A method for checking the setting value of heavy gas action of double-float gas relay
By building a fault simulation experimental platform and a finite element analysis model, combining experimental and simulation data comparison and analysis, the problem of calibration error of heavy gas action of double float gas relay was solved, and more accurate calibration value judgment and calibration were achieved.
Patent Information
- Application Number
- CN202411076584.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-08-07
AI Technical Summary
The existing double float gas relay heavy gas action calibration method has a large correction error, and the reliability of the calibration value cannot be effectively verified.
Build a transformer fault simulation experimental platform and a gas relay mechanical response platform, establish a three-dimensional finite element analysis model and force analysis model, monitor and measure the oil flow rate and pressure characteristics through ultrasonic flow rate sensors and pressure sensors, and compare the experimental data with simulation calculation data. Analysis and determine the setting value of the double float gas relay.
The error of calibration of the heavy gas action setting value of the double float gas relay is significantly reduced, and the accuracy and reliability of the setting value are improved.
Smart Images

Figure CN118604604B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of transformer relay protection in power systems, in particular to a method for verifying a heavy gas action setting value of a double-float gas relay. Background Art
[0002] As the scale of the power system gradually expands, the number of transformer tripping caused by malfunction of the transformer gas protection is gradually increasing, affecting the safe and stable operation of the main transformer.
[0003] The gas relay is installed on the connecting pipe between the oil tank and the oil storage cabinet, and is one of the main protection components of the transformer. As an important non-electrical protection device in gas protection, the gas relay has the advantages of high sensitivity and rapid action compared with the electrical protection. Its good protection can detect the latent faults of the transformer in advance and cut off the main transformer in time to avoid the continuous expansion of the fault, which is very important for the protection of the transformer. The gas relay is mainly divided into open cup baffle gas relay, single float gas relay and double float gas relay. With the increase in the number and scale of substations, the double float gas relay is more and more widely used in power systems. Gas protection is the main non-electrical protection for internal faults of transformers, but the gas protection setting values in actual application sites are currently selected based on the test results provided by relevant countries, and the reliability cannot be verified.
[0004] At present, the calibration of the double-float gas relay heavy gas action setting value is often completed through the traditional gas relay calibration station. The surging oil flow impact experiment is carried out to measure the oil flow velocity in the double-float gas relay installation pipeline, and the oil flow velocity when the double-float gas relay heavy gas action is collected, which is used as the double-float gas relay heavy gas action setting value. However, in actual experiments, the experimental action value and the actual action value of the double-float gas relay heavy gas are usually not completely equal, and there is usually a certain error between the two.
[0005] Therefore, how to provide a new double-float gas relay heavy gas action setting value calibration method is a problem that technical personnel in this field urgently need to solve. Summary of the invention
[0006] The object of the present invention is to overcome the above-mentioned shortcomings and provide a double-float gas relay heavy gas action setting value verification method to solve the problem that the existing double-float gas relay heavy gas action setting value verification method will produce large correction errors.
[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for checking the heavy gas action setting value of a double-float gas relay, which comprises the following steps:
[0008] Building a transformer fault simulation experimental platform, which is used to simulate transformer heavy gas faults of different energy sizes;
[0009] Building a gas relay mechanical response platform, which is used to monitor the pressure and flow velocity characteristics at the pipeline and output the relationship between the pressure and flow velocity over time;
[0010] A three-dimensional finite element analysis model of the gas relay was established, and the inlet flow velocity measured by the ultrasonic flow velocity sensor was used as the boundary condition for numerical simulation calculation.
[0011] Establish a force analysis model for the gas relay and simulate the movement of the baffle according to the force condition of the baffle;
[0012] Numerical simulation calculations were performed on the heavy gas action characteristics of the gas relay and the mechanical response characteristics of the baffle;
[0013] Extract the pipeline flow velocity and pressure data at the time of heavy gas action measured in the experiment, compare and analyze with the simulation calculation data, and determine the factors for determining the setting value of the double float gas relay;
[0014] Determine whether the pipeline flow rate at the time of heavy gas action measured by the experiment is consistent with the pipeline flow rate at the time of heavy gas action calculated by simulation;
[0015] If the data match, the pipeline flow rate is used as the basis for judging the setting value of the double-float gas relay;
[0016] If the velocity data do not match, the oil flow acceleration in the pipeline at the time of heavy gas action measured by the experiment and calculated by simulation is used as the basis for determining the setting value;
[0017] According to the above judgment basis, the heavy gas action setting value of the double float gas relay is revised.
