A high and low temperature impact test equipment

By adopting the sealing design of the hanging basket and sliding chamber structure in the high and low temperature impact test equipment, combined with the optimization of the air inlet and return ducts, the problem of gas communication between the high temperature chamber and the low temperature chamber in the existing technology is solved, and the test chamber is realized internal temperature stability and long life of the equipment.

CN118594634BActive Publication Date: 2024-10-29CHENGDU CHENGXU PRECISION MASCH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411082747.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-10-29
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

In the existing basket-type high and low temperature impact box, during the movement and switching process of the hanging basket, the gases in the high-temperature chamber and the low-temperature chamber are connected, causing temperature instability and causing impact damage to heating and refrigeration equipment.

Method used

A high and low temperature impact test equipment is designed, which adopts a hanging basket and sliding chamber structure. The test chamber is sealed through elastic pull rods and clamping units to ensure that gases do not collude, and air flow management is optimized through the settings of air inlet and return ducts. , reduce air leakage and temperature fluctuations.

Benefits of technology

The stability of the temperature in the test chamber is achieved, the temperature dissipation of the hanging basket during movement is reduced, gas collusion is avoided, and the service life of the equipment and test accuracy are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118594634B_ABST
    Figure CN118594634B_ABST
Patent Text Reader

Abstract

The invention discloses a high and low temperature impact test equipment, comprising a box body, in which a hanging basket, an elastic pull rod and a sliding bin are arranged, wherein a group of clamping parts are respectively protruded from the middle parts of the upper and lower ends of the hanging basket; a group of test bins are respectively arranged above and below the hanging basket, and the opposite sides of the two groups of test bins are respectively provided with a first opening for the hanging basket to enter and exit; the two groups of test bins are both provided with a sealing plate for closing the first opening, and the elastic pull rod is connected between the two groups of sealing plates to close the two groups of test bins at the same time; the sliding bin is provided with two groups of upper and lower clamping units for clamping the hanging basket; the clamping unit comprises two groups of clamping blocks which can be arranged in the sliding bin in a horizontally relatively slidable manner, and the clamping parts at both ends of the hanging basket are respectively clamped by a group of clamping units, and the two groups of clamping blocks in each group of clamping units are provided with a wedge-shaped part which can slide in contact with the outer wall of the test bin on the same side, so that the two groups of test bins can be opened and closed alternately, so that the movement and switching of the hanging basket between the two groups of test bins will not cause air leakage, which is beneficial to the stability of the temperature in the test bin.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of temperature testing equipment, in particular to a high and low temperature impact testing equipment. Background Art

[0002] The purpose of high and low temperature shock test is to evaluate the performance and stability of materials, equipment or products in extreme temperature change environments. Generally speaking, by exposing the tested items alternately to low temperature environments of tens of degrees below zero and high temperature environments of more than 100 degrees above zero, the items are subjected to rapid and significant temperature changes in a short period of time, thereby simulating the extreme temperature conditions that may be encountered in the actual environment. The main purpose of the test is to determine the adaptability of the product to rapid changes in ambient temperature and to identify design and process defects of the product.

[0003] In the existing basket-type high and low temperature impact box, two groups of test chambers, namely the high temperature chamber and the low temperature chamber, are usually provided. The basket is moved back and forth and switched between the high temperature chamber and the low temperature chamber by a lifting device. Since the basket itself has holes, during the movement and switching of the basket, the gas in the high temperature chamber and the low temperature chamber can communicate through the holes on the basket, so that the high temperature chamber and the low temperature chamber have hot and cold gas intercommunication for several seconds, which is not conducive to the stability of the temperature in the test chamber and is also easy to cause impact damage to the heating and refrigeration equipment. Summary of the invention

[0004] The purpose of the present invention is to overcome the disadvantages of the background technology and provide a high and low temperature impact test device.

