A tunnel construction monitoring device
By using lifting components and stagnant components in tunnel construction monitoring equipment, and using friction, inertia and magnetism to extend the stagnant time of the detector, it solves the detection inaccuracy problem caused by the rapid decline of the detector in the prior art, and realizes the tunnel Comprehensive and accurate detection of upper, middle and lower gases.
Patent Information
- Application Number
- CN202411141084.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-20
AI Technical Summary
During tunnel construction, the existing emission detection equipment is inaccurate in the detection of the middle layer gas in the tunnel, and the space stagnation time and emission distance cannot be extended, resulting in a small measurement range and insufficient accuracy.
A tunnel construction monitoring equipment was designed, using lifting components, launching mechanisms, detectors and air stagnation components. Through friction blocks, pulling strips, gear columns, propellers and magnets, the Magnus effect, inertia and magnetism are used. Attract, extend the detector's stagnation time and improve the monitoring effect of the monitoring components.
It effectively extends the air stagnation time of the detector in the middle layer of the tunnel, improves the accuracy and measurement range of gas detection, and ensures that the gas distribution and content on the, middle and lower layers of the tunnel can be detected in one flight.
Smart Images

Figure CN118653884B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel monitoring devices, and in particular to a tunnel construction monitoring device. Background Art
[0002] Tunnels are engineering structures buried in the ground. When tunnels are excavated, due to the complex and changeable gas environment in the ground, it is necessary to detect the gas in the tunnel before construction to determine whether there are flammable, explosive, toxic and harmful gases in the tunnel to avoid harm to the construction process and construction personnel. Due to the different densities of various gases, gases of different densities are distributed at different heights in the tunnel. For example, the gases that need to be monitored in the tunnel include ammonia and methane in the upper layer; oxygen and carbon monoxide in the middle layer; and hydrogen sulfide and carbon dioxide in the lower layer. Existing detection equipment cannot form a comprehensive inspection of gases at different heights, and the inspection effect is poor. It needs to be adjusted and tested repeatedly, which increases the workload of the staff.
[0003] When uniformly detecting gases at different heights in a tunnel, the prior art has an emission-type detection device, which completes the detection operation on the motion trajectory of the detector by launching the detector. However, after the existing emission-type detection device launches the detector, the detector will quickly descend along a parabolic trajectory, resulting in inaccurate detection of gases in the upper and middle layers of the tunnel. It is impossible to increase the detector's hovering time and launch distance, resulting in a smaller measurement range, insufficient sampling, and inaccurate measurement. Summary of the invention
[0004] The purpose of the present invention is to solve the defect in the prior art that after the emission detection equipment emits the detector, the detector will quickly descend along a parabolic trajectory, resulting in inaccurate detection of the gas in the upper and middle layers of the tunnel, and to propose a tunnel construction monitoring device.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A tunnel construction monitoring device, comprising a base, and further comprising:
[0007] A lifting component, the lifting component is connected to the base, and an output end of the lifting component is fixedly connected to a mounting platform;
[0008] A launching mechanism, the launching mechanism comprising a driving assembly, a launching tube and a firing device, the driving assembly and the firing device are both connected to a mounting platform, the launching tube is fixedly connected to one side of the mounting platform and is communicated with an output end of the firing device, the output end of the driving assembly passes through the mounting platform and is connected to an input end of the firing device, and an opening is opened at the upper portion of the launching tube;
[0009] The detector includes a sphere, wherein the sphere is placed in the launch tube through the opening and is located at the output end of the firing device, and a monitoring component is installed in the sphere, wherein the monitoring component is used to monitor air data near the sphere;
[0010] The hovering assembly comprises a friction block, which is fixedly connected to the top of the launch tube, wherein friction occurs when the outer side of the sphere contacts the friction block.
[0011] Preferably, a plurality of brake wheels are installed at the bottom of the base, and a handle is fixedly connected to one side.
[0012] Preferably, the lifting assembly includes a plurality of hydraulic machines, a hydraulic rod is installed at the output end of the hydraulic machine, and the output ends of the plurality of hydraulic rods are fixedly connected to the bottom of the mounting platform.
[0013] Preferably, the driving assembly includes a compressor, which is mounted on a mounting platform. The output end of the compressor is connected to an air duct, the end of the air duct away from the compressor passes through the mounting platform, extends into the launch tube, and is connected to the input end of the firing device.
[0014] Preferably, the surface of the sphere is made of felt and synthetic fiber and is elastic.
