Tailings dam breach risk assessment method, device, terminal equipment and medium

Through the combination of time-series InSAR data and specific models, the tailings consolidation deformation components are separated and the risk of dam failure is identified, which solves the problems of low accuracy of dam failure assessment and high false alarm rate in the existing technology, and achieves more reliable tailings Dam breach risk monitoring.

CN118626997BActive Publication Date: 2024-10-29CENT SOUTH UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411114631.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-10-29
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

The existing tailings pond dam breach risk assessment method can easily lead to a high false alarm rate for dam breach potential. Moreover, traditional methods have low observation density and high cost, making it difficult to accurately identify key local deformation characteristics of the dam body.

Method used

Time-series InSAR data are used to calculate the deformation rate and cumulative deformation, and the tailings consolidation deformation component is separated through the linear fitting model and Weibull time function. The Jarque-Bera normality test and LOF abnormal point identification are combined to conduct dam failure risk assessment.

Benefits of technology

It improves the accuracy of tailings pond breach risk assessment, reduces the false alarm rate of dam breach hazards, enhances the reliability of monitoring, and provides new technical support for tailings pond safety monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118626997B_ABST
    Figure CN118626997B_ABST
Patent Text Reader

Abstract

The present application is applicable to the field of tailings pond safety monitoring technology, and provides a tailings pond dam break risk assessment method, device, terminal equipment and medium, including calculating deformation rate and cumulative deformation; calculating the deformation rate mean and standard deviation of the prior stable area, and judging the tailings pond with a dam body deformation rate within the range of two times the standard deviation as low risk; fitting the non-low-risk tailings pond using a linear fitting model, and judging the area that passes the hypothesis test as medium risk; fitting the tailings consolidation deformation component of the tailings pond that fails the hypothesis test using the Weibull time function and removing the component, if it passes the normality test, it is low risk, otherwise, the residual deformation is subjected to a linear exponential fitting test, and if it passes, it is a high dam break risk; performing LOF outlier identification and clustering based on spatial correlation to obtain a hierarchical assessment map of tailings pond dam break hazards. The present application can improve the accuracy of tailings pond dam break risk assessment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of tailings dam safety monitoring, and in particular, relates to a tailings dam breach risk assessment method, device, terminal equipment and medium. Background Art

[0002] Tailings ponds refer to places built by damming or enclosing land at the mouth of a valley to store tailings or other industrial wastes. They are indispensable facilities for the production of mineral processing plants in mines. With the development of the global economy and mining industry, the output of tailings is expected to increase further.

[0003] Tailings ponds are a dangerous source of man-made debris flows with high potential energy. Facts show that tailings dams are very dangerous. Once a dam breaks, a large amount of tailings and mining wastewater will be released, which will have a catastrophic impact on the surrounding areas. Not only will it cause huge disasters and losses to industrial and agricultural production, it will seriously threaten the safety of life and property of downstream residents. The spread of pollution sources such as heavy metals in tailings will also cause serious pollution to the surrounding environment and ecosystem. Therefore, it is particularly important to conduct effective safety monitoring, risk assessment and disaster identification of tailings dams.

[0004] Traditional methods for monitoring surface displacement in tailings dam areas, including leveling and the Global Navigation Satellite System (GNSS), have low observation density and high costs, and are prone to missing key local deformation features of the dam body, and thus miss or misjudge potential dam breach risks. In recent years, with the development of synthetic aperture radar interferometry (InSAR) technology, domestic and foreign scholars have further proposed a series of time series InSAR methods, which have achieved all-day, all-weather, and full-region deformation monitoring in the tailings dam area, thus providing a new opportunity for high spatial resolution monitoring of surface deformation of the tailings dam body.

[0005] The surface displacement of the dam body is one of the important precursors of tailings dam failure and the key to identifying precursors of tailings dam failure due to instability. However, the current research on InSAR monitoring of surface displacement deformation of tailings dam bodies is in its infancy both at home and abroad. Most of the research contents are surface displacement time series deformation monitoring and solution methods, and most of them directly use the cumulative deformation of surface displacement or the average deformation rate as an indicator of whether there is a risk of dam failure. The existing methods tend to regard all deformation areas as dam failure risk areas, without separating the tailings consolidation deformation component that is not a dam failure deformation threat, resulting in a high false alarm rate of dam failure risk. Summary of the invention

[0006] The present application provides a tailings dam break risk assessment method, device, terminal equipment and medium, which can improve the accuracy of tailings dam break risk assessment.

