Method for simulating the use of connate water during fracturing development of unconventional gas reservoirs

The simulation experimental device simulates the fracturing process of unconventional gas reservoirs, solving the problem of insufficient research on the utilization of native water and fracturing fluid, achieving accurate simulation and data support for the development process of unconventional gas reservoirs, and improving recovery rates. .

CN118641367BActive Publication Date: 2024-10-22SOUTHWEST PETROLEUM UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411098860.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-10-22
Estimated Expiration
2044-08-12

AI Technical Summary

Technical Problem

Existing technology has limited research on the characterization of native water in unconventional gas reservoirs and the utilization of native water by fracturing fluids, resulting in difficult development and low recovery rates.

Method used

Using a simulation experimental device, including a visual core holder and a high-speed camera, by adjusting the powder particle size and pressure, the permeability and porosity of the unconventional gas reservoir are simulated, and the dyed simulated native water and natural gas are saturated to perform fracturing operations and quantitative Analyze native water saturation changes.

Benefits of technology

Accurately simulate the dynamic changes of native water utilization in unconventional gas reservoirs from fracturing to gas production, provide strong data support for the development of unconventional gas reservoirs, and quantitatively characterize the natural gas change process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118641367B_ABST
    Figure CN118641367B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for simulating the utilization of connate water during the fracturing development of unconventional gas reservoirs, and relates to the technical field of unconventional gas reservoir development. The method uses a simulation experimental device including a visualized core, and includes the following steps: by adjusting the different particle size gradations of the powder, applying confining pressure to the visualized core holder until the difference in gas permeability and porosity between the experimental core and the real core is no more than 5%, and recording the pressure difference P0 between the confining pressure and the displacement pressure at this time; saturating the experimental core with dyed simulated connate water until the pressure in the visualized core holder reaches the target pressure; displacing the experimental core with natural gas until the experimental core reaches the target water saturation; fracturing the experimental core, and analyzing the changes in the simulated connate water saturation during the process. The present invention can accurately simulate the dynamic changes of the connate water of the original unconventional gas reservoir from fracturing to gas production.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of unconventional gas reservoir development, and in particular to a method for simulating the utilization of connate water in the process of unconventional gas reservoir fracturing development. Background Art

[0002] With the rapid increase in natural gas consumption demand, the decline of conventional gas reservoirs and the advancement of exploration and development technology, unconventional gas reservoirs have gradually become a research hotspot in recent years. Unconventional gas reservoirs include tight gas reservoirs and shale gas reservoirs. They have huge reserves and gradually mature development technologies, and have become an important development target at present. At the same time, with the large-scale development of unconventional oil and gas reservoirs, fracturing technology has become an important technical means for increasing the production and development of oil and gas reservoirs. Through fracturing, the utilization of unconventional oil and gas reservoirs can be greatly improved.

[0003] However, unconventional gas reservoirs have the characteristics of poor physical properties, complex pore throat configuration, and small average seepage pore throat radius. Poor macroscopic physical properties and strong pore throat heterogeneity are important factors that lead to complex fluid distribution patterns and difficult development in unconventional gas reservoirs. Therefore, the impact of fracturing fluid on the content and distribution of connate water determines the impact on natural gas recovery. However, there are currently few studies on the characterization of connate water in unconventional gas reservoirs and the use of connate water by fracturing fluid. At present, it is urgent to explore the distribution characteristics of simulated connate water in unconventional gas reservoirs and the use and distribution characteristics of simulated connate water by fracturing fluid. Analyze the impact of fracturing fluid on simulated connate water during fracturing, in order to provide a theoretical basis for the efficient development of unconventional gas reservoirs. Summary of the invention

[0004] To solve at least one of the above problems, the present invention proposes a method for simulating the utilization of connate water during the fracturing development of unconventional gas reservoirs.