[0005] The embodiments of the present invention are implemented by the following technical solutions:

[0006] A high and low temperature impact test device, comprising a box body, wherein the box body is provided with:

[0007] The hanging basket has a set of clamping parts protruding from the middle of the upper and lower ends; a set of test chambers are respectively provided above and below the hanging basket to provide high temperature and low temperature environments respectively; the opposite sides of the two sets of test chambers are provided with first openings for the hanging basket to enter and exit;

[0008] An elastic pull rod, each of the two test chambers is provided with a sealing plate for closing the first opening, and the elastic pull rod is connected between the two sealing plates to simultaneously close the two test chambers; and

[0009] The sliding chamber is connected with a driving mechanism so as to be able to slide up and down between the two groups of test chambers; the sliding chamber is provided with two groups of upper and lower clamping units for clamping the hanging basket;

[0010] The clamping unit includes two groups of clamping blocks that can be relatively slidably arranged in the sliding bin horizontally, and an elastic member that drives the two groups of clamping blocks to close; the clamping parts at both ends of the hanging basket are clamped by a group of clamping units respectively;

[0011] The two groups of clamping blocks in each group of clamping units have wedge-shaped portions that can slide in contact with the outer wall of the test bin on the same side, so that after the test bin on the same side is inserted into any end of the hanging basket, the opposite side of the clamping unit at the other end of the hanging basket closes the first opening of the test bin that has been inserted into the hanging basket.

[0012] Furthermore, the opposite surfaces of the two groups of clamping units are both sealing surfaces that can close the first opening, and the two groups of wedge-shaped portions located on the back side of the sealing surfaces of the clamping units form a V-shaped opening with a width greater than the size of the test chamber.

[0013] Furthermore, in each clamping unit, a plurality of positioning posts are arranged relatively on opposite surfaces of the two groups of clamping blocks, and a plurality of positioning holes corresponding to the plurality of positioning posts are provided on the clamping part; when the plurality of positioning posts are inserted into the plurality of positioning holes, the two groups of clamping blocks are clamped and sealed on the clamping part.

[0014] Furthermore, the upper and lower ends of the sliding bin are provided with second openings matching the contour of the test bin, so that the sliding bin can be slidably mounted on the test bin; the high temperature bin is located above the sliding bin, and the low temperature bin is located below the sliding bin.

[0015] Furthermore, the elastic pull rod includes an inner tube, an outer tube and a tension spring; wherein, both ends of the inner tube are through-connected, and the upper end of the inner tube passes through and is fixed on a sealing plate in the high-temperature warehouse; the outer tube is sleeved on the inner tube, and the upper end of the outer tube is slidably sealed on the outer wall of the inner tube through a sealing ring, and the lower end of the outer tube is closed and fixed on the sealing plate of the low-temperature warehouse, so that the high-temperature warehouse is connected to the inside of the outer tube, which can prevent the elastic pull rod from condensing and freezing due to water vapor in the low-temperature warehouse, affecting the smoothness of the extension and retraction of the elastic pull rod, and the tension spring is connected between the upper end of the inner tube and the lower end of the outer tube.

[0016] Furthermore, the elastic pull rod passes through the side wall of the test chamber on the peripheral side of the first opening, and the elastic pull rod is connected to the connecting ear provided on the peripheral side of the plate-shaped portion;

[0017] Furthermore, the upper side of the high-temperature chamber is connected to the heat source circulation through the air inlet duct and the return air duct, and the lower side of the low-temperature chamber is connected to the cold source circulation through the air inlet duct and the return air duct; wherein the air inlet duct and the return air duct in each group of test chambers are arranged relative to each other.

[0018] Further, the sealing plate includes a plate-shaped portion and a sealing ring vertically arranged on one end surface of the plate-shaped portion, the plate-shaped portion is located in the test chamber and is larger than the first opening, and the sealing ring can be plugged and sealed on the inner wall of the first opening; a spoiler that can be moved between the air inlet duct and the air return duct is arranged on the other end surface of the plate-shaped portion;

[0019] When the hanging basket is inserted into the test chamber, the hanging basket pushes the sealing plate to move so that the spoiler plate abuts against the inner wall of the test chamber, and the air flow from the air inlet pipe blows onto the hanging basket.

[0020] Furthermore, in each group of clamping units, the opposite surfaces of the two groups of clamping blocks are provided with grooves matching the clamping portion, so that the contact surfaces between the two groups of clamping blocks and the contact surfaces between the clamping blocks and the clamping portion are tightly abutted.

