A wind tunnel ultra-low dew point test method based on cavity ring-down spectroscopy test principle

By designing a multi-functional and multi-mode dew point testing system in the wind tunnel, combined with the cavity ring-down spectrum analyzer and auxiliary systems, the problem of rapid accuracy of extremely low dew point measurements in the wind tunnel is solved, and high precision and fast response are achieved. Dew point test is suitable for wind tunnel environments under complex working conditions.

CN118670676BActive Publication Date: 2024-10-29CHINA AERODYNAMIC RES & DEV CENT EQUIP DESIGN & TESTING TECH INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411164954.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-10-29
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

The rapid and accurate measurement of extremely low dew points in wind tunnels is an unsolved technical problem in the world. Especially under complex working conditions, it is difficult for existing equipment based on the optical cavity ring-down spectroscopy test principle to achieve fast response and high-precision measurement.

Method used

A multi-functional and multi-mode dew point testing system is designed, including a cavity ring-down spectrum analyzer and auxiliary system. It uses bypass purge testing, pipeline electric heating system, bypass flow system and control system to achieve Real-time tracking monitoring and fast and accurate measurements at extremely low dew points in wind tunnels.

Benefits of technology

It achieves high accuracy of dew point testing (accuracy up to ±0.5℃~±1.3℃) and fast response, is suitable for wind tunnel dew point testing under complex working conditions, and meets the fast and high precision requirements of extremely low dew points in wind tunnels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118670676B_ABST
    Figure CN118670676B_ABST
Patent Text Reader

Abstract

The present invention provides a method for testing extremely low dew point in a wind tunnel based on the principle of cavity ring-down spectroscopy testing. The scheme adopts a multifunctional and multi-mode system structure design in the design of the dew point test system. The system mainly includes an optical cavity ring-down spectrometer and an auxiliary system. The optical cavity ring-down spectrometer is mainly responsible for completing the moisture content test and converting it into normal pressure dew point; the auxiliary system mainly includes a bypass purge test system (purifier, etc.), a pipeline electric heating system, a bypass flow system (flow meter, etc.), a sampling system (pipeline, valve, etc.) and a control system, etc., which has multiple functions such as pipeline purge and on-site detection, pipeline heating and water removal, large flow rapid water removal, gas sampling, and control. In addition, the standby protection working mode, purge working mode, self-test working mode, test working mode and other multi-modes are adopted to realize the real-time tracking and monitoring of the extremely low dew point in the wind tunnel, and accurate wind tunnel dew point test data can be quickly given under various working conditions of the wind tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wind tunnel dew point measurement, in particular to a wind tunnel extremely low dew point testing method based on the optical cavity ring-down spectroscopy testing principle. Background Art

[0002] Dew point is an important indicator reflecting the micro-water content in the gas. Dew point temperature refers to the temperature corresponding to when the water vapor partial pressure (i.e., absolute water content) remains unchanged and the wet air reaches saturation. Generally, it is called dew point above zero degrees and frost point below zero degrees. The rapid and accurate measurement of extremely low dew point in wind tunnels is a technical problem that has not yet been solved in the field of humidity in the world. It not only needs to reach the extremely low dew point range (-100°C), but also needs to ensure fast test response tracking under extremely low dew point. At present, although there is research and development of analyzers based on the principle of cavity ring-down spectroscopy testing, they are generally used under stable pressure, temperature and other test conditions, which is different from the actual test in the wind tunnel. The working conditions in the wind tunnel are complex, the pressure and temperature of the test medium vary widely, the gas cleanliness is not ideal, and the sampling gas path is long, so the test is difficult. At present, there is no actual test case for extremely low dew point in wind tunnels based on the principle of cavity ring-down spectroscopy testing in China. Summary of the invention

[0003] The purpose of the present invention is to solve the technical problems of extremely low dew point and fast test response speed in actual wind tunnel testing, and to provide a wind tunnel extremely low dew point rapid testing method based on the optical cavity ring-down spectroscopy testing principle.

