Power distribution prediction method and system based on association rule analysis

By analyzing multi-source data through association rules, identifying power consumption patterns and combining power load constraint information, it solves the accuracy problem caused by traditional power distribution forecasting relying on a single data source, and achieves more accurate power demand forecasting and distribution.

CN118586677BActive Publication Date: 2024-10-29ELECTRIC POWER RES INST STATE GRID SHANXI ELECTRIC POWER +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411057390.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-10-29
Estimated Expiration
2044-08-02

AI Technical Summary

Technical Problem

Traditional power distribution forecasting methods rely on a single data source, are difficult to accurately reflect complex power consumption patterns, and cannot fully capture the impact of multiple external factors on power demand.

Method used

A method based on association rule analysis is used to identify power influencing factors through multiple data sources, extract power consumption patterns, perform cluster analysis and association mining, build a time series model, and formulate a power distribution plan based on power load constraint information.

Benefits of technology

It improves the accuracy of power distribution, can more accurately identify complex power consumption patterns, and improves the accuracy of power demand forecasting and the flexibility of power distribution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118586677B_ABST
    Figure CN118586677B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for predicting power distribution based on association rule analysis, and relates to the technical field of power distribution. The method comprises: performing data identification based on multiple data sources according to power influencing factors to obtain a non-current collection data set; analyzing the non-current collection data set in combination with a power consumption trend chart to extract multiple power consumption patterns; clustering the non-current collection data set to generate multiple power consumption features; performing association mining on the non-current collection data set to generate an association rule set; synchronizing real-time power consumption data to a time series model to generate a power demand forecast value; formulating a power distribution plan based on the association rule set combined with the power demand forecast value. The method solves the technical problem that the traditional power distribution forecast relies on a single data source, which makes it difficult to accurately reflect complex power consumption patterns. By analyzing multi-source data through association rules, the power consumption pattern is accurately identified, and the technical effect of improving the accuracy of power distribution is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power distribution, and in particular to a power distribution prediction method and system based on association rule analysis. Background Art

[0002] With the acceleration of urbanization, the continuous expansion of industrial production and the continuous improvement of residents' living standards, electricity demand has become diversified, complex and dynamic. This change has put forward higher requirements on the power distribution system, requiring more accurate, efficient and flexible forecasting and scheduling capabilities. Traditional power distribution forecasting methods mainly rely on direct monitoring data of the power system, such as physical quantities such as current and voltage, but these data can only reflect the immediate state of the power system and it is difficult to fully capture the various external factors that affect changes in power demand. For example, sudden changes in weather conditions, cyclical fluctuations in economic activities, sudden social events, and personalized differences in user behavior may have a significant impact on power demand. Therefore, it is often difficult to accurately reflect the actual situation and future trends of power demand by predicting based on a single data source. Summary of the invention

[0003] The present application provides a method and system for predicting power distribution based on association rule analysis, which solves the technical problem that traditional power distribution prediction relies on a single data source, making it difficult to accurately reflect complex power consumption patterns.

[0004] In view of the above problems, the present application provides a power distribution prediction method and system based on association rule analysis.

[0005] In a first aspect of the present application, a method for predicting power distribution based on association rule analysis is provided, the method comprising:

[0006] Based on multiple data sources, data identification is performed according to power influencing factors to obtain a non-current collection data set; the non-current collection data set is analyzed in combination with a power consumption trend chart to extract multiple power consumption patterns; cluster analysis is performed on the non-current collection data set based on the multiple power consumption patterns, and multiple power consumption features are generated according to the cluster analysis results; association mining is performed on the non-current collection data set according to the multiple power consumption features to generate an association rule set; a time series model is constructed, and real-time power consumption data is synchronized to the time series model to generate a power demand forecast value; power load constraint information is introduced, and a power distribution plan is formulated based on the association rule set combined with the power demand forecast value.

[0007] A second aspect of the present application provides a power distribution prediction system based on association rule analysis, the system comprising:

[0008] A data identification module, the data identification module is used to perform data identification according to power influencing factors based on multiple data sources to obtain a non-current collection data set; a first analysis module, the first analysis module is used to analyze the non-current collection data set in combination with a power consumption change trend chart to extract multiple power consumption patterns; a second analysis module, the second analysis module is used to perform cluster analysis on the non-current collection data set based on the multiple power consumption patterns, and generate multiple power consumption characteristics according to the cluster analysis results; a data mining module, the data mining module is used to perform association mining on the non-current collection data set according to the multiple power consumption characteristics to generate an association rule set; a model construction module, the model construction module is used to construct a time series model, synchronize real-time power consumption data to the time series model, and generate a power demand forecast value; a plan formulation module, the plan formulation module is used to introduce power load constraint information, and formulate a power distribution plan based on the association rule set combined with the power demand forecast value.

