Method and device for correcting flow rate of turbine in hydropower station based on river water dynamics
By generating a hydrodynamic model and calculating the overflow flow error of the generator set, the problem of the overflow flow error of the turbine in the hydropower station is solved, and the operating efficiency and safety are improved.
Patent Information
- Application Number
- CN202411132928.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-08-19
AI Technical Summary
There are errors in the design and operation of turbine overflow in hydropower stations, which are difficult to effectively correct and affect power generation efficiency and safe operation.
By obtaining the time series data of the overflow flow of the generating unit and the river topographic cross-section data, a constant flow hydrodynamic model and a non-steady flow hydrodynamic model are generated, the measured water level value and the calculated flow time series value are determined, the overflow flow error of the generating unit is calculated, and then the hydropower station is corrected Turbine overflow.
It improves the operating efficiency of hydropower station turbines, accurately corrects overflow, and improves power generation efficiency and safety.
Smart Images

Figure CN118657089B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of flow rate correction for a hydropower station turbine based on river water power, and in particular to a method for correcting flow rate correction for a hydropower station turbine based on river water power, a device for correcting flow rate correction for a hydropower station turbine based on river water power, an electronic device and a computer-readable storage medium. Background Art
[0002] The flow rate of a hydropower station turbine refers to the maximum flow rate at which the turbine can operate safely under specific head conditions. It is an important design parameter for a hydropower station and has a significant impact on the safe operation and power generation efficiency of the hydropower station. How to improve the efficiency of determining the flow rate of a generator set is a problem that needs to be overcome in the entire life cycle of a hydropower station from design to operation. Summary of the invention
[0003] The embodiments of the present invention provide a method, device, electronic device and computer-readable storage medium for correcting the flow rate of a turbine in a hydropower station based on river water power, so as to overcome the above problems or at least partially solve the above problems.
[0004] The embodiment of the present invention discloses a method for correcting the flow rate of a turbine in a hydropower station based on river hydrodynamics, comprising:
[0005] Obtain the time series data of the flow rate of the generator set and the river topographic cross-section data from the downstream of the hydropower station to the water level station;
[0006] Determine the roughness value through the time series data of the flow rate of the generator set and the cross-section data of the river terrain;
[0007] generating a steady flow hydrodynamic model and a non-steady flow hydrodynamic model based on the roughness value;
[0008] Determine the calculated water level value of the target river section through the steady flow hydrodynamic model based on the time series data of the flow rate of the generator set and the river topographic section data;
[0009] Determine the calculated flow time series value of the outlet boundary through the unsteady flow hydrodynamic model based on the flow time series data of the generator set, the river topographic section data and the measured water level value;
[0010] Determine the error time series value of the flow rate of the generator set of the hydropower station turbine by using the calculated flow time series value and the river terrain section data;
[0011] The flow rate of the turbine of the hydropower station is corrected based on the time series value of the flow rate error of the generator set.
[0012] Optionally, the river terrain section data includes time series data of water level of a downstream river water level station, and the step of determining the calculated water level value of the target river section based on the time series data of the flow rate of the generator set and the river terrain section data by using the steady flow hydrodynamic model includes:
[0013] Determining the time series data of the flow rate of the generator set as the first upper boundary condition of the steady flow hydrodynamic model;
[0014] Determine the water level time series data of the downstream river water level station as the first lower boundary condition of the steady flow hydrodynamic model;
[0015] The calculated water level value of the target river section is determined by the steady flow hydrodynamic model.
[0016] Optionally, the step of determining the calculated flow time series value of the outlet boundary through the unsteady flow hydrodynamic model based on the generator set flow time series data, the river channel topographic section data and the measured water level value comprises:
[0017] Determining the time series data of the flow rate of the generator set as the second upper boundary condition of the unsteady flow hydrodynamic model;
[0018] Determine the water level time series data of the downstream river water level station as the second lower boundary condition of the unsteady flow hydrodynamic model;
[0019] Determining the measured water level value as the initial condition of the unsteady flow hydrodynamic model;
[0020] The calculated flow rate time series values at the outlet boundary are determined by the unsteady flow hydrodynamic model.
[0021] Optionally, the river terrain section data includes flow time series data monitored by a downstream river water level station, and the step of determining a generator set flow error time series value for a turbine of the hydropower station through the calculated flow time series value and the river terrain section data includes:
[0022] Determine the calculated flow integral and the monitored flow integral using the calculated flow time series values and the monitored flow time series data of the downstream river water level station;
[0023] Determining an integral difference between the monitored flow integral and the calculated flow integral;
[0024] A first-order derivative is performed based on the integral difference to determine a time series value of a generator set flow error for the turbine of the hydropower station.
[0025] Optionally, the river terrain section data includes a water level monitored by a downstream river water level station, and the step of correcting the flow rate of the turbine of the hydropower station based on the flow rate error time series value of the generator set includes:
[0026] Determine a propagation time, and determine an extension length of the time series data of the overcurrent flow of the generator set by using the propagation time;
[0027] Determining a third upper boundary condition of the unsteady flow hydrodynamic model by using the extension length and the time series data of the flow rate of the generator set;
[0028] Determining the monitored water level of the downstream river channel water level station as the third lower boundary condition of the unsteady flow hydrodynamic model;
[0029] Determine the characteristic flow time series value of the outlet boundary by the unsteady flow hydrodynamic model;
[0030] Determine the initial moment of characteristic flow;
[0031] Determine the time variation value of characteristic error flow rate through the characteristic flow time series value;
[0032] The time-varying value of the characteristic error flow and the initial moment of the characteristic flow are used to determine the time correction result of the time series value of the generator set flow error, and the correction result is used to correct the flow of the turbine of the hydropower station.
[0033] Optionally, it also includes:
[0034] The generator set flow rate time series data and the generator set flow rate error time series value are superimposed to determine as the fourth upper boundary condition of the unsteady flow hydrodynamic model;
[0035] The flow time series data monitored by the downstream river water level station is used as the fourth lower boundary condition of the unsteady flow hydrodynamic model;
[0036] Determine the calculated water level time series value of the outlet boundary by the unsteady flow hydrodynamic model;
[0037] The water level time series data of the downstream river water level station and the calculated water level time series value are used to generate a verification result, and the verification result is used to verify the correction result.
[0038] Optionally, the step of using the downstream river channel water level station water level time series data and the calculated water level time series value to generate a verification result, and using the verification result to verify the correction result includes:
[0039] Generate a first image using the water level time series data of the downstream river water level station;
[0040] Generate a second image using the calculated water level time series values;
[0041] When the water level difference between the first image and the second image is less than a preset water level difference threshold, it is determined that the correction result is valid.
[0042] The embodiment of the present invention also discloses a flow rate correction device for a turbine of a hydropower station based on river water power, comprising:
[0043] The river terrain section data acquisition module is used to obtain the time series data of the flow rate of the generator set and the river terrain section data from the downstream of the hydropower station to the water level station;
[0044] A roughness value determination module, used to determine the roughness value through the time series data of the flow rate of the generator set and the river terrain section data;
[0045] A flow hydrodynamic model generation module, used for generating a steady flow hydrodynamic model and a non-steady flow hydrodynamic model based on the roughness value;
[0046] A calculated water level value determination module, used to determine the calculated water level value of the target river section based on the time series data of the flow rate of the generator set and the river terrain section data through the steady flow hydrodynamic model;
[0047] A calculation flow time series value determination module is used to determine the calculation flow time series value of the outlet boundary based on the flow time series data of the generator set, the river topographic section data and the measured water level value through the non-steady flow hydrodynamic model;
[0048] A generator set flow error time series value determination module, used to determine the generator set flow error time series value for the turbine of the hydropower station through the calculated flow time series value and the river terrain section data;
[0049] The overflow flow correction module is used to correct the overflow flow of the turbine of the hydropower station based on the overflow flow error time series value of the generator set.