[0004] The dew point test system is installed near the gas outlet of the opening at the dew point test position in the wind tunnel section. In order to achieve fast and high-precision testing of extremely low dew points, the dew point test system needs to consider not only the accuracy and response time of the analyzer itself, but also the following: At extremely low dew points, the moisture content of the gas in the wind tunnel is extremely low, and any micro-leakage in the sampling pipeline will cause inaccurate testing; at the same time, considering the surface adsorption characteristics of moisture, how to quickly remove moisture from the inner surface of the sampling pipeline is very critical to improving the response time of the dew point test; it is also necessary to consider the use conditions and working conditions of the test site, such as changes in gas pressure and temperature in the wind tunnel and the cleanliness of the gas.

[0005] Based on the above considerations, the dew point test system is designed with a multifunctional and multi-mode system structure. The system mainly includes a cavity ring-down spectrometer and an auxiliary system. The cavity ring-down spectrometer is mainly responsible for completing the moisture content test and converting it into normal pressure dew point; the auxiliary system mainly includes a bypass purge test system (purifier, etc.), a pipeline electric heating system (thermal resistor, heating belt, temperature controller, etc.), a bypass flow system (flow meter, etc.), a sampling system (pipeline, valve, etc.) and a control system, etc., with pipeline purge and on-site detection, pipeline heating and water removal, large flow rapid water removal, gas sampling, control and other functions. In addition, the standby protection working mode, purge working mode, self-test working mode, test working mode and other multi-modes are adopted to realize the real-time tracking and monitoring of the extremely low dew point of the wind tunnel, and accurate wind tunnel dew point test data can be quickly given under various working conditions of the wind tunnel.

[0006] This solution is achieved through the following technical measures:

[0007] A wind tunnel ultra-low dew point test method based on the cavity ring-down spectroscopy test principle includes the following steps:

[0008] Step 1: When the system is not working, all pneumatic valves are closed, and the analyzer is isolated from the gas in the cave and the outside atmosphere. At this time, the system is in standby protection working mode;

[0009] Step 2: Open the purge air inlet manual valve Ⅰ (7) and adjust the inlet pressure regulating valve (8) so that the pressure of the pressure sensor Ⅱ (9) is 3KG; open the bypass pneumatic valve Ⅷ (26) to allow the purge nitrogen to be discharged through the bypass, and monitor the dew point value of the incoming gas in real time through the bypass dew point meter (25) installed on the bypass;

[0010] Step 3: When the measured value of the bypass dew point meter (25) is lower than -40°C, close the bypass pneumatic valve VIII (26), open the pneumatic valve II (11) at the front end of the purifier (12), and control the nitrogen to enter the purifier (12) for drying;

[0011] Step 4: Open the wind tunnel main pneumatic valve I (6) to start purging the sampling pipeline (1) before the test, and the system enters the purge working mode; after the set purge time is up, close the wind tunnel main pneumatic valve I (6) to end the purge;

[0012] Step 5: Open the pneumatic valve III (13) after the purifier (12), the pneumatic valve V (21) at the inlet of the analyzer (22), and the pneumatic valve VI (23) at the outlet of the analyzer (22), and the dried gas enters the pipeline and enters the self-test working mode; before entering the analyzer (22), the flow rate needs to be adjusted by the mass flow meter (15). After adjustment, one path enters the analyzer (22) through the pressure reducing valve (19), and the other path is a branch discharge pipeline to discharge excess gas;

[0013] Step 6: The opening of the mass flow meter (15) is determined by the pressure value P2 of the pressure sensor III (14). The flow rate of the mass flow meter (15) is adjusted according to the pressure value P2, and the pressure value P2 is controlled to be less than 70 Kpa (gauge pressure); the pressure reducing valve (19) at the inlet of the analyzer (22) is a preset pressure regulating valve, and the pressure value P3 of the pressure sensor IV (20) at the inlet of the analyzer (22) is controlled to be less than 40 Kpa;

[0014] Step 7: The analyzer (22) starts to test the dew point in real time. After 2 to 3 hours of drying, the gas dew point can reach ≤-90°C; close the front-end pneumatic valve II (11) of the purifier (12) inlet, the rear-end pneumatic valve III (13) of the purifier (12), the inlet pneumatic valve V (21) of the analyzer (22), and the outlet pneumatic valve VI (23) of the analyzer (22), and end the self-test;