[0018] Furthermore, the transformer fault simulation experimental platform uses an air cannon as an excitation source and a pressure reducing valve to control the pressure to simulate transformer heavy gas faults of different energy sizes.
[0019] Furthermore, the pressure and flow rate characteristics at the pipeline are monitored, and the relationship between the pressure and flow rate over time is output, including:
[0020] Ultrasonic flow rate sensor is used to monitor the change of oil flow rate in the pipeline where the double-float gas relay is installed;
[0021] Pressure sensors are used to monitor the oil flow pressure in the pipelines at the inlet and outlet of the double-float gas relay.
[0022] Further, using the inlet flow velocity measured by the ultrasonic flow velocity sensor as the numerical simulation calculation boundary condition includes: using the ultrasonic flow velocity sensor to measure the flow velocity of the gas relay installation pipeline as an excitation signal, thereby serving as the simulation calculation inlet boundary condition, and the specific process includes:
[0023] An ultrasonic flow rate sensor is used to measure the oil flow rate in the installation pipeline of the double-float gas relay;
[0024] The signal acquisition instrument is used to output the data of the voltage and time of the ultrasonic flow velocity sensor, and the relationship between the flow velocity and time is inferred based on Matlab, and the functional relationship between the inlet and outlet flow velocity and time is fitted;
[0025] The relationship between the flow velocity at the inlet and time in the numerical simulation calculation is set by the DEFINE_PROFILE macro. Among them, the DEFINE_PROFILE macro is the DEFINE_PROFILE (name, t, i) macro.
[0026] Furthermore, the specific process of establishing the gas relay stress analysis model is as follows:
[0027] The Compute_Force_And_Moment internal function is used to extract the moment of the baffle around the center of rotation when the surging oil flow impacts M 1;
[0028] Measuring the suction torque between the permanent magnet and the baffle inside the double-float gas relay M 2;
[0029] Calculate the gravity of the baffle and further calculate the gravitational moment of the baffle around the center of rotation M 3;
[0030] Calculate the total moment on the baffle M = M 1+ M 3- M 2. Calculate the baffle rotation angular velocity ω = M / I , I Represents the moment of inertia of the baffle.
[0031] Furthermore, the specific process of numerical simulation calculation of the heavy gas action characteristics of the gas relay and the mechanical response characteristics of the baffle is as follows:
[0032] The hybrid mesh technology is used to mesh the three-dimensional finite element analysis model of the gas relay;
[0033] The baffle motion equation is established according to the force analysis model of the double-float gas relay, and the baffle motion control is realized through the DEFINE_CG_MOTION macro; wherein, the DEFINE_CG_MOTION macro is the DEFINE_CG_MOTION (name, dt, vel,omega, time, dtime) macro.
[0034] Based on the numerical simulation method, the baffle motion characteristics and pressure distribution information of the three-dimensional simulation model of the double-float gas relay are calculated.
[0035] Furthermore, the pipeline flow velocity and pressure data at the time of heavy gas action measured in the experiment were extracted and compared with the simulation calculation data to determine the factors for determining the setting value of the double float gas relay, including:
[0036] Compare the pipeline flow velocity measured by the experiment when the heavy gas alarm occurs and the inlet flow velocity calculated by the numerical simulation when the heavy gas alarm occurs;
[0037] If the comparison results match, it proves that the heavy gas alarm is due to the effect of flow velocity;
[0038] If the comparison results do not match, it proves that the heavy gas alarm is not caused by the flow rate, and the flow characteristic quantity should be further explored.
