A management method for well control equipment
By real-time monitoring and automation processing of temperature, pressure and vibration data of well control equipment, the detection and maintenance process of well control equipment is optimized, the problems of untimely response and insufficient automation in the existing technology are solved, and the well control equipment is improved Safety and reliability.
Patent Information
- Application Number
- CN202411127649.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-16
AI Technical Summary
The existing well control equipment management methods have shortcomings in real-time data processing and equipment failure prevention, which leads to insufficient response to sudden problems of well control equipment, increasing the risk of operational interruptions and safety accidents, and the degree of automation of fault diagnosis and risk assessment. insufficient.
Use real-time collection of temperature, pressure and vibration data of well control equipment, generate real-time monitoring data records through time stamp synchronization, analyze detection date and usage frequency, determine emergency detection priority, start automated email request third-party detection services, and analyze fault indicators and safety scores, adjust key operating parameters, formulate fault prevention measures and emergency response plans, monitor and optimize maintenance strategies in real time.
Improve the early identification ability of well control equipment failures, reduce the risk of safety accidents, optimize maintenance and scheduling efficiency, reduce the need for manual intervention, enhance the operational safety and reliability of well control equipment, and provide oil and gas mining More stable working environment.
Smart Images

Figure CN118643421B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of well control monitoring, and in particular to a management method for well control equipment. Background Art
[0002] The field of well control monitoring technology involves the development and implementation of systems and tools to ensure the safety and efficiency of wellheads during drilling operations. It focuses on the management of well control systems in oil and gas production, including the operation of blowout preventers, pressure monitoring, wellhead integrity inspection and emergency response. An effective well control monitoring system can prevent and control well kicks or other abnormal high-pressure events, reduce environmental risks and ensure the safety of operators. Advanced sensor technology, automated control systems and data analysis tools are used to achieve real-time monitoring and control of wellhead status to optimize resource extraction and management.
[0003] Among them, the management method of well control equipment aims to improve the operational efficiency and safety of well control equipment, including regular inspection, maintenance plan, performance monitoring and fault diagnosis of well control equipment. The purpose is to reduce the failure rate of well control equipment through systematic management, extend its service life, and ensure that well control events can be responded to quickly and effectively during drilling operations, which can improve the safety and economy of oil and gas extraction and protect the safety of operators and the environment.
[0004] Although existing technologies provide basic monitoring and management functions for well control equipment, they are deficient in real-time data processing and equipment failure prevention. They rely more on periodic inspection and maintenance plans and lack the ability to respond quickly to real-time changes, resulting in insufficient response to sudden problems in well control equipment, increasing the risk of operational interruptions and safety accidents. For example, if an abnormality in a key parameter of the equipment is not discovered and handled immediately, it will lead to serious well control accidents, such as blowouts or explosions, endangering the life safety of operators and the environment. The degree of automation in fault diagnosis and risk assessment is insufficient, and a lot of manual operations and expert intervention are still required, which not only increases costs but also prolongs response time. Existing technologies still have a lot of room for improvement in improving automation levels, real-time monitoring accuracy, and fault response speed. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings in the prior art and to propose a management method for well control equipment.
[0006] In order to achieve the above object, the present invention adopts the following technical solution, a management method of well control equipment, comprising the following steps:
[0007] S1: Collect real-time operating parameters of well control equipment, record real-time readings of temperature, pressure and vibration, synchronize data according to timestamps, and generate real-time monitoring data records;
[0008] S2: Based on the real-time monitoring data records, check the inspection date of the well control equipment, analyze the model and usage frequency information of the well control equipment, and determine the priority of emergency inspection, select the well control equipment that needs to be inspected first according to the priority, and generate a list of uninspected well control equipment;
[0009] S3: Based on the list of uninspected well control equipment, start the inspection of the well control equipment, send an automated email to request a third-party inspection service, record the sending time and expected feedback time, and generate an inspection scheduling record;
[0010] S4: Analyze the fault indicators and safety scores of the well control equipment according to the detection and scheduling records, allocate maintenance resources and time plans for the well control equipment whose fault indicators exceed the safety threshold, and generate risk assessment results;
[0011] S5: Based on the risk assessment results, adjust the key operating parameters of the well control equipment, formulate fault prevention measures and emergency response plans, verify the continuity and safety of the well control equipment operation, and form prevention and emergency plans;
[0012] S6: Implement the prevention and emergency plan, monitor the operating status of the adjusted well control equipment in real time and collect operating data, and form maintenance strategy optimization results by periodically evaluating the adaptability and effectiveness of the maintenance strategy.
[0013] As a further solution of the present invention, the real-time monitoring data records include the well control equipment number, recording time, temperature reading, pressure reading and vibration frequency; the list of uninspected well control equipment includes the well control equipment identification, model name, inspection date and usage frequency; the inspection scheduling record includes the inspection request number, the target well control equipment list, the expected inspection time and the expected feedback period; the risk assessment results include an indicator list of well control equipment failure, a safety score, and statistics of over-threshold indicators; the prevention and emergency plan includes key parameter adjustment, a list of preventive measures and emergency response steps; the maintenance strategy optimization results include a maintenance cycle adjustment plan, a well control equipment operating parameter modification plan and effect optimization measures.
