A numerical simulation method for suspended top coal at the end of weakened fully mechanized caving working face
Through the three-dimensional discrete element numerical model, the problem of overhanging coal overhead at the end of the inclined thick coal seam is solved, efficient coal overhead and safety management is achieved, and the coal seam recovery rate is improved.
Patent Information
- Application Number
- CN202410828029.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-06-25
AI Technical Summary
During the mining of inclined thick coal seams, it is difficult for coal to fall quickly on the top of the working face to suspend the coal, resulting in too large suspended length and area of the top coal, posing safety hazards and reducing the recovery rate. The existing technologies such as explosive blasting and hydraulic fracturing have safety hazards. Or the effect is poor and there is a lack of effective theoretical basis and data support.
The numerical model was established using the three-dimensional discrete element 3DEC calculation and analysis program, and the stress state and displacement characteristics of coal seam were simulated and analyzed through the hydraulic punching hole weakening technology, and the weakening effect of high-pressure water jet technology on the suspended top coal at the end of the inclined thick coal seam was studied. , formulate efficient plan for collapse.
It provides theoretical basis and data support, and the suspended length of the top coal is significantly reduced through hydraulic punching hole construction, improves the recovery rate, reduces safety hazards, and realizes effective management of suspended top coal.
Smart Images

Figure CN118709511B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a numerical simulation method, in particular to a numerical simulation method for weakened end suspended top coal of a fully-mechanized caving working face in an inclined thick coal seam, and belongs to the technical field of safe mining of coal mines. Background Art
[0002] Thick coal seams refer to coal seams with a depth of more than 3.5m in underground mining and more than 10m in open-pit mining. The output of thick coal seams in my country accounts for about 45% of the total raw coal output. Thick coal seams are the main coal seams for my country to achieve high-yield and efficient mining, especially in southwest my country. The main mining coal seams are often inclined thick coal seams with a coal seam inclination greater than 25°. The geological conditions of inclined thick coal seams are usually more complex, usually manifested in: 1. The inclination of the coal seams varies greatly, sometimes in the same mining area and the same mining area, the coal seam inclination will be different; 2. The thickness of the coal seams varies greatly, which may include thin coal seams, medium-thick coal seams, thick coal seams and extra-thick coal seams; 3. The geological structure is complex, often with faults and wrinkles, developed coal seam joints, and a high degree of metamorphism. Therefore, the mining difficulty of inclined thick coal seams is usually greater, and the high-yield, high-efficiency and safety issues in the mining process have always been a problem that plagues my country's coal enterprises.
[0003] The comprehensive top coal caving mining technology is currently the main technical means for mining thick coal seams in my country with its comprehensive advantages such as high yield, high efficiency and safety. Top coal caving mining is a coal mining process developed for the mining of thick and extra-thick coal seams. When mining coal seams using the top coal caving mining method, a coal mining working face with a mining height of 2 to 3 meters is arranged along the bottom plate of the coal seam or the bottom of a certain thickness range of the coal seam. Mining is carried out in a comprehensive mechanized manner. The top coal is broken into loose bodies by using the effect of mine pressure or assisted by loosening blasting and other methods. After being released from the "coal release window" behind or above the support, it is transported out of the working face by a scraper conveyor. The top coal caving mining method has many significant advantages. It is suitable for one-time full-height mining of coal seams with a thickness of 5m to 20m, and can mine coal that originally required multiple layers of mining in thick coal seams at one time. However, in the process of mining inclined thick coal seams by top coal caving mining method, due to the large inclination of the coal seam, the top coal at the end of the working face is prone to difficulty in falling quickly, which in turn causes the top coal to be suspended for too long and over a large area. The maximum suspended length and area of the top coal exceed the allowable range of the top coal suspension at the end specified in the safety regulations for the fully-mechanized caving working face, which can easily cause safety accidents such as excessive gas accumulation and spontaneous combustion, posing a great safety hazard. In addition, a large area of top coal suspension at the end will reduce the fully-mechanized caving recovery rate and cause a waste of coal resources. Therefore, when mining inclined thick coal seams by top coal caving mining method, it is necessary to carry out suspension control work on the top coal at the end of the fully-mechanized caving working face.
