Strip-shaped foundation pit supporting structure
By using a support structure combining reinforced concrete support, buried support and prefabricated underground continuous wall in foundation pit projects, the problems of high construction costs and great environmental impact in the existing technology are solved, and the construction speed and environmental impact are achieved. Small and economical effects.
Patent Information
- Application Number
- CN202420349832.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-26
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-02-26
AI Technical Summary
In the excavation of foundation pit projects, the existing support structure with drilling and pouring piles combined with three-axis cement mixing pile water stop curtain plus internal support is high construction cost, has large vibration, complex processes, difficult to control quality, and has a great impact on the surrounding environment. , cannot be used for foundation pit projects in complex environments such as old residential buildings.
A strip-shaped foundation pit support structure combining reinforced concrete support, buried support and prefabricated underground continuous walls can be used as waterproof retaining walls and load-bearing walls through pre-buried inserts. The two walls are integrated to reduce construction steps and site requirements, and use L-shaped steel rails to connect buried supports and enclosure walls to simplify the construction process.
It achieves fast construction speed and small environmental impact, improves earth excavation efficiency and displacement control capabilities, reduces construction costs, and is suitable for foundation pit projects in complex environments.
Smart Images

Figure CN221956741U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering construction, in particular to a strip foundation pit supporting structure. Background Art
[0002] In strip foundation pit projects with small excavation width and general depth, such as tunnel foundation pits and road pipeline foundation pits, bored cast-in-place piles combined with three-axis cement mixing piles and water-stop curtains, plus multiple internal supports, are a common, simple and economical support method due to their low construction cost and low vibration. However, bored cast-in-place concrete piles are usually constructed underground and underwater, with many construction procedures, complex processes, and difficult to control construction quality; three-axis machinery requires a large site space, and the construction process has a greater impact on the surrounding area; there are multiple supports within the excavation range, and the earth excavation efficiency is low. Therefore, it is not applicable to foundation pit projects with complex surrounding environments such as road reconstruction in old communities. Utility Model Content
[0003] The purpose of the utility model is to provide a strip foundation pit support structure, which has the characteristics of fast construction speed and small environmental impact.
[0004] The technical solution of the utility model: a strip foundation pit support structure is applied to the strip foundation pit, including an assembled underground continuous wall arranged on the inner side of the strip foundation pit, and a plurality of concealed supports are arranged between the assembled underground continuous walls; a plurality of reinforced concrete supports and reinforced concrete crown beams are arranged on the upper end surface of the assembled underground continuous wall; a plurality of the reinforced concrete supports are fixedly connected to the reinforced concrete crown beam; the corners of the reinforced concrete crown beam are fixed by corner supports.
[0005] In the above-mentioned strip foundation pit supporting structure, the connection pair between the concealed support and the surrounding wall is pre-buried with an L-shaped steel track.
[0006] In the aforementioned strip foundation pit support structure, the top elevation of the L-shaped steel track is flush with the top elevation of the retaining wall, and the bottom elevation is flush with the bottom elevation of the buried support.
[0007] The aforementioned strip foundation pit support structure, the L-shaped steel track has a long side of 120mm, a short side of 64mm, a thickness of 12mm, the long side is welded to the steel cage, and the short side protrudes 14mm from the surrounding wall; the spacing between the guide steel is the hidden support width + 40mm, leaving a 20mm clearance on each side.
