Upper computer of automatic welding device for titanium alloy electrode preparation and control method

By designing an automatic welding device host computer for titanium alloy electrodes, the problem of automatic welding of non-circular titanium alloy electrode blocks has been solved, open management and automatic control of welding parameters have been achieved, the consistency of welding quality has been improved, and human errors have been reduced. Improved product quality.

CN118720325APending Publication Date: 2024-10-01西部超导材料科技股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410972705.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

It is difficult to realize automatic welding of non-circular titanium alloy electrode blocks with existing technology, resulting in inconsistent welding quality and affecting product quality.

Method used

An automatic welding device host computer for titanium alloy electrode preparation is designed, including a human-computer interaction unit, a data processing unit and a collection and communication unit. Through the process input management module, welding control module, cooling water control module and vacuum and pressure control module to realize open management and automatic control of welding parameters.

Benefits of technology

Automatic welding of non-circular titanium alloy electrodes is realized, which improves the consistency of welding quality, reduces human errors, and improves product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118720325A_ABST
    Figure CN118720325A_ABST
Patent Text Reader

Abstract

The invention discloses an upper computer of an automatic welding device for preparing a titanium alloy consumable electrode. The upper computer comprises a man-machine interaction unit, a control unit and a control unit, wherein the man-machine interaction unit is used for displaying and modifying an equipment running state and welding control parameters; the data processing unit is used for operating a process formula database, script program operation and alarm service operation, storing display data of the man-machine interaction unit as a real-time historical database, performing state monitoring, logic interlocking judgment and parameter calculation, and sending a result to the acquisition communication unit; receiving and collecting an actual data value of interaction between the communication unit and the PLC; and the acquisition communication unit is used for performing data grouping and classification on variables needing to interact with the PLC in the man-machine interaction unit and the data processing unit, and transmitting a data processing result sent by the data processing unit to the PLC. According to the upper computer and the control method, a pre-input process calling mode is adopted, welding process parameters are managed in a full-open mode, a welding process path is planned autonomously, and automatic welding of different welding seam types is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of nonferrous metal processing equipment, relates to a host computer for an automatic welding device for preparing titanium alloy electrodes, and also relates to a host computer control method for the automatic welding device for preparing titanium alloy electrodes. Background Art

[0002] Titanium alloys have been widely used in aerospace, shipbuilding, chemical industry, biomedicine and other fields due to their low density, high strength, good corrosion resistance and excellent biocompatibility. At present, the preparation process of titanium alloy primary electrodes still requires the use of plasma welding boxes to weld electrode blocks. The traditional automatic welding process can only meet the welding of circular electrode blocks. Non-circular electrode blocks are difficult to achieve automatic welding due to the different welding samples. Manual welding is often used, which easily leads to inconsistent welding quality, thus affecting product quality. Summary of the invention

[0003] The purpose of the present invention is to provide a host computer for an automatic welding device for preparing titanium alloy electrodes, which solves the problem in the prior art that automatic welding of non-circular electrode blocks is difficult to achieve.

[0004] Another object of the present invention is to provide a host computer control method for an automatic welding device for preparing titanium alloy electrodes.

[0005] The technical solution adopted by the present invention is that the host computer used for the automatic welding device for preparing titanium alloy electrodes comprises:

[0006] Human-machine interaction unit, used to display and modify equipment operating status and welding control parameters;

[0007] The data processing unit is used to operate the process recipe database, script program operation, and alarm service operation, store the display data of the human-computer interaction unit as a real-time historical database, and perform status monitoring, logic interlock determination, and parameter calculation, and send the results to the acquisition communication unit, while receiving the actual value of the data exchanged between the acquisition communication unit and the PLC for calculation;

[0008] The acquisition communication unit is used for data interaction with the PLC, data range conversion, data grouping and classification of variables in the human-computer interaction unit and the data processing unit that need to interact with the PLC, setting different refresh cycles according to the groups, diagnosing the communication status with the PLC, and receiving the data processing results sent by the data processing unit and transmitting them to the PLC.

