A passive reinforcement slurry and method for basement pit in water-rich stratum
Through passive grouting technology, composite slurry is injected into the base in water-rich strata, and groundwater pressure is used to reinforce the base. This solves the problems of uncontrollable reinforcement effect and low construction efficiency of deep foundation pits in the existing technology, and achieves short construction period and low cost. The passive reinforcement effect of the base.
Patent Information
- Application Number
- CN202411060483.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-08-05
AI Technical Summary
Existing deep foundation pit reinforcement methods have uncontrollable effects in water-rich strata, high construction time and costs, and cannot effectively solve the problem of strong water permeability in the base strata, resulting in foundation pit collapse and low construction efficiency.
The passive grouting method is used to inject fluid composite slurry into the base through the grouting pipe under the action of groundwater pressure outside the foundation pit to reinforce the base. Combined with the construction of underground diaphragm walls and structures, excavation and grouting are performed simultaneously to control the grouting. Amount and pressure to ensure reinforcement effect.
It achieves effective reinforcement of the base, shortens the construction period, and reduces costs. It is suitable for deep foundation pit pretreatment of various strata and support forms, ensuring construction quality and safety.
Smart Images

Figure CN118621803B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of foundation pit reinforcement, relates to grouting reinforcement of foundation pits, and in particular to a passive reinforcement slurry and method for a base of a foundation pit in a water-rich stratum. Background Art
[0002] With the development of economy and society, more and more underground projects such as urban rail transit, municipal pipe gallery, water conservancy projects, etc. are being built. The construction of underground projects inevitably requires deep foundation pit excavation. During the construction of deep foundation pits, problems such as foundation pit collapse and surrounding building collapse often occur due to base pipe burst or seepage damage. The traditional deep foundation pit reinforcement methods are mainly the following:
[0003] 1. Use high-pressure rotary jet piles, cement mixing piles and other cement soil piles to pre-reinforce the original foundation pit foundation, mix and fuse the cement slurry and the stratum to pre-treat the stratum and reinforce the poor geology of the base. However, this method has certain limitations. The reinforcement effect of high-pressure rotary jet piles in permeable strata is uncontrollable, and cement mixing piles are extremely difficult to pile after exceeding a certain depth, and the construction period and construction cost are high.
[0004] 2. Replacement of the soft strata at the base by replacement filling. This method requires ultra-deep excavation of the replacement layer foundation pit. Without increasing the embedded depth of the foundation pit retaining structure, it is easy to cause the foundation pit to be damaged by kicking. In addition, this replacement method cannot solve the problem of strong permeability of the base strata and cannot ensure the safety of the base during the excavation of the foundation pit.
[0005] 3. The consolidation grouting process is used to improve the poor foundation, but this method has a long construction period, has a great impact on the excavation of the working well, and has low construction efficiency.
[0006] To this end, we propose a passive reinforcement slurry and method for the base of foundation pits in water-rich strata to solve the above problems. Summary of the invention
[0007] The purpose of the present invention is to overcome the deficiencies of the prior art and to provide a slurry and method for passively reinforcing the base of a foundation pit in a water-rich stratum with a short construction period and high efficiency.
[0008] To solve the above problems, the technical solution of the present invention is:
[0009] A passive reinforcement method for a foundation pit in a water-rich stratum comprises the following steps:
[0010] Step S101: constructing underground continuous wall and excavating foundation pit once
[0011] Construct underground continuous walls around the predetermined location of the foundation pit;
[0012] Excavate the foundation pit until the excavation surface;
[0013] Step S103: Passive grouting
[0014] When the water level in the foundation pit is lower than the water level outside the foundation pit by more than or equal to 15 meters, passive grouting is performed on the base of the foundation pit, and the grouting slurry flows to the periphery of the base under the pressure of the groundwater outside the foundation pit for reinforcement;
[0015] Step S105: Secondary excavation of foundation pit and structural construction
[0016] Continue to excavate the foundation pit until the base, seal the bottom of the foundation pit and construct the lining wall;
[0017] Step S103 of passive grouting is carried out simultaneously with step S105 of secondary excavation of foundation pit and structural construction.
[0018] In a further embodiment, in step S101, during the construction of the underground continuous wall and the primary excavation of the foundation pit, dewatering is performed while the foundation pit is excavated, and the water level in the foundation pit is greater than or equal to 500 mm below the excavation surface.
[0019] In a further embodiment, the excavation face is located above the substrate.
[0020] In a further embodiment, before the passive grouting in step S103, a plurality of grouting pipes are installed at intervals around the outer side of the underground continuous wall, and passive grouting is performed through the grouting pipes.
[0021] In a further embodiment, before the passive grouting in step S103, after the grouting pipe is set, a water pressure test is performed using an isotope medium, which is suitable for detecting the grouting pipe, the stratum around the base, and the underground continuous wall.
