An early warning system and method for comprehensive monitoring of BAS system authority handover

By dynamically adjusting the monitoring frequency and risk assessment index of the BAS system, the problem of insufficient adjustment of the permission handover monitoring frequency in the existing technology is solved, the accuracy of risk assessment and system stability are improved, and automated and intelligent monitoring are realized.

CN118710065BActive Publication Date: 2024-11-22ZHEJIANG XULUN INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411178184.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-22
Estimated Expiration
2044-08-27

AI Technical Summary

Technical Problem

It is difficult for existing BAS systems to dynamically adjust the monitoring frequency during permission handover monitoring, resulting in overloading of the system during peak periods and the inability to accurately monitor key events, affecting the accuracy and refinement of risk assessments.

Method used

By combining user activity modes, dynamically judge the current period, adjust the real-time monitoring frequency, use differentiated risk assessment index calculation formulas, generate real-time risk assessment index, and issue early warning signals when the threshold is reached to execute correction strategies.

Benefits of technology

It improves the accuracy and pertinence of risk assessment, reduces system load, ensures timely perception of key events, realizes automated processing and intelligent monitoring, and improves the overall security and stability of the BAS system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118710065B_ABST
    Figure CN118710065B_ABST
Patent Text Reader

Abstract

The present invention discloses an early warning system for comprehensively monitoring the authority handover of a BAS system, and relates to the technical field of monitoring and early warning. The system comprises an authority management module, a monitoring module, an analysis and early warning module, and a response and correction module. In an environment covering different operation ends, the system performs comprehensive / holistic monitoring on the authority allocation and handover of each user in the operation end. The monitoring system can prioritize authority change events or adjust the monitoring strategy in real time in combination with the user's activity pattern and behavior analysis. The technical key points are as follows: according to the user's activity pattern, the current period is dynamically determined, and a frequency estimate of real-time monitoring is generated according to the current period to ensure the effectiveness and adaptability of the monitoring strategy. Different characteristics of authority changes in different time periods are considered, and a differentiated risk assessment index calculation formula is designed to achieve a refined assessment of the authority handover process of the BAS system, thereby improving the accuracy and pertinence of the risk assessment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of monitoring and early warning, and in particular to an early warning system and method for comprehensively monitoring the handover of authority of a BAS system. Background Art

[0002] In the BAS system, the monitoring and early warning of authority transfer usually involve the following aspects:

[0003] Permission management and change monitoring: Permission management: ensure that only authorized personnel can access and operate the BAS system, which involves assigning different user roles and permissions, such as administrator, operator, technical support, etc.; Change monitoring: record and monitor all permission changes, including changes in user roles, adding users, deleting users, etc., which can be achieved through audit logs or specific monitoring tools;

[0004] Abnormal activity detection and early warning: Abnormal activity detection: monitor and identify activities that are inconsistent with normal operating patterns, such as access during non-working hours, abnormally frequent login attempts, etc.; Early warning system: when abnormal activity is detected, the system should be able to issue an early warning to notify relevant security personnel or administrators. The early warning can be in the form of alarms, emails, text messages, etc.

[0005] The document with the existing application publication number CN115097772A points out a method for authority transfer of a comprehensive monitoring BAS system, which belongs to the comprehensive monitoring system of urban rail transit, including step one, configuring the authority transfer data point object, alarm behavior object and alarm instance object of each subsystem of the BAS; step two, customizing the authority transfer operation model, operation screen and operation dialog box; step three, completing the authority transfer operation through the authority transfer operation screen and operation dialog box in the running mode; this method provides loose coupling and object-oriented flexible configuration; the current authority attribution is displayed in real time through the authority transfer screen, and the authority transfer operation is triggered through the screen, and then the operation dialog box instance is called to complete the authority transfer operation, and the authority transfer of each subsystem of the BAS can be sounded and light alarmed. The application scenario is urban rail transit, and there is a big difference in the authority management of the staff in the shopping mall. At the same time, it does not take into account the actual environment. For example: during the morning rush hour, the system cannot record frequent operations or actions, which easily causes the entire monitoring system to overload and increase the failure rate.

[0006] Combining the above documents and prior art, it can be concluded that:

[0007] Currently, for the staff or users in the shopping mall, the BAS system they use involves the handover or change of authority. The traditional method is to conduct comprehensive monitoring of each time period or each user, and follow the established monitoring frequency. The monitoring frequency can indeed be adjusted, but most of them are modified manually and cannot be adjusted automatically. Taking into account the actual scenario, during the peak hours of weekdays, such as 9 to 10 in the morning, users log in and change frequently during this period. If all-round monitoring is still carried out according to the established frequency, it will not only cause the system to be overloaded, but also allocate resources to monitor conventional permissions, which may cause key events to be unable to be accurately and effectively monitored. In the subsequent risk assessment, most of the established algorithms are also used, and the actual conditions are not taken into account, so that the accuracy and refinement of the subsequent risk assessment operations need to be strengthened. Summary of the invention

[0008] 1. Technical issues to be resolved

[0009] In view of the shortcomings of the prior art, the present invention provides an early warning system and method for comprehensively monitoring the authority handover of a BAS system. The system dynamically determines the current period according to the user activity pattern, and generates a frequency estimate of real-time monitoring according to the current period to ensure the effectiveness and adaptability of the monitoring strategy. A differentiated risk assessment index calculation formula is designed considering the different characteristics of authority changes in different time periods, thereby realizing a refined assessment of the authority handover process of the BAS system, improving the accuracy and pertinence of the risk assessment, and solving the problems raised in the background technology.

