A method and system for controlling active power balance in a wind-solar-hydrogen-storage-ammonia-alcohol park
By dividing control zones in the wind and light nitrogen storage park and combining new energy prediction correction and priority scheduling, the problem of grid balance control caused by uncertain new energy output is solved, the safety and stability of the system are improved, and the Reliable power supply of chemical load and stable frequency.
Patent Information
- Application Number
- CN202411110631.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-08-14
AI Technical Summary
Due to the lack of support from traditional synchronous generators in the wind and light hydrogen storage park, the output of new energy is uncertain, resulting in increased difficulty in grid balance control and large frequency fluctuations, affecting system safety and stability.
A live balance control method for the wind and light nitrogen storage park is adopted. By dividing the main control area and the sub-control area, combining new energy prediction and correction, priority energy storage scheduling, and load emergency regulation, real-time active balance scheduling of the power grid is achieved, reducing the limit of new energy The probability of electricity avoids frequent start and stop of the electrolytic cell.
It improves the safety, stability and disturbance resistance of the park's power system, ensures continuous and reliable power supply of chemical loads, reduces system frequency fluctuations, and improves the overall reliability of the power grid.
Smart Images

Figure CN118646102B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to an active power balance control method and system, in particular to an active power balance control method and system for a wind-solar-hydrogen-storage-ammonia-alcohol park, belonging to the technical field of energy and energy conservation. Background Art
[0002] As a new energy supply system, wind, solar and hydrogen storage effectively solve the problems of limited new energy transmission channels and cross-provincial and cross-regional consumption of new energy. By utilizing wind and solar new energy to generate electricity and produce hydrogen locally, it drives the production of downstream chemical products such as methanol and synthetic ammonia. The resulting integrated wind, solar, hydrogen storage and ammonia-alcohol park (hereinafter referred to as the "park") is an important way to realize the local consumption of new energy, improve energy utilization efficiency and achieve the "dual carbon" goals.
[0003] According to whether the park power grid is connected to the public power grid (hereinafter referred to as the "public grid"), the power generation and supply system composed of the park power supply and load can be divided into two types: grid-connected and off-grid. The park system needs to strictly control the power-off rate of the public grid, improve the utilization rate of new energy, and reduce carbon emissions in the entire life production process to ensure that ammonia and methanol meet international green certification standards. According to the layout of green electricity hydrogen production and downstream chemical industry, there are wind farms, photovoltaic power stations, biomass power plants (or hydrogen-fired generators), electrochemical energy storage power stations, hydrogen production (electrolysis of water or PEM hydrogen production), synthetic ammonia and methanol chemical loads in the park. Among them, wind farms and photovoltaic power stations are used to provide green electricity sources for park loads; biomass power plants (or hydrogen-fired generators) are used to bear the base load of chemical production in the park, and the carbon dioxide released by biomass power generation is stored after carbon capture for methanol production; electrochemical energy storage power stations are used as flexible adjustment resources for peak and frequency control of the park power grid; hydrogen production, synthetic ammonia and methanol are the power loads of the park. Since the park lacks traditional synchronous generators as basic power supply support, the uncertainty of wind and solar power and other new energy output increases the difficulty of real-time balance control of the park power grid; the park power grid involves the dual restrictions of power supply and use safety and chemical production safety. Therefore, in order to improve the safety, stability and reliability of the park power system, it is necessary to combine the characteristics and requirements of power generation and load power consumption, select reliable regulation resources for real-time power generation and use balance control, avoid large fluctuations in system frequency, and improve the system's anti-disturbance ability.
[0004] There has been extensive and in-depth research on the active power balance control strategies of interconnected large power grids and microgrids. However, the active power balance control strategies and methods for park microgrids or park power grids formed by chemical industry as the main power load or flexible load have not yet been involved. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide a method and system for controlling active power balance in a wind-solar-hydrogen-storage-ammonia-alcohol park, so as to realize real-time active power balance scheduling of the park power grid.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0007] A method for controlling active power balance of a wind-solar-hydrogen-storage-ammonia-alcohol park comprises the following steps:
[0008] S1. Modeling of active balance control area of the park power grid;
[0009] S2, Park power grid active balance control mode and control strategy, the specific steps are:
[0010] 2.1. The control mode of the control area determines the active power balance regulation responsibility of the control area;
[0011] 2.2. Calculate the regional control deviation ACE according to the control modes of the main control area and the sub-control area;
[0012] 2.3. When the grid-connected park power grid is in the grid-connected state, due to the disturbance of the park power grid causing the change of the power flow at the grid connection point, considering the restriction requirements of grid power use and the demand control requirements of the park power consumption, the additional control link is used to perform periodic power repayment;
[0013] 2.4. For control areas including new energy stations, additional control links are added to consider new energy forecast corrections to deal with the deviation between new energy forecast and actual output and the risk of large fluctuations in new energy output;
[0014] 2.5. Use the proportional-integral link to calculate the regional active power regulation demand. The specific steps are:
[0015] S3, active power balance control and distribution method of the park power grid;
[0016] 3.1. The stations and loads in the control area serve as the dispatching control units of the control area, receiving remote plans or dispatching control instructions. Their control mode determines the regulatory responsibility for participating in the balance of the control area;
[0017] 3.2. Considering the regional regulation requirements of on-grid / off-grid status Calculation of
[0018] 3.3. Regional Regulation Demand When allocating between dispatching control units, the principles of new energy priority consumption, energy storage priority dispatching, and load emergency regulation are adopted. The energy is allocated between wind farms, photovoltaic power stations, energy storage power stations, and hydrogen production loads. Energy storage is used to prioritize system disturbances to reduce the probability of new energy power restrictions and avoid electrolyzers entering load intervals with frequent starts and stops.
[0019] 3.4. Sub-control area is entirely occupied by biomass power plants or hydrogen-fired generators The conventional allocation strategy of adjustable capacity ratio, adjustable capacity or specified priority is adopted among multiple power plants or units;
[0020] 3.5. Calculate the active power control targets of stations and loads.
[0021] Furthermore, the step S1 specifically comprises:
[0022] 1.1. Determine the active power balance control requirements of the park based on the connection relationship between the park and the public grid. The grid-connected type is used to maintain the power tracking exchange plan of the tie line or the power control of power down, and the off-grid type is used to maintain the system frequency in compliance with the requirements. When dividing the active power balance control area of the park, it is divided into the main control area and the sub-control area;
[0023] 1.2. Combining wind power, photovoltaic power, flexible hydrogen production resources, biomass power generation with synthetic ammonia and methanol production resources;
[0024] 1.3. In the park power grid, energy storage is incorporated as a regulating resource into the resource combination of wind power, photovoltaic power, and flexible hydrogen production;
[0025] 1.4. In the park power grid, synthetic ammonia and methanol production are loads with high power supply reliability requirements, and the stable power load is matched with the stable basic power source biomass power generation;
[0026] 1.5. Wind power, photovoltaic power, flexible hydrogen production and energy storage in the park power grid are used as internal resources of the main control area;
[0027] 1.6. Determine the boundary model of the main control area and sub-control area.