[0014] As a further solution of the present invention, the steps of collecting real-time operating parameters of well control equipment, recording real-time readings of temperature, pressure and vibration, synchronizing data according to timestamps, and generating real-time monitoring data records are specifically as follows:
[0015] S101: collecting real-time operating parameters of well control equipment, capturing temperature, pressure and vibration data in real time, classifying and reading values of operating parameters of well control equipment in real time, and generating real-time parameter readings;
[0016] S102: extracting key data from the real-time parameter readings, assigning timestamps to the operating parameter readings of the well control equipment, verifying the time synchronization and sequence of the key operating parameters of the well control equipment, and obtaining a time-stamped data set;
[0017] S103: Based on the time-stamped data set, the temperature, pressure and vibration readings of the well control equipment are aggregated and analyzed, the integrity and security of the data in storage and transmission are verified, and a real-time monitoring data record is generated.
[0018] As a further solution of the present invention, based on the real-time monitoring data records, checking the inspection date of the well control equipment, analyzing the model and usage frequency information of the well control equipment, and determining the priority of the emergency inspection, the well control equipment that needs to be inspected first is screened according to the priority, and the steps of generating the list of uninspected well control equipment are specifically as follows:
[0019] S201: extracting the inspection date of the well control equipment from the real-time monitoring data record, calculating the inspection interval of the well control equipment according to the real-time date, analyzing the equipment that exceeds the predetermined inspection period, and obtaining a list of overdue inspection equipment;
[0020] S202: Analyze the models and usage frequencies of the well control equipment in the overdue inspection equipment list, evaluate the wear degree and failure risk of the well control equipment through the use records of the well control equipment, and obtain the wear evaluation results of the well control equipment;
[0021] S203: Based on the well control equipment wear assessment result, a decision tree classification algorithm is used to score and classify the emergency inspection priority of the well control equipment, prioritize the risky well control equipment, and generate a list of uninspected well control equipment.
[0022] As a further solution of the present invention, the formula of the decision tree classification algorithm is as follows:
[0023]
[0024] in, The attributes after weight adjustment For the dataset The information gain of For attribute value The weight coefficient of For the dataset The entropy of For the attributes The value of The subset size is is the size of the total dataset, For subset The entropy of .
[0025] As a further solution of the present invention, based on the list of uninspected well control equipment, the inspection of the well control equipment is initiated, an automated email is sent to request a third-party inspection service, and the sending time and expected feedback time are recorded. The steps of generating the inspection scheduling record are specifically as follows:
[0026] S301: Based on the list of uninspected well control equipment, an automated email is assigned and an inspection request is sent, wherein the email content includes the well control equipment model, inspection requirements and priority, and an inspection request email is generated;
[0027] S302: Send the test request email to the email address of the target third-party test service provider, record the sending time of the test request email, set the expected feedback time according to the average response time of the third-party service, and obtain the email sending record;
[0028] S303: Summarize the information in the email sending record, including the email sending time, the expected feedback time and the content of the detection request, track and manage the processing degree of the detection request, and generate a detection scheduling record.
[0029] As a further solution of the present invention, according to the detection scheduling record, the fault index and safety score of the well control equipment are analyzed, and for the well control equipment whose fault index exceeds the safety threshold, maintenance resources and time plan are allocated, and the steps of generating risk assessment results are specifically as follows:
[0030] S401: Based on the detection scheduling record, collect the data of well control equipment detection, analyze the fault indicators of the well control equipment, including temperature exceeding the standard, pressure abnormality and safety score, and obtain the fault and safety data set;
[0031] S402: Analyze the data in the fault and safety data set, identify the well control equipment whose fault index exceeds the preset safety threshold, evaluate the emergency maintenance needs of the well control equipment and assign priorities, and form an emergency maintenance needs list;
[0032] S403: According to the emergency maintenance demand list, maintenance technicians, maintenance spare parts and maintenance tools are allocated to the well control equipment with failure risks, and a maintenance schedule for the well control equipment is planned, resource allocation and time arrangement are optimized, and risk assessment results are generated.
[0033] As a further solution of the present invention, based on the risk assessment results, the key operating parameters of the well control equipment are adjusted, fault prevention measures and emergency response plans are formulated, and the continuity and safety of the operation of the well control equipment are verified. The steps of forming the prevention and emergency plans are specifically as follows:
[0034] S501: According to the risk assessment result, identify the key operating parameters of the well control equipment that need to be adjusted, including adjusting the temperature setting and the pressure limit, verify that the well control equipment operates according to the new operating standard, and obtain the adjusted operating parameter record;
[0035] S502: Based on the adjusted operation parameter records, formulate fault prevention measures for well control equipment, including maintenance inspection and fault detection, set up emergency response drafts for well control equipment for emergencies, and form a fault prevention and emergency response plan;
[0036] S503: Implement the fault prevention and emergency response plan, conduct periodic operation tests on the well control equipment, check the stability and safety of the operation of the well control equipment through the tests, and generate prevention and emergency plans.