[0039] Furthermore, the specific process of extracting the oil flow acceleration in the pipeline at the time of heavy gas action measured by experiment and calculated by simulation as the basis for setting value judgment includes:
[0040] Extract the heavy gas action oil flow acceleration calculated by numerical simulation and the heavy gas action oil flow acceleration measured by experiment, compare the pipeline oil flow acceleration measured by experiment when the heavy gas alarm sounds and the inlet oil flow acceleration calculated by numerical simulation when the heavy gas alarm sounds, and verify the determining factors of the heavy gas alarm.
[0041] If the experimentally measured pipeline oil flow acceleration during heavy gas alarm is consistent with the numerical simulation calculated inlet oil flow acceleration data during heavy gas alarm, the pipeline oil flow acceleration will be used as the basis for determining the setting value of the double float gas relay.
[0042] Furthermore, the transformer fault simulation experimental platform includes an air cannon, a surging oil flow generating chamber, an oil pillow, a flow rate sensor, a pressure sensor and a gas relay installed on the oil pipeline; the air cannon is used to provide compressed air with different pressures; the surging oil flow generating chamber is used to provide expansion work space for compressed air and stimulate the oil pipeline to generate surging oil flow; the oil pillow is used to store or replenish oil; a butterfly valve is installed at the oil outlet of the oil pillow; a bellows is installed at one end of the oil pipeline close to the oil outlet of the oil pillow; the bellows is used to correct the deviation and suppress vibration of the oil pipeline.
[0043] The beneficial effects of the present invention are as follows: compared with the existing method of simply obtaining a flow rate setting value based on a gas relay calibration bench, the method of the present invention adopts a method combining a three-dimensional model with experimental measurement data, and compares and analyzes the matching relationship between the oil flow velocity and the oil flow acceleration in the experimental measurement and the simulation analysis results, and further selects a suitable flow characteristic quantity as the double-float gas relay heavy gas action setting value, which can not only correct the action setting value of the double-float gas relay, but also significantly reduce the error of the double-float gas relay heavy gas action setting value calibration, and effectively solves the problem that the existing double-float gas relay heavy gas action setting value calibration method will produce a large correction error. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 A flow chart of a method for verifying the heavy gas action setting value of a double-float gas relay provided in an embodiment of the present invention;
[0045] Figure 2 A model diagram of a transformer fault simulation experiment platform provided by an embodiment of the present invention;
[0046] Figure 3 A schematic diagram of step S103 provided in an embodiment of the present invention;
[0047] Figure 4 A structural block diagram of a double-float gas relay setting device provided in an embodiment of the present invention;
[0048] Figure 5 The heavy gas action characteristic diagram of the experimental test relay provided by the embodiment of the present invention;
[0049] Figure 6 A comparison chart of the oil flow velocities during the experimental and simulated heavy gas action moments provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0050] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0051] Example 1: Figure 1 As shown, the embodiment of the present invention discloses a method for verifying the heavy gas action setting value of a double-float gas relay, comprising the following steps:
[0052] S101. Build a transformer fault simulation experimental platform; the transformer fault simulation experimental platform is used to simulate transformer heavy gas faults of different energy sizes.
[0053] Transformer fault simulation experiment platform Figure 2As shown, the transformer fault simulation experiment platform includes an air cannon 1, a surging oil flow generating chamber 2, an oil pillow 4, a flow rate sensor 5, a pressure sensor 6 and a gas relay 7 installed on the oil pipeline 3; the air cannon 1 is used to provide compressed air with different pressures; the surging oil flow generating chamber 2 is used to provide expansion work space for compressed air and stimulate the oil pipeline 3 to generate surging oil flow; the oil pillow 4 is used to store or replenish oil; a butterfly valve 8 is installed at the oil outlet of the oil pillow 4; a bellows 9 is installed at one end of the oil pipeline 3 close to the oil outlet of the oil pillow 4; the bellows 9 is used to correct the deviation and suppress vibration of the oil pipeline 3.
[0054] S102. Build a double-float gas relay mechanical response platform to monitor the pressure and flow rate characteristics in the pipeline and output the relationship between pressure and flow rate over time.