[0015] Step 8: Prepare to start the test, enter the test working mode, turn on the electric heating system, and heat the sampling pipeline (1) through the heating belt I (16) and the heating belt II (27); the temperature sensor I (5) at the front end of the wind tunnel main pneumatic valve I (6) monitors the wind tunnel inlet temperature T1 in real time, and the temperature sensor II (17) at the rear end of the wind tunnel main pneumatic valve I (6) is used to monitor the real-time temperature T2 of the gas after heating and dehydration of the pipe wall;

[0016] Step 9: Obtain the current pressure value P1 of the wind tunnel in real time through the wind tunnel inlet pressure sensor Ⅰ (4). If the pressure value P1 ≥ 100 Kpa and the temperature T1 ≥ 0°C, open the wind tunnel main pneumatic valve Ⅰ (6); if the pressure value P1 ≤ 95 Kpa or the temperature T1 < 0°C, close the wind tunnel main pneumatic valve Ⅰ (6);

[0017] Step 10: If the opening condition of the wind tunnel main pneumatic valve I (6) is met, the wind tunnel gas enters the pipeline for heating, and the real-time temperature T2 of the heated gas is obtained. When the inlet temperature standard (0-60°C) of the analyzer (22) is reached, the pneumatic valve IV (18) at the rear end of the heating belt I (16) is opened;

[0018] Step 11: adjust the flow rate of the mass flow meter according to the P2 value, and control the P2 pressure value to be less than 70Kpa; the pressure reducing valve (19) at the inlet of the analyzer (22) is a preset pressure regulating valve, and control the pressure value P3 of the pressure sensor IV (20) at the inlet of the analyzer (22) to be less than 40Kpa, and open the pneumatic valve V (21) at the front end of the analyzer (22), so that the gas enters the analyzer (22);

[0019] Step 12: If P1 is greater than or equal to 120 Kpa, open the pneumatic valve VI (23) at the outlet of the analyzer (22); if P1 is less than 120 Kpa, close the pneumatic valve VI (23) at the outlet of the analyzer (22) and turn on the pump (24);

[0020] Step 13: The analyzer (22) tests the wind tunnel dew point data in real time, and transmits the dew point test data to the core control system through the PLC in real time. At the same time, the dew point and related monitoring data are transmitted to the measurement computer in real time, realizing various control monitoring functions of the dew point test system and dew point collection, display storage and other functions;

[0021] Step 14: During the operation of the wind tunnel, repeat steps 8 to 13 for continuous monitoring.

[0022] As a preferred embodiment of this scheme: in step 1, when the dew point test system is not working, the analyzer and the inside of the sampling pipeline are sealed and protected to maintain a certain degree of dryness and cleanliness; in order to maintain good pipeline sealing, the sampling pipeline must undergo an airtightness test before use.

[0023] As a preferred embodiment of this scheme: in step 2, the gas supply pressure of the purge gas circuit is greater than 3KG, and the dew point of the purge gas source is lower than -60°C.

[0024] As the preferred solution of this scheme: the sampling pipeline is an EP grade stainless steel pipe with an outer diameter of 1 / 4 inch, and a VCR joint is used at the connection; a filter needs to be installed at the inlet of the sampling pipeline to filter dust, etc., and the filtration accuracy is 0.003μm.

[0025] As a preferred embodiment of this solution: in step seven, the analyzer can test a dew point value below -90°C, and it is determined that the analyzer is working normally.

[0026] The beneficial effects of this solution can be known from the description of the above solution, and the beneficial effects of the present invention are:

[0027] 1. High precision: the dew point test accuracy can reach ±0.5℃~±1.3℃;

[0028] 2. Fast response time: can track the changes of wind tunnel dew point in real time;

[0029] 3. Good applicability: It adopts multiple working modes to realize system protection, purging, self-test and measurement, etc., to meet the needs of dew point testing under complex working conditions.

[0030] It can be seen that compared with the prior art, the present invention has outstanding substantive features and significant progress, and the beneficial effects of its implementation are also obvious. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 Schematic diagram of the gas path structure of an embodiment of the present invention.

