A mobile data management system and method for power transformers
By generating floating models and response models to predict and optimize the real-time data of power transformers, it solves the problems of data transmission lag and command response delay in the power transformer monitoring system, and improves the real-time and accuracy of the system.
Patent Information
- Application Number
- CN202411206768.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-08-30
AI Technical Summary
The existing power transformer monitoring system has a lag in the data transmission process, which makes it impossible to judge the status of the transformer in real time, and the response time of control instructions is too long, making it impossible to resolve abnormal situations in a timely manner, resulting in a huge lag in system analysis and control.
By collecting historical data, we generate the floating model and response model of the power transformer, use these models to predict and optimize real-time data, reduce the lag in data transmission time, and update the model in real time to improve the real-time and accuracy of the system.
It significantly enhances the real-time and accuracy of the system, avoids lag and command response delays caused by data transmission time, and ensures timely monitoring and processing of abnormal power transformer faults.
Smart Images

Figure CN118709127B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data prediction, and in particular to a mobile data management system and method for power transformers. Background Art
[0002] With the development of sensor technology, the accuracy, sensitivity and durability of sensors are constantly improving. More types of sensors (such as temperature, pressure, vibration, and gas sensors) are used to monitor transformers. Various sensors can accurately measure various data of real-time transformers. With the development of wireless networks, data transmission is faster and more accurate. The popularization of wireless communication technologies such as cellular networks, Wi-Fi, Bluetooth, and Zigbee provides a basis for data transmission of remote monitoring systems. Wireless communication is particularly important in remote areas or environments where wiring is difficult. The widespread use of smartphones and tablets makes mobile monitoring and data access more convenient. Wireless networks can transmit real-time detection data to mobile devices, allowing operation and maintenance personnel to obtain transformer operation data anytime and anywhere. With the growth of electricity demand and the increase in the complexity of power grids, the requirements for the reliability and stability of power systems are getting higher and higher. Real-time monitoring of the status of key equipment such as transformers can help prevent failures and reduce power outages. Although the current power transformer monitoring is more accurate in real-time data collection and faster in data analysis, there are still problems. The data in some transformers changes very frequently, so the data can change significantly during data transmission, resulting in a lag in the data transmitted to the mobile control end, making it impossible to judge the transformer status in real time or causing misjudgment. In addition, because abnormal transformers can cause changes in their response time, the instructions sent by the control end cannot be implemented effectively and promptly. Often after the response time, the data has changed significantly, and the instructions at this time cannot solve the real-time anomalies, resulting in a great lag in system analysis and control. Therefore, how to solve the lag in system data analysis is crucial. Summary of the invention
[0003] The object of the present invention is to provide a mobile data management system and method for a power transformer to solve the problems raised in the above background technology.
[0004] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0005] A mobile data management method for a power transformer, the method comprising the following steps:
[0006] S100, collecting all types of data when abnormal faults occur in power transformers in history, analyzing all types of collected data, calculating the correlation between each type of data and abnormal faults of power transformers, and analyzing all correlations to obtain mapping data of abnormal faults of power transformers;
[0007] Furthermore, the specific steps of analyzing all the correlations to obtain the mapping data of abnormal faults of power transformers are as follows:
[0008] S101, collect all types of data when abnormal faults occur in power transformers in history, and assume that each type of data collected is {Q1, Q2, Q3, ..., Q n}, Q1, Q2, Q3, ..., Q n Indicates the 1st, 2nd, 3rd, ..., nth data values when the power transformer has an abnormal fault in the collected history, and the corresponding value of each data collected when the power transformer is working normally is {Q'1, Q'2, Q'3, ..., Q' n}, Q'1, Q'2, Q'3,..., Q' n Indicates the 1st, 2nd, 3rd, ..., nth data values collected when the power transformer is working normally, where n is a positive integer;
[0009] S102, analyzing all the collected data of the power transformer when it fails and when it works normally, and calculating the correlation between each data and the abnormal failure of the power transformer, the formula is: ,
[0010] In the formula, Re represents the correlation between each type of data and abnormal faults of power transformers, and m represents the number of each type of data collected when abnormal faults of power transformers occur. The correlation of all types of data collected when abnormal faults of power transformers occur is calculated, and the correlation of each type of data is {Re1, Re2, Re3, ..., Re n}, Re1, Re2, Re3,..., Re n Indicates the calculated correlation degree of the 1st, 2nd, 3rd, ..., nth type of data;
[0011] S103, analyzing the calculated correlation of each type of data, and selecting the maximum correlation value Re max As the mapping data Ma when an abnormal fault occurs in the power transformer.