[0004] Conventional methods for forced top coal caving of suspended top coal in top coal caving working faces mainly weaken the suspended coal body in advance to shorten the suspended length required for the top coal to fall naturally. They usually adopt explosive blasting, hydraulic fracturing, carbon dioxide pre-cracking and other means, but they all have certain shortcomings: explosive blasting has a good weakening effect, but the high energy release generated is easy to induce gas explosions, coal dust and other accidents, there are great safety hazards, and there are great difficulties in obtaining and storing explosives; hydraulic fracturing is pollution-free and safe, but the fracturing effect in coal seams is weak, and the controllability of crack extension direction and length is poor, making it difficult to achieve precise weakening; carbon dioxide pre-cracking technology is relatively new, and the cost of a single fracturing is high, and it is currently difficult to widely promote. In view of the problems existing in the existing methods for forced top coal caving of suspended top coal in top coal caving working faces, the applicant considers introducing high-pressure water jet technology into the treatment of suspended top coal at the end of the fully mechanized caving working face, but the existing technology lacks corresponding theoretical basis and data support. Summary of the invention
[0005] In view of the problems existing in the above-mentioned prior art, the present invention provides a numerical simulation method for weakening the suspended top coal at the end of the fully-mechanized caving working face, which can provide a theoretical basis and data support for introducing high-pressure water jet technology into the management of the suspended top coal at the end of the fully-mechanized caving working face, so as to study the pressure relief characteristics of the top coal at the end of the fully-mechanized caving working face, formulate an efficient collapse plan for the top coal at the end of the fully-mechanized caving working face, and realize the effective management of the suspended top coal.
[0006] To achieve the above purpose, the numerical simulation method of the suspended top coal at the end of the weakened fully-mechanized caving working face specifically includes the following steps:
[0007] Step 1: Conduct on-site investigation of the mine to obtain relevant design parameters for coal mining and conduct geological exploration to obtain geological data on the location of the fully mechanized caving working face;
[0008] Step 2: According to the geological data of the location of the fully mechanized caving working face, the 3DEC simulation software is used to establish a numerical analysis model of the suspended top coal at the end of the fully mechanized caving working face; the command stream is used to divide the coal-rock layer, and the divided coal-rock layer is grouped and meshed; the joints are assigned parameters to the divided coal-rock layer using the Coulomb slip model, and boundary constraints are performed according to the actual mining situation of the fully mechanized caving face;
[0009] Step 3: According to the actual on-site investigation and geological data of the mine, the fully mechanized top coal mining is simulated based on the numerical analysis model of the suspended top coal at the end of the fully mechanized top coal mining face. When the working face is simulated to advance to a certain distance and the suspended top coal appears at the end of the fully mechanized top coal mining face, the through-layer drilling and hydraulic punching method is used to perform hole weakening simulation analysis at the suspended top coal at the end. After calculating the deformation characteristics of the suspended top coal under the hole making condition, the data is saved and extracted.
[0010] Step 4, extract the simulation data of coal seam mining under the cave-making condition for analysis, and obtain the weakening characteristics of the end-hanging roof coal seam under the cave-making condition;
[0011] The initial stress state of the suspended top coal before hydraulic punching is σ1=σ2=σ3=p0, where σ1, σ2, σ3 are the first principal stress, the second principal stress, and the third principal stress, respectively, and p0 is the original rock stress. The elastic strain energy density of the coal seam is:
[0012]
[0013] Where: υ is the elastic strain energy density; E is the elastic modulus of rock; v is Poisson's ratio;
[0014] The stress state of the suspended top coal after hydraulic punching is calculated as follows:
[0015]
[0016] Where: σ1, σ2, σ3 are the first principal stress, the second principal stress, and the third principal stress respectively; r0 is the radius of the through-layer drilling hole; r is the radius of the hydraulic punching hole; p0 is the original rock stress;
[0017] The elastic strain energy density expression of coal seam is:
[0018]
[0019] Where: υ is the elastic strain energy density; E is the elastic modulus of rock; v is Poisson's ratio; σ1 and σ2 are the first principal stress and the second principal stress, respectively.
[0020] Furthermore, in Step 2, when the Coulomb slip model is used to assign parameters to the divided coal-rock layers, the following equations are established for the elastic properties of 3DEC:
[0021]
[0022] Where: K is the bulk modulus; G is the shear modulus; E is the Young's modulus; v is the Poisson's ratio;
[0023] For a group of joints with an attitude perpendicular to the loading direction and equal spacing, the following relationship is satisfied:
[0024]
[0025]
[0026] Where: E m is Young's modulus of rock mass; E r is the Young's modulus of rock; k n is the joint normal stiffness; s is the joint spacing; k sis the joint shear stiffness; G m is the shear modulus of rock mass; G r is the shear modulus of rock.