[0015] Preferably, the air-holding assembly also includes a bearing, which is installed on the outside of the sphere along the horizontal axial direction, wherein the bearing is located in the middle of the sphere, two friction blocks are provided, and the two friction blocks are symmetrically distributed on both sides of the bearing, the top of the bearing is rotatably connected to a gear column, and the column part of the gear column is coaxially fixedly connected to multiple propellers, and the top of the launch tube is fixedly connected to a pull rod plate, and a rack part is provided on one side of the pull rod plate, and the gear part of the gear column is meshed with the rack part.
[0016] Preferably, the propeller is made of flexible plastic.
[0017] Preferably, the suspension assembly further comprises a fitting magnet, both sides of the sphere are fixedly connected with the fitting magnet, and both outer sides of the front end of the transmitting tube are fixedly connected with a plurality of neodymium magnets, wherein the fitting magnet and the neodymium magnet on the same side have opposite poles.
[0018] Preferably, the monitoring component includes an air bin, a cavity is opened inside the sphere, the air bin is installed in the cavity, a gas phase detection device is installed on the air bin, the input end of the air bin is connected to an air intake pipe, and the output end is connected to an exhaust pipe, the air intake pipe and the exhaust pipe both pass through the sphere at one end away from the air bin and are connected to the outside world.
[0019] Preferably, the gas phase detection device is used to detect data on gas type and content, and the signal is connected to an external receiving device.
[0020] Compared with the prior art, the advantages of the present invention are:
[0021] 1. The present invention is provided with a lifting assembly, a launching mechanism, a detector and a friction block. After the lifting assembly lifts the launching mechanism to the top of the tunnel, the launching mechanism launches the sphere into the tunnel. Under the friction effect of the top friction block in the launching tube, the sphere rotates counterclockwise around the horizontal axis. Due to the Magnus effect, the sphere has an upward lift during movement, thereby increasing the hovering time of the sphere and improving the monitoring effect of the monitoring component.
[0022] 2. The present invention arranges a pull plate, a gear column and a propeller. When the sphere passes through the launch tube, the rack portion on the pull plate and the gear portion of the gear column mesh with each other to drive the gear column to rotate, thereby driving the propeller to rotate. When the sphere flies out, the propeller can keep rotating for a short time under the action of inertia. When the propeller rotates, it gives the sphere an upward lift, further increasing the sphere's hovering time and improving the monitoring effect of the monitoring component.
[0023] 3. The present invention arranges neodymium magnets and bonding magnets. When the sphere passes through the transmitting tube, the sphere drives the bonding magnets thereon to pass through multiple neodymium magnets at a certain initial velocity. Under the magnetic attraction of the neodymium magnets to the bonding magnets, a larger acceleration is given to the sphere again, so that the sphere is launched from the transmitting tube at a higher initial velocity, thereby further improving the monitoring range of the detector.
[0024] In summary, compared with traditional monitoring devices, the present invention is very convenient for gas detection at the bottom of the tunnel. However, the transmitting detection device has a short hovering time and no lift, which causes the detector to quickly descend along a parabolic trajectory, resulting in inaccurate gas detection in the upper and middle layers of the tunnel. The present device can extend the detection time of the sphere in the upper and middle layers and improve the measurement accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a schematic diagram of the overall axial structure of a tunnel construction monitoring device proposed by the present invention.
[0026] Figure 2 This is a schematic diagram of the base and foot brake wheel structure of a tunnel construction monitoring device proposed by the present invention.
[0027] Figure 3 This is a schematic diagram of the structure of a hydraulic device and a hydraulic rod of a tunnel construction monitoring device proposed by the present invention.
[0028] Figure 4 This is a schematic diagram of the axial internal structure of a transmitting tube of a tunnel construction monitoring device proposed by the present invention.
[0029] Figure 5This is a schematic diagram of the installation platform and compressor structure of a tunnel construction monitoring device proposed by the present invention.
[0030] Figure 6 This is a schematic diagram of the sphere, gear column and brace plate structure of a tunnel construction monitoring device proposed by the present invention.
[0031] Figure 7 This is a schematic diagram of a spherical half-section structure of a tunnel construction monitoring device proposed by the present invention.