[0010] (II) Technical solution

[0011] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0012] An early warning system for comprehensively monitoring the transfer of authority of a BAS system, comprising:

[0013] The authority management module manages the authority changes of all users in any operation end of the BAS system;

[0014] The monitoring module combines the activity patterns of users in the operation end to determine the current period, adjusts the real-time monitoring strategy according to the current period, and obtains and executes the corresponding monitoring frequency. The period includes the peak period of working days, the non-peak period of working days, and non-working days.

[0015] The analysis and warning module obtains the permission change information within the preset time period t under the current monitoring frequency;

[0016] During the peak hours of working days, the obtained permission change information includes the frequency of permission adjustment that meets the non-first-level permission change category in each operation terminal, the number of unauthorized user accesses, and the number of adjustment contents. Based on the normalized permission change information, the corresponding risk assessment index of each operation terminal in the time period t is generated;

[0017] During the off-weekday peak period, the obtained permission change information includes the frequency of permission adjustment in each operation terminal, the number of unauthorized user accesses, and the number of adjusted contents. Based on the normalized permission change information, the corresponding risk assessment index of each operation terminal in the time period t is generated;

[0018] Compare the risk assessment index obtained at the current monitoring frequency with the preset assessment threshold;

[0019] When the risk assessment index exceeds the assessment threshold, an early warning signal is issued;

[0020] The response correction module executes the notification correction strategy under the condition of receiving the early warning signal.

[0021] Furthermore, the process of determining the current period is as follows:

[0022] The activity pattern of the predefined user is the login time. On weekdays, the time distribution of user logins is analyzed to determine whether it is a weekday peak period or a weekday non-peak period. On non-workdays, it is directly determined as a non-workday.

[0023] The analysis process is as follows:

[0024] Data collection and preparation: Collect user login time data, including date and specific time; Statistical analysis: Count the number of logins in each hour period of each working day, and calculate the average number of logins in each hour period; Cluster analysis: Use clustering algorithm to divide the hour periods within each day into different groups, and determine the peak period or non-peak period of working days based on the analysis results.

[0025] Furthermore, the process of adjusting the real-time monitoring strategy according to the current period is as follows:

[0026] When it is determined that the current working day is at peak hours, the pre-built rule engine is used to classify the user's permission changes into first-level permission change categories and non-first-level permission change categories, identify and filter out the corresponding events of the first-level permission change category, and generate the current monitoring frequency estimate based on the established monitoring frequency and the long-term trend of the monitoring process. During the working day peak hours, real-time monitoring is performed based on the monitoring frequency estimate. The formula is as follows:

[0027] ;

[0028] In the formula, Indicates the estimated monitoring frequency, Indicates the established monitoring frequency, represents an exponential function, which introduces a long-term trend, where represents the growth rate of the control trend, represents the number of years since monitoring began;

[0029] If it is determined that the current period is off-peak on a working day, real-time monitoring is performed according to the established monitoring frequency;

[0030] When it is determined that the current day is a non-working day, the current monitoring frequency estimate is generated according to the established monitoring frequency, and real-time monitoring is performed according to the monitoring frequency estimate on non-working days. The formula is as follows:

[0031] ;

[0032] In the formula, Represents the non-working day adjustment factor.

[0033] Furthermore, the number of times the content is adjusted includes any one of adding, modifying and deleting.

[0034] Furthermore, the risk assessment index corresponding to each operation end in the time period t is generated based on the following formula:

[0035] ;

[0036] In the formula, represents the risk assessment index, Indicates the frequency of permission adjustments that meet the non-first-level permission change category. Indicates the frequency of permission adjustment. They represent the number of unauthorized accesses and content adjustments by users in the corresponding period, respectively, and the weight coefficients are: , , , , , , represents the error correction factor, and The value range is 2~8.

[0037] Furthermore, the process of executing the notification correction strategy is as follows:

[0038] Notify the operating personnel to understand the real-time situation, which includes the specific time period when the warning signal appears. The operating personnel analyze and check the BAS system configuration or process, and formulate corrective measures based on the analysis results. Corrective measures include adjusting operating strategies, repairing system vulnerabilities, strengthening security controls, and optimizing processes.

[0039] Furthermore, the corrective response module also includes: recording the fluctuation of the risk assessment index of each operating end in each time period t within the day, and representing it through a curve chart, obtaining the daily risk assessment value of the corresponding operating end based on the fluctuation, and statistically calculating the average of the risk assessment value of the corresponding operating end each month, sorting the operating ends under the same BAS system from large to small according to the size of the average, and executing the troubleshooting strategy according to the sorting situation.

