Construction method for restoring and treating nursery stocks in hilly and mountainous region mine and automatically planting and fertilizing

Through drone aerial mapping and mechanized automation technology, the problem of slow progress and high cost of vegetation planting construction in ecological restoration of mines has been solved, efficient vegetation planting and construction has been achieved, and resource waste and safety risks have been reduced.

CN118716147APending Publication Date: 2024-10-01WUHAN SURVEYING GEOTECHN RES INST OF MCC
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410809541.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the ecological restoration and management of mines, the construction progress of vegetation seedling planting is slow, the cost is high, and the survival rate is low, resulting in rework and waste of resources.

Method used

UAV aerial surveying and high-precision three-dimensional imaging technology are used for terrain surveying, combined with mechanization and automation technology, to automatically plan and excavate tree ponds, automate fertilization and planting, and reduce manual operations.

Benefits of technology

It improves the rationality and ornamental value of the vegetation layout, shortens the construction period and cost, reduces safety risks, and achieves efficient use of resources and cost savings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118716147A_ABST
    Figure CN118716147A_ABST
Patent Text Reader

Abstract

The invention provides an automatic planting and fertilizing construction method for restoring and treating nursery stocks in a hill and mountain mine, which comprises the following steps: surveying and mapping a mine vegetation regreening area to obtain coordinate information and a topographic map of a planting area, and positioning, marking and arranging on the topographic map according to designed tree seed spacing and tree pool size. The positioned vegetation planting topographic map data are converted into visual path data, the data are imported into a vehicle machine panel, and planting point distribution can be checked through the panel; the mechanical equipment adjusts an advancing path through the visual data displayed by the flat plate and a self positioning point, and performs tree pool excavation on a predetermined tree pool point position; the mechanical fertilizing vehicle performs fixed-point fertilizing on the excavated tree pool by using premixed materials such as chemical fertilizer and a water-retaining agent; and transplanting the tree seedlings with the soil balls into corresponding tree pools by using a planting machine, and carrying out automatic soil covering operation. The construction method has the advantages of highly mechanized operation, convenience in construction, construction period saving and cost saving.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mine ecological restoration and management, and specifically to a construction method for automatic planting and fertilizing of seedlings for mine restoration and management in hilly mountainous areas. Background Art

[0003] At present, the ecological restoration and management of some mines is large in area and wide in scope, the management patches vary in size, and traditional vegetation seedling planting requires a large amount of manpower, including manual work such as laying out the patches, spreading ash to determine points, and manually directing the excavation of tree pits and planting.

[0004] Now that green mine construction is advocated, closed mines, damaged forests and grasslands need to undergo ecological restoration and land reclamation. However, in reality, due to technical, weather and other reasons, the construction progress and seedling growth effect of vegetation seedlings in mine ecological restoration and management have not been ideal. These situations will result in rework, vegetation maintenance and reduced vegetation survival rate, while delaying project schedules, causing waste of resources and consuming a lot of manpower. Summary of the invention

[0005] In view of the deficiencies in the above-mentioned prior art, the present invention provides a construction method for automatic planting and fertilizing of seedlings for mine restoration and management in hilly and mountainous areas, aiming to solve the shortcomings of large-scale manual labor, low degree of mechanized operation, slow construction progress, etc. in the existing mine ecological restoration construction process, while also achieving the effect of saving construction period, saving costs, reducing costs and increasing efficiency.

[0006] The technical solution provided by the present invention is a construction method for automatic planting and fertilization of seedlings for mine restoration and management in hilly mountainous areas, comprising the following steps:

[0007] (1) Topographic surveying: Collect coordinate information of greening areas through engineering surveying and mapping to form a topographic map;

[0008] (2) Planting area division: Determine the planting area according to the design plan, as well as the vegetation types and planting requirements of the planting area, and divide the planned topographic map into blocks;

[0009] (3) Tree pit positioning: Based on the surveyed topographic map, the tree pits are marked and positioned according to the vegetation planting spacing and tree pit specifications required by the design, and are distinguished by different colors;

[0010] (4) Importing topographic map data: Export the topographic map with the relevant tree pool data marked into a kml file, and then import the file into the locomotive flatbed to form visual point data, and use the self-coordinate positioning as the origin to plan the path for the tree pool point;

