Underwater rock drilling point positioning and equipment movement method

By using an automated system combining walking mechanism and amplitude variable mechanism in underwater rock drilling equipment, the problems of large labor and inaccurate positioning caused by manual control are solved, and efficient and accurate movement of underwater rock drilling points are achieved and missed fragmentation is reduced. .

CN118622248BActive Publication Date: 2024-12-06JIANGMEN HANGTONG SHIPBUILDING OF CCCC FOURTH HARBOR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410808435.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-12-06
Estimated Expiration
2044-06-21

AI Technical Summary

Technical Problem

The movement of underwater rock drilling equipment in the prior art relies on manual control, resulting in large labor, high intensity, inaccurate positioning, and easy to cause omissions and repeated breakage.

Method used

A system that combines an overwater module with an underwater module including a walking mechanism and a buoy mechanism is adopted to obtain rock drilling position information through the positioning device, and automatically control the movement of the underwater module to the target position to reduce manual intervention.

Benefits of technology

It improves the accuracy of rock drilling location, reduces omissions and repeated breakage, improves rock drilling efficiency, and realizes automated construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118622248B_ABST
    Figure CN118622248B_ABST
Patent Text Reader

Abstract

The present application provides a method for positioning underwater rock drilling points and moving equipment, and relates to the field of underwater rock drilling technology. The method for positioning underwater rock drilling points and moving equipment includes: obtaining positioning information of a positioning device and position information of a target rock drilling position, and obtaining current position information of an underwater module according to the positioning information; determining a target object to be moved in a walking mechanism and a variable amplitude mechanism and a movement distance of the target object according to the position information of the target rock drilling position and the current position information; and controlling the target object based on the movement distance to move the underwater module to the target rock drilling position. The embodiment of the present application can complete automated construction through the positioning information of the positioning device, reduce blind rock drilling operations, improve the accuracy of the actual rock drilling position and the target rock drilling position, reduce omissions or repeated crushing, and improve rock drilling efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of underwater rock drilling, and in particular to a method for underwater rock drilling point positioning and equipment movement. Background Art

[0002] During the seabed foundation trench excavation and channel regulation construction, in order to meet the shipping water depth and foundation trench excavation depth, it is necessary to remove underwater rocks.

[0003] However, when clearing underwater rocks, it is necessary to determine the rock drilling area, divide it into multiple rock drilling positions according to the rock drilling area, and perform rock drilling operations on these rock drilling positions one by one. Therefore, it is necessary to move the rock drilling equipment accordingly according to the change of the rock drilling position. However, in the prior art, the rock drilling equipment is moved to the corresponding rock drilling position by manual control. However, there are often a large number of rock drilling positions in a single rock drilling area. The manual control method results in a large amount of labor for the operator, high intensity, and low safety factor. The manual judgment of the underwater rock drilling position is also inaccurate, which is prone to omissions and repeated crushing problems. Summary of the invention

[0004] The embodiment of the present application provides a method for underwater rock drilling point positioning and equipment movement, which can solve the problem that the existing manual control method for moving rock drilling equipment causes heavy workload and high intensity for operators, and the positioning is inaccurate, and it is easy to miss and repeat the breakage. In order to achieve this purpose, the embodiment of the present application provides the following solutions.

[0005] According to one aspect of an embodiment of the present application, a method for underwater rock drilling point positioning and equipment movement is provided, which is used for rock drilling equipment, wherein the rock drilling equipment includes an above-water module provided with a walking mechanism, a luffing mechanism and a positioning device, and an underwater module for underwater rock drilling, wherein the above-water module is connected to the underwater module, the walking mechanism and the luffing mechanism are used to drive the underwater module to move, and the walking mechanism and the luffing mechanism drive the underwater module to move in different directions, and the method includes:

[0006] Acquire positioning information of the positioning device and position information of the target rock drilling position, and acquire current position information of the underwater module according to the positioning information;

[0007] Determine the target object to be moved in the walking mechanism and the luffing mechanism and the moving distance of the target object according to the position information of the target rock drilling position and the current position information;

[0008] The target object is controlled based on the movement distance to move the underwater module to the target rock drilling position.

[0009] In a possible implementation, the above-water module is installed on a ship, and the positioning device includes a first positioning instrument, a second positioning instrument, and a third positioning instrument, the first positioning instrument is installed on the ship, and the second positioning instrument and the third positioning instrument are installed on the above-water module;

[0010] Acquiring positioning information of a positioning device, and acquiring current position information of the underwater module according to the positioning information, including:

[0011] The positioning information of the first positioning instrument, the second positioning instrument and the third positioning instrument is obtained, and the orientation of the ship, the rock drilling direction of the underwater module and the current position information of the underwater module are determined according to the positioning information.

[0012] In a possible implementation, obtaining location information of a target rock drilling location includes:

[0013] If it is determined that there is a drilling position where drilling has been completed, the position information of the target drilling position is acquired according to the drilling position where drilling has been completed and a predetermined drilling distance.