[0027] Furthermore, the peak shear stress on the joint is given by:
[0028]
[0029] Where: is the peak shear stress; c is the cohesion; σ n is the normal stress; φ is the internal friction angle;
[0030] When the peak shear stress is exceeded, the shear stress drops to the residual strength instantly. The shear stress is not greater than the residual strength. The residual strength is given by the following formula:
[0031]
[0032] Where: is the residual strength; c res is the residual cohesion; res is the residual friction angle.
[0033] Furthermore, in Step 2, the boundary constraints are as follows: the left and right boundary surfaces and the bottom boundary are subject to normal constraints; the top boundary is a free boundary, and the equivalent gravity of the upper overburden is applied. The initial ground stress is balanced, and the maximum balance ratio is set to 1×10 -5 .
[0034] Furthermore, in Step 1, the geological data of the location of the fully-mechanized caving working face include the location of the fully-mechanized caving working face, the parameters of the opening and tunnel section, the distribution of coal seams, the inclination of coal seams, the mining-caving ratio, the thickness of coal and rock layers, and the physical and mechanical parameters.
[0035] Furthermore, in Step 3, the hole making parameters include column hole height, radius and coal seam position.
[0036] Compared with the existing technology, the numerical simulation method of weakening the suspended top coal at the end of the fully-mechanized caving working face in the present invention establishes a numerical model through a three-dimensional discrete element 3DEC calculation and analysis program, and establishes a simulation analysis model for the weakening effect of hydraulic punching on the suspended top coal at the end of the fully-mechanized caving working face in the inclined coal seam, and obtains the numerical simulation effect of cavitation weakening of the suspended top coal at the end of the fully-mechanized caving working face in the inclined thick coal seam, and studies the weakening characteristics of the suspended top coal at the end of the fully-mechanized caving working face in the inclined thick coal seam under the condition of hydraulic punching cavitation weakening. This can provide a theoretical basis and data support for introducing high-pressure water jet technology into the management of the suspended top coal at the end of the fully-mechanized caving working face, so as to study the pressure relief characteristics of the top coal at the end of the fully-mechanized caving working face, formulate an efficient collapse plan for the top coal at the end of the fully-mechanized caving working face, and realize the effective management of the suspended top coal. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 is a schematic diagram of a numerical model of coal seam burial depth position in an embodiment;
[0038] Figure 2 It is a schematic diagram of the layout of the fully mechanized caving working face;
[0039] Figure 3 yes Figure 2 Schematic diagram of section II;
[0040] Figure 4 It is a displacement diagram of suspended top coal at the end of fully mechanized caving working face in inclined thick coal seam simulating the situation of no coal seam cavitation;
[0041] Figure 5 It is a displacement diagram of the suspended top coal at the end of the fully mechanized caving working face in an inclined thick coal seam simulating coal seam cavitation.
[0042] In the figure: 1. Goaf; 2. Suspended top coal at the end of the fully-mechanized caving working face; 3. Lane; 4. Fully-mechanized caving working face; 5. Coal pillars between goafs; 6. Coal body. DETAILED DESCRIPTION
[0043] The numerical simulation method for weakening the suspended top coal at the end of the fully-mechanized top coal caving working face is used to establish a numerical analysis model of the suspended top coal at the end of the fully-mechanized top coal caving working face through the three-dimensional discrete element 3DEC 7.0 calculation and analysis program, and the weakening analysis model of the coal seam cavity on the suspended top coal at the end of the fully-mechanized top coal caving working face is established through the simulation of cavity making in the inclined thick coal seam, and the numerical simulation effect of the coal seam cavity weakening characteristics of the suspended top coal at the end of the fully-mechanized top coal caving working face in the inclined thick coal seam is obtained. By comparing the horizontal and vertical displacement change laws of the top coal at the end of the fully-mechanized top coal caving working face before and after weakening, the weakening characteristics of the suspended top coal at the end of the fully-mechanized top coal caving working face in the thick inclined thick coal seam under the condition of hydraulic punching cavity making are obtained, which can provide theoretical basis and technical support for reducing the occurrence probability of disasters such as separation between the coal seam and the roof at the end of the fully-mechanized top coal caving working face in the mining of inclined thick coal seams and improving the top coal recovery rate.