[0005] The technical solution of the present invention is: a method for simulating the utilization of primary water in the process of fracturing development of unconventional gas reservoirs, comprising the following steps. The method is based on a simulation experimental device, and the simulation experimental device comprises a visual core holder, one end of the visual core holder is connected to a displacement pump, and the other end is provided with a back pressure valve, a high-speed camera is provided outside the visual core holder, at least one visual window is provided on the visual core holder, an experimental core is provided in the visual core holder, the experimental core is composed of a real cross-section core and at least one pressure-resistant transparent cross-section core, a transparent silica gel pad is provided between the real cross-section core and the pressure-resistant transparent cross-section core, a fracturing crack is provided in the real cross-section core, and the fracturing crack is filled with powder, and the powder is used to adjust the permeability and porosity of the experimental core;

[0006] The method comprises the following steps:

[0007] S1. By adjusting the different particle size distributions of the powder, apply confining pressure to the visualization core holder until the difference between the gas permeability and porosity of the experimental core and the real core is no more than 5%, and record the pressure difference P0 between the confining pressure and the displacement pressure at this time;

[0008] S2, under the condition that the pressure difference between the confining pressure and the inlet pressure of the visualization core holder is maintained at P0 and the confining pressure is the formation pressure P1, the experimental core is saturated with the dyed simulated native water until the pressure in the visualization core holder reaches the target pressure;

[0009] S3, under the condition that the pressure difference between the confining pressure of the core holder and the inlet pressure is maintained at P0 and the confining pressure is the formation pressure P1, the experimental core is displaced with natural gas until the experimental core reaches the target water saturation;

[0010] S4, using fracturing fluid and displacement pump to simulate fracturing of the experimental core, after fracturing, developing in a depletion development manner by reducing the outlet pressure of the visualized core holder until the abandonment pressure is reached;

[0011] In S3 and S4, the experimental cores were photographed and recorded, and the simulated primary water saturation at different times and in different areas of the experimental cores was quantitatively analyzed based on the photographs: , where represents the simulated primary water saturation at time t, Indicates the area occupied by the simulated native water in the photo at the initial moment, Represents the area occupied by the simulated native water in the photo at time t.

[0012] An embodiment of the present invention is that the true cross-section core includes a transverse cross-section and a longitudinal cross-section.

[0013] Furthermore, the visualization core holder is provided with two viewing windows, which are used to observe the transverse section and the longitudinal section respectively.

[0014] One embodiment of the present invention is that the visualized core clamp includes a shell and two plungers, the two plungers are arranged at both ends of the shell, an experimental core is arranged between the two plungers, a rubber cylinder is arranged outside the experimental core, a confining pressure chamber is formed between the rubber cylinder and the shell, and at least one transparent visual window is arranged on the shell.

[0015] Furthermore, a first buckle is fixedly provided on the outer wall edge of the pressure-resistant transparent cross-section core, and a second buckle matching the first buckle is provided on the rubber tube, and the pressure-resistant transparent cross-section core is fixed by the rubber tube, the first buckle and the second buckle.

[0016] One implementation of the present invention is that before the experiment, the experimental core is heated to the formation temperature.

[0017] One embodiment of the present invention is that the area occupied by the simulated native water in the photo is obtained based on the following steps: simulated native water and fracturing fluid in different proportions are mixed and photographed, and then the photo is grayed to obtain the grayscale values ​​under different mixing proportions of the simulated native water and the fracturing fluid, and the grayscale values ​​are made into a standard curve; after digitally graying the image, the grayscale values ​​in different times and different regions are obtained, and the area occupied by the simulated native water is calculated based on the standard curve.

[0018] In one embodiment of the present invention, the simulated fracturing operation includes the following steps: a displacement pump is pressurized until a core fracture is propped open, and then a proppant is injected.

[0019] Beneficial effects: The present invention can accurately simulate the process from fracturing to gas production in unconventional gas reservoirs, the dynamic changes in the utilization of primary water, and quantitatively characterize its changes through operations, which can provide strong data support for the development of unconventional gas reservoirs; at the same time, this method can also quantitatively characterize the changes in natural gas during the development process. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A simulation experimental device used in the method of this embodiment;

[0021] Figure 2 for Figure 1 The enlarged structural diagram of the visualized core holder is shown in the figure;

[0022] Figure 3 This is a schematic diagram of the cross-sectional structure of the experimental core;

[0023] In the figure, 1 is a visualized core holder, 2 is a confining pressure pump, 3 is a high-speed camera, 4 is a back pressure valve, 5 is an intermediate container, 6 is a displacement pump, 7 is an experimental core, 8 is a heater, 101 is a viewing window, 102 is a shell, 103 is a plunger, 104 is a rubber cylinder, 105 is a first buckle, 701 is a real section core, 702 is a pressure-resistant transparent section core, and 703 is a transparent silicone pad. DETAILED DESCRIPTION

[0024] The specific implementation modes of the present invention will be described clearly and completely below with reference to examples and drawings. Obviously, the described examples are only some embodiments of the present invention, rather than all embodiments.

