Task guidance methods, devices and equipment for early stage engineering

By identifying and assembling task process information in the preliminary project, the problem of low efficiency in archiving task results is solved, task process guidance that meets different needs is achieved, and the efficiency of the preliminary project is improved.

CN118674234BActive Publication Date: 2024-11-22THREE GORGES HI TECH INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411151682.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-22
Estimated Expiration
2044-08-21

AI Technical Summary

Technical Problem

In the prior art, the tasks of the preliminary engineering need to be separately formed and archived, resulting in inefficiency and ineffective response to the inconsistent steps, procedures and processes of different industries, regions and projects.

Method used

By identifying task process information in various resource files, a special model suitable for different resource types is built, the content description of task process nodes is connected to different operation scenarios, task guidance information is assembled, and process guidance for early engineering tasks is realized, and process guidance is achieved. Different results are formed separately for archive.

Benefits of technology

It greatly shortens the preparation cycle of the preliminary project, improves the efficiency of development, and can adapt to the task process needs of different industries, regions and projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118674234B_ABST
    Figure CN118674234B_ABST
Patent Text Reader

Abstract

The present application discloses a task guidance method, device and equipment for a preliminary project, which relates to the technical field of processing engineering information. It is not necessary to archive different achievements of tasks separately, which can greatly shorten the preparation period of the preliminary project and improve the efficiency of carrying out the preliminary project. The method includes: taking the description information of the task items in the preliminary project as the basis, identifying the task flow in various resource files, obtaining the task flow information of the preliminary project, the task flow information including the task flow node and the content description of the task flow node, docking the content description of the task flow node to different operation scenes, obtaining the scene operation style adapted by the task flow node, assembling the scene operation style adapted by the task flow node according to the task flow node, obtaining the task guidance information of the preliminary project, and when receiving the processing instruction of the task item, guiding the process of the pending tasks in the preliminary project according to the task guidance information.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of engineering information processing, and in particular to a task guidance method, device and equipment for early stage engineering. Background Art

[0002] In engineering projects, the importance of pre-project management is self-evident. It directly affects the success, progress and effect of the project. It must be analyzed in detail in the pre-project preparation stage to formulate reliable and reasonable measures to ensure the stable progress of the project construction. The existing pre-project mainly includes the planning stage, feasibility study stage, project evaluation stage and decision-making stage, and the actual pre-project business is mainly to integrate the results of each task of the pre-project, such as special technical forums, project land surveys, and collection of policy and administrative planning materials. The process is relatively fragmented and messy.

[0003] In related technologies, since the preliminary projects need to deal with different industries, different regions, and different projects, there will be inconsistencies in the steps, procedures, and processes of the preliminary projects. As a result, the tasks of each preliminary project need to be separately formed into different results for archiving, affecting the efficiency of the preliminary projects. Summary of the invention

[0004] In view of this, the present application provides a task guidance method, device and equipment for a preliminary project, the main purpose of which is to solve the problem in the prior art that each task of the preliminary project needs to be separately formed into different results for archiving, affecting the efficiency of the preliminary project.

[0005] According to a first aspect of the present application, a task guidance method for a preliminary project is provided, comprising:

[0006] Based on the description information of the tasks in the previous project, the task flow is identified in various resource files to obtain the task flow information of the previous project, wherein the task flow information includes the task flow nodes and the content description of the task flow nodes;

[0007] Connecting the content description of the task flow node to different operation scenarios to obtain the scenario operation style adapted by the task flow node;

[0008] Assembling the task flow nodes according to the scenario operation style adapted by the task flow nodes to obtain task guidance information for the early stage project;

[0009] When a processing instruction for a task item is received, the process of the pending tasks in the previous project is guided according to the task guidance information.

[0010] Furthermore, before identifying the task flow in various resource files based on the description information of the task items in the previous project to obtain the task flow information of the previous project, the method further includes:

[0011] According to the existing preliminary engineering projects, the project resources are integrated into a static knowledge base, wherein the static knowledge base at least includes the file resources of the preliminary engineering projects in different task description dimensions;

[0012] Based on the language model, special labeling training is performed on the file resources in the static knowledge base to build special models suitable for different resource types, and the special models are used to identify task processes for various types of resource files;

[0013] Accordingly, the task flow information of the previous project is identified based on the description information of the task items in the previous project, and the task flow information of the previous project is obtained, including:

[0014] Based on the description information of tasks in the previous project, the pre-established special model is used to identify the task flow in various resource files to obtain the task flow information of the previous project.

[0015] Furthermore, the language model is used to perform special labeling training on the file resources in the static knowledge base to construct special models suitable for different resource types, including:

[0016] Based on the task requirement information of the resource parties for the preliminary project in the static knowledge base, searching the file resources for the guiding rules applicable to different resource parties in the preliminary project;

[0017] The guiding rules applicable to different resource parties in the previous project are used as training labels, and special labeling training is performed on the resource files in the static knowledge base based on the language model to construct special models applicable to different resource parties.