[0040] Furthermore, the risk assessment value of the corresponding operation end is obtained every day according to the fluctuation situation. The formula is as follows:

[0041] ;

[0042] In the formula, represents the risk assessment value corresponding to the day, d represents the number of the day, d=1, 2, ..., Q, Q is a positive integer, and Q represents the day number, It represents the risk assessment index corresponding to the time period t, i=1, 2, ..., n, n is a positive integer, i represents the number of the corresponding time period t, n represents the number of time periods t on that day, Represents the average value of the corresponding risk assessment index in each corresponding time period t.

[0043] Furthermore, the process of executing the troubleshooting strategy according to the sorting situation is as follows:

[0044] During the corresponding working hours at the end of each month, select the top three corresponding operation terminals for troubleshooting.

[0045] An early warning method for comprehensively monitoring the handover of authority of a BAS system includes the following specific steps:

[0046] S1. Manage the permission changes of all users in any operation terminal in the BAS system;

[0047] S2. Based on the activity patterns of users in the operation end, determine the current period, adjust the real-time monitoring strategy according to the current period, derive and execute the corresponding monitoring frequency, and the period includes the peak period of working days, the non-peak period of working days, and non-working days;

[0048] S3. Under the current monitoring frequency, obtain the permission change information within the preset time period t;

[0049] During the peak hours of working days, the obtained permission change information includes the frequency of permission adjustment that meets the non-first-level permission change category in each operation terminal, the number of unauthorized user accesses, and the number of adjustment contents. Based on the normalized permission change information, the corresponding risk assessment index of each operation terminal in the time period t is generated;

[0050] During the off-weekday peak period, the obtained permission change information includes the frequency of permission adjustment in each operation terminal, the number of unauthorized user accesses, and the number of adjusted contents. Based on the normalized permission change information, the corresponding risk assessment index of each operation terminal in the time period t is generated;

[0051] Compare the risk assessment index obtained at the current monitoring frequency with the preset assessment threshold;

[0052] When the risk assessment index exceeds the assessment threshold, an early warning signal is issued;

[0053] S4. Execute the notification correction strategy upon receiving the warning signal;

[0054] Then, the fluctuation of the risk assessment index of each operating end in each time period t on the same day is recorded and represented by a curve chart. The daily risk assessment value of the corresponding operating end is obtained based on the fluctuation, and the average of the risk assessment value of the corresponding operating end each month is statistically calculated. The operating ends under the same BAS system are sorted from large to small according to the size of the average, and the troubleshooting strategy is executed according to the sorting.

[0055] (III) Beneficial effects

[0056] The present invention provides an early warning system and method for comprehensively monitoring the handover of authority of a BAS system, which has the following beneficial effects:

[0057] According to the user activity pattern, the current period is dynamically determined to adjust the real-time monitoring strategy. The predefined algorithms and formulas are used to generate the estimated frequency of real-time monitoring according to the current period to ensure the effectiveness and adaptability of the monitoring strategy. During the peak period of working days, the conventional permission adjustment is filtered out to reduce unnecessary data processing and ensure the timely perception of key events. During the non-peak period of working days and non-working days, the corresponding adjusted monitoring frequency is used. Under the condition of normal data processing pressure, all-round data acquisition can be carried out to facilitate the subsequent risk assessment;

[0058] Considering the different characteristics of authority changes in different time periods, a differentiated risk assessment index calculation formula was designed to achieve a refined assessment of the BAS system authority handover process, improve the accuracy and pertinence of risk assessment, and automate the entire early warning and response process, reducing manual intervention and improving processing efficiency and accuracy. At the same time, by continuously tracking and monitoring the changes in the risk assessment index, intelligent monitoring of the BAS system authority handover process is achieved;

[0059] We fully utilize the real-time recorded permission change information, generate risk assessment index and daily / monthly risk assessment values ​​through data analysis, and provide strong data support for operational decisions. At the same time, we execute troubleshooting strategies based on the sorting results of risk assessment values, realize data-based priority processing, and conduct comprehensive troubleshooting on high-risk operations every month, which not only solves current problems, but also prevents the occurrence of potential risks, thereby improving the overall safety and stability of the BAS system. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] Figure 1 A schematic diagram of the modular structure of an early warning system for comprehensive monitoring of BAS system authority transfer;

[0061] Figure 2 The present invention is a flowchart of the overall steps of an early warning method for comprehensive monitoring of the authority transfer of a BAS system. DETAILED DESCRIPTION

[0062] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0063] The development concept and process of the system are as follows:

[0064] When conducting comprehensive monitoring on the existing BAS system authority handover, since the BAS system involves the change or transfer of authority between different users or roles, sensitive data or thresholds are usually set when monitoring it. When it is detected that a user has accessed sensitive data or the amount of access or change exceeds the preset threshold, an alarm is immediately issued to prevent unauthorized access or operation, as well as other access anomalies. However, it does not take into account that when the BAS system is running, the amount of authority handover is different at different times, so the threshold setting is not the same. Dynamic adjustment of the threshold cannot guarantee the accuracy of determining whether to issue an alarm;

