A tool for live inspection and repair of fasteners of high-voltage electrical equipment
By designing the fastener tool for live maintenance of high-voltage electrical equipment, the operating rod, drive device and universal joint assembly can be used to automatically tighten the nut, which solves the problem of loose bolts of high-voltage electrical equipment, improves the safety and economicality of maintenance, and avoids the The inconvenience and high cost of using live working vehicles.
Patent Information
- Application Number
- CN202411102831.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-08-13
AI Technical Summary
During operation, existing high-voltage electrical equipment may loosen and rust due to vibration, overheating and other factors, especially in severe weather conditions, which may lead to connection breakage and cause safety hazards. Existing solutions such as power outage maintenance or the use of live working vehicles. Inconvenience and high cost.
A fastener tool for live maintenance of high-voltage electrical equipment is designed, including operating rods, drive devices, insulating cylinders, universal joint components and sleeves. The automatic tightening of the nuts is achieved through universal joint components and drive devices to improve the tool's Flexibility and convenience reduce risks and costs for operators.
The tool can securely and efficiently fasten bolts without stopping the power supply, shorten maintenance cycles, reduce costs, improve maintenance economy and safety of high-voltage electrical equipment, and avoid the limitations of using live working vehicles.
Smart Images

Figure CN118617355B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of high-voltage electric equipment maintenance, and in particular relates to a tool for live inspection and repair of fasteners of high-voltage electric equipment. Background Art
[0002] There are many types and numbers of power equipment, such as busbars, transformers, circuit breakers, disconnectors, etc. These components require a large number of bolts for fastening and connection. However, during the operation of the equipment, when affected by external factors such as vibration and overheating, the bolts are prone to loosening, rusting, and burning, resulting in increased resistance at the bolt connection and heating of the bolts. Especially for equipment operating outdoors, loosening of connection bolts and falling off of nuts are more common after strong winds, hail, and thunderstorms. In severe cases, the connection may break, posing a huge safety hazard to people, power grids, and equipment.
[0003] At present, in order to ensure the safety of operators, it is generally necessary to shut down the power supply to the equipment before operating, or to use a live operating vehicle to perform live operating. The former involves load transfer, large equipment power outage operations, and long power outage time, which will bring inconvenience to industrial production, traffic operation, and people's lives. The live operating vehicle is large in size, has high cost of use, poor flexibility, and is inconvenient to use, which will increase the workload of maintenance and lengthen the maintenance cycle. Some work sites are even unable to use operating vehicles due to limited working space, making it difficult to meet the requirements for the economic efficiency of high-voltage power equipment maintenance. Summary of the invention
[0004] The present application aims to solve at least one of the technical problems existing in the prior art or related art.
[0005] In view of this, according to an embodiment of the present application, a tool for live inspection of fasteners of high-voltage electrical equipment is proposed, comprising:
[0006] Operating lever;
[0007] A driving device, wherein an output shaft of the driving device is connected to the first end of the operating rod;
[0008] An insulating cylinder, which is sleeved on the outside of the operating rod and is rotatably connected to the operating rod so that the operating rod can rotate inside the insulating cylinder;
[0009] A universal joint assembly, a first end of the universal joint assembly being connected to a second end of the operating rod;
[0010] The first sleeve is provided with a first accommodating groove for accommodating the nut. The first end of the first sleeve is connected to the second end of the universal joint assembly so as to drive the first sleeve to rotate with the operating rod to screw the nut.
[0011] In a feasible implementation manner, a tool for live overhaul of fasteners of high-voltage electrical equipment includes:
[0012] A bracket, the bracket is detachably connected to the second end of the universal joint assembly, the first sleeve passes through the first end of the bracket, and the first sleeve is rotatably connected to the bracket;
[0013] A square flying head, the square flying head is arranged at the second end of the bracket, and a second receiving groove is arranged on the square flying head, and the second receiving groove is used to receive the bolt;
[0014] A magnetic body, which is detachably arranged on the second end of the bracket and is used to magnetize the square flying head;
[0015] Wherein, the second accommodating groove is coaxially arranged with the first accommodating groove.
[0016] In a feasible implementation manner, the first end of the bracket is slidably connected to the second end of the bracket to adjust the axial distance between the square flying head and the first sleeve.
[0017] In a feasible embodiment, the support comprises:
[0018] A first frame body, the first frame body is detachably connected to the second end of the universal joint assembly, and the first sleeve is connected to the second end of the universal joint assembly after passing through the first frame body; the first frame body is provided with a first sliding groove, and the first sliding groove is arranged along the axial direction of the first sleeve;
[0019] A second frame body, the second frame body is slidably connected to the first frame body, a square flying head is arranged on the second frame body, and the axial distance between the square flying head and the first sleeve is adjusted by sliding the second frame body relative to the first frame body; the second frame body is provided with a second sliding groove, and the second sliding groove is arranged along the axial direction of the first sleeve;
[0020] A sliding screw passes through the first sliding slot and the second sliding slot, and is used to guide the second frame when the second frame slides.
[0021] In a feasible embodiment, the support further includes:
[0022] A quick-pressing screw, the quick-pressing screw passes through the first sliding slot and the second sliding slot, and is used to fix the first frame and the second frame;
[0023] An insulating pull rope, a first end of which is connected to the pressing handle of the quick-pressing screw;
[0024] The elastic rope is arranged on the first frame and the second frame at the same time. The elastic rope is used to pull the second frame and the first frame closer to shorten the axial distance between the four-way flying head and the first sleeve.