[0014] In a possible implementation, determining the current position information of the underwater module according to the positioning information includes:

[0015] Determine the positions of the first locator, the second locator, and the third locator according to the positioning information;

[0016] Based on the position and the relative position of the underwater module and at least one of the first locator, the second locator and the third locator, the position information of the underwater module is determined.

[0017] In a possible implementation, determining the target object to be moved in the walking mechanism and the luffing mechanism and the moving distance of the target object according to the position information of the target rock drilling position and the current position information includes:

[0018] Determining a moving direction and a moving distance of the underwater module according to the position information of the target rock drilling position and the current position information;

[0019] A target object to be moved is determined based on the moving direction, and a moving distance of the target object is determined according to the moving distance.

[0020] In a possible implementation, the target object is a walking mechanism, the walking mechanism is provided with at least one walking drive unit, the walking drive unit is used to drive the underwater module to move along a first direction, the walking drive unit includes a driver, and each driver is correspondingly provided with an encoder;

[0021] The controlling the target object based on the movement distance to move the underwater module to the target rock drilling position includes:

[0022] A reference object in the encoder is determined, and a driver in the travel drive unit is synchronously controlled to work based on the numerical value of the reference object, and the power of the driver is used to drive the underwater module to move.

[0023] In a possible implementation, the walking mechanism further includes a walking track, limit switches are provided at both ends of the walking track, and the walking drive unit moves along the walking track;

[0024] The method of using the power of the driver to drive the underwater module to move includes:

[0025] If it is determined that the travel drive unit contacts the limit switch, the travel drive unit is controlled to stop working.

[0026] In a possible implementation, the above-water module includes a hanging bracket and a traction rope, one end of the traction rope is connected to the underwater module and passes through the top of the hanging bracket, and the traction rope transmits power to the underwater module through the top to drive the underwater module to rise and fall;

[0027] The hanging bracket comprises a first bracket and a luffing bracket rotatably connected at the top, and the luffing mechanism is connected to the bottom of the luffing bracket;

[0028] The target object is a luffing mechanism, and the step of controlling the target object based on the movement distance to move the underwater module to the target rock drilling position includes:

[0029] The position of the bottom of the luffing bracket is changed based on the movement distance so that the top position of the hanging bracket corresponds to the target rock drilling position.

[0030] In a possible implementation, the luffing mechanism includes a push-pull unit, a push-pull base and a push-pull seat, the push-pull seat is respectively connected to the push-pull end of the push-pull unit and the bottom of the luffing bracket, and the push-pull seat is provided with a plurality of first pin holes for fixing the push-pull base;

[0031] The step of changing the position of the bottom of the amplitude varying support based on the movement distance comprises:

[0032] Pull out the pin that fixes the push-pull seat, and determine the telescopic distance of the push-pull end based on the movement distance;

[0033] Control the push-pull end to push the push-pull seat to move on the push-pull base according to the telescopic distance;

[0034] Determine that the movement is completed, close the push-pull unit, and insert the pin shaft into the push-pull seat and a first pin hole corresponding to the current position of the push-pull seat to fix the push-pull seat.

[0035] In a possible implementation, the above-water module further includes a winch and a motor for driving the winch, and the winch is connected to an end of the traction rope away from the underwater module;

[0036] The controlling the target object based on the movement distance to move the underwater module to the target rock drilling position includes:

[0037] Determining that the underwater module is located above the target rock drilling position, and using the motor to drive the winch to lower the underwater module at a preset speed;

[0038] Obtaining the water bottom depth according to the power value change information of the motor;

[0039] The redundant release amount corresponding to the target rock drilling position is determined based on the water bottom depth and a predetermined index, wherein the redundant release amount includes the lowering amount of the traction rope each time the underwater module is lowered.

[0040] The beneficial effects of the technical solution provided by the embodiment of the present application are:

[0041] The underwater rock drilling point positioning and equipment movement method provided in the present application obtains the positioning information of the positioning device and the position information of the target rock drilling position, and obtains the current position information of the underwater module according to the positioning information; determines the target object to be moved in the walking mechanism and the amplitude changing mechanism and the movement distance of the target object according to the position information of the target rock drilling position and the current position information; controls the target object based on the movement distance to move the underwater module to the target rock drilling position. Therefore, when changing the rock drilling position, the embodiment of the present application obtains the positioning of the underwater module through the positioning information of the positioning device, selects the target object for moving the underwater module in the rock drilling equipment according to the positioning and the position information of the target rock drilling position, and uses the target object to move the underwater module to the target rock drilling position. The embodiment of the present application can complete the automated construction through the positioning information of the positioning device, reduce blind rock drilling operations, improve the accuracy of the actual rock drilling position and the target rock drilling position, reduce omissions or repeated fragmentation, and improve rock drilling efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following is a brief introduction to the drawings required for use in describing the embodiments of the present application.

