By designing battery string processing equipment with rotation and movement freedom, and automatically laying and clamping conductive connectors, the problem of low manual laying efficiency is solved, and the processing efficiency and product quality of battery strings are improved.
Patent Information
- Application Number
- CN202411151802.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2024-08-08
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-21
AI Technical Summary
During the processing of existing photovoltaic cell strings, manual laying of connectors is inefficient, resulting in low efficiency of battery string processing and reducing the production efficiency of photovoltaic cells.
Design a battery string processing device, including a first carrier with rotational freedom and a fixture assembly, which has a degree of freedom of movement, for automatic laying and clamping of conductive connectors, through the coordinated work of the fixture assembly and the pressing member, Realize automatic cutting and laying of conductive connectors to avoid manual intervention.
It improves the processing efficiency of the battery string, reduces the demand for manual operation, enhances the production efficiency and product quality of the battery string, and avoids the risk of scattered and short-circuited connection parts at the cut-off.
Smart Images

Figure CN118693187B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of solar power generation, and in particular to a battery string processing device and a battery string processing method. Background Art
[0002] In the process of processing a photovoltaic cell string, it is necessary to weld independent cells through connectors to form a cell string with multiple cells. In the prior art, the connectors are usually manually laid and then welded to the cells. However, this manual laying method of the connectors has the problem of low laying efficiency, which leads to low processing efficiency of the cell string and reduces the production efficiency of photovoltaic cells. Summary of the invention
[0003] In order to solve the deficiencies of the prior art, the purpose of the present application is to provide a battery string processing device and a battery string processing method, which can improve the processing efficiency of the battery string.
[0004] To achieve the above objectives, this application adopts the following technical solutions:
[0005] A battery string processing device, the processing device includes a first carrier and a clamp assembly. The first carrier is used to wind a conductive connector, and the first carrier has a rotational degree of freedom. The clamp assembly has a degree of freedom of movement, so that the clamp assembly has a working position and a clamping position close to the first carrier. When the clamp assembly is in the clamping position, the clamp assembly can clamp the conductive connector; when the conductive connector is cut off, the clamp assembly can move from the clamping position to the working position, so that the clamp assembly drives the conductive connector to move to a connection position that can fit with the battery cell.
[0006] Furthermore, the first carrier is provided with a receiving groove and a winding surface for winding the conductive connector, the winding surface is arranged around the rotation axis of the first carrier, and the receiving groove has at least one opening located on the winding surface. The clamp assembly includes a first clamp and a second clamp, the second clamp has a degree of freedom of movement so that the second clamp can approach or move away from the first clamp, and when the second clamp approaches the first clamp, the first clamp and the second clamp form a clamping space for clamping one end of the conductive connector. When the clamp assembly is in the clamping position, the first clamp is at least partially located in the receiving groove, or the second clamp is at least partially located in the receiving groove. The clamp assembly is provided with a first fixing portion for fixing the first fixing portion, the first fixing portion is located on the first clamp, and when the second clamp approaches the first clamp, the first fixing portion and the second clamp form a clamping space for clamping one end of the conductive connector. Alternatively, the first fixing portion is located on the second clamping member, and when the second clamping member is close to the first clamping member, the first fixing portion and the first clamping member form a clamping space for clamping one end of the conductive connecting member.
[0007] Furthermore, the first fixing part is provided with a first adsorption hole, and the first fixing piece is adsorbed onto the first fixing part by forming a negative pressure in the first adsorption hole, or the first fixing part is used to bond with the first fixing piece, or the first fixing part is used to weld with the first fixing piece.
[0008] Furthermore, the clamp assembly includes a first heating part for heating the conductive connecting member and the first fixing member, the first heating part is located in the first clamping member or the second clamping member, or the first heating part is arranged close to the first clamping member and / or the second clamping member, and the conductive connecting member and the first fixing member are welded by the first heating part, or the first fixing member has viscosity so that the first fixing member and the conductive connecting member are bonded.
[0009] Furthermore, the processing equipment also includes a press assembly, which has a clamping force acting on the conductive connector so that the conductive connector is pressed onto the first carrier. The press assembly includes a clamping piece, which has freedom of movement so that the clamping piece has a clamping position for clamping the conductive connector and a separation position for separating from the conductive connector. When the clamping piece is in the clamping position, the clamping piece has a clamping force acting on the conductive connector. The press assembly is provided with a second fixing portion for fixing the second fixing portion, and the second fixing portion is located on the side of the clamping piece facing the first carrier.
[0010] Furthermore, the second fixing portion is provided with a third adsorption hole, and the second fixing piece is adsorbed onto the second fixing portion by forming negative pressure in the third adsorption hole, or the second fixing portion is used to bond with the second fixing piece.
[0011] Furthermore, the press assembly includes a third heating part for heating the conductive connecting member and the second fixing member, so that the conductive connecting member and the second fixing member are welded together, and the third heating part is located in the pressing member or arranged close to the pressing member; or the third heating part is located on the clamp assembly, and when the clamp assembly is in the clamping position, the third heating part is arranged close to the pressing member, so that the conductive connecting member and the second fixing member are welded together, or the second fixing member has stickiness, so that the second fixing member and the conductive connecting member are bonded together.
[0012] Furthermore, the pressing tool assembly also includes a driving member, which is transmission-connected to the pressing member and is fixed on the first carrier.
[0013] To achieve the above objectives, this application adopts the following technical solutions:
[0014] A processing method for a battery string comprises: winding a conductive connector on a first carrier with rotational freedom; moving a clamp assembly to a clamping position, the clamp assembly clamping the conductive connector; cutting the conductive connector, wherein the cutting position of the conductive connector is close to the clamp assembly; and moving the clamp assembly from the clamping position to a working position to drive the conductive connector to move from the first carrier to a connection position capable of being bonded to a battery cell.
[0015] Further, cutting off the conductive connecting member includes: pressing the conductive connecting member onto the first carrier by means of a pressing tool assembly; and cutting off the conductive connecting member between the pressing tool assembly and the clamp assembly.
[0016] In the present application, the conductive connector wound on the first carrier can be unfolded and laid through the clamp assembly, so that the conductive connector can be laid automatically without manual laying of the conductive connector, thereby improving the processing efficiency of the battery string. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the overall structure of the battery string processing equipment of this application;
[0018] Figure 2 A schematic diagram of the structure of the fixed components of the battery string processing equipment of the present application;
[0019] Figure 3 This is a schematic diagram of the overall structure of the first carrier of the present application;
[0020] Figure 4 A schematic diagram of the structure of a press assembly of a battery string processing device of the present application;
[0021] Figure 5 A schematic structural diagram of a processing device for a conductive connecting member of the present application;
[0022] Figure 6 A schematic structural diagram of the battery string processing equipment of the present application from another perspective;
[0023] Figure 7 A schematic diagram of the process of the battery string processing method of the present application;
[0024] Figure 8 This is a schematic flow chart of the first method of step S1 of the battery string processing method of the present application;
[0025] Fig. 9 This is a flow chart of a second method of step S1 of the battery string processing method of the present application;
[0026] Fig.10 This is a flow chart of step S2 of the battery string processing method of the present application;
[0027] Fig.11 Schematic diagram of the process of step S3 of the battery string processing method of the present application. DETAILED DESCRIPTION
[0028] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the specific implementation manner of the present application will be clearly and completely described below in conjunction with the drawings in the implementation manner of the present application.
[0029] It should be noted that the words "first", "second" and similar words used in the specification and claims of this application do not indicate any order, quantity or importance, but are only used to distinguish different components. Similarly, words such as "one" or "a" do not indicate a quantitative limitation, but indicate the existence of at least one. "Multiple" or "several" means at least two. Unless otherwise specified, words such as "front", "back", "left", "right", "bottom" and / or "top" are only for the convenience of description and are not limited to one position or one spatial orientation. Words such as "include" or "comprise" mean that the elements or objects appearing before "include" or "comprise" include the elements or objects listed after "include" or "comprise" and their equivalents, and do not exclude other elements or objects. Words such as "connect" or "connected" are not limited to physical or mechanical connections, and may include electrical connections, whether direct or indirect.
[0030] The singular forms "a", "said" and "the" used in this specification and the appended claims are also intended to include the plural forms, unless the context clearly indicates otherwise. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more of the associated listed items.