[0037] As a further solution of the present invention, the steps of implementing the prevention and emergency plan, monitoring the operating status of the adjusted well control equipment in real time and collecting operating data, and forming the maintenance strategy optimization result by periodically evaluating the adaptability and effectiveness of the maintenance strategy are as follows:
[0038] S601: Implement the prevention and emergency plan, monitor the key operating parameters of the adjusted well control equipment in real time, including temperature and pressure, check the operating data of the well control equipment, analyze the real-time status of the well control equipment, and generate real-time operating status results;
[0039] S602: using the real-time operation status result and a multiple regression analysis method, evaluating the correlation between the maintenance effect of the well control equipment and the safety performance index, and obtaining a maintenance effect evaluation result;
[0040] S603: Based on the maintenance effect evaluation result, the maintenance strategy of the well control equipment is adjusted, the maintenance cycle and resource allocation are rearranged, the operation efficiency and safety of the well control equipment are optimized, and a maintenance strategy optimization result is formed.
[0041] As a further solution of the present invention, the formula of the multiple regression analysis method is as follows:
[0042]
[0043] in, To maintain the effect evaluation results, To prevent the implementation of the time, For emergency response speed, is the equipment failure rate, is the operator response time, For maintenance frequency, and is the regression coefficient, is the error term.
[0044] Compared with the prior art, the advantages and positive effects of the present invention are:
[0045] In the present invention, the introduction of synchronized timestamps allows for more accurate tracking of data changes, improves the speed and accuracy of responding to changes in the performance of well control equipment, and effectively improves the early identification of well control equipment failures through comprehensive analysis of real-time data, thereby reducing potential safety accidents caused by well control equipment failures. Automated email detection is initiated to optimize the efficiency of maintenance scheduling and ensure timely allocation of detection and maintenance resources. The automated process reduces the need for manual intervention, reduces the risk of operational errors, and improves the efficiency of the overall maintenance management process. By performing specific repairs and adjustments on well control equipment that exceeds the safety threshold, the operational safety and reliability of well control equipment are further enhanced, providing a more stable operating environment for oil and gas production. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 It is a schematic diagram of the main steps of the present invention;
[0047] Figure 2 It is a schematic diagram of the refinement of S1 of the present invention;
[0048] Figure 3 It is a schematic diagram of the refinement of S2 of the present invention;
[0049] Figure 4 It is a schematic diagram of the refinement of S3 of the present invention;
[0050] Figure 5 It is a schematic diagram of the refinement of S4 of the present invention;
[0051] Figure 6 It is a detailed schematic diagram of S5 of the present invention;
[0052] Figure 7 It is a detailed schematic diagram of S6 of the present invention. DETAILED DESCRIPTION
[0053] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0054] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.
[0055] Embodiment 1
[0056] See also Figure 1 The present invention provides a technical solution, a method for managing well control equipment, comprising the following steps:
[0057] S1: Collect real-time operating parameters of well control equipment, including temperature, pressure and vibration, and record real-time readings of temperature, pressure and vibration, synchronize data according to timestamps, and generate real-time monitoring data records;
[0058] S2: Based on real-time monitoring data records, check the inspection date of well control equipment. For well control equipment that has exceeded the inspection period, analyze the model and usage frequency of the well control equipment, determine the priority of emergency inspection, select the well control equipment that needs to be inspected first according to the priority, and generate a list of uninspected well control equipment;
[0059] S3: Based on the list of uninspected well control equipment, start the inspection of well control equipment, send an automated email to request third-party inspection services, and record the sending time and expected feedback time. Update the inspection progress status according to the feedback and generate an inspection scheduling record.
[0060] S4: Analyze the inspection results of the well control equipment from the inspection and scheduling records, analyze the fault indicators and safety scores of the well control equipment, classify and mark the well control equipment whose fault indicators exceed the safety threshold as risk equipment, and allocate maintenance resources and time plans for the marked well control equipment to generate risk assessment results;
[0061] S5: Based on the risk assessment results, adjust the key operating parameters of the well control equipment, including the upper temperature limit and pressure threshold, formulate fault prevention measures and emergency response plans, verify the continuity and safety of the well control equipment operation, and form prevention and emergency plans;
[0062] S6: Implement prevention and emergency plans, monitor the operating status of the adjusted well control equipment in real time and collect operating data, verify the effectiveness of the adjustment measures, and form maintenance strategy optimization results by periodically evaluating the adaptability and effectiveness of the maintenance strategy.
[0063] Real-time monitoring data records include the well control equipment number, recording time, temperature reading, pressure reading and vibration frequency. The list of uninspected well control equipment includes the well control equipment identification, model name, inspection date and frequency of use. The inspection scheduling records include the inspection request number, the target well control equipment list, the expected inspection time and the expected feedback period. The risk assessment results include the indicator list of well control equipment failure, the safety score, and the statistics of over-threshold indicators. The prevention and emergency plan includes key parameter adjustment, a list of preventive measures and emergency response steps. The maintenance strategy optimization results include the maintenance cycle adjustment plan, the well control equipment operating parameter modification plan and the effect optimization measures.