[0021] Furthermore, when the clamping unit clamps the clamping portion, the lower ends of the two groups of wedge-shaped portions abut against each other.

[0022] The technical solution of the embodiment of the present invention has at least the following advantages and beneficial effects:

[0023] The first openings of the two groups of test chambers are sealed by sealing plates. When the hanging basket enters any group of test chambers, it will push the sealing plates on the test chamber to be entered, and then tighten the other group of sealing plates through the elastic pull rod. The two groups of test chambers can only be opened and closed alternately. The movement and switching of the hanging basket between the two groups of test chambers will not cause air cross-talk, which is conducive to the stability of the temperature in the test chamber.

[0024] In addition, during the lifting and lowering process of the hanging basket, the clamping unit on the same side as the test chamber is released due to the squeezing of the wedge-shaped portion, so that the hanging basket can smoothly enter the test chamber; after the hanging basket is completely inserted into the test chamber, the two groups of clamping blocks of the clamping unit on the other side always remain clamped and spliced ​​on the clamping portion, which can play a role in closing the opening of the test chamber; similarly, the hanging basket can be fixed in the sliding chamber by at least one group of clamping units regardless of whether it is in the lifting and lowering process;

[0025] In addition, setting up a sliding bin can reduce the contact of the hanging basket with the external environment during movement, and reduce the dissipation of the hanging basket's own temperature before entering the test bin; the air inlet duct and the air return duct in the test bin are arranged at the end away from the sliding bin, and will not interfere with the sliding of the sliding bin; the air inlet duct and the air return duct are arranged relative to each other, and during the process of inserting the hanging basket into the test bin, the amount of airflow in the test bin leaking from the first opening can be reduced; and when the hanging basket completely enters the test bin, the spoiler on the sealing plate can be pushed to interfere with the airflow in the test bin, so that the airflow blows toward the hanging basket. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 A three-dimensional diagram of a high and low temperature impact test device in an embodiment of the present invention;

[0027] Figure 2 It is a three-dimensional diagram of a sliding bin in an embodiment of the present invention;

[0028] Figure 3 It is a schematic diagram of the internal structure of the sliding warehouse in the embodiment of the present invention after removing the hanging basket and the warehouse door;

[0029] Figure 4 for Figure 3 An enlarged view of part A;

[0030] Figure 5 Schematic diagram of the connection relationship between the hanging basket and the clamping unit in an embodiment of the present invention;

[0031] Figure 6 It is a schematic diagram of the internal structure of the high and low temperature impact test equipment in an embodiment of the present invention;

[0032] Figure 7 for Figure 6 A magnified view of part B;

[0033] Figure 8 is a working principle diagram of a spoiler in an embodiment of the present invention;

[0034] Icons: 1-box, 10-slide rail, 2-test chamber, 20-high temperature chamber, 21-low temperature chamber, 22-air inlet duct, 23-return air duct, 24-first opening, 3-sliding chamber, 30-chamber door, 31-second opening, 4-clamping unit, 40-clamping block, 400-wedge-shaped portion, 401-groove, 402-positioning column, 41-elastic member, 5-hanging basket, 50-clamping portion, 500-positioning hole, 6-sealing plate, 60-sealing ring, 61-spoiler, 62-connecting ear, 63-plate-shaped portion, 7-elastic pull rod, 70-inner tube, 71-outer tube, 8-driving mechanism, 80-motor, 81-screw, 82-slider. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0036] Reference Figures 1 to 8 The present invention provides a high and low temperature impact test device, including a box body 1, in which two groups of test chambers 2, a group of sliding chambers 3 and a group of hanging baskets 5 are arranged.

[0037] Among them, the two groups of test chambers 2 are respectively a high-temperature chamber 20 located on the upper part of the sliding chamber 3 and a low-temperature chamber 21 located on the lower part of the sliding chamber 3. The high-temperature chamber 20 is connected to the heat source through the air inlet pipe 22 and the return air pipe 23 to provide a high-temperature environment for the circulation inside the high-temperature chamber 20. The low-temperature chamber 21 is connected to the cold source through the air inlet pipe 22 and the return air pipe 23 to provide a low-temperature environment for the circulation inside the low-temperature chamber 21; the cold source and the heat source are respectively the existing refrigeration compressor and the hot air blower, which respectively send heat and cold to the test chamber 2 through the air supply device, which will not be repeated here.

