first lever 28 connected to the balancing tube assembly moves along the second guide groove 27 toward the direction away from the balancing bellows 4. In other words, the first lever 28 rotates with the pin at point D as the rotating axis, so that the length of the second guide groove 27 can meet the compression requirement of the balancing bellows 4. And, in Figure 5 Points B1 and F1 are limit displacement points, that is, point B1 limits the maximum tensile displacement of the balancing bellows 4, and point F1 limits the maximum compressive displacement of the working bellows 11, thereby ensuring the service life of the balancing bellows 4 and the working bellows 11.
[0065] In addition, the fourth guide groove 32 is the same as the second guide groove 27 and will not be described in detail here.
[0066] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0067] In the present invention, unless otherwise clearly specified and limited, when a first feature is “on” or “below” a second feature, it may be that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, when a first feature is “above”, “above” or “above” a second feature, it may be that the first feature is directly above or obliquely above the second feature, or it may simply mean that the first feature is higher in level than the second feature. When a first feature is “below”, “below” or “below” a second feature, it may be that the first feature is directly below or obliquely below the second feature, or it may simply mean that the first feature is lower in level than the second feature.
[0068] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may alter, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A lever-type expansion joint used to balance the pressure of a straight pipe. It is characterized in that include: A working pipe assembly is arranged between the straight pipes; A lever assembly, arranged on a side of the working tube assembly; A working pin assembly is inserted into the lever assembly to connect the lever assembly with the working tube assembly; A balance pipe assembly is disposed above the working pipe assembly and connected to the lever assembly; A balancing pin assembly is inserted into the lever assembly to connect the lever assembly with the balancing pipe assembly; An exhaust member, disposed above the balance pipe assembly; A hose, disposed between the working pipe assembly and the balancing pipe assembly, so that the working pipe assembly and the balancing pipe assembly are connected; The plane where the axial line of the balancing tube assembly and the axial line of the working tube assembly are located is the first plane, the plane where the axial line of the balancing pin assembly is located is the second plane, and the plane where the axial line of the working pin assembly is located is the third plane. The second plane is perpendicular to the first plane, and the third plane is perpendicular to the first plane. The distances from the midpoint of the line between the axial line of the balance tube assembly and the axial line of the working tube assembly to the second plane and the third plane are equal; The working tube assembly comprises: The pipe body is arranged between the straight pipes and is connected with the straight pipes; A working bellows, arranged between the tube bodies and communicated with the tube bodies; The lever assembly comprises: A first connecting rod, disposed on a first side surface of the tube body and connected to the tube body; A second connecting rod is disposed on a second side surface of the tube body and connected to the tube body; Wherein, the first side surface and the second side surface are respectively arranged on two opposite side surfaces of the tube body; The lever assembly further comprises: a first cross bar, disposed on the first side surface and connected to the first connecting rod through a pin, the first cross bar being perpendicular to the first connecting rod, and a point where the first cross bar is connected to the first connecting rod being a midpoint of the first connecting rod; A first limiting connecting rod is arranged on the first side surface and is connected to the first cross bar and the tube body; a second cross bar, disposed on the second side surface and connected to the second connecting rod through a pin, the second cross bar being perpendicular to the second connecting rod, and a point where the second cross bar is connected to the second connecting rod being a midpoint of the second connecting rod; A second limiting connecting rod is arranged on the second side surface and is connected to the second cross bar and the tube body; The balance pipe assembly comprises: A first end tube is disposed between the first connecting rod and the second connecting rod and is connected to both the first connecting rod and the second connecting rod; A second end tube is disposed between the first limiting link and the second limiting link, and is connected to both the first limiting link and the second limiting link; A balancing bellows, disposed between the first end tube and the second end tube, and connected to both the first end tube and the second end tube, the size of the balancing bellows being the same as that of the working bellows; The lever assembly further comprises: A first guide groove is formed on the first limit connecting rod, and the first guide groove is located on a side surface of the working bellows; A second guide groove is provided on the first limit connecting rod, and the second guide groove is provided on a side surface of the balancing bellows; A first lever, arranged on the outer side of the first limiting link; A first movable groove is provided in the first lever, and a pin is used to pass through the first movable groove and the first guide groove, so that the first lever, the first limiting connecting rod and the tube body are connected; A second movable groove is provided in the first lever, and a pin is passed through the second movable groove and the second guide groove, thereby connecting the first lever, the first limiting connecting rod and the second end tube; A third guide groove is provided on the second limit connecting rod, and the third guide groove is provided on the side of the working bellows; a fourth guide groove, which is provided on the second limit connecting rod and is located on a side surface of the balancing bellows; A second lever, arranged on the outer side of the second limiting link; A third movable groove is provided on the second lever, and a pin is passed through the third movable groove and the third guide groove, so that the second lever, the second limiting connecting rod and the tube body are connected; The fourth movable groove is formed in the second lever, and a pin shaft is used to pass through the fourth movable groove and the fourth guide groove, thereby connecting the second lever, the second limiting connecting rod and the second end tube.
2. The lever-type expansion joint for balancing the straight pipe pressure as claimed in claim 1, Features: The working pipe assembly and the balancing pipe assembly are made of the same material; The working pipe assembly and the balancing pipe assembly have the same size.
3. The lever-type expansion joint for balancing straight pipe pressure as claimed in claim 1, It is characterized in that The balance pipe assembly comprises: A first flat cover is disposed on a side of the first end tube away from the balancing bellows and connected to the first end tube; The second flat cover is arranged on the side of the second end pipe away from the balancing bellows and is connected to the second end pipe.
4. The lever-type expansion joint for balancing straight pipe pressure as claimed in claim 1, It is characterized in that The working pin assembly comprises: A first connecting rod pin is passed through the first connecting rod and connected to the tube body; A second connecting rod pin is passed through the second connecting rod and connected to the tube body; A first lever pin is passed through the first lever and the first limit connecting rod and is connected to the tube body; The second lever pin is passed through the second lever and the second limiting connecting rod and is connected to the tube body.
5. The lever-type expansion joint for balancing the straight pipe pressure as claimed in claim 4, Features: The balancing pin assembly also includes: A third connecting rod pin is passed through the first connecting rod and connected to the first end tube; A fourth connecting rod pin is passed through the second connecting rod and connected to the first end tube; A third lever pin is passed through the first lever and the first limit connecting rod and is connected to the second end tube; The fourth lever pin is passed through the second lever and the second limit connecting rod and is connected to the second end tube.
6. The lever-type expansion joint for balancing straight pipe pressure as claimed in claim 1, Features: The length of the first guide groove along the axial direction of the tube body is equal to the sum of the displacement of the working bellows and the displacement of the balancing bellows; The length of the second guide groove along the axial direction of the second end tube is equal to the sum of the displacement of the working bellows and the displacement of the balancing bellows.