[0065] Therefore, this application provides an early warning system for the transfer of BAS system authority through comprehensive monitoring:

[0066] In the environment covering different operation terminals, the authority allocation and handover of each user or role in the operation terminal are comprehensively / holisticly monitored. The monitoring system can prioritize the authority change events or adjust the monitoring strategy in real time based on the user's activity pattern and behavior analysis, and then comprehensively evaluate the authority adjustment data of each operation terminal under different conditions to obtain the results that reflect whether there are any abnormalities in the corresponding operation terminal, and carry out subsequent early warning and corrective response operations based on the results;

[0067] The example scenario is described as follows:

[0068] Assume that the BAS system of a large commercial office building covers multiple subsystems such as air conditioning, lighting, and security monitoring. In this environment, different operating companies or tenants may change regularly, and their permissions in the BAS system need to be adjusted in a timely manner to ensure safety and smooth operation. Embodiment 1:

[0069] See also Figure 1 , This embodiment provides an early warning system for comprehensively monitoring the authority handover of a BAS system, the system includes functional modules that run in sequence, including an authority management module, a monitoring module, an analysis and early warning module, and a response and correction module; wherein the monitoring module and the analysis and early warning module are the core modules in the entire early warning system;

[0070] The following is a description or explanation of each functional module:

[0071] The authority management module manages the authority changes of all users or roles in any operation end within the BAS system;

[0072] The number of operation terminals is M. Usually, the BAS system is installed in a commercial office building. There are several operation terminals in the commercial office building. The number of operation terminals is M. The value of M is a positive integer and is set according to actual conditions.

[0073] The specific instructions are as follows:

[0074] Scope of permission management: User and role management. The system manages the permissions of all users or roles to ensure that they can only access the system functions and data they need. Permission change records: Track and record the details of each permission change, including timestamp, executor, and specific content of the change.

[0075] Complexity of management operations: Distributed permission management, managing permissions for each operation end, ensuring that the permission settings of each area meet security and operational requirements; centralized management, managing permissions of all operation ends through a centralized permission management interface or database as much as possible, simplifying management processes and reducing operational risks.

[0076] The monitoring module combines the activity patterns of users on the operation side to determine the current period, adjusts the real-time monitoring strategy according to the current period, and obtains the corresponding monitoring frequency. The period includes the peak period on weekdays, the non-peak period on weekdays, and non-working days.

[0077] The process of determining the current period is as follows:

[0078] The activity pattern of the predefined user is the login time. On weekdays, the time distribution of user logins is analyzed to determine whether it is a weekday peak period or a weekday non-peak period. On non-workdays, it is directly determined as a non-workday.

[0079] The analysis process is as follows:

[0080] Data collection and preparation: Collect user login time data, including date and specific time, and distinguish between working days and non-working days. Monday to Friday are defined as working days, and weekends and holidays are defined as non-working days.

[0081] Statistical analysis: Time period login statistics: Login statistics for each hour period on each working day; Average login calculation: Calculate the average login for each hour period to identify time periods with significantly higher user activity;

[0082] Cluster analysis: Use clustering algorithms (such as K-means) to divide the hourly periods within each day into different groups to find out which groups represent peak periods. Based on the analysis results, determine the weekday peak period or weekday non-peak period;

[0083] For example, through cluster analysis, it is found that the user activity of group A (including 8 am to 10 am) and group B (including 5 pm to 7 pm) has increased significantly, so these time periods can be determined as the peak time periods on weekdays;

[0084] Through the above algorithms and analysis process, the peak time period on weekdays can be effectively identified from the distribution of user login times, providing data support and guidance for business operations and optimization.

[0085] The process of adjusting the real-time monitoring strategy according to the current period is as follows:

[0086] When it is determined that the current working day is at peak hours, the pre-built rule engine is used to classify the user's permission changes into first-level permission change categories and non-first-level permission change categories, identify and filter out the corresponding events of the first-level permission change category, and generate the current monitoring frequency estimate based on the established monitoring frequency and the long-term trend of the monitoring process. During the working day peak hours, real-time monitoring is performed based on the monitoring frequency estimate. The formula is as follows:

[0087] ;

[0088] In the formula, Indicates the estimated monitoring frequency, Indicates the established monitoring frequency, represents an exponential function, which introduces a long-term trend, where represents the growth rate of the control trend, represents the number of years since the start of monitoring. The representation of this part of the exponential function simulates the gradual change of monitoring frequency over time, that is, the long-term trend of the monitoring process;

[0089] For example:

[0090] The setting is 60s (once per minute). is 0.05, and the monitoring frequency changes slightly each year. is 5, and 5 years have passed since the start of monitoring. Substituting these values ​​into the above formula, we get:

[0091] =60*0.284=17.04≈17s;

[0092] Therefore, in Under the condition of , the monitoring frequency is once every 17 seconds;

[0093] Specifically, the above-mentioned first-level permission changes are ordinary routine permission adjustments, including account information modification, personal setting adjustment, reference setting adjustment, daily operation permissions, notification reminder settings, and account status management;

[0094] Account information modification: user name change, email address update, and contact number change;

[0095] Personal settings adjustment: change of avatar or profile picture, adjustment of language or time zone;

[0096] Reference settings adjustment: general application or platform settings adjustment, such as interface theme and font size;

[0097] Daily operation permissions: permissions to browse pages or content;

[0098] Notification reminder settings: adjust subscriptions to system notifications and reminders;

[0099] Account status management: account activation or deactivation;

[0100] These changes can usually be completed by users themselves or after regular identity verification, so no additional review is required. In terms of security and risk management, these changes are classified as low-risk or routine changes and need to be filtered during peak working hours when authority handovers and adjustments are frequent.