[0064] See also Figure 2 , collect the real-time operating parameters of the well control equipment, record the real-time readings of temperature, pressure and vibration, synchronize the data according to the timestamp, and generate the real-time monitoring data record in the following steps:
[0065] S101: collecting real-time operating parameters of well control equipment, capturing temperature, pressure and vibration data in real time, classifying and reading the values of operating parameters of well control equipment in real time, and generating real-time parameter readings. The execution process is as follows;
[0066] The S101 sub-step collects the real-time operating parameters of the well control equipment, including temperature, pressure and vibration data. Through the set sensor network, the equipment status is continuously monitored. Each sensor is equipped with an independent signal processing unit, which processes the sensor data in real time and converts the original signal into a digital signal. The digital signal is encoded into a transmittable format and sent to the data center through a secure communication protocol. In the data center, each data point received undergoes preliminary filtering and calibration to eliminate noise and deviation to ensure the accuracy of the data. The data is classified according to the preset threshold, and the temperature, pressure and vibration data are stored separately, and a timestamp is assigned to each data point. The timestamp is synchronized through the Network Time Protocol (NTP) service to ensure the consistency and sequentiality of all data in time and generate real-time parameter readings. The formula is: ,in, Represents parameter readings, Represents the security factor of data transmission. represents the sensor sensitivity, represents the weight of the calibration parameter, Represents sensor data, Represents the calibration value.
[0067] S102: extract key data from real-time parameter readings, assign timestamps to operating parameter readings of well control equipment, verify time synchronization and sequence of key operating parameters of well control equipment, and the execution flow of obtaining time-stamped data sets is as follows;
[0068] Substep S102 extracts key data from real-time parameter readings, assigns timestamps to the data, and checks synchronization. Advanced time management is used to accurately time-stamp each received data point to ensure the accuracy of time information. The timestamp of each data point is compared with the global standard time to verify time synchronization. After the timestamp is assigned, a sorting algorithm is used to sort the data according to the time sequence to ensure the time sequence of the data set. By introducing an anomaly detection mechanism, data points with abnormal timestamps can be identified and marked to ensure the quality and reliability of the data set and obtain a time-stamped data set. The formula is: ,in, Represents a time stamp, represents the time calibration factor, Represents the data receiving time, Represents the time synchronization deviation.
[0069] S103: Based on the time-stamped data set, the temperature, pressure and vibration readings of the well control equipment are aggregated and analyzed, the integrity and security of the data in storage and transmission are verified, and the execution process of generating real-time monitoring data records is as follows;
[0070] Sub-step S103 conducts a comprehensive analysis of the operating parameters (temperature, pressure, and vibration) of the well control equipment based on the time-stamped data set, and normalizes each parameter to unify the data scale and reduce the impact of variability. Afterwards, statistical models are used to perform trend analysis and pattern recognition on the data to identify potential abnormalities or signs of failure. During the data analysis process, multiple layers of data encryption and access control are implemented to ensure the security of data during storage and transmission. At the same time, by implementing a data integrity verification protocol, the data is monitored to see if it has been tampered with or lost during transmission, and real-time monitoring data records are generated. The formula is: ,in, represents the data integrity score, represents the encryption strength coefficient, Represents the amount of original data, represents the influence coefficient of abnormal data, Represents the amount of abnormal data.
[0071] See also Figure 3 Based on the real-time monitoring data records, check the inspection date of the well control equipment, analyze the model and frequency of use of the well control equipment, and determine the priority of emergency inspection. Filter the well control equipment that needs to be inspected first according to the priority, and generate the list of uninspected well control equipment. The specific steps are as follows:
[0072] S201: extracting the inspection date of the well control equipment from the real-time monitoring data record, calculating the inspection interval of the well control equipment against the real-time date, analyzing the equipment that exceeds the predetermined inspection cycle, and obtaining the list of overdue inspection equipment. The execution process is as follows;
[0073] Sub-step S201 extracts the inspection date of the well control equipment from the real-time monitoring data record, locates the data field storing the inspection date, parses the inspection date in each record, compares the inspection date with the current date, and calculates the inspection interval of each well control equipment. The inspection interval is obtained by the date difference algorithm, that is, the difference in days from the last inspection to the current date is calculated. Check whether the inspection interval of each well control equipment exceeds the set predetermined inspection cycle. The cycle is determined by the operating manual of the well control equipment or the manufacturer's maintenance guide, and obtains a list of overdue inspection equipment. The formula is: ,in, Represents the number of days between tests. Represents the current date, Represents the date of last detection.
[0074] S202: Analyze the models and usage frequencies of the well control equipment in the overdue inspection equipment list, evaluate the wear degree and failure risk of the well control equipment through the use records of the well control equipment, and the execution process of obtaining the wear evaluation results of the well control equipment is as follows;
[0075] Sub-step S202 analyzes the model and usage frequency of the well control equipment in the list of overdue detection equipment, extracts the usage records of each device from the data set, and by analyzing the records, can evaluate the usage frequency of the equipment, that is, the number of times the equipment is operated within a certain period of time. According to the frequency of use and the model of the equipment, a specific attenuation function will be used to simulate the degree of wear of the equipment. The degree of wear is calculated by combining the number of equipment operations with the preset wear parameters, which are determined by the model of the well control equipment and the expected service life. Based on the calculated degree of wear, the failure risk of the well control equipment is evaluated, and the wear assessment results of the well control equipment are generated. The formula is: ,in, Represents the degree of wear. Represents the frequency of use, Represents the number of operations, Represents the wear coefficient.