[0007] In a first aspect, the present application provides a tailings dam breach risk assessment method, comprising:

[0008] Collect time series InSAR data of multiple tailings ponds in the study area over a historical period, and calculate the deformation rate and cumulative deformation of each tailings pond based on the time series InSAR data;

[0009] Calculate the average value and standard deviation of the deformation rate of the prior stable area in the study area, set the deformation stability interval based on the average value and standard deviation, and determine the areas of the dam body deformation in the stable interval in multiple tailings ponds as having low dam break risk;

[0010] For the tailings pond area where the dam body deformation is in an unstable range, the pre-built linear fitting model is used to fit the dam body deformation, and the degree of linear fitting of the dam body deformation is evaluated by hypothesis testing. The dam break risk of the tailings pond area that passes the linear hypothesis test is determined to be medium risk.

[0011] The tailings consolidation deformation of the tailings pond area that fails the linear hypothesis test is fitted using the Weibull time function and the component is removed. The residual deformation after removing the tailings consolidation deformation component is tested for normality. If a tailings pond area passes the normality test, it is judged to have a low dam break risk. Otherwise, a linear exponential fitting test is performed on the residual deformation using a pre-constructed linear exponential function model. If the linear exponential hypothesis test is passed, the tailings pond area is judged to have a high dam break risk. Otherwise, the tailings pond area is judged to have a medium dam break risk.

[0012] LOF outlier identification and clustering based on spatial correlation are performed for each tailings pond to obtain a hierarchical assessment map of tailings pond dam break hazards corresponding to the study area.

[0013] Optionally, the deformation rate average and standard deviation of the prior stable area in the study area are calculated, and the deformation stability interval is set accordingly, and the areas of the dam body deformation in the stable interval in multiple tailings ponds are determined as having low dam break risk, including:

[0014] According to the average value and standard deviation of deformation rate, a stable deformation interval is constructed; the stable deformation interval can be expressed as , represents the average deformation rate, represents standard deviation;

[0015] For each of the multiple tailings ponds, if the deformation rate of a tailings pond area is in the stable deformation range, the dam break risk of the tailings pond area is assessed as low risk.

[0016] Optionally, hypothesis testing includes Related tests and Related inspections;

[0017] The expression of the linear fitting model is as follows:

[0018]

[0019] in, represents the LOS deformation sequence, which is solved by the time series InSAR technology. Indicates time; represents the unknown parameters, estimated by the least squares fit;

[0020] The expression of the correlation test is as follows:

[0021]

[0022] in, represents the relevant test statistic, Indicates The original sequence, Indicates A sequence of linear fitting models, represents the sequence length, represents the original sequence mean;

[0023] The expression of the correlation test is as follows:

[0024]

[0025] in, express Statistics, Indicates the number of parameters.

[0026] Optionally, normality test is based on JarqueBera test;

[0027] The expression of JarqueBera test is as follows:

[0028]

[0029]

[0030]

[0031] in, is the sample skewness, which indicates the skewness of the residual deformation sequence distribution. A positive value indicates that the residual deformation is right-skewed, and a negative value indicates that the residual deformation is left-skewed. is the sample kurtosis, which indicates the degree of peak or flat peak of the residual deformation sequence distribution phase; represents the sample mean, represents the mean of the residual deformation sequence distribution, and the JB statistic approximately obeys the chi-square distribution with 2 degrees of freedom. The rejection domain is .

[0032] Optionally, the linear exponential fitting model can be expressed as follows:

[0033]

[0034] in, represents the residual deformation sequence, represents the automatically selected optimal segmentation point, Indicates unknown parameters.

[0035] In a second aspect, the present application provides a tailings dam breach risk assessment device, comprising:

[0036] The data acquisition module is used to collect time-series InSAR data of multiple tailings ponds in the study area during the historical period, and calculate the deformation rate and cumulative deformation of each tailings pond based on the time-series InSAR data;

[0037] The first evaluation module calculates the average value and standard deviation of the deformation rate of the prior stable area in the study area, sets the deformation stability interval based on the average value and standard deviation, and determines the area of ​​the dam body deformation in the stable interval in multiple tailings ponds as having a low dam break risk;

[0038] The second assessment module uses a pre-built linear fitting model to fit the dam deformation in the tailings pond area where the dam deformation is in an unstable range, and uses hypothesis testing to evaluate the linear fitting degree of the dam deformation. The tailings pond area that passes the linear hypothesis test is judged to have a medium risk of dam break.

[0039] The third evaluation module uses the Weibull time function to fit the tailings consolidation deformation of the tailings pond area that fails the linear hypothesis test and removes the component, and performs a normality test on the residual deformation after removing the tailings consolidation deformation component. If a tailings pond area passes the normality test, it is judged to have a low dam break risk; otherwise, a linear exponential fitting test is performed on the residual deformation using a pre-constructed linear exponential function model. If the linear exponential hypothesis test is passed, the tailings pond area is judged to have a high dam break risk, otherwise, the tailings pond area is judged to have a medium dam break risk;

[0040] The fourth assessment module performs LOF outlier point identification and clustering based on spatial correlation for each tailings pond, and obtains a hierarchical assessment map of tailings pond dam breach hazards corresponding to the study area.