[0028] Furthermore, the step 1.6 is specifically as follows:
[0029] Grid-connected park power grid: The sub-control area is the internal control area of the main control area. The sub-control area interconnection line is the grid-connected point outgoing line of the biomass power plant after the step-up transformer and the grid-connected point incoming line of the step-down transformer for the electricity load of synthetic ammonia and methanol production. The main control area interconnection line is the grid-connected assessment point required by the power grid company, and the incoming line is the high-voltage side or low-voltage side of the public connection point PCC main transformer. The active power flow direction of the park active control area is positive for delivery. The sub-control area is a closed area or a collection of multiple closed areas.
[0030] Off-grid park power grid: The main control area and sub-control area are independent of each other and interconnected through interconnection lines; the interconnection lines between the two control areas are the outgoing lines from the biomass power plant after the step-up transformer and the incoming lines from the step-down transformer for the electricity loads of synthetic ammonia and methanol production; the active power flow direction of the park's active power control area is positive when it is delivered.
[0031] Furthermore, the step 2.1 is specifically as follows:
[0032] Grid-connected park power grid: The grid-connected and off-grid operation states of the park power grid are determined according to the grid-connected switch state at the public connection point PCC of the park power grid. In the grid-connected state, the main control area and the sub-control area maintain the interconnection line exchange power within the exchange plan interval, and use constant interconnection line exchange power control FTC; in the off-grid state, the main control area maintains the system frequency within the target frequency interval, and uses constant frequency control FFC; the sub-control area maintains the interconnection line exchange power within the planned value interval, and uses constant interconnection line exchange power control FTC;
[0033] Off-grid campus power grid: The main control area maintains the system frequency within the target frequency range and adopts constant frequency control FFC; the sub-control area maintains the interconnection line exchange power near the planned value and adopts constant interconnection line exchange power control FTC.
[0034] Furthermore, the step 2.2 is specifically as follows:
[0035] Constant Frequency Control FFC:
[0036] (1)
[0037] Where P ACE is the value of the regional control deviation ACE; B is the frequency deviation coefficient; f is the measurement frequency; f N is the target frequency;
[0038] Constant Tie Line Switching Power Control FTC:
[0039] (2)
[0040] In the formula, P T Exchange power for tie lines; P T,Plan Exchange plans for tie lines.
[0041] Furthermore, the step 2.3 is specifically as follows:
[0042] The accumulated unplanned exchange power during the power repayment period is,
[0043] (3)
[0044] In the formula, , is the starting time of the cycle; , They are t Interconnection line switching power, interconnection line switching plan or maximum demand at any time; It is the electricity repayment cycle;
[0045] If the non-planned exchange power is greater than the set threshold, , then the power repayment is started, and the power used for the planned repayment is,
[0046] (4)
[0047] The planned reimbursement power is used as the component of the tie-line exchange plan, and formula (2) is adjusted;
[0048] (5).
[0049] Furthermore, the step 2.4 is specifically as follows:
[0050] (6)
[0051] In the formula, , It is the adjustment coefficient of new energy forecast deviation and new energy forecast increment, with a value range of 0~1.0; , It is the new energy forecast for the current 5 minutes and the new energy forecast value for the next 5 minutes; It is the actual output of new energy. For multiple wind farms or photovoltaic power stations, the predicted and actual output of new energy is the sum of the predicted and actual output of all stations.
[0052] Furthermore, the step 2.5 is specifically as follows:
[0053] (7)
[0054] In the formula, , They are the proportional coefficient and the integral coefficient respectively, and their values are negative; is the ACE at time t; is the starting time of the integration period.
[0055] Furthermore, the step S3 is specifically:
[0056] 3.1. The stations and loads in the control area serve as the dispatching control units of the control area, receiving remote plans or dispatching control instructions. Their control mode determines the regulatory responsibility for participating in the balance of the control area;
[0057] a) Grid-connected park power grid:
[0058] Main control area: Wind farms and photovoltaic power stations adopt the planned tracking BLO mode or the planned tracking + balancing adjustment BLR mode; the planned tracking BLO mode tracks wind power and photovoltaic power generation plans; the planned tracking + balancing adjustment BLR mode participates in the allocation of unbalanced quantities in the control area on the basis of tracking wind power and photovoltaic power generation plans; the energy storage power station adopts the balancing adjustment BPR control mode as the balancing power source of the control area. If there are multiple energy storage power stations, some energy storage power stations are selected to work in the planned tracking BLO mode or the planned tracking + balancing adjustment BLR mode to participate in peak load regulation or peak load regulation and frequency regulation control; the hydrogen production load adopts the planned tracking BLO mode or the planned tracking + balancing adjustment BLR mode; the planned tracking BLO mode tracks the hydrogen production power consumption plan; the planned tracking + balancing adjustment BLR mode participates in the allocation of unbalanced quantities in the control area on the basis of tracking the hydrogen production power consumption plan;
[0059] Sub-control area: Biomass power plants or hydrogen-fired generators adopt the balanced regulation BPR mode to participate in the interconnection line power control of the sub-control area; synthetic ammonia and methanol loads adopt the planned tracking BLO mode to track the power consumption plan;
[0060] b) Off-grid park power grid:
[0061] The control mode of wind farms, photovoltaic power stations, hydrogen production loads in the main control area, biomass power plants or hydrogen-fired generators, synthetic ammonia and methanol loads in the sub-control area is the same as that of the grid-connected park power grid; the energy storage power station is used as a balancing power source, and adopts the constant frequency and constant voltage local control mode, and does not receive remote AGC instructions. Similarly, if there are multiple energy storage power stations, some energy storage power stations are selected to work in the balancing regulation BPR mode, the planned tracking BLO mode, or the planned tracking + balancing regulation BLR mode;
[0062] 3.2. Considering the regional regulation requirements of on-grid / off-grid status Calculation of main and sub-control areas in grid-connected state and sub-control areas in off-grid state Same as formula (6); in the off-grid state, the main control area is responsible for the frequency regulation of the park power grid and undertakes the real-time balance control of active power. The power of the energy storage power station of the balancing power source that deviates from the preset balance base point needs to be borne by other frequency-regulated power sources to restore the adjustable capacity of the balancing power source;
[0063] The regulation demand of the main control area in the off-grid state is:
[0064] (8)
[0065] In the formula, , are the actual output and preset balance base point of the energy storage power station as the balancing power source at time t; if there are multiple energy storage power stations as balancing power sources, the actual output and preset balance base point of each station are accumulated; The power changes frequently. For engineering applications, first-order low-pass filtering can be used to filter out high-frequency components and capture the power change trend.