[0031] like Figure 1 , Figure 2 and Figure 3As shown, the present application provides a battery string processing device 100, which includes a first carrier 11 and a fixing component 12. The first carrier 11 is used to wind the conductive connector, and the first carrier 11 has a rotational freedom. Among them, the fixing component 12 has a degree of freedom of movement, and the fixing component 12 can fix or connect one end of the cut conductive connector 200. In this way, when the conductive connector 200 is cut off, the movement of the fixing component 12 can drive the conductive connector 200 wound on the first carrier 11 to move, thereby realizing the laying of the conductive connector 200. Therefore, there is no need to manually lay the conductive connector 200, thereby improving the processing efficiency of the battery string. At the same time, since the first carrier 11 has a degree of freedom of rotation, the first carrier 11 rotates at the same time during the process of the fixed component 12 driving the conductive connector 200 to move, so that the first carrier 11 will not interfere with the movement of the conductive connector 200, which is conducive to the laying of the conductive connector 200.
[0032] Specifically, after the conductive connector 200 is cut, the first carrier 11 rotates so that the first carrier 11 can output the conductive connector 200. At this time, the fixing component 12 synchronously drives the conductive connector 200 to move, so that the movements of the first carrier 11 and the fixing component 12 can be coordinated, thereby allowing the conductive connector 200 to be moved to a connection position that can fit with the battery cell 300.
[0033] The connection position refers to the position of the conductive connector 200 when the cut conductive connector 200 can be attached to the battery cell 300. It can be understood that when the conductive connector 200 is in the connection position, the conductive connector 200 can be attached to the battery cell 300 and can be connected, so that the conductive connector 200 and the battery cell 300 can form a battery string.
[0034] In order to clearly illustrate the technical solution of this application, the following is also defined: Figure 1 Front, back, left, right, up and down as shown.
[0035] In the present application, the conductive connector 200 is a welding strip, through which the independent battery cells 300 can be welded, so that the independent battery cells 300 are welded to form a battery string. It can be understood that the conductive connector 200 can be a circular welding strip, a triangular welding strip, etc., and the present application does not limit the structural form of the conductive connector 200.
[0036] Specifically, the fixing component 12 has a working position and a fixed position close to the first carrier 11. When the fixing component 12 is in the fixed position, the fixing component 12 can fix the conductive connector 200. In the case where the conductive connector 200 is cut off, the fixing component 12 can move from the fixed position to the working position, so that the fixing component 12 drives the conductive connector 200 to move to the connection position that can be bonded with the battery cell 300. In this way, by moving the fixing component 12 between the fixed position and the working position, the fixing component 12 can drive the cut conductive connector 200 to move from the first carrier 11 to the connection position, thereby realizing the unfolding and laying of the conductive connector 200, which is then conducive to the bonding of the conductive connector 200 and the battery cell 300, so as to improve the welding efficiency of the battery cell 300.
[0037] In this embodiment, the battery cells 300 can be arranged at equal intervals first, and then the conductive connector 200 can be laid on the battery cells 300, so as to achieve the connection between the conductive connector 200 and the battery cells 300; or the conductive connector 200 can be laid first, and then the battery cells 300 can be arranged at equal intervals on the conductive connector 200.
[0038] It should be noted that the number of the conductive connectors 200 can be adjusted according to actual needs, and the conductive connectors 200 are wound on the first carrier 11 at equal intervals, so that the conductive connectors 200 are also laid at equal intervals.
[0039] The fixed position refers to the position of the fixing component 12 when the fixing component 12 fixes the conductive connector 200 wound on the first carrier 11. The working position refers to the position of the fixing component 12 when the fixing component 12 drives the cut conductive connector 200 to move to fit with the battery cell 300.
[0040] Optionally, the fixing assembly 12 includes a first clamping member 121 and a second clamping member 122, and the second clamping member 122 has a degree of freedom of movement so that the second clamping member 122 can be close to or away from the first clamping member 121. In the present application, the second clamping member 122 has a degree of freedom of movement along the left and right directions of the processing equipment 100. When the second clamping member 122 is close to the first clamping member 121, the first clamping member 121 and the second clamping member 122 form a clamping space for clamping one end of the conductive connector 200. In this way, through the movement of the second clamping member 122, the second clamping member 122 can cooperate with the first clamping member 121 to clamp and release the conductive connector 200, which is conducive to the fixed assembly 12 driving the conductive connector 200 to move to the connection position when the fixed assembly 12 clamps the conductive connector 200, and is also conducive to the conductive connector 200 being able to be unfolded and laid when the fixed assembly 12 releases the conductive connector 200.
[0041] Specifically, when the fixing assembly 12 is in the fixed position, the second clamping member 122 is close to the first clamping member 121, so that the second clamping member 122 cooperates with the first clamping member 121 to form a clamping space to clamp and fix one end of the conductive connector 200, which is conducive to cutting the conductive connector 200. After the cutting is completed, the conductive connector 200 is driven to move to the connection position by the fixing assembly 12. At this time, the second clamping member 122 is away from the first clamping member 121, so that the fixing assembly 12 releases the conductive connector 200, so that the conductive connector 200 wound on the first carrier 11 can be unfolded and laid, and then the conductive connector 200 is automatically laid, which is conducive to improving the processing efficiency of the battery string.
[0042] It is understandable that in the present application, the conductive connector 200 is a welding strip and the number of the conductive connectors 200 is not unique. Therefore, after the conductive connector 200 is cut, the cut-off part of the conductive connector 200 is divided into two ends, and since the two ends of the conductive connector 200 lose connection, the conductive connector 200 will be scattered. However, after the conductive connector 200 is cut, the clamping of the conductive connector 200 by the fixing component 12 can avoid the conductive connector 200 from being scattered, so that when the fixing component 12 drives the conductive connector 200 to be laid, there will be no contact between the conductive connectors 200, thereby avoiding short circuits between the battery cells 300 due to contact between the conductive connectors 200.
[0043] As an optional implementation, the first carrier 11 may be provided with a receiving groove 111. When the fixing component 12 is in a fixed position, the first clamping member 121 at least partially or the second clamping member 122 at least partially can enter the receiving groove 111, that is, the first clamping member 121 is at least partially located in the receiving groove 111, or the second clamping member 122 is at least partially located in the receiving groove 111, so that the first clamping member 121 and the second clamping member 122 can be located on both sides of the conductive connector 200, which is beneficial for the first clamping member 121 and the second clamping member 122 to clamp the conductive connector 200.
[0044] like Figure 2As shown, as an embodiment, the fixing assembly 12 is provided with a first fixing portion 123 for fixing the first fixing member 500, the first fixing portion 123 is located on the first clamping member 121, and when the second clamping member 122 is close to the first clamping member 121, the first fixing portion 123 and the second clamping member 122 form a clamping space for clamping one end of the conductive connector 200, or, the first fixing portion 123 is located on the second clamping member 122, and when the second clamping member 122 is close to the first clamping member 121, the first fixing portion 123 and the first clamping member 121 form a clamping space for clamping one end of the conductive connector 200. In this way, when the conductive connector 200 is in the clamping space, the first fixing member 500 can be further clamped and limited at the cut-off position of the conductive connector 200, thereby avoiding the conductive connector 200 from being scattered at the cut-off position, and then the spacing between the conductive connectors 200 is kept equidistant for laying.
[0045] Take the first fixing part 123 being located on the first clamping member 121 as an example for explanation. When the fixing assembly 12 moves to the fixed position, the second clamping member 122 approaches the first clamping member 121, so that the second clamping member 122 can cooperate with the first fixing part 123 to form a clamping space to clamp one end of the conductive connector 200. When the first fixing part 123 cooperates with the second clamping member 122 to clamp the conductive connector 200, since the first fixing member 500 is fixed on the first clamping member 121, the clamping of the conductive connector 200 by the second clamping member 122 and the first fixing part 123 is the clamping of the conductive connector 200 by the first fixing member 500 and the second clamping member 122, so that the connection between the first fixing member 500 and the conductive connector 200 prevents the conductive connector 200 from being scattered after being cut off, thereby keeping the spacing between the conductive connectors 200 equidistant, so that the conductive connector 200 can meet the processing requirements of the battery string. After the cutting is completed, the fixing component 12 drives the conductive connector 200 to move to the connection position. Then, the second clamping component 122 moves away from the first clamping component 121. Since the first fixing component 500 and the conductive connector 200 are already connected, the fixing component 12 releases the first fixing component 500 while releasing the conductive connector 200, so that the conductive connector 200 on the first carrier 11 can be automatically laid at equal intervals. The connection method between the first fixing component 500 and the conductive connector 200 is described below and will not be repeated here.