[0038] The hanging basket 5 is arranged in the sliding warehouse 3, and the sliding warehouse 3 is provided with an openable and closable warehouse door 30, which can conveniently take and place the product to be tested. The hanging basket 5 can enter the high temperature warehouse 20 and the low temperature warehouse 21 respectively as the sliding warehouse 3 moves up and down. Figure 1 The lifting of the sliding bin 3 is realized by a driving mechanism 8, which includes a motor 80 arranged on the top of the box body 1, and a screw rod 81 connected to the motor 80 is vertically arranged on the box body 1; Figure 2 A slider 82 threadedly connected to the screw rod 81 is provided on the back of the sliding bin 3. The sliding bin 3 can slide up and down by driving the screw rod 81 forward and reversely by the motor 80.

[0039] Among them, refer to Figure 5 The hanging basket 5 is used to place the product to be tested, and a door (not shown) that can be opened and closed is provided on one side of the hanging basket 5. A group of clamping parts 50 are protruding from the middle of the upper and lower ends of the hanging basket 5, and the clamping parts 50 are in the shape of long strips.

[0040] The sliding compartment 3 is provided with two sets of upper and lower clamping units 4 for clamping the hanging basket 5; Figures 3 to 6 Each group of clamping units 4 includes two groups of clamping blocks 40 that can be horizontally slidably arranged in the sliding bin 3, and an elastic member 41 that drives the two groups of clamping blocks 40 to gather and close; the clamping parts 50 at the upper and lower ends of the hanging basket 5 are clamped and fixed by the two groups of clamping blocks 40 in each group of clamping units 4.

[0041] Reference Figure 2 and Figure 3 Specifically, in this embodiment, the elastic member 41 adopts a tension spring, and the opposite surfaces of the two groups of clamping blocks 40 can be clamped on the clamping portion 50, and the other end of each group of clamping blocks 40 extends to the outside of the sliding warehouse 3, and one end of the clamping block 40 located outside the sliding warehouse 3 is connected to the outer wall of the sliding warehouse 3 through a tension spring. Under the action of the tension spring, the two groups of clamping blocks 40 in the clamping unit 4 can be relatively gathered and clamped on the left and right sides of the clamping portion 50.

[0042] Reference Figure 4 In each clamping unit 4, grooves 401 are arranged on opposite sides of the two clamping blocks 40, and the rectangular frame formed by the two clamping blocks 401 matches the outline of the clamping portion 50. A positioning column 402 located in the groove 401 is also arranged on the opposite side of each clamping block 40; Figure 5 The clamping portion 50 is provided with a plurality of positioning holes 500 corresponding one to one with the plurality of positioning posts 402 ; when the clamping unit 4 is clamped on the clamping portion 50 , each group of positioning posts 402 is inserted into a group of positioning holes 500 , and the two groups of clamping blocks 40 are clamped and sealed on the clamping portion 50 .

[0043] Optionally, a silicone rubber layer can be provided on the opposite surface of each group of clamping blocks 40 and / or on the side wall of the clamping portion 50. The silicone rubber has good high and low temperature resistance, so that when the clamping unit 4 clamps the clamping portion 50, the end face of the clamping block 40 and the clamping portion 50 can be sealed to form a whole surface, which can be used as the sealing surface of the first opening 24.

[0044] The upper and lower ends of the hanging basket 5 can be firmly confined in the sliding compartment 3 by two sets of clamping units 4 .

[0045] Among them, the opposite sides of the two groups of test chambers 2 are provided with first openings 24 for the hanging basket 5 to enter and exit, that is, the first opening 24 is set at the lower end of the high-temperature chamber 20, and another group of first openings 24 is relatively set at the upper end of the low-temperature chamber 21. The entire surface contour area formed between the end faces of the two groups of clamping blocks 40 and the clamping part 50 is larger than the cross-sectional area of ​​the first opening 24, so that after the hanging basket 5 enters the test chamber 2, the first opening 24 can be closed by the entire surface formed between the two groups of clamping blocks 40 and the clamping part 50.