[0009] The present invention is also characterized in that:

[0010] The human-computer interaction unit includes a process input management module, a process retrieval module, a welding control module, a parameter recording module, a cooling water control module, and a vacuum and pressure control module.

[0011] The process input management module is used to modify, add, and delete the process parameters corresponding to any stored process name in the process formula database, and to manage the addition or update of process names in the process formula database;

[0012] The process retrieval module is used to retrieve the corresponding process and corresponding process parameters from the process formula database according to the process name, and at the same time input the batch number of the material to be welded, generate a file named with the above batch number through the data processing unit archiving script program, and archive the batch number file in the parameter recording module for data recording.

[0013] Process parameters include welding parameter management and weld parameter management. Weld parameter management includes fixed gun weld selection, weld surface selection, weld type selection for corresponding weld surface, and welding parameter setting. Welding parameter setting includes the setting of assembly quantity, weld quantity, welding current, welding voltage, and argon gas flow parameters.

[0014] Welding parameter management includes enabling selection of X-axis and Y-axis, speed setting of X-axis and Y-axis, and displacement distance setting of X-axis and Y-axis.

[0015] The parameter recording module is used to display the historical storage data in the data processing unit in a line graph, and at the same time record all operation actions on the batch welding materials in the process input management module, process retrieval module, welding control module, cooling water control module, vacuum and pressure control module to the corresponding batch file and archive it to generate a historical data record file.

[0016] The cooling water control module is used to control the operation of the system cooling system, including system cooling water switch control and real-time monitoring of cooling water temperature and flow during welding. When the cooling water script program in the data processing unit determines that the temperature or flow is abnormal, the PLC is controlled by the acquisition communication unit to terminate welding to protect the safety of the equipment, and an alarm is issued through the data processing unit alarm service.

[0017] The vacuum and pressure control module is used to control the furnace chamber pressure and the furnace chamber pressure rise rate before automatic welding. Specifically, before automatic welding, the vacuum pump group pumps the furnace chamber pressure to the set value, measures the pressure rise rate and stores it in the corresponding batch number file in the parameter recording module. At the same time, the argon filling control script program in the data processing unit fills argon according to the set pressure, and automatically closes the valve when the set pressure state is reached. The pressure data is stored in the real-time historical database in the data processing unit; if the pressure rise rate does not meet the setting, the alarm service in the data processing unit will pop up a window to remind you.

[0018] The welding control module consists of a welding control script program in the data processing unit. It reads the data variable conditions in the acquisition and communication unit, retrieves the module data according to the welding process, and transmits the execution results to the welding equipment through the acquisition and communication unit. At the same time, it alarms for abnormal parameters in the welding process through the alarm service in the data processing unit.

[0019] The welding control module includes welding gun selection, servo enable, welding area selection, start and end weld input, welding start button, end button, and real-time process parameter display. The start and end weld input and welding gun selection activation are interlocked with the welding control script program in the data processing unit. The welding end button includes the functions of terminating the current weld and terminating the current process.

[0020] Another technical solution adopted by the present invention is that the host computer control method for the automatic welding device for preparing titanium alloy electrodes comprises the following steps:

[0021] S1, process retrieval stage: input the batch number of the material to be welded in the human-computer interaction unit, retrieve and check the process in the process input management module according to the process name, and enter the welding preparation stage after verification;

[0022] S2, preparation stage: load the material, check that there is no abnormal alarm in the cooling water control module, then turn on the vacuum and pressure control module, evacuate and fill with argon according to the set value, and when the pressure reaches the set value, close the argon filling valve;

[0023] S3, welding control stage: in the welding interface of the welding control module, activate the fixed gun selection, servo enable, and the first arc starting point weld positioning in sequence. The data processing unit calculates the first welding position setting value and transmits the setting value to the PLC through the acquisition communication unit. The PLC controls the material to move to the first welding position. After the fixed gun arc starts normally, the welding is started. The material is welded according to the S1 process, and welding is performed in sequence until the final weld is completed.