[0050] The embodiment of the present invention further discloses an electronic device, comprising a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus;
[0051] The memory is used to store computer programs;
[0052] The processor is used to implement the method described in the embodiment of the present invention when executing the program stored in the memory.
[0053] The embodiment of the present invention further discloses a computer-readable storage medium having instructions stored thereon, which, when executed by one or more processors, enables the processors to execute the method described in the embodiment of the present invention.
[0054] The embodiments of the present invention include the following advantages:
[0055] According to an embodiment of the present invention, a time series data of the flow rate of a generator set is obtained, as well as the topographic cross-section data of the river channel from the downstream of the hydropower station to the water level station; a roughness value is determined through the time series data of the flow rate of the generator set and the topographic cross-section data of the river channel; a constant flow hydrodynamic model and a non-constant flow hydrodynamic model are generated based on the roughness value; a measured water level value of a target river section is determined through the constant flow hydrodynamic model based on the time series data of the flow rate of the generator set and the topographic cross-section data of the river channel; a calculated flow time series value of an outlet boundary is determined through the non-constant flow hydrodynamic model based on the time series data of the flow rate of the generator set, the topographic cross-section data of the river channel and the calculated water level value; a time series value of an error of the flow rate of the generator set for the turbine of the hydropower station is determined through the calculated flow time series value and the topographic cross-section data of the river channel; and the flow rate of the turbine of the hydropower station is corrected based on the time series value of the flow rate error of the generator set, thereby improving the operation efficiency of the turbine of the hydropower station. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] Figure 1 It is a flow chart of the steps of a method for correcting the flow rate of a turbine in a hydropower station based on river water power provided in an embodiment of the present invention;
[0057] Figure 2 It is a structural block diagram of a flow rate correction device for a hydropower station turbine based on river water power provided in an embodiment of the present invention;
[0058] Figure 3 is a hardware structure block diagram of an electronic device provided in an embodiment of the present invention;
[0059] Figure 4 is a schematic diagram of a computer-readable medium provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0060] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0061] A hydroelectric generator is a device that converts the kinetic energy of water into electrical energy. Its basic structure consists of a turbine, a generator, and bearings. The turbine is a key component, and its function is to convert the kinetic energy of flowing water into mechanical energy and transfer the mechanical energy to the generator to generate electrical energy.
[0062] Calculating the flow rate of a turbine is a problem that all hydropower stations need to face throughout their life cycle from design to operation. For a specific type of generator set, an empirical formula is generally used to deduce the average flow rate, and the average load is used to calculate the flow rate of water used for power generation. Since the load and flow rate of the unit are not one-to-one corresponding, that is, the same load, because the generator operates under different working conditions, the efficiency and flow rate are different, which inevitably brings errors to the calculation. As the operating time increases, the operating characteristics of the turbine will also change. The deviation between the flow rate characteristic curve used in the design stage and the actual operating conditions will also become larger and larger, which will cause troubles for the operation and scheduling of the hydropower station.
[0063] The generator set overflow flow rate deduced by the relevant technology based on the empirical formula is determined in the design stage. With the long-term operation of the generator set, the generator set overflow flow rate will deviate from the actual situation, and the error is difficult to correct effectively.
[0064] Reference Figure 1 , shows a flow chart of the steps of a method for correcting the flow rate of a turbine in a hydropower station based on river water power provided in an embodiment of the present invention, which may specifically include the following steps:
[0065] Step 101, obtaining the time series data of the flow rate of the generator set and the river topographic section data from the downstream of the hydropower station to the water level station;
[0066] Step 102, determining the roughness value through the time series data of the flow rate of the generator set and the river topography section data;
[0067] Step 103, generating a steady flow hydrodynamic model and a non-steady flow hydrodynamic model based on the roughness value;
[0068] Step 104, determining the calculated water level value of the target river section through the steady flow hydrodynamic model based on the time series data of the flow rate of the generator set and the river topographic section data;
[0069] Step 105, determining the calculated flow time series value of the outlet boundary through the unsteady flow hydrodynamic model based on the flow time series data of the generator set, the river topographic section data and the measured water level value;
[0070] Step 106, determining a time series value of a flow error of a generator set of a turbine of the hydropower station through the calculated flow time series value and the river terrain section data;
[0071] Step 107: correcting the flow rate of the turbine of the hydropower station based on the time series value of the flow rate error of the generator set.
[0072] The generator flow time series data refers to a series of data points representing the flow of the turbine at different time points in the hydropower station. The flow of the turbine is an important parameter for the operation of the hydropower station, which directly affects the power generation of the hydropower station. The turbine flow time series data can be used to analyze the trend of the turbine flow, predict the future turbine flow, and optimize the operation of the hydropower station.
[0073] The time series data of turbine flow rate in a hydropower station can be obtained by measuring the flow rate of the turbine at different time points.
[0074] In a specific implementation, the time series data of the generator set's overcurrent flow rate, the time series data of the generator set's operating status, the time series data of the water level in front of the hydropower station dam, and the time series data of the water level below the hydropower station dam can also be obtained.
[0075] The river topographic cross-section data from the downstream of the hydropower station to the water level station refers to the detailed information such as the shape, size and geological conditions of the river cross-section between the downstream of the hydropower station and the water level station. These data are usually presented in the form of charts and data, and are important basic data for the planning, design, construction and operation of hydropower stations.
[0076] The river topographic cross-section data from the downstream of the hydropower station to the water level station mainly include the following contents:
[0077] River channel cross-sectional shape: River channel cross-sectional shape refers to the shape of the cross section of the river channel, usually represented by a cross-sectional diagram. The cross-sectional diagram can reflect information such as the width, depth, and slope of the river channel.
[0078] River channel cross-sectional dimensions: River channel cross-sectional dimensions refer to the specific size of the river channel cross-section, including river channel width, river channel depth, riverbed elevation, bank slope elevation, etc. These dimension data are of great significance for calculating river channel flow, water flow velocity, water level changes, etc.
[0079] Riverbed geological conditions: Riverbed geological conditions refer to the lithology, structure, looseness, etc. of the riverbed. Riverbed geological conditions affect the scouring and transportation capacity of water flow, and thus affect the morphological changes of the river channel.
[0080] Optionally, the river terrain section data from the downstream of the hydropower station to the water level station in the embodiment of the present invention may also include time series data of water level of the downstream river water level station, time series data of water level monitoring of the downstream river water level station and flow monitoring of the downstream river water level station.
[0081] Both the steady-flow hydrodynamic model and the unsteady-flow hydrodynamic model are numerical models used to simulate the flow of water bodies such as rivers and channels. The main difference between the two is that the steady-flow hydrodynamic model assumes that the boundary conditions and parameters such as the flow rate remain constant during the calculation process, while the unsteady-flow hydrodynamic model can take into account the changes in parameters such as boundary conditions and the flow rate over time.
[0082] Steady flow hydrodynamic models are usually used to simulate steady-state flows, that is, the state of the flow does not change over time. The calculation of this model is relatively simple, but its scope of application is limited, and it is only applicable when parameters such as boundary conditions and water flow rate remain constant.
[0083] Common applications of steady flow hydrodynamic models include:
[0084] Calculate the flow and water level of rivers and channels;
[0085] Evaluate the operational effectiveness of water conservancy projects;
[0086] Analyze the spread of water pollutants.