[0046] Exemplarily, a first adsorption hole 1231 is provided on the first fixing portion 123, and negative pressure is formed in the first adsorption hole 1231 to adsorb the first fixing member 500 onto the first fixing portion 123, thereby improving the connection stability between the first fixing member 500 and the first fixing portion 123, thereby preventing the first fixing member 500 from falling off the first fixing portion 123 during the operation of the fixing assembly 12.
[0047] Or the first fixing portion 123 is used to bond the first fixing member 500. By bonding the first fixing portion 123 and the first fixing member 500, the connection stability between the first fixing portion 123 and the first fixing member 500 is improved, thereby preventing the first fixing member 500 from falling off the first fixing portion 123 during the operation of the fixing assembly 12.
[0048] Or the first fixing portion 123 is used for welding with the first fixing member 500. Such arrangement can avoid the first fixing member 500 from falling off from the first fixing portion 123, thereby facilitating the connection stability between the first fixing portion 123 and the first fixing member 500.
[0049] Among them, when the first fixing part 123 is provided with a first adsorption hole 1231, when the fixing component 12 drives the conductive connector 200 to move to the connection position and the fixing component 12 no longer clamps the conductive connector 200, negative pressure is no longer formed in the first adsorption hole 1231, so that the first fixing part 500 can automatically fall off the first fixing part 123, which is conducive to the separation of the first fixing part 500 from the first fixing part 123, so that the first fixing part 500 can be laid together with the conductive connector 200.
[0050] When the first fixing portion 123 is used to bond the first fixing member 500, a foam adhesive strip is provided on the first fixing portion 123, and the foam adhesive strip has viscosity, so that the first fixing portion 123 can be used to bond the first fixing member 500. It should be noted that the viscosity of the first fixing portion 123 and the first fixing member 500 can overcome the gravity of the first fixing member 500, so that the first fixing member 500 can be fixed on the first fixing portion 123, and the viscosity of the first fixing portion 123 and the first fixing member 500 cannot overcome the total gravity after the first fixing member 500 and the conductive connector 200 are connected, so that when the fixing component 12 drives the conductive connector 200 to move to the connection position and the fixing component 12 no longer clamps the conductive connector 200, the first fixing member 500 can automatically fall from the first fixing portion 123, which is conducive to the separation of the first fixing member 500 from the first fixing portion 123, so that the first fixing member 500 can be laid together with the conductive connector 200.
[0051] Among them, when the first fixing part 123 is used to weld with the first fixing member 500, when the fixing component 12 drives the conductive connecting member 200 to move to the connection position and the fixing component 12 no longer clamps the conductive connecting member 200, the first fixing member 500 can be cut off from the conductive connecting member 200 so that the conductive connecting member 200 can be laid.
[0052] Optionally, in order to achieve the connection between the first fixing member 500 and the conductive connector 200, the fixing assembly 12 of the present application is provided with a first heating part (not shown) for heating the conductive connector 200 and the first fixing member 500, and the conductive connector 200 and the first fixing member 500 are welded by the first heating part. Alternatively, the first fixing member 500 of the present application has adhesiveness so that the first fixing member 500 and the conductive connector 200 are bonded. It can be understood that by welding or bonding the conductive connector 200 and the first fixing member 500, the connection stability between the conductive connector 200 and the first fixing member 500 is improved, so that when the fixing assembly 12 releases the conductive connector 200, the first fixing member 500 can be separated from the first fixing part 123 and attached to the conductive connector 200. At the same time, by improving the connection stability between the conductive connector 200 and the first fixing member 500, it is beneficial for the first fixing member 500 to further limit the cut portion of the conductive connector 200, thereby further preventing the conductive connector 200 from being scattered at the cut portion. In addition, when the fixing assembly 12 drives the conductive connector 200 to move for laying, the conductive connector 200 is connected to the first fixing member 500, so that the first fixing member 500 can follow the conductive connector 200 for laying.
[0053] It should be noted that when the connection method between the first fixing portion 123 and the first fixing component 500 is bonding, and the connection method between the first fixing component 500 and the conductive connector 200 is bonding, the bonding stability between the first fixing portion 123 and the first fixing component 500 is weaker than the bonding stability between the first fixing component 500 and the conductive connector 200. Therefore, when the conductive connector 200 is laid in the fixing component 12, the first fixing component 500 can be separated from the first fixing portion 123 and laid following the conductive connector 200, thereby avoiding the situation where the first fixing component 500 is attached to the first fixing portion 123 and cannot fall off.
[0054] In some embodiments, the first heating unit may be an electric heating wire disposed in the first fixing unit 123, so that the first fixing member 500 and the conductive connecting member 200 can be heated by the electric heating wire, so that the first fixing member 500 and the conductive connecting member 200 are welded. In some embodiments, the first heating unit may also be an electric heating lamp disposed on or outside the first fixing unit 123, so that the first fixing member 500 and the conductive connecting member 200 are heated by the electric heating lamp, so that the first fixing member 500 and the conductive connecting member 200 are welded. The present application does not limit the structural form and the setting position of the first heating unit, as long as the first heating unit can heat and weld the first fixing member 500 and the conductive connecting member 200.
[0055] Specifically, the first adsorption hole 1231 and the first heating part are provided on the fixing component 12 as an example. First, negative pressure is formed through the first adsorption hole 1231, so that the first fixing member 500 can be adsorbed on the first fixing part 123. After the fixing component 12 is moved to the fixed position, the second clamping member 122 is close to the first clamping member 121, so that the first fixing member 500 can cooperate with the second clamping member 122 to clamp the conductive connecting member 200. At this time, the first fixing member 500 and the conductive connecting member 200 are heated by the first heating part, so that the first fixing member 500 and the conductive connecting member 200 are welded and fixed. Then the conductive connector 200 is cut off. After the cutting is completed, the fixing component 12 drives the conductive connector 200 to move to the connection position, and then moves away from the first clamping component 121 through the second clamping component 122, so that the fixing component 12 releases the conductive connector 200, thereby realizing the laying of the conductive connector 200. At the same time, negative pressure is no longer formed in the first adsorption hole 1231, and the first fixing component 500 is welded to the conductive connector 200, so that the first fixing component 500 can be detached from the first fixing part 123, and the first fixing component 500 can be laid following the conductive connector 200.
[0056] As an embodiment, the first fixing member 500 is set as a bus bar 400. After the first fixing member 500 is laid following the conductive connector 200, the bus bar 400 can be welded with the battery cell 300 to form a battery string, which is beneficial to improve the processing efficiency of the battery string. As another embodiment, the first fixing member 500 can be set as a metal bar, which can also be bonded to the first fixing portion 123 or welded to the conductive connector 200 through the metal bar. It is only necessary to cut and separate the first fixing member 500 from the conductive connector 200 after the first fixing member 500 is laid following the conductive connector 200. In summary, the present application does not limit the structural form of the first fixing member 500.
[0057] like Figure 1 and Figure 3As shown, as an embodiment, the fixing assembly 12 has the freedom of movement along the front-to-back direction of the processing equipment 100 and the freedom of movement along the left-to-right direction of the processing equipment 100. The fixing assembly 12 moves to the clamping position along the front-to-back direction of the processing equipment 100, and the fixing assembly 12 moves to the working position along the left-to-right direction of the processing equipment 100. Among them, the first clamping member 121 and the first carrier 11 at least partially overlap in the front-to-back direction of the processing equipment 100, thereby improving the structural compactness of the processing equipment 100. In order to avoid interference between the fixing assembly 12 and the first carrier 11 when moving along the front-to-back direction of the processing equipment 100, the first carrier 11 is provided with a receiving groove 111, and when the fixing assembly 12 is in the fixed position, the first clamping member 121 is at least partially located in the receiving groove 111.
[0058] Through the above-mentioned arrangement, when the fixing component 12 moves along the front-rear direction of the processing equipment 100, the accommodating groove 111 can prevent the first carrier 11 from interfering with the movement of the fixing component 12, thereby facilitating the first clamping member 121 and the second clamping member 122 of the fixing component 12 to move to the left and right sides of the conductive connecting member 200 at the accommodating groove 111, thereby facilitating the first clamping member 121 and the second clamping member 122 to clamp the conductive connecting member 200.