[0024] The beneficial effects of the present invention are:

[0025] The host computer of the automatic welding device for preparing titanium alloy electrodes of the present invention has fully open management of welding process parameters, and the type of each weld can be freely selected, and the welding parameters under this type can be modified; at the same time, each weld type and the welding parameters of this type can be independently stored as a process name, so that the welding parameters can be retrieved according to the welding process and the stored process name;

[0026] The host computer control method for the automatic welding device for preparing titanium alloy electrodes of the present invention introduces open welding parameter management in the welding preparation process of titanium alloy consumable electrodes, realizes autonomous planning of the welding process path for preparing non-circular titanium alloy consumable electrodes, and then upgrades to automatic welding, thereby improving the consistency of product welding quality and reducing the uncertainty of manual welding. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the structure of the host computer of the automatic welding device for preparing titanium alloy electrodes of the present invention;

[0028] Figure 2 It is a schematic diagram of process input of a host computer control method for an automatic welding device for preparing titanium alloy electrodes according to the present invention.

[0029] In the figure, 1. Human-computer interaction unit, 2. Data processing unit, 3. Acquisition and communication unit, 4. Welding parameter management, 5. Weld seam parameter management. DETAILED DESCRIPTION

[0030] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0031] Example 1

[0032] The host computer of the automatic welding device for preparing titanium alloy electrodes of the present invention has a structure as follows: Figure 1 As shown, it includes a human-computer interaction unit 1, a data processing unit 2, and a collection and communication unit 3;

[0033] The human-machine interaction unit 1 is used to display and modify the equipment operation status and welding control parameters, and interact with the operator to facilitate the operator to view, set and modify the welding control parameters and view the equipment operation status.

[0034] The data processing unit 2 is used to operate the process recipe database, manage the operation of various functional script programs, and the operation of alarm services, store the display data of the human-computer interaction unit 1 as a real-time historical database, and perform status monitoring, logical interlocking judgment, and parameter calculation, and send the results to the acquisition communication unit 3, and at the same time receive the actual value of the data interacted between the acquisition communication unit 3 and the PLC for calculation.

[0035] The acquisition communication unit 3 is used for data interaction with the PLC, data range conversion, data grouping and classification of variables in the human-computer interaction unit 1 and the data processing unit 2 that need to interact with the PLC, setting different refresh cycles according to the groups, communication status diagnosis with the PLC, etc. At the same time, it receives the data processing results sent by the data processing unit 2 and transmits them to the PLC.

[0036] Example 2

[0037] On the basis of Example 1, the human-computer interaction unit 1 includes a process input management module, a process retrieval module, a welding control module, a parameter recording module, a cooling water control module, and a vacuum and pressure module;

[0038] Among them, the process input management module can first arbitrarily retrieve a parameter in the welding parameter management 4 and weld parameter management 5 corresponding to the process name stored in the process formula database, and after modification, it can be stored under a new process name or the current process name to realize the new or updated management of the process name, and select the stored process name for retrieval through the process retrieval module; the modification, addition and deletion of the process in the process input management module are realized by the process formula database in the data processing unit 2 and the writing of the process formula script program.

[0039] Welding parameter management 4 includes fixed gun weld selection, weld surface selection, weld type selection of corresponding weld surface, and welding parameter setting. The welding parameter setting includes the setting of assembly quantity, weld quantity, welding current, welding voltage, and argon gas flow parameters.

[0040] Weld parameter management 5 includes providing 1-6 types of weld type specific parameters for selection and modification. The setting and modification of specific parameters of each weld type include enabling selection of X-axis and Y-axis, speed setting of X-axis and Y-axis, and displacement distance setting of X-axis and Y-axis.