[0008] Compared with the prior art, the utility model adopts a strip foundation pit support structure combining reinforced concrete support, concealed support and assembled underground continuous wall, which has the characteristics of fast construction speed and small environmental impact; the utility model can pre-embed dowel bars and other measures as needed, so that the prefabricated underground continuous wall can be used as a waterproof retaining wall when excavating the foundation pit, and can also be used as a load-bearing wall of load-bearing ground buildings, which can realize the integration of two walls and further save costs; the foundation pit support structure of the utility model has only the first reinforced concrete support within the excavation range, the excavation working surface is large, the excavation is carried out to the bottom at one time, and there is no need to set up steel supports in the middle. The earth excavation efficiency is high, and at the same time, the economy is good, the displacement control ability is strong, and the feasibility is high. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 It is a three-dimensional schematic diagram of the strip foundation pit and the supporting structure of the utility model;
[0010] Figure 2 This is a schematic diagram of the first concrete support plane layout of the utility model;
[0011] Figure 3 This is a schematic diagram of the plan layout of the concealed support of the assembled underground continuous wall of the utility model;
[0012] Figure 4 It is a cross-sectional schematic diagram of a foundation pit support structure combining reinforced concrete support, concealed support and assembled underground continuous wall of the utility model;
[0013] Figure 5 It is a schematic diagram of deformation of the strip foundation pit retaining wall of the utility model;
[0014] Figure 6 This is a schematic diagram of the deformation of the long side of the strip foundation pit of the utility model;
[0015] Figure 7 This is a schematic diagram of the deformation of the short side of the strip foundation pit of the utility model;
[0016] Figure 8 It is a schematic diagram of the cross section of conventional strip foundation pit support;
[0017] Fig. 9 It is a three-dimensional schematic diagram of a conventional strip foundation pit support structure;
[0018] Fig.10 This is a schematic diagram of the deformation of the long side of the conventional strip foundation pit support;
[0019] Fig.11 This is a schematic diagram of the deformation of the short side of a conventional strip foundation pit support;
[0020] The meaning of the numbers in the figure are: 1. Reinforced concrete support; 2. Reinforced concrete crown beam; 3. Precast underground continuous wall hidden support; 4. Precast underground continuous wall; 5. Steel pipe support; 6. H400 double-jointed steel purlin; 7. 1100@1300 bored piles; 8. 850 three-axis cement mixing pile water-stop curtain; 9. 850 three-axis cement mixing pile pit bottom reinforcement; 10. Corner brace. DETAILED DESCRIPTION
[0021] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.
[0022] Example: A strip foundation pit support structure, see Figure 1-4 , including an assembled underground continuous wall 4 arranged on the inner side of the strip foundation pit, and a plurality of concealed supports 3 are arranged between the assembled underground continuous walls 4; a plurality of reinforced concrete supports 1 and reinforced concrete crown beams 2 are arranged on the upper end surface of the assembled underground continuous wall 4; a plurality of the reinforced concrete supports 1 are fixedly connected to the reinforced concrete crown beams 2; the corners of the reinforced concrete crown beams 2 are fixed by angle supports 10. An L-shaped steel track is pre-embedded in the connection pair between the concealed support and the enclosure wall. The top elevation of the L-shaped steel track is flush with the top elevation of the enclosure wall, and the bottom elevation is flush with the bottom elevation of the concealed support. The long side of the L-shaped steel track is 120mm, the short side is 64mm, and the thickness is 12mm. The long side is welded to the steel cage, and the short side protrudes 14mm from the enclosure wall; the spacing between the guide rail steel is the concealed support width + 40mm, and 20mm clearance is left on each side.
[0023] In this embodiment, the construction method of the strip foundation pit support structure includes the following steps:
[0024] Step S1, arranging a strip-shaped prefabricated foundation pit plane system with concealed braces: the crown beam is supported by the first reinforced concrete support, the corners are supported by angle braces, and the remaining areas are supported by opposite braces; the concealed braces are arranged by opposite braces;
[0025] Step S2, arranging a strip-shaped prefabricated foundation pit profile system with concealed supports: the first reinforced concrete support is connected to the crown beam, the concealed support is located below the pit bottom, and there is no support coverage from the bottom of the crown beam to the pit bottom; during the foundation pit excavation and main structure construction process, there is no support removal condition.
[0026] Step S3, making prefabricated wall guide rails for concealed support connection: pre-embed L-shaped steel tracks in the enclosure wall of the concealed support connection to assist in the construction of concealed support; wherein the top elevation of the L-shaped steel guide rail is flush with the top elevation of the enclosure wall, and the bottom elevation is flush with the bottom elevation of the concealed support, the long side is 120mm, the short side is 64mm, the steel plate thickness is 12mm, the long side is welded to the steel cage, and the short side protrudes 14mm from the enclosure wall; the spacing between the guide steel sections is the concealed support width + 40mm, leaving a 20mm clearance on each side.
[0027] Step S4, complete the concealed support of the assembled underground continuous wall during the retaining pile foundation construction stage: first construct the retaining wall, then construct the concealed support; the specific steps are: construction of the retaining wall with L-shaped steel track → hoisting of the concealed support prefabricated wall → placing it at the bottom of the trench → elevation control.