[0012] S200, collecting the change data of the mapping data over time before the abnormal fault occurs in the power transformer under the same environmental data in history, and generating a floating model of the mapping data before the abnormal fault occurs; collecting the response time of the power transformer to the instruction under different mapping data states when the abnormal fault occurs in the historical power transformer, and generating a power transformer response model;
[0013] Furthermore, the specific steps of generating the floating model and the response model of the power transformer are as follows:
[0014] S201, collect the mapping data before the abnormal fault of the power transformer in the history and the value of the change over time is {Ma1, Ma2, Ma3, ..., Ma k}, Ma1, Ma2, Ma3,..., Ma k represents the 1st, 2nd, 3rd, ..., kth mapping data that change with time before the abnormal fault of the power transformer occurs in the collected history, where k is a positive integer; the time corresponding to the mapping data change before the abnormal fault of the power transformer occurs in the collected history is {t1, t2, t3, ..., t k}, t1, t2, t3, ..., t k represents the 1st, 2nd, 3rd, ..., kth time of the mapping data change before the abnormal fault of the power transformer occurs in the collected history;
[0015] S202, using the mapping data of the changes over time before the abnormal failure of the power transformer in the collected history as a variable, and the corresponding time of each mapping data as an independent variable to draw a scatter plot, connect any two points in the scatter plot, and set the selected two points to be (t i ,Ma i ) and (t j ,Ma j ), (t i ,Ma i ) represents the coordinates of the previous point selected arbitrarily, (t j ,Ma j ) represents the coordinates of the next point selected arbitrarily, i, j∈(1, k); for all points in the scatter plot, two points can be repeatedly selected to connect, and we get The connected straight lines are calculated, and the slope and intercept of each straight line in the scatter plot are calculated. The slope and intercept of the floating model of the power transformer are calculated using the slope and intercept of each straight line. Assuming that the expression of the floating model of the power transformer is Ma=a×t+b, the formula for calculating the slope of the floating model is: ,
[0016] In the formula, a represents the slope of the floating model, Ma j Indicates the ordinate of the next point in the straight line, Ma i Indicates the ordinate of the previous point in the line, t i Indicates the horizontal coordinate of the previous point in the line, t j Indicates the horizontal coordinate of the next point in the line; Represents the total number of straight lines in the scatter plot;
[0017] According to the formula After calculating the slope of each straight line in the scatter plot, substitute any point in each straight line into the expression of the corresponding straight line to calculate the straight line intercept. Finally, the intercept of all straight lines is calculated as , Indicates the 1st, 2nd, 3rd, ..., The intercept of the straight line is calculated based on the intercept of all straight lines. The formula is: ,
[0018] In the formula, b represents the intercept of the floating model of the power transformer, and bi represents the intercept of each straight line in the scatter plot;
[0019] S203. Collect the response time of the power transformer to instructions under different mapping data states when an abnormal fault occurs in the power transformer in history, use the same method as in S202 to draw a scatter plot with the mapping data as the independent variable and the response time as the variable, and obtain the expression of the power transformer response model through calculation: Res=A×Ma+B, where A represents the slope of the response model, B represents the intercept of the response model, and Res represents the response time of the power transformer.
[0020] Using historical data to generate the floating model and response model of the power transformer can clearly find the changes in the mapping data of abnormal faults occurring within a certain period of time, and the response time of the power transformer under the specific mapping data; using the two models can achieve more accurate monitoring of abnormal faults of the power transformer.
[0021] S300, using a mapping data sensor to collect mapping data of the power transformer in real time, transmitting the collected mapping data to the mobile control terminal by wireless transmission, and the mobile control terminal predicting and optimizing the received mapping data by using a floating model and a response model;
[0022] Furthermore, the specific steps of the mobile control terminal using the floating model and the response model to perform prediction optimization on the received mapping data are as follows:
[0023] S301, using a mapping data sensor to collect mapping data of the power transformer in real time, obtaining real-time mapping data of the power transformer as Ma_s, transmitting the real-time collected mapping data of the power transformer to the mobile control terminal using a wireless communication network, and the mobile control terminal determines the transmission time as ts after receiving the transmitted mapping data;
[0024] S302, the mobile control terminal uses the floating model of the power transformer to perform a first round of prediction optimization on the received mapping data, substitutes the determined transmission time into the floating model to calculate the floating value of the mapping data during the transmission process, and uses the floating value to optimize the mapping data. The formula is: ,
[0025] In the formula, Ma_op1 represents the mapping data after the first round of prediction optimization, and Ma_s represents the collected real-time mapping data;
[0026] S303, after performing the first round of prediction optimization on the collected real-time mapping data, the mobile control terminal combines the floating model and the response model to perform the second round of prediction optimization on the mapping data after the first round of prediction optimization, and the formula is: ,
[0027] In the formula, Ma_op2 represents the mapping data after the second round of prediction optimization, and ts represents the transmission time of the mapping data.
[0028] The calculated floating model and response model are used to predict and optimize the collected mapping data in advance, and abnormal judgment is performed after the prediction optimization to avoid the lag of the collected data in the transmission time, the data received by the mobile control end is not timely, and when the command is issued, the response time of the power transformer causes the command to lag, and the real-time problem cannot be solved; the real-time, accuracy and effectiveness of the system are greatly enhanced;
[0029] S400, using the wireless transmission time to determine the collection period of the power transformer mapping data, transmitting the collected mapping data to the mobile control terminal according to the collection period, and the mobile control terminal analyzing the prediction optimization data according to the subsequently received mapping data, and updating the floating model of the mapping data;
[0030] Furthermore, the specific steps for updating the floating model of the mapping data are as follows:
[0031] S401, collecting the transmission time of the mapping data to the mobile control terminal {ts1, ts2, ts3, ..., ts p}, ts1, ts2, ts3,..., ts p represents the collected transmission time when the mapping data is transmitted for the 1st, 2nd, 3rd, ..., pth time, where p is a positive integer; the average value of the collected transmission time is calculated as the collection period T of the real-time mapping data;
[0032] S402, using the acquisition period T to acquire the mapping data of the power transformer, extracting the mapping data transmitted to the mobile control terminal as {Ma_s1, Ma_s2, Ma_s3, ..., Ma_s r}, Ma_s1, Ma_s2, Ma_s3,..., Ma_s rRepresents the 1st, 2nd, 3rd, ..., rth mapping data extracted and transmitted to the mobile control terminal; the time interval of each mapping data is T; when the first mapping data is received, the first round of prediction optimization is performed on the first mapping data according to the method in S300, and the mapping data after the first round of prediction optimization is obtained as Ma_op1, and the difference between the mapping data after the first round of prediction optimization and the second mapping data transmitted is calculated, and the formula is: Ma_c=Ma_s2-Ma_op1, in the formula, Ma_c represents the difference between the mapping data after the first round of prediction optimization and the second mapping data transmitted; then the first round of prediction optimization is performed on the second mapping data, and the difference between the second mapping data after the first round of prediction optimization and the third mapping data is calculated, and the mapping data difference is traversed and calculated in sequence as {Ma_c1, Ma_c2, Ma_c3, ..., Ma_c r-1}, Ma_c1, Ma_c2, Ma_c3,..., Ma_c r-1 Indicates the calculated 1st, 2nd, 3rd, ..., r-1th mapping data difference; judge the calculated r-1 differences, and when the r-1 differences are all equal, update the floating model intercept, the formula is: b_g=b+Ma_c; b_g represents the intercept of the updated floating model; when the r-1 differences are not equal, update the floating model slope, the formula is: ,
[0033] In the formula, a_g represents the slope of the updated floating model, Ma_c α and Ma_c β Represents the sum of any two differences among r-1 differences; T represents the period of each mapping data; the formula represents that after transforming the floating model scatter plot using the difference, the point after the vertical coordinate of each point in the scatter plot changes by Ma_c is obtained, and the new floating model is calculated using the transformed point.