[0041] The process retrieval module is used to retrieve the process name and the corresponding welding parameter management 4 and weld parameter management 5 stored in the process recipe database to avoid repeated parameter input and avoid errors; at the same time, the batch number of the material to be welded needs to be entered. After the welding starts, the batch number will be generated by the archiving script program of the data processing unit 2 to generate a file named with the batch number, which will be used for data archiving in the parameter recording module in the human-computer interaction unit 1.

[0042] All parameter values ​​in welding parameter management 4 and weld parameter management 5 can also be temporarily modified after being retrieved from the process retrieval module. They are only used for welding of the current batch of materials and will not be stored in the process recipe database. They will be deleted after welding to avoid arbitrary modification of process data. The modification process is recorded and stored in the specified file through the data processing unit 2, and data is archived in the parameter recording module for easy traceability.

[0043] The parameter recording module is mainly used to display the data stored in the real-time historical database in the data processing unit 2. The display mode is a line graph. The display content can select key process parameters such as current, voltage, axis speed, position, pressure, etc. At the same time, the operation actions of all personnel in the human-computer interaction unit 1 to actively change the buttons or values ​​of the current batch of welding materials can be stored in the batch file input by the process retrieval module in the human-computer interaction unit 1 and archived to generate a historical data record file for subsequent cause investigation.

[0044] The cooling water module is used to control the cooling system of the entire plasma welding box. The status display is located in the human-computer interaction unit 1, including the system cooling water switch control and the cooling water temperature and flow rate of the key parts of the monitoring equipment. When the cooling water script program in the data processing unit 2 determines that the temperature or flow rate is abnormal, on the one hand, the PLC is controlled to terminate the welding to protect the equipment safety through the acquisition communication unit 3, and on the other hand, the alarm service of the data processing unit 2 is used to give an alarm prompt in the human-computer interaction unit 1. When the cooling water temperature or flow rate exceeds the set value, the welding process is automatically terminated and an alarm reminder is given;

[0045] The welding control module displays and selects the welding gun selection, servo enable, welding area selection, start and end weld input, welding start button, end button, real-time process parameter display and other modules through the screen of the human-machine interaction unit 1. The start and end weld input and the gun selection are interlocked to avoid welding parameter execution errors. The welding end button includes the function of terminating the current weld and the function of terminating the current process. After the corresponding action operation is completed by selection, the welding control script of the data processing unit 2 is logically judged, and the data grouping of the communication unit 3 is interacted with the PLC, and the interaction results are fed back to the screen of the human-machine interaction unit 1 for status display;

[0046] The welding control module consists of a welding control script program in the data processing unit 2. By reading the data variable conditions in the acquisition and communication unit 3, the welding process is retrieved and the module is executed, and the execution result is transmitted to the welding equipment through the acquisition and communication unit 3. At the same time, the display of process parameter abnormalities is realized through the alarm service in the data processing unit 2.

[0047] The vacuum and pressure control module is mainly used to control the vacuum pump group to pump the furnace chamber pressure to the required value before the start of automatic welding, and to fill the argon gas to the required pressure state to ensure that the necessary conditions for automatic welding are met; the operation of the vacuum pump group requires the normal operation of the cooling water, and its logical judgment is completed through the vacuum control script program in the data processing unit 2, and the pressure data is stored in the real-time historical database in the data processing unit 2.

[0048] After the vacuum pump group is started, it switches to automatic control mode under the control of the vacuum control script program in the data processing unit 2. When the set pressure is reached, the furnace chamber pressure rise rate is automatically measured, and the pressure rise rate data is stored in the batch number file input by the process retrieval module in the human-computer interaction unit 1. When the pressure rise rate does not meet the setting, the alarm service pop-up window in the data processing unit 2 is used to remind you to prevent gas leakage from causing oxidation of the material; the set values ​​of the pressure rise rate and the set pressure are set from the human-computer interaction interface. It also includes an argon control device. The argon filling control script program in the data processing unit 2 can automatically fill in argon according to the set pressure, automatically close the valve after reaching the set pressure, and display the status in the human-computer interaction unit 1.