[0076] S203: Based on the well control equipment wear assessment results, a decision tree classification algorithm is used to score and classify the emergency inspection priority of the well control equipment, and the risky well control equipment is processed first. The execution process of generating a list of uninspected well control equipment is as follows;
[0077] Substep S203 classifies and scores the equipment to determine the inspection priority based on the well control equipment wear assessment results. Using the well control equipment wear degree and criticality as input, a decision support tool is applied. The tool assigns an emergency inspection priority to each equipment based on the equipment's wear status and operational importance. The classification process considers the potential impact of well control equipment failure and the availability of alternative solutions. Equipment with higher risks is classified as a priority to ensure the reliability and safety of critical equipment and generate a list of uninspected well control equipment.
[0078] The formula for the decision tree classification algorithm is as follows:
[0079]
[0080] in, The attributes after weight adjustment For the dataset The information gain of For attribute value The weight coefficient of For the dataset The entropy of For the attributes The value of The subset size is is the size of the total dataset, For subset The entropy of .
[0081] The execution flow is as follows:
[0082] Computational Dataset The total entropy , for each attribute value , determine the weight coefficient , the coefficients can be obtained by analyzing the attribute values The historical influence or expert rating is obtained by calculating the subset entropy under the attribute value , and considering the ratio of the subset size of the attribute value to the total data set size and the weight coefficient, calculate the weighted subset entropy, calculate the difference between the total entropy and the weighted subset entropy, and obtain the information gain after adjusting the weight.
[0083] See also Figure 4 , based on the list of uninspected well control equipment, start the inspection of well control equipment, send an automated email to request third-party inspection services, and record the sending time and expected feedback time. The specific steps for generating inspection scheduling records are:
[0084] S301: Based on the list of uninspected well control equipment, an automated email is assigned and an inspection request is sent. The email content includes the well control equipment model, inspection requirements and priority. The execution process of generating an inspection request email is as follows;
[0085] Based on the list of uninspected well control equipment, sub-step S301 retrieves all well control equipment marked as uninspected, and extracts detailed information of each equipment from the database, including model, inspection requirements and emergency inspection priority. The information is formatted as email content with a specific template. The email template is designed to clearly present the key information of each equipment so that the recipient can quickly identify the urgency and operational requirements of the email. An inspection request email is automatically generated based on the list, and a specific operation guide and contact information are attached to facilitate the understanding and response of the third-party service provider. The email is configured with an automated sending function. Once the email is placed in the sending queue, an inspection request email is generated. The formula is: ,in, Represents the content of the email. Represents the number of devices to be inspected, is the mail content encoding function, , and Respectively represent The model, detection requirements and priority of each device.
[0086] S302: Send a test request email to the email address of the target third-party test service provider, record the sending time of the test request email, and set the expected feedback time according to the average response time of the third-party service. The execution process of obtaining the email sending record is as follows;
[0087] S302: When the test request email is generated, it is automatically sent to the email address of the target third-party test service provider. The email sending module records the sending time of each email and combines it with the average response time agreed in advance by the third-party service provider to set the expected feedback time to ensure the timeliness and efficiency of the service process. The difference between the sending time and the expected feedback time is used to evaluate the response efficiency of the third-party service provider. The data is recorded to form an email sending record. The formula is: ,in, represents the expected feedback time, Represents the time when the email was sent. Represents the average response time.
[0088] S303: Summarize the information in the email sending record, including the email sending time, the expected feedback time and the content of the test request, track and manage the processing level of the test request, and generate the test scheduling record. The execution process is as follows;
[0089] Sub-step S303 summarizes the information in the email sending record, including the email sending time, expected feedback time and the content of the test request. Through an integrated tracking device, it can monitor the processing level of each test request in real time and present the information through a data visualization interface. This allows management to easily track the status of each request to ensure that no request is ignored or delayed. It can also automatically identify response timeouts, mark cases as requiring urgent attention, and generate test scheduling records. The formula is: ,in, Represents the detection scheduling record, Represents the number of emails sent. Is the mail tracking function , and Respectively represent The sending time, expected response time and detection request content of each email.
[0090] See also Figure 5 ,According to the inspection and scheduling records, the fault indicators and safety scores of the well control equipment are analyzed. For the well control equipment whose fault indicators exceed the safety threshold, maintenance resources and time plans are allocated. The specific steps for generating risk assessment results are as follows:
[0091] S401: Based on the detection scheduling record, the data of well control equipment detection is collected, and the fault indicators of the well control equipment are analyzed, including temperature exceeding the standard, pressure abnormality and safety score, and the execution process of the fault and safety data set is obtained as follows;
[0092] Substep S401 summarizes the inspection data of all well control equipment based on the inspection scheduling records, and extracts the temperature records, pressure readings and safety scores of the equipment by connecting to the central data set. The data is initially screened to eliminate any errors or outliers. Statistical analysis is performed on the temperature and pressure data to calculate the mean and standard deviation to determine whether there are any excesses. The safety score is directly imported from the safety monitoring equipment, and the score is evaluated based on a series of preset standards to obtain a fault and safety data set. The formula is: ,in, represents the failure and safety dataset, Represents temperature data, Represents pressure data, Represents the safety score, Is a data aggregation function.