[0041] In a third aspect, the present application provides a terminal device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned tailings dam breach risk assessment method when executing the computer program.

[0042] In a fourth aspect, the present application provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the above-mentioned tailings dam break risk assessment method is implemented.

[0043] The above solution of the present application has the following beneficial effects:

[0044] The tailings dam break risk assessment method provided in the present application, on the one hand, proposes a robust separation method for tailings consolidation deformation components, establishes a tailings consolidation deformation component model based on the Weibull time function, adopts the artificial fish swarm algorithm to estimate its parameters, realizes accurate separation of tailings consolidation deformation components, and eliminates the risk of excessive false alarm rate of dam break hidden dangers caused by tailings consolidation deformation components; on the other hand, develops a large-scale multi-tailings dam break risk satellite InSAR assessment method, conducts assessment based on the statistical characteristics of prior stable regions and the Jarque–Bera (JB) normality test, conducts LOF outlier point identification and clustering based on spatial correlation for the assessment results of the entire dam body, and obtains the final tailings dam break hidden danger classification assessment map, which can effectively improve the reliability of InSAR assessment of tailings dam break risk, and provide new technical support for tailings dam safety monitoring and risk assessment.

[0045] Other beneficial effects of the present application will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0047] Figure 1 A flow chart of a tailings dam breach risk assessment method provided in one embodiment of the present application;

[0048] Figure 2 A schematic diagram of the assessment results of the tailings dam breach risk assessment method provided for this application;

[0049] Figure 3 This is a schematic diagram of the evaluation results of a dam-break hazard evaluation method based on a typical small-probability method in one embodiment of the present application;

[0050] Figure 4 A schematic diagram of the structure of a tailings dam breach risk assessment device provided in one embodiment of the present application;

[0051] Figure 5 A schematic diagram of the structure of a terminal device provided in one embodiment of the present application. DETAILED DESCRIPTION

[0052] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0053] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.

[0054] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0055] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.

[0056] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0057] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0058] In view of the problem of low accuracy of traditional methods for assessing tailings dam break risk, the present application provides a tailings dam break risk assessment method, device, terminal equipment and medium. On the one hand, a robust separation method for tailings consolidation deformation component is proposed, a tailings consolidation deformation component model is established based on the Weibull time function, and its parameters are estimated using an artificial fish swarm algorithm to achieve accurate separation of tailings consolidation deformation components, thereby eliminating the risk of excessive false alarm rate of dam break hazards caused by tailings consolidation deformation components; on the other hand, a satellite InSAR assessment method for dam break risks of multiple tailings dams over a large area is developed, and the assessment is carried out based on the statistical characteristics of a priori stable regions and the Jarque–Bera (JB) normality test, and the LOF outlier point identification and clustering based on spatial correlation are carried out on the assessment results of the entire dam body to obtain the final tailings dam break hazard classification assessment map, which can effectively improve the reliability of InSAR assessment of tailings dam break risk, and provide new technical support for tailings dam safety monitoring and risk assessment.

[0059] The following is an exemplary description of the tailings dam breach risk assessment method provided in this application.

[0060] like Figure 1 As shown, the tailings dam breach risk assessment method provided in this application includes the following steps:

[0061] Step 11, collect time series InSAR data of multiple tailings ponds in the study area during the historical period, and calculate the deformation rate and cumulative deformation of each tailings pond based on the time series InSAR data.

[0062] The above-mentioned time series InSAR data include ascending and descending orbit data acquired by Sentinel-1 series A\B satellites (synthetic aperture radar observation satellites designed and launched by the European Space Agency, which can obtain image data with short revisit period, good interferometric quality and relatively accurate orbit attitude), and TanDEM-X data (with a resolution of 30m, a data product acquired by the German Aerospace Center using TerraSAR-X and TanDem-X in bistatic mode). Among them, TanDEM-X data is used as an external reference DEM to remove the phase difference caused by surface elevation.