[0034] The accuracy of the system and the prediction optimization can be judged by using the data after prediction optimization and the data collected at a fixed period. When the difference is 0, it means that the floating model is accurate. When it is not 0, the floating model is optimized according to the difference between the collected value and the predicted optimized value. The floating model of the system is updated in real time to make the prediction optimization of the collected mapping data more accurate and avoid system misjudgment caused by model lag.
[0035] S500, the mobile control terminal calculates a mapping threshold according to the mapping data of abnormal faults occurring in the power transformer in history, uses the calculated mapping threshold to judge the real-time mapping data after prediction optimization, and generates a control instruction to transmit to the power transformer.
[0036] Furthermore, the specific steps of using the calculated mapping threshold to judge the real-time mapping data after prediction optimization are as follows:
[0037] S501, collect the mapping data of abnormal faults of power transformers in history {Mah1, Mah2, Mah3, ..., Mah g}, Mah1, Mah2, Mah3,..., Mah g Indicates the 1st, 2nd, 3rd, ..., gth mapping data when an abnormal fault occurs in the power transformer in the collected history, where g is a positive integer; all the collected mapping data are analyzed to calculate the mapping threshold of the power transformer, and the formula is: ,
[0038] In the formula, Ma_y represents the mapping threshold of the power transformer, st represents the standard deviation of the collected mapping data; g represents the number of collected mapping data;
[0039] S502. Use the calculated mapping threshold of the power transformer to judge the mapping data after two rounds of prediction optimization. When Ma_op2≥Ma_y, it is judged that the power transformer has an abnormal failure risk. The mobile control terminal generates a power-off control instruction, and uses the wireless communication network to transmit the power-off control instruction to the power transformer. After the power transformer receives the power-off control instruction, it cuts off the power after a response time. When Ma_op2<Ma_y, it is judged that the power transformer is working normally and there is no abnormal failure risk.
[0040] A mobile data management system for a power transformer, the mobile data management system comprising a data collection module, a model calculation module, a data prediction module, a model optimization module and an instruction generation module;
[0041] The data collection module is used to collect various data when abnormal faults occur in power transformers in history;
[0042] The model calculation module is used to analyze the data when abnormal faults occurred in the power transformer in history, draw a scatter plot, and calculate the floating model and the response model respectively;
[0043] The data prediction module is used to collect real-time mapping data of the power transformer and then predict and optimize the collected mapping data according to the floating model and the response model;
[0044] The model optimization module is used to collect mapping data of the power transformer using a fixed period, compare and analyze the mapping data after prediction optimization and the mapping data after a unit period, and optimize the floating model;
[0045] The instruction generation module is used to calculate the mapping threshold after the mobile control terminal predicts and optimizes the received mapping data, judge the predicted and optimized mapping data according to the mapping threshold, and generate a power-off control instruction to transmit to the power transformer.
[0046] The model calculation module includes a floating model unit and a response model unit;
[0047] The floating model unit is used to analyze the mapping data and corresponding time data of abnormal faults of power transformers in history, draw a scatter plot, and calculate the floating model;
[0048] The response model unit is used to analyze the mapping data and response data when abnormal faults occur in the power transformer in history, draw a scatter plot, and calculate the response model.
[0049] The data prediction module includes a first round prediction unit and a second round prediction unit;
[0050] The first round prediction unit is used to predict and optimize the received mapping data according to the floating model after the mobile control section receives the collected mapping data;
[0051] The second round prediction unit is used to combine the floating model and the response model to perform a second round of prediction optimization on the mapping data in the mobile control section after performing the first round of prediction optimization.
[0052] The model optimization module includes an intercept optimization unit and a slope optimization unit;
[0053] The intercept optimization unit is used to optimize the intercept of the floating model by using the equal mapping data differences when it is determined that the calculated mapping data differences are all equal;
[0054] The slope optimization unit is used to modify the floating model scatter plot using the mapping data difference when it is determined that the calculated mapping data difference is not equal, and to update the slope of the floating model using the modified scatter plot.