[0044] The numerical simulation method of the suspended top coal at the end of the weakened fully-mechanized caving working face specifically includes the following steps:
[0045] Step 1: Conduct on-site investigation of the mine to obtain relevant design parameters for coal mining. Geological exploration is used to obtain geological data on the location of the fully-mechanized caving working face, including the location of the fully-mechanized caving working face, opening and tunnel section parameters, coal seam distribution, coal seam inclination, mining-cavitation ratio, coal-rock layer thickness, and physical and mechanical parameters.
[0046] Step 2, establish a fully mechanized caving face model. Combined with the geological data of the mined coal seams, first, the three-dimensional discrete element 3DEC 7.0 calculation and analysis program is used to establish a numerical analysis model of the suspended top coal at the end of the fully mechanized caving face. To avoid interference from the previous model, add new before the first command; then, divide the coal-rock layer into the model input command stream according to the actual distribution of the coal seam, and group and mesh the divided coal-rock layer; the joints adopt the Coulomb slip model, and the parameters of the divided coal-rock layer are assigned respectively, and the boundary constraints are performed according to the actual mining situation of the fully mechanized caving face. The parameters assigned include the bulk density, Poisson's ratio and elastic modulus of the physical and mechanical parameters of coal and rock.
[0047] When assigning parameters, for the elastic properties of 3DEC, it is more advantageous to use bulk modulus K and shear modulus G than Young's modulus E and Poisson's ratio v. For all elastic materials that do not violate the principles of thermodynamics, a pair of parameters consisting of bulk modulus K and shear modulus G is feasible, but for some acceptable materials, a pair of parameters consisting of Young's modulus E and Poisson's ratio v loses its meaning. One extreme is that the material undergoes volume change but no shear, and the other extreme is that the material undergoes shear but no volume change. Neither a pair of parameters consisting of bulk modulus K and shear modulus G nor a pair of parameters consisting of Young's modulus E and Poisson's ratio v can characterize any of the above two types of materials, so the following equation is established:
[0048]
[0049] For a rock mass with a set of joints perpendicular to the loading direction and with equal spacing, Young's modulus E m , Young's modulus of rock E r , joint normal stiffness k n And the joint spacing s satisfies the following relationship:
[0050]
[0051] Joint shear stiffness k s , rock mass shear modulus G m , rock shear modulus G r And the joint spacing s satisfies the following relationship:
[0052]
[0053] The Coulomb slip model provides a linear representation of the joint stiffness and yield limit and is based on the elastic stiffness, friction, cohesive and tensile strength properties, and dilatation properties commonly found in rock joints. The model simulates the displacement weakening of the joint due to the loss of cohesive and tensile strength at the onset of shear or tensile failure. The shear and normal stresses on the joint develop as in the elastic model until the stresses reach peak intensity, with the peak shear stress given by:
[0054]
[0055] Where: is the peak shear stress; c is the cohesion; σ n is the normal stress; φ is the internal friction angle.
[0056] When the peak shear stress is exceeded (i.e., the suspended top coal collapses), the shear stress drops to the residual strength instantly. The shear stress cannot exceed the residual strength, which is given by the following formula:
[0057]
[0058] Where: is the residual strength; c res is the residual cohesion; res is the residual friction angle. By default, in 3DEC, c res = 0 and φ res =φ.
[0059] According to the actual mining situation of the fully mechanized caving face, the boundary constraints are as follows: the left and right boundary faces and the bottom boundary are subject to normal constraints; the top boundary is a free boundary, and the equivalent gravity of the upper overburden is applied. The initial ground stress is balanced, and the maximum balance ratio is set to 1×10 -5 , after the initial equilibrium, reset the displacement and velocity so that the initial displacement of the model returns to zero.
[0060] Step 3, simulated mining and hole making: According to the actual on-site investigation of the mine and geological data, the coal seam is simulated for fully mechanized top coal mining based on the numerical analysis model of the suspended top coal at the end of the fully mechanized top coal working face. After the working face is simulated to advance to the set distance, the hole making parameters are used to simulate the hole making of the suspended top coal at the end by using the through-layer drilling and hydraulic punching method. The hole making parameters include column hole height, radius and coal seam position, etc. After calculating the deformation characteristics of the suspended top coal under the hole making condition, the data is saved and extracted.