[0049] The data grouping in the acquisition communication unit 3 can group the variables that interact with the PLC in the human-machine interaction unit 1 and the data processing unit 2, such as the welding control variable group, the vacuum and pressure parameter group, the cooling water parameter group, etc. Each parameter group can set a different refresh cycle with the PLC in the acquisition communication unit 3 to ensure the real-time data of the human-machine interaction unit 1 and the data processing unit 2. At the same time, the communication status of each variable in the human-machine interaction unit 1 and the data processing unit 2 in each group can be checked through the diagnostic control in the acquisition communication unit 3, and a log is generated to facilitate fault judgment.

[0050] The upper computer of the automatic welding device for preparing titanium alloy electrodes of the present invention has the following working principle: the welding control module in the human-machine interaction unit 1 and the welding control script program in the data processing unit 2 are the control core of the whole device, the process input management and retrieval module in the human-machine interaction unit 1, the vacuum and pressure control module and the process recipe database in the data processing unit 2, and the corresponding control script programs include but are not limited to vacuum, argon filling, process recipes, etc., which are jointly used for preparation before welding, the cooling water control module in the human-machine interaction unit 1 and the cooling water script program in the data processing unit 2 are used to protect the safety of the welding process, the parameter recording module is used to record the data generated during the operation of the welding control module and display the real-time and historical data to the human-machine interaction unit 1, the human-machine interaction unit 1 and the data processing unit 2 need to interact with the PLC data through the acquisition communication unit 3 to complete the data sending and uploading update, the above modules complement each other and jointly ensure the normal operation of the automatic welding device.

[0051] Example 3

[0052] The control method of the host computer of the automatic welding device for preparing titanium alloy consumable electrodes according to the second embodiment of the present invention is specifically implemented according to the following steps:

[0053] S01, process input stage: first select the stored process name in the process input management module of the human-computer interaction unit 1 to retrieve a process recipe parameter, such as Figure 2As shown in the figure, after modifying and adding the parameters in welding parameter management 4 and weld parameter management 5, click the Save button and enter the new process name to complete the storage. After the process is stored, the parameters under the process name can be directly called through the process call module for the next use without entering.

[0054] S1. Process retrieval stage: manually input the batch number of the material to be welded, click the process button to select the required stored process name and click the OK button to enter the process verification interface in the process input management module. The welding parameter management 4 and weld parameter management 5 are locked through the process recipe script program in the data processing unit 2. The parameters can only be viewed but not modified. If the operator finds that the retrieved process parameters are inconsistent with the actual required parameters, he can select the return to initial state button to return to the dialogue window. After verification, click OK to enter the welding preparation stage.

[0055] S2, preparation stage: Load the material, the operator checks the cooling water status in the cooling water control module to be normal, there is no abnormal alarm, open the vacuum interface in the vacuum and pressure module, and start the vacuum stage before welding. After clicking the vacuum start, the vacuum control script program in the data processing unit 2 automatically completes the vacuum leak detection, and the pump group status and furnace chamber pressure are displayed in real time on the human-computer interaction interface. After the leak detection is completed, the argon filling control script program in the data processing unit 2 can automatically fill argon according to the set pressure to reach the set pressure. Complete the preparation work before welding.

[0056] S3, welding control stage: After the argon filling is completed, enter the welding interface of the welding control module of the human-machine interaction unit, activate the welding gun selection and servo enable in the welding control module, and locate the weld at the first arc starting point. The material will pass through the welding control script program in the data processing unit 2, calculate the first welding position setting value, and transmit the setting value to the PLC through the acquisition communication unit 3. The PLC controls the material to automatically move to the first welding position. After the fixed gun arc starts normally, click the welding start button in the welding control module, and the material will automatically call the process according to step S1 for execution, and weld in sequence until the final weld.

