A method for analyzing environmental adaptability of road and bridge steel formwork
Through support vector machine and dynamic Bayesian network technology, deep feature extraction and model construction are carried out based on road and bridge environmental monitoring data, which solves the problem of insufficient evaluation of environmental factors in traditional analysis methods, and improves the environmental adaptability analysis of road and bridge steel molds Accuracy and predictive capabilities optimize the effectiveness of improvement strategies.
Patent Information
- Application Number
- CN202411148778.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-21
AI Technical Summary
The traditional road-bridge steel mold environmental adaptability analysis method lacks the evaluation of the interaction of complex environmental factors, which leads to inaccurate analysis results, limiting the predictive ability of future environmental changes, affecting the improvement effectiveness and maintenance costs of steel molds.
Using technologies such as support vector machines and dynamic Bayesian networks, key variables are selected based on road and bridge environmental monitoring data, deep features are extracted, environmental adaptability hierarchical evaluation model and time-dependent probability model are constructed, and the accuracy and uncertainty of evaluation results are optimized. Develop adaptive improvement strategies.
It improves the accuracy and predictive ability of steel mold environmental adaptability analysis, enhances the forward-looking and targeted nature of the improvement strategy, and significantly improves the reliability of the evaluation results and the quality of decision-making support.
Smart Images

Figure CN118656604B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of environmental adaptability analysis, and in particular to an environmental adaptability analysis method for road and bridge steel molds. Background Art
[0002] The field of environmental adaptability analysis technology focuses on evaluating the performance and durability of materials, products or systems under specific environmental conditions. This technology covers a wide range of applications, from weather resistance evaluation of building materials to temperature and humidity adaptability testing of electronic equipment. Environmental conditions may include temperature, humidity, corrosive gases, salt spray, ultraviolet radiation, etc. Depending on the application field and purpose, environmental adaptability analysis can help designers and engineers optimize material selection, improve product design, predict product life, and ensure the reliability and stability of products in their intended use environment.
[0003] Among them, the environmental adaptability analysis method of road and bridge steel formwork is used for steel formwork in road and bridge construction to evaluate its performance and durability under different environmental conditions. The purpose of this method is to ensure that the steel formwork can maintain structural integrity and functionality in the face of various environmental factors during its service life, thereby ensuring the safety, quality and economic benefits of the building structure. By predicting and evaluating the performance degradation and life reduction that the steel formwork may encounter in the actual use environment, this method aims to optimize the material selection, design and maintenance strategy of the steel formwork to achieve the effect of improving the efficiency and reliability of the construction project.
[0004] Traditional road and bridge steel formwork environmental adaptability analysis methods rely on simplified models and limited variable considerations when dealing with the impact of complex environmental factors on steel formwork performance. They lack the evaluation of the complex interactions of environmental variables, resulting in inaccurate and unreliable analysis results. At the same time, they limit the ability to predict future environmental changes and their impact on steel formwork performance, affecting the effectiveness and timeliness of steel formwork improvements, leading to premature damage or performance degradation of steel formworks, increasing maintenance costs and safety risks, and affecting the overall quality and economic benefits of construction projects. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings in the prior art and to propose a method for analyzing the environmental adaptability of road and bridge steel molds.
[0006] In order to achieve the above object, the present invention adopts the following technical scheme: a method for analyzing environmental adaptability of road and bridge steel molds, comprising the following steps:
[0007] S1: Based on the road and bridge environmental monitoring data, key variables are screened, noise is eliminated, factors affecting the performance of steel molds are selected, and characteristic screening results are obtained;
[0008] S2: Based on the feature screening results, extract key features that affect the environmental adaptability of the steel mold to obtain a deep feature set;
[0009] S3: Based on the deep feature set, a support vector machine is used to construct an environmental adaptability classification evaluation model, and the environmental adaptability of the road and bridge steel mold is quantified into differentiated grades according to the extracted features to obtain an adaptability classification result;
[0010] S4: Based on the feature screening results, a dynamic Bayesian network is applied to construct a time-dependent probability model, and the environmental adaptability of the steel mold at different time points is predicted by the model to obtain an environmental adaptability probability analysis result;
[0011] S5: Based on the adaptability classification results and the environmental adaptability probability analysis results, the results are integrated to optimize the accuracy and uncertainty of the evaluation results to obtain a fusion evaluation result;
[0012] S6: Based on the fusion evaluation results, matching decision support information is formulated according to the evaluation results to obtain an adaptive improvement strategy.