[0055] Compared with the prior art, the beneficial effects achieved by the present invention are:
[0056] After analyzing the historical data, the present invention generates a floating model and a response model of the power transformer, which clearly reflects the changes in the mapping data and the response data of abnormal faults occurring within a certain period of time, and is conducive to the system to monitor the power transformer more accurately.
[0057] The present invention uses a floating model and a response model to predict and optimize mapping data, and uses the predicted and optimized mapping data to judge abnormal fault conditions of power transformers, thereby avoiding the lag in data reception by a mobile control terminal caused by data transmission time; and uses prediction means to overcome the problem that after transmitting control instructions, the power transformer lags behind due to the response time and cannot solve real-time abnormalities; thus greatly enhancing the real-time, accuracy and effectiveness of the system.
[0058] The present invention optimizes the floating model according to the difference between the collected value and the predicted optimized value, and updates the floating model of the system in real time, so that the prediction optimization of the collected mapping data is more accurate, and avoids the system misjudgment caused by the lagging model. BRIEF DESCRIPTION OF THE DRAWINGS
[0059] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0060] Figure 1 It is a module distribution diagram of a mobile data management system for power transformers of the present invention;
[0061] Figure 2 It is a schematic diagram of the steps of a mobile data management method for a power transformer of the present invention;
[0062] Figure 3 It is a current-time scatter diagram of a mobile data management method for a power transformer of the present invention;
[0063] Figure 4 It is a current-response time scatter diagram of a mobile data management method for a power transformer of the present invention. DETAILED DESCRIPTION
[0064] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0065] See also Figure 1-Figure 4 , the present invention provides a technical solution:
[0066] A mobile data management method for a power transformer, the method comprising the following steps:
[0067] S100, collecting all types of data when abnormal faults occur in power transformers in history, analyzing all types of collected data, calculating the correlation between each type of data and abnormal faults of power transformers, and analyzing all correlations to obtain mapping data of abnormal faults of power transformers;
[0068] The specific steps of analyzing all the correlations to obtain the mapping data of abnormal faults of power transformers are as follows:
[0069] S101, collect all types of data when abnormal faults occur in power transformers in history, and assume that each type of data collected is {Q1, Q2, Q3, ..., Q n}, Q1, Q2, Q3, ..., Q n Indicates the 1st, 2nd, 3rd, ..., nth data values when the power transformer has an abnormal fault in the collected history, and the corresponding value of each data collected when the power transformer is working normally is {Q'1, Q'2, Q'3, ..., Q' n}, Q'1, Q'2, Q'3,..., Q' n Indicates the 1st, 2nd, 3rd, ..., nth data values collected when the power transformer is working normally, where n is a positive integer;
[0070] S102, analyzing all the collected data of the power transformer when it fails and when it works normally, and calculating the correlation between each data and the abnormal failure of the power transformer, the formula is: ,
[0071] In the formula, Re represents the correlation between each type of data and abnormal faults of power transformers, and m represents the number of each type of data collected when abnormal faults of power transformers occur. The correlation of all types of data collected when abnormal faults of power transformers occur is calculated, and the correlation of each type of data is {Re1, Re2, Re3, ..., Re n}, Re1, Re2, Re3,..., Re n Indicates the calculated correlation degree of the 1st, 2nd, 3rd, ..., nth type of data;
[0072] S103, analyzing the calculated correlation of each type of data, and selecting the maximum correlation value Re max As the mapping data Ma when an abnormal fault occurs in the power transformer.
[0073] S200, collecting the change data of the mapping data over time before the abnormal fault occurs in the power transformer under the same environmental data in history, and generating a floating model of the mapping data before the abnormal fault occurs; collecting the response time of the power transformer to the instruction under different mapping data states when the abnormal fault occurs in the historical power transformer, and generating a power transformer response model;
[0074] The specific steps to generate the floating model and response model of the power transformer are:
[0075] S201, collect the mapping data before the abnormal fault of the power transformer in the history and the value of the change over time is {Ma1, Ma2, Ma3, ..., Ma k}, Ma1, Ma2, Ma3,..., Ma krepresents the 1st, 2nd, 3rd, ..., kth mapping data that change with time before the abnormal fault of the power transformer occurs in the collected history, where k is a positive integer; the time corresponding to the mapping data change before the abnormal fault of the power transformer occurs in the collected history is {t1, t2, t3, ..., t k}, t1, t2, t3, ..., t k represents the 1st, 2nd, 3rd, ..., kth time of the mapping data change before the abnormal fault of the power transformer occurs in the collected history;
[0076] S202, using the mapping data of the changes over time before the abnormal failure of the power transformer in the collected history as a variable, and the corresponding time of each mapping data as an independent variable to draw a scatter plot, connect any two points in the scatter plot, and set the selected two points to be (t i ,Ma i ) and (t j ,Ma j ), (t i ,Ma i ) represents the coordinates of the previous point selected arbitrarily, (t j ,Ma j ) represents the coordinates of the next point selected arbitrarily, i, j∈(1, k); for all points in the scatter plot, two points can be repeatedly selected to connect, and we get The connected straight lines are calculated, and the slope and intercept of each straight line in the scatter plot are calculated. The slope and intercept of the floating model of the power transformer are calculated using the slope and intercept of each straight line. Assuming that the expression of the floating model of the power transformer is Ma=a×t+b, the formula for calculating the slope of the floating model is: ,
[0077] In the formula, a represents the slope of the floating model, Ma j Indicates the ordinate of the next point in the straight line, Ma i Indicates the ordinate of the previous point in the line, t i Indicates the horizontal coordinate of the previous point in the line, t j Indicates the horizontal coordinate of the next point in the line; Represents the total number of straight lines in the scatter plot;
[0078] According to the formula After calculating the slope of each straight line in the scatter plot, substitute any point in each straight line into the expression of the corresponding straight line to calculate the straight line intercept. Finally, the intercept of all straight lines is calculated as , The scatter plot of the calculations is shown in Figure 1. The intercept of the straight line is calculated based on the intercept of all straight lines. The formula is: ,
[0079] In the formula, b represents the intercept of the floating model of the power transformer, and bi represents the intercept of each straight line in the scatter plot;
[0080] S203. Collect the response time of the power transformer to instructions under different mapping data states when an abnormal fault occurs in the power transformer in history, use the same method as in S202 to draw a scatter plot with the mapping data as the independent variable and the response time as the variable, and obtain the expression of the power transformer response model through calculation as Res=A×Ma+B, where A represents the slope of the response model, B represents the intercept of the response model, and Res represents the response time of the power transformer.