[0093] S402: Analyze the data in the fault and safety data set, identify the well control equipment whose fault index exceeds the preset safety threshold, evaluate the emergency maintenance needs of the well control equipment and assign priorities, and form an emergency maintenance needs list. The execution process is as follows;
[0094] In sub-step S402, for the data in the fault and safety data set, each fault indicator is evaluated using the preset safety threshold. The temperature and pressure readings of each well control equipment are compared with the safety threshold to identify equipment that exceeds the normal range. The comparison results are used to evaluate the emergency maintenance needs of each equipment, and the maintenance priority is assigned accordingly. The equipment with the highest risk is prioritized according to the priority. A clear operating guide is provided to the maintenance team to ensure that the most urgent maintenance needs can be responded to quickly and a list of emergency maintenance needs is generated. The formula is: ,in, Represents a list of urgent repair needs, Respectively represent the excessive temperature, pressure index and safety score. is the maintenance demand assessment function.
[0095] S403: According to the list of emergency maintenance requirements, maintenance technicians, maintenance spare parts and maintenance tools are allocated to the well control equipment with failure risks, and the maintenance schedule of the well control equipment is planned to optimize resource allocation and time arrangement. The execution process of generating risk assessment results is as follows;
[0096] Sub-step S403 allocates maintenance technicians, maintenance spare parts and tools to each well control equipment marked with failure risk according to the list of emergency maintenance needs, and automatically selects appropriate technicians and necessary spare parts according to the equipment model and failure type. The geographical location and availability of maintenance personnel are considered to optimize resource allocation and scheduling. The maintenance schedule is automatically generated, taking into account the urgency and complexity of each maintenance task, ensuring the most efficient resource utilization and the fastest response time, and generating risk assessment results. The formula is: ,in, Represents the risk assessment results, , , and Represents assigned technicians, spare parts, maintenance tools and maintenance schedules, respectively. It is a resource optimization and timing function.
[0097] See also Figure 6 Based on the risk assessment results, adjust the key operating parameters of the well control equipment, formulate fault prevention measures and emergency response plans, verify the continuity and safety of the well control equipment operation, and form the specific steps of prevention and emergency plans:
[0098] S501: Based on the risk assessment results, identify the key operating parameters of the well control equipment that need to be adjusted, including adjusting the temperature setting and pressure limit, verify that the well control equipment operates according to the new operating standards, and obtain the adjusted operating parameter record. The execution process is as follows;
[0099] Sub-step S503 identifies the key operating parameters of the well control equipment that need to be adjusted based on the risk assessment results, including adjusting temperature settings and pressure limits based on the current performance and historical operating data of the equipment. Through an integrated control device, the adjustments are automatically applied to the relevant equipment, and the execution is monitored to ensure compliance with the new operating standards. During the adjustment process, the adjusted operating parameters are continuously captured to verify whether the well control equipment is operating stably according to the new standards, forming a record of the adjusted operating parameters. The formula is: ,in, Represents the adjusted operating parameter record, and Represents the new temperature and pressure settings, respectively. Represents the original operating parameters, is the parameter adjustment function.
[0100] S502: Based on the adjusted operation parameter records, formulate fault prevention measures for well control equipment, including maintenance inspection and fault detection, set up emergency response drafts for well control equipment for emergencies, and form the execution process of fault prevention and emergency response plans as follows;
[0101] Sub-step S502 formulates fault prevention measures for well control equipment based on the adjusted operating parameter records, including regular maintenance inspections and fault detection procedures, as well as emergency response drafts for emergencies. By analyzing the adjusted parameter change trends and historical fault data, key monitoring points and inspection frequencies are determined to ensure that potential faults can be discovered in time and responded to quickly. Integrate measures and response strategies to generate fault prevention and emergency response plans. The formula is: ,in, stands for Failure Prevention and Emergency Response Plan, represents the adjusted operating parameters, and Represent maintenance inspection and fault detection measures, respectively. It is the preventive measures formulation function.
[0102] S503: Implement fault prevention and emergency response plans, conduct periodic operation tests on well control equipment, check the stability and safety of well control equipment operation through tests, and generate the execution process of prevention and emergency plans as follows;
[0103] Sub-step S503 implements the fault prevention and emergency response plan, arranges regular operation tests of well control equipment, verifies the equipment's operational stability and safety through testing, including real-time monitoring and periodic evaluation of key operating parameters of the equipment to verify whether the performance meets the preset safety and efficiency standards. The test results help identify any possible performance deviations or potential failures to ensure timely maintenance or adjustments. Through periodic operation tests, prevention and emergency plans are generated. The formula is: ,in, stands for Prevention and Contingency Plan, represents the test parameters to be performed, stands for Periodic Assessment, stands for Performance Deviation Check, is the solution function.
[0104] See also Figure 7 , implement prevention and emergency plans, monitor the operating status of the adjusted well control equipment in real time and collect operating data, and periodically evaluate the adaptability and effectiveness of the maintenance strategy to form the maintenance strategy optimization results. The specific steps are:
[0105] S601: Implement prevention and emergency plans, monitor key operating parameters of the adjusted well control equipment in real time, including temperature and pressure, check the operating data of the well control equipment, analyze the real-time status of the well control equipment, and generate the execution process of the real-time operating status results as follows;
[0106] After implementing the prevention and emergency response plan in sub-step S601, the adjusted well control equipment is monitored in real time, focusing on the key operating parameters of the equipment, especially temperature and pressure. Data is collected by sensors installed at key locations and transmitted to the central monitoring equipment in real time. The received data is preliminarily analyzed and the deviation from the safety baseline is calculated to evaluate the operating status of the equipment in real time. The data is also trended to identify potential failures or performance degradation at an early stage and generate real-time operating status results. The formula is: ,in, Represents the real-time running status results. and Respectively represent the monitored temperature and pressure data, It is a real-time data analysis function.