[0059] As another embodiment, the fixing component 12 is sticky, and the fixing component 12 can be bonded to one end of the cut conductive connector 200, so that the fixing component 12 can be directly bonded to the conductive connector 200. In this way, the fixing component 12 is directly connected to the conductive connector 200 by bonding, so that the fixing component 12 can drive the conductive connector 200 to move and lay by bonding. In this way, there is no need to clamp the conductive connector 200, which is conducive to simplifying the structure of the conductive connector 200. At the same time, the bonding method can enable the fixing component 12 to restrict the cut conductive connector 200, thereby avoiding the conductive connector 200 from being scattered at the cut position.
[0060] Specifically, in some embodiments, the fixing component 12 is provided with a rubber strip, which can be bonded to the conductive connector 200, thereby improving the connection stability between the conductive connector 200 and the fixing component 12, and further enabling the fixing component 12 to drive the conductive connector 200 to move to the connection position for laying through the rubber strip. When the fixing component 12 is moved to the working position, the rubber strip only needs to be cut off.
[0061] As another embodiment, the fixing component 12 is provided with a heating part for heating the conductive connector 200, and the fixing component 12 can be welded to one end of the cut conductive connector 200 through the heating part. In this way, the conductive connector 200 is connected to the fixing component 12 by welding with the heating part, and the fixing component 12 can drive the conductive connector 200 to move and lay by welding. In this way, there is no need to clamp the conductive connector 200, which is conducive to simplifying the structure of the conductive connector 200. At the same time, the welding method can enable the fixing component 12 to restrict the cut conductive connector 200, thereby avoiding the conductive connector 200 from being scattered at the cut position.
[0062] Specifically, in some embodiments, a heating wire is provided in the fixing component 12, so that the conductive connector 200 can be heated by the heating wire, so that the conductive connector 200 can be welded to the fixing component 12. In some embodiments, an electric heating lamp is provided on or outside the fixing component 12, so that the conductive connector 200 can be heated by the electric heating lamp, so that the conductive connector 200 can be welded to the fixing component 12. Therefore, the present application does not limit the structural form and setting position of the heating part on the fixing component 12. When the fixing component 12 drives the conductive connector 200 to move to the connection position, it is only necessary to cut and separate the conductive connector 200 from the fixing component 12, so as to achieve the laying of the conductive connector 200.
[0063] As another embodiment, the fixing component 12 has adsorption properties, and the fixing component 12 can adsorb one end of the conductive connector 200 after cutting. Optionally, an adsorption hole is provided on the fixing component 12, and a negative pressure is formed in the adsorption hole to adsorb one end of the conductive connector 200 after cutting on the fixing component 12. Through the above-mentioned setting, a negative pressure is formed in the adsorption hole, so that the conductive connector 200 is directly connected to the fixing component 12, so that the fixing component 12 can drive the conductive connector 200 to move for laying. At the same time, the adsorption method can enable the fixing component 12 to restrict the conductive connector 200 after cutting, thereby avoiding the conductive connector 200 from being scattered at the cutting position. In addition, when the fixing component 12 drives the conductive connector 200 to move to the working position, it is only necessary to make the negative pressure no longer formed in the adsorption hole, so that the conductive connector 200 can be directly detached from the fixing component 12, which is conducive to the separation of the conductive connector 200 from the fixing component 12. With such a configuration, there is no need to cut the conductive connector 200 connected to the fixing component 12 , which is beneficial for the fixing component 12 to drive the conductive connector 200 to be laid.
[0064] like Figure 3As shown, as an implementation mode, the first carrier 11 of the present application may be provided with a receiving groove 111, or the first carrier 11 may not be provided with a receiving groove 111, which may be adjusted according to actual needs.
[0065] It should be noted that the present application is described by taking the first carrier 11 having a rotational freedom and having an accommodating groove 111 as an example. The first carrier 11 has a winding surface 113 for winding the conductive connector 200, and the winding surface 113 is arranged around the rotation axis of the first carrier 11. The accommodating groove 111 has at least one opening located on the winding surface 113, so that the fixing component 12 can pass through the opening on the winding surface 113 and at least partially enter the accommodating groove 111.
[0066] Specifically, when the first carrier 11 has a receiving groove 111, the fixing assembly 12 can be configured as a clamp assembly, and the clamp assembly has a degree of freedom of movement so that the clamp assembly has a working position and a clamping position close to the first carrier 11;
[0067] When the clamp assembly is in the clamping position, the accommodating groove 111 can allow at least part of the clamp assembly to enter, so that the clamp assembly can clamp the conductive connector 200. When the conductive connector 200 is cut off, the clamp assembly can move from the clamping position to the working position, so that the clamp assembly drives the conductive connector 200 to move to a connection position that can fit with the battery cell 300. Through the above arrangement, when the conductive connector 200 is cut off, the conductive connector 200 wound on the first carrier 11 can be driven to move by the clamp assembly, thereby realizing the automatic laying of the conductive connector 200, thereby improving the processing efficiency of the battery string. At the same time, since the first carrier 11 has a degree of freedom of rotation, the first carrier 11 will not interfere with the movement of the conductive connector 200 during the process of the clamp assembly driving the conductive connector 200 to move, which is conducive to the laying of the conductive connector 200.
[0068] It should be noted that the working position of the clamp assembly is the working position of the fixing assembly 12, and the clamping position of the clamp assembly is the fixing position of the fixing assembly 12. Therefore, the structure and working process of the clamp assembly are not described in detail in this application.
[0069] In this embodiment, the clamp assembly includes a first clamping member 121 and a second clamping member 122, wherein the structures of the first clamping member 121 and the second clamping member 122 have been described above and will not be repeated here. More specifically, when the clamp assembly is in the clamping position, the first clamping member 121 is at least partially located in the receiving groove 111, or the second clamping member 122 is at least partially located in the receiving groove 111. Furthermore, the first clamping member 121 is at least partially located in the receiving groove 111 after passing through the opening on the winding surface 113, or the second clamping member 122 is at least partially located in the receiving groove 111 after passing through the opening on the winding surface 113.
[0070] It should be noted that the first carrier 11 and the fixture assembly constitute a processing device for the conductive connecting member 200 , that is, the processing device for the conductive connecting member 200 includes the first carrier 11 and the fixture assembly.
[0071] In the present application, a plurality of placement areas 112 are provided on the first carrier 11. The plurality of placement areas 112 are arranged at intervals on the winding surface 113, and the placement areas 112 extend substantially along the direction of the rotation axis of the first carrier 11. Each placement area 112 is fixed with a bus bar 400, and there is a gap between two adjacent placement areas 112 to accommodate a battery cell 300. With such a configuration, a battery string can be formed by welding the conductive connector 200, the bus bar 400 and the battery cell 300. Therefore, by providing the bus bar 400 on the first carrier 11, the bus bar 400 can be connected to the conductive connector 200 wound on the first carrier 11, so that the bus bar 400 can be laid following the conductive connector 200, thereby facilitating the improvement of the processing efficiency of the battery string. At the same time, there is a gap between the two placement areas 112 to accommodate a battery cell 300, so that a battery cell 300 can be directly placed between two adjacent bus bars 400 on the conductive connector 200 after laying, and the battery cell 300, the bus bar 400 and the conductive connector 200 can be welded without adjusting the position of the bus bar 400 on the conductive connector 200 after laying, which is conducive to improving the processing efficiency of the battery string. In addition, when the fixing component 12 drives the conductive connector 200 to move, the first carrier 11 can follow the conductive connector 200 to rotate around the rotation axis, thereby avoiding the first carrier 11 from interfering with the rotation of the conductive connector 200, which is conducive to improving the smoothness of the laying of the conductive connector 200.
[0072] Optionally, each placement area 112 is provided with a second adsorption hole 1121, and a negative pressure is formed in the second adsorption hole 1121 to adsorb the corresponding bus bar 400 on the placement area 112. In this way, the negative pressure formed in the second adsorption hole 1121 can adsorb the bus bar 400, thereby improving the connection stability between the bus bar 400 and the placement area 112, thereby preventing the bus bar 400 from falling off from the placement area 112. At the same time, when the conductive connector 200 follows the fixing component 12 for laying, the negative pressure is no longer formed in the second adsorption hole 1121, so that the bus bar 400 can be laid following the conductive connector 200, and will not interfere with the movement of the bus bar 400 following the conductive connector 200.