[0063] Specifically, the Sentinel-1 SAR data is first preprocessed, including decompression of the original SAR data, generation of SLC files, DEM correction, registration, cropping, and generation of multi-view intensity maps. Then, the D-InSAR technology is used to obtain the differential interferogram set after multi-view, and a reasonable spatiotemporal baseline threshold is set to construct a small baseline set, and adaptive filtering is used to filter the differential interferogram. Then, high coherence points are selected as unwrapping reference points for phase unwrapping, unwrapping phase maps are obtained, and trend term errors and atmospheric noise are removed. The SVD singular value decomposition method is used to solve the linear deformation rate, and the cumulative linear deformation at each time point can be obtained by integrating in the time domain. Finally, the residual phase is masked and spatiotemporally filtered to separate the atmospheric phase and nonlinear deformation phase at the imaging time, and the linear deformation and nonlinear deformation are finally added to obtain the temporal deformation in the LOS direction. Water area masking and geocoding are performed to obtain the cumulative deformation and average deformation rate data in the geographic coordinate system.

[0064] Step 12, calculate the average and standard deviation of the deformation rate of the prior stable area in the study area, set the deformation stability interval based on it, and determine the areas in the multiple tailings ponds where the dam body deformation is within the stable interval as having a low dam break risk.

[0065] In the embodiments of the present application, the above-mentioned a priori stable area is an area that has been inspected by experts and has a stable deformation rate and will not cause landslides. The area has good overall reflection conditions and good coherence, and is generally an urban area, an artificial building area, a bare land, etc.

[0066] Exemplarily, the calculation expression of the average deformation rate is as follows:

[0067]

[0068] Among them, the size of the prior stable region is , The a priori stable region Line The deformation rate of the column;

[0069] The calculation expression of standard deviation is as follows:

[0070]

[0071] In the above step 12, the process of evaluating the tailings pond with low dam breach risk among multiple tailings ponds based on the deformation rate average value, standard deviation and deformation rate is as follows:

[0072] Step 12.1, construct a stable deformation range based on the mean and standard deviation of the deformation rate.

[0073] Among them, the stable deformation range can be expressed as , represents the average deformation rate, Represents standard deviation.

[0074] The selected stable region satisfy , so the above interval can also be expressed as .

[0075] Step 12.2, for each of the multiple tailings ponds, if the deformation rate of the tailings pond area is in a stable deformation range, the dam break risk of the tailings pond area is assessed as low risk.

[0076] according to Criterion, if the deformation rate is If the deformation rate is within the range, then the tailings pond corresponding to the point where the deformation rate is located can be considered at a confidence level of 95% to be in a stable area, and the dam failure risk is low. If the tailings pond is within the range of deformation rate, it is considered that the tailings pond corresponding to the deformation rate point is in an unstable area and further analysis is needed.

[0077] Step 13: For the tailings pond area where the dam body deformation is in an unstable range, the dam body deformation is fitted using a pre-constructed linear fitting model, and the degree of linear fitting of the dam body deformation is evaluated using a hypothesis test. The dam break risk of the tailings pond area that passes the linear hypothesis test is determined to be medium risk.

[0078] In the embodiment of the present application, the above hypothesis test includes Related tests and Related tests.

[0079] The expression of the above linear fitting model is as follows:

[0080]

[0081] in, It represents the deformation sequence in the LOS direction, which is solved by the time series InSAR technology; Indicates time; represents the unknown parameters, estimated by the least squares fit;

[0082] The expression of the correlation test is as follows:

[0083]

[0084] in, represents the relevant test statistic, Indicates The original sequence, Indicates A sequence of linear fitting models, represents the sequence length, represents the original sequence mean;

[0085] The expression of the correlation test is as follows:

[0086]

[0087] in, express Statistics, Indicates the number of parameters.

[0088] It should be noted that when When , it means that the significance level is Take 0.01.

[0089] Since the number of time-series SAR images used in different research areas is different, the number of samples involved in the test is different. According to existing research, the larger the number of samples, the greater the possibility of passing the test. In order to achieve better test results, different significance levels should be set according to the number of samples.

[0090] Step 14, using the Weibull time function to fit the tailings consolidation deformation of the tailings pond area that fails the linear hypothesis test and remove the component, and performing a normality test on the residual deformation after removing the tailings consolidation deformation component. If a tailings pond area passes the normality test, it is judged to be at low dam break risk; otherwise, a pre-constructed linear exponential function model is used to perform a linear exponential fitting test on the residual deformation. If the linear exponential hypothesis test is passed, the tailings pond area is judged to be at high dam break risk; otherwise, the tailings pond area is judged to be at medium dam break risk.

[0091] The above normality test can be performed using the JarqueBera normality test (JB test).

[0092] The expression of JarqueBera test is as follows:

[0093]

[0094]

[0095]

[0096] in, is the sample skewness, which indicates the skewness of the residual deformation sequence distribution. A positive value indicates that the residual deformation is right-skewed, and a negative value indicates that the residual deformation is left-skewed. is the sample kurtosis, which indicates the degree of peak or flat peak of the residual deformation sequence distribution phase; represents the sample mean, represents the mean of the residual deformation sequence distribution; the JB statistic approximately obeys the chi-square distribution with 2 degrees of freedom, and the rejection domain is .