[0043] Figure 1 A flow chart of a method for underwater rock drilling point positioning and equipment movement provided in an embodiment of the present application;

[0044] Figure 2 A side view of a rock drilling apparatus provided by an embodiment of the present application;

[0045] Figure 3 A top view of a portion of the structure of a rock drilling device provided in an embodiment of the present application;

[0046] Figure 4 A top view of a first track in the walking track provided in an embodiment of the present application;

[0047] Figure 5 A schematic diagram of the position of a positioning device provided in an embodiment of the present application;

[0048] Figure 6 A structural diagram of the amplitude variation mechanism provided in an embodiment of the present application;

[0049] Figure 7 A structural diagram of the walking mechanism provided in an embodiment of the present application;

[0050] Figure 8 This is a structural diagram of the walking drive unit provided in an embodiment of the present application.

[0051] Explanation of reference numerals: 101, hanging bracket; 1011, first bracket; 1012, luffing bracket; 102, traction rope; 103, luffing mechanism; 1031, push-pull unit; 1032, push-pull seat; 1033, luffing track; 104, walking chassis; 105, winch; 106, walking drive unit; 1061, driver; 1062, driving wheel; 1063, walking wheel; 107, walking track; 1071, removal pin; 21, rock hammer. DETAILED DESCRIPTION

[0052] The embodiments of the present application are described below in conjunction with the drawings in the present application. It should be understood that the implementation methods described below in conjunction with the drawings are exemplary descriptions for explaining the technical solutions of the embodiments of the present application and do not constitute a limitation on the technical solutions of the embodiments of the present application.

[0053] It will be understood by those skilled in the art that, unless specifically stated, the singular forms "one", "said", and "the" used herein may also include plural forms. It should be further understood that the terms "including" and "comprising" used in the embodiments of the present application refer to that the corresponding features can be implemented as the presented features, information, data, steps, operations, elements and / or components, but do not exclude the implementation of other features, information, data, steps, operations, elements, components and / or combinations thereof supported by the present technical field. It should be understood that when we say that an element is "connected" or "coupled" to another element, the one element may be directly connected or coupled to the other element, or it may refer to that the one element and the other element establish a connection relationship through an intermediate element. In addition, the "connection" or "coupling" used herein may include wireless connection or wireless coupling. The term "and / or" used herein indicates at least one of the items defined by the term, for example, "A and / or B" indicates that it is implemented as "A", or is implemented as "A", or is implemented as "A and B".

[0054] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below in conjunction with the accompanying drawings.

[0055] The following describes several exemplary embodiments to illustrate the technical solutions of the embodiments of the present application and the technical effects produced by the technical solutions of the present application. It should be noted that the following embodiments can refer to, draw on or combine with each other, and the same terms, similar features and similar implementation steps in different embodiments will not be described repeatedly.

[0056] The present application provides a method for underwater rock drilling point positioning and equipment movement, which aims to solve at least one technical problem existing in the prior art.

[0057] The present application provides a method for underwater rock drilling point positioning and equipment movement, such as Figure 1-Figure 8 As shown, the underwater rock drilling point positioning and equipment movement method is used for rock drilling equipment, and the rock drilling equipment includes an above-water module provided with a walking mechanism, a luffing mechanism 103 and a positioning device, and an underwater module for underwater rock drilling. The above-water module is connected to the underwater module, and the walking mechanism and the luffing mechanism 103 are used to drive the underwater module to move, and the directions in which the walking mechanism and the luffing mechanism 103 drive the underwater module to move are different.

[0058] Optionally, the direction in which the traveling mechanism drives the underwater module to move is perpendicular to the direction in which the luffing mechanism 103 drives the underwater module to move.

[0059] In one embodiment, the above-water module is installed on a ship, the traveling mechanism drives the underwater module to move along the direction of the ship, and the luffing mechanism 103 drives the underwater module to move in a direction close to or away from the ship's side (ie, perpendicular to the direction of the ship).

[0060] Optionally, the underwater module may be a rock hammer 21. Specifically, when the rock hammer 21 is striking the rock, the head is downward and the tail is upward. The head is conical and the tail is provided with a sensor. The sensor detects the working parameters of the rock hammer 21 and transmits them to the upper computer of the rock drilling equipment or the lower computer in the rock drilling equipment, and the lower computer transmits them to the upper computer. The upper computer or the lower computer can control the lifting and lowering of the rock hammer 21 according to the working parameters transmitted by the sensor.

[0061] Optionally, the underwater rock drilling point positioning and equipment movement method includes:

[0062] S101: Acquire positioning information of a positioning device and position information of a target rock drilling position, and acquire current position information of an underwater module according to the positioning information.

[0063] Optionally, the positioning device includes a first positioning device, a second positioning device and a third positioning device, the first positioning device is installed on the ship, and the second positioning device and the third positioning device are installed on the water module.

[0064] Optionally, the second locator and the third locator can be installed on the walking mechanism, wherein, to facilitate obtaining current position information, the projections of the second locator, the third locator and the underwater module can be located on the same straight line. The projection of the first locator is located on one side of the straight line.