[0081] Using historical data to generate the floating model and response model of the power transformer can clearly find the changes in the mapping data of abnormal faults occurring within a certain period of time, and the response time of the power transformer under the specific mapping data; using the two models can achieve more accurate monitoring of abnormal faults of the power transformer.
[0082] S300, using a mapping data sensor to collect mapping data of the power transformer in real time, transmitting the collected mapping data to the mobile control terminal by wireless transmission, and the mobile control terminal predicting and optimizing the received mapping data by using a floating model and a response model;
[0083] The specific steps of the mobile control terminal using the floating model and the response model to perform prediction optimization on the received mapping data are as follows:
[0084] S301, using a mapping data sensor to collect mapping data of the power transformer in real time, obtaining real-time mapping data of the power transformer as Ma_s, transmitting the real-time collected mapping data of the power transformer to the mobile control terminal using a wireless communication network, and the mobile control terminal determines the transmission time as ts after receiving the transmitted mapping data;
[0085] S302, the mobile control terminal uses the floating model of the power transformer to perform a first round of prediction optimization on the received mapping data, substitutes the determined transmission time into the floating model to calculate the floating value of the mapping data during the transmission process, and uses the floating value to optimize the mapping data. The formula is: ,
[0086] In the formula, Ma_op1 represents the mapping data after the first round of prediction optimization, and Ma_s represents the collected real-time mapping data;
[0087] S303, after performing the first round of prediction optimization on the collected real-time mapping data, the mobile control terminal combines the floating model and the response model to perform the second round of prediction optimization on the mapping data after the first round of prediction optimization, and the formula is: ,
[0088] In the formula, Ma_op2 represents the mapping data after the second round of prediction optimization, and ts represents the transmission time of the mapping data.
[0089] The calculated floating model and response model are used to predict and optimize the collected mapping data in advance, and abnormal judgment is performed after the prediction optimization to avoid the lag of the collected data in the transmission time, the data received by the mobile control end is not timely, and when the command is issued, the response time of the power transformer causes the command to lag, and the real-time problem cannot be solved; the real-time, accuracy and effectiveness of the system are greatly enhanced;
[0090] S400, using the wireless transmission time to determine the collection period of the power transformer mapping data, transmitting the collected mapping data to the mobile control terminal according to the collection period, and the mobile control terminal analyzing the prediction optimization data according to the subsequently received mapping data, and updating the floating model of the mapping data;
[0091] The specific steps to update the floating model of mapping data are:
[0092] S401, collecting the transmission time of the mapping data to the mobile control terminal {ts1, ts2, ts3, ..., ts p}, ts1, ts2, ts3,..., ts p represents the collected transmission time when the mapping data is transmitted for the 1st, 2nd, 3rd, ..., pth time, where p is a positive integer; the average value of the collected transmission time is calculated as the collection period T of the real-time mapping data;
[0093] S402, using the acquisition period T to acquire the mapping data of the power transformer, extracting the mapping data transmitted to the mobile control terminal as {Ma_s1, Ma_s2, Ma_s3, ..., Ma_s r}, Ma_s1, Ma_s2, Ma_s3,..., Ma_s rRepresents the 1st, 2nd, 3rd, ..., rth mapping data extracted and transmitted to the mobile control terminal; the time interval of each mapping data is T; when the first mapping data is received, the first round of prediction optimization is performed on the first mapping data according to the method in S300, and the mapping data after the first round of prediction optimization is obtained as Ma_op1, and the difference between the mapping data after the first round of prediction optimization and the second mapping data transmitted is calculated, and the formula is: Ma_c=Ma_s2-Ma_op1, in the formula, Ma_c represents the difference between the mapping data after the first round of prediction optimization and the second mapping data transmitted; then the first round of prediction optimization is performed on the second mapping data, and the difference between the second mapping data after the first round of prediction optimization and the third mapping data is calculated, and the mapping data difference is traversed and calculated in sequence as {Ma_c1, Ma_c2, Ma_c3, ..., Ma_c r-1}, Ma_c1, Ma_c2, Ma_c3,..., Ma_c r-1 Indicates the calculated 1st, 2nd, 3rd, ..., r-1th mapping data difference; judge the calculated r-1 differences, and when the r-1 differences are all equal, update the floating model intercept, the formula is: b_g=b+Ma_c; b_g represents the intercept of the updated floating model; when the r-1 differences are not equal, update the floating model slope, the formula is: ,
[0094] In the formula, a_g represents the slope of the updated floating model, Ma_c α and Ma_c β Represents the sum of any two differences among r-1 differences; T represents the period of each mapping data; the formula represents that after transforming the floating model scatter plot using the difference, the point after the vertical coordinate of each point in the scatter plot changes by Ma_c is obtained, and the new floating model is calculated using the transformed point.