[0066] 3.3. Regional Regulation Demand When allocating between dispatching control units, the principles of new energy priority consumption, energy storage priority dispatching, and load emergency regulation are adopted. The energy is allocated between wind farms, photovoltaic power stations, energy storage power stations, and hydrogen production loads. Energy storage is used to prioritize system disturbances to reduce the probability of new energy power restrictions and avoid electrolyzers entering load intervals with frequent starts and stops.
[0067] a) If In the order of increasing the output of wind farms and photovoltaic power stations in power-limited state, switching to zero-power operation or discharging of energy storage power stations in charging state, discharging of energy storage power stations in non-charging state, and reducing the load of hydrogen production units with high load rate, each control unit takes on the responsibility in turn according to the active power regulation step length. ;
[0068] The distributed power of wind farm, photovoltaic power station and energy storage power station is
[0069] (9)
[0070] In the formula, Adjust the demand for the remaining areas to be allocated, , i is the calling order of the station; , and They are the regulation upper limit, actual output and regulation step length of the station respectively;
[0071] The allocated power of the hydrogen production station is
[0072] (10)
[0073] In the formula, , and They are the lower limit, actual load and regulation step of the hydrogen production control unit respectively;
[0074] b) If In the order of energy storage power stations in the discharge state switching to zero power operation or charging, energy storage power stations in the non-discharge state charging, low-load modulated hydrogen power sources increasing load power, wind farms and photovoltaic power stations reducing output and limiting power operation, each control unit takes on the responsibility in turn according to the active power regulation step length. ;
[0075] The distributed power of wind farm, photovoltaic power station and energy storage power station is
[0076] (11)
[0077] In the formula, Adjust the demand for the remaining areas to be allocated, , i is the calling order of the station; , and They are the lower limit of regulation, actual output and regulation step of the station respectively;
[0078] The allocated power of the hydrogen production unit is
[0079] (12)
[0080] In the formula, , and They are the upper limit of regulation, actual load and regulation step of the hydrogen production regulation unit;
[0081] 3.4. Sub-control area is entirely occupied by biomass power plants or hydrogen-fired generators The conventional allocation strategy of adjustable capacity ratio, adjustable capacity or specified priority is adopted among multiple power plants or units;
[0082] 3.5. Calculate the active power control targets of stations and loads.
[0083] (13)
[0084] In the formula, To control the base power of the unit, the planned tracking BLO mode and the planned tracking + balancing adjustment BLR mode take the planned power generation and consumption value, and the balancing adjustment BPR mode takes the actual output; To regulate the power of the control unit, the planned tracking BLO mode is 0, and the planned tracking + balancing regulation BLR mode wind farms, photovoltaic power plants and energy storage power plants are 、Hydrogen production station .
[0085] A wind-solar-hydrogen-storage-ammonia-alcohol park active power balance control system, comprising a balance control area modeling unit, an active power regulation unit modeling unit, a measurement data acquisition and processing unit, a regional control deviation and regulation demand calculation unit, a power distribution and active power regulation unit control target calculation unit and a control performance monitoring module unit;
[0086] The balance control area modeling unit is used for modeling and parameter maintenance of the balance control area of the wind-solar-hydrogen-storage-ammonia-alcohol integrated park. The balance control area is the responsible entity for active balance control, including the control entity and the closed area of the control boundary; the control entity maintains the control mode, target frequency, frequency deviation coefficient, proportional coefficient, integral coefficient, unplanned exchange power repayment threshold value, unplanned exchange power repayment status, and new energy forecast correction status of the control area; the control boundary maintains the interconnection line measurement points, interconnection line limits, interconnection line plans, and interconnection line operation status of the control area;
[0087] The active control unit modeling unit is used to model the active control objects of wind farms, photovoltaic power stations, energy storage power stations, biomass power plants, hydrogen production plants, synthetic ammonia and methanol plants within the control area of the wind-solar-hydrogen-storage-ammonia-alcohol integrated park. The bottom layer is the specific model of the wind farm, photovoltaic power station, energy storage power station, biomass power plant and adjustable load stations. By abstractly extracting the common characteristics of various stations and loads, it serves as the receiving unit for active dispatching control instructions within the control area;
[0088] The measurement data acquisition and processing module unit is used to obtain the park power grid frequency, grid connection point active power, tie line exchange power, tie line exchange plan, and grid connection and disconnection status;
[0089] The regional control deviation and regulation demand calculation unit calculates the regional control deviation of each control area according to the control mode, frequency measurement, tie line exchange power measurement and tie line exchange plan of each control area in the park, and superimposes the calculation components of the unplanned power repayment and new energy forecast correction link as needed to obtain the ACE for control; the control ACE after superimposing the components is subjected to the proportional integral link to obtain the regional regulation demand ARR; in the off-grid state, the main control area considers the regulation capacity of the balanced power source to restore the preset balance base point, and updates the ARR of this control area;
[0090] The power allocation and active power control unit controls the target calculation unit. The regional regulation demand ARR calculates the allocation capacity of each active power control unit in turn according to the preset resource call priority order. The upper limit, lower limit and step size constraints of regulation are considered in the allocation process.
[0091] The control performance monitoring unit includes control area performance monitoring and active power regulation unit performance monitoring; the control area performance monitoring monitors the frequency mean, frequency root mean square, ACE mean, unplanned exchange power, new energy forecast deviation power, and control qualification rate of each control area in real time by minute, hour, day, month, and year; the active power regulation unit performance monitoring monitors the operating status of each active power regulation unit and the execution of active power control targets in real time, and counts the response time, regulation rate, and regulation accuracy of each instruction, and counts the AGC operation time, AGC operation rate, power generation and consumption, number of AGC instructions, average rate, and average accuracy by hour, day, month, and year.
[0092] Compared with the prior art, the present invention has the following advantages and effects: The present invention provides a method and system for active balance control of a wind-solar-hydrogen-storage-ammonia-alcohol park. According to the power supply and load composition inside the park, the control area balance responsibilities of "ensuring power supply" and "ensuring balance" are determined by dividing different balance control areas, so as to meet the requirements of continuous and reliable power supply of key chemical loads, power flow at the grid connection point and stable control of the frequency of the off-grid system. The regional control deviation is corrected by considering the unplanned power exchange repayment, new energy forecast deviation and forecast increment to meet the requirements of advanced control of power and electricity demand and new energy forecast. The principle of "new energy priority consumption, energy storage priority dispatching, and load emergency regulation" is adopted to distribute among wind farms, photovoltaic power stations, energy storage power stations and hydrogen production loads, and energy storage is used to prioritize the regulation of system disturbances, reduce the probability of new energy power restrictions, and avoid the electrolyzer from entering the load interval with frequent start and stop. The implementation of relevant strategies and methods can improve the safety, stability and reliability of the park's power system, avoid large fluctuations in system frequency, and enhance the system's anti-disturbance capability. BRIEF DESCRIPTION OF THE DRAWINGS
[0093] Figure 1 This is a schematic diagram of the grid control area division of a wind-solar-hydrogen-storage-ammonia-alcohol integrated park in which the active balance control method of the wind-solar-hydrogen-storage-ammonia-alcohol park is connected to the grid Figure 1 .