[0065] Optionally, the first locator, the second locator and the third locator may be RTK (Real-time kinematic) locators, or GPS (Global Positioning System) locators and other devices that can be used for equipment positioning.

[0066] Optionally, the positioning information of the positioning device is obtained, and the current position information of the underwater module is obtained according to the positioning information, including: obtaining the positioning information of the first locator, the second locator and the third locator, and determining the orientation of the ship, the drilling direction of the underwater module and the current position information of the underwater module according to the positioning information.

[0067] In one embodiment, the first locator can be located on the side of the surface module close to the bow. The orientation of the ship can be determined based on the position of the first locator, and the current position of the surface module can be determined according to the positioning information of the positioning device. The direction in which the underwater module needs to move (i.e., the drilling direction) can be determined based on the position and the target drilling position. In addition, the current position information of the underwater module can also be determined based on the relative position of the positioning device and the underwater module.

[0068] Optionally, determining the current position information of the underwater module according to the positioning information includes: determining the positions of the first locator, the second locator and the third locator according to the positioning information; determining the position information of the underwater module based on the position and the relative position of the underwater module and at least one of the first locator, the second locator and the third locator.

[0069] Optionally, the position information can be calculated only based on the horizontal coordinate and the vertical coordinate in the positioning information, that is, it is preset that the first locator, the second locator and the third locator can be located on the same plane, and the position information of the underwater module can be the coordinates of the projection of the underwater module on the plane. The underwater module is moved using the coordinates so that the projection of the underwater module coincides with the target rock drilling position, thereby raising and lowering the underwater module to realize the rock drilling operation at the target rock drilling position.

[0070] In one embodiment, the distance between the projection of the underwater module on the horizontal plane where the first locator is located and the first locator is known, the first locator, the second locator and the third locator are located in the same horizontal plane, the coordinates of the first locator are (x1, y1), the coordinates of the second locator are (x2, y2), the coordinates of the third locator are (x3, y3), the coordinates of the projection of the underwater module on the plane where the first locator is located are (x, y), the distance between the projection of the underwater module and the third locator is h, and the projection is located on the line connecting the second locator and the third locator, the slope of the line is, and the coordinates (x, y) of the underwater module are calculated based on h and k.

[0071] Optionally, the drilling distances between different drilling positions may be pre-stored to obtain the position information of the target drilling position, including: if it is determined that there is a drilling position that has been completed, the position information of the target drilling position is obtained according to the drilling position that has been completed and the predetermined drilling distance. If it is determined that there is no drilling position that has been completed (i.e., the drilling equipment performs a drilling operation on the first drilling position), the target drilling position is obtained according to the drilling instruction input by the operator.

[0072] Optionally, range information of the rock drilling area can be obtained, and position information of multiple positions to be drilled can be obtained based on the completed rock drilling positions and the predetermined rock drilling intervals. Based on the position information of the positions to be drilled and the walking range of the walking mechanism and the amplitude range of the amplitude variation mechanism 103, a target rock drilling position can be selected from the positions to be drilled.

[0073] Optionally, after determining that there is a drilling position where drilling has been completed, the last drilling position where drilling has been completed is obtained, and the target drilling position is determined based on the last drilling position where drilling has been completed, the predetermined spacing, and the action rules of the walking mechanism and the luffing mechanism 103 (such as the walking mechanism moves first, and after the walking mechanism completes its single stroke, the luffing mechanism moves).

[0074] In one embodiment, the action rules include controlling the movement of the walking mechanism first and then the movement of the boom mechanism 103. For example, if the upper computer determines that the areas where the walking mechanism moves left and right have been excavated, then it determines whether the areas where the boom mechanism 103 changes amplitude have not been excavated. If not, the boom mechanism 103 is controlled to change amplitude, and then the walking mechanism drives the underwater module to move left and right to continue excavating.

[0075] When obtaining the target rock drilling position, if it is determined according to the action rule that the rock drilling equipment is currently driven to move by the walking mechanism, the last rock drilling position where rock drilling has been completed is obtained from the rock drilling positions where rock drilling has been completed, and the target rock drilling position is determined according to the movement direction of the walking mechanism and the last rock drilling position where rock drilling has been completed. The rock drilling equipment moves to the target rock drilling position along the movement direction. In this way, the target rock drilling position is automatically obtained.

[0076] S102: Determine the target object to be moved and the moving distance of the target object in the walking mechanism and the luffing mechanism 103 according to the position information of the target rock drilling position and the current position information.

[0077] Optionally, the target object to be moved in the walking mechanism and the amplitude varying mechanism 103 and the movement distance of the target object are determined according to the position information of the target rock drilling position and the current position information, including: determining the moving direction and the moving distance of the underwater module according to the position information of the target rock drilling position and the current position information; determining the target object to be moved based on the moving direction, and determining the movement distance of the target object according to the moving distance.