[0046] Reference Figure 6 and Figure 8 Both groups of test chambers 2 are provided with sealing plates 6 for closing the first openings 24. The two groups of sealing plates 6 are connected by elastic pull rods 7. Under the contraction force of the elastic pull rods 7, the two groups of sealing plates 6 can completely lean against and close the first openings 24 of the two groups of test chambers 2; therefore, when the hanging basket 5 enters any group of test chambers 2, it is necessary to push open the sealing plates 6 on the test chamber 2.

[0047] Therefore, refer to Figures 3 to 5 , the opposite surfaces of the two groups of clamping units 4 are sealing surfaces that can close the first opening 24, and on the back of the opposite surfaces of each group of clamping units 4, the two groups of clamping blocks 40 have wedge-shaped portions 400 that can slide in contact with the outer wall of the test chamber 2 on the same side, and the two groups of wedge-shaped portions 400 located on the back side of the sealing surface of the clamping unit 4 form a V-shaped mouth shape with a width greater than the size of the test chamber 2; when the sliding chamber 3 moves up, the two groups of clamping blocks 40 on the upper clamping unit 4 can move to the left and right sides through the contact between the wedge-shaped portions 400 and the bottom outer wall of the high-temperature chamber 20, and then the upper clamping unit 4 is separated from the clamping portion 50 on the upper part of the hanging basket 5, so that the hanging basket 5 can continue to move up and overcome the contraction force of the elastic pull rod 7 to open the first opening 24; when the hanging basket 5 completely enters the high-temperature chamber 20, the sealing surface of the lower clamping unit 4 seals the opened first opening 24; the same is true when the hanging basket 5 moves down to enter the low-temperature chamber 21, which will not be repeated here.

[0048] Reference Figure 4 When the clamping unit 4 clamps the clamping portion 50 , the lower ends of the two sets of wedge-shaped portions 400 abut against each other and extend onto the groove 401 .

[0049] After the sliding chamber 3 drives the hanging basket 5 to leave the test chamber 2 , the clamping unit 4 can resume the clamping action on the clamping portion 50 under the action of the elastic member 41 .

[0050] The purpose of setting the hanging basket 5 in the sliding bin 3 is to reduce the contact between the products to be tested in the hanging basket 5 and the external environment during the transfer between the two groups of test bins 2; wherein, the upper and lower ends of the sliding bin 3 are provided with second openings 31 matching the contour of the test bin 2, so that the sliding bin 3 can be slidably mounted on the test bin 2.

[0051] Through the above method, the hanging basket 5 can alternately enter the two groups of test chambers 2. When one group of test chambers 2 is opened, the other group of test chambers 2 is in a closed state, and there will be no gas leakage between the two groups. However, before the hanging basket 5 completely enters the test chamber 2, part of the gas will leak into the sliding chamber 3 at normal temperature.

[0052] In one embodiment, referring to Figure 7 The sealing plate 6 includes a plate-shaped portion 63 and a sealing ring 60 vertically arranged on the end surface of the plate-shaped portion 63 close to the hanging basket 5; wherein the plate-shaped portion 63 is located in the test chamber 2 and is larger than the size of the first opening 24; refer to Figure 6 The sealing ring 60 is rectangular, and its outer wall matches the inner wall of the first opening 24. The sealing ring 60 can be plugged in and out to seal on the inner wall of the first opening 24; a spoiler 61 that can be moved between the air inlet duct 22 and the air return duct 23 is provided on the end surface of the plate-like portion 63 facing the interior of the test chamber 2.

[0053] Among them, refer to Figure 7 The elastic pull rod 7 passes through the side wall of the test chamber 2 on the side around the first opening 24, and the gap of the tube penetration can be sealed by a sealing ring; the end face size of the plate-like portion 63 is larger than the first opening 24, and the end face size of the plate-like portion 63 is smaller than the internal cross-sectional area of ​​the test chamber 2 in the same direction, and the elastic pull rod 7 is connected to the connecting ear 62 arranged on the side around the plate-like portion 63; therefore, the elastic pull rod 7 will not interfere with the entry and exit of the hanging basket 5 and the sealing of the clamping unit 4 to the first opening 24.