[0032] In the figure, 1. sampling pipeline, 2. manual valve Ⅰ, 3. filter, 4. pressure sensor Ⅰ, 5. temperature sensor Ⅰ, 6. wind tunnel main pneumatic valve Ⅰ, 7. manual valve Ⅱ, 8. pressure regulating valve, 9. pressure sensor Ⅱ, 10. filter, 11. pneumatic valve Ⅱ, 12. purifier, 13. pneumatic valve Ⅲ, 14. pressure sensor Ⅲ, 15. mass flow meter, 16. heating belt Ⅰ, 17. temperature sensor Ⅱ, 18. pneumatic valve Ⅳ, 19. pressure reducing valve, 20. pressure sensor Ⅳ, 21. pneumatic valve Ⅴ, 22. analyzer, 23. pneumatic valve Ⅵ, 24. pump, 25. bypass dew point meter, 26. pneumatic valve Ⅷ, 27. heating belt Ⅱ, 28. check valve. DETAILED DESCRIPTION

[0033] All features disclosed in this specification, or steps in all methods or processes disclosed, except mutually exclusive features and / or steps, can be combined in any manner.

[0034] Any feature disclosed in this specification (including any additional claims, abstract and drawings), unless otherwise stated, may be replaced by other equivalent or alternative features with similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.

[0035] like Figure 1 As shown, the specific implementation steps of this embodiment are:

[0036] Step 1: When the system is not working, all pneumatic valves are closed, and the analyzer is isolated from the gas in the cave and the outside atmosphere. At this time, the system is in standby protection working mode;

[0037] Step 2: Open the purge air inlet manual valve Ⅰ (7) and adjust the inlet pressure regulating valve (8) so that the pressure of the pressure sensor Ⅱ (9) is 3KG; open the bypass pneumatic valve Ⅷ (26) to allow the purge nitrogen to be discharged through the bypass, and monitor the dew point value of the incoming gas in real time through the bypass dew point meter (25) installed on the bypass;

[0038] Step 3: When the measured value of the bypass dew point meter (25) is lower than -40°C, close the bypass pneumatic valve VIII (26), open the pneumatic valve II (11) at the front end of the purifier (12), and control the nitrogen to enter the purifier (12) for drying;

[0039] Step 4: Open the wind tunnel main pneumatic valve I (6) to start purging the sampling pipeline (1) before the test, and the system enters the purge working mode; after the set purge time is up, close the wind tunnel main pneumatic valve I (6) to end the purge;

[0040] Step 5: Open the pneumatic valve III (13) after the purifier (12), the pneumatic valve V (21) at the inlet of the analyzer (22), and the pneumatic valve VI (23) at the outlet of the analyzer (22), and the dried gas enters the pipeline and enters the self-test working mode; before entering the analyzer (22), the flow rate needs to be adjusted by the mass flow meter (15). After adjustment, one path enters the analyzer (22) through the pressure reducing valve (19), and the other path is a branch discharge pipeline to discharge excess gas;

[0041] Step 6: The opening of the mass flow meter (15) is determined by the pressure value P2 of the pressure sensor III (14). The flow rate of the mass flow meter (15) is adjusted according to the pressure value P2, and the pressure value P2 is controlled to be less than 70 Kpa (gauge pressure); the pressure reducing valve (19) at the inlet of the analyzer (22) is a preset pressure regulating valve, and the pressure value P3 of the pressure sensor IV (20) at the inlet of the analyzer (22) is controlled to be less than 40 Kpa;

[0042] Step 7: The analyzer (22) starts to test the dew point in real time. After 2 to 3 hours of drying, the gas dew point can reach ≤-90°C; close the front-end pneumatic valve II (11) of the purifier (12) inlet, the rear-end pneumatic valve III (13) of the purifier (12), the inlet pneumatic valve V (21) of the analyzer (22), and the outlet pneumatic valve VI (23) of the analyzer (22), and end the self-test;