[0095] The accuracy of the system and the prediction optimization can be judged by using the data after prediction optimization and the data collected at a fixed period. When the difference is 0, it means that the floating model is accurate. When it is not 0, the floating model is optimized according to the difference between the collected value and the predicted optimized value. The floating model of the system is updated in real time to make the prediction optimization of the collected mapping data more accurate and avoid system misjudgment caused by model lag.
[0096] S500, the mobile control terminal calculates a mapping threshold according to the mapping data of abnormal faults occurring in the power transformer in history, uses the calculated mapping threshold to judge the real-time mapping data after prediction optimization, and generates a control instruction to transmit to the power transformer.
[0097] The specific steps of using the calculated mapping threshold to judge the real-time mapping data after prediction optimization are as follows:
[0098] S501, collect the mapping data of abnormal faults of power transformers in history {Mah1, Mah2, Mah3, ..., Mah g}, Mah1, Mah2, Mah3,..., Mah g Indicates the 1st, 2nd, 3rd, ..., gth mapping data when an abnormal fault occurs in the power transformer in the collected history, where g is a positive integer; all the collected mapping data are analyzed to calculate the mapping threshold of the power transformer, and the formula is: ,
[0099] In the formula, Ma_y represents the mapping threshold of the power transformer, st represents the standard deviation of the collected mapping data; g represents the number of collected mapping data;
[0100] S502. Use the calculated mapping threshold of the power transformer to judge the mapping data after two rounds of prediction optimization. When Ma_op2≥Ma_y, it is judged that the power transformer has an abnormal failure risk. The mobile control terminal generates a power-off control instruction, and uses the wireless communication network to transmit the power-off control instruction to the power transformer. After the power transformer receives the power-off control instruction, it cuts off the power after a response time. When Ma_op2<Ma_y, it is judged that the power transformer is working normally and there is no abnormal failure risk.
[0101] A mobile data management system for a power transformer, the mobile data management system comprising a data collection module, a model calculation module, a data prediction module, a model optimization module and an instruction generation module;
[0102] The data collection module is used to collect various data when abnormal faults occur in power transformers in history;
[0103] The model calculation module is used to analyze the data when abnormal faults occurred in the power transformer in history, draw a scatter plot, and calculate the floating model and the response model respectively;
[0104] The data prediction module is used to collect real-time mapping data of the power transformer and then predict and optimize the collected mapping data according to the floating model and the response model;
[0105] The model optimization module is used to collect mapping data of the power transformer using a fixed period, compare and analyze the mapping data after prediction optimization and the mapping data after a unit period, and optimize the floating model;
[0106] The instruction generation module is used to calculate the mapping threshold after the mobile control terminal predicts and optimizes the received mapping data, judge the predicted and optimized mapping data according to the mapping threshold, and generate a power-off control instruction to transmit to the power transformer.
[0107] The model calculation module includes a floating model unit and a response model unit;
[0108] The floating model unit is used to analyze the mapping data and corresponding time data of abnormal faults of power transformers in history, draw a scatter plot, and calculate the floating model;
[0109] The response model unit is used to analyze the mapping data and response data when abnormal faults occur in the power transformer in history, draw a scatter plot, and calculate the response model.
[0110] The data prediction module includes a first round prediction unit and a second round prediction unit;
[0111] The first round prediction unit is used to predict and optimize the received mapping data according to the floating model after the mobile control section receives the collected mapping data;
[0112] The second round prediction unit is used to combine the floating model and the response model to perform a second round of prediction optimization on the mapping data in the mobile control section after performing the first round of prediction optimization.
[0113] The model optimization module includes an intercept optimization unit and a slope optimization unit;
[0114] The intercept optimization unit is used to optimize the intercept of the floating model by using the equal mapping data differences when it is determined that the calculated mapping data differences are all equal;
[0115] The slope optimization unit is used to modify the floating model scatter plot using the mapping data difference when it is determined that the calculated mapping data difference is not equal, and to update the slope of the floating model using the modified scatter plot.
[0116] Embodiment 1: Now a power transformer at a certain location is monitored in real time, and all data when an abnormal fault occurs in the power transformer are analyzed, and the mapping data of the power transformer is obtained as current;
[0117] First, the mapping data and response data corresponding to the time data of abnormal faults in the history of power transformers are collected, and a scatter plot is drawn as follows: Figure 3 and 4 As shown, the floating model is calculated as , ;
[0118] The real-time current data collected is 200, and it is transmitted to the mobile control terminal. The transmission time is 1. After the first round of prediction optimization, the current data is 214.8, and after the second round of prediction optimization, the current data is 220. The current threshold is calculated to be 200, and it is judged that the power transformer has an abnormal fault risk.
[0119] Using 1 as the collection cycle, the current data is collected in real time, and the collected current data is assumed to be 200, 216, and 233; the difference between the mapping data after the first round of prediction optimization and the mapping data of the second cycle is calculated to be 1.2 and 2.2; it is determined that the difference is not equal;
[0120] The slope of the new floating model was calculated to be 3.4.