[0073] As another embodiment, each placement area 112 is adhesive, and the placement area 112 is bonded to the bus bar 400. In this way, the bus bar 400 can be connected to the placement area 112 by bonding, which is conducive to simplifying the structure of the first carrier 11.
[0074] In order to connect the busbar 400 on the placement area 112 with the conductive connector 200, the first carrier 11 of the present application further includes a carrier body 114 and a second heating unit (not shown). The second heating unit is used to heat the busbar 400 and the conductive connector 200, and the second heating unit is located in the carrier body 114 or arranged near the carrier body 114, and the conductive connector 200 and the busbar 400 are welded by the second heating unit. In this way, the connection stability between the busbar 400 and the conductive connector 200 on the first carrier 11 is improved by welding the conductive connector 200 and the busbar 400, so that when the conductive connector 200 is moved for laying, the busbar 400 on the first carrier 11 can be separated from the placement area 112 and attached to the conductive connector 200, avoiding the situation where the conductive connector 200 is attached to the placement area 112 and does not move with the conductive connector 200.
[0075] In some embodiments, the second heating unit may be an electric heating wire disposed in the placement area 112, so that the conductive connector 200 and the bus bar 400 are heated by the electric heating wire, so that the conductive connector 200 can be welded with the bus bar 400. In some embodiments, the second heating unit may be an electric heating tube disposed inside or outside the carrier body 114, so that the conductive connector 200 and the bus bar 400 are heated by the electric heating tube, so that the conductive connector 200 can be welded with the bus bar 400. Therefore, the present application does not limit the structural form and the setting position of the second heating unit, and it only needs to meet the requirement of being able to heat and weld the conductive connector 200 and the bus bar 400 on the first carrier 11.
[0076] In order to connect the busbar 400 on 112 with the conductive connector 200, as another embodiment, the busbar 400 and the conductive connector 200 are bonded. The connection between the busbar 400 and the conductive connector 200 can be achieved by bonding, so that when the conductive connector 200 is moved for laying, the busbar 400 on the first carrier 11 can be separated from the placement area 112 and attached to the conductive connector 200, thereby simplifying the structure of the first carrier 11.
[0077] In some embodiments, a glue strip is disposed on a side of the bus bar 400 on the first carrier 11 facing away from the first carrier 11 , so that the bus bar 400 on the first carrier 11 can be bonded to the conductive connector 200 .
[0078] It should be noted that when the connection method between the placement area 112 and the busbar 400 on the first carrier 11 is bonding, and the connection method between the busbar 400 on the first carrier 11 and the conductive connector 200 is bonding, the bonding stability between the busbar 400 on the first carrier 11 and the conductive connector 200 is stronger than the bonding stability between the placement area 112 and the busbar 400 on the first carrier 11, so that when the fixing component 12 drives the conductive connector 200 to move, the conductive connector 200 can drive the busbar 400 on the first carrier 11 to detach from the placement area 112, so that the conductive connector 200 can drive the busbar 400 to be laid, thereby avoiding the situation where the conductive connector 200 cannot drive the busbar 400 on the first carrier 11 to move for laying. Such a setting is conducive to improving the welding efficiency of the busbar 400 and the battery cell 300, thereby improving the processing efficiency of the battery string.
[0079] Specifically, taking the second adsorption hole 1121 provided in the placement area 112 and the second heating part provided on the first carrier 11 as an example, first, a negative pressure is formed through the second adsorption hole 1121 so that the second fixing member 600 can be adsorbed on the placement area 112. Then, the conductive connector 200 is wound on the first carrier 11. Then, the second fixing member 600 and the conductive connector 200 are heated and welded by the second heating part. When the fixing assembly 12 drives the conductive connector 200 to move for laying, negative pressure is no longer formed in the second adsorption hole 1121, so that the conductive connector 200 can be detached from the first carrier 11. At the same time, the conductive connector 200 can drive the bus bar 400 on the first carrier 11 to move together for laying through welding, thereby improving the processing efficiency of the battery string.
[0080] It can be understood that the busbar 400 on the first carrier 11 can also be arranged on the side of the conductive connector 200 away from the first carrier 11, that is, the conductive connector 200 is firstly wound on the first carrier 11, and then the busbar 400 is adsorbed on the first carrier 11, so that the busbar 400 can clamp the conductive connector 200 in cooperation with the placement area 112. Then, the busbar 400 and the conductive connector 200 are heated and welded by the second heating part, so that the busbar can be laid following the movement of the conductive connector 200, thereby improving the processing efficiency of the battery string.
[0081] It should be noted that when the bus bar 400 on the first carrier 11 is disposed on the side of the conductive connector 200 away from the first carrier 11, the bus bar 400 is adsorbed in the placement area 112 only by the negative pressure formed in the second adsorption hole 1121. At the same time, in the present application, since there is a gap between the conductive connectors 200, the negative pressure formed in the second adsorption hole 1121 can adsorb the bus bar 400 through the gap between the conductive connectors 200, so that the bus bar 400 can be fixed to the placement area 112.
[0082] It should be noted that when the conductive connector 200 is first wound on the first carrier 11, a guide groove (not shown) is provided on the first carrier 11, and the conductive connector 200 can be limited by the guide groove, so that when the conductive connector 200 is wound on the first carrier 11, it is helpful to fix the position of the conductive connector 200 on the first carrier 11.
[0083] like Figure 1 , Figure 4 and Figure 5 As shown, as an embodiment, the battery string processing equipment 100 also includes a press assembly 13, and the press assembly 13 has a pressing force acting on the conductive connector 200, so that the conductive connector 200 is pressed onto the first carrier 11. In the present application, the press assembly 13 is arranged at the upper end of the fixing assembly 12, and at the same time, the cutting position of the conductive connector 200 is between the fixing assembly 12 and the press assembly 13, so that the conductive connector 200 is formed with two ends. Through the above-mentioned arrangement, the upper and lower ends of the conductive connector 200 at the cutting position can be fixed by the press assembly 13 and the fixing assembly 12, respectively, to prevent the conductive connector 200 from loosening during the cutting process, and thus facilitate the cutting of the conductive connector 200, so that the conductive connector 200 is formed with two ends. Among them, the press assembly 13 and the fixing assembly 12 can fix the two ends of the conductive connector 200, respectively.
[0084] In the present application, the conductive connector 200 is a welding strip and the number of welding strips is not unique. Therefore, after the welding strip is cut, the conductive connector 200 is cut into two ends. Since the two ends of the conductive connector 200 lose connection, the conductive connector 200 will be scattered. However, after the conductive connector 200 is cut, the pressing of the conductive connector 200 by the pressing tool assembly 13 can prevent the conductive connector 200 from being scattered, so that when the fixing assembly 12 drives the conductive connector 200 to be laid, the conductive connector 200 will not contact each other, thereby preventing the battery cells 300 from short-circuiting due to the contact between the conductive connectors 200.
[0085] Further, the press assembly 13 includes a pressing member 131, and the pressing member 131 has a degree of freedom of movement, so that the pressing member 131 has a pressing position for pressing the conductive connector 200 and a separation position for separating from the conductive connector 200. When the pressing member 131 is in the pressing position, the pressing member 131 has a pressing force acting on the conductive connector 200. In the present application, the pressing member 131 and the fixing assembly 12 are at least partially located on the left side of the first carrier 11. Therefore, in the present application, the pressing member 131 has a degree of freedom of movement along the left and right directions of the processing equipment 100. In this way, the pressing member 131 moves between the pressing position and the separation position, thereby realizing the pressing and separation of the conductive connector 200 by the press assembly 13.