[0043] Step 8: Prepare to start the test, enter the test working mode, turn on the electric heating system, and heat the sampling pipeline (1) through the heating belt I (16) and the heating belt II (27); the temperature sensor I (5) at the front end of the wind tunnel main pneumatic valve I (6) monitors the wind tunnel inlet temperature T1 in real time, and the temperature sensor II (17) at the rear end of the wind tunnel main pneumatic valve I (6) is used to monitor the real-time temperature T2 of the gas after heating and dehydration of the pipe wall;

[0044] Step 9: Obtain the current pressure value P1 of the wind tunnel in real time through the wind tunnel inlet pressure sensor Ⅰ (4). If the pressure value P1 ≥ 100 Kpa and the temperature T1 ≥ 0°C, open the wind tunnel main pneumatic valve Ⅰ (6); if the pressure value P1 ≤ 95 Kpa or the temperature T1 < 0°C, close the wind tunnel main pneumatic valve Ⅰ (6);

[0045] Step 10: If the opening condition of the wind tunnel main pneumatic valve I (6) is met, the wind tunnel gas enters the pipeline for heating, and the real-time temperature T2 of the heated gas is obtained. When the inlet temperature standard (0-60°C) of the analyzer (22) is reached, the pneumatic valve IV (18) at the rear end of the heating belt I (16) is opened;

[0046] Step 11: adjust the flow rate of the mass flow meter according to the P2 value, and control the P2 pressure value to be less than 70Kpa (gauge pressure); the pressure reducing valve (19) at the inlet of the analyzer (22) is a preset pressure regulating valve, and control the pressure value P3 of the pressure sensor IV (20) at the inlet of the analyzer (22) to be less than 40Kpa, and open the pneumatic valve V (21) at the front end of the analyzer (22), so that the gas enters the analyzer (22);

[0047] Step 12: If P1 is greater than or equal to 120 Kpa (absolute pressure), open the pneumatic valve VI (23) (V2) at the outlet of the analyzer (22); if P1 is less than 120 Kpa, close the pneumatic valve VI (23) (V2) at the outlet of the analyzer (22), and turn on the pump (24);

[0048] Step 13: The analyzer (22) tests the wind tunnel dew point data in real time, and transmits the dew point test data to the core control system through the PLC in real time. At the same time, the dew point and related monitoring data are transmitted to the measurement computer in real time, realizing various control monitoring functions of the dew point test system and dew point collection, display storage and other functions;

[0049] Step 14: During the operation of the wind tunnel, repeat steps 8 to 13 for continuous monitoring.

[0050] In step one, when the dew point test system is not working, the analyzer and the inside of the sampling pipeline are sealed and protected to maintain a certain degree of dryness and cleanliness; in order to maintain good pipeline sealing, the sampling pipeline must undergo an airtightness test before use.

[0051] In step 2, the gas supply pressure of the purge gas circuit is greater than 3KG, and the dew point of the purge gas source is lower than -60°C.

[0052] In step 3, when the purge gas is initially used, the dew point of the incoming gas is generally high. To prevent contamination of the purifier, a bypass dew point meter is used to detect the dew point of the incoming gas in real time. When the gas dew point is lower than a certain value, it is allowed to enter the purifier to prevent contamination of the purifier, reduce drying efficiency, and shorten the service life of the purifier. The bypass dew point meter uses a resistance-capacitance dew point transmitter with a measurement range of -80℃ to 20℃.

[0053] In step 4, the sampling pipeline that has not been used for a long time and is exposed to the outside is mainly cleaned and dried to avoid affecting the test response speed. In order to improve the response speed and test accuracy, the sampling pipeline is an EP-grade stainless steel pipe with an outer diameter of 1 / 4 inch, and a VCR joint is used at the connection; various valves on the gas line fully consider the sealing and moisture adsorption characteristics, and a filter needs to be installed at the inlet of the sampling pipeline to filter dust, etc., with a filtration accuracy of 0.003μm.

[0054] In step five, the system self-check working mode is mainly used to test the performance of the dew point meter itself and to determine whether the dew point meter is working normally.