[0121] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0122] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A mobile data management method for a power transformer, characterized in that: The method comprises the following steps: S100, collecting all types of data when abnormal faults occur in power transformers in history, analyzing all types of collected data, calculating the correlation between each type of data and abnormal faults of power transformers, and analyzing all correlations to obtain mapping data of abnormal faults of power transformers; S200, collecting the change data of the mapping data over time before the abnormal fault occurs in the power transformer under the same environmental data in history, and generating a floating model of the mapping data before the abnormal fault occurs; collecting the response time of the power transformer to the instruction under different mapping data states when the abnormal fault occurs in the historical power transformer, and generating a power transformer response model; S300, using a mapping data sensor to collect mapping data of the power transformer in real time, transmitting the collected mapping data to the mobile control terminal by wireless transmission, and the mobile control terminal predicting and optimizing the received mapping data by using a floating model and a response model; S400, using the wireless transmission time to determine the collection period of the power transformer mapping data, transmitting the collected mapping data to the mobile control terminal according to the collection period, and the mobile control terminal analyzing the prediction optimization data according to the subsequently received mapping data, and updating the floating model of the mapping data; S500, the mobile control terminal calculates a mapping threshold according to the mapping data of abnormal faults occurring in the power transformer in history, uses the calculated mapping threshold to judge the real-time mapping data after prediction optimization, and generates a control instruction to transmit to the power transformer.
2. A mobile data management method for a power transformer according to claim 1, characterized in that: The specific steps of analyzing all the correlations in S100 to obtain the mapping data of abnormal faults of the power transformer are: S101. Collect all types of data when abnormal faults occur in power transformers in history. Suppose each type of data collected is , Indicates the 1st, 2nd, 3rd, ..., nth data values when the power transformer has an abnormal fault in the collected history, and the corresponding value of each data when the power transformer is working normally is , Indicates the 1st, 2nd, 3rd, ..., nth data values collected when the power transformer is working normally, where n is a positive integer; S102, analyzing all the collected data of the power transformer when it fails and when it works normally, and calculating the correlation between each data and the abnormal failure of the power transformer, the formula is: In the formula, Re represents the correlation between each type of data and abnormal failure of power transformers, and m represents the number of each type of data when abnormal failure of power transformers occurs in the collected history; The correlation of all types of data collected when abnormal faults occur in power transformers is calculated, and the correlation of each type of data is obtained as follows: , Indicates the calculated correlation degree of the 1st, 2nd, 3rd, ..., nth type of data; S103, analyzing the calculated correlation of each type of data, and selecting the maximum correlation As the mapping data Ma when an abnormal fault occurs in the power transformer.
3. A mobile data management method for a power transformer according to claim 2, characterized in that: The specific steps of generating the floating model and response model of the power transformer in S200 are: S201, collect the mapping data before the abnormal fault of the power transformer in the history and the value of the change over time , represents the 1st, 2nd, 3rd, ..., kth mapping data that change with time before the abnormal fault of the power transformer occurs in the collected history, where k is a positive integer; the time of the mapping data change before the abnormal fault of the power transformer occurs in the collected history is , represents the 1st, 2nd, 3rd, ..., kth time of the mapping data change before the abnormal fault of the power transformer occurs in the collected history; S202, using the mapping data of the changes over time before the abnormal failure of the power transformer in the collected history as a variable, and the time of each corresponding mapping data as an independent variable to draw a scatter plot, connect any two points in the scatter plot, and set the selected two points to be and , represents the coordinates of the previous point selected arbitrarily, represents the coordinates of the next point selected arbitrarily, ; For all the points in the scatter plot, two points can be repeatedly selected to connect, and we can get The slope and intercept of each straight line in the scatter plot are calculated, and the slope and intercept of the floating model of the power transformer are calculated using the slope and intercept of each straight line. The expression of the floating model of the power transformer is assumed to be , the formula for calculating the slope of the floating model is: , In the formula, a represents the slope of the floating model, Indicates the ordinate of the next point in the line. represents the ordinate of the previous point in the line, represents the horizontal coordinate of the previous point in the line, Indicates the horizontal coordinate of the next point in the line; Represents the total number of straight lines in the scatter plot; According to the formula After calculating the slope of each straight line in the scatter plot, substitute any point in each straight line into the expression of the corresponding straight line to calculate the straight line intercept. Finally, the intercept of all straight lines is calculated as , Indicates the 1st, 2nd, 3rd, ..., The intercept of the straight line is calculated based on the intercept of all straight lines. The formula is: , In the formula, b represents the intercept of the floating model of the power transformer, and bi represents the intercept of each straight line in the scatter plot; S203, collecting the response time of the power transformer to the instruction under different mapping data states when the power transformer has an abnormal fault in the history, using the same method as in S202 to draw a scatter plot with the mapping data as the independent variable and the response time as the variable, and calculating the expression of the power transformer response model as follows: , A represents the slope of the response model, B represents the intercept of the response model, and Res represents the response time of the power transformer.
4. The mobile data management method for a power transformer according to claim 3, characterized in that: The specific steps of the mobile control terminal in S300 using the floating model and the response model to perform prediction optimization on the received mapping data are as follows: S301, using a mapping data sensor to collect mapping data of the power transformer in real time, obtaining real-time mapping data of the power transformer as Ma_s, transmitting the real-time collected mapping data of the power transformer to the mobile control terminal using a wireless communication network, and the mobile control terminal determines the transmission time as ts after receiving the transmitted mapping data; S302, the mobile control terminal uses the floating model of the power transformer to perform a first round of prediction optimization on the received mapping data, substitutes the determined transmission time into the floating model to calculate the floating value of the mapping data during the transmission process, and uses the floating value to optimize the mapping data. The formula is: , In the formula, Represents the mapping data after the first round of prediction optimization, Represents the collected real-time mapping data; S303, after performing the first round of prediction optimization on the collected real-time mapping data, the mobile control terminal combines the floating model and the response model to perform the second round of prediction optimization on the mapping data after the first round of prediction optimization, and the formula is: , In the formula, It represents the mapping data after the second round of prediction optimization, and ts represents the transmission time of the mapping data.