[0011] (5) Mechanical automated excavation: An excavation machine equipped with a locomotive flatbed plans the path reasonably based on the tree pit locations and spacing displayed on the flatbed, and excavates tree pits of different specifications based on the colors of the different marked information;

[0012] (6) Mechanical fertilization: According to the soil fertility requirements and nutritional conditions of different regions, the fertilizer containing compound fertilizer and water retaining agent is mixed in proportion according to the design requirements and transferred into the mechanical hopper. The fertilization machine distinguishes the amount of fertilizer required by the vegetation type according to the data imported from the flat plate, and then fertilizes the excavated tree pit;

[0013] (7) Planting of seedlings: Purchase qualified seedlings of tree species and transport them to the construction site by machinery. Distribute them to corresponding tree pits according to the types of seedlings to be planted. Use automated machinery to transplant the seedlings with soil balls into the corresponding tree pits and automatically cover them with soil.

[0014] Furthermore, the engineering surveying and mapping means in step (1) includes drone aerial surveying and mapping, which displays the topographic coordinate information of the planned planting area through high-precision three-dimensional imaging technology.

[0015] Furthermore, in step (2), the topographic map is processed into a CAD drawing by computer software, and the topographic map is divided into regions by comparing the scope of the planting area and the planting requirements of various seedlings in the project design drawings, and different vegetation seedling planting areas are set.

[0016] Furthermore, in step (3), different colors are used to mark different seedlings, and the tree pools are marked using a symbol array to mark the appropriate tree pool size, and the tree pool spacing is controlled by the array.

[0017] Furthermore, in step (4), the completed topographic map data in the computer is imported into the Aowei map software, and the types of seedlings in the tree pits are checked again. At the same time, different fertilizers configured in different tree pits are marked with colored graphics. The data is then exported from the computer, and the exported data file is imported into the excavation machine flatbed. The data is expanded through the Aowei map to form visual point data information, and the tree pit excavation route is reasonably arranged according to the tree pit point information imported into the locomotive flatbed, the machine's own positioning and the construction area.

[0018] Furthermore, in step (6), the mechanical vehicle follows the tree pit excavation route and the positioning and marking information of the locomotive flatbed, and fertilizer is added to the tree pit according to the different amounts of fertilizer required by different seedlings.

[0019] Furthermore, in the step (6), the mechanical hopper of the fertilizing machine controls the amount of conveyed material by switching on and off for different durations.

[0020] Beneficial effects of the present invention:

[0021] (1) The present invention uses drones to conduct more comprehensive mapping of mine planting zones, simplifies and facilitates vegetation layout, greatly ensures the rationality and ornamental value of vegetation matching, and optimizes the vegetation planting workflow.

[0022] (2) The present invention combines machinery and data to carry out mechanized and automated implantation, reducing manual processes such as line laying and positioning, saving labor costs, and carrying out large-scale, intensive, and block-based construction, thereby saving construction time and construction costs, reducing safety risks, and playing a role in reducing costs and increasing efficiency for enterprises. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 is a flow chart of the steps of the present invention;

[0024] Figure 2 is a topographic map of a specific embodiment of the present invention;

[0025] Figure 3 It is a detailed planting topographic map of the restoration area designed in a specific embodiment of the present invention. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0027] like Figure 1 As shown, a construction method for automatic planting and fertilization of seedlings for mine restoration and management in hilly mountainous areas includes the following steps:

[0028] (1) Topographic surveying: Collect coordinate information of greening areas through engineering surveying and mapping to form a topographic map;

[0029] (2) Planting area division: Determine the planting area according to the design plan, as well as the vegetation types and planting requirements of the planting area, and divide the planned topographic map into blocks;

[0030] (3) Tree pit positioning: Based on the surveyed topographic map, the tree pits are marked and positioned according to the vegetation planting spacing and tree pit specifications required by the design, and are distinguished by different colors;

[0031] (4) Importing topographic map data: Export the topographic map with the relevant tree pool data marked into a kml file, and then import the file into the locomotive flatbed to form visual point data, and use the self-coordinate positioning as the origin to plan the path for the tree pool point;