[0009] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0010] First, data is identified based on multiple data sources according to the power influencing factors to obtain a non-current collection data set. Then, the non-current collection data set is analyzed in combination with the power consumption trend chart to extract multiple power consumption patterns. Then, cluster analysis is performed on the non-current collection data set based on multiple power consumption patterns, and multiple power consumption features are generated according to the cluster analysis results. Next, association mining is performed on the non-current collection data set based on multiple power consumption features to generate an association rule set. By constructing a time series model, the real-time power consumption data is synchronized to the time series model to generate a power demand forecast value. Finally, the power load constraint information is introduced, and a power distribution plan is formulated based on the association rule set combined with the power demand forecast value. The technical problem that the traditional power distribution forecast relies on a single data source and is difficult to accurately reflect the complex power consumption pattern is solved. Multi-source data is analyzed through association rules to accurately identify the power consumption pattern, achieving the technical effect of improving the accuracy of power distribution. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0012] Figure 1 A schematic diagram of a flow chart of a power distribution prediction method based on association rule analysis provided in an embodiment of the present application;

[0013] Figure 2A schematic diagram of the structure of a power distribution prediction system based on association rule analysis provided in an embodiment of the present application.

[0014] Explanation of the accompanying drawings: data identification module 11, first analysis module 12, second analysis module 13, data mining module 14, model building module 15, plan formulation module 16. DETAILED DESCRIPTION

[0015] The present application solves the technical problem that traditional power distribution prediction relies on a single data source and is difficult to accurately reflect complex power consumption patterns by providing a power distribution prediction method and system based on association rule analysis.

[0016] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0017] It should be noted that the terms "including" and "having" are intended to cover non-exclusive inclusions. For example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or modules that are not explicitly listed or are inherent to these processes, methods, products or devices.

[0018] Embodiment 1, as Figure 1 As shown, the present application provides a power distribution prediction method based on association rule analysis, wherein the method includes:

[0019] Based on multiple data sources, data is identified according to power influencing factors to obtain a non-current acquisition data set.

[0020] Power influencing factors include, but are not limited to, weather conditions (such as temperature, humidity, wind speed, etc.), socioeconomic factors (such as GDP growth rate, population migration, changes in industrial structure, etc.), holidays and special events (such as large-scale events, natural disasters, etc.), user behavior patterns (such as electricity usage habits, energy-saving awareness, etc.), and technological innovations (such as the development of smart grids and distributed energy), etc. Data is obtained from multiple data sources including meteorological observation stations, statistics bureaus, energy bureaus, power companies' own systems (such as user management systems, marketing systems, etc.), social media platforms, and IoT sensor networks, and data is identified according to power influencing factors, that is, according to the definition and characteristics of power influencing factors, the data is screened and extracted to form a non-current collection data set, which will serve as the basis for subsequent analysis to explore the inherent laws and correlations of changes in power demand.

[0021] Furthermore, data is identified based on multiple data sources according to power influencing factors to obtain a non-current acquisition data set, and the method includes:

[0022] Non-current data are collected according to multiple data sources to obtain multiple non-current data; impact tests are performed based on power operation characteristics to generate multiple impact test results; weight training is performed according to the multiple impact test results to generate power impact factors; the power impact factors are used as indexes to identify the multiple non-current data to obtain the non-current collection data set.

[0023] Preferably, indirect current data related to power operation are collected from multiple different data sources (such as weather stations, statistics bureaus, social media, power companies' own systems, etc.), including meteorological data such as temperature, humidity, wind speed, socioeconomic data such as GDP growth rate and population distribution, user behavior data such as user feedback and behavior patterns, and power-related data such as historical power consumption and electricity prices. Although these data do not directly reflect current, they have an important impact on power demand; using historical data and professional knowledge, a series of impact tests (such as correlation analysis, regression analysis, time series analysis and other statistical methods) are designed to evaluate the impact of different non-current data on power operation characteristics (such as power consumption, load curve, peak-to-valley difference, etc.). Through testing, the impact of each non-current data on power can be quantified. The influence degree of power operation characteristics is calculated, and then multiple impact test results are obtained; based on the results of the impact test, weight training is carried out. The purpose of weight training is to assign a reasonable weight to each non-current data to reflect its importance in power operation. Optimization algorithms such as gradient descent method and genetic algorithm can be used to minimize the prediction error or maximize the model performance. Through training, a set of weight values ​​of power influencing factors can be obtained; the power influencing factors obtained by training are used as indexes to identify multiple non-current data, that is, according to the weights of the power influencing factors, non-current data that have a greater impact on power operation are selected and combined into a non-current acquisition data set. The non-current acquisition data set will serve as the basis for subsequent power demand forecasting, power distribution and other work.

