A water diversion project settlement displacement observation device
By using laser rangefinder and drill bit reinforcement technology in water diversion projects, the soil displacement changes are monitored and recorded in real time, and the problem of inaccurate manual recording in the existing technology is solved, achieving high-precision settlement observation.
Patent Information
- Application Number
- CN202411170027.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-26
AI Technical Summary
The existing settlement displacement observation device of the water diversion project requires manual and regular data recording, and the naked eye observation is likely to cause inaccurate numerical recording due to angle problems.
Using a device that includes settlement displacement components and drilling components, laser rangefinders monitor soil displacement changes in real time, and transmit data to the server wirelessly to reduce manual intervention. At the same time, the drill bit is reinforced in the soil through reciprocating screws and pressurized slabs. Ensure stable burial.
Accurate monitoring and recording of soil displacement changes is achieved, and no manual and regular outings are required. The data is more accurate and manual error is reduced.
Smart Images

Figure CN118687534B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water diversion projects, and in particular to a water diversion project settlement displacement observation device. Background Art
[0002] During the construction of water diversion projects, it is necessary to build a dam in the area where the water diversion project is built. After the dam is built, it is prone to settlement due to the influence of water sources and its own gravity. Settlement is the vertical deformation or sinking of the foundation soil caused by compression under the action of building loads. During the implementation of the water diversion project, it is particularly important to monitor and observe the settlement of the dam.
[0003] The existing dam settlement and displacement observation device usually fixes the device on the top of the dam and sets it horizontally with the foundation, and buries the bottom of the benchmark vertically in the soil to be monitored. As the settlement and displacement of the soil changes, the benchmark moves laterally and descends accordingly. For example, the patent application with application number CN202110518012.3 discloses a water diversion project settlement and displacement observation device, which includes: a mounting part, a benchmark, a linkage slider and a linkage rod, wherein the linkage rod is fixedly mounted on the surface of the mounting part, the surface of the linkage slider is slidably connected to the outer surface of the benchmark, and the outer surface of the linkage slider is provided with a connecting part, which is used to connect the linkage rod and the linkage slider; a displacement observation ruler. The water diversion project settlement displacement observation device provided by the invention has a vertically distributed benchmark structure set between the water diversion project dam and the ground. The linkage rod is installed on the water diversion project dam, and follows the synchronous settlement and displacement of the water diversion project dam. When the linkage rod settles, the linkage slider is driven to slide downward synchronously through the connecting piece. The distance the linkage slider moves downward is the settlement depth of the water diversion project dam, which is convenient for intuitive observation and recording;
[0004] The patent applied for above has the following defects:
[0005] At present, in order to accurately know the specific dimensions of soil displacement and settlement changes, rulers are often set on benchmarks and cross rails. The changes in soil settlement and displacement during the period are known through two consecutive observation records. However, manual observation marks still require manual records on a regular basis, and the naked eye observation of the ruler is prone to errors in numerical records due to angle problems and are inconsistent with reality.
[0006] Therefore, in view of this, the existing structure and deficiencies are studied and improved, and a settlement displacement observation device for water diversion projects is proposed. Summary of the invention
[0007] In view of the deficiencies in the prior art, the present invention provides a device for observing the settlement and displacement of a water diversion project, which solves the problems raised in the above-mentioned background technology.
[0008] To achieve the above objectives, the present invention is implemented through the following technical solutions: a water diversion project settlement and displacement observation device, comprising a settlement and displacement component and a soil drilling component, the settlement and displacement component comprising a cross-rail base, a sliding seat, a fixed sleeve, a vertical sleeve, a first connecting rod, a second connecting rod, a transverse outer tube, a first laser rangefinder and a second laser rangefinder, the outer wall of the cross-rail base is slidably connected to the sliding seat, and the side of the sliding seat is fixed with a fixed sleeve, the interior of the fixed sleeve is penetrated and fixed with a vertical sleeve, the top of the sliding seat is fixed with a first connecting rod, and the outer wall of the first connecting rod is sleeved with a transverse outer tube, the interior of the transverse outer tube is provided with a first laser rangefinder, the top of the inner wall of the vertical sleeve is fixed with a second laser rangefinder, and the bottom of the vertical sleeve is penetrated with a second connecting rod, and the soil drilling component is connected to the bottom end of the second connecting rod.