[0101] Non-first-level permission changes are sensitive permission adjustments, indicating other change operations except for first-level permission changes;

[0102] If it is determined that the current period is off-peak on a working day, real-time monitoring is performed according to the established monitoring frequency;

[0103] When it is determined that the current day is a non-working day, the current monitoring frequency estimate is generated according to the established monitoring frequency, and real-time monitoring is performed according to the monitoring frequency estimate on non-working days. The formula is as follows:

[0104] ;

[0105] In the formula, Indicates the non-working day adjustment factor, which is usually close to 1, but its specific value can be adjusted by the user or generated by analytical function fitting;

[0106] For example:

[0107] The setting is 60s (once per minute). is 1.005, indicating that the monitoring frequency changes slightly on non-working days. Substituting these values ​​into the above formula, the result is:

[0108] =60*2.005=120.3≈120s;

[0109] Therefore, in Under the condition of , the monitoring frequency is once every 120s.

[0110] By adopting the above technical solution, the current period is dynamically determined according to the user activity pattern, so as to adjust the real-time monitoring strategy. The predefined algorithms and formulas are used to generate the frequency estimate of real-time monitoring according to the current period to ensure the effectiveness and adaptability of the monitoring strategy. During the peak period of weekdays, the method of filtering out regular permission adjustments is adopted to reduce unnecessary data processing volume, while also ensuring the timely perception of key events. During the non-peak period of weekdays and non-working days, the corresponding adjusted monitoring frequency is adopted, which can carry out all-round data acquisition under the condition of normal data processing pressure, so as to facilitate the subsequent risk assessment.

[0111] The analysis and warning module obtains the permission change information within the preset time period t under the current monitoring frequency;

[0112] During the peak hours of working days, the obtained permission change information includes the frequency of permission adjustment that meets the non-first-level permission change category in each operation terminal, the number of unauthorized user accesses, and the number of adjustment contents. Based on the normalized permission change information, the corresponding risk assessment index of each operation terminal in the time period t is generated;

[0113] During the off-peak period of working days (meaning it is during the off-peak period of working days and non-working days), the obtained permission change information includes the frequency of permission adjustment in each operation end (including the first-level permission change category and the non-first-level permission change category), the number of unauthorized access by users, and the number of adjustment contents. Based on the normalized permission change information, the corresponding risk assessment index of each operation end in the time period t is generated;

[0114] Compare the risk assessment index obtained at the current monitoring frequency with the preset assessment threshold;

[0115] If the risk assessment index exceeds the assessment threshold, it means that there is an abnormality in the BAS system authority handover process, and an early warning signal is issued; if the risk assessment index does not exceed the assessment threshold, it means that there is no abnormality in the BAS system authority handover process, and no response is made. Regardless of whether the risk assessment index exceeds the assessment threshold, the current data needs to be recorded in real time;

[0116] It should be noted that the number of times the content is adjusted includes any one of adding, modifying and deleting. If the same information is added and modified, it means that the number of times the content is adjusted is two, so adding, modifying and deleting each corresponds to one time; the preset assessment threshold is set according to the actual situation and is used to determine whether there is an abnormality in the current risk level;

[0117] The risk assessment index corresponding to each operating end in the time period t is generated based on the following formula:

[0118] ;

[0119] In the formula, represents the risk assessment index, Indicates the frequency of permission adjustments that meet the non-first-level permission change category. Indicates the frequency of permission adjustment. They represent the number of unauthorized accesses and content adjustments by users in the corresponding period, respectively, and the weight coefficients are: , , ,and ; , , ,and ;

[0120] Indicates the error correction factor, which is used for convenience Under the condition of non-working day peak period, the risk assessment index can be adjusted to ignore the premise of the current period and compare with the same preset assessment threshold to ensure the accuracy of the comparison result, and The value range of is 2~8;

[0121] For example:

[0122] During the peak hours of working days, we mainly focus on the permission adjustments of non-first-level permission changes, so we can give these indicators a higher weight. =0.5, =0.3, =0.2, and the normalized value is =0.6, =0.2, =0.4, then the risk assessment index The value of is: 0.5*0.6+0.3*0.2+0.2*0.4=0.46;

[0123] During non-working day peak periods (including working day off-peak periods and non-working days), we consider all types of permission adjustments, assuming =0.4, =0.4, =0.2, and the normalized value is =0.5, =0.3, =0.2, then the risk assessment index The value of is: 0.4*0.5+0.4*0.3+0.2*0.2=0.34;

[0124] In this way, we constructed different risk assessment index formulas according to the different time periods and permission change information, and gave specific calculation examples.