[0024] The non-current collection data set is combined with the power consumption change trend chart for analysis to extract multiple power consumption patterns.

[0025] Based on the electricity consumption data, the electricity consumption trend chart is drawn. The electricity consumption trend chart shows the change of electricity consumption over time, which can intuitively reflect the seasonality, periodicity of electricity demand and the impact of emergencies on electricity consumption. The non-current collection data set is combined with the electricity consumption trend chart for in-depth data analysis. By analyzing the correlation between different data sources, the key factors affecting electricity consumption and their mechanism of action can be revealed, and then representative and repeatable electricity consumption behavior characteristics, namely electricity consumption patterns, can be extracted from the data. The electricity consumption pattern reflects the characteristics of electricity consumption behavior in different user groups, different time periods or different situations. For example, the electricity consumption pattern of residential users may be affected by factors such as weather and holidays, while the electricity consumption pattern of industrial users may be closely related to factors such as production cycles and market demand.

[0026] A cluster analysis is performed on the non-current collection data set based on the multiple power usage patterns, and multiple power usage features are generated according to the cluster analysis results.

[0027] Based on multiple electricity consumption patterns, cluster analysis is performed on non-current collection data sets to identify the electricity consumption characteristics of different industries and regions. Based on the cluster analysis results, multiple electricity consumption features are generated. These features represent the electricity consumption behavior characteristics of different user groups, different time periods or different situations.

[0028] Furthermore, cluster analysis is performed on the non-current collection data set based on the multiple power usage modes, and multiple power usage features are generated according to the cluster analysis results. The method includes:

[0029] Based on the multiple power consumption patterns, power consumption behavior parameters, power consumption load parameters, and power consumption time parameters are defined; the power consumption behavior parameters, the power consumption load parameters, and the power consumption time parameters are combined, k cluster numbers are randomly selected as initial cluster centers, and multiple cluster centers are generated; the non-current acquisition data set is dynamically iterated according to the multiple cluster centers, and divided into multiple cluster clusters according to the iteration results; power consumption analysis is performed based on the multiple cluster clusters to generate the multiple power consumption features.

[0030] Preferably, based on multiple power consumption patterns, power consumption behavior parameters, power consumption load parameters, and power consumption time parameters are defined. The power consumption behavior parameters describe the user's power consumption habits and behavior patterns, such as the type of power consumption equipment, power consumption time period preference, and the implementation of energy-saving measures. The power consumption load parameters reflect the user's power demand and load characteristics, such as maximum load, average load, load rate, load curve, etc. The power consumption time parameters describe the user's power consumption in different time periods, such as the power consumption and its proportion during peak hours, off-peak hours, and valley hours. The power consumption behavior parameters, power consumption load parameters, and power consumption time parameters are combined to form a multi-dimensional data set, and then k clusters are randomly selected. The number of clusters is used as the initial cluster center, and k is a preset value that determines the number of clusters in the final clustering result. According to the selected cluster center, the non-current acquisition data set is dynamically iterated and clustered. After dynamic iteration, the non-current acquisition data set is divided into multiple clusters, and each cluster represents a class of users or time periods with similar power consumption characteristics. An in-depth power consumption analysis is performed on each cluster to generate multiple power consumption characteristics, including power consumption behavior characteristics such as the type of main power consumption equipment, power consumption time distribution, power load characteristics such as maximum load, average load, load rate, etc., and power consumption time characteristics such as power consumption and its proportion during peak hours, off-peak hours, and valley hours.