[0009] Furthermore, the end of the cross rail base is fixed to the top of the dam by expansion bolts, and the cross rail base is horizontally distributed with the foundation.
[0010] Furthermore, the first connecting rod, the transverse outer tube and the transverse rail base are horizontally distributed, and the transverse outer tube is fixedly connected to the end of the transverse rail base.
[0011] Furthermore, the soil drilling assembly includes a waterproof motor, a reciprocating screw, a rotating shaft and a drill bit. The bottom output end of the waterproof motor is connected to the reciprocating screw, and the bottom of the reciprocating screw is fixed with a rotating shaft, and the bottom of the rotating shaft is fixed with a drill bit.
[0012] Furthermore, the soil drilling assembly also includes a limiting tube, a limiting groove, a movable sleeve and a soil pressing plate. The limiting tube is fixed to the bottom of the outer shell of the waterproof motor, and the limiting groove is provided on the surface of the limiting tube. The movable sleeve is passed through the interior of the limiting groove, and the soil pressing plate is fixed to the end of the movable sleeve.
[0013] Furthermore, the movable sleeve is sleeved on the outer wall of the reciprocating screw, and the soil pressing plate is transmission-connected to the waterproof motor through the movable sleeve and the reciprocating screw.
[0014] Furthermore, the soil pressing plate is sleeved on the outer wall of the limiting tube, and the inner diameter of the bottom of the soil pressing plate is smaller than the outer diameter of the top of the drill bit.
[0015] Furthermore, the soil drilling assembly also includes a first oil pipe and a transmission piston rod. The first oil pipe is fixed in a ring shape inside the top end of the drill bit, and the transmission piston rod is passed through the first oil pipe.
[0016] Furthermore, the soil drilling assembly also includes a fluid delivery tube, a second oil tube and a soil inserting fixture. The fluid delivery tube is fixed to the bottom of the side of the first oil tube, and the end of the fluid delivery tube is connected to the second oil tube. The interior of the second oil tube is penetrated by a soil inserting fixture.
[0017] Furthermore, the soil inserting fixture is distributed on the upper part of the drill bit in a ring shape, and the soil inserting fixture is connected to the soil pressing plate through the second oil pipe, the fluid delivery pipe, the first oil pipe, and the transmission piston rod.
[0018] The present invention provides a water diversion project settlement displacement observation device, which has the following beneficial effects:
[0019] 1. The second laser rangefinder and the first laser rangefinder are located inside the vertical casing and the horizontal outer pipe respectively, so they are not affected by the external environment. The soil displacement and settlement change data monitored by the second laser rangefinder and the first laser rangefinder in real time will be wirelessly transmitted to the server and displayed in the background, so there is no need for personnel to go out regularly to observe the scale and record the change data. Secondly, the change data monitored by the second laser rangefinder and the first laser rangefinder are more accurate than the change data recorded by the naked eye.