[0013] The present invention is improved in that, based on the road and bridge environmental monitoring data, the key variables are screened, noise is eliminated, factors affecting the performance of the steel mold are selected, and the specific steps of obtaining the characteristic screening results are as follows:
[0014] S101: Based on the road and bridge environmental monitoring data, data traversal is performed, records with abnormal or missing values are identified and deleted, complete data is retained, and cleaned environmental data is obtained;
[0015] S102: According to the post-cleaning environmental data, each item of data is scaled to between 0 and 1 to eliminate the dimension effect, thereby obtaining normalized environmental data;
[0016] S103: Based on the normalized environmental data, by data reorganization, key variables are extracted, the amount of information is compressed, and features that affect the environmental adaptability of the steel mold are identified to obtain feature screening results.
[0017] The present invention is improved in that, based on the feature screening results, the key features affecting the environmental adaptability of the steel mold are extracted, and the specific steps of obtaining the deep feature set are as follows:
[0018] S201: Based on the feature screening results, a network hierarchy is constructed, and parameters of each layer are set to perform a model training process to obtain a model architecture design result;
[0019] S202: According to the model architecture design result, adjust the parameter update frequency and data batch size in the network training process, optimize the model training efficiency, and generate an optimized training model;
[0020] S203: According to the optimized training model, a test set is run on the optimized training model to verify the model recognition and prediction capabilities, and key features that affect the environmental adaptability of the steel mold are extracted through the model to obtain a deep feature set.
[0021] The present invention is improved in that, based on the deep feature set, a support vector machine is used to construct an environmental adaptability classification evaluation model, and the environmental adaptability of the road and bridge steel mold is quantified into differentiated grades according to the extracted features. The specific steps of obtaining the adaptability classification results are as follows:
[0022] S301: Based on the deep feature set, initialize the kernel function parameters and regularization parameters of the support vector machine model, set the initial learning rate and loss function, and obtain an initial environmental adaptability classification model;
[0023] S302: Based on the initial environmental adaptability classification model, batch data training is performed, the learning rate is adjusted, the convergence speed is optimized, the data set is segmented by cross-validation, the performance of the model on the differentiated data set is evaluated, and the model parameters are optimized by iterative training to obtain an optimized environmental adaptability classification model;
[0024] S303: Based on the optimized environmental adaptability grading model, the environmental adaptability of the road and bridge steel mold is quantitatively graded, and the adaptability of the steel mold is divided into differentiated grades according to the extracted features and model learning results to obtain an adaptability grading result.
[0025] The present invention is improved in that the optimized environmental adaptability classification model is according to the formula:
[0026]
[0027] Calculate the distance from each data point to the decision boundary and generate an adaptive classification result, where is the adaptive classification prediction value, is the weight vector, is the input feature vector, is the bias term, is the influence coefficient of temperature factor, is the influence coefficient of humidity factor, is the influence coefficient of corrosive environmental factors, , , They are the influence weight coefficients of temperature factor, humidity factor and corrosive environment factor respectively.
[0028] The present invention is improved in that, based on the feature screening results, a dynamic Bayesian network is applied to construct a time-dependent probability model, and the environmental adaptability of the steel mold at different time points is predicted by the model. The specific steps of obtaining the environmental adaptability probability analysis results are as follows:
[0029] S401: Based on the feature screening results, the structure of the dynamic Bayesian network is set, including the time interval of the time series, the number of hidden state layers and the connection mode, so as to provide a time-dependent framework for model construction and obtain the basic structure of the dynamic Bayesian network;
[0030] S402: Based on the dynamic Bayesian network infrastructure, parameter learning and structure optimization are performed, model parameters are adjusted to match data characteristics through a probability-based inference algorithm, and prediction accuracy and generalization ability are evaluated using model verification technology to obtain a dynamic Bayesian network model after parameter optimization;
[0031] S403: Based on the dynamic Bayesian network model after the parameter optimization, the environmental adaptability of the road and bridge steel mold at various time points in the future is probabilistically predicted, the model output is analyzed, the adaptability change trend of the steel mold is predicted, and the environmental adaptability probabilistic analysis result is obtained.
[0032] The present invention is improved in that the dynamic Bayesian network model after the parameter optimization is according to the formula:
[0033]
[0034] Probabilistic prediction is performed to obtain the environmental adaptability probability analysis results, among which, For time point Environmental adaptability of road and bridge steel molds, For time point Environmental adaptability of road and bridge steel molds, For time point The state of environmental factors, is the impact weight of environmental factors, are model parameters, For a given current time point Environmental adaptability of road and bridge steel formwork , Environmental factors status and its weight At the next time point The probability of the environmental adaptability state, is the function of the dynamic Bayesian network model.