[0125] By adopting the above technical solutions, considering the different characteristics of authority changes in different time periods, a differentiated risk assessment index calculation formula was designed, which achieved a refined assessment of the BAS system authority handover process, improved the accuracy and pertinence of risk assessment, and automated the entire early warning and response process, reducing manual intervention and improving processing efficiency and accuracy. At the same time, by continuously tracking and monitoring the changes in the risk assessment index, intelligent monitoring of the BAS system authority handover process is achieved.

[0126] The response correction module executes the notification correction strategy under the condition of receiving the early warning signal;

[0127] Then, record the fluctuation of the risk assessment index of each operating end in each time period t on the same day, and express it through a curve chart. According to the fluctuation, obtain the risk assessment value of the corresponding operating end every day, and statistically calculate the average of the risk assessment value of the corresponding operating end every month. For each operating end under the same BAS system, sort it from large to small according to the size of the average value, and execute the troubleshooting strategy according to the sorting situation;

[0128] The process of executing the notification correction strategy is as follows:

[0129] Notify relevant operating personnel to understand the real-time situation, including the specific time period when the warning signal appears. The operating personnel analyze and check the BAS system configuration or process, and formulate corrective measures based on the analysis results. The corrective measures include adjusting the operating strategy, repairing system vulnerabilities, strengthening security controls, and optimizing processes. The specific contents of the corrective measures are not elaborated here;

[0130] After that, relevant personnel will promptly implement the formulated corrective measures to reduce risks and resume normal operations. After the corrective measures are implemented, they will continue to track and monitor the changes in the risk assessment index to ensure the effectiveness of the corrective measures. If the risk still exists or reappears, further adjustments to the strategy or other measures will be required.

[0131] Here is an example:

[0132] Assuming that in time period t, the risk assessment index on the operation side exceeds the preset value, the notification correction strategy may include the following steps: 1. Notify the operation team and the security team to inform them that the risk assessment index exceeds the preset value; 2. Provide relevant operation data within time period t, such as user activities, system load, etc.; 3. Analyze the cause, it may be found that the system has failed or has been attacked externally; 4. Develop corrective measures, such as repairing system failures, strengthening security protection, etc.; 5. Implement corrective measures and closely monitor changes in the risk assessment index; 6. If the risk still exists, further analyze the cause and adjust the corrective measures; Through timely notification and effective corrective measures, it can help identify and resolve potential security risks or abnormal situations, and ensure the safety and stability of operations.

[0133] The risk assessment value of the corresponding operation end is obtained every day according to the fluctuation situation, and the formula is as follows:

[0134] ;

[0135] In the formula, represents the risk assessment value corresponding to the day, d represents the number of the day, d=1, 2, ..., Q, Q is a positive integer, and Q represents the day number, It represents the risk assessment index corresponding to the time period t, i=1, 2, ..., n, n is a positive integer, i represents the number of the corresponding time period t, n represents the number of time periods t on that day, Represents the average value of the corresponding risk assessment index in each corresponding time period t;

[0136] The process of executing the troubleshooting strategy according to the sorting situation is as follows:

[0137] During the corresponding working hours at the end of each month, the top three operating terminals are selected for troubleshooting, and staff are arranged to conduct a comprehensive troubleshooting of the three selected operating terminals. The specific troubleshooting work will not be elaborated here.

[0138] By adopting the above technical solution, we can make full use of the real-time recorded permission change information, generate risk assessment index and daily / monthly risk assessment values ​​through data analysis, and provide strong data support for operational decisions; at the same time, we execute troubleshooting strategies according to the sorting results of risk assessment values, realize data-based priority processing, and conduct comprehensive troubleshooting on high-risk operations every month, which not only solves current problems, but also prevents the occurrence of potential risks, and improves the overall safety and stability of the BAS system.

[0139] Embodiment 2:

[0140] See also Figure 2Based on Example 1, this embodiment also provides an early warning method for comprehensively monitoring the handover of BAS system authority, including the following specific steps:

[0141] S1. Manage the permission changes of all users in any operation terminal in the BAS system;

[0142] S2. Based on the activity patterns of users in the operation end, determine the current period, adjust the real-time monitoring strategy according to the current period, derive and execute the corresponding monitoring frequency, and the period includes the peak period of working days, the non-peak period of working days, and non-working days;

[0143] S3. Under the current monitoring frequency, obtain the permission change information within the preset time period t;

[0144] During the peak hours of working days, the obtained permission change information includes the frequency of permission adjustment that meets the non-first-level permission change category in each operation terminal, the number of unauthorized user accesses, and the number of adjustment contents. Based on the normalized permission change information, the corresponding risk assessment index of each operation terminal in the time period t is generated;

[0145] During the off-weekday peak period, the obtained permission change information includes the frequency of permission adjustment in each operation terminal, the number of unauthorized user accesses, and the number of adjusted contents. Based on the normalized permission change information, the corresponding risk assessment index of each operation terminal in the time period t is generated;