[0078] Optionally, the correspondence between the movement distance of the walking mechanism and the movement distance of the underwater module and the correspondence between the movement distance of the variable amplitude mechanism 103 and the movement distance of the underwater module can be pre-stored, and the movement distance of the target object can be determined based on the pre-stored correspondence and the acquired movement distance.

[0079] In one embodiment, the moving direction and moving distance of the underwater module are determined based on the coordinates of the target rock drilling position and the current horizontal and vertical coordinates of the underwater module. It is detected whether the moving direction of the walking mechanism or the moving direction of the luffing mechanism 103 matches the moving direction. If it matches, the object corresponding to the matching direction (walking mechanism or luffing mechanism 103) is determined as the target object to be moved, and the moving distance of the target object is determined based on the moving distance and the pre-stored corresponding relationship. If it does not match, it is determined that the walking mechanism and the luffing mechanism 103 need to work together to realize the movement of the underwater module. The luffing mechanism 103 and the walking mechanism are both target objects, and the moving distance of the target object is determined according to the moving distance and the corresponding relationship.

[0080] S103: Control the target object to move the underwater module to the target rock drilling position based on the movement distance.

[0081] Optionally, the target object is a walking mechanism, and the walking mechanism is provided with at least one walking drive unit 106, and the walking drive unit 106 is used to drive the underwater module to move along the first direction, and the walking drive unit 106 includes a driver 1061, and each driver 1061 is provided with an encoder. The encoder records the working parameters of the driver 1061 (such as rotation speed, angular velocity and other parameters).

[0082] In one embodiment, the driver 1061 may be a driving motor, and there may be multiple driving motors, which work synchronously to drive the walking mechanism to move stably.

[0083] Optionally, the underwater module is moved to the target drilling position based on the movement distance control target object, including: determining a reference object in the encoder, synchronously controlling the driver 1061 in the travel drive unit 106 based on the numerical value of the reference object, and using the power of the driver 1061 to drive the underwater module to move.

[0084] In one embodiment, the number of the walking drive units 106 is 4, and each walking drive unit 106 is provided with a corresponding driver 1061, and the encoders are numbered a, b, c, and d, where a is used as a reference object. Before the walking drive unit 106 moves, the initialization check of the encoder is completed once, and the initial value of the encoder is recorded. After the current position meets the rock drilling requirements, in the process of moving to the target rock drilling position (after each walking mechanism works, the encoder needs to be calibrated and zeroed to make the walking drive unit 106 move synchronously), the values ​​of the encoders b, c, and d are obtained, and compared with the encoder a, and the working parameters of the drivers 1061 corresponding to the encoders b, c, and d are adjusted according to the comparison results to ensure that the walking power of each driver 1061 is consistent.

[0085] Optionally, when the traveling mechanism moves, the lifting and lowering of the underwater module and the luffing operation of the luffing mechanism 103 can also be performed simultaneously.

[0086] Optionally, the walking mechanism also includes a walking track 107, and limit switches are provided at both ends of the walking track 107. The walking drive unit 106 moves along the walking track 107; the power of the driver 1061 is used to drive the underwater module to move, including: if it is determined that the walking drive unit 106 contacts the limit switch, the walking drive unit 106 is controlled to stop working.

[0087] Optionally, the traveling mechanism further includes a traveling chassis 104 , and traveling drive units 106 are provided at both ends of the traveling chassis 104 , and the traveling drive units 106 at both ends of the traveling chassis 104 are installed on different traveling tracks 107 .

[0088] Optionally, the travel track 107 includes a first track and a second track arranged in parallel, and both ends of the travel chassis 104 are respectively located on the first track and the second track, and both ends of the travel chassis 104 move synchronously along the first track and the second track. The first track and the second track are arranged along the direction of the ship to ensure that the rock drilling equipment moves along the direction of the ship.

[0089] In one embodiment, the structures of the first track and the second track may be the same, and may be an “I” shaped structure.

[0090] Optionally, the travel drive unit 106 further includes a driving wheel 1062 , which is mounted on the top of the travel track 107 , and the output end of the driver 1061 is connected to the driving wheel 1062 , so that the movement of the travel mechanism on the travel track 107 is achieved through the rotation of the driving wheel 1062 .

[0091] Alternatively, the driving wheel 1062 may be a sprocket, and a row of pins 1071 matching the sprocket is provided at the top of the walking track 107, and the row of pins 1071 includes first pins arranged at equal intervals, and the interval of the first pins matches the tooth pitch of the sprocket. The cooperation between the row of pins 1071 and the sprocket provides the travel driving unit 106 with the force required to move on the walking track 107.

[0092] Optionally, the row pin 1071 further includes a first fixing member, which is arranged in parallel on both sides of the first pin shaft, and the two ends of the first pin shaft are connected to different first fixing members; the top height of the first fixing member is higher than the height of the first pin shaft. The limit switch can be arranged on the top of the walking track 107 and at both ends of the row pin 1071.