[0025] like Figure 1~Figure 3As shown, a method for simulating the utilization of primary water in the process of fracturing development of unconventional gas reservoirs comprises the following steps. The method is based on a simulation experimental device, and the simulation experimental device comprises a visualization core holder 1. One end of the visualization core holder 1 is connected to a displacement pump 6, and the other end is provided with a back pressure valve 4. A high-speed camera 3 is provided outside the visualization core holder 1. At least one visual window 101 is provided on the visualization core holder 1. An experimental core 7 is provided in the visualization core holder 1. The experimental core 7 consists of a real section core 701 and at least one pressure-resistant transparent section core 702. A transparent silicone pad 703 is provided between the real section core 701 and the pressure-resistant transparent section core 702. A fracturing crack is provided in the real section core 701. The fracturing crack is filled with powder, and the powder is used to adjust the permeability and porosity of the experimental core 7.

[0026] For this device, its main structure is a conventional displacement device, such as a displacement pump 6, a plurality of intermediate containers 5, a back pressure valve 4, a confining pressure pump 2, etc., which are common components in the displacement device in the art. The difference from the existing displacement device is that the core holder selected in this embodiment is a visualized core holder 1, and the purpose of visualization is to facilitate the observation of the real core profile 701 inside the core holder.

[0027] In order to achieve the above functions, in this embodiment, the visual core clamp 1 includes a shell 102 and two plungers 103. The two plungers 103 are arranged at both ends of the shell 102 for bearing pressure and sealing. An experimental core 7 is arranged between the two plungers 103. A rubber cylinder 104 is arranged outside the experimental core 7. A confining pressure chamber is formed between the rubber cylinder 104 and the shell 102. The setting at this time is the same as that of a conventional core clamp, except that two transparent visual windows 101 are arranged on the shell 102, through which the experimental core 7 can be observed.

[0028] In order to be able to observe the real core profile, the experimental core 7 in this embodiment is composed of a real profile core 701 and two pressure-resistant transparent cores 702, wherein the real profile core 701 is in the shape of a quarter cylinder, and the two pressure-resistant transparent cores 702 are respectively in the shape of a half cylinder and a quarter cylinder, and the three are combined into a complete cylinder. Since the real profile core 701 is in the shape of a quarter cylinder, it has a transverse profile and a longitudinal profile, and can provide more experimental data; the pressure-resistant transparent core 702 is made of transparent and pressure-resistant materials including transparent pressure-resistant glass, through which the real core profile 701 can be observed.

[0029] For the experimental core 7, since it is made of the real cross-section core 701 and the pressure-resistant transparent core 702, and the contact surface smoothness, friction coefficient, etc. of the pressure-resistant transparent core 702 and the real cross-section core 701 are quite different, if it is not treated, most of the fracturing fluid, native water, natural gas, etc. will flow through the contact surface of the two, resulting in distortion of the experimental results. For this reason, in this embodiment, a layer of transparent silicone pad 703 is provided between the real cross-section core 701 and the pressure-resistant transparent cross-section core 702. The thickness of the silicone pad 703 does not need to be too thick, usually 0.1~0.5mm can meet the demand, and it will not affect the experiment.

[0030] Since the device of this embodiment needs to simulate the utilization of native water in the entire development process, and the fracturing operation is a conventional development method in the development of unconventional gas reservoirs, the present invention also studies the impact of the fracturing process on the bottom native water. Generally speaking, if the fracturing operation is directly performed in the visual core clamp, it is difficult to achieve with the existing technology. Therefore, in this embodiment, the real profile core 701 is first simulated for fracturing to generate fracturing cracks; in order to avoid the fracturing cracks from affecting the experimental results before the simulated fracturing development, in this embodiment, a layer of powder is filled in the fracturing cracks, which can be rock powder or quartz sand, etc. In actual use, powders of different particle sizes can be used in combination.