[0094] Figure 2 This is a schematic diagram of the grid control area division of a wind-solar-hydrogen-storage-ammonia-alcohol integrated park in which the active balance control method of the wind-solar-hydrogen-storage-ammonia-alcohol park is connected to the grid Figure 2 .
[0095] Figure 3 This is a schematic diagram of the division of power grid control areas of an off-grid wind-solar-hydrogen-storage-ammonia-alcohol integrated park according to a method for controlling active power balance of a wind-solar-hydrogen-storage-ammonia-alcohol park of the present invention. Figure 1 .
[0096] Figure 4 This is a schematic diagram of the division of power grid control areas of an off-grid wind-solar-hydrogen-storage-ammonia-alcohol integrated park according to a method for controlling active power balance of a wind-solar-hydrogen-storage-ammonia-alcohol park of the present invention. Figure 2 .
[0097] Figure 5 This is a calculation flow chart of active balance control of the wind-solar-hydrogen-storage-ammonia-alcohol integrated park of the present invention.
[0098] Figure 6 It is a curve diagram of the dynamic regulation of hydrogen production load and the start-stop regulation load range of the present invention.
[0099] Figure 7 It is a curve diagram of the load range for normal regulation and reserved emergency standby of the energy storage power station of the present invention.
[0100] Figure 8 It is a curve diagram of the active power regulation range of the wind farm of the present invention. DETAILED DESCRIPTION
[0101] In order to elaborate on the technical scheme adopted by the present invention to achieve the predetermined technical purpose, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only partial embodiments of the present invention, rather than all embodiments, and the technical means or technical features in the embodiments of the present invention can be replaced without paying creative work. The present invention will be described in detail below with reference to the drawings and in conjunction with the embodiments.
[0102] A method for controlling active power balance of a wind-solar-hydrogen-storage-ammonia-alcohol park comprises the following steps:
[0103] S1. Modeling of active balance control area of the park power grid.
[0104] 1.1. The active power balance control requirements of the park are determined based on the connection relationship between the park and the public grid. The grid-connected type is used to maintain the interconnection line power tracking exchange plan or power off-grid control, and the off-grid type is used to maintain the system frequency in compliance with the requirements. The park power grid contains important chemical power loads. Therefore, when the active power balance control area of the park is divided, it is divided into main and sub-control areas. The main control area dispatches the adjustable resources within the control area to meet the active power balance control requirements of the park; the sub-control area is used to meet the continuous, stable and reliable power supply requirements of the chemical industry loads with high power supply reliability requirements.
[0105] 1.2. Considering the power supply reliability requirements of the chemical loads in the park, high power supply reliability requires that the loads be matched according to their output regulation characteristics, in accordance with the principle of matching stable power loads with stable basic power sources, low-volatility controllable loads with highly controllable flexible power sources, and flexible loads with uncertain power sources, to match the power generation and consumption capacity, power adjustable range, and regulation rate. Therefore, wind power, photovoltaic power, and flexible hydrogen production resources are combined, and biomass power generation is combined with synthetic ammonia and methanol production resources.
[0106] 1.3. If there is a low controllable power source or low controllable load in the resource combination, energy storage is added as a supplement to the regulation resource. In the park power grid, energy storage is included in the resource combination of wind power, photovoltaic power, and flexible hydrogen production as a regulation resource.
[0107] 1.4. For loads with high power supply reliability requirements and power sources that match them, as internal resources of the sub-control area, the adjustable resources in the active power balance control area of the park are dispatched to maintain the balance of power generation and consumption or track the power transmission and reception plan. In the park power grid, synthetic ammonia and methanol production belong to loads with high power supply reliability requirements, and the stable power load matches the stable basic power source biomass power generation. In power supply planning, system design, power generation plan formulation and real-time control strategy formulation, it is necessary to ensure that the power generation capacity, adjustable range and climbing ability of the power source meet the requirements of the capacity, adjustable range and climbing rate of the power load.
[0108] 1.5. Resources outside the sub-control area are uniformly included in the main control area. Wind power, photovoltaic power, flexible hydrogen production and energy storage in the park power grid are regarded as internal resources of the main control area.
[0109] 1.6. Determine the boundary model of the main control area and sub-control area.
[0110] Grid-connected park power grid: The sub-control area is the internal control area of the main control area. The sub-control area interconnection line is the grid-connected point outgoing line of the biomass power plant after the step-up transformer, and the grid-connected point incoming line of the step-down transformer for the electricity load of synthetic ammonia and methanol production; the main control area interconnection line is the grid-connected assessment point required by the power grid company, and the incoming line is the high-voltage side or low-voltage side of the public connection point PCC main transformer; the active power flow direction of the park active control area is positive for delivery. Figure 1 As shown in the figure, the blue area is the main control area, and the green area is the sub-control area. A sub-control area is a closed area or a collection of multiple closed areas, such as Figure 2 As shown, the sub-control area is the combination of two green areas.
[0111] Off-grid park power grid: The main control area and sub-control area are independent of each other and are interconnected through tie lines; the tie lines between the two control areas are the outgoing line of the biomass power plant after the step-up transformer and the incoming line of the step-down transformer for the power load of synthetic ammonia and methanol production; the active power flow direction of the park active power control area is positive when it is sent out. Figure 3 As shown, the blue area is the main control area, and the green area is the sub-control area. Similarly, the control area can be a collection of multiple closed areas, such as Figure 4 As shown, the sub-control area is the combination of two green areas.
[0112] S2. Active power balance control mode and control strategy of the park power grid.
[0113] 2.1. The control mode of the control area determines the active power balance regulation responsibility of the control area.
[0114] Grid-connected campus power grid: The on-grid and off-grid operation status of the campus power grid is determined according to the grid-connected switch status at the public connection point PCC of the campus power grid. In the on-grid state, the main control area and the sub-control area maintain the interconnection line exchange power within the exchange plan range, and adopt constant interconnection line exchange power control FTC (Flat Tie Control); in the off-grid state, the main control area maintains the system frequency within the target frequency range, and adopts constant frequency control FFC (Flat Frequency Control); the sub-control area maintains the interconnection line exchange power within the planned value range, and adopts constant interconnection line exchange power control FTC.
[0115] Off-grid campus power grid: The main control area maintains the system frequency within the target frequency range and adopts constant frequency control FFC; the sub-control area maintains the interconnection line exchange power near the planned value and adopts constant interconnection line exchange power control FTC.
[0116] 2.2. Calculate the area control error ACE (Area Control Error) according to the control modes of the main control area and the sub-control area. The area control error ACE reflects the active power imbalance of the control area in real time.
[0117] Different control modes select different calculation components, and the calculation formula of regional control deviation ACE is as follows.