[0035] The present invention is improved in that, based on the adaptability classification results and the environmental adaptability probability analysis results, the results are integrated to optimize the accuracy and uncertainty of the evaluation results. The specific steps of obtaining the fusion evaluation results are as follows:
[0036] S501: Based on the adaptability classification result and the environmental adaptability probability analysis result, a comparative analysis is performed to identify the commonalities and differences between the two results, and a corresponding integration strategy is formulated to obtain a basic integration analysis strategy;
[0037] S502: According to the basic integrated analysis strategy, the fusion weight of the adaptability classification result and the environmental adaptability probability analysis result is adjusted to obtain a comprehensive performance optimization strategy;
[0038] S503: The adaptability classification results and the environmental adaptability probability analysis results are integrated and optimized through the comprehensive performance optimization strategy to reflect the accuracy of adaptability classification and the probabilistic uncertainty of environmental adaptability, and obtain a fusion evaluation result.
[0039] The present invention is improved in that, based on the fusion evaluation result, matching decision support information is formulated according to the evaluation result, and the specific steps of obtaining the adaptive improvement strategy are as follows:
[0040] S601: Based on the fusion evaluation results, the characteristics and conditions of each adaptability level are analyzed, and decision support points are classified to obtain key decision support point analysis results.
[0041] S602: Using the analysis results of the key decision support points, according to the characteristics of the differentiated adaptability levels, formulating maintenance measures and optimization strategies, and combining the reliability and cost-effectiveness of the implementation of the strategies to obtain maintenance and optimization measures solutions;
[0042] S603: Utilize the maintenance and optimization measures to formulate a matching execution plan and operation guide, provide decision support for the design, maintenance and use of road and bridge steel formwork, and obtain an adaptive improvement strategy.
[0043] Compared with the prior art, the advantages and positive effects of the present invention are:
[0044] In the present invention, by screening key variables, the accuracy of feature recognition is effectively improved, the reliability of the analysis results is ensured, and a support vector machine is used to construct an environmental adaptability grading evaluation model, which realizes the precise quantification of the environmental adaptability of steel molds and optimizes the information quality of decision support. A dynamic Bayesian network is applied to construct a time-dependent probability model, which enhances the ability to predict the impact of environmental changes, improves the foresight and pertinence of the steel mold adaptability improvement strategy, and significantly improves the accuracy of the evaluation and the management of uncertainty by integrating the evaluation results, providing strong support for the formulation of more effective adaptability improvement strategies. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 A flow chart of a method for analyzing environmental adaptability of road and bridge steel molds is proposed for the present invention;
[0046] Figure 2 The present invention proposes a schematic diagram of the detailed process of step S1 in a method for analyzing environmental adaptability of road and bridge steel molds;
[0047] Figure 3 The present invention proposes a schematic diagram of the detailed process of step S2 in a method for analyzing environmental adaptability of road and bridge steel molds;
[0048] Figure 4 The present invention proposes a schematic diagram of the detailed process of step S3 in a method for analyzing environmental adaptability of road and bridge steel molds;
[0049] Figure 5 The present invention proposes a detailed flow chart of step S4 in a method for analyzing environmental adaptability of road and bridge steel molds;
[0050] Figure 6 The present invention proposes a schematic diagram of the detailed process of step S5 in a method for analyzing environmental adaptability of road and bridge steel molds;
[0051] Figure 7 The present invention proposes a detailed flow chart of step S6 in a method for analyzing environmental adaptability of road and bridge steel formwork. DETAILED DESCRIPTION
[0052] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0053] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating positions or positional relationships, are based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined. Example
[0054] See also Figure 1 The present invention provides a technical solution: a method for analyzing the environmental adaptability of road and bridge steel molds, comprising the following steps:
[0055] S1: Based on the road and bridge environmental monitoring data, key variables are screened, noise is eliminated, factors affecting the performance of steel molds are selected, and characteristic screening results are obtained;
[0056] S2: Based on the feature screening results, the key features that affect the environmental adaptability of the steel mold are extracted to obtain a deep feature set;
[0057] S3: Based on the deep feature set, support vector machine is used to build an environmental adaptability classification evaluation model. According to the extracted features, the environmental adaptability of the road and bridge steel mold is quantified into differentiated grades to obtain the adaptability classification results;
[0058] S4: Based on the feature screening results, a dynamic Bayesian network is applied to construct a time-dependent probability model. The environmental adaptability of the steel mold at different time points is predicted through the model, and the environmental adaptability probability analysis results are obtained;
[0059] S5: Based on the adaptability classification results and the environmental adaptability probability analysis results, the results are integrated to optimize the accuracy and uncertainty of the assessment results and obtain the fusion assessment results;
[0060] S6: Based on the fusion evaluation results, formulate matching decision support information according to the evaluation results and obtain adaptive improvement strategies.