[0018] Furthermore, the content description of the task flow node is docked to different operation scenarios to obtain the scenario operation style adapted by the task flow node, including:

[0019] Based on the existing preliminary engineering projects, different operation scenarios of preliminary engineering applications are constructed according to task types and operation methods;

[0020] By utilizing the different operation scenarios of the preliminary engineering application, the preset components and structured data sources in the visualization interface for different operation scenarios are respectively connected with the content description of the task flow node to obtain the scenario operation style adapted to the task flow node.

[0021] Furthermore, the task flow nodes are assembled according to the scene operation style adapted by the task flow nodes to obtain the task guidance information of the early stage project, including:

[0022] Acquire the stock data associated with the task in the static knowledge base according to the task process node;

[0023] By analyzing the stock data associated with the task, the task process nodes are formed into the operation process of different resource matters in the early stage of the project;

[0024] According to the operation flow of different resource matters of the preliminary project, the task process nodes are assigned to different scene operation styles for assembly to obtain the task guidance information of the preliminary project.

[0025] Furthermore, when a processing instruction of a task item is received, the process of guiding the tasks to be processed in the previous project is guided according to the task guidance information, including:

[0026] When receiving a task processing instruction, obtaining the docking resource party and docking resource item information of the task to be processed in the previous project according to the task guidance information;

[0027] Determine the operation process of the tasks to be processed in the early stage project according to the docking resource matter information;

[0028] According to the operation flow of the tasks to be processed, the documents in the tasks to be processed are converted into operation scenarios suitable for the docking resource party and then transferred to the docking resource party.

[0029] Furthermore, after receiving the processing instruction of the task item and guiding the process of the tasks to be processed in the previous project according to the task guidance information, the method further includes:

[0030] If the process guide of the task to be processed feeds back abnormal information, the task process node with the abnormal information is recorded, so as to adjust the model parameters of the task process identification through the record of the abnormal information;

[0031] If the process guide of the task to be processed feedbacks success information, the document fed back by the docking resource party will be archived as an achievement resource.

[0032] According to a second aspect of the present application, a task guiding device for a preliminary project is provided, comprising:

[0033] An identification unit is used to identify task flows in various resource files based on the description information of task items in the previous project, and obtain task flow information of the previous project, wherein the task flow information includes task flow nodes and content descriptions of task flow nodes;

[0034] A docking unit, used to dock the content description of the task flow node to different operation scenarios to obtain a scenario operation style adapted to the task flow node;

[0035] An assembling unit, used to assemble the task flow nodes according to the scene operation style adapted by the task flow nodes to obtain task guidance information of the preliminary project;

[0036] The guiding unit is used to guide the process of the tasks to be processed in the previous project according to the task guiding information when receiving the processing instructions of the task items.

[0037] Furthermore, the device also includes:

[0038] An integration unit is used to identify the task flow in various resource files based on the description information of the task items in the previous project, and before obtaining the task flow information of the previous project, integrate the project resources into a static knowledge base according to the existing previous project projects, wherein the static knowledge base at least includes the file resources of the previous project projects in different task description dimensions;

[0039] A construction unit, used to perform special tagging training on file resources in the static knowledge base based on a language model, and to construct special models suitable for different resource types, wherein the special models are used to identify task processes for various types of resource files;

[0040] Correspondingly, the identification unit is specifically used to identify the task flow in various resource files based on the description information of the task items in the previous project, using the pre-established special model to obtain the task flow information of the previous project.

[0041] Furthermore, the construction unit is specifically used for:

[0042] Based on the task requirement information of the resource parties for the preliminary project in the static knowledge base, searching the file resources for the guiding rules applicable to different resource parties in the preliminary project;

[0043] The guiding rules applicable to different resource parties in the previous project are used as training labels, and special labeling training is performed on the resource files in the static knowledge base based on the language model to construct special models applicable to different resource parties.

[0044] Furthermore, the docking unit is specifically used for:

[0045] Based on the existing preliminary engineering projects, different operation scenarios of preliminary engineering applications are constructed according to task types and operation methods;

[0046] By utilizing the different operation scenarios of the preliminary engineering application, the preset components and structured data sources in the visualization interface for different operation scenarios are respectively connected with the content description of the task flow node to obtain the scenario operation style adapted to the task flow node.

[0047] Furthermore, the assembly unit is specifically used for:

[0048] Acquire the stock data associated with the task in the static knowledge base according to the task process node;

[0049] By analyzing the stock data associated with the task, the task process nodes are formed into the operation process of different resource matters in the early stage of the project;

[0050] According to the operation flow of different resource matters of the preliminary project, the task process nodes are assigned to different scene operation styles for assembly to obtain the task guidance information of the preliminary project.

[0051] Furthermore, the guiding unit is specifically used for:

[0052] When receiving a task processing instruction, obtaining the docking resource party and docking resource item information of the task to be processed in the previous project according to the task guidance information;

[0053] Determine the operation process of the tasks to be processed in the early stage project according to the docking resource matter information;

[0054] According to the operation flow of the tasks to be processed, the documents in the tasks to be processed are converted into operation scenarios suitable for the docking resource party and then transferred to the docking resource party.