[0025] In a feasible embodiment, the support further includes:
[0026] A guide portion, the cross section of which is in the shape of an I, the guide portion is arranged on the first frame, and the guide portion is parallel to the first sliding groove;
[0027] The guide groove has an I-shaped cross section, is arranged on the second frame, is parallel to the second sliding groove, and the guide portion is slidably connected in the guide groove.
[0028] In a feasible implementation manner, the universal joint assembly includes:
[0029] A universal joint body, wherein a first end of the universal joint body is connected to the operating rod, and a second end of the universal joint body is connected to the first sleeve;
[0030] A first connecting portion, a first end of the first connecting portion being connected to the insulating cylinder;
[0031] The second connecting part has a first end which is rotatably connected to the first connecting part, and a second end which is detachably connected to the bracket.
[0032] In a feasible implementation manner, the insulating cylinder includes:
[0033] The cylinder body is a hollow cavity with openings at both ends, and the cylinder body is sleeved on the outside of the operating rod, and the operating rod is rotatably connected to the cylinder body;
[0034] A third connecting part, the third connecting part is arranged at the first end of the cylinder, the third connecting part is provided with an external thread, the external thread is threadedly connected to the screw thread of the driving device, and the third connecting part is detachably connected to the driving device;
[0035] A fourth connection portion, which is disposed at the second end of the cylinder and is connected to the first connection portion;
[0036] In a feasible implementation manner, the tool for live overhaul of fasteners of high-voltage electrical equipment further comprises:
[0037] An installation portion, the installation portion is arranged on the fourth connection portion, and the installation portion is embedded in the first connection portion;
[0038] A fixing screw is sleeved on the mounting portion, and the fixing screw is clamped and connected with the first connecting portion to fix the first connecting portion on the fourth connecting portion.
[0039] In a feasible implementation manner, the tool for live overhaul of fasteners of high-voltage electrical equipment further comprises:
[0040] A first bearing, the first bearing is sleeved on the outer side of the operating rod;
[0041] A first jack screw, the first jack screw is threadedly connected to the insulating tube, and after the first jack screw passes through the insulating tube, the first jack screw fits with the first bearing;
[0042] A second bearing, the second bearing is sleeved on the outside of the first sleeve;
[0043] The bearing cover is sleeved on the outer side of the second bearing and connected to the bracket to fix the second bearing on the bracket;
[0044] There is a gap between the bearing cover and the first sleeve.
[0045] Compared with the prior art, the tool for live inspection and repair of fasteners of high-voltage electrical equipment in the present application has the following beneficial effects:
[0046] The tool for live inspection and repair of fasteners of high-voltage electrical equipment provided in the embodiment of the present application includes an operating rod, a driving device, an insulating cylinder, a universal joint assembly and a first sleeve; when it is necessary to tighten the bolt, first adjust the angle of the universal joint assembly so that after the operator holds the tool, the first receiving groove of the first sleeve can be aligned with the nut, so that the nut is embedded in the first receiving groove, and then start the driving device, which drives the operating rod to rotate inside the insulating cylinder, and then drives the universal joint assembly and the first sleeve to rotate, tightens the nut, thereby realizing the function of tightening the power equipment and preventing the safety hazards caused by loosening of the power bolts. The first sleeve is connected to the operating rod through a universal joint assembly so that the first sleeve can be rotated to various angles, which makes it convenient for the first sleeve to align with the nut to be repaired, improves the flexibility of the tool and makes it easy to use; an insulating cylinder is set on the outside of the operating rod, and the operator holds the insulating cylinder to hold and adjust the position of the tool to ensure the safety of the operator during live maintenance; the operating rod is connected to the output shaft of the driving device, and the screwing of the nut is completed by the driving device. The operator does not need to reach a position close to the nut to manually screw it, which improves the convenience of operation, thereby improving the operating efficiency, shortening the maintenance cycle, and reducing the time of live maintenance for operators, further improving the safety of live maintenance operations; operators can directly use tools to perform aerial operations at a distance without the need to use a live operation vehicle, which reduces the cost and workload of maintenance and improves the economy of live maintenance of aerial equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0048] Figure 1 A first schematic structural diagram of a tool for live repair of fasteners of high-voltage electrical equipment according to an embodiment of the present application;
[0049] Figure 2 A schematic structural diagram of a first receiving slot of a tool for live repair of fasteners of high-voltage electrical equipment provided by an embodiment of the present application;
[0050] Figure 3 A second schematic structural diagram of a tool for live repair of fasteners of high-voltage electrical equipment according to an embodiment of the present application;
[0051] Figure 4 for Figure 3 A magnified image of point A;
[0052] Figure 5 A schematic structural diagram of a second receiving slot of a tool for live repair of fasteners of high-voltage electrical equipment provided by an embodiment of the present application;
[0053] Figure 6 A schematic structural diagram of a second sleeve of a tool for live overhauling fasteners of high-voltage electrical equipment according to an embodiment of the present application;
[0054] Figure 7 A schematic structural diagram of a bracket of a tool for live repair of fasteners of high-voltage electrical equipment according to an embodiment of the present application;
[0055] in, Figures 1 to 7 The corresponding relationship between the reference numerals and component names in the figure is:
[0056] 10. operating rod; 11. driving device; 12. insulating cylinder; 13. universal joint assembly; 14. first sleeve; 15. first receiving groove; 16. bracket; 17. square flying head; 18. magnetic body; 19. second receiving groove; 20. second sleeve; 21. mounting part; 22. locking screw; 23. first bearing; 24. first top screw; 25. second bearing; 26. bearing cover;
[0057] 121, cylinder; 122, third connecting portion; 123, fourth connecting portion;
[0058] 131. Universal joint body; 132. First connecting part; 133. Second connecting part;
[0059] 161. First frame; 162. Second frame; 163. Sliding screw; 164. First sliding groove; 165. Second sliding groove; 166. Quick-pressing screw; 167. Insulating pull rope; 168. Elastic rope; 169. Guide part; 1610. Guide groove. DETAILED DESCRIPTION
[0060] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0061] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0062] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0063] The preferred embodiments of the present application are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present application and are not used to limit the present application.