[0061] The feature screening results include ambient temperature, humidity index, and corrosion rate. The deep feature set includes steel mold structural integrity index, corrosion resistance, and temperature and humidity change response capability. The adaptability grading results include high adaptability level, medium adaptability level, and low adaptability level. The environmental adaptability probabilistic analysis results include time-dependent impact analysis results, probabilistic performance prediction information, and influencing factor weight distribution. The fusion evaluation results include comprehensive adaptability scoring, key influencing factor identification, and performance degradation trend prediction. The adaptability improvement strategies include maintenance cycle optimization, material selection scheme, and anti-corrosion measures adjustment.
[0062] See also Figure 2 ,Based on the road and bridge environmental monitoring data, the specific steps of screening key variables, eliminating noise, selecting factors affecting the performance of steel molds, and obtaining feature screening results are as follows:
[0063] S101: Based on the road and bridge environmental monitoring data, data traversal is performed, records with abnormal or missing values are marked and deleted, and complete data is retained. The specific steps for obtaining the cleaned environmental data are as follows;
[0064] In sub-step S101, data preprocessing is performed based on the road and bridge environmental monitoring data. Through the data cleaning algorithm and combined with the Pandas library function, missing values are eliminated and outliers are filtered. The dropna() function is used to remove records containing null values. The conditional filtering function query() is used to set the threshold to exclude abnormal data that is not within the normal working parameter range. The data cleaning process is completed to generate cleaned environmental data.
[0065] S102: According to the cleaned environmental data, each item of data is scaled to between 0 and 1 to eliminate the dimension effect, and the specific steps of obtaining normalized environmental data are as follows;
[0066] In sub-step S102, data normalization is performed based on the cleaned environmental data. A numerical scaling algorithm is used to adjust the data range through the MinMaxScaler class of the Scikit-learn library. Each eigenvalue of the data is scaled to between 0 and 1 by setting parameters. This operation aims to unify the data scale and eliminate the dimensionality effect, complete data normalization, and generate normalized environmental data.
[0067] S103: Based on the normalized environmental data, by reorganizing the data, extracting key variables, compressing the amount of information, identifying the features that affect the environmental adaptability of the steel mold, and obtaining the specific steps of the feature screening results are as follows;
[0068] In sub-step S103, feature extraction is performed based on normalized environmental data. The variable importance analysis method is adopted, and the Pearson correlation coefficient between variables is calculated using the correlation analysis function corr() of Pandas. Features that are strongly correlated with the environmental adaptability of steel molds are screened out. By identifying important variables, the complexity of the data set is reduced and the information with the greatest decision-making influence is retained. Feature extraction is completed and feature screening results are generated.
[0069] See also Figure 3 ,Based on the feature screening results, the key features that affect the environmental adaptability of steel molds are extracted, and the specific steps for obtaining the deep feature set are as follows:
[0070] S201: Based on the feature screening results, a network hierarchy is constructed, and the parameters of each layer are set to perform a model training process. The specific steps for obtaining the model architecture design results are as follows;
[0071] In sub-step S201, based on the feature screening results, a deep learning algorithm is used, and the network hierarchy is built using the TensorFlow framework. The parameters of each layer are defined, including adding multiple convolutional layers to capture spatial features, batch normalization layers to accelerate the training process, activation layers to introduce nonlinearity, and fully connected layers for feature integration. The optimizer is set to Adam, and the loss function selects mean_squared_error. The model training process is carried out to generate the model architecture design results.
[0072] S202: According to the model architecture design results, the parameter update frequency and data batch size in the network training process are adjusted to optimize the model training efficiency. The specific steps of generating the optimized training model are as follows;
[0073] In sub-step S202, according to the model architecture design results, the parameters in the network training process are adjusted, the LearningRateScheduler in the Keras library is used to adjust the parameter update frequency, the batch size adjustment function is set, and the batch processing size dynamic adjustment strategy is adopted. The initial batch size is set to 32 and dynamically adjusted to 64 or 128 according to the training progress to optimize the computing resource utilization and training speed, and generate an optimized training model.
[0074] S203: According to the optimized training model, the optimized training model is run on the test set to verify the model recognition and prediction capabilities, and the key features that affect the environmental adaptability of the steel mold are extracted through the model. The specific steps of obtaining the deep feature set are as follows;
[0075] In sub-step S203, according to the optimized training model, the test set is used to run the model, and the evaluation function Model.evaluate is used to verify the model recognition and prediction capabilities. The FeatureExtraction method of the TensorFlow framework is used to perform deep feature extraction on the optimized training model, focusing on identifying the key features that affect the environmental adaptability of the steel mold to obtain a deep feature set.