[0118] Constant Frequency Control FFC:
[0119] (1)
[0120] Where P ACE is the value of the regional control deviation ACE; B is the frequency deviation coefficient, unit: MW / 0.1Hz; f is the measured frequency, unit: Hz; f N is the target frequency, unit: Hz.
[0121] Constant Tie Line Switching Power Control FTC:
[0122] (2)
[0123] In the formula, P T is the interconnection line exchange power, unit: MW; P T,Plan It is the interconnection line exchange plan, unit: MW, transmission is positive and reception is negative.
[0124] 2.3. When the grid-connected park power grid is in the grid-connected state, due to the change of the power flow at the grid connection point caused by the disturbance of the park power grid, considering the restriction requirements of grid power use and the demand control requirements of the park power consumption, a fixed-cycle power repayment is carried out through additional control links. The power repayment period is the smaller value of the grid power usage statistical period and the demand period in the green power hydrogen production certification.
[0125] The accumulated unplanned exchange power during the power repayment period is,
[0126] (3)
[0127] In the formula, is the starting time of the cycle; , They are t The current tie line switching power, tie line switching plan or maximum demand, unit: MW; It is the power repayment period, in seconds.
[0128] If the non-planned exchange power is greater than the set threshold, , then the power repayment is started, and the power used for the planned repayment is,
[0129] (4)
[0130] The planned reimbursement power is used as a component of the tie-line switching plan and is adjusted to formula (2).
[0131] (5).
[0132] 2.4. For control areas including new energy stations, additional control links are added to consider new energy forecast corrections to deal with the risk of deviations between new energy forecasts and actual output and large fluctuations in new energy output.
[0133] (6)
[0134] In the formula, , It is the adjustment coefficient of new energy forecast deviation and new energy forecast increment, with a value range of 0~1.0; , It is the new energy forecast for the current 5 minutes and the new energy forecast value for the next 5 minutes; It is the actual output of new energy. For multiple wind farms or photovoltaic power stations, the predicted and actual output of new energy is the sum of the predicted and actual output of all stations.
[0135] 2.5. Use the proportional-integral link to calculate the regional active power regulation demand.
[0136] (7)
[0137] In the formula, , They are the proportional coefficient and the integral coefficient respectively, and their values are negative; is the ACE at time t; is the starting time of the integration period.
[0138] S3, such as Figure 5 As shown, the active power balance control and distribution method of the park power grid is shown.
[0139] 3.1. The stations and loads within the control area serve as the dispatching and control units of the control area, receiving remote plans or dispatching and control instructions. Their control mode determines the regulatory responsibility for participating in the balance of the control area.
[0140] a) Grid-connected park power grid:
[0141] Main control area: Wind farms and photovoltaic power stations adopt the planned tracking BLO (base load and off-regulated) mode or the planned tracking + balanced regulation BLR (base load and regulated) mode; the planned tracking BLO mode tracks the wind power and photovoltaic power generation plans; the planned tracking + balanced regulation BLR mode participates in the unbalanced quantity allocation in the control area on the basis of tracking the wind power and photovoltaic power generation plans; the energy storage power station adopts the balanced regulation BPR (balance power regulated) control mode as the balanced power source of the control area. If there are multiple energy storage power stations, some energy storage power stations are selected to work in the planned tracking BLO mode or the planned tracking + balanced regulation BLR mode to participate in peak load regulation or peak load regulation and frequency regulation control; the hydrogen production load adopts the planned tracking BLO mode or the planned tracking + balanced regulation BLR mode; the planned tracking BLO mode tracks the hydrogen production power consumption plan; the planned tracking + balanced regulation BLR mode participates in the unbalanced quantity allocation in the control area on the basis of tracking the hydrogen production power consumption plan.
[0142] Sub-control area: Biomass power plants or hydrogen-fired generators adopt the balanced regulation BPR mode to participate in the interconnection line power control of the sub-control area; synthetic ammonia and methanol loads adopt the planned tracking BLO mode to track the electricity consumption plan.
[0143] b) Off-grid park power grid:
[0144] The control mode of wind farms, photovoltaic power stations, hydrogen production loads in the main control area, biomass power plants or hydrogen-fired generators, synthetic ammonia and methanol loads in the sub-control area is the same as that of the grid-connected park power grid; the energy storage power station is used as a balancing power source, adopts the constant frequency and constant voltage local control mode, and does not receive remote AGC instructions. Similarly, if there are multiple energy storage power stations, some of them are selected to operate in the balancing regulation BPR mode, the planned tracking BLO mode, or the planned tracking + balancing regulation BLR mode.
[0145] 3.2. Considering the regional regulation requirements of on-grid / off-grid status Calculation of main and sub-control areas in grid-connected state and sub-control areas in off-grid state Same as formula (6); in the off-grid state, the main control area is responsible for the frequency regulation of the park power grid and undertakes the real-time balancing control of active power. The power of the energy storage power station of the balancing power source that deviates from the preset balancing base point needs to be borne by other frequency-regulated power sources to restore the adjustable capacity of the balancing power source.
[0146] The regulation demand of the main control area in the off-grid state is:
[0147] (8)
[0148] In the formula, , are the actual output and preset balance base point of the energy storage power station as the balancing power source at time t; if there are multiple energy storage power stations as balancing power sources, the actual output and preset balance base point of each station are accumulated; The power changes frequently, and engineering applications can use first-order low-pass filtering to filter out high-frequency components and capture the power change trend.
[0149] 3.3. Regional Regulation Demand When allocating between dispatching control units, the principles of new energy priority consumption, energy storage priority dispatching, and load emergency regulation are adopted, such as Figure 6 , Figure 7 and Figure 8 As shown, the energy is distributed among wind farms, photovoltaic power stations, energy storage power stations and hydrogen production loads, using energy storage to prioritize regulating system disturbances, reduce the probability of power restrictions on new energy sources, and avoid the electrolyzer entering a load interval with frequent start and stop.
[0150] a) If In the order of increasing the output of wind farms and photovoltaic power stations in power-limited state, switching to zero-power operation or discharging of energy storage power stations in charging state, discharging of energy storage power stations in non-charging state, and reducing the load of hydrogen production units with high load rate, each control unit takes on the responsibility in turn according to the active power regulation step length. .
[0151] The distributed power of wind farm, photovoltaic power station and energy storage power station is
[0152] (9)
[0153] In the formula, Adjust the demand for the remaining areas to be allocated, , i is the calling order of the station; , and They are respectively the regulation upper limit, actual output and regulation step of the station.
[0154] The allocated power of the hydrogen production station is
[0155] (10)
[0156] In the formula, , and They are respectively the lower limit of regulation, actual load and regulation step of the hydrogen production control unit.
[0157] b) If In the order of energy storage power stations in the discharge state switching to zero power operation or charging, energy storage power stations in the non-discharge state charging, low-load modulated hydrogen power sources increasing load power, wind farms and photovoltaic power stations reducing output and limiting power operation, each control unit takes on the responsibility in turn according to the active power regulation step length. .