[0055] Furthermore, the device also includes:

[0056] The adjusting unit is used for, after receiving the processing instruction of the task item, guiding the process of the task to be processed in the previous project according to the task guiding information, if the process guiding of the task to be processed feedbacks abnormal information, recording the task process node with the abnormal information, so as to adjust the model parameters of the task process identification through the recording of the abnormal information;

[0057] The archiving unit is used to archive the document fed back by the docking resource party as a result resource if the process guidance of the task to be processed feeds back success information.

[0058] According to a third aspect of the present application, a computer device is provided, comprising a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the method described in the first aspect when executing the computer program.

[0059] According to a fourth aspect of the present application, a readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps of the method described in the first aspect are implemented.

[0060] By means of the above technical scheme, the present application provides a method, device and equipment for guiding the task of the preliminary project. Compared with the method in the prior art that the task of the preliminary project needs to be archived separately, the present application uses the description information of the task items in the preliminary project as the basis, identifies the task flow in various resource files, obtains the task flow information of the preliminary project, and the task flow information includes the task flow node and the content description of the task flow node. The special model is applicable to various resource files involved in the task processing in the preliminary project, docks the content description of the task flow node to different operation scenes, obtains the scene operation style adapted by the task flow node, assembles the scene operation style adapted by the task flow node according to the task flow node, obtains the task guidance information of the preliminary project, and when the processing instruction of the task item is received, the process guidance is performed on the pending tasks in the preliminary project according to the task guidance information. The whole process refines and splits the preliminary project into task flow nodes and docks them to different operation scenes according to the step operation to assemble into the task guidance information of the preliminary project. There is no need to archive the different results of the task separately. The task guidance of the preliminary project through the task guidance information greatly shortens the preparation cycle of the preliminary project and improves the efficiency of the preliminary project.

[0061] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0063] Figure 1 It is a flowchart of a task guidance method for a preliminary project in one embodiment of the present application;

[0064] Figure 2 It is a flowchart of a task guidance method for a preliminary project in another embodiment of the present application;

[0065] Figure 3 yes Figure 1 A schematic flow chart of a specific implementation of step 102;

[0066] Figure 4 yes Figure 1 A schematic flow chart of a specific implementation of step 103;

[0067] Figure 5 yes Figure 1 A schematic flow chart of a specific implementation of step 104;

[0068] Figure 6 It is a structural schematic diagram of a task guiding device for a preliminary project in an embodiment of the present application;

[0069] Figure 7 It is a schematic diagram of the device structure of a computer device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0070] Now the content of the present invention will be discussed with reference to several exemplary embodiments. It should be understood that these embodiments are discussed only to enable those skilled in the art to better understand and thus implement the content of the present invention, rather than implying any limitation on the scope of the present invention.

[0071] As used herein, the term "including" and variations thereof are to be interpreted as open-ended terms meaning "including but not limited to." The term "based on" is to be interpreted as "based, at least in part, on." The terms "one embodiment" and "an embodiment" are to be interpreted as "at least one embodiment." The term "another embodiment" is to be interpreted as "at least one other embodiment."

[0072] In the task guidance scenario of the preliminary project, since the preliminary project needs to face different industries, different regions, and different projects, there will be inconsistencies in the steps, procedures, and processes of the preliminary project. Correspondingly, each task of the preliminary project needs to be archived separately as different results, which affects the efficiency of the preliminary project. In order to solve this problem, this embodiment provides a task guidance method for the preliminary project, such as Figure 1 As shown, the method is applied to the server side for task guidance in the early stage engineering, and includes the following steps:

[0073] 101. Based on the description information of the tasks in the previous project, the task flow is identified in various resource files to obtain the task flow information of the previous project.

[0074] Preliminary works refer to a series of preparatory work that needs to be done before the project is officially launched. These works include but are not limited to project feasibility study, preliminary design, budget preparation, bidding preparation and construction preparation. Through careful preparation of the task flow in the preliminary works, a solid foundation can be laid for the smooth progress of the project.

[0075] Considering that each stage in the preliminary project has different task requirements, the task items in each stage of the preliminary project can be extracted to obtain the task items of the preliminary project, and then the task description can be performed for the preliminary project to obtain the description information of the task items in the preliminary project. Here, the preliminary project can automatically generate the task items required for the preliminary project through the system. Each task item corresponds to a task code and a task description. For example, the task description of task code 1 is resource acquisition, the task description of task code 1.1 is project compliance, and the task description of task code 1.2 is the signing of a project cooperation framework agreement.

[0076] Among them, various types of resource files are document resources that are connected to different task descriptions in the preliminary project, including but not limited to decision-making resources, research resources, application document resources, drawing resources, report resources and special resources. For example, the document resource that needs to be connected to the task description of application approval and approval is the "project application report", the document resource that needs to be connected to the task description of state-owned land use right review is the "state-owned land use right application document", and the document resource that needs to be connected to the task description of construction drawing review is the "construction drawing design drawing materials".