[0064] like Figure 1 and Figure 2 As shown, according to an embodiment of the present application, a tool for live maintenance of fasteners of high-voltage electrical equipment is proposed, comprising: an operating rod 10, a driving device 11, an insulating cylinder 12, a universal joint assembly 13 and a first sleeve 14; the output shaft of the driving device 11 is connected to the first end of the operating rod 10; the insulating cylinder 12 is sleeved on the outside of the operating rod 10, and the insulating cylinder 12 is rotatably connected to the operating rod 10, so that the operating rod 10 can rotate inside the insulating cylinder 12; the first end of the universal joint assembly 13 is connected to the second end of the operating rod 10; a first accommodating groove 15 is provided on the first sleeve 14, and the first accommodating groove 15 is used to accommodate a nut, and the first end of the first sleeve 14 is connected to the second end of the universal joint assembly 13, so as to screw the nut by driving the first sleeve 14 to rotate with the operating rod 10.
[0065] The tool for live inspection of high-voltage electrical equipment fasteners provided in the embodiment of the present application includes an operating rod 10, a driving device 11, an insulating cylinder 12, a universal joint assembly 13 and a first sleeve 14; when it is necessary to tighten the bolt, first adjust the angle of the universal joint assembly 13 so that after the operator holds the tool, the first receiving groove 15 of the first sleeve 14 can be aligned with the nut, so that the nut is embedded in the first receiving groove 15, and then start the driving device 11. The driving device 11 drives the operating rod 10 to rotate inside the insulating cylinder 12, and then drives the universal joint assembly 13 and the first sleeve 14 to rotate, and tightens the nut, thereby realizing the function of fastening the power equipment and preventing the safety hazards caused by the loosening of the power bolts. The first sleeve 14 is connected to the operating rod 10 through the universal joint assembly 13, so that the first sleeve 14 can be rotated to various angles, which is convenient for the first sleeve 14 to align with the nut to be repaired, improves the flexibility of the tool and is easy to use; an insulating cylinder 12 is arranged on the outside of the operating rod 10, and the operator holds the insulating cylinder 12 to hold and adjust the position of the tool to ensure the safety of the operator during the live maintenance process; the operating rod 10 is connected to the output shaft of the driving device 11, and the screwing of the nut is completed by the driving device 11, and the operator does not need to reach a position close to the nut to manually screw it, which improves the convenience of operation, thereby improving the operating efficiency, shortening the maintenance cycle, and reducing the time of live maintenance for operators, further improving the safety of live maintenance operations; operators can directly use tools to perform aerial operations at a distance without the need to use a live operation vehicle, which reduces the cost and workload of maintenance and improves the economy of live maintenance of high-altitude equipment.
[0066] It is understandable that before the first sleeve 14 is aligned with the nut, it is necessary to adjust the universal joint assembly 13 to adjust the angle of the first sleeve 14 so that the first sleeve 14 can be more easily aligned with the nut; after the nut is embedded in the first receiving groove 15, the operator adjusts the angle of the operating rod 10 to keep the universal joint assembly 13 and the operating rod 10 vertical, and then starts the driving device 11 to drive the first sleeve 14 to rotate and tighten the nut.
[0067] Further, such as Figure 2 As shown, the cross-section of the first receiving groove 15 is hexagonal, and the slot size of the first receiving groove 15 is greater than or equal to the size of the nut, so that the first sleeve 14 can adapt to nuts of different sizes and improve the practicality of the tool; at the same time, it ensures that the first receiving groove 15 can limit the nut on the premise that the nut can smoothly enter the first receiving groove 15, thereby preventing the nut from continuously rotating relative to the first sleeve 14 in the first receiving groove 15.
[0068] As a preferred solution, the size of the first accommodating groove 15 decreases from the notch of the first accommodating groove 15 to the bottom of the groove. By embedding nuts of different sizes into different depths of the first accommodating groove 15, the limiting effect of the first accommodating groove 15 on the nut is ensured to prevent the nut from rotating in the first sleeve 14, thereby ensuring that the tool has a high screwing efficiency for nuts of different sizes.
[0069] In some examples, the driving device 11 may be a driving motor, which is driven by the driving motor to automatically screw the nut to improve operating efficiency; the driving device 11 may also be a manual rotating handle, which is used to slowly tighten the nut to improve operating precision.