[0022] In a further embodiment, in step S103, in passive grouting, when each grouting pipe reaches the designed final pressure and is stable for 10 minutes, and the grouting volume of a single pipe is greater than or equal to 80% of the designed grouting volume, grouting is stopped;
[0023] Or when the grouting pressure reaches the designed final pressure for more than or equal to 20 minutes, and the grouting volume does not reach the designed grouting volume, stop grouting;
[0024] Or when the grouting pressure does not reach the designed final pressure, the grouting volume reaches 1.5 times the designed maximum grouting volume, and there is no leakage, stop grouting;
[0025] Repeat the above steps until all grouting pipes are grouting completed.
[0026] In a further embodiment, the grouting volume of a single tube is calculated by formula (1):
[0027] (1)
[0028] In the formula, Q is the grouting volume of a single pipe; n is the formation porosity; α is the formation filling coefficient, which is 0.2-0.5; β is the slurry loss coefficient, which is 1.25-1.8; D is the diameter of the foundation pit; H is the thickness of the base reinforcement area, and N is the number of grouting pipes.
[0029] In a further embodiment, in formula (1), the diameter of the irregular foundation pit is calculated by formula (2):
[0030] (2)
[0031] Where A is the effective area of the special-shaped foundation pit.
[0032] In a further embodiment, during the secondary excavation of foundation pit and structure construction in step S105, during the excavation process, before the passive grouting slurry reinforcement body reaches the design age, the covering layer greater than or equal to two meters above the base is retained and not excavated temporarily.
[0033] In a further embodiment, in step S103 of passive grouting, the slurry used for passive grouting includes:
[0034] Cement, 1000 to 1200 parts;
[0035] Fly ash, 200 to 250 parts, with a dosage of 15% to 25%;
[0036] Water reducer, 5 to 15 parts, dosage 0.6% to 1.0%;
[0037] Aluminate, the dosage is 10% to 12%;
[0038] Water, 500 to 570 parts;
[0039] The volume ratio of water to fly ash is 1.2% to 1.3%.
[0040] Compared with the prior art, the present invention has the following beneficial effects:
[0041] 1. This passive reinforcement method installs several grouting pipes at intervals outside the retaining structure of the foundation pit, excavates the soil in the foundation pit until the excavation surface, and when the water level difference between the inside and outside of the foundation pit exceeds 15m, grouting is carried out into the soil below the base through the grouting pipe. Under the pressure of the surrounding groundwater, the slurry converges toward the base, thereby reinforcing the base. This method is simple and effective. During the grouting process, excavation can be continued from the excavation surface to the base at the same time. Excavation construction and grouting construction are carried out simultaneously, shortening the construction period and reducing construction costs.
[0042] 2. This passive reinforcement method has strong applicability and can be used for deep foundation pretreatment construction in any support form and in any stratum. When a deep foundation pit has pipe bursts due to seepage damage, the disturbed base layer can also be restored and reinforced. Each construction step has quality control indicators to ensure that the construction quality is controllable. Grouting pipes are used for reinforcement and water stopping, and the construction steps and structural settings are simple, the grouting effect is controllable, and the construction cost is low. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 A flowchart of a passive reinforcement method for a foundation pit in a water-rich stratum;
[0044] Figure 2 A top view of a passive reinforcement method for a foundation pit in a water-rich stratum;
[0045] Figure 3 The present invention is a side cross-sectional view of a passive base reinforcement method for a foundation pit in a water-rich stratum.
[0046] In the figure: 1. foundation pit; 2. underground continuous wall; 3. lining wall; 4. grouting pipe; 41. grouting device; 5. excavation surface. DETAILED DESCRIPTION
[0047] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0048] Embodiment 1:
[0049] A passive reinforcement slurry and method for basement pit in water-rich strata, such as Figures 1 to 3 As shown, the following steps are included:
[0050] S101, construction of underground continuous wall 2 and primary excavation of foundation pit 1
[0051] like Figure 2 , Figure 3As shown, in accordance with the specifications and design requirements, an underground continuous wall 2 is constructed around the predetermined position of the foundation pit 1, and the bottom end of the underground continuous wall 2 is lower than the base of the foundation pit 1. During the construction process, the construction quality of the underground continuous wall 2 is strictly controlled according to actual construction needs, and the foundation pit 1 is surrounded and waterproofed to ensure the construction safety of the foundation pit 1.
[0052] After the construction of the underground continuous wall 2 is completed and accepted, the internal earth of the foundation pit 1 is excavated to the excavation surface 5. The excavation surface 5 is located above the base of the foundation pit 1. While excavating the earth, precipitation is carried out. The water level in the foundation pit 1 needs to be lowered to at least 500mm below the excavation surface 5. During the excavation process, the water level observation outside the foundation pit 1 is strengthened.