[0087] The unsteady flow hydrodynamic model can simulate unsteady flow, that is, the state of the flow changes over time. The calculation of this model is more complicated, but its application range is wider. It can be used to simulate the changes of boundary conditions and parameters such as water flow over time.
[0088] Common applications of unsteady flow hydrodynamic models include:
[0089] Simulate hydrological phenomena such as floods and storm surges;
[0090] Analyze the impact of reservoir operations on river flows;
[0091] Study the long-distance transport of water pollutants.
[0092] The embodiment of the present invention can construct a steady-flow hydrodynamic model and a non-steady-flow hydrodynamic model applicable to the river channel based on the river channel topographic cross-section data from the downstream of the hydropower station to the water level station.
[0093] In the specific implementation, the roughness of the steady flow hydrodynamic model can be determined using the time series data of the generator set flow rate, the time series data of the downstream river water level station water level, the downstream river water level station monitoring water level, and the downstream river water level station monitoring flow time series data.
[0094] Exemplarily, the roughness of the steady flow hydrodynamic model can be determined in the following manner:
[0095] 1. Data Collection
[0096] Generator flow time series data: This data should include the flow of the turbine at different time points. The data can be obtained from the SCADA system of the power station.
[0097] Downstream river water level station water level time series data: This data should include the changes in the observed water level of the downstream river water level station at different time points. The data can be obtained from the data logger of the river water level station.
[0098] Water level monitoring at downstream river water level stations: This data should include the water level values monitored at downstream river water level stations. The data can be obtained through manual measurement or real-time monitoring systems.
[0099] Downstream river water level station monitoring flow time series data: This data should include the changes in the monitoring flow values of the downstream river water level station at different time points. The data can be obtained through manual measurement or real-time monitoring system.
[0100] 2. Data Preprocessing
[0101] Check data quality: Data should be checked for errors, outliers, and missing values. Any errors or outliers should be corrected or removed. Missing values can be estimated by interpolation or other methods.
[0102] Convert data into a consistent format: Data should be converted into a consistent format, such as a CSV file or a spreadsheet.
[0103] Synchronize timestamps: Timestamps of all datasets should be synchronized to allow accurate comparison.
[0104] 3. Model Setup
[0105] Select a Steady-State Hydraulic Model: There are several steady-state hydraulic models to choose from. Select the model that fits the application and has the necessary features.
[0106] Define the model geometry: The model geometry should include river channels, power stations, and any other relevant features. The geometry can be created using GIS software or other modeling tools.
[0107] Set model parameters: Model parameters should include Manning's roughness coefficient, upstream boundary conditions and downstream boundary conditions.
[0108] 4. Model Calibration
[0109] Calibrating the Manning's Roughness Coefficient: The Manning's Roughness Coefficient can be calibrated by comparing the simulated water level and flow with the observed water level and flow. The Manning's Roughness Coefficient can be adjusted until the simulated and observed data are as close as possible.
[0110] Use optimization techniques: Optimization techniques can be used to automate the calibration process. These techniques help find the best value for the Manning's roughness coefficient that minimizes the difference between simulated and observed data.
[0111] 5. Model Validation
[0112] Validate the model: Once the model has been calibrated, it should be validated using data not used for calibration. Validation data can be used to assess the model's ability to predict water levels and flows under different conditions.
[0113] 6. Model Application
[0114] Use models to simulate different scenarios: Models can be used to simulate different scenarios, such as different flows, different water levels, or different channel geometries. Simulations can be used to assess the impact of these changes on water levels and flows in the river.
[0115] In specific implementations, the accuracy of the model depends on the quality of the data and the accuracy of the model settings.
[0116] The Manning roughness coefficient will vary depending on flow conditions, streambed material, and vegetation. The limitations of the model should be carefully considered before using it to make decisions.
[0117] Under normal circumstances, the downstream water level station is often not far from the hydropower station, and the hydrodynamic characteristics have almost no obvious changes. Therefore, the unsteady flow hydrodynamic model can use the roughness value of the steady flow hydrodynamic model.
[0118] Exemplarily, the specific steps of generating a steady flow hydrodynamic model based on the roughness value are as follows:
[0119] Collect data: Collect river section data, water level data, flow data and roughness value.
[0120] Preprocess data: clean, convert, and interpolate data.
[0121] Build the model: Select an appropriate steady-flow hydrodynamic model and build the model based on the collected data.
[0122] Set model parameters: Set model parameters, including roughness value, boundary conditions, etc.
[0123] Run model: Run the model to calculate results such as water level and flow.
[0124] Analyze results: Analyze the model results and compare them with the actual situation.
[0125] Here are some specific modeling steps:
[0126] Select model: Select an appropriate steady flow hydrodynamic model, such as the MANNING model, St. Vincent-Manning model, etc.
[0127] Grid division: Divide the river channel into grid cells, each grid cell represents a small water area
[0128] Define boundary conditions: Define upstream and downstream boundary conditions, such as water level, flow rate, etc.
[0129] Set roughness value: Set the roughness value of each mesh element based on the collected roughness values.
[0130] Solve the model: Use numerical methods to solve the model equations and obtain results such as water level and flow.
[0131] Exemplarily, the specific steps of generating the unsteady flow hydrodynamic model based on the roughness value are as follows:
[0132] Collect data: Collect river section data, water level data, flow data, roughness value and inflow flow time series data.
[0133] Preprocess data: clean, convert, and interpolate data.
[0134] Model building: Select an appropriate unsteady flow hydrodynamic model and build the model based on the collected data.
[0135] Set model parameters: Set model parameters, including roughness value, boundary conditions, inflow flow time series, etc.
[0136] Run model: Run the model to calculate results such as water level and flow.
[0137] Analyze results: Analyze the model results and compare them with the actual situation.
[0138] Here are some specific modeling steps:
[0139] Select model: Select an appropriate unsteady flow hydrodynamic model, such as the St. Vincent-Manning unsteady model, momentum conservation model, etc.
[0140] Grid division: Divide the river channel into grid cells, each grid cell represents a small water area.
[0141] Define boundary conditions: Define upstream and downstream boundary conditions, such as water level, flow rate, etc.
[0142] Set roughness value: Set the roughness value of each mesh element based on the collected roughness values.
[0143] Set the time series of incoming water flow: Set the time series of incoming water flow, that is, the change of upstream water flow over time.
[0144] Solve the model: Use numerical methods to solve the model equations and obtain results such as water level and flow.
[0145] The outlet boundary refers to the flow state at the turbine outlet, including water velocity, pressure, water level, etc. The outlet boundary condition is an important parameter of the hydraulic model of a hydropower station, which affects the efficiency and stability of the turbine.
[0146] The outlet boundary conditions of a hydropower station turbine are usually determined by the following factors:
[0147] Downstream water level: Downstream water level refers to the observed water level in the river downstream of the hydropower station. The downstream water level will affect the outlet pressure of the turbine, which in turn affects the efficiency and power of the turbine.
[0148] Downstream flow: Downstream flow refers to the flow in the river downstream of the hydropower station. Downstream flow affects the outlet flow velocity of the turbine, which in turn affects the efficiency and stability of the turbine.
[0149] Turbine operating state: Turbine operating state refers to the turbine speed, opening and other parameters. Turbine operating state will affect the turbine outlet boundary conditions.
[0150] In the hydraulic model of a hydropower station, the outlet boundary conditions are usually expressed in the following way:
[0151] Fixed water level: The downstream water level is assumed to be fixed and not affected by the operation of the turbine.
[0152] Fixed flow: The downstream flow is assumed to be fixed and not affected by the operation of the turbine.