[0031] In conventional visualization core holders, the rubber tube used covers the entire core. Although transparent rubber can be used to make the rubber tube, the transparency of these transparent rubbers deteriorates after long-term work, resulting in reduced observation effect. For this reason, in this embodiment, a first buckle 105 is fixedly provided on the edge of the outer wall of the pressure-resistant transparent cross-section core 702, and a second buckle (not shown in the figure) matching the first buckle 105 is provided on the rubber tube. The pressure-resistant transparent cross-section core 702 is fixed by the rubber tube 104, the first buckle 105 and the second buckle, and the central body of the pressure-resistant transparent core 702 is not covered by the rubber tube. Since a large confining pressure is provided in this embodiment, the external confining pressure will make the rubber tube 104 close to the pressure-resistant transparent cross-section core 702 and the plunger 103, making it difficult for the water in the experimental core 7 to be discharged through the rubber tube 104.

[0032] Since the stratum still has a certain temperature, in this embodiment, a corresponding heating device can also be provided, which can be an oven covering the entire visualization core holder, or a heater 8 provided in the confining pressure chamber.

[0033] The method comprises the following steps:

[0034] S1. By adjusting the different particle size distributions of the powder, apply confining pressure to the visual core holder until the difference between the gas permeability and porosity of the experimental core and the real core is no more than 5%, and record the pressure difference P0 between the confining pressure and the displacement pressure at this time;

[0035] Specifically, in this step, the main purpose is to simulate the condition of the formation before the core is fractured. Since the experimental core with a real cross-section core is used for the experiment in this embodiment, its specific pore throat structure, flow channel tortuosity, etc. are consistent with the actual situation. However, since the real cross-section core is pre-fractured in the embodiment of the present invention, its permeability and porosity have undergone significant changes. Therefore, this embodiment needs to restore its permeability and porosity.

[0036] To this end, in this embodiment, the size of the cracks is reduced by filling the cracks with powders of different quantities and different particle size distributions, and the permeability and porosity of the real profile core are further adjusted by adjusting the pressure difference between the confining pressure and the displacement pressure, until the difference in gas permeability and porosity between the experimental core and the real core is no more than 5%, and the permeability and porosity are considered to have been restored.

[0037] S2, under the condition that the pressure difference between the confining pressure and the inlet pressure of the visualization core holder is maintained at P0 and the confining pressure is the formation pressure P1, the experimental core is saturated with the dyed simulated native water until the pressure in the visualization core holder reaches the target pressure;

[0038] In this step, the simulated native water needs to be dyed first. The dyed color makes it easier to identify the simulated native water, so as to track the use of the native water during the development process. The dye can be a conventional dye in the art, such as methylene blue, etc. Among them, the simulated native water is used to simulate the formation water in the formation, and it can be simulated by adding corresponding salts, etc.

[0039] After dyeing the simulated native water, it is necessary to inject the simulated native water into the experimental core to saturate it with native water. However, during the injection process, the confining pressure and the inlet pressure difference of the displacement pump need to be maintained at P0 at all times, so that the gas permeability and porosity of the experimental core remain basically unchanged.

[0040] S3, under the condition that the pressure difference between the confining pressure of the core holder and the inlet pressure is maintained at P0 and the confining pressure is the formation pressure P1, the experimental core is displaced with natural gas until the experimental core reaches the target water saturation;

[0041] Specifically, this step is mainly used to simulate the specific situation of water-containing natural gas in the formation. After S2 is saturated with water, in order to simulate the specific situation of water-containing natural gas, it is necessary to inject corresponding natural gas on the basis of S2 to simulate the situation of water-containing natural gas. Since the formation pressure is certain, in this process, the confining pressure is fixed to the formation pressure, and the pressure difference between the confining pressure and the inlet of the visualization core holder is fixed to P0. In this case, the mixing of natural gas and native water under actual formation conditions can be simulated.

[0042] When the experimental core reaches the target water saturation, stop gas injection. During this process, due to the compressibility of gas and the characteristics of core pores, the confining pressure and the inlet of the visual core holder may fluctuate, and it is necessary to wait for the pressure difference to stabilize before measuring its water saturation.