[0146] Compare the risk assessment index obtained at the current monitoring frequency with the preset assessment threshold;

[0147] When the risk assessment index exceeds the assessment threshold, an early warning signal is issued;

[0148] S4. Execute the notification correction strategy upon receiving the warning signal;

[0149] Then, the fluctuation of the risk assessment index of each operating end in each time period t on the same day is recorded and represented by a curve chart. The daily risk assessment value of the corresponding operating end is obtained based on the fluctuation, and the average of the risk assessment value of the corresponding operating end each month is statistically calculated. The operating ends under the same BAS system are sorted from large to small according to the size of the average, and the troubleshooting strategy is executed according to the sorting.

[0150] In the application, the several formulas involved are all calculated by removing the dimensions and taking their numerical values. The formula is a formula obtained by collecting a large amount of data and performing software simulation to obtain the most recent real situation. The formula is set by technical personnel in this field according to actual conditions.

[0151] The above embodiments may be implemented in whole or in part by software, hardware, firmware or any other combination thereof. When implemented using software, the above embodiments may be implemented in whole or in part in the form of a computer program product. A person of ordinary skill in the art may appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein may be implemented in electronic hardware, or in a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution.

[0152] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, and may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0153] The above description is only a specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application.

Claims

1. An early warning system for comprehensive monitoring of BAS system authority transfer, It is characterized in that include: The authority management module manages the authority changes of all users in any operation end of the BAS system; The monitoring module combines the activity patterns of users in the operation end to determine the current period, adjusts the real-time monitoring strategy according to the current period, and derives and executes the corresponding monitoring frequency. The period includes the peak period of working days, the non-peak period of working days, and non-working days. The process of determining the current period is as follows: The activity pattern of the predefined user is the login time. On weekdays, the time distribution of user logins is analyzed to determine whether it is a weekday peak period or a weekday non-peak period. On non-workdays, it is directly determined as a non-workday. The analysis process is as follows: Data collection and preparation: Collect user login time data, including date and specific time; Statistical analysis: Count the number of logins in each hour period of each working day, and calculate the average number of logins in each hour period; Cluster analysis: Use clustering algorithms to divide the hour periods of each day into different groups, and determine the peak period or non-peak period of working days based on the analysis results; The process of adjusting the real-time monitoring strategy according to the current period is as follows: When it is determined that the current working day is at peak hours, the pre-built rule engine is used to classify the user's permission changes into first-level permission change categories and non-first-level permission change categories, identify and filter out the corresponding events of the first-level permission change category, and generate the current monitoring frequency estimate based on the established monitoring frequency and the long-term trend of the monitoring process. During the working day peak hours, real-time monitoring is performed based on the monitoring frequency estimate. The formula is as follows: ; In the formula, Indicates the estimated monitoring frequency, Indicates the established monitoring frequency, represents an exponential function, which introduces a long-term trend, where represents the growth rate of the control trend, represents the number of years since monitoring began; If it is determined that the current period is off-peak on a working day, real-time monitoring is performed according to the established monitoring frequency; When it is determined that the current day is a non-working day, the current monitoring frequency estimate is generated according to the established monitoring frequency, and real-time monitoring is performed according to the monitoring frequency estimate on non-working days. The formula is as follows: ; In the formula, represents the non-working day adjustment factor; The analysis and warning module obtains the permission change information within the preset time period t under the current monitoring frequency; During the peak hours of working days, the obtained permission change information includes the frequency of permission adjustment that meets the non-first-level permission change category in each operation terminal, the number of unauthorized user accesses, and the number of adjustment contents. Based on the normalized permission change information, the corresponding risk assessment index of each operation terminal in the time period t is generated; During the non-working day peak period, the obtained permission change information includes the frequency of permission adjustment in each operation end, the number of unauthorized user accesses and the number of adjusted contents. Based on the normalized permission change information, the corresponding risk assessment index of each operation end in the time period t is generated; wherein, the non-working day peak period means the non-working day and non-working day. Compare the risk assessment index obtained at the current monitoring frequency with the preset assessment threshold; When the risk assessment index exceeds the assessment threshold, an early warning signal is issued; The response correction module executes the notification correction strategy under the condition of receiving the early warning signal.

2. According to claim 1, an early warning system for comprehensive monitoring of BAS system authority handover, Features: The number of times the content is adjusted includes any one of addition, modification and deletion.

3. According to claim 2, an early warning system for comprehensive monitoring of BAS system authority transfer, Features: The risk assessment index corresponding to each operating end in the time period t is generated based on the following formula: ; In the formula, represents the risk assessment index, Indicates the frequency of permission adjustments that meet the non-first-level permission change category. Indicates the frequency of permission adjustment. They represent the number of unauthorized accesses and content adjustments by users in the corresponding period, respectively, and the weight coefficients are: , , , , , , represents the error correction factor, and The value range is 2~8.