[0097] It should be noted that the analysis of a large amount of soil settlement data shows that the consolidation settlement process is often approximated by an inverse S-shaped curve. Therefore, many scholars use growth curve models to mathematically model and evaluate the consolidation settlement process, such as the Verhulst model, the Gompertz model, the Weibull model, etc. Studies have shown that the Weibull time function can better take into account the characteristics of the single-point consolidation settlement curve of the mining area and the accuracy of mathematical modeling, and can achieve high-precision mathematical modeling under the condition of low model complexity, which has great advantages in the mathematical modeling of consolidation settlement curves.

[0098] In an embodiment of the present application, the expression of the Weibull time function is as follows:

[0099]

[0100] in, Indicates the final settlement value of the assessment, represents the cumulative time series of settlement, Indicates pending parameters, Represents the cumulative settlement time series estimated by the Weibull model.

[0101] When using the artificial fish swarm algorithm for robust estimation of Weibull time function model parameters, the fitness function used is as follows:

[0102]

[0103] in, It's an artificial fish The fitness of Represents the time obtained by the Weibull model estimation The corresponding cumulative settlement is Indicates time The corresponding accumulated subsidence obtained by InSAR monitoring.

[0104] It should be noted that the parameter estimation result of the artificial fish swarm algorithm is the global optimal solution obtained by comprehensively considering the overall data. However, the original data used in this application may contain gross errors caused by noise and other deformation components that do not conform to the trend of soil consolidation and settlement. The mathematical modeling curve of the global optimal solution will deviate from the actual curve of soil consolidation and settlement due to the influence of the two. In order to eliminate or weaken the influence of gross errors and other deformations on the mathematical modeling results, this application introduces the idea of ​​robust estimation in the mathematical modeling of the artificial fish swarm algorithm, that is, adding a robust estimation method based on “ "The standard residual judgment of the criterion is carried out iteratively to perform mathematical modeling of the curve. After each mathematical modeling, the standard residual and the absolute value of the residual at each point are calculated. If the absolute value of the residual at a certain point is greater than 3 times the standard residual, the point is eliminated and mathematical modeling is performed again until all points meet the " ” guidelines.

[0105] In the embodiments of the present application, the expression of the linear exponential fitting model is as follows:

[0106]

[0107] in, represents the residual deformation sequence, represents the automatically selected optimal segmentation point, Indicates unknown parameters.

[0108] After completing the above steps, the dam break risk level (low risk, medium risk and high risk) corresponding to each tailings pond in the study area is obtained.

[0109] Among them, low risk means that the corresponding tailings dam area is relatively stable and needs to maintain regular monitoring;

[0110] Medium risk means that there are abnormal deformation signals in the corresponding tailings dam area, which requires close attention and increased monitoring;

[0111] High risk means that there are abnormal accelerated deformation signals in the corresponding tailings dam area, and the risk of dam failure is high. It is necessary to immediately notify the relevant departments and take preventive measures.

[0112] In actual management, corresponding dam break prevention and early warning measures are implemented according to different dam break risks.

[0113] Step 15, identify and cluster LOF outliers based on spatial correlation for multiple tailings ponds, and obtain a hierarchical assessment map of tailings pond dam breach hazards corresponding to the study area.

[0114] In order to more intuitively see the dam break risk assessment results of each tailings pond in the study area, the LOF outlier point identification and clustering based on spatial correlation can be carried out on the dam break risk assessment results of each tailings pond in the study area to obtain the final tailings pond dam break hazard classification assessment map. The specific process is as follows:

[0115] By calculating the formula

[0116]

[0117] get Point distance ,in, is the neighborhood size, For the neighborhood The point farthest from the For point With point The Euclidean distance between .

[0118] By calculating the formula

[0119]

[0120] get Point Reachable distance ,in, For point No. distance.

[0121] By calculating the formula

[0122]

[0123] get Local reachability density of a point ,in, For point No. The set of all points within the distance neighborhood.

[0124] By calculating the formula

[0125]

[0126] get Local anomaly factor of a point ,like Local anomaly factor of a point The larger the value is than 1, the higher the possibility that the point is an outlier.

[0127] When a point is judged as an outlier, it needs to be clustered. , and let the mode of the signal in the window be the new center point signal.

[0128] It should be noted that when performing LOF outlier identification, the input data is A matrix, each row represents a point, the first and second columns are the row and column numbers of the corresponding points, and the third column is the evaluation result obtained through steps 11-15.