[0158] The distributed power of wind farm, photovoltaic power station and energy storage power station is
[0159] (11)
[0160] In the formula, Adjust the demand for the remaining areas to be allocated, , i is the calling order of the station; , and They are respectively the lower limit of regulation, actual output and regulation step of the station.
[0161] The allocated power of the hydrogen production unit is
[0162] (12)
[0163] In the formula, , and They are respectively the upper limit of regulation, actual load and regulation step of the hydrogen production control unit.
[0164] 3.4. Sub-control area is entirely occupied by biomass power plants or hydrogen-fired generators For regulation, conventional allocation strategies of adjustable capacity ratio, adjustable capacity or specified priority are adopted among multiple power plants or units.
[0165] 3.5. Calculate the active power control targets of stations and loads.
[0166] (13)
[0167] In the formula, To control the base power of the unit, the planned tracking BLO mode and the planned tracking + balancing adjustment BLR mode take the planned power generation and consumption value, and the balancing adjustment BPR mode takes the actual output; To regulate the power of the control unit, the planned tracking BLO mode is 0, and the planned tracking + balancing regulation BLR mode wind farms, photovoltaic power plants and energy storage power plants are 、Hydrogen production station .
[0168] A wind-solar-hydrogen-storage-ammonia-alcohol park active power balance control system comprises a balance control area modeling unit, an active power regulation unit modeling unit, a measurement data acquisition and processing unit, a regional control deviation and regulation demand calculation unit, a power distribution and active power regulation unit control target calculation unit and a control performance monitoring module unit.
[0169] The balancing control area modeling unit is used for modeling and parameter maintenance of the balancing control area of the integrated wind, solar, hydrogen storage and ammonia park. The balancing control area is the responsible entity for active balance control, including the control entity and the closed area of the control boundary; the control entity maintains the control mode, target frequency, frequency deviation coefficient, proportional coefficient, integral coefficient, unplanned exchange power repayment threshold value, unplanned exchange power repayment status, and new energy forecast correction status of the control area; the control boundary maintains the interconnection line measurement points, interconnection line limits, interconnection line plans, and interconnection line operation status of the control area.
[0170] The active power regulation unit modeling unit is used to model the active power control objects of wind farms, photovoltaic power stations, energy storage power stations, biomass power plants, hydrogen production plants, synthetic ammonia and methanol plants within the control area of the wind, solar, hydrogen storage and ammonia integrated park. The bottom layer is the specific model of the wind farm, photovoltaic power station, energy storage power station, biomass power plant and adjustable load stations. It abstractly extracts the common characteristics of various stations and loads and serves as the receiving unit for active power dispatching control instructions within the control area.
[0171] Wind farms and photovoltaic power stations maintain installed capacity, active power measurement points, planned value measurement points, power forecast measurement points, maximum regulation upper limit, minimum regulation lower limit, adjustable upper limit measurement points, adjustable lower limit measurement points, start and stop measurement points and controllable status measurement points; energy storage power stations maintain installed capacity, rated capacity, active power measurement points, state of charge (SOC) measurement points, planned value measurement points, SOC safety upper limit, SOC safety lower limit, adjustable upper limit measurement points, adjustable lower limit measurement points, start and stop measurement points and controllable status measurement points; biomass power plants maintain installed capacity, active power measurement points, planned value measurement points, maximum regulation upper limit, minimum regulation lower limit, adjustable upper limit measurement points, adjustable lower limit measurement points, start and stop measurement points and controllable status measurement points; adjustable loads maintain rated capacity, active power measurement points, planned value measurement points, maximum regulation upper limit, minimum regulation lower limit, adjustable upper limit measurement points, adjustable lower limit measurement points and controllable status measurement points.
[0172] Active power control unit maintenance type, maximum adjustment upper limit, minimum adjustment lower limit, adjustment upper limit, adjustment lower limit, start and stop status, controllable status, command dead zone, adjustment step, maximum command, control mode, remote local status parameters.
[0173] The measurement data acquisition and processing module unit is used to obtain the park power grid frequency, active power of the grid connection point, tie line exchange power, tie line exchange plan, and grid connection and off-grid status; the active power, power generation plan and predicted power, adjustable upper limit and adjustable lower limit, controllable state, and start-stop status of wind farms and photovoltaic power stations; the active power, SOC and charge and discharge plan, adjustable upper limit and adjustable lower limit, and start-stop status of energy storage power stations; the active power, power generation plan, adjustable upper limit and adjustable lower limit, controllable state, and start-stop status of biomass power plants; the active power, power consumption plan, adjustable upper limit and adjustable lower limit, controllable state, and start-stop status of adjustable loads. Data is extracted from wind farms, photovoltaic power stations, energy storage power stations, biomass power plants, and adjustable loads to obtain the upper limit, lower limit, start-stop status, and controllable status of the active control unit.
[0174] The regional control deviation and regulation demand calculation unit calculates the regional control deviation of each control area according to the control mode, frequency measurement, interconnection line exchange power measurement and interconnection line exchange plan of each control area in the park, and superimposes the calculation components of unplanned power repayment and new energy forecast correction links as needed to obtain the ACE used for control; the control ACE after superimposing the components is subjected to the proportional integral link to obtain the regional regulation demand ARR; in the off-grid state, the main control area considers the regulation capacity of the balanced power supply to restore the preset balance base point, and updates the ARR of this control area.
[0175] The power allocation and active power control unit controls the target calculation unit. The regional regulation demand ARR calculates the allocation capacity of each active power control unit in turn according to the preset resource call priority order. The upper limit, lower limit and step size constraints are considered in the allocation process. Each active power control unit calculates the base point power and the allocated power according to its control mode, and the target power is obtained by superposition.
[0176] The control performance monitoring unit includes control area performance monitoring and active power regulation unit performance monitoring; the control area performance monitoring monitors the frequency mean, frequency root mean square, ACE mean, unplanned exchange power, new energy forecast deviation power, and control qualification rate of each control area in real time by minute, hour, day, month, and year; the active power regulation unit performance monitoring monitors the operating status of each active power regulation unit and the execution of active power control targets in real time, and counts the response time, regulation rate, and regulation accuracy of each instruction, and counts the AGC operation time, AGC operation rate, power generation and consumption, number of AGC instructions, average rate, and average accuracy by hour, day, month, and year.
[0177] The present invention provides a method and system for active balance control of a wind, solar, hydrogen storage, and ammonia alcohol park. According to the power supply and load composition inside the park, the control area balance responsibilities of "ensuring power supply" and "ensuring balance" are determined by dividing different balance control areas, so as to meet the requirements of continuous and reliable power supply of key chemical loads, power flow at the grid connection point, and stable control of the frequency of the off-grid system. The regional control deviation is corrected by considering the unplanned power exchange repayment, new energy forecast deviation, and forecast increment to meet the requirements of advanced control of power and electricity demand and new energy forecast. The principle of "new energy priority consumption, energy storage priority scheduling, and load emergency regulation" is adopted to distribute among wind farms, photovoltaic power stations, energy storage power stations, and hydrogen production loads, and energy storage is used to prioritize the regulation of system disturbances, reduce the probability of new energy power restrictions, and avoid the electrolyzer from entering the load interval with frequent start and stop. The implementation of relevant strategies and methods can improve the safety, stability, and reliability of the park's power system, avoid large fluctuations in system frequency, and enhance the system's anti-disturbance capability.