[0070] like Figure 3 and Figure 4 As shown, in a feasible embodiment, a tool for live maintenance of high-voltage electrical equipment fasteners includes: a bracket 16, a square flying head 17 and a magnetic body 18; the bracket 16 is detachably connected to the second end of the universal joint assembly 13, the first sleeve 14 passes through the first end of the bracket 16, and the first sleeve 14 is rotatably connected to the bracket 16; the square flying head 17 is arranged at the second end of the bracket 16, and a second accommodating groove 19 is arranged on the square flying head 17, and the second accommodating groove 19 is used to accommodate bolts; the magnetic body 18 is detachably arranged on the second end of the bracket 16, and the magnetic body 18 is used to magnetize the square flying head 17; wherein the second accommodating groove 19 is coaxially arranged with the first accommodating groove 15.
[0071] In this technical solution, a square flying head 17 is provided on the bracket 16, and the bracket 16 is arranged on the universal joint assembly 13, so that the angle of the bracket 16 and the square flying head 17 can be adjusted through the universal joint assembly 13, so that the second receiving groove 19 of the square flying head 17 can be aligned with the head of the bolt; the magnetic body 18 is used to magnetize the square flying head 17, and by aligning the second receiving groove 19 of the square flying head 17 with the head of the bolt, the magnetized square flying head 17 can absorb the bolt and embed the bolt head into the second receiving groove 19, and at the same time, the second receiving groove 19 limits the bolt to prevent the bolt from being displaced perpendicular to the axis direction of the square flying head 17; the first sleeve 14 can be flexibly rotated relative to the bracket 16 to ensure that the first sleeve 14 can quickly screw the nut, and the axis of the square flying head 17 coincides with the axis of the first sleeve 14, so that a group of bolts and nuts can be disassembled and assembled by cooperating with the first sleeve 14 through the square flying head 17, so as to realize the replacement function of the bolt and nut assembly.
[0072] Furthermore, the magnetic body 18 is a strong magnetic material, which can magnetize the square flying head 17, and then use the square flying head 17 to absorb the bolt, drive the bolt to move, and prevent the bolt from falling.
[0073] like Figure 4As shown, further, the cross-section of the second accommodating groove 19 is hexagonal, and the slot size of the second accommodating groove 19 is greater than or equal to the size of the bolt head, so that the square flying head 17 can adapt to bolts of different sizes and improve the practicality of the tool; at the same time, it ensures that under the premise that the bolt head can smoothly enter the second accommodating groove 19, the second accommodating groove 19 can limit the bolt head, thereby preventing the bolt from continuously rotating relative to the square flying head 17 in the second accommodating groove 19.
[0074] As a preferred solution, the size of the second accommodating groove 19 decreases from the groove mouth of the second accommodating groove 19 to the groove bottom. By embedding bolt heads of different sizes into different depths of the second accommodating groove 19, the limiting effect of the second accommodating groove 19 on the bolt head is ensured to prevent the bolt head from rotating in the square flying head 17, thereby ensuring that the tool can quickly align bolts of different sizes and the limiting effect is effective.
[0075] In some examples, such as Figure 5 In the embodiment, the outer contour of the cross section of the square flying head 17 is a square. When the size of the bolt head to be disassembled is larger than the notch size of the second receiving groove 19, such as Figure 6 In the embodiment, the second sleeve 20 can be installed on the square flying head 17. A square assembly groove is arranged on the end face of the second sleeve 20. By setting the outer contour of the cross section of the square flying head 17 to a square, the square end of the square flying head 17 can match the square assembly groove on the second sleeve 20, so that the square flying head 17 can be inserted into the second sleeve 20, and the detachable connection between the square flying head 17 and the second sleeve 20 is realized. Then, by installing the second sleeve 20 of different sizes on the square flying head 17, the second sleeve 20 is used to replace the square flying head 17 to limit the bolt heads of different sizes, so as to further expand the adaptability of the tool to bolts of different sizes, further expand the use range of the tool, and improve the practicality of the tool.
[0076] Furthermore, the square flying head 17 is connected to the bracket 16 by threads, so that the square flying head 17 and the bracket 16 are detachably connected, which is convenient for quickly replacing the appropriate square flying head 17 according to the size of the bolt, thereby improving the practicality of the tool.
[0077] In a feasible implementation manner, the first end of the bracket 16 is slidably connected to the second end of the bracket 16 to adjust the axial distance between the square flying head 17 and the first sleeve 14 .
[0078] In this technical solution, the first end of the bracket 16 is movably connected to the second end of the bracket 16, the first end of the bracket 16 is connected to the universal joint assembly 13, the universal joint assembly 13 is provided with a first sleeve 14, and the second end of the bracket 16 is provided with a square flying head 17. By sliding the second end of the bracket 16, the distance between the second end of the bracket 16 and the first end of the bracket 16 is adjusted, and then the axial distance between the square flying head 17 and the first sleeve 14 is adjusted, so as to adapt to bolts of different lengths and nuts in different positions, so that the tool can be suitable for bolt and nut assemblies of different sizes, thereby improving the practicability of the tool. There is no need to frequently replace the tool during use. The tool is easy to use, improves the efficiency of disassembly and assembly of the bolts, and shortens the maintenance cycle.