[0077] Considering that various resource files record the content description of tasks in the preliminary project, the resource party to which the task is connected, the operation steps of the task, etc., by identifying the task flow in various resource files, the task flow information of the preliminary project can be obtained. Here, the task flow information includes the task flow node and the content description of the task flow node. The preliminary project can be split into tasks through the task flow node to output the corresponding content description according to the split tasks. The content description at least includes the results information, other descriptions of job responsibilities, materials required for handling conditions, resource providers, and resource providers, etc. Taking the "investment decision" task flow node as an example, the corresponding content description includes the results information "project investment decision opinion letter", other descriptions of job responsibilities "project feasibility study results as investment decision support documents", materials required for handling conditions "investment decision request or proposal documents", resource providers "project units and planning and development department organizations", and resource providers "group companies".

[0078] The executor of this embodiment can be a task guidance device or equipment for the preliminary project, and can be configured in the server end for task guidance in the preliminary project. The server end uses the description information of the task items in the preliminary work as a basis, and performs task process identification in various resource files to process and template the task processes for connecting different industries, different regions, and different projects, forming a guidance guide for the preliminary project, so as to facilitate different engineering personnel to carry out preliminary tasks and shorten the work preparation cycle.

[0079] 102. Connect the content description of the task flow node to different operation scenarios to obtain a scenario operation style adapted to the task flow node.

[0080] Taking into account that the content description of the task process node is suitable for different scenario interfaces, we can pre-precipitate operation scenarios suitable for different resource types based on the task type and operation method, such as document input, automatic generation of structured results, and OCR automatic scanning, and then connect the content description of the task process node to the operation scenario of the corresponding resource type.

[0081] For example, the content description of a task flow node is "construction permit", and the content description of the task flow node is the resource generation of "construction permit application document", and the corresponding docking operation scenario is the automatic generation of structured results.

[0082] It is understandable that, considering the universality of resource files, the resource files will record the scene interfaces matching different task processes and the data structures in the scene interfaces in the form of task steps. The content description of the task process nodes can be connected to different operation scenarios through the scene association fields in the resource files. For example, the scene association field "Resource Acquisition for Construction Drawing Review" in the resource file can connect the task description of the process node to the OCR automatic scanning operation scenario.

[0083] 103. Assemble the task flow nodes according to the scenario operation style adapted by the task flow nodes to obtain task guidance information of the early stage project.

[0084] In this embodiment, the scenario operation style adapted to the task flow node can assign the task flow to the operation scenario, so as to combine the task flow with the operation scenario through the scenario operation style, and construct the operation flow and guidance flow of the preliminary project during the switching of operation scenarios at different task flow nodes. The task flow nodes are assembled according to the operation flow and guidance flow to obtain the task guidance information of the preliminary project.

[0085] It should be noted that the description content of a task flow node may involve multiple operation scenarios. In this case, the scenario operation styles adapted by the task flow node will also increase accordingly. In the case where the task flow node involves multiple operation scenarios, it is necessary to make an association judgment on the content descriptions of the multiple operation scenarios. If there is no dependency between the content descriptions of the multiple operation scenarios, the content descriptions of the multiple operation scenarios in the process node are executed in parallel. If there is a dependency between the content descriptions of the multiple operation scenarios, the content descriptions of the multiple operation scenarios in the process node are executed in parallel.

[0086] 104. When a processing instruction of a task item is received, a process guidance is provided for the tasks to be processed in the previous project according to the task guidance information.

[0087] It can be understood that the task guidance information here can be used as a work guidance guide to provide process guidance for pending tasks in the early stage of the project. For example, for the tasks of project handling, the task guidance information can provide the project handling process, prerequisite tasks for handling, handling methods, docking resources, handling cycle and other task process nodes.

[0088] Specifically, prompt information of the task process nodes can be generated according to the task guidance information. The prompt information is used to prompt the staff to obtain task resources and / or connect with resource parties according to the corresponding task process nodes. After obtaining the task resources and / or connecting with resource parties, the task processing progress and task processing results will be archived.

[0089] The task guidance method of the preliminary project provided by the embodiment of the present application is compared with the method in which the tasks of the preliminary project in the prior art need to form results separately for archiving. The present application uses the description information of the task matters in the preliminary project as the basis, identifies the task flow in various resource files, obtains the task flow information of the preliminary project, and the task flow information includes the task flow node and the content description of the task flow node. The special model is applicable to various resource files involved in the task processing in the preliminary project, docks the content description of the task flow node to different operation scenes, obtains the scene operation style adapted by the task flow node, assembles the scene operation style adapted by the task flow node according to the task flow node, obtains the task guidance information of the preliminary project, and when the processing instruction of the task matters is received, the process guidance is performed on the pending tasks in the preliminary project according to the task guidance information. The whole process refines and splits the preliminary project into task flow nodes and docks them to different operation scenes according to the step operation to assemble the task guidance information of the preliminary project, without the need to archive the different results formed by the task separately, and guides the task of the preliminary project through the task guidance information, which greatly shortens the preparation cycle of the preliminary project and improves the efficiency of the preliminary project.

