By using the refractory metal carbide inner coating and the design of the throttle valve core in the hydrocracking system, combined with the gradual heating and flushing functions of the heat transfer medium, the wear and fire risk caused by excessive pressure drop of the pressure reducing valve is solved , improving the reliability and stability of the system.

CN118725902APending Publication Date: 2024-10-01TAIF JOINT STOCK COMPANY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410363661.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-03-30
Filing Date
2024-03-28
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the existing hydrocracking system, the pressure drop of the pressure reducing valve is too large, which leads to wear and leakage risks of internal components, and the temperature of the working medium exceeding the auto-ignition temperature may cause fires, affecting system reliability and stability.

Method used

The pressure reducing valve and throttle valve core using refractory metal carbide inner coating, combined with the gradual heating and flushing function of the heat transfer medium, reduce the risk of erosion, wear and thermal shock during pressure transmission, ensuring the durability and durability of valve components. Security.

Benefits of technology

It effectively reduces the risk of wear and leakage of the pressure reducing valve, avoids fires caused by overheating of the working medium, improves the reliability and stability of the hydrocracking system, and ensures uninterrupted operation of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118725902A_ABST
    Figure CN118725902A_ABST
Patent Text Reader

Abstract

The present invention relates to the field of petroleum product processing, more particularly to a hydroconversion and hydrocracking process. A hydrocracking system for a petroleum feedstock comprises: a liquid phase hydrocracking (LPH) section comprising at least one LPH reactor; a gas phase hydrocracking (GPH) section comprising at least one GPH reactor; a separation section between the LPH section and the GPH section, comprising at least one high pressure separator, at least one low pressure separator, and at least one stream supply line from the high pressure separator to the low pressure separator, where the at least one stream supply line comprises a pressure relief valve and a throttle spool arranged downstream of the pressure relief valve in the supply line; a heat transfer medium feed line to the stream supply line and the pressure relief valve. The technical result is a reliable operation of the hydrocracking system by preventing erosive wear and damage of system components in the separation section.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of petroleum product processing, and more particularly to methods of hydroconversion and hydrocracking. Background Art

[0002] Hydrocracking processes, in particular slurry-phase hydrocracking (SPH), are carried out at high temperatures and high pressures. Thus, in particular, according to document RU2504575, the pressure in the slurry hydrocracking reactor can reach 24 MPa. In the separation section after the SPH section, a low-pressure separator (herein referred to as a "hot flash tank") is arranged after the hot high-pressure separator and operates in the range of about 0.7 MPa to about 3.5 MPa.

[0003] Various pressure reducing devices are used to reduce pressure in systems similar to the system disclosed in RU2504575. An example of such a device is a pressure reducing valve disclosed, for example, in US2012161054, which provides one-step pressure reduction and a pressure drop of at least 20 MPa across the valve. These pressure drops are harmful to the internal components of the valve and the downstream piping.

[0004] It should be considered that valve failure is critical to the operation of the entire system as it can lead to process stoppage. In addition, damage to the valve internal components increases the risk of leakage, which can lead to ignition of the working medium if its temperature exceeds its auto-ignition temperature when released into the environment.

[0005] The present invention solves the problem of reliable operation of a hydrocracking system by reducing the risk of erosive wear and damage to system components in the separation section. Summary of the invention

[0006] According to one aspect of the present invention, there is provided a hydrocracking system for petroleum feedstocks, comprising: an LPH section comprising at least one liquid-phase hydrocracking (LPH) reactor; a GPH section comprising at least one gas-phase hydrocracking (GPH) reactor; a separation section located between the LPH section and the GPH section, comprising at least one high-pressure separator, at least one low-pressure separator, and at least one logistics supply pipeline from the high-pressure separator to the low-pressure separator, wherein the at least one logistics supply pipeline comprises a pressure reducing valve and a throttling valve core arranged in the supply pipeline downstream of the pressure reducing valve; and a heat transfer medium feed pipeline to the logistics supply pipeline and the pressure reducing valve.

[0007] According to one embodiment of the present invention, the at least one high pressure separator operates at a pressure in the range of about 18 MPa to about 24 MPa.

[0008] According to one embodiment of the present invention, the at least one low-pressure separator operates at a pressure in the range of about 1.0 to about 1.4 MPa.

[0009] According to one embodiment of the present invention, the pressure reducing valve is configured to reduce the logistics pressure, wherein the pressure drop across the pressure reducing valve does not exceed 10 MPa.