[0079] like Figure 3 As shown, in a feasible embodiment, the bracket 16 includes: a first frame body 161, a second frame body 162 and a sliding screw 163; the first frame body 161 is detachably connected to the second end of the universal joint assembly 13, and the first sleeve 14 passes through the first frame body 161 and is connected to the second end of the universal joint assembly 13; the first frame body 161 is provided with a first sliding groove 164, and the first sliding groove 164 is arranged along the axial direction of the first sleeve 14; the second frame body 162 is slidably connected to the first frame body 161 The second frame 162 is connected with a square flying head 17, and the axial distance between the square flying head 17 and the first sleeve 14 is adjusted by sliding the second frame 162 relative to the first frame 161; the second frame 162 is provided with a second sliding groove 165, and the second sliding groove 165 is arranged along the axial direction of the first sleeve 14; the sliding screw 163 passes through the first sliding groove 164 and the second sliding groove 165, and the sliding screw 163 is used to guide the second frame 162 when the second frame 162 slides.
[0080] In this technical solution, the bracket 16 is composed of two "L"-shaped frames slidably connected, the first frame 161 is provided with a first sliding groove 164, and the first sleeve 14 passes through the first frame 161; the second frame 162 is provided with a square flying head 17, and the relative movement between the second frame 162 and the first frame 161 is guided by making the sliding screw 163 pass through the first sliding groove 164 and the second sliding groove 165 at the same time, and the sliding screw 163 can adjust the clamping force on the first frame 161 and the second frame 162. When the sliding screw 163 is in a tightened state, the relative position of the first frame 161 and the second frame 162 can be fixed, thereby fixing the axial distance between the square flying head 17 and the first sleeve 14; when the sliding screw 163 is in a non-tightened state, the first frame 161 and the second frame 162 can slide flexibly, so as to facilitate the rapid adjustment of the axial distance between the square flying head 17 and the first sleeve 14 to adapt to different bolt and nut assemblies.
[0081] Furthermore, a plurality of sliding screws 163 may be provided to ensure the stability of the second frame 162 and the first frame 161 during the sliding process.
[0082] like Figure 3 and Figure 4 As shown, in a feasible embodiment, the bracket 16 also includes: a quick-pressing screw 166, an insulating pull rope 167 and an elastic rope 168; the quick-pressing screw 166 passes through the first sliding groove 164 and the second sliding groove 165, and the quick-pressing screw 166 is used to fix the first frame 161 and the second frame 162; the first end of the insulating pull rope 167 is connected to the pressure handle of the quick-pressing screw 166; the elastic rope 168 is simultaneously arranged on the first frame 161 and the second frame 162, and the elastic rope 168 is used to pull the second frame 162 and the first frame 161 closer, thereby shortening the axial distance between the four-sided flying head 17 and the first sleeve 14.
[0083] In this technical solution, the quick-pressing screw 166 passes through the first sliding groove 164 and the second sliding groove 165. The quick-pressing screw 166 is used to fix the first frame 161 and the second frame 162. By connecting the insulating pull rope 167 to the pressure handle of the quick-pressing screw 166, the operator can loosen the quick-pressing screw 166 at a distance, so that the first frame 161 and the second frame 162 are no longer subjected to the tightening pressure of the quick-pressing screw 166. At this time, the elastic rope 168 restores its elastic deformation, so that the second frame 162 slides relative to the first frame 161, thereby making the square flying head 17 close to the first sleeve 14, so that when the bolt head is embedded in the second receiving groove 19, the nut can also be embedded in the first receiving groove 15, thereby realizing the disassembly and assembly of the bolt and nut assembly.
[0084] Furthermore, the second end of the insulating pull rope 167 extends to the ground. Before use, when adjusting the axial distance between the four-sided flying head 17 and the first sleeve 14, the quick-pressing screw 166 needs to be manually tightened; when the bolt head needs to be embedded in the second accommodating groove 19 and the nut needs to be embedded in the first accommodating groove 15, the quick-pressing screw 166 can be loosened by operating the insulating pull rope 167 on the ground, so that the four-sided flying head 17 can quickly approach the first sleeve 14, reducing the burden on high-altitude workers and preventing safety hazards caused by high-altitude workers operating with both hands at the same time and failing to initiate emergency measures in time, which helps to improve the safety of high-altitude operations.
[0085] In some examples, when it is necessary to remove the nut and bolt, the bracket 16 is mounted on the universal joint assembly 13, the axial distance between the square flying head 17 and the first sleeve 14 is adjusted, and the bracket 16 is fastened with the quick-pressing screw 166 to fix the axial distance between the square flying head 17 and the first sleeve 14; the insulating tube 12 is used to move the overall tool to the position where the bolt and nut assembly needs to be removed, so that the bolt head is embedded in the second receiving groove 19 of the square flying head 17, and the first receiving groove 15 of the first sleeve 14 is aligned with the nut to be removed; the insulating pull rope 167 is pulled to make the quick-pressing screw The screw 166 is loosened, and the bracket 16 slides under the action of the elastic rope 168, and the first sleeve 14 will be sleeved on the nut, that is, the nut is embedded in the first accommodating groove 15; then the driving device 11 is turned on, and the operating rod 10 is driven to rotate by the output shaft of the driving motor, and the universal joint assembly 13 is driven to rotate, and the first sleeve 14 is driven to rotate, so that the nut in the first sleeve 14 is removed from the bolt; after the nut is removed, the square flying head 17 sucks the bolt, and the overall tool is gently shaken to remove the bolt, and the operator moves the tool to the ground to complete the operation of removing the bolt and nut assembly.