[0090] Furthermore, considering that the existing preliminary engineering projects contain a large amount of information related to the task flow, in order to accurately obtain the task flow nodes of the preliminary engineering and the content description of the task flow nodes, in this embodiment, Figure 2 As shown, before step 101, the method further includes the following steps:

[0091] 201. Based on the existing preliminary engineering projects, integrate project resources into a static knowledge base.

[0092] 202. Perform special labeling training on the file resources in the static knowledge base based on the language model to construct special models suitable for different resource types.

[0093] Among them, the static knowledge base at least includes the file resources of preliminary engineering projects in different task description dimensions, for example, file resources related to projects such as pumping storage and environmental protection projects in various provinces. Specifically, project resources such as project review materials, project approval materials, various certificate application materials, and scientific research and pre-scientific research materials can be sorted out and integrated to build a static knowledge base.

[0094] In this embodiment, the special model is applicable to various types of resource files involved in task processing in the preliminary project. Specifically, in the process of constructing special models applicable to different resource types, based on the task requirement information of the resource party for the preliminary project in the static knowledge base, the guiding rules applicable to different resource parties in the preliminary project can be found in the file resources. Here, the resource party is the task requirement party, for example, the government, local administration bureau, etc. The corresponding guiding rules can be the security level stipulated by the state in the static knowledge base, the report compiled according to the enterprise system requirements, etc. Then, the guiding rules applicable to different resource parties in the preliminary project are used as training labels, and the resource files in the static knowledge base are specially marked and trained based on the language model to construct special models applicable to different resource parties.

[0095] Specifically, in the process of special labeling training for resource files in the static knowledge base based on the language model, the language model can use the LLM model to pre-label the task requirements of different resource parties involved in the resource files in the static knowledge base, generate training labels at the positions of the corresponding guiding rules in the static knowledge base, and input the static knowledge base with the training labels into the LLM model for training, so as to identify the task requirements of different resource parties in the static knowledge base through the LLM model. In this way, the special model obtained after training can be used for different resource parties to identify the task requirements in the early stage of the project, for example, to identify the work tasks, work task processing content and work results applicable to the government in the policy documents of the early stage of the project.

[0096] Accordingly, in the process of identifying task flows in various resource files, the description information of task items in the previous project is used as a basis, and a pre-established special model is used to identify task flows in various resource files to obtain the task flow information of the previous project.

[0097] Specifically, during the identification process, the region, project type, industry, etc. can be used as input, and the description information of the tasks in the previous project can be input into the pre-established special model to perform task flow identification in various resource files to obtain task flow nodes and content descriptions of task flow nodes.

[0098] In the above embodiment, specifically, Figure 3 As shown, step 102 includes the following steps:

[0099] 301. Based on the existing preliminary engineering projects, different operation scenarios of preliminary engineering applications are constructed according to task types and operation methods.

[0100] 302. Utilizing the different operation scenarios of the preliminary engineering application, the preset components and structured data sources in the visualization interface for connecting different operation scenarios are respectively connected with the content description of the task flow node to obtain the scenario operation style adapted to the task flow node.

[0101] In this embodiment, considering the different operation scenarios of resources for the preliminary engineering project docking, some resource parties need to operate through website pages, and some resource parties provide template resources with set formats. In order to enable the task processing items of the preliminary engineering to be accurately docked to the operation scenarios of different resource parties, based on the existing preliminary engineering projects, different operation scenarios of preliminary engineering applications are constructed according to the task type and operation method. The task type can be a licensing task, an examination task, a procedure task, and a decision-making task, etc. The operation method can be a page operation, a scanning operation, and a structured operation, etc. By constructing different operation scenarios for preliminary engineering applications, the tasks of the preliminary engineering can be easily docked to different demand resources, such as page demand resources, document demand resources, and scanning demand resources.

[0102] Specifically, the page layout and data structure of different operation scenarios can be connected and linked with the task process nodes of the preliminary project respectively. Here, the page layout includes but is not limited to the component layout, function layout, etc. in the page, and the data structure is a document structure and / or a table structure. By connecting the task process nodes with the operation scenarios, the corresponding task processes in the preliminary project can be more conveniently applied to the scene interface, and at the same time, the task content can be matched with the preset components and structured data tables in the scene interface.

[0103] In the above embodiment, specifically, Figure 4 As shown, step 103 includes the following steps:

[0104] 401. Acquire the stock data associated with the task in the static knowledge base according to the task flow node.

[0105] 402. By analyzing the stock data associated with the task, the task process nodes are transformed into operation processes of different resource matters in the early stage of the project.

[0106] 403. According to the operation process of different resource items of the preliminary project, the task process nodes are assigned to different scene operation styles for assembly to obtain task guidance information of the preliminary project.

[0107] In this embodiment, by combining task flow nodes with different operation scenarios, the task flow nodes can be connected to the operation processes of different resource matters in the early stage project. In order to facilitate the flow of resource matters, the task guidance lines of the early stage project can also be constructed in different operation processes. Through the task guidance lines, the task flow nodes are assigned to different scenario operation styles for assembly to obtain the task guidance information of the early stage project.