[0057] The welding start button in step S3 has the function of prompting the condition of automatic welding operation. When clicked, the welding control script program in the data processing unit 2 will judge the start condition. If the condition is not met, a pop-up window will prompt the missing condition, such as the enable is not met, the weld input is wrong, etc. If the condition is not met, the welding start will fail, and the operator will check according to the prompt reason until the condition is met.

[0058] Example 4

[0059] like Figure 2As shown, based on Example 3, the control method of the host computer of the automatic welding device for preparing titanium alloy consumable electrodes of the present invention selects the welding method of the "cross" type weld, sets two fixed guns for welding, and a total of 10 welds, wherein the welding sequence of the 1# gun is 5-4-3-2-1, and the welding sequence of the 2# gun is 5-6-7-8-9-10. First, input the batch number of the material to be welded to retrieve the process parameters corresponding to the "cross" type weld, and after checking that the process parameters are correct, if the 1# gun is activated, the system will execute in sequence according to the steps set under the parameters until the last weld is completed. The welding process of the 2# gun is the same.

[0060] The advantages of the host computer control method for an automatic welding device for preparing titanium alloy electrodes of the present invention are as follows: a pre-input process retrieval method is adopted to realize fully open management of welding process parameters, and each weld type can be freely selected, and the welding parameters under this type can be modified; at the same time, each weld type and the welding parameters of this type can be independently stored as a process name, so that the welding parameters can be retrieved according to the welding process and the stored process name; by introducing open welding parameter management in the welding preparation process of titanium alloy consumable electrodes, the welding process path of non-circular titanium alloy consumable electrodes can be independently planned, and then manual welding is upgraded to automatic welding, thereby improving the consistency of product welding quality and reducing the uncertainty of manual welding.

Claims

1. A host computer for an automatic welding device for titanium alloy electrode preparation, characterized in that: include: A human-machine interaction unit (1), used for displaying and modifying the equipment operation status and welding control parameters; The data processing unit (2) is used to operate the process recipe database, script program execution, and alarm service execution, store the display data of the human-machine interaction unit (1) as a real-time historical database, perform status monitoring, logic interlock determination, and parameter calculation, and send the result to the acquisition communication unit (3), and at the same time receive the actual value of the data exchanged between the acquisition communication unit (3) and the PLC for calculation; The acquisition communication unit (3) is used to perform data interaction with the PLC, data range conversion, data grouping and classification of variables in the human-machine interaction unit (1) and the data processing unit (2) that need to interact with the PLC, setting different refresh cycles according to the groups, diagnosing the communication status with the PLC, and receiving the data processing results sent by the data processing unit (2) and transmitting them to the PLC.

2. The host computer for the automatic welding device for preparing titanium alloy electrodes according to claim 1 is characterized in that: The human-machine interaction unit (1) comprises a process input management module, a process retrieval module, a welding control module, a parameter recording module, a cooling water control module, and a vacuum and pressure control module.

3. The host computer for the automatic welding device for preparing titanium alloy electrodes according to claim 2 is characterized in that: The process input management module is used to modify, add, and delete the process parameters corresponding to any stored process name in the process formula database, and to manage the addition or update of process names in the process formula database; The process retrieval module is used to retrieve the corresponding process and corresponding process parameters from the process formula database according to the process name, and at the same time input the batch number of the material to be welded, generate a file named with the batch number through the archiving script program of the data processing unit (2), and record and archive the batch number file in the parameter recording module.