[0054] Before the hanging basket 5 completely enters the test chamber 2, part of the gas will leak into the sliding chamber 3 at room temperature; in order to reduce the amount of gas leakage in the test chamber 2, refer to Figure 6 The air inlet duct 22 and the air return duct 23 in each group of test chambers 2 are arranged opposite to each other on the left and right, and the air inlet duct 22 and the air return duct 23 are arranged on the side wall of the test chamber 2 away from the first opening 24. Therefore, the gas discharged from the air inlet duct 22 can enter the return duct 23 with a shorter stroke in the test chamber 2, and is not easy to diffuse to the side of the test chamber 2 close to the first opening 24, which can reduce the leakage of gas in the process of the hanging basket 5 entering the test chamber 2.

[0055] At the same time, the air inlet pipe 22 and the air return pipe 23 are arranged on the side wall of the test chamber 2 away from the first opening 24 to avoid interference with the sliding stroke of the sliding chamber 3.

[0056] Therefore, refer to Figure 8After the hanging basket 5 is completely inserted into the test chamber 2, the first opening 24 of the test chamber 2 is closed by the sealing surface of the clamping unit 4; at the same time, the hanging basket 5 pushes the sealing plate 6 to move toward the bottom of the test chamber 2, so that the spoiler 61 abuts against the inner wall of the bottom of the test chamber 2, and the airflow blown out of the air inlet pipe 22 is disturbed by the spoiler 61 and cannot be directly blown to the return air pipe 23. The gas flows downward along the gap between the connecting ears 62, passes through the hanging basket 5 in turn, and is discharged along the return air pipe 23, which can facilitate the diffusion of the airflow in the entire test chamber 2, that is, at this time, the gas flows to Figure 8 Indicated by the direction of the arrow.

[0057] Optionally, the upper ends of the two groups of spoilers 61 on the upper part of the sealing plate 6 may be tilted outwards on both sides to make it easier for the airflow to diffuse downwards.

[0058] In one embodiment, the elastic pull rod 7 includes an inner tube 70, an outer tube 71 and a tension spring; Figure 7 , both ends of the inner tube 70 are connected, and the upper end of the inner tube 70 passes through and is fixed to the sealing plate 6 in the high temperature chamber 20. Specifically, the upper end of the inner tube 70 passes through the connecting ear 62; Figure 8 The outer tube 71 is sleeved on the inner tube 70 , the upper end of the outer tube 71 is slidably sealed on the outer wall of the inner tube 70 through a sealing ring, and the lower end of the outer tube 71 is closed and fixed on the connecting ear 62 of the inner sealing plate 6 of the low-temperature warehouse 21 .

[0059] Through the two ends of the inner tube 70, the high-temperature gas in the high-temperature warehouse 20 can be communicated with the inside of the outer tube 71. After the hanging basket 5 enters the low-temperature warehouse 21, the outer tube 71 of the elastic pull rod 7 is stretched in the low-temperature warehouse 21; when the hanging basket 5 leaves the low-temperature warehouse 21, the elastic pull rod 7 can be prevented from freezing due to condensation of water vapor, which affects the smoothness of the extension and retraction of the elastic pull rod 7; wherein, the tension spring is connected between the upper end of the inner tube 70 and the lower end of the outer tube 71, so that the elastic pull rod 7 can have a longer stretching amount.

[0060] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A high and low temperature impact test device, comprising a box, characterized in that: The box is equipped with: The hanging basket has a set of clamping parts protruding from the middle of the upper and lower ends; a set of test chambers are respectively provided above and below the hanging basket to provide high temperature and low temperature environments respectively; the opposite sides of the two sets of test chambers are provided with first openings for the hanging basket to enter and exit; An elastic pull rod, each of the two test chambers is provided with a sealing plate for closing the first opening, and the elastic pull rod is connected between the two sealing plates to simultaneously close the two test chambers; and The sliding chamber is connected with a driving mechanism so as to be able to slide up and down between the two groups of test chambers; the sliding chamber is provided with two groups of upper and lower clamping units for clamping the hanging basket; The clamping unit includes two groups of clamping blocks that can be relatively slidably arranged in the sliding bin horizontally, and an elastic member that drives the two groups of clamping blocks to close; the clamping parts at both ends of the hanging basket are clamped by a group of clamping units respectively; The two groups of clamping blocks in each group of clamping units have wedge-shaped portions that can slide in contact with the outer wall of the test bin on the same side, so that after the test bin on the same side is inserted into any end of the hanging basket, the opposite side of the clamping unit at the other end of the hanging basket closes the first opening of the test bin that has been inserted into the hanging basket.