[0020] 2. The water diversion project settlement displacement observation device, when the drill bit drills into the soil, the reciprocating screw rotates to make the moving sleeve on its surface reciprocate up and down along the inside of the limit slide slot, so that the soil pressing plate recompacts the upper soil loosened by the rotation of the drill bit, so that the drill bit can be firmly buried in the soil, and the rotation of the soil pressing plate is stopped after the drill bit reaches the preset depth in the soil, and the soil pressing plate also moves to the bottom of the reciprocating screw. At this time, the soil is compacted by the soil pressing plate to press the top of the transmission piston rod, so that the transmission piston rod is pressed into the first oil pipe, so as to push the soil inserting fixture to extend from the upper part of the outer side of the drill bit and insert into the soil, thereby further reinforcing the drill bit in the soil. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a schematic diagram of the overall back structure of a transverse rail base of a water diversion project settlement and displacement observation device of the present invention;
[0022] Figure 2 This is a schematic diagram of the overall front structure of a water diversion project settlement and displacement observation device of the present invention;
[0023] Figure 3 It is a schematic diagram of the cross-section structure of a transverse rail base of a water diversion project settlement displacement observation device of the present invention;
[0024] Figure 4 It is a schematic diagram of the top surface perspective structure of the earth pressing plate of a water diversion project settlement and displacement observation device of the present invention;
[0025] Figure 5 A schematic diagram of the bottom perspective structure of an earth plate of a water diversion project settlement and displacement observation device according to the present invention;
[0026] Figure 6A schematic diagram of the cross-sectional structure of a limit pipe of a water diversion project settlement displacement observation device according to the present invention;
[0027] Figure 7 This is a schematic diagram of the first oil pipe structure of a water diversion project settlement displacement observation device of the present invention.
[0028] In the figure: 1. Settlement displacement assembly; 101. Cross rail base; 102. Sliding seat; 103. Fixed sleeve; 104. Vertical sleeve; 105. First connecting rod; 106. Second connecting rod; 107. Transverse outer tube; 108. First laser rangefinder; 109. Second laser rangefinder; 2. Soil drilling assembly; 201. Waterproof motor; 202. Reciprocating screw; 203. Rotating shaft; 204. Drill bit; 205. Limiting tube; 206. Limiting slide; 207. Moving sleeve; 208. Earth pressing plate; 209. First oil pipe; 210. Transmission piston rod; 211. Infusion tube; 212. Second oil pipe; 213. Soil inserting fixture. DETAILED DESCRIPTION
[0029] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0030] like Figure 1-Figure 7 As shown, the present invention provides a technical solution: a water diversion project settlement displacement observation device, including a settlement displacement component 1 and a soil drilling component 2, the settlement displacement component 1 includes a cross-rail base 101, a sliding seat 102, a fixed sleeve 103, a vertical sleeve 104, a first linkage rod 105, a second linkage rod 106, a transverse outer tube 107, a first laser rangefinder 108 and a second laser rangefinder 109, the outer wall of the cross-rail base 101 is slidably connected with the sliding seat 102, and the side of the sliding seat 102 is fixed with the fixed sleeve 103, the interior of the fixed sleeve 103 is penetrated and fixed with the vertical sleeve 104, and the top of the sliding seat 102 is fixed with the first linkage rod 105, and the outer wall of the first linkage rod 105 is sleeved with a transverse outer tube 107, a first laser rangefinder 108 is arranged inside the transverse outer tube 107, a second laser rangefinder 109 is fixed to the top of the inner wall of the vertical sleeve 104, and a second linkage rod 106 is penetrated through the bottom of the vertical sleeve 104, the drilling assembly 2 is connected to the bottom end of the second linkage rod 106, the end of the cross-rail base 101 is fixed to the top of the dam by an expansion bolt, and the cross-rail base 101 is horizontally distributed with the foundation, the first linkage rod 105, the transverse outer tube 107 and the cross-rail base 101 are horizontally distributed, and the transverse outer tube 107 is fixedly connected to the end of the cross-rail base 101;
[0031] The specific operation is as follows: after the drill bit 204 is vertically drilled into the soil whose displacement is to be monitored, if the soil moves horizontally, the drill bit 204 causes the sliding seat 102 to move horizontally along the outer wall of the cross-rail base 101 through the second linkage rod 106 and the vertical sleeve 104. At this time, the first linkage rod 105 moves synchronously with the sliding seat 102. At the same time, the first laser rangefinder 108 monitors the change in the spacing between it and the end of the first linkage rod 105 inside the transverse outer tube 107. The change in spacing is the change in the soil displacement to be monitored.