[0153] Water level-flow relationship: Establish a relationship between downstream water level and flow to reflect changes in downstream hydrological conditions.
[0154] Turbine characteristic curve: The turbine characteristic curve is used to represent the outlet boundary conditions of the turbine.
[0155] The determination of the outlet boundary conditions of the hydropower station turbine is an important part of the hydraulic model of the hydropower station. Choosing appropriate outlet boundary conditions can improve the accuracy and reliability of the model.
[0156] After determining the flow hydrodynamic model, the embodiment of the present invention can perform river hydrodynamic model calculation, and determine the measured water level value of the target river section through the constant flow hydrodynamic model based on the generator set flow time series data and the river terrain section data; determine the calculated flow time series value of the outlet boundary through the non-constant flow hydrodynamic model based on the generator set flow time series data, the river terrain section data and the measured water level value, and determine the generator set flow error time series value for the hydropower station turbine based on the river terrain section data through the calculated flow time series value.
[0157] Among them, the measured water level value is the water level calculated value for the target river section by the steady flow hydrodynamic model; the calculated flow time series value is the flow time series value for the outlet boundary obtained by calculating the non-steady flow hydrodynamics.
[0158] The embodiment of the present invention can also determine the generator set flow error time series value and the motor set flow error time series value for the hydropower station turbine by calculating the flow time series value and the river terrain section data, and correct the flow of the hydropower station turbine based on the generator set flow error time series value; wherein the motor set flow error time series value refers to the change of the difference between the actual value and the rated value of the hydropower station turbine flow in the time series. It reflects the degree and trend of the hydropower station turbine flow operation, so the flow of the hydropower station turbine can be corrected based on the generator set flow error time series value, thereby improving the operation efficiency of the hydropower station turbine.
[0159] According to an embodiment of the present invention, a time series data of the flow rate of a generator set is obtained, as well as the topographic cross-section data of the river channel from the downstream of the hydropower station to the water level station; a roughness value is determined through the time series data of the flow rate of the generator set and the topographic cross-section data of the river channel; a constant flow hydrodynamic model and a non-constant flow hydrodynamic model are generated based on the roughness value; a measured water level value of a target river section is determined through the constant flow hydrodynamic model based on the time series data of the flow rate of the generator set and the topographic cross-section data of the river channel; a calculated flow time series value of an outlet boundary is determined through the non-constant flow hydrodynamic model based on the time series data of the flow rate of the generator set, the topographic cross-section data of the river channel and the calculated water level value; a time series value of an error of the flow rate of the generator set for the turbine of the hydropower station is determined through the calculated flow time series value and the topographic cross-section data of the river channel; and the flow rate of the turbine of the hydropower station is corrected based on the time series value of the flow rate error of the generator set, thereby improving the operation efficiency of the turbine of the hydropower station.
[0160] Based on the above embodiment, a variant embodiment of the above embodiment is proposed. It should be noted that in order to make the description concise, only the differences from the above embodiment are described in the variant embodiment.
[0161] In an optional embodiment of the present invention, the river terrain section data includes time series data of water level of a downstream river water level station, and the step of determining the calculated water level value of the target river section based on the time series data of the flow rate of the generator set and the river terrain section data by the steady flow hydrodynamic model includes:
[0162] Determining the time series data of the flow rate of the generator set as the first upper boundary condition of the steady flow hydrodynamic model;
[0163] Determine the water level time series data of the downstream river water level station as the first lower boundary condition of the steady flow hydrodynamic model;
[0164] The calculated water level value of the target river section is determined by the steady flow hydrodynamic model.
[0165] In the specific implementation, the time series data of the flow rate of the generator set is taken as the upper boundary condition of the steady flow hydrodynamic model; the time series data of the water level of the downstream river water level station is taken as the lower boundary condition of the steady flow hydrodynamic model. The measured water level values at various locations along the river section are obtained through the calculation of the steady flow hydrodynamic model.
[0166] Exemplarily, the following steps may be included:
[0167] 1. Data preparation:
[0168] Collect data:
[0169] Generator flow time series data: Collect the flow of turbines at different time points. The data can be obtained from the SCADA system of the power station.
[0170] Downstream river water level station water level time series data: Collect the changes in the observed water level at the downstream river water level station at different time points. The data can be obtained from the data logger of the river water level station.
[0171] Check data quality: Make sure data is accurate and consistent. Check for errors, outliers, and missing values. Correct or remove errors and outliers, and estimate missing values using interpolation or other methods.
[0172] Convert the data to a consistent format: Convert both datasets to a consistent format, such as a CSV file or spreadsheet. Ensure that the timestamps of the two datasets are synchronized for accurate comparison.
[0173] 2. Model Setup
[0174] Select a steady-state hydraulic model: Select an appropriate steady-state hydraulic model that is suitable for the application and has the necessary functions. Commonly used steady-state hydraulic models include HEC-RAS, MIKE 11, and Flow3D.
[0175] Define model geometry: Create a digital representation of the river channel, including its dimensions, topography, and any relevant features. This can be done using GIS software or other modeling tools.
[0176] Set model parameters: Specify model parameters, including Manning's roughness coefficient, upstream boundary conditions (time series data of flow rate at generator set) and downstream boundary conditions (time series data of water level at downstream river level station).
[0177] 3. Model Execution
[0178] Run the model: Run the steady-state hydraulic model using the prepared data and defined parameters. The model will simulate the flow of water in the river channel and calculate the water level at each location along the river segment.
[0179] Analyze results: After the model is run, analyze the calculated water level values. Identify if there are any patterns or trends in water levels along the river section. If available, compare simulated water levels to observed water levels to assess the accuracy of the model.
[0180] The accuracy of the model depends on the quality of the data and the accuracy of the model settings.
[0181] The Manning roughness coefficient varies depending on flow conditions, streambed material, and vegetation.
[0182] Before using a model to make decisions, the limitations of the model should be carefully considered.
[0183] By following the above steps, generator flow and downstream river level data can be effectively used to calculate water levels in river sections, which can provide valuable insights into river flow dynamics and support various water management applications.
[0184] In an optional embodiment of the present invention, the step of determining the calculated flow time series value of the outlet boundary based on the generator set flow time series data, the river channel topographic section data and the measured water level value through the unsteady flow hydrodynamic model includes:
[0185] Determining the time series data of the flow rate of the generator set as the second upper boundary condition of the unsteady flow hydrodynamic model;
[0186] Determine the water level time series data of the downstream river water level station as the second lower boundary condition of the unsteady flow hydrodynamic model;
[0187] Determining the measured water level value as the initial condition of the unsteady flow hydrodynamic model;
[0188] The calculated flow rate time series values at the outlet boundary are determined by the unsteady flow hydrodynamic model.
[0189] In a specific implementation, the embodiment of the present invention can use the time series data of the flow rate of the generator set as the upper boundary condition of the non-steady flow hydrodynamic model; the time series data of the water level of the downstream river water level station as the lower boundary condition of the non-steady flow hydrodynamic model; and the measured water level values at various positions along the river section as the initial conditions of the non-steady flow hydrodynamic model. The calculated flow time series value of the outlet boundary is obtained through the calculation of the non-steady flow hydrodynamic model.
[0190] 1. Data preparation:
[0191] Collect data:
[0192] Generator flow time series data: Collect the flow of turbines at different time points. The data can be obtained from the SCADA system of the power station.
[0193] Downstream river water level station water level time series data: Collect the changes in the observed water level at the downstream river water level station at different time points. The data can be obtained from the data logger of the river water level station.
[0194] The calculated water level at various locations along the river reach: This is the result of the last run of the steady-flow hydrodynamic model, or it can be estimated by other methods.