[0061] Step 4, obtain the cavitation weakening characteristics of the top coal seam at the end of the fully mechanized caving working face: extract the simulation data of coal seam mining under cavitation conditions for analysis, and obtain the weakening characteristics of the top coal seam at the end under cavitation conditions.
[0062] The initial stress state of the suspended top coal before hydraulic punching is σ1=σ2=σ3=p0, where σ1, σ2, σ3 are the first principal stress, the second principal stress, and the third principal stress, respectively, and p0 is the original rock stress. The elastic strain energy density of the coal seam is:
[0063]
[0064] Where: υ is the elastic strain energy density; E is the elastic modulus of rock; v is Poisson's ratio;
[0065] The stress state of the suspended top coal after hydraulic punching is calculated as follows:
[0066]
[0067] Where: σ1, σ2, σ3 are the first principal stress, the second principal stress, and the third principal stress respectively; r0 is the radius of the through-layer drilling hole; r is the radius of the hydraulic punching hole; p0 is the original rock stress;
[0068] The elastic strain energy density expression of coal seam is:
[0069]
[0070] Where: υ is the elastic strain energy density; E is the elastic modulus of rock; v is Poisson's ratio; σ1 and σ2 are the first principal stress and the second principal stress, respectively.
[0071] The present invention will be further described below by taking the fully mechanized caving working face of the inclined thick coal seam 3722 of a certain coal mine as an example and in conjunction with the accompanying drawings.
[0072] The coal seam inclination angle of the inclined thick coal seam in this mine is between 25° and 45°, the thickness h is between 3.5m and 8m, and the geological data of the fully mechanized caving working face are shown in Table 1.
[0073] Table 1 Physical and mechanical parameters of coal strata
[0074]
[0075] The average inclination of the coal seam in the 3722 fully mechanized caving working face is 30°, the average thickness of the coal seam is about 11m, the designed recovery rate is 93%, the mining ratio is 1:3, the roadway is mined along the middle of the coal seam, 8m of top coal is left, and the top coal is mined by comprehensive mechanization. The cutting section of the working face is a rectangular section with a net height of 2.8m, a net width of 8m, and a net section of 22.4m 2 According to the on-site conditions of the fully mechanized caving working face, a three-dimensional geometric model with length × width × height = 600m × 400m × 600m is constructed. Figure 1 3722 fully mechanized caving working face layout diagram as shown. Figure 2 , Figure 3 As shown, according to the actual coal mine fully mechanized caving parameters investigated and collected, the mine adopts upper and lower rectangular inclined shafts 3 for air intake and return air mining. The inclined shaft 3 is located on both sides of the fully mechanized caving working face 4. When the fully mechanized caving working face 4 mines the coal body 6 along the advancing direction of the working face, an end hanging top coal 2 that is difficult to collapse in time appears at the end.
[0076] Firstly, the three-dimensional discrete element 3DEC 7.0 calculation and analysis program was used to establish the numerical analysis model of the suspended top coal at the end of the fully mechanized caving working face. The model input command flow was divided into coal-rock layers according to the actual distribution of coal seams. The divided coal-rock layers were grouped and meshed. The joints were modeled using the Coulomb slip model. The divided coal-rock layers were assigned parameters respectively. Boundary constraints were imposed according to the actual mining conditions of the fully mechanized caving face. The boundary constraints were as follows: the left and right boundary surfaces and the bottom boundary were normal constraints; the top boundary was a free boundary, and the equivalent gravity of the upper overburden was applied. The initial ground stress was balanced, and the maximum balance ratio was set to 1×10 -5 ; After the initial equilibrium, reset the displacement and velocity so that the initial displacement of the model returns to zero; fix is often used for rigid bodies to fix the displacement, and the range must include its center of mass.
[0077] When high-pressure water jet technology is introduced into the treatment of suspended top coal at the end of the fully mechanized caving working face, the method of drilling holes through the layer is used. The hole punching starts at a depth of 5m. In order to prevent the holes from collapsing due to stress, holes with a diameter of 2m are punched out at a certain distance. In order to verify the effectiveness of top coal cavitation weakening, the three-dimensional discrete element 3DEC 7.0 calculation and analysis program simulation software is used to compare and analyze the deformation data of suspended top coal at the end of coal seam mining with / without cavitation weakening.