[0032] If the soil settles, the drill bit 204 sinks with the soil. At this time, the second linkage rod 106 slides down along the inside of the vertical casing 104. At the same time, the second laser rangefinder 109 monitors the change in the spacing between it and the top of the second linkage rod 106 in real time. The spacing change is the soil settlement change of the displacement to be monitored. The second laser rangefinder 109 and the first laser rangefinder 108 are respectively located inside the vertical casing 104 and the horizontal outer tube 107, so as not to be affected by the external environment. Moreover, the second laser rangefinder 109 and the first laser rangefinder 108 are connected to a solar charging device to ensure long-term operation. Finally, the soil displacement and settlement change data monitored in real time by the second laser rangefinder 109 and the first laser rangefinder 108 are wirelessly transmitted to the server and displayed in the background, so that there is no need for personnel to go out regularly to observe the scale and record the change data. Secondly, the change data monitored by the second laser rangefinder 109 and the first laser rangefinder 108 are more accurate than the change data recorded by personnel's naked eye observation.
[0033] like Figure 1-Figure 7 As shown, the soil drilling assembly 2 includes a waterproof motor 201, a reciprocating screw 202, a rotating shaft 203 and a drill bit 204. The bottom output end of the waterproof motor 201 is connected to the reciprocating screw 202, and the bottom of the reciprocating screw 202 is fixed with the rotating shaft 203, and the bottom of the rotating shaft 203 is fixed with the drill bit 204;
[0034] The specific operation is as follows: the drill bit 204 is perpendicular to the soil surface through the second connecting rod 106. When the second connecting rod 106 slides down along the vertical casing 104 due to gravity so that the drill bit 204 contacts the soil surface, the waterproof motor 201 drives the reciprocating screw rod 202 and the rotating shaft 203 to rotate the drill bit 204, so that the drill bit 204 sinks vertically into the soil to complete the burial.
[0035] like Figure 1-Figure 7As shown, the soil drilling component 2 also includes a limiting tube 205, a limiting slide groove 206, a movable sleeve 207 and a soil pressing plate 208. The limiting tube 205 is fixed to the bottom of the housing of the waterproof motor 201, and the limiting slide groove 206 is provided on the surface of the limiting tube 205. The inside of the limiting slide groove 206 is penetrated by a movable sleeve 207, and the end of the movable sleeve 207 is fixed with a soil pressing plate 208. The movable sleeve 207 is sleeved on the outer wall of the reciprocating screw 202, and the soil pressing plate 208 is transmission-connected to the waterproof motor 201 through the movable sleeve 207 and the reciprocating screw 202. The soil pressing plate 208 is sleeved on the outer wall of the limiting tube 205, and the bottom inner diameter of the soil pressing plate 208 is smaller than the top outer diameter of the drill bit 204.
[0036] The specific operation is as follows: while the drill bit 204 drills into the soil, the reciprocating screw 202 rotates to make the movable sleeve 207 on its surface reciprocate up and down along the inside of the limiting slide groove 206, so that the soil pressing plate 208 re-compacts the upper soil loosened by the rotation of the drill bit 204, so that the drill bit 204 can be firmly buried in the soil, so as to avoid the loosening of the drill bit 204 and cause the soil displacement and settlement change data measured later to be incorrect.
[0037] like Figure 1-Figure 7 As shown, the soil drilling assembly 2 also includes a first oil pipe 209 and a transmission piston rod 210. The first oil pipe 209 is fixed in a ring shape inside the top of the drill bit 204, and the transmission piston rod 210 is penetrated inside the first oil pipe 209. The soil drilling assembly 2 also includes a liquid delivery pipe 211, a second oil pipe 212 and a soil inserting fixture 213. The liquid delivery pipe 211 is fixed to the bottom of the side of the first oil pipe 209, and the end of the liquid delivery pipe 211 is connected to the second oil pipe 212, and the second oil pipe 212 is penetrated inside the soil inserting fixture 213. The soil inserting fixture 213 is distributed in a ring shape on the upper part of the drill bit 204, and the soil inserting fixture 213 is transmission-connected to the soil pressing plate 208 through the second oil pipe 212, the liquid delivery pipe 211, the first oil pipe 209, and the transmission piston rod 210.