[0043] In this process, water saturation is quantitatively analyzed through the following steps: taking photos of the experimental cores, and quantitatively analyzing the simulated primary water saturation at different times and in different areas of the experimental cores based on the photos: , where represents the simulated primary water saturation at time t, Indicates the area occupied by the simulated native water in the photo at the initial moment, Represents the area occupied by the simulated native water in the photo at time t.

[0044] The area occupied by the simulated native water in the photo is obtained based on the following steps: mixing simulated native water and fracturing fluid in different proportions and taking photos, then graying the photos to obtain the grayscale values ​​under different mixing proportions of simulated native water and fracturing fluid, and making a standard curve; after digitally graying the image, the grayscale values ​​in different times and different regions are obtained, and the area occupied by the simulated native water is calculated based on the standard curve.

[0045] The reason why the above method is used to calculate the area occupied by the simulated native water is that in the embodiment of the present invention, not only the corresponding simulated native water is provided, but also the fracturing fluid is provided. And because in the prior art, considering factors such as cost and environmental protection, most of the fracturing fluids are water-based fracturing fluids, which can be mixed with the simulated native water. After mixing, the color of the simulated native water will change. Through the standard curve, the mixing degree of the fracturing fluid and the simulated native water can be obtained, and the area of ​​the simulated native water that is not mixed with the fracturing fluid can be added to obtain how much simulated native water is not used or used incompletely.

[0046] S4, using fracturing fluid and displacement pump to simulate fracturing of the experimental core, after fracturing, developing in a depletion development manner by reducing the outlet pressure of the visualized core holder until the abandonment pressure is reached;

[0047] In this step, the simulated fracturing does not necessarily mean to create new cracks, but rather to simulate that under the fracture pressure conditions, the fracture peaks of the real profile core itself will be opened, and after opening, the corresponding proppant can be injected.

[0048] In this embodiment, the exhaustion development is carried out by gradually reducing the pressure of the back pressure valve until the pressure of the back pressure valve reaches the abandonment pressure, and the changes in the simulated primary water saturation in the process are recorded. This method is the same as S3: the cross-section core is photographed and recorded, and the simulated primary water saturation at different times and in different areas of the experimental core is quantitatively analyzed based on the photos: , where represents the simulated primary water saturation at time t, Indicates the area occupied by the simulated native water in the photo at the initial moment, Represents the area occupied by the simulated native water in the photo at time t.

[0049] The area occupied by the simulated native water in the photo is obtained based on the following steps: mixing simulated native water and fracturing fluid in different proportions and taking photos, then graying the photos to obtain the grayscale values ​​under different mixing proportions of simulated native water and fracturing fluid, and making a standard curve; after digitally graying the image, the grayscale values ​​in different times and different regions are obtained, and the area occupied by the simulated native water is calculated based on the standard curve.

[0050] The reason why the above method is used to calculate the area occupied by the simulated native water is that in the embodiment of the present invention, not only the corresponding simulated native water is provided, but also the fracturing fluid is provided. And because in the prior art, considering factors such as cost and environmental protection, most of the fracturing fluids are water-based fracturing fluids, which can be mixed with simulated native water. After mixing, the color of the simulated native water will change. Through the standard curve, the mixing degree of the fracturing fluid and the simulated native water can be obtained, and the area of ​​the simulated native water that is not mixed with the fracturing fluid can be added to obtain how much simulated native water has not been used or has not been used completely.

[0051] In S3 and S4, the cross-section cores were photographed and recorded, and the simulated connate water saturation at different times and in different areas of the experimental cores was quantitatively analyzed based on the photographs: , where represents the simulated primary water saturation at time t, Indicates the area occupied by the simulated native water in the photo at the initial moment, Represents the area occupied by the simulated native water in the photo at time t.

[0052] In some cases, due to the high temperature in the formation, in order to truly restore the formation conditions, the experimental core is heated to the formation temperature before the experiment.

[0053] The above description is only a preferred embodiment of the present invention and does not constitute any form of limitation to the present invention. Although the present invention has been disclosed as a preferred embodiment as above, it is not intended to limit the present invention. Any technician familiar with the profession can make some changes or modifications to equivalent embodiments of equivalent changes using the technical contents disclosed above without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the scope of the technical solution of the present invention.