[0032] (5) Mechanical automated excavation: An excavation machine equipped with a locomotive flatbed plans the path reasonably based on the tree pit locations and spacing displayed on the flatbed, and excavates tree pits of different specifications based on the colors of the different marked information;

[0033] (6) Mechanical fertilization: According to the soil fertility requirements and nutritional conditions of different regions, the fertilizer containing compound fertilizer and water retaining agent is mixed in proportion according to the design requirements and transferred into the mechanical hopper. The fertilization machine distinguishes the amount of fertilizer required by the vegetation type according to the data imported from the flat plate, and then fertilizes the excavated tree pit;

[0034] (7) Planting of seedlings: Purchase qualified seedlings of tree species and transport them to the construction site by machinery. Distribute them to corresponding tree pits according to the types of seedlings to be planted. Use automated machinery to transplant the seedlings with soil balls into the corresponding tree pits and automatically cover them with soil.

[0035] The engineering surveying and mapping means in step (1) includes drone aerial surveying and mapping, which displays the topographic coordinate information of the planned planting area through high-precision three-dimensional imaging technology.

[0036] In the step (2), the topographic map is processed into a CAD drawing by computer software, and the topographic map is divided into regions by comparing the scope of the planting area and the planting requirements of various seedlings in the project design drawings, and different vegetation seedling planting areas are set.

[0037] In the step (3), different colors are used to mark different seedlings, and the tree pools are marked using a symbol array to mark the appropriate tree pool size, and the tree pool spacing is controlled by the array.

[0038] In the step (4), the completed topographic map data in the computer is imported into the Aowei map software, the types of seedlings in the tree pits are checked again, and different fertilizers configured in different tree pits are marked with colored graphics. The data is then exported from the computer, and the exported data file is imported into the excavation machine flatbed. The data is expanded through the Aowei map to form visualized point data information, and the tree pit excavation route is reasonably arranged according to the tree pit point information imported into the locomotive flatbed, the machine's own positioning and the construction area.

[0039] In step (6), the mechanical vehicle follows the tree pit excavation route and the positioning and marking information of the locomotive flatbed, and adds fertilizer to the tree pit according to the different amounts of fertilizer required by different seedlings. In step (6), the mechanical hopper of the fertilization machine controls the amount of conveyed material by switching on and off for different durations.

[0040] In a specific embodiment, if Figure 2 According to the topographic map shown in the figure, the planting area division and tree pool positioning according to the present invention are determined as follows: Figure 3The specific planting map of the restoration area shown in the figure includes open-pit mining area LC01, open-pit mining area LC02, open-pit mining area LC03 and partial greening area FL01, partial greening area FL02, partial greening area FL03. Among them, open-pit mining area LC01 is plowed and leveled to plant trees (fir, cypress, maple), with a spacing of 2.0m*2.0m, and grass seeds are sown in the forest, covering an area of ​​1724.2㎡. Open-pit mining area LC02 is plowed and leveled to plant trees (fir, cypress, maple), with a spacing of 2.0m*2.0m, and grass seeds are sown in the forest, covering an area of ​​2822.6㎡. Open-pit mining area LC02 is plowed and leveled to plant trees (fir, cypress, maple), with a spacing of 2.0m*2.0m, and grass seeds are sown in the forest, covering an area of ​​2822.6㎡. In the partial greening area, fir, cypress and maple trees were planted with a spacing of 3m*3m, and grass seeds were sown in the forest. Grass seeds were sown in the partial greening area FL01, covering an area of ​​296.7㎡. Grass seeds were sown in the partial greening area FL02, covering an area of ​​3750.0㎡. Grass seeds were sown in the partial greening area FL03, covering an area of ​​2833.1㎡.

[0041] The present invention combines machinery and data to achieve automation. It does not require manual laying out of lines, spreading ash, and determining the location of the tree pit. A mechanical excavator is used to dig holes, and mechanical fertilization is carried out through drone sowing.