[0093] Optionally, in order to prevent the walking chassis 104 from tilting up or detaching from the walking track 107, the two sides of the walking track 107 are recessed to form fixed grooves, and the length of the fixed grooves corresponds to the stroke length of the walking mechanism; the walking drive unit 106 includes at least one walking wheel 1063, and at least a portion of the walking wheel 1063 is located in the fixed groove to contact the walking track 107 when the walking chassis 104 is offset or tilted.

[0094] In one embodiment, the annular surface of the running wheel 1063 is opposite to the side of the fixing groove, and the whole of the running wheel 1063 is located in the fixing groove. Wherein, grooves may be provided on both sides of the second track and the first track, and a running wheel 1063 is provided in each groove.

[0095] Optionally, the above-water module includes a hanging bracket 101 and a traction rope 102, one end of the traction rope 102 is connected to the underwater module and passes through the top of the hanging bracket 101, and the traction rope 102 transmits power to the underwater module through the top to drive the underwater module to rise and fall; the hanging bracket 101 includes a first bracket 1011 and a variable amplitude bracket 1012 rotatably connected at the top, and the variable amplitude mechanism 103 is connected to the bottom of the variable amplitude bracket 1012.

[0096] Optionally, the bottom of the first bracket 1011 is rotatably fixed to the end of the traveling chassis 104, and the bottom of the variable amplitude bracket 1012 is movably fixed to the side of the traveling chassis 104 away from the traveling track 107. The first end of the first bracket 1011 is arranged on the side of the traveling chassis 104 close to the ship's side, and the second end extends in a direction away from the traveling chassis 104, and the second end is provided with a pulley matching the traction rope 102. The traction rope 102 is placed in the pulley, and its extension direction is changed by the pulley.

[0097] Optionally, a pulley may also be provided at the first end of the first bracket 1011, and the traction rope 102 first passes through the pulley provided at the first end, and then passes through the pulley provided at the second end to adjust the extension direction of the traction rope 102 to extend toward the underwater module.

[0098] In one embodiment, the first bracket 1011 is an A-shaped frame, the first end of which is fixed to both sides of the same end of the traveling chassis 104, and the second end of which extends to a side away from the traveling chassis 104. The variable amplitude bracket 1012 may also be an A-shaped frame, which includes two pillars, and the bottom ends of the pillars are connected to different variable amplitude mechanisms 103.

[0099] Optionally, if the target object is the luffing mechanism 103, the target object is controlled based on the movement distance to move the underwater module to the target drilling position, including: changing the bottom position of the luffing bracket 1012 based on the movement distance so that the top position of the hanging bracket 101 corresponds to the target drilling position.

[0100] In one embodiment, the position change information of the top of the hanging bracket 101 corresponding to different amplitude change modes of the amplitude change mechanism 103 can be stored, and the position change information of the hanging bracket 101 can be determined according to the movement distance of the amplitude change mechanism 103. The action of the amplitude change mechanism 103 is controlled according to the amplitude change mode corresponding to the position change information.

[0101] Optionally, the amplitude varying mechanism 103 includes a push-pull unit 1031, a push-pull base and a push-pull seat 1032, the push-pull seat 1032 is respectively connected to the push-pull end of the push-pull unit 1031 and the bottom of the amplitude varying bracket 1012, and a plurality of first pin holes for fixing the push-pull base are provided on the push-pull seat 1032; the position of the bottom of the amplitude varying bracket 1012 is changed based on the movement distance, including: pulling out the pin shaft fixing the push-pull seat 1032, determining the telescopic distance of the push-pull end based on the movement distance; controlling the push-pull end to push the push-pull seat 1032 to move on the push-pull base according to the telescopic distance; determining that the movement is completed, closing the push-pull unit 1031, and inserting the pin shaft into the push-pull seat 1032 and the first pin hole corresponding to the current position of the push-pull seat 1032 to fix the push-pull seat 1032.

[0102] Optionally, the push-pull end of the push-pull unit 1031 is connected to the bottom of a support column in the luffing bracket 1012 .

[0103] Optionally, the push-pull unit 1031 may be a push-pull oil cylinder or a screw stepper motor, and the push-pull end of the push-pull unit 1031 is extended to drive the pillar of the variable amplitude bracket 1012 to move, thereby changing the inclination angle of the pillar. The push-pull unit 1031 may also be provided with a variable amplitude sensor, which is used to detect the extension distance of the push-pull end.

[0104] Optionally, one side of the push-pull seat 1032 is connected to the push-pull end of the push-pull unit 1031. The push-pull unit 1031 is placed flat on the push-pull base, and the push-pull unit 1031 is used to drive the push-pull seat 1032 to move along the push-pull base.

[0105] Optionally, the push-pull base includes a variable amplitude track 1033, the push-pull seat 1032 is movably fixed to the variable amplitude track 1033, the first pin hole is arranged on the side of the variable amplitude track 1033, and the side of the push-pull seat 1032 is provided with a second pin hole corresponding to the first pin hole, and the first pin hole and the second pin hole are used to insert a pin shaft to fix the push-pull seat 1032.