[0129] It should be noted that in practical applications, a threshold is set according to the specific data situation to determine whether a point is an abnormal point.

[0130] In order to verify the feasibility of the tailings dam breach risk assessment method provided by this application, in another embodiment of this application, the Cadia tailings dam in Australia was used as the experimental area, and 38 scenes of Sentinel-1 radar satellite data covering the tailings dam were selected from December 8, 2016 to February 25, 2018, with TanDEM-X with a spatial resolution of 30m as the external reference DEM. In order to reflect the advantages of the method provided by this application, the traditional dam breach risk assessment method based on the typical small probability method was compared with it, and the comparison results are shown as follows: Figure 2 , Figure 3 As shown, Figure 2 is a schematic diagram of the results of the tailings dam breach risk assessment method provided in this application, Figure 3 This is a schematic diagram of the results of the traditional dam break hazard assessment method based on the typical small probability method. Figure 2 , Figure 3 It can be seen that compared with traditional methods, the method provided in this application can accurately identify areas where high risks are concentrated and dam breaches may occur in the later stage. Therefore, the method provided in this application can be used to conduct a graded assessment of the dam breach hazards of tailings ponds.

[0131] It can be seen from the above content that the tailings dam break risk assessment method provided in this application, on the one hand, proposes a robust separation method for tailings consolidation deformation components, establishes a tailings consolidation deformation component model based on the Weibull time function, and uses the artificial fish swarm algorithm to estimate its parameters, thereby achieving accurate separation of the tailings consolidation deformation components and eliminating the risk of excessive false alarm rate of dam break hazards caused by the tailings consolidation deformation components; on the other hand, a large-scale multi-tailings dam break risk satellite InSAR assessment method is developed, and the assessment is carried out based on the statistical characteristics of the prior stable region and the Jarque–Bera (JB) normality test, and the LOF outlier point identification and clustering based on spatial correlation are carried out on the assessment results of the entire dam body to obtain the final tailings dam break hazard classification assessment map, which can effectively improve the reliability of the InSAR assessment of the tailings dam break risk, and provide a new technical support for the safety monitoring and risk assessment of tailings dams.

[0132] The tailings dam break risk assessment device provided in this application is described in detail below.

[0133] like Figure 4 As shown, the tailings dam breach risk assessment device 400 includes:

[0134] The data acquisition module 401 is used to collect time series InSAR data of multiple tailings ponds in the study area within a historical period, and calculate the deformation rate and cumulative deformation of each tailings pond based on the time series InSAR data;

[0135] The first evaluation module 402 calculates the average value and standard deviation of the deformation rate of the prior stable area in the study area, sets the deformation stability interval accordingly, and determines the area of ​​the dam body deformation in the stable interval in the multiple tailings ponds as having a low dam break risk;

[0136] The second evaluation module 403, for the tailings pond area where the dam body deformation is in an unstable range, uses a pre-constructed linear fitting model to fit the dam body deformation, uses hypothesis testing to evaluate the linear fitting degree of the dam body deformation, and determines the dam break risk of the tailings pond area that passes the linear hypothesis test as medium risk;

[0137] The third evaluation module 404 uses the Weibull time function to fit the tailings consolidation deformation of the tailings pond area that fails the linear hypothesis test and removes the component, and performs a normality test on the residual deformation after removing the tailings consolidation deformation component. If a tailings pond area passes the normality test, it is determined to have a low dam break risk; otherwise, a linear exponential fitting test is performed on the residual deformation using a pre-constructed linear exponential function model. If the linear exponential hypothesis test is passed, the tailings pond area is determined to have a high dam break risk, otherwise, the tailings pond area is determined to have a medium dam break risk;

[0138] The fourth assessment module 405 performs LOF outlier identification and clustering based on spatial correlation for each tailings pond, and obtains a hierarchical assessment map of tailings pond dam failure hazards corresponding to the study area.

[0139] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.

[0140] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, only the judgment of the above-mentioned functional units and modules is used as an example for illustration. In actual applications, the above-mentioned functions can be assigned to different functional units and modules as needed, that is, the internal structure of the device can be judged into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiments can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0141] like Figure 5 As shown, an embodiment of the present application provides a terminal device, such as Figure 5 As shown, the terminal device D10 of this embodiment includes: at least one processor D100 ( Figure 5 Only one processor is shown in the figure), a memory D101, and a computer program D102 stored in the memory D101 and executable on the at least one processor D100, wherein the processor D100 implements the steps of any of the above-mentioned method embodiments when executing the computer program D102.