[0055] The data acquisition uses an ultrasonic flow velocity sensor to measure the oil flow velocity at the installation pipeline of the double float gas relay. The flow velocity measurement adopts non-contact measurement, and the signal acquisition instrument is used to extract the flow velocity change after the fault occurs. The signal acquisition instrument extracts the voltage signal, and the ultrasonic flow velocity sensor outputs the current signal. Therefore, a current-voltage conversion module needs to be connected between the two to output the voltage signal, such as Figure 4 shown.
[0056] The pressure data is measured by a pressure sensor, which outputs a voltage signal, and the pressure information is also extracted using a signal acquisition instrument.
[0057] S103, establishing a three-dimensional finite element analysis model of a double-float gas relay, using the experimentally measured inlet flow velocity as a boundary condition for numerical simulation calculation, the three-dimensional finite element model including a double-float gas relay model and an oil flow model located in the cavity of the double-float gas relay model.
[0058] In this implementation case, the BF double-float gas relay produced by EMB of Germany was taken as an example, and a 1:1 three-dimensional model was generated based on the internal structure of the double-float gas relay. A three-dimensional finite element oil flow cavity model was generated with the help of the three-dimensional model of the double-float gas relay, which facilitated the subsequent simulation calculation of the internal flow field and flow characteristics of the relay.
[0059] Among them, the control equations in the simulation calculation process of the internal oil flow cavity model of the double float gas relay are as follows:
[0060] The continuity equation is also called the mass conservation equation, and its equation is as follows: ;
[0061] Introducing vector symbols , the continuity equation can be written as: ;
[0062] In the formula ρrepresents the transformer insulating oil density, t is the time, u is the velocity vector, u, v and w are the velocity vectors u Components in the x, y, and z directions.
[0063] The momentum conservation equations in the x, y, and z directions in space are as follows:
[0064] ;
[0065] ;
[0066] ;
[0067] In the formula, is the dynamic viscosity, ,symbol , and is the generalized source term of the momentum conservation equation.
[0068] Energy conservation equation: ;
[0069] Where E is the total energy of turbulence, including the sum of internal energy, kinetic energy and potential energy. ; h is enthalpy, Denote the enthalpy of component j and defined as ,in ; is the effective heat transfer coefficient, , is the turbulent heat transfer coefficient; That is, the chemical reaction heat and its customized volume heat source term; is the diffusion flux of component j.
[0070] S104. Establish a force analysis model for a double-float gas relay, and simulate the movement state of the baffle according to the force condition of the baffle; extract the pipeline flow velocity and pressure data at the time of heavy gas action measured in the experiment, and compare and analyze them with the simulation calculation data.
[0071] The Compute_Force_And_Moment internal function is used to extract the moment of the baffle around the center of rotation when the surging oil flow impacts M 1;
[0072] Measuring the suction torque between the permanent magnet and the baffle inside the double-float gas relay based on angular displacement sensor and pressure sensor M 2;
[0073] Calculate the gravity of the baffle and further calculate the gravitational moment of the baffle around the center of rotation M 3;
[0074] Calculate the total moment on the baffle M = M 1+ M 3- M 2. Calculate the baffle rotation angular velocity ω = M / I , I Represents the moment of inertia of the baffle.
[0075] The flow rate information of the double float gas relay at the time of action is extracted, and the oil flow rate at the inlet when the baffle moves to the closed position of the reed switch in the simulation calculation is monitored based on the above baffle motion control equation. Figure 5 As shown in the figure, when the excitation pressure is lower than 0.109Mpa, the oil flow will not trigger the heavy gas protection mechanism of the relay. When the excitation pressure is 0.109Mpa, the flow rate of the oil flow rises to 0.8068m / s. As the excitation pressure increases, the peak flow rate in the pipeline increases significantly, but the heavy gas action flow rate only increases slightly, and the overall action flow rate value remains stable.
[0076] S105. Extract the oil flow acceleration information at the time of the double-float gas relay operation measured in the experiment, and monitor the oil flow acceleration at the inlet when the baffle moves to the closed position of the reed switch in the simulation calculation.