[0195] Check data quality: Make sure data is accurate and consistent. Check for errors, outliers, and missing values. Correct or remove errors and outliers, and estimate missing values using interpolation or other methods.
[0196] Convert the data to a consistent format: Convert the three data sets to a consistent format, such as a CSV file or spreadsheet. Ensure that the timestamps of the three data sets are synchronized for accurate comparison.
[0197] 2. Model Setup
[0198] Select an unsteady flow hydrodynamic model: Select an appropriate unsteady flow hydrodynamic model that is suitable for the application and has the necessary functions. Common unsteady flow hydrodynamic models include the Saint-Venant-Manning unsteady model, the momentum conservation model, etc.
[0199] Define model geometry: Create a digital representation of the river channel, including its dimensions, topography, and any relevant features. This can be done using GIS software or other modeling tools.
[0200] Set model parameters: Specify model parameters, including Manning's roughness coefficient, upstream boundary conditions (time series data of flow rate at generator sets), downstream boundary conditions (time series data of water level at downstream river level stations), and initial conditions (calculated water level values at various locations along the river section).
[0201] 3. Model Execution
[0202] Run the model: Run the unsteady flow hydrodynamic model using the prepared data and defined parameters. The model will simulate the flow of water in the river channel and calculate the calculated flow time series values at the outlet boundary.
[0203] Analyze the results: After the model is run, analyze the calculated flow time series values. Identify if there are any patterns or trends in the flow. If available, compare the simulated flow to the observed flow to assess the accuracy of the model.
[0204] The accuracy of the model depends on the quality of the data and the accuracy of the model settings.
[0205] The Manning roughness coefficient varies depending on flow conditions, streambed material, and vegetation.
[0206] Before using a model to make decisions, the limitations of the model should be carefully considered.
[0207] By following the above steps, the generator flow, downstream river level and reach level values can be effectively utilized to obtain the calculated flow time series values at the outlet boundary, which can provide valuable insights into river flow dynamics and support various water management applications.
[0208] In an optional embodiment of the present invention, the river terrain section data includes flow time series data monitored by a downstream river water level station, and the step of determining a generator set flow error time series value for a turbine of the hydropower station through the calculated flow time series value and the river terrain section data includes:
[0209] Determine the calculated flow integral and the monitored flow integral using the calculated flow time series values and the monitored flow time series data of the downstream river water level station;
[0210] Determining an integral difference between the monitored flow integral and the calculated flow integral;
[0211] A first-order derivative is performed based on the integral difference to determine a time series value of a generator set flow error for the turbine of the hydropower station.
[0212] In the specific implementation, the calculated flow time series values at the outlet boundary and the monitored flow time series data at the downstream river water level station are mathematically integrated over time to obtain the calculated flow integral and the monitored flow integral; the monitored flow integral is subtracted from the calculated flow integral to obtain the integral difference, i.e., integral difference = monitored flow integral - calculated flow integral; the first-order derivative of the integral difference is calculated to obtain the derivative of the integral difference, which is the time series value of the generator set overcurrent flow error.
[0213] The embodiment of the present invention determines the calculated flow integral and the monitored flow integral by adopting the calculated flow time series value and the monitored flow time series data of the downstream river water level station; determines the integral difference between the monitored flow integral and the calculated flow integral; and determines the generator set overflow flow error time series value for the turbine of the hydropower station based on a first-order derivative, thereby improving the calculation efficiency of the generator set overflow flow error time series value.
[0214] In an optional embodiment of the present invention, the river terrain section data includes a water level monitored by a downstream river water level station, and the step of correcting the flow rate of the turbine of the hydropower station based on the flow rate error time series value of the generator set includes:
[0215] Determine a propagation time, and determine an extension length of the time series data of the overcurrent flow of the generator set by using the propagation time;
[0216] Determining a third upper boundary condition of the unsteady flow hydrodynamic model by using the extension length and the time series data of the flow rate of the generator set;
[0217] Determining the monitored water level of the downstream river channel water level station as the third lower boundary condition of the unsteady flow hydrodynamic model;
[0218] Determine the characteristic flow time series value of the outlet boundary by the unsteady flow hydrodynamic model;
[0219] Determine the initial moment of characteristic flow;
[0220] Determine the time variation value of characteristic error flow rate through the characteristic flow time series value;
[0221] The time-varying value of the characteristic error flow and the initial moment of the characteristic flow are used to determine the time correction result of the time series value of the generator set flow error, and the correction result is used to correct the flow of the turbine of the hydropower station.
[0222] Considering that there is a certain propagation time for water from the generator set to the downstream water level monitoring station, the time series value of the flow error needs to be advanced by a certain time.
[0223] Exemplarily, the propagation time can be calculated using the unsteady flow hydrodynamic model as follows:
[0224] The first data point of the boundary condition time series of the calculated data is used as the boundary condition and extended for a certain time length, which is not shorter than the propagation time. For example, assuming that the first data point of the generator set overcurrent flow time series data is 1000m 3 / s, then 1000m 3 / s is used as the upper boundary condition of the unsteady flow hydrodynamic model; assuming that the water level monitored by the downstream water level monitoring station is 50m, 50m is used as the third lower boundary condition of the unsteady flow hydrodynamic model.
[0225] On the basis of the third upper boundary condition, an additional characteristic flow is added, the characteristic flow value is not greater than 5% of the condition value of the third upper boundary condition, and the characteristic flow duration is consistent with the upper boundary condition data interval. For example, if the third upper boundary condition has one data every 1 hour, the characteristic flow duration is 1 hour. Record the time corresponding to the characteristic flow as the initial time of the characteristic flow.
[0226] Using the unsteady flow hydrodynamic model, the characteristic flow time series values at the outlet boundary are calculated.
[0227] Determine the calculated flow integral and the monitored flow integral using the characteristic flow time series value and the monitored flow time series data of the downstream river water level station;
[0228] Determining an integral difference between the monitored flow integral and the calculated flow integral;
[0229] A first-order derivative is performed based on the integral difference to determine a time-varying value of a characteristic error flow rate for the turbine of the hydropower station.
[0230] The time corresponding to the time when the characteristic error flow rate is not 0 is the target time when the characteristic flow rate is transmitted to the water level station. The target time minus the initial time of the characteristic flow rate can obtain the time correction result of the error time series value of the generator flow rate. At this time, the correction result can be used to correct the flow rate of the turbine of the hydropower station.
[0231] In an optional embodiment of the present invention, it also includes:
[0232] The generator set flow rate time series data and the generator set flow rate error time series value are superimposed to determine as the fourth upper boundary condition of the unsteady flow hydrodynamic model;
[0233] The flow time series data monitored by the downstream river water level station is used as the fourth lower boundary condition of the unsteady flow hydrodynamic model;
[0234] Determine the calculated water level time series value of the outlet boundary by the unsteady flow hydrodynamic model;
[0235] The water level time series data of the downstream river water level station and the calculated water level time series value are used to generate a verification result, and the verification result is used to verify the correction result.
[0236] Optionally, the step of using the downstream river channel water level station water level time series data and the calculated water level time series value to generate a verification result, and using the verification result to verify the correction result includes:
[0237] Generate a first image using the water level time series data of the downstream river water level station;
[0238] Generate a second image using the calculated water level time series values;
[0239] When the water level difference between the first image and the second image is less than a preset water level difference threshold, it is determined that the correction result is valid.
[0240] In practical applications, after the correction result is determined, in order to further improve the control efficiency of the overflow flow, the correction result can be further verified.