[0108] It can be understood that, considering that the operation processes have different flow directions, the above-mentioned task guiding lines have directions and interactions. For operation processes with interactions, the task guiding lines can be merged and / or split during the flow process. For example, the operation process of handling conditions requires multiple research reports. The task guiding line can be disassembled into multiple task guiding sub-lines, which can be merged after the operation process of each task guiding sub-line is completed.

[0109] In the above embodiment, specifically, Figure 5 As shown, step 104 includes the following steps:

[0110] 501. When a task item processing instruction is received, the docking resource party and docking resource item information of the task to be processed in the previous project are respectively obtained according to the task guidance information.

[0111] 502. Determine the operation flow of the tasks to be processed in the early stage project according to the docking resource matter information.

[0112] 503. According to the operation flow of the task to be processed, the document in the task to be processed is converted into an operation scenario suitable for the docking resource party and then transferred to the docking resource party.

[0113] In this embodiment, after the resource party completes the task items, it can automatically generate a corresponding task result package for output based on the completed task content and task results. If a digital archive is set up in the early stage of the project, the corresponding task result package can be directly submitted to the archive for archiving.

[0114] Taking into account the occurrence of exceptions during the process guidance of the tasks to be processed, such as policy changes, changes in the docking resource party, etc., during the task processing process, if the process guidance of the tasks to be processed feedbacks exception information, the task process nodes with the exception information will be recorded to adjust the model parameters of the task process identification through the record of the exception information; if the process guidance of the tasks to be processed feedbacks success information, the documents fed back by the docking resource party will be archived as the outcome resources.

[0115] Further, as Figure 1-5 The specific implementation of the method, the embodiment of the present application provides a task guidance device for the early stage engineering, such as Figure 6As shown, the device includes: an identification unit 61, a docking unit 62, an assembly unit 63, and a guiding unit 64.

[0116] The identification unit 61 is used to identify the task flow in various resource files based on the description information of the task items in the previous project, and obtain the task flow information of the previous project, wherein the task flow information includes the task flow nodes and the content description of the task flow nodes;

[0117] A docking unit 62, used to dock the content description of the task flow node to different operation scenarios to obtain a scenario operation style adapted to the task flow node;

[0118] An assembling unit 63, configured to assemble the task flow nodes according to the scene operation style adapted by the task flow nodes to obtain task guidance information of the preliminary project;

[0119] The guiding unit 64 is used to guide the process of the tasks to be processed in the previous project according to the task guiding information when receiving the processing instruction of the task items.

[0120] The task guidance device of the preliminary project provided by the embodiment of the present invention is compared with the method in which the tasks of the preliminary project in the prior art need to form results separately for archiving. The present application uses the description information of the task items in the preliminary project as the basis, identifies the task flow in various resource files, obtains the task flow information of the preliminary project, and the task flow information includes the task flow node and the content description of the task flow node. The special model is applicable to various resource files involved in the task processing in the preliminary project, docks the content description of the task flow node to different operation scenes, obtains the scene operation style adapted by the task flow node, assembles the scene operation style adapted by the task flow node according to the task flow node, obtains the task guidance information of the preliminary project, and when the processing instruction of the task item is received, the process guidance is performed on the pending tasks in the preliminary project according to the task guidance information. The whole process refines and splits the preliminary project into task flow nodes and docks them to different operation scenes according to the step operation to assemble into the task guidance information of the preliminary project. There is no need to archive the different results formed by the task separately. The task guidance of the preliminary project is performed through the task guidance information, which greatly shortens the preparation cycle of the preliminary project and improves the efficiency of the preliminary project.

[0121] In a specific application scenario, the device further includes:

[0122] An integration unit is used to identify the task flow in various resource files based on the description information of the task items in the previous project, and before obtaining the task flow information of the previous project, integrate the project resources into a static knowledge base according to the existing previous project projects, wherein the static knowledge base at least includes the file resources of the previous project projects in different task description dimensions;

[0123] A construction unit, used to perform special tagging training on file resources in the static knowledge base based on a language model, and to construct special models suitable for different resource types, wherein the special models are used to identify task processes for various types of resource files;

[0124] Correspondingly, the identification unit is specifically used to identify the task flow in various resource files based on the description information of the task items in the previous project, using the pre-established special model to obtain the task flow information of the previous project.

[0125] In a specific application scenario, the construction unit is specifically used for:

[0126] Based on the task requirement information of the resource parties for the preliminary project in the static knowledge base, searching the file resources for the guiding rules applicable to different resource parties in the preliminary project;

[0127] The guiding rules applicable to different resource parties in the previous project are used as training labels, and special labeling training is performed on the resource files in the static knowledge base based on the language model to construct special models applicable to different resource parties.

[0128] In a specific application scenario, the docking unit is specifically used for:

[0129] Based on the existing preliminary engineering projects, different operation scenarios of preliminary engineering applications are constructed according to task types and operation methods;

[0130] By utilizing the different operation scenarios of the preliminary engineering application, the preset components and structured data sources in the visualization interface for different operation scenarios are respectively connected with the content description of the task flow node to obtain the scenario operation style adapted to the task flow node.