[0032] In the figure: 1 base, 2 handle, 3 foot brake wheel, 4 hydraulic machine, 5 hydraulic rod, 6 mounting platform, 7 compressor, 8 air duct, 9 launching tube, 10 neodymium magnet, 11 friction block, 12 pull plate, 13 firing device, 14 sphere, 15 bearing, 16 gear column, 17 propeller, 18 fitting magnet, 19 air intake pipe, 20 air chamber, 21 gas phase detection device, 22 exhaust pipe. DETAILED DESCRIPTION
[0033] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0034] Reference Figure 1-Figure 3 A tunnel construction monitoring device includes a base 1 and a lifting component, wherein the lifting component is connected to the base 1, and an output end of the lifting component is fixedly connected to a mounting platform 6.
[0035] The lifting assembly includes multiple hydraulic machines 4, and hydraulic rods 5 are installed at the output ends of the hydraulic machines 4. The output ends of the multiple hydraulic rods 5 are fixedly connected to the bottom of the mounting platform 6. The hydraulic machines 4 and hydraulic rods 5 use existing technologies to lift the height of the mounting platform 6 through hydraulic action.
[0036] A plurality of brake wheels 3 are installed at the bottom of the base 1, and a handle 2 is fixedly connected to one side, wherein the brake wheel 3 adopts a wheel that can be self-locked by stepping on in the prior art, so as to facilitate moving and fixing the base 1.
[0037] Reference Figure 4-Figure 6 , the launching mechanism includes a driving assembly, a launching tube 9 and a firing device 13. The driving assembly and the firing device 13 are both connected to the mounting platform 6. The launching tube 9 is fixedly connected to one side of the mounting platform 6 and is connected to the output end of the firing device 13. The output end of the driving assembly passes through the mounting platform 6 and is connected to the input end of the firing device 13. An opening is provided at the top of the launching tube 9.
[0038] The driving assembly includes a compressor 7, which is mounted on a mounting platform 6. The output end of the compressor 7 is connected to an air duct 8. The end of the air duct 8 away from the compressor 7 passes through the mounting platform 6, extends into the launch tube 9, and is connected to the input end of the firing device 13.
[0039] The firing device 13 adopts existing technology, such as a piston-type firing structure, in which a piston cylinder is fixedly connected in the mounting platform 6, a piston rod is sealingly and slidingly connected in the piston cylinder, a return spring is fixedly connected between the piston rod and the inside of the piston cylinder, the end of the piston cylinder away from the piston rod is connected to the air duct 8, and the end of the piston rod away from the piston cylinder extends into the launch tube 9 and cooperates with the ball 14 placed therein.
[0040] The hovering assembly includes a friction block 11, which is fixedly connected to the top of the launch tube 9, wherein friction occurs when the outer side of the sphere 14 contacts the friction block 11.
[0041] The surface of the sphere 14 is made of felt and synthetic fiber, which is elastic and forms a cushioning protection effect after the sphere 14 falls to the ground, thereby avoiding damage to the internal monitoring components and devices.
[0042] The hovering assembly also includes a bearing 15, which is mounted on the outside of the sphere 14 along the horizontal axial direction, wherein the bearing 15 is located in the middle of the sphere 14, two friction blocks 11 are provided, and the two friction blocks 11 are symmetrically distributed on both sides of the bearing 15, a gear column 16 is rotatably connected to the top of the bearing 15, and a plurality of propellers 17 are coaxially fixedly connected to the column portion of the gear column 16, a pull plate 12 is fixedly connected to the top of the launch tube 9, a rack portion is provided on one side of the pull plate 12, and the gear portion of the gear column 16 is meshed with the rack portion.
[0043] The propeller 17 is made of flexible plastic, which effectively prevents the propeller 17 from being damaged after the sphere 14 falls to the ground.
[0044] The suspension assembly also includes a bonding magnet 18, which is fixedly connected to both sides of the sphere 14, and a plurality of neodymium magnets 10 are fixedly connected to both outer sides of the front end of the transmitting tube 9, wherein the bonding magnet 18 and the neodymium magnet 10 on the same side have opposite magnetic poles.
[0045] When the sphere 14 approaches the multiple neodymium magnets 10, the sphere 14 is accelerated under the magnetic attraction of the neodymium magnets 10 to the bonding magnets 18, and when the sphere 14 passes through the neodymium magnets 10 and moves away from the neodymium magnets 10, the sphere 14 is decelerated. Since the sphere 14 passes with a certain initial velocity and is first accelerated and then decelerated, the neodymium magnets 10 cause the acceleration and deceleration strokes of the sphere 14 to be the same, but the deceleration stroke time is less than the acceleration stroke time, so that the sphere 14 obtains a certain acceleration effect brought by the magnetic attraction when passing through the multiple neodymium magnets 10, further increasing the initial velocity of the sphere 14 launched from the launch tube 9, and increasing the detection range of the monitoring component.