[0077] When the experimentally measured flow rate information at the time of double-float gas relay action is consistent with the oil flow rate information from the movement of the baffle to the closing angle of the reed switch in the simulation calculation results, it is proved that the flow rate is the decisive factor for the movement of the baffle and the heavy gas action alarm.
[0078] If the experimentally measured flow velocity information at the time of double-float gas relay action is significantly different from the oil flow velocity information from the movement of the baffle to the closing angle of the reed switch in the simulation calculation results, it means that the action of the baffle and the heavy gas action alarm are not only the effect of the flow velocity. Therefore, it is necessary to extract new flow characteristic quantities as the setting basis for the heavy gas action of the double-float gas relay. When the experimentally measured oil flow acceleration information at the time of double-float gas relay action is consistent with the oil flow acceleration information from the movement of the baffle to the closing angle of the reed switch in the simulation calculation results, it proves that the flow characteristic of oil flow acceleration is the decisive factor for the movement of the baffle and the heavy gas action alarm.
[0079] like Figure 3 As shown, in Figure 1 In step S103, a three-dimensional finite element model is established, and fluid simulation calculation is performed on the fluid calculation model, and the experimentally measured inlet flow velocity is used as the boundary condition for calculation, and the steps are as follows:
[0080] S1031, first generate a 1:1 three-dimensional model of a double-float gas relay, and extract the fluid based on this model to obtain an oil flow model of the relay cavity.
[0081] S1032 uses hybrid grid technology and adopts unstructured grid division method at the inlet and outlet and where there are no small components to save computing costs; structured grid division method is used for areas that require precise calculations and have small components to ensure calculation accuracy.
[0082] S1033, using a signal acquisition instrument to collect the oil flow velocity information at the installation pipeline of the double-float gas relay, and then converting the voltage information into flow velocity information, thereby obtaining the flow velocity at the inlet of the gas relay. The experimentally measured flow velocity information is edited into the udf through the DEFINE_PROFILE macro to become the inlet boundary condition of the double-float gas relay simulation calculation.
[0083] like Figure 4 As shown, in another embodiment of the present application, the steps of simulating different initial excitations of the oil flow model, performing fluid simulation numerical calculation on the fluid calculation model, and obtaining the corresponding relationship between the initial excitation of the oil flow model and the heavy gas action of the double float gas relay model may include the following steps:
[0084] S106, build a transformer fault simulation experimental platform and a double-float gas relay mechanical response platform, use ultrasonic flow rate sensors and pressure sensors to measure the oil flow rate and pressure at the gas relay installation pipeline, the flow rate measurement adopts non-contact measurement, and the pressure measurement adopts contact measurement.
[0085] S107, using a signal acquisition instrument to collect flow rate and pressure data information. The flow rate sensor outputs a current signal, the pressure sensor outputs a voltage signal, and the signal acquisition instrument collects the voltage signal, so the pressure data can be directly collected, and the flow rate signal is collected through an external current-voltage conversion module.
[0086] S108, establishing a double-float gas relay model, and on this basis establishing an oil flow model of the double-float gas relay model cavity.
[0087] S109, establish the double-float gas relay baffle force model, control the baffle movement through baffle force analysis, and use hybrid grid technology to divide the grid, perform numerical simulation calculations, monitor and record the inlet flow rate and pressure information when the baffle moves to the closed angle of the reed switch.
[0088] S110, by comparing the flow rate information at the time of the double-float gas relay action measured by the experiment with the oil flow rate information from the movement of the baffle to the closing angle of the reed switch in the simulation calculation results, it is determined whether the flow rate can be used as the setting value of the double-float gas relay. If the two results do not match, the oil flow acceleration information at the time of the double-float gas relay action is compared with the oil flow acceleration information from the movement of the baffle to the closing angle of the reed switch in the simulation calculation results to determine whether the oil flow acceleration can be used as the setting value of the double-float gas relay.