[0031] Furthermore, dynamically iterating the non-current acquisition data set according to the multiple cluster centers and dividing it into multiple clusters according to the iteration results, the method includes:

[0032] The non-current acquisition data set is randomly extracted without replacement to determine the first non-current acquisition data; the distance from the first non-current acquisition data to the multiple cluster centers is calculated, and the multiple data distances are screened for the minimum value to obtain the first cluster center; the first non-current acquisition data is assigned to the cluster of the first cluster center, and it is iterated until each non-current acquisition data in the non-current acquisition data set is traversed and stopped; the data mean is calculated for the multiple cluster centers, the multiple cluster centers are updated, and multiple cluster update centers are generated, and it is determined whether the update values ​​of the multiple cluster update centers are less than a preset floating threshold; if the update values ​​of the multiple cluster update centers are greater than or equal to the preset floating threshold, a dynamic adjustment instruction is generated, and the multiple cluster update centers are iteratively calculated according to the dynamic adjustment instruction until the update values ​​of the multiple cluster update centers are less than the preset floating threshold and stopped; if the update values ​​of the multiple cluster update centers are less than the preset floating threshold, it is regarded as cluster convergence, and the multiple cluster clusters are generated.

[0033] Preferably, a non-current acquisition data set is randomly extracted without replacement, a data point is selected as the first non-current acquisition data, the distance from the first non-current acquisition data to all preset cluster centers is calculated, the minimum value is found among these distances, and the corresponding cluster center is the first cluster center of the data point; the first non-current acquisition data is assigned to the cluster of the first cluster center, and this process is repeated to traverse each non-current acquisition data point in the data set, each time the data point is assigned to its nearest cluster center, and the data in the cluster is updated; when all data points are assigned to the corresponding clusters, the data in each cluster is mean calculated to update the center position of the cluster, and multiple cluster update centers are generated, and the cluster update center is based on the mean of all data points in the current cluster; the update value of each cluster update center (i.e., the new cluster) is determined The difference between the cluster center and the original cluster center) is less than the preset floating threshold. If all updated values ​​are less than the threshold, it is considered that the clustering process has converged and the clustering result is stable. If the updated value of any cluster update center is greater than or equal to the preset floating threshold, a dynamic adjustment instruction is generated. According to the dynamic adjustment instruction, the cluster update center is further iterated. In each iteration, the distance from each data point to all cluster centers is recalculated, the data points are redistributed, and the cluster center is updated again. This process is repeated until the updated values ​​of all cluster centers are less than the preset floating threshold. When the clustering converges, the data set is divided into multiple cluster clusters according to the final cluster center. Each cluster cluster contains a group of non-current collection data with similar characteristics. These characteristics reflect different power consumption behaviors, load characteristics or time patterns.

[0034] The non-current collection data set is subjected to association mining according to the multiple power consumption characteristics to generate an association rule set.

[0035] Association mining is performed on non-current collection data sets based on multiple electricity consumption features to generate association rule sets.

[0036] Furthermore, the method of performing association mining on the non-current collection data set according to the multiple power consumption characteristics to generate an association rule set includes:

[0037] The plurality of power consumption characteristics are discretized to generate a plurality of discrete intervals; the non-current collection data set is traversed and converted based on the plurality of discrete intervals to construct a plurality of non-current collection time zone data; an association rule mining algorithm is used to perform frequent item calculations on the plurality of non-current collection time zone data to generate a frequent item set; and the association rule set is generated by combining the frequent item set with a confidence threshold.

[0038] Preferably, for each power consumption feature, according to its numerical range, distribution characteristics and practical significance, a suitable discretization method (such as equal-width discretization, equal-frequency discretization, clustering-based discretization, etc.) is selected; according to the selected discretization strategy, the continuous value of each power consumption feature is divided into multiple discrete intervals, and a label is assigned to each interval; using the discretized interval labels, traverse the non-current acquisition data set, and replace the power consumption characteristic value of each data point with the corresponding interval label; if the data set contains timestamp information, the data set can be divided into different time zones (such as hours, days, weeks, etc.) according to the timestamp, and the discretized characteristic values ​​are applied in each time zone to construct multiple non-current acquisition data sets. Current collection time zone data; select appropriate association rule mining algorithms, such as Apriori algorithm or FP-Growth algorithm, to calculate frequent items of multiple non-current collection time zone data, that is, calculate the frequency of all possible item sets in the data set, and screen out frequent item sets that meet the minimum support threshold; for each frequent item set, calculate the confidence between all possible non-empty true subsets (i.e., the premise of the rule) and the remaining items (i.e., the conclusion of the rule), and the confidence indicates the probability that the conclusion is true under the condition that the premise is true; use the confidence threshold to extract association rules that meet the minimum confidence threshold from the frequent item set, and these rules are the association rule set.