[0028] The steps of the retaining wall construction are to construct guide wall → form trench → inspect trench sections → hoist prefabricated wall → place guide wall → inject joint water stop glue → hoist sections to connect → connect joints → close joints → place at the bottom of trench → vibrate and sink → control elevation.
[0029] Among them, there are two types of guide walls: prefabricated and cast-in-place. The cast-in-place guide wall has an "L" shape or an inverted "L" shape, which can be selected according to different soil properties. When the soil layer is good, an inverted "L" shape or even a prefabricated steel guide wall can be selected. When an "L"-shaped guide wall is used, the backfill and compaction work behind the guide wall should be strengthened. Simple reinforced concrete guide walls are used in areas with good surface foundations; cast-in-place L-shaped reinforced concrete guide walls are used in areas with weak surface soil. The construction of the guide wall is a key process to ensure the axis position of the underground wall and the quality of the trench. In order to maintain the stability of the surface soil, temporary wooden supports and cross braces are added every 1-3 meters between the guide walls; the construction accuracy of the guide wall is directly related to the accuracy of the underground continuous wall, so when constructing the guide wall, attention must be paid to the clearance size, vertical and horizontal accuracy, and plane position of the inner side of the guide wall. The horizontal steel bars of the guide wall must be connected to make the guide wall a whole to prevent accidents due to insufficient strength or poor construction. To ensure the construction accuracy of the underground wall and facilitate the operation of the trenching machine, the clearance inside the guide wall should be slightly larger than the thickness of the underground wall (4cm larger than the design value), the top of the guide wall is 10cm higher than the ground, and the depth of the guide wall is 1.2m. The construction error standard of the guide wall is: the center line error is ±10mm; the elevation error within the entire length of the top surface is ±10mm.
[0030] Trenching is a method of trenching concrete anti-seepage wall (underground continuous wall) using the grabbing method. The process principle is as follows: the combined force of the pressure on the stratum generated by the weight of the grab bucket (hydraulic type, wire rope suspension type) and the combined force of the bucket force generated by the oil cylinder or wire rope doubler mechanism is used to excavate the stratum, and at the same time, the slag is directly discharged out of the hole to complete the construction of the slot hole; the size of the grab bucket is very important, the smaller the mass, the lighter the weight, and the smaller the excavation force under balance. When encountering a relatively hard stratum, the grab bucket (hydraulic type, wire rope suspension type) will be lifted, thereby reducing the excavation efficiency; in addition, the hydraulic grab bucket generally has a correction mechanism, which can detect the hole inclination at any time during the operation and correct it; although the wire rope grab bucket does not have a correction device, it can observe the changes in the position of the wire rope of the suspended grab bucket during the operation, and judge the occurrence of the hole inclination at any time, and take measures to eliminate it; when the stratum in the slot hole is hard, or encounters large-diameter boulders and bedrock, heavy chisels can be used for pre-crushing before excavation.
[0031] The purpose of trench section inspection is to ensure the trenching time and quality. The trench section length should be controlled within a reasonable range, and the side ground wall trench section divisions should be relatively consistent to facilitate construction and ensure construction safety.
[0032] The main hoisting process for prefabricated walls is: measurement and setting out → component entry inspection → component numbering → hoisting equipment installation → installation and adjustment of embedded parts → turning over → lifting and leveling → reinforcement alignment → drop position → elevation and wall bottom position adjustment → wall facade verticality adjustment → caulking. During the hoisting process, the control lines of the pre-installed wall components are projected on the completed components. After the components are delivered to the site, the quantity, size, appearance quality, etc. are reviewed, and the hoisting area and hoisting sequence number are marked on the components for easy confirmation. Before hoisting, install the tool-type embedded parts for adjusting the elevation and horizontal position of the wall. When the component is lifted 20 to 30 cm from the ground or vehicle, check and adjust the horizontality of the top of the wall for easy positioning. When the component is lifted 30 to 50 cm above the installation position, identify the position relationship of the reinforcement, the position of the edge line and the control line, and slowly drop it to accurately adjust it into position. After the wall is in place, the precise adjustment of the wall elevation, axis and verticality is completed by adjusting the tool-type embedded parts.