[0076] See also Figure 4 ,Based on the deep feature set, the support vector machine is used to build an environmental adaptability grading evaluation model. According to the extracted features, the environmental adaptability of the road and bridge steel mold is quantified into differentiated grades. The specific steps to obtain the adaptability grading results are as follows:
[0077] S301: Based on the deep feature set, the kernel function parameters and regularization parameters of the support vector machine model are initialized, the initial learning rate and loss function are set, and the specific steps of obtaining the initial environmental adaptability classification model are as follows;
[0078] In sub-step S301, based on the deep feature set, the support vector machine model is initialized, and the Scikit-learn library is used to set the kernel function parameter to the radial basis function to process nonlinear feature mapping. The regularization parameter C is set to 1.0 to control the model complexity, the initial learning rate is set to 0.01, and the loss function is selected as the hinge loss to obtain the initial environmental adaptability classification model.
[0079] S302: Based on the initial environmental adaptability classification model, batch data training is performed, the learning rate is adjusted, the convergence speed is optimized, the data set is segmented by cross-validation, the performance of the model on the differentiated data set is evaluated, and the model parameters are optimized through iterative training to obtain the optimized environmental adaptability classification model. The specific steps are as follows;
[0080] In sub-step S302, batch data training is performed based on the initial environmental adaptability classification model, and the SGDClassifier in the Scikit-learn library is used to adjust the learning rate. A dynamic adjustment strategy is adopted to automatically adjust the learning rate according to the number of iterations. The cross-validation method StratifiedKFold is used to split the data set, and the performance of the model on the differentiated data set is evaluated. The model parameters C and the learning rate are optimized through multiple iterative training to obtain the optimized environmental adaptability classification model.
[0081] S303: Based on the optimized environmental adaptability classification model, the environmental adaptability of the road and bridge steel mold is quantitatively classified, and the adaptability of the steel mold is divided into differentiated levels according to the extracted features and model learning results. The specific steps for obtaining the adaptability classification result are as follows;
[0082] In sub-step S303, the environmental adaptability of road and bridge steel molds is quantitatively graded based on the optimized environmental adaptability grading model. The optimized support vector machine model is used in combination with the extracted deep feature set. Through the model learning results, the adaptability of the steel mold is divided into multiple differentiated levels to obtain the adaptability grading results.
[0083] The optimized environmental adaptability classification model is based on the formula:
[0084]
[0085] Calculate the distance from each data point to the decision boundary and generate an adaptive classification result, where is the adaptive classification prediction value, is the weight vector, is the input feature vector, is the bias term, is the influence coefficient of temperature factor, is the influence coefficient of humidity factor, is the influence coefficient of corrosive environmental factors, , , They are the influence weight coefficients of temperature factor, humidity factor and corrosive environment factor respectively.
[0086] The specific implementation process of the improved formula is as follows:
[0087] Determined through experimental data or expert knowledge , , The value reflects the importance of different environmental factors on the adaptability of the steel mold. According to the actual temperature, humidity and corrosive conditions of the environment where the steel mold is located, the , , The actual value of is substituted into the formula to accurately reflect the actual impact of environmental factors on the adaptability of the steel mold. By improving the formula to adjust the decision boundary, the adaptability classification result reflecting the impact of environmental factors is obtained.
[0088] See also Figure 5 Based on the feature screening results, the dynamic Bayesian network is applied to build a time-dependent probability model. The environmental adaptability of the steel mold at different time points is predicted by the model. The specific steps to obtain the environmental adaptability probability analysis results are as follows:
[0089] S401: Based on the feature screening results, the structure of the dynamic Bayesian network is set, including the time interval of the time series, the number of hidden state layers and the connection mode, to provide a time-dependent framework for model construction. The specific steps for obtaining the basic structure of the dynamic Bayesian network are as follows;
[0090] In sub-step S401, based on the feature screening results, the structure of the dynamic Bayesian network is set. The time interval of the time series is set to 1 hour using Python's pgmpy library, the number of hidden state layers is set to 3, and the connection method adopts sequence connection to construct the time-dependent framework of the model. The prior probability distribution and conditional probability distribution are defined for each hidden state to obtain the basic structure of the dynamic Bayesian network.