[0038] The specific operation is as follows: after the drill bit 204 reaches a preset depth in the soil, it stops rotating, and the soil pressing plate 208 also moves to the bottom of the reciprocating screw 202, and a certain length of the upper part of the second connecting rod 106 is still retained inside the vertical casing 104. At this time, the soil between the soil pressing plate 208 and the top surface of the drill bit 204 is compacted by the soil pressing plate 208 and exerts pressure on the top of the transmission piston rod 210, so that the transmission piston rod 210 is pressed into the first oil pipe 209. At this time, the oil inside the first oil pipe 209 enters the second oil pipe 212 along the infusion pipe 211 to push the soil inserting fixture 213 to extend from the upper outer part of the drill bit 204 and insert into the soil, thereby further reinforcing the drill bit 204 in the soil.
[0039] In summary, when the water diversion project settlement displacement observation device is used, the drill bit 204 is firstly perpendicular to the soil surface through the second connecting rod 106. When the second connecting rod 106 slides down along the inside of the vertical casing 104 due to gravity so that the drill bit 204 contacts the soil surface, the waterproof motor 201 drives the reciprocating screw rod 202 and the rotating shaft 203 to rotate the drill bit 204, so that the drill bit 204 vertically sinks into the soil to complete the embedding;
[0040] When the drill bit 204 drills into the soil, the reciprocating screw 202 rotates to make the movable sleeve 207 on its surface reciprocate up and down along the inside of the limiting slide groove 206, so that the soil pressing plate 208 recompacts the upper soil loosened by the rotation of the drill bit 204, so that the drill bit 204 can be firmly buried in the soil;
[0041] After the drill bit 204 reaches a preset depth in the soil, it stops rotating, and the soil pressing plate 208 also moves to the bottom of the reciprocating screw 202, and a certain length of the upper portion of the second linkage rod 106 is still left inside the vertical sleeve 104. At this time, the soil between the soil pressing plate 208 and the top surface of the drill bit 204 is compacted by the soil pressing plate 208 and exerts pressure on the top of the transmission piston rod 210, so that the transmission piston rod 210 is pressed into the first oil pipe 209. At this time, the oil in the first oil pipe 209 enters the second oil pipe 212 along the delivery pipe 211 to push the soil inserting fixture 213 to extend from the upper outer portion of the drill bit 204 and insert into the soil, thereby further reinforcing the drill bit 204 in the soil.
[0042] After the drill bit 204 is vertically drilled into the soil whose displacement is to be monitored, if the soil moves horizontally, the drill bit 204 causes the sliding seat 102 to move horizontally along the outer wall of the cross-rail base 101 through the second linkage rod 106 and the vertical sleeve 104. At this time, the first linkage rod 105 moves synchronously with the sliding seat 102. At the same time, the first laser rangefinder 108 monitors the change in the spacing between it and the end of the first linkage rod 105 inside the transverse outer tube 107. The change in spacing is the change in the soil displacement to be monitored.
[0043] If the soil settles, the drill bit 204 sinks with the soil. At this time, the second connecting rod 106 slides down along the inside of the vertical casing 104. At the same time, the second laser rangefinder 109 monitors the change in the distance between it and the top of the second connecting rod 106 in real time. The change in distance is the soil settlement change of the displacement to be monitored. The second laser rangefinder 109 and the first laser rangefinder 108 are respectively located inside the vertical casing 104 and the horizontal outer tube 107, so as not to be affected by the external environment. In addition, the second laser rangefinder 109 and the first laser rangefinder 108 are connected to a solar charging device to ensure long-term operation. Finally, the soil displacement and settlement change data monitored in real time by the second laser rangefinder 109 and the first laser rangefinder 108 are wirelessly transmitted to the server and displayed in the background.