[0107] S602: Using the real-time operation status results and the multiple regression analysis method, the correlation between the maintenance effect of the well control equipment and the safety performance index is evaluated, and the execution process of obtaining the maintenance effect evaluation result is as follows;
[0108] Substep S602 uses the real-time operation status results and multiple regression analysis methods to evaluate the correlation between the maintenance effect of well control equipment and safety performance indicators. By defining independent variables such as the real-time values of temperature and pressure after adjustment and dependent variables such as equipment failure rate and maintenance records, a multiple regression model is established. The model analyzes the specific impact of the adjusted parameters on the equipment maintenance effect and quantifies the effectiveness of the maintenance measures. Based on the model output, the maintenance effect evaluation results are obtained.
[0109] The formula for the multiple regression analysis method is as follows:
[0110]
[0111] in, To maintain the effect evaluation results, To prevent the implementation of the time, For emergency response speed, is the equipment failure rate, is the operator response time, For maintenance frequency, and is the regression coefficient, is the error term.
[0112] The execution flow is as follows:
[0113] Collect real-time operating data related to well control equipment and select the execution time of preventive measures , Emergency Response Speed , Equipment failure rate , Operator response time and maintenance frequency As independent variables, multiple regression analysis is performed through statistical software to estimate the regression coefficient of each independent variable. The coefficient can be determined by least squares optimization. The evaluation results of the maintenance effect are calculated based on the estimated regression coefficient and the collected data, and how the independent variables affect the maintenance effect is analyzed, and the quantitative evaluation results of the maintenance effect are generated.
[0114] S603: Based on the maintenance effect evaluation result, the maintenance strategy of the well control equipment is adjusted, the maintenance cycle and resource allocation are rearranged, and the operation efficiency and safety of the well control equipment are optimized. The execution process of forming the maintenance strategy optimization result is as follows;
[0115] Based on the maintenance effect evaluation results, sub-step S603 adjusts the maintenance strategy of the well control equipment, rearranges the maintenance cycle and resource allocation to optimize the operating efficiency and safety of the equipment. According to the evaluation results, the well control equipment that needs priority maintenance is identified, and the maintenance cycle of the well control equipment is adjusted to make it more frequent or more targeted. The resource allocation algorithm is adjusted to ensure the effective use of key components and technicians. The adjustments are integrated and approved through a series of strategy meetings and implementation plans to form the maintenance strategy optimization results. The formula is: ,in, Represents the optimization result of the maintenance strategy, Representative maintenance effectiveness evaluation, Represents resource allocation. represents the adjusted maintenance cycle, is the optimization strategy function.
[0116] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A method for managing well control equipment, characterized in that: The following steps are involved: Collect real-time operating parameters of well control equipment, record real-time readings of temperature, pressure and vibration, synchronize data based on timestamps, and generate real-time monitoring data records; Based on the real-time monitoring data records, check the inspection date of the well control equipment, analyze the model and usage frequency information of the well control equipment, and determine the priority of emergency inspection, select the well control equipment that needs to be inspected first according to the priority, and generate a list of uninspected well control equipment; Based on the list of uninspected well control equipment, start the inspection of the well control equipment, send an automated email to request a third-party inspection service, record the sending time and expected feedback time, and generate an inspection scheduling record; Analyze the fault indicators and safety scores of the well control equipment according to the detection and scheduling records, allocate maintenance resources and time plans for the well control equipment whose fault indicators exceed the safety threshold, and generate risk assessment results; Based on the risk assessment results, adjust the key operating parameters of the well control equipment, formulate fault prevention measures and emergency response plans, verify the continuity and safety of the well control equipment operation, and form prevention and emergency plans; Implement the prevention and emergency plans, monitor the operating status of the adjusted well control equipment in real time and collect operating data, and form maintenance strategy optimization results by periodically evaluating the adaptability and effectiveness of the maintenance strategy; Based on the real-time monitoring data records, the inspection date of the well control equipment is checked, the model and usage frequency information of the well control equipment are analyzed, and the priority of the emergency inspection is determined. The well control equipment that needs to be inspected first is screened according to the priority, and the steps of generating the list of uninspected well control equipment are specifically as follows: Extracting the inspection date of the well control equipment from the real-time monitoring data record, calculating the inspection interval of the well control equipment against the real-time date, analyzing the equipment that exceeds the predetermined inspection period, and obtaining a list of overdue inspection equipment; Analyze the models and usage frequencies of the well control equipment in the list of overdue inspection equipment, evaluate the wear degree and failure risk of the well control equipment through the use records of the well control equipment, and obtain the wear evaluation results of the well control equipment; Based on the well control equipment wear assessment results, a decision tree classification algorithm is used to score and classify the emergency inspection priorities of the well control equipment, prioritize the risky well control equipment, and generate a list of uninspected well control equipment; According to the detection scheduling record, the fault index and safety score of the well control equipment are analyzed, and for the well control equipment whose fault index exceeds the safety threshold, maintenance resources and time plan are allocated to generate the risk assessment result in the following steps: Based on the detection scheduling record, the data of well control equipment detection is collected, and the fault indicators of the well control equipment are analyzed, including temperature exceeding the standard, pressure abnormality and safety score, to obtain a fault and safety data set; Analyze the data in the fault and safety data set, identify the well control equipment whose fault indicators exceed the preset safety threshold, evaluate the emergency maintenance needs of the well control equipment and assign priorities to form an emergency maintenance needs list; According to the list of emergency maintenance needs, maintenance technicians, spare parts and tools are allocated to well control equipment with failure risks, and a maintenance schedule for the well control equipment is planned, resource allocation and time arrangement are optimized, and risk assessment results are generated; The steps of implementing the prevention and emergency plan, monitoring the operating status of the adjusted well control equipment in real time and collecting operating data, and periodically evaluating the adaptability and effectiveness of the maintenance strategy to form the optimization results of the maintenance strategy are as follows: Implement the prevention and emergency plan, monitor the key operating parameters of the adjusted well control equipment in real time, including temperature and pressure, check the operating data of the well control equipment, analyze the real-time status of the well control equipment, and generate real-time operating status results; Using the real-time operation status results, a multiple regression analysis method is used to evaluate the correlation between the maintenance effect of the well control equipment and the safety performance index, and obtain a maintenance effect evaluation result; Based on the maintenance effect evaluation results, the maintenance strategy of the well control equipment is adjusted, the maintenance cycle and resource allocation are rearranged, the operating efficiency and safety of the well control equipment are optimized, and a maintenance strategy optimization result is formed.