[0086] It is understandable that when the bolt head is embedded in the second receiving groove 19 and the insulating pull rope 167 is pulled, if the nut cannot be smoothly embedded in the first receiving groove 15, the angle of the first sleeve 14 can be slightly adjusted through the driving device 11 to align the first receiving groove 15 with the nut so that the nut can be accurately embedded in the first receiving groove 15.
[0087] Furthermore, when the driving device 11 is a driving motor, a switch, a forward button and a reverse button are provided on the driving device 11. By pressing the buttons on the driving device 11, the operator controls the rotation direction and rotation angle of the output shaft of the driving device 11, thereby adjusting the rotation direction and rotation angle of the nut.
[0088] In some examples, when it is necessary to install nuts and bolts, the bracket 16 is installed on the universal joint assembly 13, the axial distance between the square flying head 17 and the first sleeve 14 is adjusted, and the bracket 16 is tightened with the quick-press screw 166 to fix the axial distance between the square flying head 17 and the first sleeve 14; the nut is placed in the first receiving groove 15, and the bolt is placed in the second receiving groove 19, and the square flying head 17 can absorb the bolt and prevent it from falling; the insulating tube 12 is used to move the overall tool to the position where the bolt and nut assembly needs to be installed, and the insulating tube 12 is controlled to allow the bolt to pass through The position to be installed; pull the insulating pull rope 167 to loosen the quick-press screw 166, and the bracket 16 slides under the action of the elastic rope 168, and the nut in the first sleeve 14 will be aligned with and close to the screw of the bolt; then turn on the driving device 11, and drive the operating lever 10 to rotate by rotating the output shaft of the driving motor, drive the universal joint assembly 13 to rotate, drive the first sleeve 14 to rotate, and screw the nut in the first sleeve 14 onto the bolt; after tightening the nut, gently shake the entire tool, and the operator moves the tool to the ground to complete the operation of installing the bolt and nut assembly.
[0089] like Figure 7 As shown, in a feasible embodiment, the bracket 16 also includes: a guide portion 169 and a guide groove 1610; the cross-section of the guide portion 169 is in the shape of an "I", the guide portion 169 is arranged on the first frame 161, and the guide portion 169 is parallel to the first sliding groove 164; the cross-section of the guide groove 1610 is in the shape of an "I", the guide groove 1610 is arranged on the second frame 162, the guide groove 1610 is parallel to the second sliding groove 165, and the guide portion 169 is slidably connected in the guide groove 1610.
[0090] In this technical solution, an "I"-shaped guide portion 169 is provided on the first frame 161, and an "I"-shaped guide groove 1610 is provided on the second frame 162. The guide portion 169 is embedded in the guide groove 1610 to prevent the second frame 162 and the first frame 161 from being misaligned during the sliding process, thereby ensuring that the axis of the square flying head 17 always coincides with the axis of the first sleeve 14, ensuring that when the head of the bolt is aligned with the second receiving groove 19 on the square flying head 17, the nut can also be aligned with the first receiving groove 15 on the first sleeve 14, thereby reducing the difficulty of disassembly and assembly of the bolt and nut assembly and improving the user experience.
[0091] like Figure 1 , Figure 3 and Figure 4As shown, in a feasible embodiment, the universal joint assembly 13 includes: a universal joint body 131, a first connecting part 132 and a second connecting part 133; the first end of the universal joint body 131 is connected to the operating rod 10, and the second end of the universal joint body 131 is connected to the first sleeve 14; the first end of the first connecting part 132 is connected to the insulating tube 12; the first end of the second connecting part 133 is rotatably connected to the first connecting part 132, and the second end of the second connecting part 133 is detachably connected to the bracket 16.
[0092] In this technical solution, the universal joint body 131 includes a fixed joint in the middle and movable joints at both ends. The two movable joints of the universal joint body 131 are respectively connected to the operating rod 10 and the first sleeve 14, so that the angle of the first sleeve 14 can be adjusted through the universal joint body 131, so that the nut can be smoothly embedded in the first receiving groove 15; the first end of the first connecting part 132 is connected to the insulating tube 12, and the second end of the first connecting part 132 is rotatably connected to the first end of the second connecting part 133, and the second connecting part 133 and the universal joint body 131 can rotate separately to adjust the angle without interfering with each other; when the bracket 16 is installed to the second connecting part 1 33, the bracket 16 adjusts the angle through the second connecting portion 133, the first sleeve 14 adjusts the angle through the universal joint assembly 13, and the first sleeve 14 passes through the bracket 16 and is rotatably connected to the bracket 16, so that the angle of the bracket 16 is consistent with the angle of the first sleeve 14, that is, the angle of the square flying head 17 is consistent with the angle of the first sleeve 14, that is, the axis of the square flying head 17 coincides with the axis of the first sleeve 14, to ensure that when the bolt head is embedded in the square flying head 17, the nut can also be accurately embedded in the first sleeve 14, thereby improving the alignment efficiency of the tool and the bolt and nut assembly, and helping to improve the timeliness of maintenance and improve maintenance efficiency.