[0053] Step S103: Passive grouting
[0054] When the water level difference between the foundation pit 1 and the foundation pit 1 reaches 15 meters, passive grouting reinforcement construction of the base is carried out; the passive reinforcement grouting is carried out by a backward drilling and grouting machine, and the grouting range is 500mm above the base to 1000mm below the underground continuous wall 2. The grouting material is a fluid composite slurry. The specific proportion of the slurry is shown in Table 1:
[0055] Table 1
[0056]
[0057] The slurries of ratio 1 and ratio 2 have good fluidity and are easy to be injected into the formation; they have small shrinkage after consolidation, good adhesion and high early strength; they have the advantages of low stone permeability and good anti-seepage performance, and their strength is much higher than that of cement paste; the amount of water is adjusted according to the solid content of the water reducer in actual construction applications. In this embodiment, the water reducer is a polycarboxylic acid with a content of 20%.
[0058] like Figure 2 , Figure 3 As shown, several grouting pipes 4 are set around the outer side of the underground continuous wall 2 at intervals, and a drilling machine is used to locate the holes according to the designed hole positions and then drill holes from top to bottom. During the drilling process, an isotope medium is used to perform a water pressure test. The water pressure test is combined with tracer isotope technology to check whether the grouting pipeline is normal and to judge the grouting capacity of the formation, etc., to prevent blockage during the grouting process; and the isotope technology can also be used to judge the water leakage of the underground continuous wall 2. If the underground continuous wall 2 is found to have serious leakage during the water pressure test, tracer positioning work is performed during the water pressure test, and fixed-point reinforcement grouting is performed on the position after the passive reinforcement grouting of the base is completed. Preferably, the grouting pipe 4 uses a sleeve valve pipe with a model of DN50.
[0059] After the grouting pipe 4 is installed to the designed position, the grouting device 41 is connected to the top of the grouting pipe 4 to start the passive reinforcement grouting of the base. The grouting device 41 used in this embodiment is a drilling and injection integrated machine; the slurry is injected into the stratum through the bottom end of the grouting pipe 4. Since the water level outside the foundation pit 1 is higher than the water level inside the foundation pit 1, the slurry injected by the grouting pipe 4 flows toward the base under the action of water pressure and gathers in the range of 500mm above the base to 1000mm below the underground continuous wall 2 to reinforce the stratum in this range. The flow direction of the slurry is as follows: Figure 2 , Figure 3 As shown by the arrow in; strictly control the grouting amount and grouting pressure during the grouting process, and seal the grouting pipe 4 in time after the grouting is completed to avoid slurry overflow.
[0060] When performing passive reinforcement grouting for the base, the grouting pressure is controlled at 0.3MPa to 0.5MPa, and the real-time grouting pressure is adjusted according to the actual grouting amount and grouting pressure of the grouting formation on site. When each grouting pipe 4 reaches the designed final pressure and stabilizes for 10 minutes, and the grouting amount of a single pipe is greater than or equal to 80% of the designed grouting amount, the grouting can be stopped; or when the grouting pressure reaches the designed final pressure for greater than or equal to 20 minutes, and the grouting amount still does not reach the designed grouting amount, the grouting can be terminated; or when the grouting pressure does not reach the designed final pressure, the grouting amount reaches 1.5 times the designed maximum grouting amount, and there is no leakage, the grouting can be terminated. The grouting amount of a single grouting pipe 4 for passive reinforcement grouting for the base is calculated by formula (1):
[0061] (1)
[0062] Where: Q is the grouting volume of a single grouting pipe 4; n is the formation porosity, which can be obtained according to the data given in the geological survey report or with reference to Table 1; α is the formation filling coefficient, which is 0.2-0.5; β is the slurry loss coefficient, which is 1.25-1.8; H is the thickness of the base reinforcement zone, N is the number of grouting pipes 4; D is the diameter of the foundation pit 1, and for the special-shaped foundation pit 1, it is calculated using formula (2):
[0063] (2)
[0064] Where A is the effective area of the special-shaped foundation pit 1.
[0065] After the grouting of a single grouting pipe 4 is completed, the above steps are repeated to successively carry out grouting of other pipelines until the grouting of all grouting pipes 4 is completed.
[0066] Step S105: Secondary excavation of foundation pit 1 and structural construction
[0067] While the passive grouting reinforcement of the base is being carried out, the secondary excavation of the foundation pit 1 is carried out from the excavation surface 5 to the base, thereby reducing the impact of the grouting work on the excavation of the foundation pit 1, accelerating the construction process, and shortening the construction period; during the excavation process, before the grouting reinforcement body reaches the design age, the covering layer of at least two meters above the base cannot be excavated, and the groundwater level must be strictly monitored during the grouting and excavation process to ensure the safety of the structure and surrounding environment of the foundation pit 1 during the excavation.