5. A mobile data management method for a power transformer according to claim 4, characterized in that: The specific steps of updating the floating model of the mapping data in S400 are: S401, collecting the transmission time of mapping data to the mobile control terminal , represents the collected transmission time when the mapping data is transmitted for the 1st, 2nd, 3rd, ..., pth time, where p is a positive integer; the average value of the collected transmission time is calculated as the collection period T of the real-time mapping data; S402, using the collection period T to collect the mapping data of the power transformer, extracting the mapping data transmitted to the mobile control terminal as follows: , represents the 1st, 2nd, 3rd, ..., rth mapping data extracted and transmitted to the mobile control terminal; the time interval of each mapping data is T; when the first mapping data is received, the first mapping data is subjected to a first round of prediction optimization according to the method in S300, and the mapping data after the first round of prediction optimization is obtained as , calculate the difference between the first round of prediction optimization mapping data and the second mapping data transmitted, the formula is: , in the formula, It represents the difference between the mapping data after the first round of prediction optimization and the second mapping data transmitted; then the first round of prediction optimization is performed on the second mapping data, and the difference between the second mapping data after the first round of prediction optimization and the third mapping data is calculated, and the mapping data difference is obtained by traversing and calculating in sequence. , Indicates the calculated 1st, 2nd, 3rd, ..., r-1th mapping data difference; the calculated r-1 differences are judged, and when the r-1 differences are all equal, the floating model intercept is updated, and the formula is: ; Represents the intercept of the updated floating model; when the r-1 differences are not equal, the slope of the floating model is updated, and the formula is: , In the formula, a_g represents the slope of the updated floating model, and represents the sum of any two differences among r-1 differences; T represents the period of each mapping data; the formula represents the change of the vertical coordinate of each point in the scatter plot after transforming the floating model scatter plot using the difference The new floating model is calculated using the transformed points.
6. A mobile data management method for a power transformer according to claim 5, characterized in that: The specific steps of using the calculated mapping threshold in S500 to judge the real-time mapping data after prediction optimization are as follows: S501, collecting historical mapping data when abnormal faults occur in power transformers , Indicates the 1st, 2nd, 3rd, ..., gth mapping data when an abnormal fault occurs in the power transformer in the collected history, where g is a positive integer; all the collected mapping data are analyzed to calculate the mapping threshold of the power transformer, and the formula is: , In the formula, represents the mapping threshold of the power transformer, st represents the standard deviation of the collected mapping data; g represents the number of collected mapping data; S502, using the calculated mapping threshold of the power transformer to judge the mapping data after two rounds of prediction optimization, when When the power transformer is judged to have an abnormal fault risk, the mobile control terminal generates a power-off control instruction, and transmits the power-off control instruction to the power transformer through the wireless communication network. After the power transformer receives the power-off control instruction, it cuts off the power after the response time. When the power transformer is operating normally, there is no risk of abnormal failure.
7. A mobile data management system for power transformers, characterized in that: The mobile data management system includes a data collection module, a model calculation module, a data prediction module, a model optimization module and an instruction generation module; The data collection module is used to collect various data when abnormal faults occur in power transformers in history; The model calculation module is used to analyze the data when abnormal faults occurred in the power transformer in history, draw a scatter plot, and calculate the floating model and the response model respectively; The data prediction module is used to collect real-time mapping data of the power transformer and then predict and optimize the collected mapping data according to the floating model and the response model; The model optimization module is used to collect mapping data of the power transformer using a fixed period, compare and analyze the mapping data after prediction optimization and the mapping data after a unit period, and optimize the floating model; The instruction generation module is used to calculate the mapping threshold after the mobile control terminal predicts and optimizes the received mapping data, judge the predicted and optimized mapping data according to the mapping threshold, and generate a power-off control instruction to transmit to the power transformer.
8. A mobile data management system for power transformers according to claim 7, characterized in that: The model calculation module includes a floating model unit and a response model unit; The floating model unit is used to analyze the mapping data and corresponding time data of abnormal faults of power transformers in history, draw a scatter plot, and calculate the floating model; The response model unit is used to analyze the mapping data and response data when abnormal faults occur in the power transformer in history, draw a scatter plot, and calculate the response model.
9. A mobile data management system for power transformers according to claim 7, characterized in that: The data prediction module includes a first round prediction unit and a second round prediction unit; The first round prediction unit is used to predict and optimize the received mapping data according to the floating model after the mobile control section receives the collected mapping data; The second round prediction unit is used to combine the floating model and the response model to perform a second round of prediction optimization on the mapping data in the mobile control section after performing the first round of prediction optimization.
10. A mobile data management system for power transformers according to claim 7, characterized in that: The model optimization module includes an intercept optimization unit and a slope optimization unit; The intercept optimization unit is used to optimize the intercept of the floating model by using the equal mapping data differences when it is determined that the calculated mapping data differences are all equal; The slope optimization unit is used to modify the floating model scatter plot using the mapping data difference when it is determined that the calculated mapping data difference is not equal, and to update the slope of the floating model using the modified scatter plot.
Citation Information
Patent Citations
Transformer fault control method
CN104101795A
Transformer fault detection system applying artificial intelligence to smart power grid
CN113904445A