2. The high and low temperature impact test equipment according to claim 1, characterized in that: The opposite surfaces of the two groups of clamping units are both sealing surfaces that can close the first opening, and the two groups of wedge-shaped parts located on the back side of the sealing surface of the clamping unit form a V-shaped opening with a width greater than the size of the test chamber.

3. The high and low temperature impact test equipment according to claim 1 or 2, characterized in that: In each clamping unit, a plurality of positioning posts are arranged on opposite sides of the two clamping blocks, and a plurality of positioning holes corresponding to the plurality of positioning posts are arranged on the clamping part; when the plurality of positioning posts are inserted into the plurality of positioning holes, the two clamping blocks are clamped and sealed on the clamping part.

4. The high and low temperature impact test equipment according to claim 1, characterized in that: The upper and lower ends of the sliding bin are provided with second openings matching the contour of the test bin, so that the sliding bin can be slidably mounted on the test bin; the high temperature bin is located above the sliding bin, and the low temperature bin is located below the sliding bin.

5. The high and low temperature impact test equipment according to claim 4, characterized in that: The elastic pull rod comprises an inner tube, an outer tube and a tension spring; Among them, the two ends of the inner tube are through-connected, and the upper end of the inner tube passes through and is fixed on the sealing plate in the high-temperature warehouse; the outer tube is sleeved on the inner tube, and the upper end of the outer tube is slidably sealed on the outer wall of the inner tube through a sealing ring, and the lower end of the outer tube is closed and fixed on the sealing plate of the low-temperature warehouse, so that the high-temperature warehouse is connected with the inside of the outer tube; the tension spring is connected between the upper end of the inner tube and the lower end of the outer tube.

6. The high and low temperature impact test equipment according to claim 1 or 5, characterized in that: The elastic pull rod penetrates through the side wall of the test chamber on the peripheral side of the first opening, and the elastic pull rod is connected to the connecting ear arranged on the peripheral side of the plate-shaped part.

7. The high and low temperature impact test equipment according to claim 6, characterized in that: The upper side of the high-temperature chamber is connected to the heat source circulation through the air inlet duct and the return air duct, and the lower side of the low-temperature chamber is connected to the cold source circulation through the air inlet duct and the return air duct; wherein the air inlet duct and the return air duct in each group of test chambers are arranged relative to each other.

8. The high and low temperature impact test equipment according to claim 7, characterized in that: The sealing plate includes a plate-shaped portion and a sealing ring vertically arranged on one end surface of the plate-shaped portion. The plate-shaped portion is located in the test chamber and is larger than the first opening. The sealing ring can be plugged and sealed on the inner wall of the first opening. A spoiler that can be moved between the air inlet pipe and the air return pipe is arranged on the other end surface of the plate-shaped portion. When the hanging basket is inserted into the test chamber, the hanging basket pushes the sealing plate to move so that the spoiler plate abuts against the inner wall of the test chamber, and the air flow from the air inlet pipe blows onto the hanging basket.

9. The high and low temperature impact test equipment according to claim 1, characterized in that: In each set of clamping units, the opposite surfaces of the two sets of clamping blocks are provided with grooves matching the clamping parts, so that the contact surfaces between the two sets of clamping blocks and the contact surfaces between the clamping blocks and the clamping parts are tightly abutted.

10. The high and low temperature impact test equipment according to claim 9, characterized in that: When the clamping unit clamps the clamping portion, the lower ends of the two groups of wedge-shaped portions abut against each other.

Citation Information

Patent Citations

  • Three-box type temperature impact test box

    CN102331435A

  • Temperature shock proof box insulation construction

    CN206832606U