[0091] S402: Based on the dynamic Bayesian network infrastructure, parameter learning and structure optimization are performed, model parameters are adjusted to match data characteristics through a probability-based inference algorithm, and model verification technology is used to evaluate prediction accuracy and generalization ability. The specific steps of obtaining the dynamic Bayesian network model after parameter optimization are as follows;
[0092] In sub-step S402, parameter learning and structure optimization are performed based on the dynamic Bayesian network infrastructure. The expectation maximization algorithm is used to adjust the model parameters to match the data characteristics. The k-fold cross-validation method is used to split the data set. The prediction accuracy and generalization ability are evaluated. The core parameters and network structure of the model are fine-tuned through an iterative optimization process to obtain a dynamic Bayesian network model with optimized parameters.
[0093] S403: Based on the dynamic Bayesian network model after parameter optimization, the environmental adaptability of the road and bridge steel mold at various time points in the future is probabilistically predicted, the model output is analyzed, the adaptability change trend of the steel mold is predicted, and the specific steps of obtaining the environmental adaptability probability analysis result are as follows;
[0094] In sub-step S403, based on the dynamic Bayesian network model after parameter optimization, a probability prediction is made on the environmental adaptability of the road and bridge steel mold at various time points in the future. The dynamic Bayesian network model is used to analyze the adaptability change trend at different time points. According to the probability distribution of the model output, the differentiated level of environmental adaptability of the steel mold is predicted to obtain the environmental adaptability probability analysis result.
[0095] The dynamic Bayesian network model after parameter optimization is as follows:
[0096]
[0097] Probabilistic prediction is performed to obtain the environmental adaptability probability analysis results, among which, For time point The environmental adaptability of the road and bridge steel formwork represents the adaptability of the road and bridge steel formwork to environmental factors at a specific time point. For time point The environmental adaptability of the road and bridge steel mold represents the environmental adaptability of the road and bridge steel mold at the next predicted time point. For time point The state of environmental factors is expressed through quantitative indicators, such as temperature, humidity, and corrosiveness. The influence weight of environmental factors is used to quantify the importance of different environmental factors on the environmental adaptability of road and bridge steel formwork. are model parameters, including all internal parameters and hyperparameters that affect the model's predictive performance, For a given current time point Environmental adaptability of road and bridge steel formwork , Environmental factors status and its weight At the next time point The probability of the environmental adaptability state, is the function of the dynamic Bayesian network model.
[0098] The specific implementation process of the improved formula is as follows:
[0099] Collection and timing Environmental factors of road and bridge steel formwork , including temperature, humidity and corrosive conditions, to determine the weight of environmental factors affecting the environmental adaptability of road and bridge steel formwork , which can be obtained through experimental data analysis or expert experience, using the current time point Environmental adaptability status of road and bridge steel formwork and environmental factors , combined with the influence weight , calculate the next time point through the dynamic Bayesian network model The model prediction is not only based on the current environmental adaptability status of the road and bridge steel formwork, but also takes into account the specific influence of external environmental factors, providing a comprehensive and accurate environmental adaptability prediction.
[0100] See also Figure 6 , based on the adaptability classification results and the environmental adaptability probability analysis results, the results are integrated to optimize the accuracy and uncertainty of the evaluation results. The specific steps to obtain the fusion evaluation results are as follows:
[0101] S501: Based on the adaptability classification results and the environmental adaptability probability analysis results, a comparative analysis is performed to identify the commonalities and differences between the two results, and a corresponding integration strategy is formulated. The specific steps for obtaining the basic integration analysis strategy are as follows;
[0102] In sub-step S501, a comparative analysis is conducted based on the adaptability grading results and the environmental adaptability probability analysis results to identify the commonalities and differences between the two results. Statistical analysis methods are used, such as the Pearson correlation coefficient to calculate commonalities and standard deviation analysis to identify differences. This is implemented using Python's Pandas library. Through the merging and grouping operations of DataFrame and the calculation functions of correlation coefficients and standard deviations, corresponding integration strategies are formulated to obtain basic integration analysis strategies.
[0103] S502: According to the basic integrated analysis strategy, the fusion weights of the adaptability classification results and the environmental adaptability probability analysis results are adjusted to obtain the specific steps of the comprehensive performance optimization strategy as follows;
[0104] In sub-step S502, according to the basic integrated analysis strategy, the fusion weights of the adaptability grading results and the environmental adaptability probability analysis results are adjusted. The method of dynamically adjusting the weights is adopted to ensure that the weight adjustment takes into account the statistical analysis results. The NumPy library is used to dynamically adjust the weight coefficients through NumPy's array operations and mathematical functions to obtain a comprehensive performance optimization strategy.