[0178] The above is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with this profession can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent replacement and improvement made to the above embodiments without departing from the content of the technical solution of the present invention, based on the technical essence of the present invention, within the spirit and principles of the present invention, still fall within the protection scope of the technical solution of the present invention.
Claims
1. A method for controlling active power balance of a wind-solar-hydrogen-storage-ammonia-alcohol park, characterized by comprising the following steps: S1. Modeling of active balance control area of the park power grid; The step S1 specifically comprises: 1.
1. Determine the active power balance control requirements of the park based on the connection relationship between the park and the public grid. The grid-connected type is used to maintain the power tracking exchange plan of the tie line or the power control of power down, and the off-grid type is used to maintain the system frequency in compliance with the requirements. When dividing the active power balance control area of the park, it is divided into the main control area and the sub-control area; 1.
2. Combining wind power, photovoltaic power, flexible hydrogen production resources, biomass power generation with synthetic ammonia and methanol production resources; 1.
3. In the park power grid, energy storage is incorporated as a regulating resource into the resource combination of wind power, photovoltaic power, and flexible hydrogen production; 1.
4. In the park power grid, synthetic ammonia and methanol production are loads with high power supply reliability requirements, and the stable power load is matched with the stable basic power source biomass power generation; 1.
5. Wind power, photovoltaic power, flexible hydrogen production and energy storage in the park power grid are used as internal resources of the main control area; 1.
6. Determine the boundary model of the main control area and the sub-control area; Grid-connected park power grid: The sub-control area is the internal control area of the main control area. The sub-control area interconnection line is the grid-connected point outgoing line of the biomass power plant after the step-up transformer and the grid-connected point incoming line of the step-down transformer for the electricity load of synthetic ammonia and methanol production. The main control area interconnection line is the grid-connected assessment point required by the power grid company, and the incoming line is the high-voltage side or low-voltage side of the public connection point PCC main transformer. The active power flow direction of the park active control area is positive for delivery. The sub-control area is a closed area or a collection of multiple closed areas. Off-grid park power grid: The main control area and sub-control area are independent of each other and interconnected through interconnection lines; the interconnection lines between the two control areas are the outgoing lines of the biomass power plant after the step-up transformer and the incoming lines of the step-down transformer for the electricity load of synthetic ammonia and methanol production; the active power flow direction of the park active power control area is positive when it is sent out; S2, Park power grid active balance control mode and control strategy, the specific steps are: 2.
1. The control mode of the control area determines the active power balance regulation responsibility of the control area; Grid-connected park power grid: The grid-connected and off-grid operation states of the park power grid are determined according to the grid-connected switch state at the public connection point PCC of the park power grid. In the grid-connected state, the main control area and the sub-control area maintain the interconnection line exchange power within the exchange plan interval, and use constant interconnection line exchange power control FTC; in the off-grid state, the main control area maintains the system frequency within the target frequency interval, and uses constant frequency control FFC; the sub-control area maintains the interconnection line exchange power within the planned value interval, and uses constant interconnection line exchange power control FTC; Off-grid park power grid: The main control area maintains the system frequency within the target frequency range and adopts constant frequency control FFC; the sub-control area maintains the interconnection line exchange power near the planned value and adopts constant interconnection line exchange power control FTC; 2.
2. Calculate the regional control deviation ACE according to the control modes of the main control area and the sub-control area; Constant Frequency Control FFC: (1) Where P ACE is the value of the regional control deviation ACE; B is the frequency deviation coefficient; f is the measurement frequency; f N is the target frequency; Constant Tie Line Switching Power Control FTC: (2) In the formula, P T Exchange power for tie lines; P T,Plan exchange plans for tie lines; 2.
3. When the grid-connected park power grid is in the grid-connected state, due to the disturbance of the park power grid causing the change of the power flow at the grid connection point, considering the restriction requirements of grid power use and the demand control requirements of the park power consumption, the additional control link is used to perform periodic power repayment; The accumulated unplanned exchange power during the power repayment period is, (3) In the formula, , is the starting time of the cycle; , They are t Interconnection line switching power, interconnection line switching plan or maximum demand at any time; It is the electricity repayment cycle; If the non-planned exchange power is greater than the set threshold, , then the power repayment is started, and the power used for the planned repayment is, (4) The planned reimbursement power is used as the component of the tie-line exchange plan, and formula (2) is adjusted; (5); 2.
4. For control areas including new energy stations, additional control links are added to consider new energy forecast corrections to deal with the deviation between new energy forecast and actual output and the risk of large fluctuations in new energy output; (6) In the formula, , It is the adjustment coefficient of new energy forecast deviation and new energy forecast increment, with a value range of 0~1.0; , It is the new energy forecast for the current 5 minutes and the new energy forecast value for the next 5 minutes; The actual output of renewable energy; for multiple wind farms or photovoltaic power stations, the forecast and actual output of renewable energy is the sum of the forecast and actual output of all stations; 2.
5. Use proportional integral link to calculate regional active power regulation demand; (7) In the formula, , They are the proportional coefficient and the integral coefficient respectively, and their values are negative; is the ACE at time t; is the starting time of the integration period; S3, the active power balance control and distribution method of the park power grid, the specific steps are: 3.
1. The stations and loads in the control area serve as the dispatching control units of the control area, receiving remote plans or dispatching control instructions. Their control mode determines the regulatory responsibility for participating in the balance of the control area; a) Grid-connected park power grid: Main control area: Wind farms and photovoltaic power stations adopt the planned tracking BLO mode or BLR mode; the planned tracking BLO mode tracks wind power and photovoltaic power generation plans; the BLR mode participates in the allocation of unbalanced quantities in the control area on the basis of tracking wind power and photovoltaic power generation plans; the energy storage power station adopts the balanced regulation BPR control mode as the balanced power source of the control area. If there are multiple energy storage power stations, some energy storage power stations are selected to work in the planned tracking BLO mode or BLR mode to participate in peak load or frequency regulation control; the hydrogen production load adopts the planned tracking BLO mode or BLR mode; the planned tracking BLO mode tracks the hydrogen production electricity plan; the BLR mode participates in the allocation of unbalanced quantities in the control area on the basis of tracking the hydrogen production electricity plan; Sub-control area: Biomass power plants or hydrogen-fired generators adopt the balanced regulation BPR mode to participate in the interconnection line power control of the sub-control area; synthetic ammonia and methanol loads adopt the planned tracking BLO mode to track the power consumption plan; b) Off-grid park power grid: The control mode of wind farms, photovoltaic power stations, hydrogen production loads in the main control area, biomass power plants or hydrogen-fired generators, synthetic ammonia and methanol loads in the sub-control area is the same as that of the grid-connected park power grid; the energy storage power station is used as a balancing power source, and adopts the constant frequency and constant voltage local control mode, and does not receive remote AGC instructions. Similarly, if there are multiple energy storage power stations, some energy storage power stations are selected to work in the balancing regulation BPR mode, the plan tracking BLO mode or the BLR mode; 3.