[0089] Figure 6 This is a comparison chart of the experimental action flow rate values and the simulation action flow rate values between the excitation pressure of 0.108Mpa and 0.115Mpa. It can be seen from the figure that the flow rate during heavy gas action is highly consistent. At this time, the flow rate can be used as the basis for setting the relay.
[0090] S111, using the determined flow characteristics as the setting value of the double-float gas relay, using the same excitation source to repeatedly test and measure the flow characteristics of the double-float gas relay during heavy gas action and output them.
[0091] S112, using the output flow characteristic quantity as the setting value of the double-float gas relay, and recalibrating the setting value.
[0092] Embodiment 2:
[0093] A double-float gas relay heavy gas action setting value verification device, the device comprising:
[0094] A three-dimensional finite element model of a double-float gas relay, the model comprising a double-float gas relay model and an internal cavity oil flow model;
[0095] The simulation module simulates the action characteristics of the double-float gas relay baffle under different fault levels, as well as the pressure distribution, flow rate, and oil flow acceleration information through the inlet boundary conditions under different excitation sources;
[0096] An experimental action value acquisition module is used to acquire the oil flow characteristic information of the double-float gas relay at the time of heavy gas action, wherein the experimental action information is acquired by the oil flow impact experiment;
[0097] A sensor and signal acquisition module, used to obtain information, including pressure, flow velocity and flow acceleration information at the installation pipeline;
[0098] Furthermore, when establishing a three-dimensional finite element analysis model of a double-float gas relay, the simulation analysis module construction process is as follows:
[0099] The oil flow cavity model of double-float gas relay is established by volume extraction method.
[0100] Use hybrid meshing technology to generate meshes;
[0101] Based on the dynamic mesh technology and UDF macro definition, the motion of the baffle is controlled to obtain the baffle motion characteristics and flow field information.
[0102] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A method for verifying the heavy gas action setting value of a double-float gas relay, characterized in that: It includes the following steps: Building a transformer fault simulation experimental platform, which is used to simulate transformer heavy gas faults of different energy sizes; Building a gas relay mechanical response platform, which is used to monitor the pressure and flow velocity characteristics at the pipeline and output the relationship between the pressure and flow velocity over time; A three-dimensional finite element analysis model of the gas relay was established, and the inlet flow velocity measured by the ultrasonic flow velocity sensor was used as the boundary condition for numerical simulation calculation. Establish a force analysis model for the gas relay and simulate the movement of the baffle according to the force condition of the baffle; Numerical simulation calculations were performed on the heavy gas action characteristics of the gas relay and the mechanical response characteristics of the baffle; Extract the pipeline flow velocity and pressure data at the time of heavy gas action measured in the experiment, compare and analyze with the simulation calculation data, and determine the factors for determining the setting value of the double float gas relay; Determine whether the pipeline flow rate at the time of heavy gas action measured by the experiment is consistent with the pipeline flow rate at the time of heavy gas action calculated by simulation; If the data match, the pipeline flow rate is used as the basis for judging the setting value of the double-float gas relay; If the velocity data do not match, the oil flow acceleration in the pipeline at the time of heavy gas action measured by the experiment and calculated by simulation is used as the basis for determining the setting value; According to the above judgment basis, the heavy gas action setting value of the double float gas relay is revised; The method of using the inlet flow velocity measured by the ultrasonic flow velocity sensor as the boundary condition of the numerical simulation calculation includes: using the flow velocity of the gas relay installation pipeline measured by the ultrasonic flow velocity sensor as the excitation signal, thereby using it as the inlet boundary condition of the simulation calculation, and the specific process includes: An ultrasonic flow rate sensor is used to measure the oil flow rate in the installation pipeline of the double-float gas relay; The signal acquisition instrument is used to output the data of the voltage and time of the ultrasonic flow velocity sensor, and the relationship between the flow velocity and time is inferred based on Matlab, and the functional relationship between the inlet and outlet flow velocity and time is fitted; The DEFINE_PROFILE macro is used to set the relationship between the flow velocity at the inlet and time in the numerical simulation calculation; The specific process of establishing the gas relay stress analysis model is as follows: The Compute_Force_And_Moment internal function is used to extract the moment of the baffle around the center of rotation when the surging oil flow impacts M 1; Measuring the suction torque between the permanent magnet and the baffle inside the double-float gas relay M 2; Calculate the gravity of the baffle and further calculate the gravitational moment of the baffle around the center of rotation M 3; Calculate the total moment on the baffle M = M 1+ M 3- M 2. Calculate the baffle rotation angular velocity ω = M / I , I represents the moment of inertia of the baffle; The specific process of numerical simulation calculation of the heavy gas action characteristics of the gas relay and the mechanical response characteristics of the baffle is as follows: The hybrid mesh technology is used to mesh the three-dimensional finite element analysis model of the gas relay; The damper motion equation is established based on the force analysis model of the double-float gas relay, and the damper motion control is realized through the DEFINE_CG_MOTION macro; Based on the numerical simulation method, the baffle motion characteristics and pressure distribution information of the three-dimensional simulation model of the double-float gas relay are calculated.