[0039] A time series model is constructed, and real-time electricity consumption data is synchronized to the time series model to generate a power demand forecast value.

[0040] According to the characteristics of electricity consumption data and forecasting objectives (such as short-term forecast, long-term forecast, seasonal forecast, etc.), select appropriate time series models, including autoregressive model (AR), moving average model (MA), etc., and use historical electricity consumption data to train the selected time series model. Synchronize the real-time electricity consumption data to the time series model and output the power demand forecast value.

[0041] The power load constraint information is introduced, and a power distribution plan is formulated based on the association rule set and the power demand forecast value.

[0042] The power distribution plan is formulated by introducing power load constraint information and combining the association rule set with the power demand forecast value.

[0043] Furthermore, the power load constraint information is introduced, and a power distribution plan is formulated based on the association rule set and the power demand forecast value. The method includes:

[0044] Based on the electricity consumption behavior parameters, the electricity load parameters, the electricity consumption time parameters and the electricity consumption, a plurality of electricity consumption extreme values ​​are obtained; according to the plurality of electricity consumption extreme values ​​in combination with the power grid capacity, the transmission line capacity and the power generation equipment capacity, power constraints are performed to generate power grid stability constraints, line transmission constraints and power generation output constraints; based on the power grid stability constraints, the line transmission constraints and the power generation output constraints, they are integrated to verify the integrated constraint results, and when the verification is passed, the power load constraint information is output; based on the power load constraint information, linear programming is performed on the association rule set and the power demand forecast value to generate the power distribution plan.

[0045] Preferably, based on the electricity consumption behavior parameters, electricity load parameters, electricity consumption time parameters and electricity consumption, multiple electricity consumption extreme values ​​are obtained, including the maximum load extreme value (peak value), the minimum load extreme value (valley value), and the corresponding time; the grid stability constraint is to set the maximum load and minimum load limits that the grid can withstand according to the capacity and stability requirements of the grid, so as to ensure that the grid can operate stably under various load conditions; the line transmission constraint is to set the transmission limit of each line according to the capacity and transmission capacity of the transmission line, and these limits can be determined based on the rated capacity and current operating conditions (such as temperature and degree of wear) of the line; the power generation output constraint is to set the upper and lower limits of the output of each power generation equipment according to the capacity, efficiency and availability of the power generation equipment; the grid stability constraint, line transmission constraint and power generation output constraint are integrated to form a comprehensive power constraint, which can reflect the power grid, line transmission constraint and power generation output constraint. The relationship and mutual influence between the power lines and power generation equipment; through simulation and emulation, verify whether the integrated constraint results meet the actual operation requirements of the power grid, including the simulation of extreme load conditions, fault conditions and emergencies to ensure the effectiveness and reliability of the constraints, and output the power load constraint information after verification; based on the power load constraint information, build a linear programming model, the objective function of the linear programming model can be to minimize the power cost, maximize the power grid efficiency or meet specific power demand, etc.; integrate the association rule set and the power demand forecast value into the linear programming model, the association rule set can help identify the correlation between different power consumption characteristics, so as to more accurately predict the changing trend of power demand, and the power demand forecast value provides the model with the future power demand forecast value as an important input of the model; use the linear programming solver to solve the constructed linear programming problem. The solution process will generate an optimal power distribution plan, which achieves the optimal solution of the objective function set by the model under the premise of meeting all constraints. Based on electricity consumption behavior parameters, electricity load parameters, electricity consumption time parameters and electricity consumption data, combined with constraint information such as grid capacity, transmission line capacity and power generation equipment capacity, and through linear programming to generate power distribution plans, the power distribution plan will help to achieve reasonable distribution and efficient use of electricity, ensure the stable operation of the power grid and meet the power needs of users.

[0046] Furthermore, after introducing the power load constraint information and formulating a power distribution plan based on the association rule set and the power demand forecast value, the method further includes:

[0047] Perform power linear fitting with the power demand forecast value to generate a power linear fitting result; perform data deviation evaluation on the power demand forecast value based on the power linear fitting result, and generate a characteristic abnormality evaluation result according to the deviation value; perform abnormal feedback on the power distribution plan based on the abnormal evaluation result, and dynamically adjust the power distribution plan according to the feedback parameters.