2. Considering the regional regulation requirements of on-grid / off-grid status Calculation of main and sub-control areas in grid-connected state and sub-control areas in off-grid state Same as formula (7); in the off-grid state, the main control area is responsible for the frequency regulation of the park power grid and undertakes the real-time balance control of active power. The power of the energy storage power station of the balancing power source that deviates from the preset balance base point needs to be borne by other frequency-regulated power sources to restore the adjustable capacity of the balancing power source; The regulation demand of the main control area in the off-grid state is: (8) In the formula, , They are the proportional coefficient and the integral coefficient respectively, and their values are negative; is the ACE at time t; is the starting time of the integration period, , are the actual output and preset balance base point of the energy storage power station as the balancing power source at time t; if there are multiple energy storage power stations as balancing power sources, the actual output and preset balance base point of each station are accumulated; The power changes frequently, so the engineering application uses a first-order low-pass filter to filter out high-frequency components and capture the power change trend; 3.
3. Regional Regulation Demand When allocating between dispatching control units, the principles of new energy priority consumption, energy storage priority dispatching, and load emergency regulation are adopted. The energy is allocated between wind farms, photovoltaic power stations, energy storage power stations, and hydrogen production loads. Energy storage is used to prioritize system disturbances to reduce the probability of new energy power restrictions and avoid electrolyzers entering load intervals with frequent starts and stops. a) If In the order of increasing the output of wind farms and photovoltaic power stations in power-limited state, switching to zero-power operation or discharging of energy storage power stations in charging state, discharging of energy storage power stations in non-charging state, and reducing the load of hydrogen production units with high load rate, each control unit takes on the responsibility in turn according to the active power regulation step length. ; The distributed power of wind farm, photovoltaic power station and energy storage power station is (9) In the formula, Adjust the demand for the remaining areas to be allocated, , i is the calling order of the station; , and They are the regulation upper limit, actual output and regulation step length of the station respectively; The allocated power of the hydrogen production station is (10) In the formula, , and They are the lower limit, actual load and regulation step of the hydrogen production control unit respectively; b) If In the order of energy storage power stations in the discharge state switching to zero power operation or charging, energy storage power stations in the non-discharge state charging, low-load modulated hydrogen power sources increasing load power, wind farms and photovoltaic power stations reducing output and limiting power operation, each control unit takes on the responsibility in turn according to the active power regulation step length. ; The distributed power of wind farm, photovoltaic power station and energy storage power station is (11) In the formula, Adjust the demand for the remaining areas to be allocated, , i is the calling order of the station; , and They are the lower limit of regulation, actual output and regulation step of the station respectively; The allocated power of the hydrogen production unit is (12) In the formula, , and They are the upper limit of regulation, actual load and regulation step of the hydrogen production regulation unit; 3.
4. Sub-control area is entirely occupied by biomass power plants or hydrogen-fired generators Adjustment, using adjustable capacity ratio, adjustable capacity or designated priority allocation strategy among multiple power plants or units; 3.
5. Calculate the active power control targets of stations and loads; (13) In the formula, To regulate the base power of the unit, the plan tracking BLO mode and BLR mode take the planned power generation and consumption values, and the balance adjustment BPR mode takes the actual output; To regulate the power of the control unit, the plan tracks the BLO mode to 0, and the wind farm, photovoltaic power station and energy storage power station in BLR mode take 、Hydrogen production station .
2. A wind-solar-hydrogen-storage-ammonia-alcohol park active power balance control system using the wind-solar-hydrogen-storage-ammonia-alcohol park active power balance control method according to claim 1, characterized in that: It includes a balance control area modeling unit, an active power regulation unit modeling unit, a measurement data acquisition and processing unit, a regional control deviation and regulation demand calculation unit, a power distribution and active power regulation unit control target calculation unit and a control performance monitoring module unit; The balance control area modeling unit is used for modeling and parameter maintenance of the balance control area of the wind-solar-hydrogen-storage-ammonia-alcohol integrated park. The balance control area is the responsible entity for active balance control, including the control entity and the closed area of the control boundary; the control entity maintains the control mode, target frequency, frequency deviation coefficient, proportional coefficient, integral coefficient, unplanned exchange power repayment threshold value, unplanned exchange power repayment status, and new energy forecast correction status of the control area; the control boundary maintains the interconnection line measurement points, interconnection line limits, interconnection line plans, and interconnection line operation status of the control area; The active control unit modeling unit is used to model the active control objects of wind farms, photovoltaic power stations, energy storage power stations, biomass power plants, hydrogen production plants, synthetic ammonia and methanol plants within the control area of the wind-solar-hydrogen-storage-ammonia-alcohol integrated park. The bottom layer is the specific model of the wind farm, photovoltaic power station, energy storage power station, biomass power plant and adjustable load stations. By abstractly extracting the common characteristics of various stations and loads, it serves as the receiving unit for active dispatching control instructions within the control area; The measurement data acquisition and processing module unit is used to obtain the park power grid frequency, grid connection point active power, tie line exchange power, tie line exchange plan, and grid connection and disconnection status; The regional control deviation and regulation demand calculation unit calculates the regional control deviation of each control area according to the control mode, frequency measurement, tie line exchange power measurement and tie line exchange plan of each control area in the park, and superimposes the calculation components of unplanned power repayment and new energy forecast correction as needed to obtain the ACE used for control; The control ACE after superimposing the components is subjected to the proportional integral link to obtain the regional regulation demand ARR; in the off-grid state, the main control area considers the regulation capacity of the balanced power source to restore the preset balance base point and updates the ARR of this control area; The power allocation and active power control unit controls the target calculation unit. The regional regulation demand ARR calculates the allocation capacity of each active power control unit in turn according to the preset resource call priority order. The upper limit, lower limit and step size constraints of regulation are considered in the allocation process. Control performance monitoring unit, including control area performance monitoring and active power regulation unit performance monitoring; The control area performance monitoring monitors the frequency mean, frequency root mean square, ACE mean, unplanned exchange power, new energy forecast deviation power and control qualification rate of each control area in real time on a minute, hour, day, month and year basis; the active power regulation unit performance monitoring monitors the operating status of each active power regulation unit and the execution of active power control targets in real time, and counts the response time, regulation rate and regulation accuracy of each instruction, and counts the AGC operation time, AGC operation rate, power generation and consumption, number of AGC instructions, average rate and average accuracy in hours, days, months and years.