[0241] For example, the generator set flow time series data and the generator set flow error time series values can be superimposed as the fourth upper boundary condition of the non-steady flow hydrodynamic model; the downstream river water level station monitoring flow time series data can be used as the fourth lower boundary condition of the non-steady flow hydrodynamic model; the measured water level values at various locations along the river section can be used as the initial conditions of the non-steady flow hydrodynamic model. The calculated water level time series values of the outlet boundary can be obtained through the calculation of the non-steady flow hydrodynamic model.
[0242] The first image is an image representing the time series data of the water level at the downstream river water level station, and the second image is an image representing the time series values of the calculated water level.
[0243] Comparing the first image with the second image, if the difference between the two water levels in the figure is small (the maximum water level difference is less than 0.1m), it means that the result of the generator set overcurrent flow correction is good.
[0244] Overcurrent flow verification:
[0245] According to the turbine output formula:
[0246] P = 9.81 × Q × H × η
[0247] Where P is the power generation power (kW), Q is the flow rate of the unit (m³ / s), H is the working head of the unit (m), and η is the efficiency, which has no unit.
[0248] P can be directly obtained through the time series data of the operating status of the generator set; H can be obtained by subtracting the time series data of the water level in front of the hydropower station dam from the time series data of the water level below the hydropower station dam; Q is the correction value of the overcurrent flow of the generator set.
[0249] In order to enable those skilled in the art to better understand the embodiments of the present invention, a complete example is used below to illustrate the embodiments of the present invention.
[0250] Step 1: Data preparation
[0251] Determine the generating set to be calibrated, collect the generating set flow time series data, generating set operating status time series data, hydropower station dam water level time series data, hydropower station dam water level time series data, river channel topography section data from the downstream of the hydropower station to the water level station, downstream river channel water level station water level time series data, downstream river channel water level station monitoring water level, downstream river channel water level station monitoring flow time series data.
[0252] Step 2: Construct a river hydrodynamic model
[0253] Based on the topographic cross-section data of the river channel from the downstream of the hydropower station to the water level station, a steady-flow hydrodynamic model and a non-steady-flow hydrodynamic model suitable for the river channel are constructed.
[0254] The roughness of the steady flow hydrodynamic model is determined using the time series data of the generator set's flow rate, the time series data of the water level at the downstream river level station, the water level monitored by the downstream river level station, and the time series data of the flow monitored by the downstream river level station.
[0255] Generally speaking, the downstream water level station is often not far from the hydropower station, and the hydrodynamic characteristics have almost no obvious changes. Therefore, the unsteady flow hydrodynamic model can use the roughness value of the steady flow hydrodynamic model.
[0256] Step 3: Calculation of river hydrodynamic model
[0257] 3.1 Take the time series data of the flow rate of the generator set as the upper boundary condition of the steady flow hydrodynamic model;
[0258] The water level time series data of the downstream river water level station are taken as the lower boundary condition of the steady flow hydrodynamic model. The calculated water level values at various locations along the river section are obtained through the steady flow hydrodynamic model calculation.
[0259] 3.2 The flow time series data of the generator set is used as the upper boundary condition of the unsteady flow hydrodynamic model; the water level time series data of the downstream river water level station is used as the lower boundary condition of the unsteady flow hydrodynamic model; the calculated water level values at various locations along the river section are used as the initial conditions of the unsteady flow hydrodynamic model. The calculated flow time series values of the outlet boundary are obtained through the calculation of the unsteady flow hydrodynamic model.
[0260] Step 4: Calculation of the generator set overcurrent flow error
[0261] 4.1 Perform mathematical area integral calculation on the calculated flow time series values at the outlet boundary and the monitored flow time series data at the downstream river water level station in time to obtain the calculated flow integral and the monitored flow integral.
[0262] 4.2 Subtract the calculated flow integral from the monitored flow integral to obtain the integral difference.
[0263] Right now:
[0264] Integral difference = monitoring flow integral - calculated flow integral
[0265] 4.3 Calculate the first-order derivative of the integral difference and obtain the derivative of the integral difference, which is the time series value of the overcurrent flow error of the generator set.
[0266] Step 5: Correction of the time series value of the generator set overcurrent flow error in time
[0267] Considering that there is a certain propagation time for water from the generator set to the downstream water level monitoring station, the time series value of the flow error needs to be advanced by a certain time.
[0268] The propagation time is calculated using the unsteady flow hydrodynamic model:
[0269] 5.1 Take the first data point of the boundary condition time series of the calculated data as the boundary condition and extend it for a certain time length, which is not shorter than the propagation time. For example: Assume that the first data point of the generator set overcurrent flow time series data is 1000m 3 / s, then 1000m 3 / s is used as the upper boundary condition of the unsteady flow hydrodynamic model; assuming that the water level monitored by the downstream water level monitoring station is 50m, 50m is used as the lower boundary condition of the unsteady flow hydrodynamic model.
[0270] 5.2 On the basis of the upper boundary condition, an additional characteristic flow is added, the characteristic flow value is not greater than 5% of the upper boundary condition value, and the characteristic flow duration is consistent with the upper boundary condition data interval. For example, if the upper boundary condition has one data every 1 hour, the characteristic flow duration is 1 hour. Record the time corresponding to the characteristic flow as the initial time of the characteristic flow.
[0271] 5.3 Using the unsteady flow hydrodynamic model, calculate the characteristic flow time series value at the outlet boundary. Repeat step 4 to obtain the characteristic error flow value changing with time.
[0272] 5.4 The time corresponding to the time when the characteristic error flow rate changes with time and is not 0 is the time when the characteristic flow rate propagates to the water level station. Subtracting the initial time of the characteristic flow rate from this time, the time correction result of the time series value of the generator set flow error can be obtained.
[0273] Step 6: Result verification
[0274] 6.1 The time series data of the flow rate of the generator set and the time series value of the flow rate error of the generator set are superimposed as the upper boundary conditions of the non-steady flow hydrodynamic model; the time series data of the flow rate monitored by the downstream river water level station are used as the lower boundary conditions of the non-steady flow hydrodynamic model; the calculated water level values at various locations along the river section are used as the initial conditions of the non-steady flow hydrodynamic model. The calculated water level time series values of the outlet boundary are obtained through the calculation of the non-steady flow hydrodynamic model.
[0275] 6.2 Draw a graph of the water level time series data of the downstream river water level station and the calculated water level time series values. If the difference between the two water levels in the graph is small (the maximum water level difference is less than 0.1m), it means that the result of the generator set flow correction is good.
[0276] Step 7: Check the flow rate
[0277] According to the turbine output formula:
[0278] P = 9.81 × Q × H × η
[0279] Where P is the power generation power (kW), Q is the flow rate of the unit (m³ / s), H is the working head of the unit (m), and η is the efficiency, which has no unit.
[0280] P can be directly obtained through the time series data of the operating status of the generator set; H can be obtained by subtracting the time series data of the water level in front of the hydropower station dam from the time series data of the water level below the hydropower station dam; Q is the correction value of the overcurrent flow of the generator set.
[0281] It should be noted that, for the sake of simplicity, the method embodiments are described as a series of action combinations, but those skilled in the art should be aware that the embodiments of the present invention are not limited by the order of the actions described, because according to the embodiments of the present invention, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions involved are not necessarily required by the embodiments of the present invention.