[0055] In step six, in order to speed up the dehumidification of the inner wall of the sampling pipeline and improve the dynamic test response time, the air flow rate of the sampling pipeline is increased. At the same time, the flow rate through the measurement chamber of the dew point equipment is prevented from being too large and affecting the dew point test. According to the flow rate, part of the gas needs to be released through the bypass system to ensure that the pressure / flow and other parameters meet the air intake requirements of the analyzer.

[0056] In step seven, the analyzer can test the dew point value below -90℃, which means the analyzer is working normally.

[0057] In step eight, the pipeline heating system is controlled by setting an electric heating tape on the sampling pipeline and controlling it through a thermostat. On the one hand, it meets the analyzer's requirements for the inlet gas temperature. On the other hand, it can increase the saturated vapor pressure of water on the inner surface of the gas pipeline by increasing the temperature, so that it can be quickly dehydrated and dehumidified when the airflow passes through, avoiding the slow release of moisture adsorbed by the inner wall material of the pipeline and affecting the dew point measurement speed. When the temperature is lower than the limit set by the system, increase the front-end heating power and increase the temperature of the heating tape to heat the pipeline to meet the test requirements.

[0058] In step nine, the pressure thresholds for opening and closing the pneumatic valve are set to different values ​​in order to prevent the pneumatic valve from being repeatedly started and stopped in a short period of time when the gas pressure in the cave fluctuates, thereby affecting the service life of the pneumatic valve for a long time.

[0059] In the step twelve, an air pump is connected in parallel to the pneumatic valve at the outlet of the analyzer. When the pressure is low, the air pump is switched to operate and the pneumatic valve is closed to ensure that when the pressure value of the inlet gas is close to the atmospheric pressure, the inlet gas flow rate can still meet the analysis and measurement requirements.

[0060] The present invention is not limited to the above-mentioned specific embodiments, but extends to any new features or any new combination disclosed in this specification, as well as any new method or process steps or any new combination disclosed.