[0078] According to the actual on-site investigation of the mine and geological data, the coal seam is simulated for excavation: first, the width of the retained coal pillar must be determined, and then the simulated excavation and support of the tunnel must be carried out. After the simulated excavation of the tunnel reaches the designed position, the cut is opened, and then the comprehensive mining simulation is started. After the deformation characteristics of the suspended top coal without hole making are calculated, the data are saved and extracted. Finally, the deformation characteristics of the suspended top coal under hole making are calculated and the data are saved and extracted. The simulation data of coal seam mining under hole making conditions are extracted and analyzed to obtain the weakening characteristics of the end suspended top coal seam under hole making conditions. The simulation data of the end top coal seam of comprehensive mining under hole making is extracted and analyzed to weaken the end suspended top coal. It is known from field experience that the amount of roof subsidence in coal seam stability is the most intuitive indicator of collapse. The details are as follows:
[0079] Firstly, the situation of no cavitation in the top coal seam at the end of the fully mechanized caving working face in the inclined thick coal seam is simulated, and the following results can be obtained: Figure 4 The vertical displacement of the top coal at the end of the fully-mechanized caving working face in the inclined thick coal seam is shown in the figure. Under the condition that there is no cave-in at the top coal seam at the end of the fully-mechanized caving working face in the inclined thick coal seam, when the fully-mechanized caving working face is caving, the top coal sinking amount at the end of the fully-mechanized caving working face in the inclined thick coal seam is less than 1m, indicating that the top has not collapsed. In the corresponding 3DEC7.0 displacement diagram (as shown in Figure 4 As shown in the figure, it can also be clearly seen that the maximum displacement of the suspended top coal at the end of the fully mechanized caving working face in the inclined thick coal seam without coal seam cavitation is about 0.9m.
[0080] Secondly, the cave formation of the top coal seam at the end of the fully mechanized caving working face in the inclined thick coal seam is simulated, and the following results can be obtained: Figure 5 The vertical displacement of the top coal at the end of the fully-mechanized caving working face in the inclined thick coal seam is shown in the figure. Under the conditions of coal seam cave formation, when the fully-mechanized caving working face is caving, the top coal at the end of the fully-mechanized caving working face in the inclined thick coal seam sinks more than 1m, indicating that the top begins to collapse. In the corresponding 3DEC7.0 displacement diagram (as shown in Figure 5 It can also be clearly seen that the maximum displacement of the suspended top coal at the end of the fully mechanized caving working face in the inclined thick coal seam is more than 1m when the coal seam is caved. Figure 4 and Figure 5 The displacement diagram of the top coal in the end suspension, the maximum displacement occurs at the top coal position in the end suspension. Figure 5 The top coal displacement map shows that the weakening effect of cavitation is obvious.
[0081] The present invention establishes a numerical analysis model of the suspended top coal at the end of a fully-mechanized caving working face through a three-dimensional discrete element 3DEC calculation and analysis program, and establishes an analysis model of the weakening effect of coal seam cavities on the suspended top coal at the end of a fully-mechanized caving working face through a cavity making simulation in an inclined thick coal seam, and obtains the numerical simulation results of the cavitation weakening characteristics of the suspended top coal at the end of a fully-mechanized caving working face in an inclined thick coal seam, and obtains the weakening characteristics of the suspended top coal at the end of a fully-mechanized caving working face in a thick inclined coal seam by comparing the displacement change law of the top coal at the end of the fully-mechanized caving working face before and after weakening, and obtains the weakening characteristics of the suspended top coal at the end of a fully-mechanized caving working face in a thick inclined thick coal seam under the condition of coal seam cavitation with hydraulic punching and cavity making, which can provide a theoretical basis and data support for introducing high-pressure water jet technology into the treatment of the suspended top coal at the end of a fully-mechanized caving working face, so as to study the pressure relief characteristics of the top coal at the end of the fully-mechanized caving working face, formulate an efficient collapse plan for the top coal at the end of the fully-mechanized caving working face, and realize the effective treatment of the suspended top coal.