[0093] like Figure 1 and Figure 3 As shown, in a feasible embodiment, the insulating cylinder 12 includes: a cylinder body 121, a third connecting part 122 and a fourth connecting part 123; the cylinder body 121 is a hollow cavity with openings at both ends, and the cylinder body 121 is mounted on the outside of the operating rod 10, and the operating rod 10 is rotatably connected to the cylinder body 121; the third connecting part 122 is arranged at the first end of the cylinder body 121, and the third connecting part 122 is provided with an external thread, and the external thread is threadedly connected to the screw thread of the driving device 11, so that the third connecting part 122 is detachably connected to the driving device 11; the fourth connecting part 123 is arranged at the second end of the cylinder body 121, and the fourth connecting part 123 is connected to the first connecting part 132.
[0094] In this technical solution, the cylinder 121 is sleeved on the outside of the operating rod 10, and the operating rod 10 can rotate inside the cylinder 121; the cylinder 121 is connected to the driving device 11 through the third connecting part 122, and the cylinder 121 is connected to the first connecting part 132 through the fourth connecting part 123; by arranging an external thread on the third connecting part 122 and connecting the external thread with the threaded thread of the driving device 11, the reliability of the connection between the insulating cylinder 12 and the driving device 11 is guaranteed under the premise of realizing the detachable connection between the insulating cylinder 12 and the driving device 11.
[0095] like Figure 1 , Figure 3 and Figure 4 As shown, in a feasible embodiment, the tool for live maintenance of high-voltage electrical equipment fasteners also includes: a mounting portion 21 and a fixing screw 22; the mounting portion 21 is arranged on the fourth connecting portion 123, and the mounting portion 21 is embedded in the first connecting portion 132; the fixing screw 22 is sleeved on the mounting portion 21, and the fixing screw 22 is clamped and connected to the first connecting portion 132 to fix the first connecting portion 132 on the fourth connecting portion 123.
[0096] In this technical solution, a mounting portion 21 is provided on the fourth connecting portion 123 , a fixing screw 22 is sleeved on the mounting portion 21 and is clamped and connected with the first connecting portion 132 , and the mounting portion 21 and the first connecting portion 132 are fixed by the fixing screw 22 to stably fix the first connecting portion 132 on the insulating tube 12 .
[0097] In some examples, an external thread is provided on the outer wall of the mounting portion 21, and an internal thread is provided on the inner wall of the locking screw 22. The locking screw 22 is threadedly connected to the mounting portion 21, and the locking screw 22 is clamped with the first connecting portion 132 to detachably connect the first connecting portion 132 of the universal joint assembly 13 to the insulating tube 12.
[0098] like Figure 1 , Figure 3 and Figure 4 As shown, in a feasible embodiment, the tool for live maintenance of high-voltage electrical equipment fasteners also includes: a first bearing 23, a first push screw 24, a second bearing 25 and a bearing cover 26; the first bearing 23 is sleeved on the outside of the operating rod 10; the first push screw 24 is threadedly connected to the insulating tube 12, and after the first push screw 24 passes through the insulating tube 12, the first push screw 24 fits with the first bearing 23; the second bearing 25 is sleeved on the outside of the first sleeve 14; the bearing cover 26 is sleeved on the outside of the second bearing 25, and the bearing cover 26 is connected to the bracket 16 to fix the second bearing 25 on the bracket 16; wherein, there is a gap between the bearing cover 26 and the first sleeve 14.
[0099] In this technical solution, both ends of the operating rod 10 are sleeved with first bearings 23, and the first top screw 24 is threadedly connected to the insulating tube 12 and abuts against the outer ring of the first bearing 23 to ensure the stability of the connection between the first bearing 23 and the operating rod 10, so that the first bearing 23 is used to stably support the operating rod 10 when the operating rod 10 rotates, thereby ensuring the smooth rotation of the operating rod 10; the outer side of the first sleeve 14 is sleeved with a second bearing 25, and the second bearing 25 is detachably connected to the bracket 16 through a bearing cover 26. The second bearing 25 supports the first sleeve 14 when the first sleeve 14 rotates. The sleeve 14 is rotationally supported to ensure the stability of the first sleeve 14 during rotation and prevent the first sleeve 14 from shaking. At the same time, the first sleeve 14 is rotationally supported by the second bearing 25, so that the relative position between the first sleeve 14 and the bracket 16 can be fixed. When the angle of the first sleeve 14 is adjusted by the universal joint assembly 13, the relative position of the bracket 16 and the first sleeve 14 will not change, and the rotation angle of the bracket 16 and the first sleeve 14 will remain consistent, so that the axis of the square flying head 17 and the first sleeve 14 are always in the same straight line, thereby improving the convenience of aligning the bolt and nut assembly.
[0100] It is easy for those skilled in the art to understand that, under the premise of no conflict, the above-mentioned advantageous methods can be freely combined and superimposed.
[0101] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present application shall be included in the protection scope of the present application. The above are only preferred implementations of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and variations can be made without departing from the technical principles of the present application, and these improvements and variations should also be regarded as the protection scope of the present application.