[0046] Reference Figure 7 , the detector includes a sphere 14, wherein the sphere 14 is placed in the launch tube 9 through an opening and is located at the output end of the firing device 13, and a monitoring component is installed in the sphere 14, wherein the monitoring component is used to monitor the air data near the sphere 14.
[0047] The monitoring component includes an air bin 20. A cavity is opened inside the sphere 14. The air bin 20 is installed in the cavity. A gas phase detection device 21 is installed on the air bin 20. The input end of the air bin 20 is connected to an air intake pipe 19, and the output end is connected to an exhaust pipe 22. The air intake pipe 19 and the exhaust pipe 22 both pass through the sphere 14 at one end away from the air bin 20 and are connected to the outside world.
[0048] The air bin 20 is provided with an air pumping component for drawing in outside air through the air intake pipe 19 and discharging it through the air exhaust pipe 22. The air pumping component is a spiral blade, and the spiral output direction of the spiral blade is directed from the air intake pipe 19 to the exhaust pipe 22. The spiral blade can be automatically driven by the rotating sphere 14 to rotate to perform the air pumping work, and an electric drive structure can also be built in to drive the spiral blade to rotate to complete the air pumping work.
[0049] The gas phase detection device 21 is used to detect data on gas type and content, and the signal is connected to an external receiving device.
[0050] In the present invention, the base 1 is pushed to the place in the tunnel that needs to be monitored by using the handle 2, the foot brake wheel 3 is stepped on to fix the base 1, the opening on the launch tube 9 is opened, and the sphere 14 is placed in the launch tube 9;
[0051] Start the hydraulic machine 4 and start to push the hydraulic rod 5 upward. When the mounting platform 6 is close to the top of the tunnel, stop the hydraulic rod 5.
[0052] Make sure there is no obstruction in front of the launch tube 9 and complete the preparation work;
[0053] At this time, the compressor 7 is started, and the high-speed compressed gas is impacted to the input end of the firing device 13 through the air duct 8. The firing device 13 is started, and its output end quickly pushes out the ball 14 from the launch tube 9 at a high speed;
[0054] When the ball 14 passes through the launch tube 9, the ball 14 contacts the friction block 11 at the top of the launch tube 9. Under the friction resistance of the friction block 11 on the ball 14, the ball 14 starts to rotate counterclockwise around the horizontal axis. There is a bearing 15 in the middle of the ball 14, which prevents the propeller 17 at the top from rotating counterclockwise with the ball 14.
[0055] When the sphere 14 rotates counterclockwise, due to the Magnus effect, the airflow velocity above the sphere 14 is fast, and the airflow velocity below is slow. According to the Bernoulli effect, the pressure is low where the velocity is high. Therefore, when the sphere 14 moves in the air, the airflow velocity at the top is fast and the pressure is low, while the airflow velocity at the bottom is slow and the pressure is high. The counterclockwise rotation of the sphere 14 will give the sphere 14 an upward lift, thereby increasing the hovering time of the sphere 14.
[0056] When the ball 14 passes through the launch tube 9, the rack part on the strip plate 12 in the launch tube 9 meshes with the gear part of the gear column 16. When the ball 14 moves, the gear column 16 is driven to rotate, thereby driving the propeller 17 to rotate. When the ball 14 flies out, the propeller 17 can keep rotating for a short time under the action of inertia. When the propeller 17 rotates, it gives the ball 14 an upward lift, thereby increasing the hovering time of the ball 14 and improving the monitoring effect of the monitoring component.
[0057] When the sphere 14 passes through the launch tube 9, it will pass through multiple neodymium magnets 10 with a large initial velocity. The large initial velocity prevents the neodymium magnet 10 from sucking and stopping the sphere 14 through the magnetic attraction to the bonding magnet 18 at the beginning, and the friction block 11 prevents the sphere 14 from slipping and being sucked. Therefore, after the sphere 14 passes through a row of neodymium magnets 10, part of the energy generated by the magnetic attraction of the neodymium magnet 10 to the bonding magnet 18 is converted into kinetic energy, giving the sphere 14 a large acceleration again, so that the sphere 14 is launched from the launch tube 9 at a high initial velocity, thereby improving the monitoring range of the detector;
[0058] When the sphere 14 flies out, the gas phase detection device 21 works, and the air near the sphere 14 enters the gas chamber 20 through the air intake pipe 19. The gas entering the gas chamber 20 is detected by the gas phase detection device 21, and the data of the gas type and content are transmitted to the receiving device in real time. Then the gas is discharged through the exhaust pipe 22. Therefore, when the sphere 14 flies in the air, the gas in the area where the sphere 14 flies over will be monitored, avoiding the inaccurate measurement results caused by the detection of a single area, and the gas distribution and content in the upper, middle and lower layers of the tunnel can be detected in one flight.