[0033] Guide wall shelving is to use the guide wall as a support for heavy objects, as a fulcrum for the placement of steel cages, joint pipes, etc., and sometimes also bear the load of other construction equipment.
[0034] Injecting water-stop glue into the joints, hanging up the sections, connecting the joints and closing the joints all realize the assembly connection of the prefabricated walls, so that the prefabricated walls form a whole and fit into the strip foundation pit.
[0035] The hoisting of concealed support prefabricated wall is to hoist the concealed support and the corresponding enclosing wall to achieve the installation of both.
[0036] After the above construction, as an example design comparison, considering the typical deep silt soil geological conditions in Gongshu District, Hangzhou, a strip foundation pit with a width of 15m, a length of 60m, and a depth of 12m, the conventional design uses 1100@1300 bored piles combined with 850mm triaxial cement mixing piles as the retaining wall, combined with one concrete support + two steel pipe support support (609), and the passive area uses 850mm triaxial cement mixing pile skirt + grille reinforcement; the utility model uses a 760mm prefabricated underground continuous wall combined with a reinforced concrete support + prefabricated underground continuous wall hidden support support structure. The comparison results are shown in Table 1:
[0037] Support structure type Calculate the maximum displacement Cross-section per meter Bored pile + support 21mm 123,300 yuan Prefabricated underground continuous wall + support 11.0mm 115,400 yuan
[0038] Table 1
[0039] The specific costs are shown in Table 2;
[0040]
[0041] Table 2
[0042] Figure 5 It is a schematic diagram of deformation of the strip foundation pit retaining wall of the utility model; Figure 6 This is a schematic diagram of the deformation of the long side of the strip foundation pit of the utility model; Figure 7 This is a schematic diagram of the deformation of the short side of the strip foundation pit of the utility model; Figure 8 It is a schematic diagram of the cross section of conventional strip foundation pit support; Fig. 9 It is a three-dimensional schematic diagram of a conventional strip foundation pit support structure; Fig.10 This is a schematic diagram of the deformation of the long side of the conventional strip foundation pit support; Fig.11 It is a schematic diagram of the short side deformation of conventional strip foundation pit support.
[0043] From the above, it can be seen that the strip foundation pit support structure and construction method combining reinforced concrete support, concealed support and assembled underground continuous wall of the utility model have the characteristics of fast construction speed and small environmental impact; measures such as pre-embedded inserted bars can be taken as needed, so that the prefabricated underground continuous wall can be used as a waterproof retaining wall when excavating the foundation pit, and can also be used as a load-bearing wall of load-bearing ground buildings, which can realize the integration of two walls and further save costs. Compared with the traditional support structure, the foundation pit support structure of the utility model has certain economic advantages in cost; according to the comparison of three-dimensional analysis deformation data, the foundation pit support structure of the utility model has obvious advantages in deformation control; according to the construction process and working conditions, the foundation pit support structure of the utility model has obvious advantages in construction period.
Claims
1. A strip foundation pit support structure, applied to a strip foundation pit, characterized in that: The invention comprises an assembled underground continuous wall (4) arranged inside a strip foundation pit, wherein a plurality of concealed supports (3) are arranged between the assembled underground continuous walls (4); a plurality of reinforced concrete supports (1) and reinforced concrete crown beams (2) are arranged on the upper end surface of the assembled underground continuous wall (4); the plurality of reinforced concrete supports (1) are fixedly connected to the reinforced concrete crown beams (2); and the corners of the reinforced concrete crown beams (2) are fixed via angle supports (10).
2. The strip foundation pit support structure according to claim 1 is characterized in that: The connection pair between the concealed support and the enclosure wall is pre-buried with an L-shaped steel track.
3. The strip foundation pit support structure according to claim 2 is characterized in that: The top elevation of the L-shaped steel track is flush with the top elevation of the retaining wall, and the bottom elevation is flush with the bottom elevation of the buried support.
4. The strip foundation pit support structure according to claim 3 is characterized in that: The long side of the L-shaped steel track is 120mm, the short side is 64mm, the thickness is 12mm, the long side is welded to the steel cage, and the short side protrudes 14mm from the surrounding wall; the spacing between the guide steel sections is the hidden support width + 40mm, leaving 20mm clearance on each side.