[0086] Specifically, when the conductive connector 200 needs to be cut off, the clamping member 131 moves to the clamping position so that the clamping member 131 can clamp the conductive connector 200, and then the conductive connector 200 is fixed by the fixing assembly 12, thereby fixing the upper and lower ends of the cutting position of the conductive connector 200, which is conducive to cutting off the conductive connector 200. After the cutting is completed, the fixing component 12 drives the conductive connector 200 to move for laying, and at the same time, the first carrier 11 rotates in coordination with the movement of the conductive connector 200. At this time, the pressing component 13 rotates following the first carrier 11, so that the pressing component 13 can maintain the pressure on the conductive connector 200 until the conductive connector 200 moves to the connection position, and the clamping member 131 moves to the separation position, so that the pressure drop member no longer limits the conductive connector 200. In the process of the movement of the conductive connector 200, the conductive connector 200 is pressed by the clamping member 131, so that the conductive connector 200 will not slip off the first carrier 11, which is conducive to the conductive connector 200 following the movement of the fixing component 12 for laying.
[0087] Optionally, the press assembly 13 is provided with a second fixing portion 132 for fixing the second fixing member 600, and the second fixing portion 132 is located on the side of the pressing member 131 facing the first carrier 11. By providing the second fixing member 600, the pressing effect of the press assembly 13 on the conductive connector 200 can be improved, thereby facilitating the cutting of the conductive connector 200. In some embodiments, the second fixing portion 132 is provided on the side of the pressing member 131 facing the first carrier 11, and at the same time, the second fixing member 600 is provided on the side of the second fixing portion 132 facing the first carrier 11, so that when the pressing member 131 drives the second fixing portion 132 to move to the pressing position, the second fixing member 600 on the second fixing portion 132 is abutted against the conductive connector 200, and the second fixing member 600 is connected to the conductive connector 200, so that the second fixing member 600 can press and fix the conductive connector 200, thereby avoiding the disorder at the cut-off position of the conductive connector 200. It should be noted that the connection method between the second fixing member 600 and the conductive connecting member 200 is described in detail below and will not be repeated here.
[0088] Exemplarily, a third adsorption hole 133 is provided on the second fixing portion 132, and negative pressure is formed in the third adsorption hole 133 to adsorb the second fixing component 600 onto the second fixing portion 132, thereby improving the connection stability between the second fixing component 600 and the second fixing portion 132, thereby preventing the second fixing component 600 from falling off the second fixing portion 132 during the movement of the second fixing portion 132.
[0089] Or the second fixing portion 132 is used to bond with the second fixing member 600. By bonding the second fixing portion 132 with the second fixing member 600, the connection stability between the second fixing portion 132 and the second fixing member 600 is improved, and the second fixing member 600 is prevented from falling off from the second fixing portion 132 during the movement of the second fixing portion 132.
[0090] Among them, when the third adsorption hole 133 is provided on the second fixing part 132, the fixing component 12 drives the conductive connector 200 to move to the connection position, and when the fixing component 12 no longer clamps the conductive connector 200, the negative pressure is no longer formed in the third adsorption hole 133, so that the second fixing component 600 can be separated from the second fixing part 132, so that the second fixing component 600 can be laid following the conductive connector 200.
[0091] When the second fixing portion 132 is used to bond the second fixing member 600, a foam adhesive strip is provided on the second fixing portion 132, and the foam adhesive strip has viscosity, so that the second fixing portion 132 can be used to bond the second fixing member 600. It should be noted that the viscosity of the second fixing portion 132 and the second fixing member 600 can overcome the gravity of the second fixing member 600, so that the second fixing member 600 can be fixed on the second fixing portion 132, and the viscosity of the second fixing portion 132 and the second fixing member 600 cannot overcome the total gravity after the second fixing member 600 and the conductive connector 200 are connected, so that when the fixing component 12 drives the conductive connector 200 to move to the connection position and the fixing component 12 no longer clamps the conductive connector 200, the second fixing member 600 can automatically fall from the second fixing portion 132, which is conducive to the separation of the second fixing member 600 from the second fixing portion 132, so that the second fixing member 600 can be laid together with the conductive connector 200.
[0092] Optionally, in order to achieve the connection between the second fixing member 600 and the conductive connector 200, the presser assembly 13 of the present application includes a third heating portion 135 for heating the conductive connector 200 and the second fixing member 600, and the conductive connector 200 and the second fixing member 600 are welded by the third heating portion 135. Alternatively, the second fixing member 600 of the present application has adhesiveness so that the second fixing member 600 and the conductive connector 200 are bonded. It can be understood that by welding or bonding the conductive connector 200 and the second fixing member 600, the connection stability between the conductive connector 200 and the second fixing member 600 is improved, and then when the pressing member 131 moves from the pressing position to the separation position, the second fixing member 600 can be separated from the second fixing portion 132 and attached to the conductive connector 200. At the same time, by improving the connection stability between the conductive connector 200 and the second fixing member 600 , the second fixing member 600 can further limit the cut portion of the conductive connector 200 , thereby preventing the conductive connector 200 from being scattered at the cut portion.
[0093] It should be noted that when the second fixing portion 132 and the second fixing component 600 are connected by bonding, and the second fixing component 600 and the conductive connector 200 are connected by bonding, the bonding stability between the second fixing portion 132 and the second fixing component 600 is weaker than the bonding stability between the second fixing component 600 and the conductive connector 200, so that when the conductive connector 200 is laid in the fixing assembly 12, the second fixing component 600 can be separated from the second fixing portion 132 and laid following the conductive connector 200.
[0094] Specifically, the third heating portion 135 is located inside the pressing member 131 or is disposed close to the pressing member 131 , or the third heating portion 135 is located on the fixing component.
[0095] In some embodiments, the third heating unit 135 may be an electric heating wire disposed in the second fixing unit 132, so that the second fixing member 600 and the conductive connecting member 200 can be heated by the electric heating wire, so that the second fixing member 600 and the conductive connecting member 200 are welded. In some embodiments, the third heating unit 135 may also be an electric heating lamp disposed on or outside the fixing assembly 12, so that the second fixing member 600 and the conductive connecting member 200 are heated by the electric heating lamp, so that the second fixing member 600 and the conductive connecting member 200 are welded. In some embodiments, the third heating unit 135 includes a cylinder 1351 and an electric heating pipe 1352, the cylinder 1351 is fixedly mounted on the fixing assembly 12, the cylinder 1351 is transmission-connected with the electric heating pipe 1352, and the cylinder 1351 drives the electric heating pipe 1352 to move toward the pressing member 131, so that the electric heating pipe 1352 can heat the second fixing member 600 and the conductive connecting member 200, so that the second fixing member 600 and the conductive connecting member 200 are welded. Therefore, the present application does not impose any restrictions on the structural form and setting position of the third heating part 135 , and it is only necessary that the third heating part 135 can heat and weld the second fixing member 600 and the conductive connecting member 200 .
[0096] Specifically, the third adsorption hole 133 is provided on the second fixing part 132 and the third heating part 135 is provided on the pressing tool assembly 13. First, a negative pressure is formed by the third adsorption hole 133 so that the second fixing member 600 can be adsorbed on the third fixing part. Then, the pressing member 131 is close to the first carrier 11, so that the second fixing member 600 can press the conductive connecting member 200 on the first carrier 11. Then, the second fixing member 600 and the conductive connecting member 200 are heated and welded by the third heating part 135, so that when the pressing member 131 moves from the pressing position to the separation position, the second fixing member 600 can be attached to the conductive connecting member 200, so that the second fixing member 600 can follow the conductive connecting member 200 to move and be laid.
[0097] As an embodiment, the second fixing member 600 is set as a bus bar 400, so that after the second fixing member 600 is laid following the conductive connector 200, the bus bar 400 can be welded with the battery cell 300 through the conductive connector 200 to form a battery string, which is beneficial to improve the processing efficiency of the battery string. As another embodiment, the second fixing member 600 can be set as a metal bar, which can also be connected to the second fixing portion 132 and the conductive connector 200 through the metal bar. It is only necessary to cut and separate the second fixing member 600 from the conductive connector 200 after the second fixing member 600 is laid following the conductive connector 200. This application does not limit the structural form of the first fixing member 500.
[0098] Optionally, the pressing tool assembly 13 further includes a driving member 134, which is in transmission connection with the pressing member 131 and is fixed on the first carrier 11. In this way, the pressing member 131 can be driven by the driving member 134 to move along the left and right direction of the processing equipment 100, so that the pressing member 131 can move between the pressing position and the separation position.
[0099] like Figure 1 and Figure 6 As shown, as an embodiment, the processing equipment 100 includes a second carrier 14, and the second carrier 14 has a placement surface 141 for placing the battery cell 300 and / or the conductive connector 200. Through the provision of the second carrier 14, the fixing component 12 can lay the conductive connector 200 on the placement surface 141, and the battery string can be welded on the placement surface 141, thereby improving the processing efficiency of the battery string.