[0131] In a specific application scenario, the assembly unit is specifically used for:

[0132] Acquire the stock data associated with the task in the static knowledge base according to the task process node;

[0133] By analyzing the stock data associated with the task, the task process nodes are formed into the operation process of different resource matters in the early stage of the project;

[0134] According to the operation flow of different resource matters of the preliminary project, the task process nodes are assigned to different scene operation styles for assembly to obtain the task guidance information of the preliminary project.

[0135] In a specific application scenario, the guiding unit is specifically used for:

[0136] When receiving a task processing instruction, obtaining the docking resource party and docking resource item information of the task to be processed in the previous project according to the task guidance information;

[0137] Determine the operation process of the tasks to be processed in the early stage project according to the docking resource matter information;

[0138] According to the operation flow of the tasks to be processed, the documents in the tasks to be processed are converted into operation scenarios suitable for the docking resource party and then transferred to the docking resource party.

[0139] In a specific application scenario, the device further includes:

[0140] The adjusting unit is used for, after receiving the processing instruction of the task item, guiding the process of the task to be processed in the previous project according to the task guiding information, if the process guiding of the task to be processed feedbacks abnormal information, recording the task process node with the abnormal information, so as to adjust the model parameters of the task process identification through the recording of the abnormal information;

[0141] The archiving unit is used to archive the document fed back by the docking resource party as a result resource if the process guidance of the task to be processed feeds back success information.

[0142] It should be noted that for other corresponding descriptions of the functional units involved in the task guidance device for the preliminary engineering provided in this embodiment, reference can be made to Figure 1-Figure 5 The corresponding description in will not be repeated here.

[0143] Based on the above Figure 1-Figure 5 The method shown in the embodiment of the present application accordingly provides a storage medium on which a computer program is stored, and when the program is executed by a processor, the above-mentioned Figure 1-Figure 5 The task guidance method of the preliminary engineering is shown.

[0144] Based on this understanding, the technical solution of the present application can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.), and includes a number of instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each implementation scenario of the present application.

[0145] Based on the above Figure 1-Figure 5 The method shown, and Figure 6 In order to achieve the above-mentioned purpose, the embodiment of the present application also provides a physical device for guiding the task of the preliminary project, which can be a computer, a smart phone, a tablet computer, a smart watch, a server, or a network device, etc. The physical device includes a storage medium and a processor; the storage medium is used to store a computer program; the processor is used to execute the computer program to achieve the above-mentioned Figure 1-Figure 5 The task guidance method of the preliminary engineering is shown.

[0146] Optionally, the physical device may also include a user interface, a network interface, a camera, a radio frequency (RF) circuit, a sensor, an audio circuit, a WI-FI module, etc. The user interface may include a display, an input unit such as a keyboard, etc., and the optional user interface may also include a USB interface, a card reader interface, etc. The network interface may optionally include a standard wired interface, a wireless interface (such as a WI-FI interface), etc.

[0147] In an exemplary embodiment, see Figure 7 The physical device includes a communication bus, a processor, a memory and a communication interface, and may also include an input / output interface and a display device, wherein each functional unit can communicate with each other through the bus. The memory stores a computer program, and the processor is used to execute the program stored in the memory and execute the task guidance method of the preliminary engineering in the above embodiment.

[0148] Those skilled in the art will appreciate that the physical device structure guided by a task of preliminary engineering provided in this embodiment does not constitute a limitation on the physical device, and may include more or fewer components, or a combination of certain components, or different arrangements of components.

[0149] The storage medium may also include an operating system and a network communication module. The operating system is a program that manages the task-guided physical device hardware and software resources of the above-mentioned preliminary project, and supports the operation of information processing programs and other software and / or programs. The network communication module is used to realize communication between components within the storage medium, and communication with other hardware and software in the information processing physical device.

[0150] Through the description of the above implementation methods, those skilled in the art can clearly understand that the present application can be implemented by means of software plus the necessary general hardware platform, or by hardware. By applying the technical solution of the present application, compared with the current existing methods, the present application breaks down the preliminary project into task flow nodes and connects them to different operation scenarios according to the step operations to assemble the task guidance information of the preliminary project. There is no need to archive the different results of the tasks separately. The task guidance information is used to guide the preliminary project, which greatly shortens the preparation period of the preliminary project and improves the efficiency of the preliminary project.

[0151] Those skilled in the art will appreciate that the accompanying drawings are only schematic diagrams of a preferred implementation scenario, and the modules or processes in the accompanying drawings are not necessarily necessary for implementing the present application. Those skilled in the art will appreciate that the modules in the devices in the implementation scenario can be distributed in the devices of the implementation scenario according to the description of the implementation scenario, or can be changed accordingly and located in one or more devices different from the present implementation scenario. The modules of the above-mentioned implementation scenario can be combined into one module, or can be further split into multiple submodules.

[0152] The above serial numbers of this application are only for description and do not represent the advantages and disadvantages of the implementation scenarios. The above disclosure is only a few specific implementation scenarios of this application, but this application is not limited to them, and any changes that can be thought of by technicians in this field should fall within the scope of protection of this application.