[0048] Preferably, linear regression is used to fit the power demand forecast value to obtain a power linear fitting result, that is, a linear trend of power demand over time; the power demand forecast value is compared with the power linear fitting result, and the difference between the two is calculated, and this difference reflects the difference between the forecast value and the actual linear trend; the power demand forecast value is evaluated for abnormality according to the size and distribution of the deviation value, and if the deviation value exceeds the set threshold or conforms to a specific abnormal pattern (such as a sudden increase, decrease or periodic fluctuation abnormality), the forecast value is considered to be abnormal; the abnormal evaluation result is fed back to the power distribution plan, including indicating which time periods or regions have abnormal power demand forecast values, and the specific manifestations of the abnormalities (such as overestimation, underestimation or periodic deviation), and the power distribution plan is dynamically adjusted according to the parameters of the abnormal feedback, such as reallocating power, and reallocating power resources to the time periods or regions with abnormal forecast values ​​to ensure the balance of power supply and demand.

[0049] In summary, the embodiments of the present application have at least the following technical effects:

[0050] First, data is identified based on multiple data sources according to the power influencing factors to obtain a non-current collection data set. Then, the non-current collection data set is analyzed in combination with the power consumption trend chart to extract multiple power consumption patterns. Then, cluster analysis is performed on the non-current collection data set based on multiple power consumption patterns, and multiple power consumption features are generated according to the cluster analysis results. Next, association mining is performed on the non-current collection data set based on multiple power consumption features to generate an association rule set. By constructing a time series model, the real-time power consumption data is synchronized to the time series model to generate a power demand forecast value. Finally, the power load constraint information is introduced, and a power distribution plan is formulated based on the association rule set combined with the power demand forecast value. The technical problem that the traditional power distribution forecast relies on a single data source and is difficult to accurately reflect the complex power consumption pattern is solved. Multi-source data is analyzed through association rules to accurately identify the power consumption pattern, achieving the technical effect of improving the accuracy of power distribution.

[0051] Embodiment 2, based on the same inventive concept as the power distribution prediction method based on association rule analysis in the above embodiment, Figure 2 As shown, the present application provides a power distribution prediction system based on association rule analysis, wherein the system includes:

[0052] A data identification module 11, the data identification module 11 is used to perform data identification according to power influencing factors based on multiple data sources to obtain a non-current collection data set; a first analysis module 12, the first analysis module 12 is used to analyze the non-current collection data set in combination with the power consumption trend chart to extract multiple power consumption patterns; a second analysis module 13, the second analysis module 13 is used to perform cluster analysis on the non-current collection data set based on the multiple power consumption patterns, and generate multiple power consumption characteristics according to the cluster analysis results; a data mining module 14, the data mining module 14 is used to perform association mining on the non-current collection data set according to the multiple power consumption characteristics to generate an association rule set; a model construction module 15, the model construction module 15 is used to construct a time series model, synchronize real-time power consumption data to the time series model, and generate a power demand forecast value; a plan formulation module 16, the plan formulation module 16 is used to introduce power load constraint information, and formulate a power distribution plan based on the association rule set combined with the power demand forecast value.

[0053] Furthermore, the data identification module 11 is used to perform the following method:

[0054] Non-current data are collected according to multiple data sources to obtain multiple non-current data; impact tests are performed based on power operation characteristics to generate multiple impact test results; weight training is performed according to the multiple impact test results to generate power impact factors; the power impact factors are used as indexes to identify the multiple non-current data to obtain the non-current collection data set.

[0055] Furthermore, the second analysis module 13 is used to perform the following method:

[0056] Based on the multiple power consumption patterns, power consumption behavior parameters, power consumption load parameters, and power consumption time parameters are defined; the power consumption behavior parameters, the power consumption load parameters, and the power consumption time parameters are combined, k cluster numbers are randomly selected as initial cluster centers, and multiple cluster centers are generated; the non-current acquisition data set is dynamically iterated according to the multiple cluster centers, and divided into multiple cluster clusters according to the iteration results; power consumption analysis is performed based on the multiple cluster clusters to generate the multiple power consumption features.