[0100] It should be noted that the battery cell 300 may be laid on the placement surface 141 before the conductive connector 200 is laid on the placement surface 141. Alternatively, the battery cell 300 may be laid on the conductive connector 200 for welding after the conductive connector 200 is laid on the placement surface 141. Therefore, the present application does not limit the order of laying the battery cell 300 and the conductive connector 200 on the placement surface 141.
[0101] Specifically, the processing equipment 100 further includes a guide wheel 15 for guiding the cut conductive connector 200. Along the up and down direction of the processing equipment 100, the placement surface 141 is the upper surface of the second carrier 14, and the uppermost end of the guide wheel 15 and the placement surface 141 are located on the same horizontal plane. In this way, when the fixing assembly 12 drives the conductive connector 200 to move for laying, the guide wheel 15 can guide the laying height of the conductive connector 200. At the same time, since the uppermost end of the guide wheel 15 and the placement surface 141 are located on the same horizontal plane, the conductive connector 200 can be laid on the placement surface 141 more smoothly.
[0102] More specifically, the fixing component 12 is arranged close to the second carrier 14, and the fixing component 12 is at least partially located above the second carrier 14, so that the fixing component 12 can drive the conductive connector 200 to move and be laid above the second carrier 14, thereby enabling the placement surface 141 on the second carrier 14 to support the conductive connector 200.
[0103] Optionally, the fixing component 12 has the freedom of movement along the vertical direction of the processing equipment 100, and / or the second carrier 14 has the freedom of movement along the vertical direction of the processing equipment 100. It can be understood that when the fixing component 12 drives the conductive connector 200 to move for laying, the fixing component 12 and / or the second carrier 14 move along the vertical direction of the processing equipment 100, so that the conductive connector 200 can be attached to the placement surface 141 on the second carrier 14, and then the conductive connector 200 can be laid on the placement surface 141. Such a configuration is conducive to the fixing component 12 laying the conductive connector 200 on the placement surface 141.
[0104] In some embodiments, the second carrier 14 can be a lifting platform, and the upper surface of the lifting platform is the placement surface 141. By raising and lowering the lifting platform, the distance between the conductive connector 200 and the placement surface 141 can be adjusted, so that the conductive connector 200 can be laid in contact with the placement surface 141.
[0105] In some embodiments, the fixing assembly 12 may include a lifting cylinder having the freedom to move in the up and down directions of the processing equipment 100. At the same time, the lifting cylinder is transmission-connected to the first clamping member 121 and the second clamping member 122, so that the lifting cylinder can drive the first clamping member 121 and the second clamping member 122 to move in the up and down directions of the processing equipment 100, thereby driving the conductive connecting member 200 clamped by the first clamping member 121 and the second clamping member 122 to move in the up and down directions, so that the conductive connecting member 200 can be laid in contact with the placement surface 141.
[0106] As an optional implementation, the processing equipment 100 of the present application includes a first carrier 11, a clamp assembly and a second carrier 14, that is, the processing equipment 100 of the present application includes a processing device for the conductive connector 200 composed of the first carrier 11 and the clamp assembly and the second carrier 14. When the clamp assembly is in the clamping position, the receiving groove 111 can allow at least part of the clamp assembly to enter, so that the clamp assembly can clamp the conductive connector 200; when the conductive connector 200 is cut off, the clamp assembly can move from the clamping position to the working position, so that the clamp assembly drives the conductive connector 200 to move to the placement surface 141 that can fit the battery cell 300.
[0107] As an embodiment, the present application discloses a carrier having rotational freedom and having a receiving groove. In addition, the carrier has a winding surface for winding the conductive connector 200, and the winding surface is arranged around the rotation axis of the carrier. The receiving groove has at least one opening located on the winding surface. It should be noted that the above-mentioned receiving groove is the receiving groove 111 of the first carrier 11, and the above-mentioned winding surface is the winding surface 113 of the first carrier 11, that is, the first carrier 11 in the above-mentioned embodiment is this carrier.
[0108] like Figure 7 As shown, as an embodiment, the present application also discloses a battery string processing method, the processing method comprising the following steps:
[0109] S1: Winding the conductive connecting member 200 on a first carrier 11 having rotational freedom;
[0110] S2: moving the clamp assembly to the clamping position, the clamp assembly 41 clamps the conductive connector 200;
[0111] S3: cutting off the conductive connecting member 200, and the cutting position of the conductive connecting member 200 is close to the clamp assembly;
[0112] S4: The clamp assembly moves from the clamping position to the working position to drive the conductive connector 200 to move from the first carrier 11 to a connection position capable of being attached to the battery cell 300 .
[0113] The connection position in step S4 refers to the second carrier 14 , wherein the second carrier 14 is used to place the conductive connector 200 and / or the battery cell 300 , so that the conductive connector 200 can be attached to the battery cell 300 on the second carrier 14 .
[0114] like Figure 8 and Fig. 9 As shown, step S1 includes:
[0115] S11: Arranging bus bars 400 on the first carrier 11 at equal intervals along the rotation direction of the first carrier 11;
[0116] Specifically, the busbar 400 can be laid following the conductive connector 200, and the busbar 400 can be welded with the battery cell 300 and the conductive connector 200 to form a battery string. At the same time, the interval between adjacent busbars 400 can accommodate one battery cell 300, so that in step S4, after the fixture assembly drives the conductive connector 200 to move and lay, there is no need to adjust the spacing of the busbars 400 on the conductive connector 200, which is conducive to improving the processing efficiency of the battery string.
[0117] S12 : Winding the conductive connecting member 200 on the first carrier 11 , so that the conductive connecting member 200 is wound on the bus bar 400 .
[0118] Specifically, by winding the conductive connector 200 around the first carrier 11, the first carrier 11 has a degree of rotational freedom, so that in step S4, when the conductive connector 200 moves for laying, the first carrier 11 will rotate following the movement of the conductive connector 200, so that the first carrier 11 will not interfere with the movement of the conductive connector 200. At the same time, a second heating unit can also be provided on the first carrier 11, and the conductive connector 200 and the bus bar 400 are welded by the second heating unit, so that in step S4, when the fixture assembly drives the conductive connector 200 to move for laying, the bus bar 400 on the first carrier 11 can be attached to the conductive connector 200 and laid together with the conductive connector 200. More specifically, the bus bars 400 are arranged at equal intervals on the first carrier 11 along the rotation direction of the first carrier 11; the conductive connector 200 is wound around the first carrier 11 on which the bus bars 400 are arranged, so that the conductive connector 200 and the bus bar 400 are in contact and welded.
[0119] Or step S1 comprises:
[0120] S11: Winding the conductive connecting member 200 on the first carrier 11;
[0121] Specifically, the first carrier 11 may be provided with a guide groove to limit the conductive connecting member 200 wound on the first carrier 11 , thereby preventing the conductive connecting member 200 from being offset on the first carrier 11 .
[0122] S12 : Fixing the busbars 400 on the first carrier 11 , so that the busbars 400 are arranged on the conductive connectors 200 at equal intervals along the rotation direction of the first carrier 11 .
[0123] Specifically, the conductive connector 200 is first wound on the first carrier 11, and then the busbar 400 is arranged on the conductive connector 200 and welded through the second heating part, so that the busbar 400 is not in direct contact with the first carrier 11. Then, when the conductive connector 200 is laid in step S4, the conductive connector 200 can directly drive the busbar 400 to move, and the busbar 400 will not be fixed on the first carrier 11, resulting in the busbar 4 not being laid following the conductive connector 200.
[0124] The clamp assembly includes a first clamping member 121 and a second clamping member 122 .
[0125] like Fig.10 As shown, step S2 includes:
[0126] S21: moving the clamp assembly to a clamping position;
[0127] Specifically, the clamp assembly moves to the clamping position, which enables the clamp assembly to move to the conductive connector 200 , thereby facilitating the clamp assembly to clamp the conductive connector 200 .
[0128] S22 : The second clamping member 122 moves close to the first clamping member 121 , so that the first clamping member 121 and the second clamping member 122 form a clamping space for clamping one end of the conductive connecting member 200 .