Claims
1. A numerical simulation method for weakening the suspended top coal at the end of a fully mechanized caving working face, characterized in that: The specific steps include: Step 1: Conduct on-site investigation of the mine to obtain relevant design parameters for coal mining and conduct geological exploration to obtain geological data on the location of the fully mechanized caving working face; Step 2: According to the geological data of the location of the fully mechanized caving working face, the 3DEC simulation software is used to establish a numerical analysis model of the suspended top coal at the end of the fully mechanized caving working face; the command stream is used to divide the coal-rock layer, and the divided coal-rock layer is grouped and meshed; the joints are assigned parameters to the divided coal-rock layer using the Coulomb slip model, and boundary constraints are performed according to the actual mining situation of the fully mechanized caving face; Step 3: According to the actual on-site investigation and geological data of the mine, the fully mechanized top coal mining is simulated based on the numerical analysis model of the suspended top coal at the end of the fully mechanized top coal mining face. When the working face is simulated to advance to a certain distance and the suspended top coal appears at the end of the fully mechanized top coal mining face, the through-layer drilling and hydraulic punching method is used to perform hole weakening simulation analysis at the suspended top coal at the end. After calculating the deformation characteristics of the suspended top coal under the hole making condition, the data is saved and extracted. Step 4, extract the simulation data of coal seam mining under the cave-making condition for analysis, and obtain the weakening characteristics of the end-hanging roof coal seam under the cave-making condition; The initial stress state of the suspended top coal before hydraulic punching is σ1=σ2=σ3=p0, where σ1, σ2, σ3 are the first principal stress, the second principal stress, and the third principal stress, respectively, and p0 is the original rock stress. The elastic strain energy density of the coal seam is: Where: υ is the elastic strain energy density; E is the elastic modulus of rock; v is Poisson's ratio; The stress state of the suspended top coal after hydraulic punching is calculated as follows: Where: σ1, σ2, σ3 are the first principal stress, the second principal stress, and the third principal stress respectively; r0 is the radius of the through-layer drilling hole; r is the radius of the hydraulic punching hole; p0 is the original rock stress; The elastic strain energy density expression of coal seam is: Where: υ is the elastic strain energy density; E is the elastic modulus of rock; v is Poisson's ratio; σ1 and σ2 are the first principal stress and the second principal stress, respectively.
2. The numerical simulation method for the suspended top coal at the end of a weakened fully-mechanized caving working face according to claim 1 is characterized in that: In Step 2, the Coulomb slip model is used to assign parameters to the divided coal-rock layers. For the elastic properties of 3DEC, the following equations are established: Where: K is the bulk modulus; G is the shear modulus; E is the Young's modulus; v is the Poisson's ratio; For a group of joints with an attitude perpendicular to the loading direction and equal spacing, the following relationship is satisfied: Where: E m is Young's modulus of rock mass; E r is the Young's modulus of rock; k n is the joint normal stiffness; s is the joint spacing; k s is the joint shear stiffness; G m is the shear modulus of rock mass; G r is the shear modulus of rock.
3. The numerical simulation method for the suspended top coal at the end of a weakened fully-mechanized caving working face according to claim 2 is characterized in that: The peak shear stress at the joint is given by: Where: is the peak shear stress; c is the cohesion; σ n is the normal stress; φ is the internal friction angle; When the peak shear stress is exceeded, the shear stress drops to the residual strength instantly. The shear stress is not greater than the residual strength. The residual strength is given by the following formula: Where: is the residual strength; c res is the residual cohesion; res is the residual friction angle.
4. The numerical simulation method for the suspended top coal at the end of a weakened fully-mechanized caving working face according to claim 1 is characterized in that: In Step 2, the boundary constraints are as follows: Normal constraints are applied to the left and right boundary faces and the bottom boundary; The top boundary is a free boundary, and the equivalent gravity of the upper overburden is applied. The initial ground stress is balanced, and the maximum balance ratio is set to 1×10 -5 .
5. The numerical simulation method for the suspended top coal at the end of a weakened fully-mechanized caving working face according to claim 1 is characterized in that: In Step 1, the geological data of the location of the fully-mechanized caving working face include the location of the fully-mechanized caving working face, the parameters of the opening and tunnel section, the distribution of coal seams, the inclination of coal seams, the mining-caving ratio, the thickness of coal and rock layers, and the physical and mechanical parameters.
6. The numerical simulation method for the suspended top coal at the end of a weakened fully-mechanized caving working face according to claim 1 is characterized in that: In Step 3, the hole making parameters include column hole height, radius and coal seam position.
Citation Information
Patent Citations
Hydraulic slotting efficient caving method for suspended top coal at end of top coal caving working face
CN117211791A
Fully mechanized caving face end top coal pressure relief characteristic numerical simulation research method
CN117313485A