4. The host computer for the automatic welding device for preparing titanium alloy electrodes according to claim 3 is characterized in that: The process parameters include welding parameter management (4) and weld parameter management (5), wherein the welding parameter management (4) includes the selection of a fixed gun weld, the selection of a weld surface, the selection of a weld type corresponding to the weld surface, and the setting of welding parameters; the welding parameter setting includes the setting of the number of assemblies, the number of welds, the welding current, the welding voltage, and the argon gas flow rate parameters; The welding seam parameter management (5) includes enabling selection of the X-axis and the Y-axis, speed setting of the X-axis and the Y-axis, and displacement distance setting of the X-axis and the Y-axis.

5. The host computer for the automatic welding device for preparing titanium alloy electrodes according to claim 3 is characterized in that: The parameter recording module is used to display the historical storage data in the data processing unit (2) in a line graph, and at the same time record all the operation actions performed on the batch welding material in the process input management module, the process retrieval module, the welding control module, the cooling water control module, and the vacuum and pressure control module in the corresponding batch file and archive them to generate a historical data recording file.

6. The host computer for the automatic welding device for preparing titanium alloy electrodes according to claim 3 is characterized in that: The cooling water control module is used to control the operation of the system cooling system, including system cooling water switch control, and real-time monitoring of the cooling water temperature and flow rate during the welding process; when the cooling water script program in the data processing unit (2) determines that the temperature or flow rate is abnormal, the PLC is controlled to terminate the welding to protect the equipment safety through the acquisition communication unit (3), and an alarm prompt is issued through the alarm service of the data processing unit (2).

7. The host computer for the automatic welding device for preparing titanium alloy electrodes according to claim 3 is characterized in that: The vacuum and pressure control module is used to control the furnace chamber pressure and the furnace chamber pressure rise rate before automatic welding. Specifically, before automatic welding, the vacuum pump group pumps the furnace chamber pressure to a set value, measures the pressure rise rate and stores it in the corresponding batch file in the parameter recording module, and at the same time, the argon filling control script program in the data processing unit (2) fills argon gas according to the set pressure, and automatically closes the valve after reaching the set pressure state, and the pressure data is stored in the real-time historical database in the data processing unit (2); if the pressure rise rate does not meet the setting, a pop-up window reminder is issued through the alarm service in the data processing unit (2).

8. The host computer for the automatic welding device for preparing titanium alloy electrodes according to claim 3 is characterized in that: The welding control module comprises a welding control script program in a data processing unit (2), which reads data variable conditions in a collection and communication unit (3), performs operations according to the data of the welding process call module, transmits the execution results to the welding equipment through the collection and communication unit (3), and simultaneously issues an alarm for parameter abnormalities during the welding process through an alarm service in the data processing unit (2).

9. The host computer for the automatic welding device for preparing titanium alloy electrodes according to claim 8, characterized in that: The welding control module includes welding gun selection, servo enable, welding area selection, start and end weld input, welding start button, end button, and real-time process parameter display. The start and end weld input are activated by the welding gun selection through the welding control script program in the data processing unit (2). The welding end button includes the functions of terminating the current weld and terminating the current process.

10. The host computer control method for an automatic welding device for preparing a titanium alloy consumable electrode according to any one of claims 3 to 9, characterized in that: Here are the steps: S1, process retrieval stage: input the batch number of the material to be welded in the human-machine interaction unit (1), retrieve and check the process in the process input management module according to the process name, and enter the welding preparation stage after checking. S2, preparation stage: load the material, check that there is no abnormal alarm in the cooling water control module, then turn on the vacuum and pressure control module, evacuate and fill with argon according to the set value, and when the pressure reaches the set value, close the argon filling valve; S3, welding control stage: in the welding interface of the welding control module, the fixed gun selection and servo enable are activated in sequence, the first arc starting point weld is positioned, the data processing unit (2) calculates the first welding position setting value and transmits the setting value to the PLC through the acquisition communication unit (3), the PLC controls the material to move to the first welding position, after the fixed gun arc starts normally, the welding is started, the material is welded according to the process called in S1, and the welding is carried out in sequence until the final weld is completed.