[0282] Reference Figure 2 , shows a structural block diagram of a hydropower station turbine flow correction device based on river water power provided in an embodiment of the present invention, which may specifically include the following modules:
[0283] The river terrain section data acquisition module 201 is used to obtain the time series data of the flow rate of the generator set and the river terrain section data from the downstream of the hydropower station to the water level station;
[0284] A roughness value determination module 202, used to determine the roughness value through the time series data of the flow rate of the generator set and the river terrain section data;
[0285] A hydrodynamic model generation module 230, for generating a steady hydrodynamic model and a non-steady hydrodynamic model based on the roughness value;
[0286] The calculated water level value determination module 204 is used to determine the calculated water level value of the target river section based on the time series data of the flow rate of the generator set and the river terrain section data through the steady flow hydrodynamic model;
[0287] The calculated flow time series value determination module 205 is used to determine the calculated flow time series value of the outlet boundary based on the flow time series data of the generator set, the river topographic section data and the measured water level value through the unsteady flow hydrodynamic model;
[0288] A generator set flow error time series value determination module 206 is used to determine the generator set flow error time series value for the turbine of the hydropower station through the calculated flow time series value and the river terrain section data;
[0289] The flow rate correction module 207 is used to correct the flow rate of the turbine of the hydropower station based on the time series value of the flow rate error of the generator set.
[0290] As for the device embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0291] In addition, an embodiment of the present invention also provides an electronic device, including: a processor, a memory, and a computer program stored in the memory and executable on the processor. When the computer program is executed by the processor, the various processes of the above-mentioned embodiment of the method for correcting the flow rate of a hydropower station turbine based on river water power are implemented, and the same technical effect can be achieved. To avoid repetition, it will not be described here.
[0292] The embodiment of the present invention also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, each process of the embodiment of the hydropower station turbine flow correction method based on river water power is implemented, and the same technical effect can be achieved. To avoid repetition, it is not repeated here. The computer-readable storage medium is, for example, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0293] Figure 3 A schematic diagram of the hardware structure of an electronic device for implementing various embodiments of the present invention.
[0294] The electronic device 300 includes but is not limited to: a radio frequency unit 301, a network module 302, an audio output unit 303, an input unit 304, a sensor 305, a display unit 306, a user input unit 307, an interface unit 308, a memory 309, a processor 310, and a power supply 311. Those skilled in the art will appreciate that Figure 3 The electronic device structure shown in the figure does not constitute a limitation on the electronic device, and the electronic device may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently. In the embodiments of the present invention, the electronic device includes but is not limited to a mobile phone, a tablet computer, a laptop computer, a PDA, a vehicle-mounted terminal, a wearable device, and a pedometer.
[0295] It should be understood that in the embodiment of the present invention, the radio frequency unit 301 can be used for receiving and sending signals during information transmission or communication. Specifically, after receiving downlink data from the base station, it is sent to the processor 310 for processing; in addition, uplink data is sent to the base station. Generally, the radio frequency unit 301 includes but is not limited to an antenna, at least one amplifier, a transceiver, a coupler, a low noise amplifier, a duplexer, etc. In addition, the radio frequency unit 301 can also communicate with the network and other devices through a wireless communication system.
[0296] The electronic device provides users with wireless broadband Internet access through the network module 302, such as helping users to send and receive emails, browse web pages, and access streaming media.
[0297] The audio output unit 303 can convert the audio data received by the RF unit 301 or the network module 302 or stored in the memory 309 into an audio signal and output it as sound. Moreover, the audio output unit 303 can also provide audio output related to a specific function performed by the electronic device 300 (for example, a call signal reception sound, a message reception sound, etc.). The audio output unit 303 includes a speaker, a buzzer, a receiver, etc.
[0298] The input unit 304 is used to receive audio or video signals. The input unit 304 may include a graphics processor (GPU) 3041 and a microphone 3042. The graphics processor 3041 processes the image data of a static picture or video obtained by an image capture device (such as a camera) in a video capture mode or an image capture mode. The processed image frame can be displayed on the display unit 306. The image frame processed by the graphics processor 3041 can be stored in the memory 309 (or other storage medium) or sent via the radio frequency unit 301 or the network module 302. The microphone 3042 can receive sound and can process such sound into audio data. The processed audio data can be converted into a format output that can be sent to a mobile communication base station via the radio frequency unit 301 in the case of a telephone call mode.
[0299] The electronic device 300 also includes at least one sensor 305, such as a light sensor, a motion sensor, and other sensors. Specifically, the light sensor includes an ambient light sensor and a proximity sensor, wherein the ambient light sensor can adjust the brightness of the display panel 3061 according to the brightness of the ambient light, and the proximity sensor can turn off the display panel 3061 and / or the backlight when the electronic device 300 is moved to the ear. As a type of motion sensor, the accelerometer sensor can detect the magnitude of acceleration in each direction (generally three axes), and can detect the magnitude and direction of gravity when stationary, which can be used to identify the posture of the electronic device (such as horizontal and vertical screen switching, related games, magnetometer posture calibration), vibration recognition related functions (such as pedometer, tapping), etc.; the sensor 305 can also include a fingerprint sensor, a pressure sensor, an iris sensor, a molecular sensor, a gyroscope, a barometer, a hygrometer, a thermometer, an infrared sensor, etc., which will not be repeated here.
[0300] The display unit 306 is used to display information input by the user or information provided to the user. The display unit 306 may include a display panel 3061, which may be configured in the form of a liquid crystal display (LCD), an organic light-emitting diode (OLED), or the like.
[0301] The user input unit 307 can be used to receive input digital or character information, and generate key signal input related to user settings and function control of the electronic device. Specifically, the user input unit 307 includes a touch panel 3071 and other input devices 3072. The touch panel 3071, also known as a touch screen, can collect user touch operations on or near it (such as operations performed by users using fingers, styluses, or any other suitable objects or accessories on or near the touch panel 3071). The touch panel 3071 may include two parts: a touch detection device and a touch controller. Among them, the touch detection device detects the user's touch orientation, detects the signal brought by the touch operation, and transmits the signal to the touch controller; the touch controller receives the touch information from the touch detection device, converts it into contact point coordinates, and then sends it to the processor 310, receives the command sent by the processor 310 and executes it. In addition, the touch panel 3071 can be implemented in various types such as resistive, capacitive, infrared, and surface acoustic waves. In addition to the touch panel 3071, the user input unit 307 may also include other input devices 3072. Specifically, other input devices 3072 may include but are not limited to a physical keyboard, function keys (such as volume control keys, switch keys, etc.), a trackball, a mouse, and a joystick, which are not described in detail here.
[0302] Furthermore, the touch panel 3071 may be overlaid on the display panel 3061. When the touch panel 3071 detects a touch operation on or near it, it is transmitted to the processor 310 to determine the type of touch event. Then, the processor 310 provides corresponding visual output on the display panel 3061 according to the type of touch event. Figure 3 In the figure, the touch panel 3071 and the display panel 3061 are used as two independent components to realize the input and output functions of the electronic device. However, in some embodiments, the touch panel 3071 and the display panel 3061 can be integrated to realize the input and output functions of the electronic device, which is not limited here.
[0303] The interface unit 308 is an interface for connecting an external device to the electronic device 300. For example, the external device may include a wired or wireless headset port, an external power supply (or battery charger) port, a wired or wireless data port, a memory card port, a port for connecting a device with an identification module, an audio input / output (I / O) port, a video I / O port, a headphone port, etc. The interface unit 308 may be used to receive input (e.g., data information, power, etc.) from an external device and transmit the received input to one or more elements within the electronic device 300 or may be used to transmit data between the electronic device 300 and an external device.