[0059] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A tunnel construction monitoring device, comprising a base (1), characterized in that: Also includes: A lifting component, the lifting component is connected to the base (1), and the output end of the lifting component is fixedly connected to a mounting platform (6); A launching mechanism, the launching mechanism comprising a driving assembly, a launching tube (9) and a firing device (13), the driving assembly and the firing device (13) being both connected to a mounting platform (6), the launching tube (9) being fixedly connected to one side of the mounting platform (6) and being in communication with an output end of the firing device (13), the output end of the driving assembly passing through the mounting platform (6) and being connected to an input end of the firing device (13), and an opening being formed at an upper portion of the launching tube (9); A detector, the detector comprising a sphere (14), wherein the sphere (14) is placed in the launch tube (9) through an opening and is located at the output end of the firing device (13), and a monitoring component is installed in the sphere (14), wherein the monitoring component is used to monitor air data near the sphere (14); A suspension assembly, the suspension assembly comprising a friction block (11), the friction block (11) being fixedly connected to the top of a launch tube (9), wherein the outer side of a sphere (14) has friction when in contact with the friction block (11), the suspension assembly further comprising a bearing (15), the bearing (15) being mounted on the outer side of the sphere (14) along a horizontal axial direction, wherein the bearing (15) is located in the middle of the sphere (14), two friction blocks (11) are provided, and the two friction blocks (11) are symmetrically distributed on both sides of the bearing (15), and the top of the bearing (15) is rotatably connected to a gear column (16) The column portion of the gear column (16) is coaxially fixedly connected to a plurality of propellers (17), a pull plate (12) is fixedly connected to the top of the launch tube (9), a rack portion is provided on one side of the pull plate (12), the gear portion of the gear column (16) and the rack portion are meshed with each other, the air suspension assembly also includes a bonding magnet (18), both sides of the sphere (14) are fixedly connected to the bonding magnet (18), and both outer sides of the front end of the launch tube (9) are fixedly connected to a plurality of neodymium magnets (10), wherein the bonding magnets (18) and the neodymium magnets (10) on the same side have opposite magnetic poles.
2. A tunnel construction monitoring device according to claim 1, characterized in that: A plurality of foot brake wheels (3) are installed at the bottom of the base (1), and a handle (2) is fixedly connected to one side.
3. The tunnel construction monitoring device according to claim 1, characterized in that: The lifting assembly comprises a plurality of hydraulic machines (4), the output ends of the hydraulic machines (4) being provided with hydraulic rods (5), and the output ends of the plurality of hydraulic rods (5) are all fixedly connected to the bottom of the mounting platform (6).
4. The tunnel construction monitoring device according to claim 1, characterized in that: The drive assembly comprises a compressor (7), the compressor (7) being mounted on a mounting platform (6), the output end of the compressor (7) being connected to an air duct (8), the end of the air duct (8) away from the compressor (7) passing through the mounting platform (6), extending into a launch tube (9), and being connected to an input end of a firing device (13).
5. The tunnel construction monitoring device according to claim 1, characterized in that: The surface of the sphere (14) is made of felt and synthetic fiber and has elasticity.
6. The tunnel construction monitoring device according to claim 1, characterized in that: The propeller (17) is made of flexible plastic.
7. The tunnel construction monitoring device according to claim 1, characterized in that: The monitoring component comprises a gas chamber (20), a cavity is provided inside the sphere (14), the gas chamber (20) is installed in the cavity, a gas phase detection device (21) is installed on the gas chamber (20), an input end of the gas chamber (20) is connected to an air intake pipe (19), and an output end is connected to an air exhaust pipe (22), and the ends of the air intake pipe (19) and the air exhaust pipe (22) away from the gas chamber (20) both penetrate the sphere (14) and are connected to the outside.
8. The tunnel construction monitoring device according to claim 7, characterized in that: The gas phase detection device (21) is used to detect data on gas type and content, and the signal is connected to an external receiving device.