[0044] The embodiments of the present invention are given for the purpose of illustration and description, and are not intended to be exhaustive or to limit the invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
Claims
1. A water diversion project settlement and displacement observation device, comprising a settlement and displacement component (1) and a soil drilling component (2), characterized in that: The settlement displacement assembly (1) comprises a transverse rail base (101), a sliding seat (102), a fixed sleeve (103), a vertical sleeve (104), a first linkage rod (105), a second linkage rod (106), a transverse outer tube (107), a first laser rangefinder (108) and a second laser rangefinder (109); the outer wall of the transverse rail base (101) is slidably connected to the sliding seat (102), and the side of the sliding seat (102) is fixed with the fixed sleeve (103); the interior of the fixed sleeve (103) is penetrated and fixed with the vertical sleeve (104); the top of the sliding seat (102) is fixed with the first linkage rod (105), and the outer wall of the first linkage rod (105) is sleeved with the transverse outer tube (107); A first laser rangefinder (108) is arranged inside the transverse outer tube (107); a second laser rangefinder (109) is fixed to the top of the inner wall of the vertical sleeve (104); a second connecting rod (106) is penetrated through the bottom of the vertical sleeve (104); the soil drilling component (2) is connected to the bottom end of the second connecting rod (106); the soil drilling component (2) comprises a waterproof motor (201), a reciprocating screw rod (202), a rotating shaft (203) and a drill bit (204); the bottom output end of the waterproof motor (201) is connected to the reciprocating screw rod (202); the bottom of the reciprocating screw rod (202) is fixed with a rotating shaft (203); the bottom of the rotating shaft (203) is fixed with a drill bit (204); the soil drilling component (2) further comprises a limiting tube (205), a limiting slide groove (206), a movable sleeve (207) and a soil pressing plate (208); the limiting tube (205) is fixed to the bottom of the housing of the waterproof motor (201); the limiting slide groove (206) is provided on the surface of the limiting tube (205); the movable sleeve (207) is inserted into the interior of the limiting slide groove (206); and the soil pressing plate (208) is fixed to the end of the movable sleeve (207); the movable sleeve (207) is sleeved on the outer wall of the reciprocating screw (202); and the soil pressing plate (208) is connected to the waterproof motor (201) through the movable sleeve (207) and the reciprocating screw (202); the soil pressing plate (208) is sleeved on the outer wall of the limiting tube (205); and the soil pressing plate (208) is connected to the waterproof motor (201) through the movable sleeve (207) and the reciprocating screw (202); The bottom inner diameter of the plate (208) is smaller than the top outer diameter of the drill bit (204). The soil drilling component (2) further comprises a first oil pipe (209) and a transmission piston rod (210). The top of the drill bit (204) is internally fixed with the first oil pipe (209) in a ring shape, and the first oil pipe (209) is provided with a transmission piston rod (210). The soil drilling component (2) further comprises a liquid delivery pipe (211), a second oil pipe (212) and a soil inserting fixture (213). The bottom of the side of the first oil pipe (209) is fixed with a liquid delivery pipe (211), and the end of the liquid delivery pipe (211) is connected to the second oil pipe (212). The second oil pipe (212) is provided with a soil inserting fixture (213).The soil inserting piece (213) is distributed in a ring shape on the upper part of the drill bit (204), and the soil inserting piece (213) is connected to the soil pressing plate (208) through the second oil pipe (212), the fluid delivery pipe (211), the first oil pipe (209), and the transmission piston rod (210).
2. A water diversion project settlement displacement observation device according to claim 1, characterized in that: The end of the cross rail base (101) is fixed to the top of the dam by means of expansion bolts, and the cross rail base (101) is horizontally distributed with the foundation.
3. The water diversion project settlement displacement observation device according to claim 1, characterized in that: The first connecting rod (105), the transverse outer tube (107) and the transverse rail base (101) are horizontally distributed, and the transverse outer tube (107) and the end of the transverse rail base (101) are fixedly connected.