[0304] The memory 309 can be used to store software programs and various data. The memory 309 can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area can store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory 309 can include a high-speed random access memory, and can also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0305] The processor 310 is the control center of the electronic device. It uses various interfaces and lines to connect various parts of the entire electronic device. By running or executing software programs and / or modules stored in the memory 309 and calling data stored in the memory 309, it performs various functions of the electronic device and processes data, thereby monitoring the electronic device as a whole. The processor 310 may include one or more processing units; preferably, the processor 310 may integrate an application processor and a modem processor, wherein the application processor mainly processes the operating system, user interface, and application programs, and the modem processor mainly processes wireless communications. It is understandable that the above-mentioned modem processor may not be integrated into the processor 310.
[0306] The electronic device 300 may also include a power source 311 (such as a battery) for supplying power to various components. Preferably, the power source 311 may be logically connected to the processor 310 through a power management system, thereby implementing functions such as charging, discharging, and power consumption management through the power management system.
[0307] In addition, the electronic device 300 includes some functional modules not shown, which will not be described in detail here.
[0308] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0309] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course can also be implemented by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for enabling a terminal (which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to execute the methods described in each embodiment of the present invention.
[0310] like Figure 4 As shown, in another embodiment provided by the present invention, a computer-readable storage medium 401 is also provided, in which instructions are stored. When the computer-readable storage medium 401 is run on a computer, the computer executes the method for correcting the flow rate of a hydropower station turbine based on river water power as described in the above embodiment.
[0311] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation modes, which are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, all of which are within the protection of the present invention.
[0312] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed in the embodiments of the present invention can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0313] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0314] In the embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0315] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0316] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0317] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as USB flash drives, mobile hard disks, ROM, RAM, magnetic disks, or optical disks.
[0318] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A method for correcting the flow rate of a turbine in a hydropower station based on river water power, characterized in that: include: Obtain the time series data of the flow rate of the generator set and the river topographic cross-section data from the downstream of the hydropower station to the water level station; Determine the roughness value through the time series data of the flow rate of the generator set and the river topography section data; generating a steady flow hydrodynamic model and a non-steady flow hydrodynamic model based on the roughness value; Determine the calculated water level value of the target river section through the steady flow hydrodynamic model based on the time series data of the flow rate of the generator set and the river topographic section data; Determine the calculated flow time series value of the outlet boundary through the unsteady flow hydrodynamic model based on the flow time series data of the generator set, the river topographic section data and the measured water level value; Determine the error time series value of the flow rate of the generator set of the hydropower station turbine by using the calculated flow time series value and the river terrain section data; The flow rate of the turbine of the hydropower station is corrected based on the time series value of the flow rate error of the generator set.
2. The method according to claim 1, characterized in that The river terrain section data includes the time series data of the water level of the downstream river water level station, and the step of determining the calculated water level value of the target river section based on the time series data of the flow rate of the generator set and the river terrain section data through the steady flow hydrodynamic model includes: Determining the time series data of the flow rate of the generator set as the first upper boundary condition of the steady flow hydrodynamic model; Determine the water level time series data of the downstream river water level station as the first lower boundary condition of the steady flow hydrodynamic model; The calculated water level value of the target river section is determined by the steady flow hydrodynamic model.
3. The method according to claim 2, characterized in that The step of determining the calculated flow time series value of the outlet boundary through the unsteady flow hydrodynamic model based on the generator set flow time series data, the river channel topographic section data and the measured water level value comprises: Determining the time series data of the flow rate of the generator set as the second upper boundary condition of the unsteady flow hydrodynamic model; Determine the water level time series data of the downstream river water level station as the second lower boundary condition of the unsteady flow hydrodynamic model; Determining the measured water level value as the initial condition of the unsteady flow hydrodynamic model; The calculated flow rate time series values at the outlet boundary are determined by the unsteady flow hydrodynamic model.
4. The method according to claim 3, characterized in that The river terrain section data includes flow time series data monitored by a downstream river water level station, and the step of determining a flow error time series value of a generator set for a turbine of the hydropower station through the calculated flow time series value and the river terrain section data includes: Determine the calculated flow integral and the monitored flow integral using the calculated flow time series values and the monitored flow time series data of the downstream river water level station; Determining an integral difference between the monitored flow integral and the calculated flow integral; A first-order derivative is performed based on the integral difference to determine a time series value of a generator set flow error for the turbine of the hydropower station.
5. The method according to claim 4, characterized in that The river terrain section data includes the water level monitored by the downstream river water level station, and the step of correcting the flow rate of the turbine of the hydropower station based on the flow rate error time series value of the generator set includes: Determine a propagation time, and determine an extension length of the time series data of the overcurrent flow of the generator set by using the propagation time; Determining a third upper boundary condition of the unsteady flow hydrodynamic model by using the extension length and the time series data of the flow rate of the generator set; Determining the monitored water level of the downstream river channel water level station as the third lower boundary condition of the unsteady flow hydrodynamic model; Determine the characteristic flow time series value of the outlet boundary by the unsteady flow hydrodynamic model; Determine the initial time of characteristic flow; Determine the time variation value of characteristic error flow rate through the characteristic flow time series value; The time-varying value of the characteristic error flow and the initial moment of the characteristic flow are used to determine the time correction result of the time series value of the generator set flow error, and the correction result is used to correct the flow of the turbine of the hydropower station.
6. The method according to claim 5, characterized in that Also includes: The generator set flow rate time series data and the generator set flow rate error time series value are superimposed to determine as the fourth upper boundary condition of the unsteady flow hydrodynamic model; The flow time series data monitored by the downstream river water level station is used as the fourth lower boundary condition of the unsteady flow hydrodynamic model; Determine the calculated water level time series value of the outlet boundary by the unsteady flow hydrodynamic model; The water level time series data of the downstream river water level station and the calculated water level time series value are used to generate a verification result, and the verification result is used to verify the correction result.
7. The method according to claim 6, characterized in that The step of using the downstream river channel water level station water level time series data and the calculated water level time series value to generate a verification result, and using the verification result to verify the correction result includes: Generate a first image using the water level time series data of the downstream river water level station; Generate a second image using the calculated water level time series values; When the water level difference between the first image and the second image is less than a preset water level difference threshold, it is determined that the correction result is valid.
8. A flow correction device for a turbine in a hydropower station based on river water power, characterized in that: include: The river terrain section data acquisition module is used to obtain the time series data of the flow rate of the generator set and the river terrain section data from the downstream of the hydropower station to the water level station; A roughness value determination module, used to determine the roughness value through the time series data of the flow rate of the generator set and the river terrain section data; A flow hydrodynamic model generation module, used for generating a steady flow hydrodynamic model and a non-steady flow hydrodynamic model based on the roughness value; A calculated water level value determination module, used to determine the calculated water level value of the target river section based on the time series data of the flow rate of the generator set and the river terrain section data through the steady flow hydrodynamic model; A calculation flow time series value determination module is used to determine the calculation flow time series value of the outlet boundary based on the flow time series data of the generator set, the river topographic section data and the measured water level value through the non-steady flow hydrodynamic model; A generator set flow error time series value determination module, used to determine the generator set flow error time series value for the turbine of the hydropower station through the calculated flow time series value and the river terrain section data; The overflow flow correction module is used to correct the overflow flow of the turbine of the hydropower station based on the overflow flow error time series value of the generator set.
9. An electronic device, characterized in that: It includes a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other through the communication bus; The memory is used to store computer programs; The processor is used to implement the method according to any one of claims 1 to 7 when executing the program stored in the memory.
10. A computer-readable storage medium having instructions stored thereon, which, when executed by one or more processors, cause the processors to perform the method according to any one of claims 1 to 7.
Citation Information
Patent Citations
Method for calculating stable sealing period riverway ice prevention safety excess flow based on flat beach flow
CN113836477A
Hydropower station discharged ecological flow evaluation method and device, storage medium and equipment
CN115423182A