Claims
1. A tool for live inspection of fasteners of high-voltage electrical equipment. It is characterized in that The tool for live overhaul of fasteners of high-voltage electrical equipment comprises: Operating lever; A driving device, wherein an output shaft of the driving device is connected to the first end of the operating rod; An insulating cylinder, wherein the insulating cylinder is sleeved on the outside of the operating rod, and the insulating cylinder is rotatably connected to the operating rod so that the operating rod can rotate inside the insulating cylinder; a universal joint assembly, wherein a first end of the universal joint assembly is connected to a second end of the operating rod; A first sleeve, wherein a first receiving groove is provided on the first sleeve, and the first receiving groove is used to receive a nut, and a first end of the first sleeve is connected to a second end of the universal joint assembly, so as to drive the first sleeve to rotate with the operating rod to screw the nut; A bracket, the bracket is detachably connected to the second end of the universal joint assembly, the first sleeve passes through the first end of the bracket, and the first sleeve is rotatably connected to the bracket; A square flying head, the square flying head is arranged at the second end of the bracket, the square flying head is provided with a second receiving groove, the second receiving groove is used to receive the bolt; wherein the second receiving groove is coaxially arranged with the first receiving groove; The bracket includes a first frame and a second frame, the first frame is detachably connected to the second end of the universal joint assembly, and the first sleeve is connected to the second end of the universal joint assembly after passing through the first frame; the first frame is provided with a first sliding groove, and the first sliding groove is arranged along the axial direction of the first sleeve; the second frame is slidably connected to the first frame, and the square flying head is arranged on the second frame; the second frame is provided with a second sliding groove, and the second sliding groove is arranged along the axial direction of the first sleeve; A quick-pressing screw, the quick-pressing screw passes through the first sliding slot and the second sliding slot, and the quick-pressing screw is used to fix the first frame and the second frame; An insulating pull rope, a first end of which is connected to the pressing handle of the quick-pressing screw; An elastic rope is provided on both the first frame and the second frame at the same time, and is used to pull the second frame and the first frame closer to each other, thereby shortening the axial distance between the four-way flying head and the first sleeve.
2. A tool for live inspection of fasteners of high-voltage electrical equipment according to claim 1, It is characterized in that The tool for live overhaul of high-voltage electrical equipment fasteners also includes: A magnetic body is detachably arranged on the second end of the bracket, and is used to magnetize the square flying head.
3. A tool for live inspection of fasteners of high-voltage electrical equipment according to claim 1, Features: The first end of the bracket is slidably connected to the second end of the bracket to adjust the axial distance between the square flying head and the first sleeve.
4. A tool for live inspection of fasteners of high-voltage electrical equipment according to claim 3, It is characterized in that The second frame body slides relative to the first frame body to adjust the axial distance between the square flying head and the first sleeve, and the bracket further includes: A sliding screw passes through the first sliding slot and the second sliding slot, and is used to guide the second frame when the second frame slides.
5. A tool for live inspection of fasteners of high-voltage electrical equipment according to claim 1, It is characterized in that The support also includes: A guide portion, wherein the cross section of the guide portion is in an "I" shape, the guide portion is arranged on the first frame, and the guide portion is parallel to the first sliding groove; The guide groove has an I-shaped cross section, is arranged on the second frame, is parallel to the second sliding groove, and the guide portion is slidably connected in the guide groove.
6. A tool for live inspection and repair of fasteners of high-voltage electrical equipment according to claim 1, It is characterized in that The universal joint assembly comprises: A universal joint body, wherein a first end of the universal joint body is connected to the operating rod, and a second end of the universal joint body is connected to the first sleeve; A first connecting portion, a first end of which is connected to the insulating tube; A second connecting part, wherein a first end of the second connecting part is rotatably connected to the first connecting part, and a second end of the second connecting part is detachably connected to the bracket.
7. A tool for live inspection and repair of fasteners of high-voltage electrical equipment according to claim 6, It is characterized in that The insulating cylinder comprises: A cylinder, which is a hollow cavity with openings at both ends, and is sleeved on the outside of the operating rod, and the operating rod is rotatably connected to the cylinder; A third connection part, the third connection part is arranged at the first end of the barrel, the third connection part is provided with an external thread, the external thread is threadedly connected to the screw thread of the driving device, and the third connection part is detachably connected to the driving device; A fourth connection portion, wherein the fourth connection portion is disposed at the second end of the cylinder, and the fourth connection portion is connected to the first connection portion.
8. A tool for live inspection and repair of fasteners of high-voltage electrical equipment according to claim 7, It is characterized in that The tool for live overhaul of high-voltage electrical equipment fasteners also includes: a mounting portion, the mounting portion being arranged on the fourth connecting portion and embedded in the first connecting portion; A fixing screw, wherein the fixing screw is sleeved on the mounting portion, and the fixing screw is clamped and connected to the first connecting portion to fix the first connecting portion on the fourth connecting portion.
9. A tool for live inspection and repair of fasteners of high-voltage electrical equipment according to any one of claims 1 to 8, It is characterized in that The tool for live overhaul of high-voltage electrical equipment fasteners also includes: a first bearing, wherein the first bearing is sleeved on the outer side of the operating rod; a first jack screw, wherein the first jack screw is threadably connected to the insulating tube, and after the first jack screw passes through the insulating tube, the first jack screw fits with the first bearing; a second bearing, wherein the second bearing is sleeved on an outer side of the first sleeve; A bearing cover, wherein the bearing cover is sleeved on the outer side of the second bearing and the bearing cover is connected to the bracket to fix the second bearing on the bracket; Wherein, there is a gap between the bearing cover and the first sleeve.