[0042] The above is only a detailed description of a specific implementation scheme of the present invention, and does not limit the present invention. Any modifications, equivalent substitutions and improvements made on the design concept of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction method for automatic planting and fertilization of seedlings for mine restoration and management in hilly and mountainous areas, characterized in that: The steps include: (1) Topographic surveying: Collect coordinate information of greening areas through engineering surveying and mapping to form a topographic map; (2) Planting area division: Determine the planting area according to the design plan, as well as the vegetation types and planting requirements of the planting area, and divide the planned topographic map into blocks; (3) Tree pit positioning: Based on the surveyed topographic map, the tree pits are marked and positioned according to the vegetation planting spacing and tree pit specifications required by the design, and are distinguished by different colors; (4) Importing topographic map data: Export the topographic map with the relevant tree pool data marked into a kml file, and then import the file into the locomotive flatbed to form visual point data, and use the self-coordinate positioning as the origin to plan the path for the tree pool point; (5) Mechanical automated excavation: An excavation machine equipped with a locomotive flatbed plans the path reasonably based on the tree pit locations and spacing displayed on the flatbed, and excavates tree pits of different specifications based on the colors of the different marked information; (6) Mechanical fertilization: According to the soil fertility requirements and nutritional conditions of different regions, the fertilizer containing compound fertilizer and water retaining agent is mixed in proportion according to the design requirements and transferred into the mechanical hopper. The fertilization machine distinguishes the amount of fertilizer required by the vegetation type according to the data imported from the flat plate, and then fertilizes the excavated tree pit; (7) Planting of seedlings: Purchase qualified seedlings of tree species and transport them to the construction site by machinery. Distribute them to corresponding tree pits according to the types of seedlings to be planted. Use automated machinery to transplant the seedlings with soil balls into the corresponding tree pits and automatically cover them with soil.

2. The construction method for automatic planting and fertilization of seedlings for mine restoration and management in hilly and mountainous areas according to claim 1 is characterized in that: The engineering surveying and mapping means in step (1) includes drone aerial surveying and mapping, which displays the topographic coordinate information of the planned planting area through high-precision three-dimensional imaging technology.

3. The construction method for automatic planting and fertilization of seedlings for mine restoration and treatment in hilly and mountainous areas according to claim 1 is characterized in that: In the step (2), the topographic map is processed into a CAD drawing by computer software, and the topographic map is divided into regions by comparing the scope of the planting area and the planting requirements of various seedlings in the project design drawings, and different vegetation seedling planting areas are set.

4. The construction method for automatic planting and fertilization of seedlings for mine restoration and treatment in hilly and mountainous areas according to claim 1 is characterized in that: In the step (3), different colors are used to mark different seedlings, and the tree pools are marked using a symbol array to mark the appropriate tree pool size, and the tree pool spacing is controlled by the array.

5. The construction method for automatic planting and fertilization of seedlings for mine restoration and treatment in hilly and mountainous areas according to claim 1 is characterized in that: In the step (4), the completed topographic map data in the computer is imported into the Aowei map software, the types of seedlings in the tree pits are checked again, and different fertilizers configured in different tree pits are marked with colored graphics. The data is then exported from the computer, and the exported data file is imported into the excavation machine flatbed. The data is expanded through the Aowei map to form visualized point data information, and the tree pit excavation route is reasonably arranged according to the tree pit point information imported into the locomotive flatbed, the machine's own positioning and the construction area.

6. The construction method for automatic planting and fertilization of seedlings for mine restoration and treatment in hilly and mountainous areas according to claim 1 is characterized in that: In the step (6), the mechanical vehicle follows the tree pit excavation route and the positioning and marking information of the locomotive flatbed, and adds fertilizer to the tree pit according to the different amounts of fertilizer required by different seedlings.

7. The construction method for automatic planting and fertilization of seedlings for mine restoration and treatment in hilly and mountainous areas according to claim 1 is characterized in that: In the step (6), the mechanical hopper of the fertilizing machine controls the amount of conveyed material by switching on and off for different durations.

Citation Information

Patent Citations

  • Formula for preparing building material and product thereof by utilizing caustic sludge

    CN104072048A

  • Green cover construction method for ecological restoration of abandoned mine pit side slope

    CN106088109A

  • Rocky slope fast treating, greening and beautifying method

    CN107853052A

  • Ecological restoration treatment method based on historically left and abandoned mines

    CN116837869A