Claims

1. A method for simulating the use of connate water in the process of fracturing development of unconventional gas reservoirs, characterized in that: The method is based on a simulation experiment device, which comprises a visualization core holder (1), one end of the visualization core holder (1) is connected to a displacement pump (6), and the other end is provided with a back pressure valve (4), a high-speed camera (3) is provided outside the visualization core holder (1), at least one visual window (101) is provided on the visualization core holder (1), an experimental core (7) is provided inside the visualization core holder (1), the experimental core (7) is composed of a real cross-section core (701) and at least one pressure-resistant transparent cross-section core (702), a transparent silica gel pad (703) is provided between the real cross-section core (701) and the pressure-resistant transparent cross-section core (702), a fracturing crack is provided inside the real cross-section core (701), and the fracturing crack is filled with powder, and the powder is used to adjust the permeability and porosity of the experimental core (7); The method comprises the following steps: S1. By adjusting the different particle size distributions of the powder, a confining pressure is applied to the visual core holder (1) until the difference between the gas permeability and porosity of the experimental core (7) and the real core is no more than 5%, and the pressure difference P0 between the confining pressure and the displacement pressure at this time is recorded; S2, under the condition that the pressure difference between the confining pressure and the inlet pressure of the visualization core holder (1) is maintained at P0, and the confining pressure is the formation pressure P1, the experimental core (7) is saturated with the dyed simulated connate water until the pressure in the visualization core holder (1) reaches the target pressure; S3, under the condition that the pressure difference between the confining pressure and the inlet pressure of the visualization core holder (1) is maintained at P0 and the confining pressure is the formation pressure P1, the experimental core (7) is displaced with natural gas until the experimental core (7) reaches the target water saturation; S4. Under the condition of maintaining the confining pressure at the formation pressure P1, the experimental core (7) is simulated by using the fracturing fluid and the displacement pump (6). After the fracturing is completed, the core is developed in a depletion development manner by reducing the outlet pressure of the visual core holder (1) until the abandonment pressure is reached; In S3 and S4, the experimental core (7) is photographed and recorded, and the simulated connate water saturation at different times and in different areas of the experimental core (7) is quantitatively analyzed based on the photographs: , where represents the simulated primary water saturation at time t, Indicates the area occupied by the simulated native water in the photo at the initial moment, Represents the area occupied by the simulated native water in the photo at time t.

2. The method according to claim 1, characterized in that The real cross-section core (701) includes a transverse cross-section and a longitudinal cross-section.

3. The method according to claim 2, characterized in that The visualized core holder is provided with two visual windows (101), and the two visual windows (101) are used to observe the transverse section and the longitudinal section respectively.

4. The method according to claim 1, characterized in that The visualized core holder (1) comprises a shell (102) and two plungers (103), the two plungers (103) being arranged at two ends of the shell (102), an experimental core (7) being arranged between the two plungers (103), a rubber cylinder (104) being arranged outside the experimental core (7), a confining pressure chamber being formed between the rubber cylinder (104) and the shell (102), and at least one transparent visual window (101) being arranged on the shell (102).

5. The method according to claim 4, characterized in that A first buckle (105) is fixedly provided on the outer wall edge of the pressure-resistant transparent cross-section rock core (702), and a second buckle matching the first buckle (105) is provided on the rubber tube (104). The pressure-resistant transparent cross-section rock core (702) is fixed by means of the rubber tube (104), the first buckle (105) and the second buckle.

6. The method according to claim 1, characterized in that Before the experiment, the experimental core (7) is heated to the formation temperature.

7. The method according to claim 1, characterized in that The area occupied by the simulated native water in the photo is obtained based on the following steps: mixing simulated native water and fracturing fluid in different proportions and taking photos, then graying the photos to obtain the grayscale values ​​under different mixing proportions of simulated native water and fracturing fluid, and making a standard curve; after digitally graying the image, the grayscale values ​​in different times and different regions are obtained, and the area occupied by the simulated native water is calculated based on the standard curve.

8. The method according to claim 1, characterized in that The simulated fracturing operation comprises the following steps: the displacement pump (6) is pressurized until the core fracture is propped open, and then a proppant is injected.