[0105] S503: The adaptability classification results and the environmental adaptability probability analysis results are integrated and optimized through a comprehensive performance optimization strategy to reflect the accuracy of the adaptability classification and the probability uncertainty of the environmental adaptability. The specific steps for obtaining the fusion evaluation results are as follows;
[0106] In sub-step S503, the adaptability classification results and environmental adaptability probability analysis results are integrated and optimized through a comprehensive performance optimization strategy. The weighted average method is used to optimize the evaluation criteria to reflect the accuracy of adaptability classification and the probabilistic uncertainty of environmental adaptability. The integration process is implemented using the Scikit-learn library, and its data preprocessing and model evaluation functions are used to obtain the fusion evaluation results.
[0107] See also Figure 7 ,Based on the fusion evaluation results, the specific steps of formulating matching decision support information and obtaining the adaptive improvement strategy are as follows:
[0108] S601: Based on the fusion evaluation results, the characteristics and conditions of each adaptability level are analyzed, and the decision support point positions are classified. The specific steps for obtaining the key decision support point analysis results are as follows;
[0109] In sub-step S601, based on the fusion evaluation results, the decision tree analysis method is adopted, and the decision tree model is constructed using Python's Scikit-learn library to analyze the characteristics and conditions of each adaptability level. The key decision support points are identified through the node splitting process of the decision tree, and the key decision support point analysis results are obtained.
[0110] S602: Using the key decision support point analysis results, according to the characteristics of the differentiated adaptability levels, maintenance measures and optimization strategies are formulated, and the specific steps of obtaining the maintenance and optimization measures program are as follows in combination with the reliability and cost-effectiveness of the implementation of the strategy;
[0111] In sub-step S602, the key decision support point analysis results are used to apply the multi-criteria decision analysis method, and the Python NumPy library is used for mathematical calculations. According to the characteristics of the differentiated adaptability levels, maintenance measures and optimization strategies are formulated, and the reliability and cost-effectiveness of the implementation of the strategy are combined to obtain the maintenance and optimization measures plan.
[0112] S603: Using the maintenance and optimization measures plan, formulate matching execution plans and operation guidelines to provide decision support for the design, maintenance and use of road and bridge steel formwork, and obtain the specific steps of the adaptive improvement strategy as follows;
[0113] In sub-step S603, the maintenance and optimization measures plan is used, the project management method is adopted, and the Python Pandas library is applied to perform data collation and timeline planning, formulate matching execution plans and operation guidelines, provide decision support for the design, maintenance and use of road and bridge steel molds, and obtain adaptive improvement strategies.
[0114] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A method for analyzing the environmental adaptability of road and bridge steel molds. It is characterized in that The following steps are involved: Based on the road and bridge environmental monitoring data, key variables are screened, noise is eliminated, factors affecting the performance of steel molds are selected, and characteristic screening results are obtained; Based on the feature screening results, key features that affect the environmental adaptability of the steel mold are extracted to obtain a deep feature set; Based on the deep feature set, a support vector machine is used to construct an environmental adaptability classification evaluation model, and the environmental adaptability of the road and bridge steel mold is quantified into differentiated grades according to the extracted features to obtain an adaptability classification result; Based on the feature screening results, a dynamic Bayesian network is applied to construct a time-dependent probability model, and the environmental adaptability of the steel mold at different time points is predicted by the model to obtain the environmental adaptability probability analysis results; Based on the adaptability classification results and the environmental adaptability probability analysis results, the results are integrated to optimize the accuracy and uncertainty of the evaluation results to obtain a fusion evaluation result; Based on the fusion evaluation results, matching decision support information is formulated to obtain an adaptive improvement strategy.
2. The environmental adaptability analysis method for road and bridge steel molds according to claim 1, Features: The feature screening results include ambient temperature, humidity index, and corrosion rate; the deep feature set includes steel mold structural integrity index, corrosion resistance, and temperature and humidity change response capability; the adaptability grading results include high adaptability level, medium adaptability level, and low adaptability level; the environmental adaptability probability analysis results include time-dependent impact analysis results, probabilistic performance prediction information, and influencing factor weight distribution; the fusion evaluation results include comprehensive adaptability scoring, key influencing factor identification, and performance degradation trend prediction; the adaptability improvement strategies include maintenance cycle optimization, material selection scheme, and anti-corrosion measures adjustment.