[0057] Furthermore, the second analysis module 13 is used to perform the following method:

[0058] The non-current acquisition data set is randomly extracted without replacement to determine the first non-current acquisition data; the distance from the first non-current acquisition data to the multiple cluster centers is calculated, and the multiple data distances are screened for the minimum value to obtain the first cluster center; the first non-current acquisition data is assigned to the cluster of the first cluster center, and it is iterated until each non-current acquisition data in the non-current acquisition data set is traversed and stopped; the data mean is calculated for the multiple cluster centers, the multiple cluster centers are updated, and multiple cluster update centers are generated, and it is determined whether the update values ​​of the multiple cluster update centers are less than a preset floating threshold; if the update values ​​of the multiple cluster update centers are greater than or equal to the preset floating threshold, a dynamic adjustment instruction is generated, and the multiple cluster update centers are iteratively calculated according to the dynamic adjustment instruction until the update values ​​of the multiple cluster update centers are less than the preset floating threshold and stopped; if the update values ​​of the multiple cluster update centers are less than the preset floating threshold, it is regarded as cluster convergence, and the multiple cluster clusters are generated.

[0059] Furthermore, the data mining module 14 is used to perform the following method:

[0060] The plurality of power consumption characteristics are discretized to generate a plurality of discrete intervals; the non-current collection data set is traversed and converted based on the plurality of discrete intervals to construct a plurality of non-current collection time zone data; an association rule mining algorithm is used to perform frequent item calculations on the plurality of non-current collection time zone data to generate a frequent item set; and the association rule set is generated by combining the frequent item set with a confidence threshold.

[0061] Furthermore, the solution formulation module 16 is used to execute the following method:

[0062] Based on the electricity consumption behavior parameters, the electricity load parameters, the electricity consumption time parameters and the electricity consumption, a plurality of electricity consumption extreme values ​​are obtained; according to the plurality of electricity consumption extreme values ​​in combination with the power grid capacity, the transmission line capacity and the power generation equipment capacity, power constraints are performed to generate power grid stability constraints, line transmission constraints and power generation output constraints; based on the power grid stability constraints, the line transmission constraints and the power generation output constraints, they are integrated to verify the integrated constraint results, and when the verification is passed, the power load constraint information is output; based on the power load constraint information, linear programming is performed on the association rule set and the power demand forecast value to generate the power distribution plan.

[0063] Furthermore, the solution formulation module 16 is used to execute the following method:

[0064] Perform power linear fitting with the power demand forecast value to generate a power linear fitting result; perform data deviation evaluation on the power demand forecast value based on the power linear fitting result, and generate a characteristic abnormality evaluation result according to the deviation value; perform abnormal feedback on the power distribution plan based on the abnormal evaluation result, and dynamically adjust the power distribution plan according to the feedback parameters.

[0065] It should be noted that the above-mentioned sequence of the embodiments of the present application is only for description and does not represent the advantages and disadvantages of the embodiments. And the above-mentioned specific embodiments of this specification are described. The processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0066] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.

[0067] This specification and drawings are merely exemplary illustrations of the present application and are deemed to cover any and all modifications, variations, combinations or equivalents within the scope of the present application. Obviously, a person skilled in the art may make various modifications and variations to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.

Claims

1. A power distribution prediction method based on association rule analysis, characterized in that: The method comprises: Based on multiple data sources, data is identified according to power influencing factors to obtain non-current acquisition data sets; Analyze the non-current collection data set in combination with the power consumption change trend graph to extract multiple power consumption patterns; performing cluster analysis on the non-current collection data set based on the multiple power usage patterns, and generating multiple power usage features according to the cluster analysis results; Performing association mining on the non-current collection data set according to the multiple power consumption characteristics to generate an association rule set; Constructing a time series model, synchronizing real-time power consumption data to the time series model, and generating power demand forecast values; Introducing power load constraint information, and formulating a power distribution plan based on the association rule set and the power demand forecast value; Based on multiple data sources, data is identified according to power influencing factors to obtain a non-current acquisition data set, and the method includes: Collect non-current data according to multiple data sources to obtain multiple non-current data; Perform impact testing based on power operation characteristics and generate multiple impact testing results; Performing weight training according to the multiple impact test results to generate a power impact factor; Using the power influencing factor as an index, identifying the plurality of non-current data, and obtaining the non-current acquisition data set; Performing cluster analysis on the non-current collection data set based on the multiple power usage patterns, and generating multiple power usage features according to the cluster analysis results, the method comprising: Defining power consumption behavior parameters, power consumption load parameters, and power consumption time parameters based on the multiple power consumption modes; The power consumption behavior parameter, the power load parameter, and the power consumption time parameter are combined, and k cluster numbers are randomly selected as initial cluster centers to generate multiple cluster centers; Dynamically iterating the non-current acquisition data set according to the multiple cluster centers, and dividing it into multiple clusters according to the iteration results; Performing power consumption analysis based on the multiple clusters to generate the multiple power consumption features; According to the plurality of power consumption characteristics, association mining is performed on the non-current collection data set to generate an association rule set, the method comprising: Discretizing the plurality of power consumption characteristics to generate a plurality of discrete intervals; Traversing the non-current acquisition data set based on the multiple discrete intervals to perform conversion, and constructing multiple non-current acquisition time zone data; Using an association rule mining algorithm to calculate frequent items of the multiple non-current collection time zone data to generate frequent item sets; The association rule set is generated by combining the frequent item set with the confidence threshold.