[0142] Specifically, when the processor D100 executes the computer program D102, it collects time-series InSAR data of multiple tailings ponds in the study area within a historical period, and calculates the deformation rate and cumulative deformation of each tailings pond based on the time-series InSAR data; calculates the average deformation rate and standard deviation of the prior stable area, and judges the tailings pond area where the dam body deformation rate is within two times the standard deviation as low risk; then, the linear fitting model is used to fit the non-low-risk tailings pond area, and the hypothesis test is used to judge the deformation rate fitting situation, and the tailings pond area that passes the hypothesis test is judged as medium risk; then, the Weibull time function is used to fit the tailings consolidation deformation component of the tailings pond area that fails the hypothesis test, and the component is removed and a normality test is performed. If the normality test is passed, it is low risk. Otherwise, the linear exponential fitting model is used to perform a linear exponential fitting test on the residual deformation, and the tailings pond area that passes the fitting test is at high risk of dam break; finally, LOF outlier point identification and clustering based on spatial correlation are performed to obtain a hierarchical assessment map of tailings pond dam break hazards. Among them, on the one hand, a robust separation method of tailings consolidation deformation components is proposed, and a tailings consolidation deformation component model is established based on the Weibull time function. The artificial fish swarm algorithm is used to estimate its parameters to achieve accurate separation of tailings consolidation deformation components, eliminating the risk of excessive false alarm rate of dam break hazards caused by tailings consolidation deformation components; on the other hand, a satellite InSAR assessment method for dam break risks of multiple tailings ponds over a large area is developed. The assessment is carried out based on the statistical characteristics of prior stable regions and the Jarque–Bera (JB) normality test, and the LOF outlier point identification and clustering based on spatial correlation are carried out on the assessment results of the entire dam body to obtain the final tailings pond dam break hazard classification assessment map, which can effectively improve the reliability of InSAR assessment of tailings pond dam break risks and provide new technical support for tailings pond safety monitoring and risk assessment.

[0143] The processor D100 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0144] In some embodiments, the memory D101 may be an internal storage unit of the terminal device D10, such as a hard disk or memory of the terminal device D10. In other embodiments, the memory D101 may also be an external storage device of the terminal device D10, such as a plug-in hard disk, a smart memory card (SMC, SmartMedia Card), a secure digital (SD, Secure Digital) card, a flash card (Flash Card), etc. equipped on the terminal device D10. Further, the memory D101 may also include both an internal storage unit of the terminal device D10 and an external storage device. The memory D101 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program, etc. The memory D101 may also be used to temporarily store data that has been output or is to be output.

[0145] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.

[0146] An embodiment of the present application provides a computer program product. When the computer program product runs on a terminal device, the terminal device can implement the steps in the above-mentioned method embodiments when executing the computer program product.

[0147] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium can at least include: any entity or device that can carry the computer program code to the tailings dam break risk assessment device / terminal device, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.

[0148] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0149] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0150] In the embodiments provided in the present application, it should be understood that the disclosed devices / network equipment and methods can be implemented in other ways. For example, the device / network equipment embodiments described above are merely schematic. For example, the judgment of the modules or units is merely a logical function judgment. There may be other judgment methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0151] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0152] The advantages of the technical solution proposed in this application are: it can accurately extract and eliminate the tailings consolidation settlement deformation component in the surface deformation of the tailings pond, effectively improve the reliability of InSAR assessment of the tailings pond dam breach risk, and provide new technical support for tailings pond safety monitoring and risk assessment.

[0153] The above is a preferred embodiment of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles described in the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A tailings dam breach risk assessment method, characterized in that: include: Collecting time series InSAR data of multiple tailings ponds in the study area during a historical period, and calculating the deformation rate and cumulative deformation of each tailings pond based on the time series InSAR data; The average and standard deviation of the deformation rate of the a priori stable area in the study area are calculated, and the deformation stability interval is set accordingly. The areas where the dam body deformation in multiple tailings ponds is within the stable interval are determined as having low dam break risk. For the tailings pond area where the dam body deformation is in an unstable range, the dam body deformation is fitted using a pre-built linear fitting model, and the linear hypothesis test is used to evaluate the linear fitting degree of the dam body deformation. The dam break risk of the tailings pond area that passes the linear hypothesis test is determined to be medium risk; wherein, the linear hypothesis test includes Related tests and Related inspections; The expression of the linear fitting model is as follows: in, represents the LOS deformation sequence, which is solved by the time series InSAR technology. Indicates time; represents the unknown parameters, estimated by the least squares fit; Said The expression of the correlation test is as follows: in, represents the relevant test statistic, Indicates The original sequence, Indicates A sequence of linear fitting models, represents the sequence length, represents the original sequence mean; Said The expression of the correlation test is as follows: in, express Statistics, Indicates the number of parameters; The Weibull time function is used to fit the tailings consolidation deformation of the tailings pond area that fails the linear hypothesis test and remove the tailings consolidation deformation component. The residual deformation after removing the tailings consolidation deformation component is tested for normality. If a tailings pond area passes the normality test, it is judged to have a low dam break risk. Otherwise, the pre-constructed linear exponential function model is used to perform a linear exponential fitting test on the residual deformation. If the linear exponential hypothesis test is passed, the tailings pond area is judged to have a high dam break risk. Otherwise, the tailings pond area is judged to have a medium dam break risk. The expression of the linear exponential function model is as follows: in, represents the residual deformation sequence, represents the automatically selected optimal segmentation point, Represents unknown parameters; LOF outlier identification and clustering based on spatial correlation are performed for each tailings pond to obtain a hierarchical assessment map of tailings pond dam break hazards corresponding to the study area.