[0106] In one embodiment, the cross section of the amplitude changing track 1033 is rectangular, and the push-pull seat 1032 is sleeved on the amplitude changing track 1033 to prevent the push-pull seat 1032 from being separated from the amplitude changing track 1033 .

[0107] Optionally, there are two amplitude-changing rails 1033 , which are arranged in parallel, and a push-pull seat 1032 is correspondingly arranged on each amplitude-changing rail 1033 ; the tops of the two pillars in the amplitude-changing bracket 1012 are connected, and the push-pull seats 1032 connected at the bottoms of the two pillars are different, and the number of the push-pull units 1031 is also two, and a push-pull unit 1031 is provided on each amplitude-changing rail 1033 .

[0108] Optionally, the position of the first pin hole is within the travel of the push-pull end, the number of the second pin holes can be one or more, and the first pin holes on the variable amplitude track 1033 can be multiple groups, and the number of the first pin holes in each group is consistent with the number of the second pin holes. In addition, the distances between different groups of first pin holes can be determined according to the position adjustment information of the underwater module during the rock drilling process.

[0109] Optionally, in order to increase the amplitude changing speed of the amplitude changing mechanism 103, the amplitude changing mechanism 103 also includes a pin shaft plug-in and pull-out member. When performing the amplitude changing operation, the pin shaft plug-in and pull-out member pulls out the pin shaft inserted into the second pin hole, and after the push-pull end moves to a predetermined position, the pin shaft is inserted into the second pin hole and the first pin hole corresponding to the second pin hole, and the push-pull seat 1032 is fixed to complete the amplitude changing operation.

[0110] Optionally, a pin shaft plug-in and pull-out member, a pin shaft or the amplitude-changing track 1033 may also be provided with an entry hole sensor, which detects whether the pin shaft is inserted into the first pin hole and alarms when it is detected that the pin shaft is not inserted into the first pin hole.

[0111] In one embodiment, the push-pull unit 1031 can be a push-pull cylinder that uses hydraulic power to work. The telescopic distance of the push-pull end is detected by the amplitude change sensor on the push-pull cylinder, and the push-pull cylinder is controlled to change the amplitude based on the movement distance. The first pin hole corresponding to the initial position of the amplitude change is the a pin hole, and there are two other pin holes at positions b and c that are different from the a position. When the amplitude change operation is required, the pin shaft plug-in piece is disengaged from the a pin hole, the pin shaft is pulled out, and the pin shaft is moved to b (or c) corresponding to the amplitude change operation. The amplitude change sensor records the telescopic distance of the push-pull end. When the telescopic distance is ba (or ca) corresponding to the moving distance of the pin shaft, the pin shaft plug-in piece is controlled to insert the pin shaft into the pin hole at b (or c), and the push-pull end and the push-pull seat 1032 are fixed.

[0112] Optionally, a third pin hole is provided on the side of the push-pull unit 1031 away from the push-pull end; a plurality of fourth pin holes corresponding to the third pin hole are provided on the push-pull base, and the fourth pin holes are arranged at intervals, and the third pin hole is opposite to the fourth pin hole corresponding to the current rock drilling position of the push-pull unit 1031 to insert a pin shaft to fix the push-pull unit 1031.

[0113] In one embodiment, the fourth pin hole is set at the top of the variable amplitude track 1033, located at the end of the variable amplitude track 1033 away from the push-pull seat 1032. The fixed position of the push-pull unit 1031 is changed by adjusting the fourth pin hole through which the pin shaft is inserted, thereby changing the range of movement of the push-pull seat 1032.

[0114] Optionally, the above-water module further includes a winch 105 and a motor for driving the winch 105, the winch 105 is connected to the end of the traction rope 102 away from the underwater module, and the underwater module is lowered to the target rock drilling position by the winch 105. The underwater module is lowered in a free fall form.

[0115] The terms "first", "second", "third", "fourth", "1", "2", etc. (if any) in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than that shown or described in the drawings.

[0116] It should be understood that, although each operation step is indicated by arrows in the flowchart of the embodiment of the present application, the implementation order of these steps is not limited to the order indicated by the arrows. Unless clearly stated herein, in some implementation scenarios of the embodiment of the present application, the implementation steps in each flowchart can be performed in other orders according to demand. In addition, some or all of the steps in each flowchart may include multiple sub-steps or multiple stages based on actual implementation scenarios. Some or all of these sub-steps or stages may be executed at the same time, and each sub-step or stage in these sub-steps or stages may also be executed at different times respectively. In different scenarios of execution time, the execution order of these sub-steps or stages may be flexibly configured according to demand, and the embodiment of the present application does not limit this.

[0117] The above is only an optional implementation method for some implementation scenarios of the present application. It should be pointed out that for ordinary technicians in this technical field, without departing from the technical concept of the solution of the present application, other similar implementation methods based on the technical ideas of the present application are also within the protection scope of the embodiments of the present application.