4. According to claim 3, an early warning system for comprehensive monitoring of BAS system authority transfer, Features: The process of implementing a notification correction strategy is as follows: Notify the operating personnel to understand the real-time situation, which includes the specific time period when the warning signal appears. The operating personnel analyze and check the BAS system configuration or process, and formulate corrective measures based on the analysis results. Corrective measures include adjusting operating strategies, repairing system vulnerabilities, strengthening security controls, and optimizing processes.

5. According to claim 4, an early warning system for comprehensive monitoring of BAS system authority transfer, Features: The corrective response module also includes: recording the fluctuation of the risk assessment index of each operating end in each time period t within the day, and representing it through a curve chart, obtaining the daily risk assessment value of the corresponding operating end based on the fluctuation, and statistically calculating the average of the risk assessment value of the corresponding operating end each month, sorting the operating ends under the same BAS system from large to small according to the size of the average, and executing the troubleshooting strategy according to the sorting.

6. According to claim 5, an early warning system for comprehensive monitoring of BAS system authority transfer, Features: The risk assessment value of the corresponding operation end is obtained every day according to the fluctuation situation. The formula is as follows: ; In the formula, represents the risk assessment value corresponding to the day, d represents the number of the day, d=1, 2, ..., Q, Q is a positive integer, and Q represents the day number, It represents the risk assessment index corresponding to the time period t, i=1, 2, ..., n, n is a positive integer, i represents the number of the corresponding time period t, n represents the number of time periods t on that day, Represents the average value of the corresponding risk assessment index in each corresponding time period t.

7. An early warning system for comprehensive monitoring of BAS system authority transfer according to claim 6, Features: The process of executing the troubleshooting strategy according to the sorting situation is as follows: During the corresponding working hours at the end of each month, select the top three corresponding operation terminals for troubleshooting.

8. An early warning method for comprehensively monitoring the transfer of authority of a BAS system, using any system described in any one of claims 1 to 7, Features: The steps include: S1. Manage the permission changes of all users in any operation terminal in the BAS system; S2. Based on the activity patterns of users in the operation end, determine the current period, adjust the real-time monitoring strategy according to the current period, derive and execute the corresponding monitoring frequency, and the period includes the peak period of working days, the non-peak period of working days, and non-working days; The process of determining the current period is as follows: The activity pattern of the predefined user is the login time. On weekdays, the time distribution of user logins is analyzed to determine whether it is a weekday peak period or a weekday non-peak period. On non-workdays, it is directly determined as a non-workday. The analysis process is as follows: Data collection and preparation: Collect user login time data, including date and specific time; Statistical analysis: Count the number of logins in each hour period of each working day, and calculate the average number of logins in each hour period; Cluster analysis: Use clustering algorithms to divide the hour periods of each day into different groups, and determine the peak period or non-peak period of working days based on the analysis results; The process of adjusting the real-time monitoring strategy according to the current period is as follows: When it is determined that the current working day is at peak hours, the pre-built rule engine is used to classify the user's permission changes into first-level permission change categories and non-first-level permission change categories, identify and filter out the corresponding events of the first-level permission change category, and generate the current monitoring frequency estimate based on the established monitoring frequency and the long-term trend of the monitoring process. During the working day peak hours, real-time monitoring is performed based on the monitoring frequency estimate. The formula is as follows: ; In the formula, Indicates the estimated monitoring frequency, Indicates the established monitoring frequency, represents an exponential function, which introduces a long-term trend, where represents the growth rate of the control trend, represents the number of years since monitoring began; If it is determined that the current period is off-peak on a working day, real-time monitoring is performed according to the established monitoring frequency; When it is determined that the current day is a non-working day, the current monitoring frequency estimate is generated according to the established monitoring frequency, and real-time monitoring is performed according to the monitoring frequency estimate on non-working days. The formula is as follows: ; In the formula, represents the non-working day adjustment factor; S3. Under the current monitoring frequency, obtain the permission change information within the preset time period t; During the peak hours of working days, the obtained permission change information includes the frequency of permission adjustment that meets the non-first-level permission change category in each operation terminal, the number of unauthorized user accesses, and the number of adjustment contents. Based on the normalized permission change information, the corresponding risk assessment index of each operation terminal in the time period t is generated; During the non-working day peak period, the obtained permission change information includes the frequency of permission adjustment in each operation end, the number of unauthorized user accesses and the number of adjusted contents. Based on the normalized permission change information, the corresponding risk assessment index of each operation end in the time period t is generated; wherein, the non-working day peak period means the non-working day and non-working day. Compare the risk assessment index obtained at the current monitoring frequency with the preset assessment threshold; When the risk assessment index exceeds the assessment threshold, an early warning signal is issued; S4. Execute the notification correction strategy upon receiving the warning signal; Then, the fluctuation of the risk assessment index of each operating end in each time period t on the same day is recorded and represented by a curve chart. The daily risk assessment value of the corresponding operating end is obtained based on the fluctuation, and the average of the risk assessment value of the corresponding operating end each month is statistically calculated. The operating ends under the same BAS system are sorted from large to small according to the size of the average, and the troubleshooting strategy is executed according to the sorting.