[0129] Specifically, the second clamping member 122 moves close to the first clamping member 121 to form a clamping space, thereby clamping the conductive connector 200 wound on the first carrier 11, fixing the conductive connector 200, and facilitating cutting the conductive connector in step S3. At the same time, the clamp assembly can clamp the cut conductive connector 200, thereby facilitating driving the cut conductive connector 200 to move to the connection position in step S4.
[0130] Optionally, the clamp assembly includes a first fixing portion 123 for fixing the first fixing member 500, and the first fixing portion 123 and the first clamping member 121 form a clamping space for clamping one end of the conductive connector 200, or the first fixing portion 123 and the second clamping member 122 form a clamping space for clamping one end of the conductive connector 200.
[0131] Therefore, step S2 further includes:
[0132] S23: When the clamp assembly clamps the conductive connecting member 200, the first fixing member 500 and the conductive connecting member 200 are bonded or welded.
[0133] Specifically, the conductive connector 200 is a welding strip and the number of the conductive connectors 200 is not unique. Therefore, after the conductive connector 200 is cut off in step S3, the conductive connector 200 will be scattered. Through the connection between the first fixing member 500 and the conductive connector 200, the conductive connector 200 can be limited, so that when the conductive connector is moved and laid in step S4, the conductive connectors 200 will not contact each other, thereby avoiding short circuits between the battery cells 300 due to contact between the conductive connectors 200.
[0134] like Fig.11 As shown, cutting off the conductive connection member 200 in step S3 includes:
[0135] S31: The press assembly 13 presses the conductive connector 200 onto the first carrier 11;
[0136] Specifically, the conductive connector 200 is pressed by the presser assembly 13 , and the conductive connector 200 is clamped by the clamp assembly in step S2 , so that the conductive connector 200 can be fixed, which is conducive to cutting the conductive connector 200 .
[0137] S32: Cutting off the conductive connection member 200 between the press assembly 13 and the clamp assembly.
[0138] Specifically, the conductive connecting member 200 on the first carrier 11 is cut off, so that in step S4, the clamp assembly can drive the cut conductive connecting member 200 to move and be laid.
[0139] More specifically, in step S4, the cut conductive connector 200 is moved by the clamp assembly so that the conductive connector 200 on the first carrier 11 can be unfolded and laid to a connection position that fits the battery cell 300. Therefore, the processor of the battery string can directly perform welding on the laid conductive connector 200, thereby improving the processing efficiency of the battery string.
[0140] It should be understood that those skilled in the art can make improvements or changes based on the above description, and all these improvements and changes should fall within the scope of protection of the claims attached to this application.
Claims
1. A battery string processing device, characterized in that: The processing equipment includes: A first carrier, used for winding the conductive connecting member, the first carrier having a rotational degree of freedom, and the first carrier having a receiving groove; a clamp assembly having a degree of freedom of movement such that the clamp assembly has a working position and a clamping position proximate to the first carrier; When the clamp assembly is in the clamping position, the accommodating groove can allow at least a portion of the clamp assembly to enter, so that the clamp assembly can clamp the conductive connector; when the conductive connector is cut off, the clamp assembly can move from the clamping position to the working position, so that the clamp assembly drives the conductive connector to move to a connection position where it can fit with the battery cell.
2. The battery string processing equipment according to claim 1, characterized in that: The first carrier is provided with a winding surface for winding the conductive connecting member, the winding surface is arranged around the rotation axis of the first carrier, and the accommodating groove has at least one opening located on the winding surface; The clamp assembly includes a first clamping member and a second clamping member, wherein the second clamping member has a degree of freedom of movement so that the second clamping member can be close to or away from the first clamping member, and when the second clamping member is close to the first clamping member, the first clamping member and the second clamping member form a clamping space for clamping one end of the conductive connecting member; When the clamp assembly is in the clamping position, the first clamping member is at least partially located in the receiving groove, or the second clamping member is at least partially located in the receiving groove; The clamp assembly is provided with a first fixing portion for fixing the first fixing member, the first fixing portion is located on the first clamping member, and when the second clamping member is close to the first clamping member, the first fixing portion and the second clamping member form the clamping space for clamping one end of the conductive connecting member; Alternatively, the first fixing portion is located on the second clamping member, and when the second clamping member is close to the first clamping member, the first fixing portion and the first clamping member form the clamping space for clamping one end of the conductive connecting member.
3. The battery string processing equipment according to claim 2, characterized in that: The first fixing part is provided with a first adsorption hole, and the first fixing member is adsorbed onto the first fixing part by forming a negative pressure in the first adsorption hole; or the first fixing portion is used to bond with the first fixing member; Or the first fixing portion is used for welding with the first fixing piece.
4. The battery string processing equipment according to claim 2, characterized in that: The clamp assembly includes a first heating part for heating the conductive connecting member and the first fixing member, the first heating part is located in the first clamping member or the second clamping member, or the first heating part is arranged close to the first clamping member and / or the second clamping member, and the conductive connecting member and the first fixing member are welded by the first heating part; Or the first fixing member has adhesiveness so that the first fixing member and the conductive connecting member are bonded together.
5. The battery string processing equipment according to claim 1, characterized in that: The processing equipment further includes a press assembly, wherein the press assembly has a pressing force acting on the conductive connecting member so as to press the conductive connecting member onto the first carrier; The press assembly includes a pressing member, the pressing member having a degree of freedom of movement, so that the pressing member has a pressing position for pressing the conductive connecting member and a separation position for separating from the conductive connecting member, and when the pressing member is in the pressing position, the pressing member has a pressing force acting on the conductive connecting member; The press assembly is provided with a second fixing portion for fixing a second fixing member, and the second fixing portion is located on a side of the pressing member facing the first carrier.
6. The battery string processing equipment according to claim 5, characterized in that: The second fixing part is provided with a third adsorption hole, and the second fixing member is adsorbed onto the second fixing part by forming a negative pressure in the third adsorption hole; Or the second fixing portion is used to bond with the second fixing piece.
7. The battery string processing equipment according to claim 5, characterized in that: The press assembly comprises a third heating part for heating the conductive connecting member and the second fixing member, so that the conductive connecting member and the second fixing member are welded by the third heating part; The third heating part is located in the pressing member or is arranged near the pressing member; or the third heating part is located on the clamp assembly, and when the clamp assembly is in the clamping position, the third heating part is arranged near the pressing member, so that the conductive connecting member and the second fixing member are welded; Or the second fixing member has adhesiveness so that the second fixing member and the conductive connecting member are bonded together.
8. The battery string processing equipment according to claim 5, characterized in that: The pressing tool assembly also includes a driving member, which is transmission-connected to the pressing member and is fixed on the first carrier.
9. A method for processing a battery string, characterized in that: The first carrier has a receiving groove, and the processing method includes: Winding the conductive connecting element on a first carrier having rotational freedom; The clamp assembly is moved to a clamping position, wherein the receiving groove allows at least a portion of the clamp assembly to enter, so that the clamp assembly clamps the conductive connector; Cutting off the conductive connecting member, wherein the cutting position of the conductive connecting member is close to the clamp assembly; The clamp assembly moves from the clamping position to the working position to drive the conductive connector to move from the first carrier to a connection position capable of being attached to the battery cell.
10. The method for processing a battery string according to claim 9, characterized in that: The step of winding the conductive connecting member on the first carrier having rotational freedom comprises: Arranging bus bars at equal intervals on the first carrier along the rotation direction of the first carrier; winding the conductive connecting member on the first carrier on which the bus bars are arranged, so that the conductive connecting member and the bus bars are in contact and welded; Or the conductive connecting member is wound around the first carrier; the busbar is fixed on the first carrier so that the busbar is arranged on the conductive connecting member at equal intervals along the rotation direction of the first carrier; and the conductive connecting member and the busbar are welded.
11. The method for processing a battery string according to claim 9, characterized in that: The cutting off of the conductive connection comprises: Pressing the conductive connector onto the first carrier by a press assembly; The conductive connection between the press assembly and the clamp assembly is severed.
Citation Information
Patent Citations
Automatic photovoltaic module confluence strap bending device and method thereof
CN104966764A
Solar cell welding machine
CN109623218A
IBC solar cell string welding strip welding production line and production method thereof
CN111185687A
IBC solar cell string light welding device and welding method thereof
CN111203661A
Solder strip laying mechanism of battery piece and solar battery piece welding machine
CN210997130U