Claims

1. A method for underwater rock drilling point positioning and equipment movement, characterized in that: For rock drilling equipment, the rock drilling equipment includes an above-water module provided with a walking mechanism, a luffing mechanism and a positioning device, and an underwater module for underwater rock drilling, the above-water module is connected to the underwater module, the walking mechanism and the luffing mechanism are used to drive the underwater module to move, and the directions in which the walking mechanism and the luffing mechanism drive the underwater module to move are different, the above-water module is installed on a ship, the positioning device includes a first positioning instrument, a second positioning instrument and a third positioning instrument, the first positioning instrument is installed on the ship, and the second positioning instrument and the third positioning instrument are installed on the above-water module; The method comprises: Acquiring positioning information of a positioning device and position information of a target rock drilling position, and acquiring current position information of the underwater module according to the positioning information, including: acquiring positioning information of the first positioning device, the second positioning device, and the third positioning device, and determining the orientation of the ship, the rock drilling direction of the underwater module, and current position information of the underwater module according to the positioning information; Determining a target object to be moved in the walking mechanism and the amplitude variation mechanism and a movement distance of the target object according to the position information of the target rock drilling position and the current position information, including: determining a moving direction and a moving distance of the underwater module according to the position information of the target rock drilling position and the current position information; determining a target object to be moved based on the moving direction, and determining a movement distance of the target object according to the moving distance, wherein the target object is a walking mechanism, the walking mechanism is provided with at least one walking drive unit, the walking drive unit is used to drive the underwater module to move along a first direction, the walking drive unit includes a driver, and each driver is correspondingly provided with an encoder; Controlling the target object to move the underwater module to the target rock drilling position based on the movement distance; Determining the current position information of the underwater module according to the positioning information includes: determining the positions of the first locator, the second locator, and the third locator according to the positioning information; determining the position information of the underwater module based on the position and the relative position of the underwater module and at least one of the first locator, the second locator, and the third locator; The method of controlling the target object based on the movement distance to move the underwater module to the target rock drilling position includes: determining a reference object in the encoder, synchronously controlling the operation of a driver in the travel drive unit based on the numerical value of the reference object, and using the power of the driver to drive the underwater module to move.

2. The underwater rock drilling point positioning and equipment movement method according to claim 1 is characterized in that: Obtain location information of the target drilling location, including: If it is determined that there is a completed rock drilling position, the position information of the target rock drilling position is automatically acquired according to the completed rock drilling position and a predetermined rock drilling distance.

3. The underwater rock drilling point positioning and equipment movement method according to claim 1, characterized in that: The walking mechanism further comprises a walking track, both ends of which are provided with limit switches, and the walking drive unit moves along the walking track; The method of using the power of the driver to drive the underwater module to move includes: If it is determined that the travel drive unit contacts the limit switch, the travel drive unit is controlled to stop working.

4. The underwater rock drilling point positioning and equipment movement method according to claim 1, characterized in that: The above-water module includes a hanging bracket and a traction rope, one end of which is connected to the underwater module and passes through the top of the hanging bracket. The traction rope transmits power to the underwater module through the top to drive the underwater module to rise and fall. The hanging bracket comprises a first bracket and a luffing bracket rotatably connected at the top, and the luffing mechanism is connected to the bottom of the luffing bracket; The target object is a luffing mechanism, and the step of controlling the target object based on the movement distance to move the underwater module to the target rock drilling position includes: The position of the bottom of the luffing bracket is changed based on the movement distance so that the top position of the hanging bracket corresponds to the target rock drilling position.

5. The underwater rock drilling point positioning and equipment movement method according to claim 4, characterized in that: The luffing mechanism comprises a push-pull unit, a push-pull base and a push-pull seat, wherein the push-pull seat is respectively connected to the push-pull end of the push-pull unit and the bottom of the luffing bracket, and the push-pull seat is provided with a plurality of first pin holes for fixing the push-pull base; The step of changing the position of the bottom of the amplitude varying support based on the movement distance comprises: Pull out the pin that fixes the push-pull seat, and determine the telescopic distance of the push-pull end based on the movement distance; Control the push-pull end to push the push-pull seat to move on the push-pull base according to the telescopic distance; Determine that the movement is completed, close the push-pull unit, and insert the pin shaft into the push-pull seat and a first pin hole corresponding to the current position of the push-pull seat to fix the push-pull seat.

6. The underwater rock drilling point positioning and equipment movement method according to claim 4, characterized in that: The above-water module further comprises a winch and a motor for driving the winch, wherein the winch is connected to an end of the traction rope away from the underwater module; The controlling the target object based on the movement distance to move the underwater module to the target rock drilling position includes: Determining that the underwater module is located above the target rock drilling position, and using the motor to drive the winch to lower the underwater module at a preset speed; Obtaining the water bottom depth according to the power value change information of the motor; The redundant release amount corresponding to the target rock drilling position is determined based on the water bottom depth and a predetermined index, wherein the redundant release amount includes the lowering amount of the traction rope each time the underwater module is lowered.