[0068] After the excavation of the foundation pit 1 is completed, the bottom is sealed and the lining wall 3 and other structures are constructed on the inner side of the underground continuous wall 2.
[0069] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A passive reinforcement method for a foundation pit in a water-rich stratum, characterized in that: The following steps are involved: Step S101: constructing an underground continuous wall (2) and excavating a foundation pit (1) Constructing an underground continuous wall (2) around a predetermined position of the foundation pit (1); Excavating the foundation pit (1) until the excavation surface (5); Step S103: Passive grouting When the water level in the foundation pit (1) is lower than the water level outside the foundation pit (1) by more than or equal to 15 meters, passive grouting is performed on the base of the foundation pit (1), and the grouting slurry flows to the periphery of the base under the action of the groundwater pressure outside the foundation pit (1) to reinforce it; Step S105: Secondary excavation of foundation pit (1) and structural construction Continue to excavate the foundation pit (1) until the base, seal the bottom of the foundation pit (1) and construct an inner lining wall (3); The passive grouting in step S103 is carried out simultaneously with the secondary excavation of the foundation pit (1) and the structural construction in step S105.
2. The passive reinforcement method for a foundation pit in a water-rich stratum according to claim 1, characterized in that: In the step S101, during the construction of the underground continuous wall (2) and the primary excavation of the foundation pit (1), dewatering is performed while the foundation pit (1) is excavated, and the water level in the foundation pit (1) is greater than or equal to 500 mm below the excavation surface (5).
3. The passive reinforcement method for a foundation pit in a water-rich stratum according to claim 2, characterized in that: The excavation surface (5) is located above the base.
4. The passive reinforcement method for a foundation pit in a water-rich stratum according to claim 3, characterized in that: Before the passive grouting in step S103, a plurality of grouting pipes (4) are installed at intervals around the outer side of the underground continuous wall (2), and passive grouting is performed through the grouting pipes (4).
5. The passive reinforcement method for a foundation pit in a water-rich stratum according to claim 4, characterized in that: Before the passive grouting in step S103, after the grouting pipe (4) is installed, a water pressure test is performed using an isotope medium, which is suitable for detecting the grouting pipe (4), the stratum around the base, and the underground continuous wall (2).
6. The passive reinforcement method for a foundation pit in a water-rich stratum according to claim 5, characterized in that: In the passive grouting of step S103, when each of the grouting pipes (4) reaches the designed final pressure and is stable for 10 minutes, and the grouting volume of a single pipe is greater than or equal to 80% of the designed grouting volume, the grouting is stopped; Or when the grouting pressure reaches the designed final pressure for more than or equal to 20 minutes, and the grouting volume does not reach the designed grouting volume, stop grouting; Or when the grouting pressure does not reach the designed final pressure, the grouting volume reaches 1.5 times the designed maximum grouting volume, and there is no leakage, stop grouting; Repeat the above steps until grouting of all the grouting pipes (4) is completed.
7. The passive reinforcement method for a foundation pit in a water-rich stratum according to claim 6, characterized in that: The grouting volume of the single pipe is calculated by formula (1): (1) In the formula, Q is the grouting volume of the single pipe; n is the formation porosity; α is the formation filling coefficient, which is 0.2 to 0.5; β is the slurry loss coefficient, which is 1.25 to 1.8; D is the diameter of the foundation pit (1); H is the thickness of the base reinforcement zone, and N is the number of the grouting pipes (4).
8. The passive reinforcement method for a foundation pit in a water-rich stratum according to claim 7, characterized in that: In the formula (1), the diameter of the irregular foundation pit (1) is calculated by the formula (2): (2) Wherein, A is the effective area of the special-shaped foundation pit (1).
9. The passive reinforcement method for a foundation pit in a water-rich stratum according to claim 8, characterized in that: In the step S105 of secondary excavation of the foundation pit (1) and structural construction, during the excavation process, before the passive grouting slurry reinforcement body reaches the design age, the covering layer greater than or equal to two meters above the base is retained and not excavated.
10. The passive reinforcement method for a foundation pit in a water-rich stratum according to claim 9, characterized in that: In the passive grouting of step S103, the slurry used in the passive grouting includes: Cement, 1000 to 1200 parts; Fly ash, 200 to 250 parts, with a dosage of 15% to 25%; Water reducer, 5 to 15 parts, dosage 0.6% to 1.0%; Aluminate, the dosage is 10% to 12%; Water, 500 to 570 parts; The volume ratio of water to fly ash is 1.2% to 1.3%.