2. The power distribution prediction method based on association rule analysis according to claim 1, characterized in that: Dynamically iterating the non-current acquisition data set according to the multiple cluster centers and dividing it into multiple clusters according to the iteration results, the method comprising: Performing random extraction without replacement on the non-current acquisition data set to determine first non-current acquisition data; Calculating the distance from the first non-current collection data to the multiple cluster centers, performing minimum value screening on the multiple data distances, and obtaining a first cluster center; Allocate the first non-current acquisition data to the cluster of the first cluster center, and iterate until each non-current acquisition data in the non-current acquisition data set is traversed; Calculating data mean values ​​for the multiple cluster centers, updating the multiple cluster centers, generating multiple cluster update centers, and determining whether update values ​​of the multiple cluster update centers are less than a preset floating threshold; If the update values ​​of the multiple cluster update centers are greater than or equal to the preset floating threshold, a dynamic adjustment instruction is generated, and the multiple cluster update centers are iteratively calculated according to the dynamic adjustment instruction until the update values ​​of the multiple cluster update centers are less than the preset floating threshold; If the update values ​​of the multiple cluster update centers are less than the preset floating threshold, it is considered that the clustering is converged, and the multiple cluster clusters are generated.

3. The power distribution prediction method based on association rule analysis according to claim 1, characterized in that: Introducing power load constraint information, formulating a power distribution plan based on the association rule set and the power demand forecast value, the method includes: Based on the power consumption behavior parameter, the power load parameter, the power consumption time parameter and the power consumption, a plurality of power consumption electrode values ​​are obtained; Performing power constraints according to the plurality of power consumption values ​​combined with power grid capacity, transmission line capacity, and power generation equipment capacity to generate power grid stability constraints, line transmission constraints, and power generation output constraints; Integrate the grid stability constraint, the line transmission constraint, and the power generation output constraint, verify the integrated constraint result, and output the power load constraint information when the verification passes; Based on the power load constraint information, linear programming is performed on the association rule set and the power demand forecast value to generate the power distribution plan.

4. The power distribution prediction method based on association rule analysis according to claim 1, characterized in that: After introducing the power load constraint information and formulating a power distribution plan based on the association rule set and the power demand forecast value, the method further includes: Performing power linear fitting with the power demand forecast value to generate a power linear fitting result; Performing data deviation evaluation on the power demand forecast value according to the power linear fitting result, and generating a characteristic abnormality evaluation result according to the deviation value; Based on the abnormal evaluation result, abnormal feedback is performed on the power distribution plan, and the power distribution plan is dynamically adjusted according to the feedback parameters.

5. The power distribution prediction system based on association rule analysis is characterized by: A method for predicting power distribution based on association rule analysis according to any one of claims 1 to 4, the system comprising: A data identification module, the data identification module is used to perform data identification based on multiple data sources according to power influencing factors to obtain a non-current acquisition data set; A first analysis module, the first analysis module is used to analyze the non-current collection data set in combination with the power consumption change trend chart to extract multiple power consumption patterns; a second analysis module, the second analysis module being configured to perform cluster analysis on the non-current collection data set based on the multiple power consumption modes, and generate multiple power consumption features according to the cluster analysis result; A data mining module, the data mining module is used to perform association mining on the non-current collection data set according to the multiple power consumption characteristics to generate an association rule set; A model building module, the model building module is used to build a time series model, synchronize the real-time power consumption data to the time series model, and generate a power demand forecast value; A plan formulation module is used to introduce power load constraint information and formulate a power distribution plan based on the association rule set and the power demand forecast value.

Citation Information

Patent Citations

  • Big data-based power sale quantity information plan management system

    CN118411195A

  • System, method, and apparatus for self-adaptive scoring to detect misuse or abuse of commercial cards

    EP3631749A1