3. The environmental adaptability analysis method of road and bridge steel mold according to claim 1, Features: Based on the deep feature set, a support vector machine is used to build an environmental adaptability classification evaluation model. According to the extracted features, the environmental adaptability of the road and bridge steel mold is quantified into differentiated grades. The specific steps for obtaining the adaptability classification results are as follows: Based on the deep feature set, the kernel function parameters and regularization parameters of the support vector machine model are initialized, the initial learning rate and the loss function are set, and an initial environmental adaptability classification model is obtained; Based on the initial environmental adaptability classification model, batch data training is performed, the learning rate is adjusted, the convergence speed is optimized, the data set is segmented using cross-validation, the performance of the model on the differentiated data set is evaluated, and the model parameters are optimized through iterative training to obtain an optimized environmental adaptability classification model; Based on the optimized environmental adaptability grading model, the environmental adaptability of road and bridge steel molds is quantitatively graded, and the adaptability of the steel molds is divided into differentiated grades according to the extracted features and model learning results to obtain adaptability grading results.
4. The environmental adaptability analysis method for road and bridge steel molds according to claim 3, Features: The optimized environmental adaptability classification model is based on the formula: ; Calculate the distance from each data point to the decision boundary and generate an adaptive classification result, where is the adaptive classification prediction value, is the weight vector, is the input feature vector, is the bias term, is the influence coefficient of temperature factor, is the influence coefficient of humidity factor, is the influence coefficient of corrosive environmental factors, , , They are the influence weight coefficients of temperature factor, humidity factor and corrosive environment factor respectively.
5. The environmental adaptability analysis method of road and bridge steel mold according to claim 1, Features: Based on the feature screening results, a dynamic Bayesian network is applied to construct a time-dependent probability model. The environmental adaptability of the steel mold at different time points is predicted by the model. The specific steps for obtaining the environmental adaptability probability analysis results are as follows: Based on the feature screening results, the structure of the dynamic Bayesian network is set, including the time interval of the time series, the number of hidden state layers and the connection mode, to provide a time-dependent framework for model construction and obtain the basic structure of the dynamic Bayesian network; Based on the dynamic Bayesian network infrastructure, parameter learning and structure optimization are performed, model parameters are adjusted to match data characteristics through a probability-based inference algorithm, and prediction accuracy and generalization ability are evaluated using model verification technology to obtain a dynamic Bayesian network model with optimized parameters; Based on the dynamic Bayesian network model after parameter optimization, the environmental adaptability of the road and bridge steel mold at various time points in the future is probabilistically predicted, the model output is analyzed, the adaptability change trend of the steel mold is predicted, and the environmental adaptability probabilistic analysis result is obtained.
6. The environmental adaptability analysis method of road and bridge steel mold according to claim 5, Features: The dynamic Bayesian network model after parameter optimization is based on the formula: ; Probabilistic prediction is performed to obtain the environmental adaptability probability analysis results, among which, For time point Environmental adaptability of road and bridge steel molds, For time point Environmental adaptability of road and bridge steel molds, For time point The state of environmental factors, is the impact weight of environmental factors, are model parameters, For a given current time point Environmental adaptability of road and bridge steel formwork , Environmental factors status and its weight At the next time point The probability of the environmental adaptability state, is the function of the dynamic Bayesian network model.
7. The environmental adaptability analysis method of road and bridge steel mold according to claim 1, Features: Based on the adaptability classification results and the environmental adaptability probability analysis results, the results are integrated to optimize the accuracy and uncertainty of the evaluation results. The specific steps for obtaining the fusion evaluation results are as follows: Based on the adaptability classification results and the environmental adaptability probability analysis results, a comparative analysis is performed to identify the commonalities and differences between the two results, and a corresponding integration strategy is formulated to obtain a basic integration analysis strategy; According to the basic integrated analysis strategy, the fusion weight of the adaptability classification result and the environmental adaptability probability analysis result is adjusted to obtain a comprehensive performance optimization strategy; Through the comprehensive performance optimization strategy, the adaptability classification results and environmental adaptability probability analysis results are integrated and optimized to reflect the accuracy of adaptability classification and the probabilistic uncertainty of environmental adaptability, and obtain a fusion evaluation result.
8. The environmental adaptability analysis method of road and bridge steel mold according to claim 1, Features: Based on the fusion evaluation results, the specific steps of formulating matching decision support information and obtaining an adaptive improvement strategy are as follows: Based on the fusion evaluation results, the characteristics and conditions of each adaptability level are analyzed, and the decision support point positions are classified to obtain the key decision support point analysis results; By using the analysis results of the key decision support points, maintenance measures and optimization strategies are formulated according to the characteristics of the differentiated adaptability levels, and maintenance and optimization measures are obtained by combining the reliability and cost-effectiveness of the implementation of the strategies; By using the maintenance and optimization measures scheme, a matching execution plan and operation guide are formulated to provide decision support for the design, maintenance and use of road and bridge steel formworks, and to obtain an adaptive improvement strategy.