Claims

1. A wind tunnel ultra-low dew point test method based on the cavity ring-down spectroscopy test principle, characterized by: The following steps are included: Step 1: When the system is not working, all pneumatic valves are closed, and the analyzer is isolated from the gas in the cave and the outside atmosphere. At this time, the system is in standby protection working mode; Step 2: Open the purge air inlet manual valve Ⅰ (7) and adjust the inlet pressure regulating valve (8) so that the pressure of the pressure sensor Ⅱ (9) is 3KG; open the bypass pneumatic valve Ⅷ (26) to allow the purge nitrogen to be discharged through the bypass, and monitor the dew point value of the incoming gas in real time through the bypass dew point meter (25) installed on the bypass; Step 3: When the measured value of the bypass dew point meter (25) is lower than -40°C, close the bypass pneumatic valve VIII (26), open the pneumatic valve II (11) at the front end of the purifier (12), and control the nitrogen to enter the purifier (12) for drying; Step 4: Open the wind tunnel main pneumatic valve I (6) to start purging the sampling pipeline (1) before the test, and the system enters the purge working mode; after the set purge time is up, close the wind tunnel main pneumatic valve I (6) to end the purge; Step 5: Open the pneumatic valve III (13) after the purifier (12), the pneumatic valve V (21) at the inlet of the analyzer (22), and the pneumatic valve VI (23) at the outlet of the analyzer (22), and the dried gas enters the pipeline and enters the self-test working mode; before entering the analyzer (22), the flow rate needs to be adjusted by the mass flow meter (15). After adjustment, one path enters the analyzer (22) through the pressure reducing valve (19), and the other path is a branch discharge pipeline to discharge excess gas; Step 6: The opening of the mass flow meter (15) is determined by the pressure value P2 of the pressure sensor III (14). The flow rate of the mass flow meter (15) is adjusted according to the pressure value P2, and the pressure value P2 is controlled to be less than 70 KPa; the pressure reducing valve (19) at the inlet of the analyzer (22) is a preset pressure regulating valve, and the pressure value P3 of the pressure sensor IV (20) at the inlet of the analyzer (22) is controlled to be less than 40 KPa; Step 7: The analyzer (22) starts to test the dew point in real time. After 2 to 3 hours of drying, the gas dew point reaches ≤-90°C; the pneumatic valve II (11) at the front end of the inlet of the purifier (12), the pneumatic valve III (13) at the rear end of the purifier (12), the pneumatic valve V (21) at the inlet of the analyzer (22), and the pneumatic valve VI (23) at the outlet of the analyzer (22) are closed, and the self-test ends; Step 8: Prepare to start the test, enter the test working mode, turn on the electric heating system, and heat the sampling pipeline (1) through the heating belt I (16) and the heating belt II (27); the temperature sensor I (5) at the front end of the wind tunnel main pneumatic valve I (6) monitors the wind tunnel inlet temperature T1 in real time, and the temperature sensor II (17) at the rear end of the wind tunnel main pneumatic valve I (6) is used to monitor the real-time temperature T2 of the gas after heating and dehydration of the pipe wall; Step 9: Obtain the current pressure value P1 of the wind tunnel in real time through the wind tunnel inlet pressure sensor Ⅰ (4). If the pressure value P1 ≥ 100 Kpa and the temperature T1 ≥ 0°C, open the wind tunnel main pneumatic valve Ⅰ (6); if the pressure value P1 ≤ 95 Kpa or the temperature T1 < 0°C, close the wind tunnel main pneumatic valve Ⅰ (6); Step 10: If the opening condition of the wind tunnel main pneumatic valve I (6) is met, the wind tunnel gas enters the pipeline and is heated, and the real-time temperature T2 of the heated gas is obtained. When the inlet temperature standard of the analyzer (22) of 0 to 60°C is reached, the pneumatic valve IV (18) at the rear end of the heating belt I (16) is opened; Step 11: adjust the flow rate of the mass flow meter according to the P2 value, and control the P2 pressure value to be less than 70Kpa; the pressure reducing valve (19) at the inlet of the analyzer (22) is a preset pressure regulating valve, and control the pressure value P3 of the pressure sensor IV (20) at the inlet of the analyzer (22) to be less than 40Kpa, and open the pneumatic valve V (21) at the front end of the analyzer (22), so that the gas enters the analyzer (22); Step 12: If P1 is greater than or equal to 120 Kpa, open the pneumatic valve VI (23) at the outlet of the analyzer (22); if P1 is less than 120 Kpa, close the pneumatic valve VI (23) at the outlet of the analyzer (22) and turn on the pump (24); Step 13: The analyzer (22) tests the wind tunnel dew point data in real time, and transmits the dew point test data to the core control system through the PLC in real time. At the same time, the dew point and related monitoring data are transmitted to the measurement computer in real time, realizing various control monitoring and dew point collection, display and storage functions of the dew point test system; Step 14: During the operation of the wind tunnel, repeat steps 8 to 13 for continuous monitoring.

2. The wind tunnel ultra-low dew point test method based on the cavity ring-down spectroscopy test principle according to claim 1 is characterized by: In step one, when the dew point test system is not working, the analyzer and the inside of the sampling pipeline are sealed and protected to maintain dryness and cleanliness within the specified range; in order to maintain good pipeline sealing, the sampling pipeline must undergo an airtightness test before use.

3. The wind tunnel ultra-low dew point test method based on the cavity ring-down spectroscopy test principle according to claim 1 is characterized by: In step 2, the gas supply pressure of the purge gas circuit is greater than 3KG, and the dew point of the purge gas source is lower than -60°C.

4. The wind tunnel ultra-low dew point test method based on the cavity ring-down spectroscopy test principle according to claim 1 is characterized by: sampling The outer diameter of the pipeline is 1 / 4 inch EP grade stainless steel pipe, and VCR joints are used at the connection; a filter needs to be installed at the inlet of the sampling pipeline to filter dust, and the filtration accuracy is 0.003μm.

5. The wind tunnel ultra-low dew point test method based on the cavity ring-down spectroscopy test principle according to claim 1 is characterized by: In step seven, the analyzer can test the dew point value below -90℃, which means the analyzer is working normally.

Citation Information

Patent Citations

  • Dew point testing device and dew point testing method

    CN111855744A

  • Analysis device and analysis method for trace water in hydrogen fluoride gas

    CN112213278A