2. The tailings dam breach risk assessment method according to claim 1, characterized in that: According to the calculation of the average deformation rate and standard deviation of the prior stable area in the study area, the deformation stability interval is set accordingly, and the dam deformation in multiple tailings ponds within the stable interval is determined as having a low dam break risk, including: According to the deformation rate average and the standard deviation, a stable deformation interval is constructed; wherein the stable deformation interval can be expressed as , represents the average deformation rate, represents standard deviation; For each of the multiple tailings ponds, if the deformation rate of the tailings pond is in the stable deformation interval, the dam break risk of the tailings pond is assessed as low risk.

3. The tailings dam breach risk assessment method according to claim 1, characterized in that: The normality test is based on the JarqueBera test; The expression of the JarqueBera test is as follows: in, is the sample skewness, which indicates the skewness of the residual deformation sequence distribution. A positive value indicates that the residual deformation is right-skewed, and a negative value indicates that the residual deformation is left-skewed. is the sample kurtosis, which indicates the degree of peak or flat peak of the residual deformation sequence distribution phase; represents the sample mean, represents the mean of the residual deformation sequence distribution; the JB statistic approximately obeys the chi-square distribution with 2 degrees of freedom, and the rejection domain is .

4. A tailings dam breach risk assessment device, characterized in that: include: A data acquisition module is used to collect time-series InSAR data of multiple tailings ponds in the study area within a historical period, and calculate the deformation rate and cumulative deformation of each tailings pond based on the time-series InSAR data; The first evaluation module calculates the average value and standard deviation of the deformation rate of the prior stable area in the study area, sets the deformation stability interval based on the average value and standard deviation, and determines the area of ​​the dam body deformation in the stable interval in multiple tailings ponds as having a low dam break risk; The second assessment module uses a pre-built linear fitting model to fit the dam body deformation in the tailings pond area where the dam body deformation is in an unstable range, uses a linear hypothesis test to evaluate the linear fitting degree of the dam body deformation, and determines the dam break risk of the tailings pond area that passes the linear hypothesis test as medium risk; wherein the linear hypothesis test includes Related tests and Related inspections; The expression of the linear fitting model is as follows: in, represents the LOS deformation sequence, which is solved by the time series InSAR technology. Indicates time; represents the unknown parameters, estimated by the least squares fit; Said The expression of the correlation test is as follows: in, represents the relevant test statistic, Indicates The original sequence, Indicates A sequence of linear fitting models, represents the sequence length, represents the original sequence mean; Said The expression of the correlation test is as follows: in, express Statistics, Indicates the number of parameters; The third evaluation module uses the Weibull time function to fit the tailings consolidation deformation of the tailings pond area that fails the linear hypothesis test and removes the tailings consolidation deformation component. The residual deformation after removing the tailings consolidation deformation component is tested for normality. If a tailings pond area passes the normality test, it is judged to have a low dam break risk; otherwise, a linear exponential fitting test is performed on the residual deformation using a pre-constructed linear exponential function model. If the linear exponential hypothesis test is passed, the tailings pond area is judged to have a high dam break risk. Otherwise, the tailings pond area is judged to have a medium dam break risk. The expression of the linear exponential function model is as follows: in, represents the residual deformation sequence, represents the automatically selected optimal segmentation point, Represents unknown parameters; The fourth assessment module performs LOF outlier point identification and clustering based on spatial correlation for each tailings pond, and obtains a hierarchical assessment map of tailings pond dam breach hazards corresponding to the study area.

5. A terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the tailings dam break risk assessment method according to any one of claims 1 to 3 is implemented.

6. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the tailings dam break risk assessment method according to any one of claims 1 to 3 is implemented.

Citation Information

Patent Citations

  • Real time monitoring data-based mine tailing dam instability risk evaluating method

    CN105913184A

  • Mine natural disaster hazard source risk prevention mechanism management system and method

    CN112488469A