Claims

1. A task guidance method for early stage engineering, characterized in that: include: According to the existing preliminary engineering projects, the project resources are integrated into a static knowledge base, wherein the static knowledge base at least includes the file resources of the preliminary engineering projects in different task description dimensions; Based on the language model, special labeling training is performed on the file resources in the static knowledge base to build special models suitable for different resource types, and the special models are used to identify task processes for various types of resource files; Based on the description information of the tasks in the previous project, the pre-established special model is used to identify the task flow in various resource files to obtain the task flow information of the previous project, wherein the task flow information includes the task flow nodes and the content description of the task flow nodes; The content description of the task flow node is connected to different operation scenarios to obtain the scene operation style adapted to the task flow node, including: according to the existing preliminary engineering projects, different operation scenarios of the preliminary engineering application are constructed according to the task type and operation mode; using the different operation scenarios of the preliminary engineering application, the preset components and structured data sources in the visualization interface connected to different operation scenarios are respectively connected to the content description of the task flow node to obtain the scene operation style adapted to the task flow node; The task flow nodes are assembled according to the scene operation style adapted by the task flow nodes to obtain the task guidance information of the early stage project, including: acquiring the stock data associated with the task in the static knowledge base according to the task flow nodes; analyzing the stock data associated with the task to form the operation flow of different resource matters in the early stage project with the task flow nodes; assigning the task flow nodes to different scene operation styles according to the operation flow of different resource matters in the early stage project for assembly to obtain the task guidance information of the early stage project; When a processing instruction for a task item is received, the process of the pending tasks in the previous project is guided according to the task guidance information.

2. The method according to claim 1, characterized in that The language model-based special tagging training is performed on the file resources in the static knowledge base to construct a special model suitable for different resource types, including: Based on the task requirement information of the resource parties for the preliminary project in the static knowledge base, searching the file resources for the guiding rules applicable to different resource parties in the preliminary project; The guiding rules applicable to different resource parties in the previous project are used as training labels, and special labeling training is performed on the resource files in the static knowledge base based on the language model to construct special models applicable to different resource parties.

3. The method according to claim 1, characterized in that: When receiving the processing instruction of the task item, guiding the process of the task to be processed in the previous project according to the task guidance information includes: When receiving a task processing instruction, obtaining the docking resource party and docking resource item information of the task to be processed in the previous project according to the task guidance information; Determine the operation process of the tasks to be processed in the early stage project according to the docking resource matter information; According to the operation flow of the tasks to be processed, the documents in the tasks to be processed are converted into operation scenarios suitable for the docking resource party and then transferred to the docking resource party.

4. The method according to any one of claims 1 to 3, characterized in that After receiving the processing instruction of the task item and guiding the process of the tasks to be processed in the previous project according to the task guidance information, the method further includes: If the process guide of the task to be processed feeds back abnormal information, the task process node with the abnormal information is recorded, so as to adjust the model parameters of the task process identification through the record of the abnormal information; If the process guide of the task to be processed feedbacks success information, the document fed back by the docking resource party will be archived as an achievement resource.

5. A task guidance device for early stage engineering, characterized in that: include: An integration unit, used to integrate project resources into a static knowledge base based on existing preliminary engineering projects, wherein the static knowledge base at least includes file resources of the preliminary engineering projects in different task description dimensions; A construction unit, used to perform special tagging training on file resources in the static knowledge base based on a language model, and to construct special models suitable for different resource types, wherein the special models are used to identify task processes for various types of resource files; The identification unit is used to identify the task flow in various resource files based on the description information of the task items in the previous project using the pre-established special model to obtain the task flow information of the previous project, wherein the task flow information includes the task flow nodes and the content description of the task flow nodes; A docking unit is used to dock the content description of the task flow node to different operation scenarios to obtain a scenario operation style adapted to the task flow node, including: constructing different operation scenarios of the preliminary engineering application according to the existing preliminary engineering project and the task type and operation mode; using the different operation scenarios of the preliminary engineering application, docking the preset components and structured data sources in the visualization interface for docking different operation scenarios with the content description of the task flow node, respectively, to obtain a scenario operation style adapted to the task flow node; An assembling unit, for assembling the task flow nodes according to the scenario operation style adapted by the task flow nodes to obtain task guidance information for the preliminary project, including: acquiring the stock data associated with the task in the static knowledge base according to the task flow nodes; analyzing the stock data associated with the task to form the task flow nodes into the operation flow of different resource matters in the preliminary project; assigning the task flow nodes to different scenario operation styles for assembly according to the operation flow of different resource matters in the preliminary project to obtain the task guidance information for the preliminary project; The guiding unit is used to guide the process of the tasks to be processed in the previous project according to the task guiding information when receiving the processing instructions of the task items.

6. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that: When the processor executes the computer program, the steps of the task guidance method of the preliminary engineering described in any one of claims 1 to 4 are implemented.

7. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the task guidance method of the preliminary engineering described in any one of claims 1 to 4 are implemented.