2. The method for managing well control equipment according to claim 1, characterized in that: The real-time monitoring data records include the well control equipment number, recording time, temperature reading, pressure reading and vibration frequency; the list of uninspected well control equipment includes the well control equipment identification, model name, inspection date and usage frequency; the inspection scheduling record includes the inspection request number, target well control equipment list, expected inspection time and expected feedback period; the risk assessment results include an indicator list of well control equipment failure, safety score, and over-threshold indicator statistics; the prevention and emergency plan includes key parameter adjustment, a list of preventive measures and emergency response steps; the maintenance strategy optimization results include a maintenance cycle adjustment plan, a well control equipment operating parameter modification plan and effect optimization measures.
3. The method for managing well control equipment according to claim 1, characterized in that: The steps to collect the real-time operating parameters of the well control equipment, record the real-time readings of temperature, pressure and vibration, synchronize the data according to the timestamp, and generate the real-time monitoring data record are as follows: Collect real-time operating parameters of well control equipment, capture temperature, pressure and vibration data in real time, classify and read the values of operating parameters of well control equipment in real time, and generate real-time parameter readings; Extracting key data from the real-time parameter readings, assigning timestamps to the operating parameter readings of the well control equipment, verifying the time synchronization and sequentiality of the key operating parameters of the well control equipment, and obtaining a time-stamped data set; Based on the time-stamped data set, the temperature, pressure and vibration readings of the well control equipment are aggregated and analyzed, the integrity and security of the data in storage and transmission are verified, and real-time monitoring data records are generated.
4. The method for managing well control equipment according to claim 1, characterized in that: The formula of the decision tree classification algorithm is as follows: in, The attributes after weight adjustment For the dataset The information gain of For attribute value The weight coefficient of For the dataset The entropy of For the attributes The value of The subset size is is the size of the total dataset, For subset The entropy of .
5. The method for managing well control equipment according to claim 1, characterized in that: Based on the uninspected well control equipment list, the inspection of the well control equipment is initiated, an automated email is sent to request a third-party inspection service, and the sending time and expected feedback time are recorded. The specific steps of generating the inspection scheduling record are: Based on the list of uninspected well control equipment, an automated email is assigned and an inspection request is sent, wherein the email content includes the well control equipment model, inspection requirements and priority, and an inspection request email is generated; Send the test request email to the email address of the target third-party testing service provider, record the sending time of the test request email, set the expected feedback time according to the average response time of the third-party service, and obtain the email sending record; The information in the email sending record is summarized, including the email sending time, the expected feedback time and the content of the detection request, the processing degree of the detection request is tracked and managed, and the detection scheduling record is generated.
6. The method for managing well control equipment according to claim 1, characterized in that: Based on the risk assessment results, the key operating parameters of the well control equipment are adjusted, fault prevention measures and emergency response plans are formulated, and the continuity and safety of the well control equipment operation are verified. The specific steps for forming prevention and emergency plans are as follows: Based on the risk assessment results, identify key operating parameters of the well control equipment that need to be adjusted, including adjusting temperature settings and pressure limits, verify that the well control equipment operates in accordance with the new operating standards, and obtain adjusted operating parameter records; Based on the adjusted operating parameter records, formulate fault prevention measures for well control equipment, including maintenance inspection and fault detection, set up emergency response drafts for well control equipment for emergencies, and form a fault prevention and emergency response plan; Implement the fault prevention and emergency response plan, conduct periodic operation tests on well control equipment, verify the stability and safety of well control equipment operation through tests, and generate prevention and emergency plans.
7. The method for managing well control equipment according to claim 1, characterized in that: The formula of the multiple regression analysis method is as follows: in, To maintain the effect evaluation results, To prevent the implementation of the time, For emergency response speed, is the equipment failure rate, is the operator response time, For maintenance frequency, and is the regression coefficient, is the error term.