2. A method for verifying the heavy gas action setting value of a double-float gas relay according to claim 1, characterized in that: The transformer fault simulation experimental platform uses an air cannon as an excitation source and a pressure reducing valve to control the pressure to simulate transformer heavy gas faults of different energy sizes.
3. A method for verifying the heavy gas action setting value of a double-float gas relay according to claim 1, characterized in that: Monitor the pressure and flow characteristics of the pipeline and output the relationship between pressure and flow rate over time, including: Ultrasonic flow rate sensor is used to monitor the change of oil flow rate in the pipeline where the double-float gas relay is installed; Pressure sensors are used to monitor the oil flow pressure in the pipelines at the inlet and outlet of the double-float gas relay.
4. A method for verifying the heavy gas action setting value of a double-float gas relay according to claim 1, characterized in that: Extract the pipeline flow velocity and pressure data at the time of heavy gas action measured in the experiment, compare and analyze with the simulation calculation data, and determine the factors for determining the setting value of the double float gas relay, including: Compare the pipeline flow velocity measured by the experiment when the heavy gas alarm occurs and the inlet flow velocity calculated by the numerical simulation when the heavy gas alarm occurs; If the comparison results match, it proves that the heavy gas alarm is due to the effect of flow velocity; If the comparison results do not match, it proves that the heavy gas alarm is not caused by the flow rate, and the flow characteristic quantity should be further explored.
5. A method for verifying the heavy gas action setting value of a double-float gas relay according to claim 1, characterized in that: The specific process of extracting the oil flow acceleration in the pipeline at the time of heavy gas action measured by experiment and calculated by simulation as the basis for setting value judgment includes: Extract the heavy gas action oil flow acceleration calculated by numerical simulation and the heavy gas action oil flow acceleration measured by experiment, compare the pipeline oil flow acceleration measured by experiment when the heavy gas alarm sounds and the inlet oil flow acceleration calculated by numerical simulation when the heavy gas alarm sounds, and verify the determining factors of the heavy gas alarm. If the experimentally measured pipeline oil flow acceleration during heavy gas alarm is consistent with the numerical simulation calculated inlet oil flow acceleration data during heavy gas alarm, the pipeline oil flow acceleration will be used as the basis for determining the setting value of the double float gas relay.
6. A method for verifying the heavy gas action setting value of a double-float gas relay according to claim 1, characterized in that: The transformer fault simulation experimental platform comprises an air cannon (1), a surging oil flow generating chamber (2), an oil pillow (4), a flow rate sensor (5), a pressure sensor (6) and a gas relay (7) installed on an oil pipeline (3); the air cannon (1) is used to provide compressed air of different pressures; the surging oil flow generating chamber (2) is used to provide a space for compressed air to expand and do work, and to stimulate the oil pipeline (3) to generate surging oil flow; the oil pillow (4) is used to store or replenish oil; a butterfly valve (8) is installed at the oil outlet of the oil pillow (4); a bellows (9) is installed at one end of the oil pipeline (3) close to the oil outlet of the oil pillow (4); the bellows (9) is used to correct the deviation and suppress vibration of the oil pipeline (3).