[0010] According to one embodiment of the present invention, the logistics supply pipeline is further equipped with an electric heater.

[0011] According to one embodiment of the present invention, the supply line is configured to be heated to temperature T1 and the stream has temperature T2, wherein ΔT=T2-T1 is about 50 to about 140°C, preferably not more than 110°C, more preferably not more than 80°C.

[0012] According to one embodiment of the present invention, the heating of the at least one supply line is provided in a progressive manner, i.e., the supply line is first heated to a temperature T1′ by the electric heater, and then the temperature of the supply line is raised to T1′ by a heat transfer medium, wherein T1>T1′.

[0013] According to one embodiment of the present invention, the heat transfer medium is a liquid heat transfer medium, and the temperature of the pipeline heated by the heat transfer medium is T1 = 320-350°C.

[0014] According to one embodiment of the present invention, the liquid heat transfer medium is vacuum gas oil.

[0015] According to one embodiment of the present invention, the vacuum gas oil is fed from a fractionation column arranged in the fractionation section downstream of the GPH section through a liquid heat transfer medium feed line.

[0016] According to one embodiment of the invention, said at least one supply line comprises an inner coating of a refractory metal carbide, in particular tungsten carbide, zirconium carbide, titanium carbide, most preferably tungsten carbide.

[0017] According to one embodiment of the invention, the pressure relief valve has an inner coating of a refractory metal carbide, in particular tungsten carbide, zirconium carbide, titanium carbide, most preferably tungsten carbide.

[0018] According to one embodiment of the invention, the throttle valve core comprises a set of throttle washers with variable flow cross-sections, the axes of the openings being offset.

[0019] According to one embodiment of the present invention, the gasket of the valve core is made of high-strength material, including refractory metal carbides, ceramics, hardened steel, in particular tungsten carbide, zirconium carbide, titanium carbide, and most preferably tungsten carbide.

[0020] According to one embodiment of the present invention, the hydrocracking system comprises two stream supply pipelines from the high-pressure separator to the low-pressure separator, wherein one of the pipelines is a spare pipeline.

[0021] According to one embodiment of the invention, during periods when one of the supply lines is not in use, the spare supply line is filled with the heat transfer medium.

[0022] According to a second aspect of the present invention, a method for reducing the pressure in the separation section of the hydrocracking system of the petroleum feedstock according to the present invention is provided. The method comprises the following steps: heating at least one logistics supply pipeline including a pressure reducing valve to a temperature T1 by a heat transfer medium; passing a logistics with a temperature of T2 through the at least one supply pipeline, wherein ΔT=T2-T1 is about 50 to about 140°C, preferably not more than 110°C, more preferably not more than 80°C, wherein the logistics is supplied to the pressure reducing valve at a logistics pressure of about 18 to about 20MPa; and providing a passage for the logistics to pass through the pressure reducing valve, wherein the pressure is reduced to about 1.0-1.4MPa, and the pressure drop applied at both ends of the valve does not exceed 10MPa.

[0023] According to one embodiment of the invention, the valve is flushed with the heat transfer medium via a flushing channel in the pressure reducing valve, the flushing channel being arranged between the valve body and the stuffing box seal.

[0024] According to one embodiment of the present invention, the supply line is heated sequentially, ie first heated to a temperature T1 ′ and then heated to a temperature T1 , wherein T1 > T1 ′.

[0025] According to one embodiment of the invention the heating of the logistics supply line to the temperature T1' is provided by electrical heating, and the heating to the temperature T1 is provided by a heat transfer medium supplied to the supply line.

[0026] Heating the stream supply line to temperature T1' is provided by an electric heater, and heating the stream supplied to the supply line to temperature T1 is provided by a heat transfer medium.

[0027] According to one embodiment of the invention, one of the at least one supply line is filled with the heat transfer medium during non-use.

[0028] According to another aspect of the present invention, a pressure reducing component in a separation section of a combined hydrocracking system according to the present invention is provided, the component comprising at least one supply pipeline, the at least one supply pipeline comprising a pressure reducing valve and a throttling valve core downstream of the valve; and a heat transfer medium feed pipeline to a logistics supply pipeline.

[0029] According to one embodiment of the present invention, the pressure reducing valve comprises a stuffing box having a length exceeding the plunger stroke length.

[0030] According to one embodiment of the present invention, the pressure reducing valve is equipped with a conduit for flushing / cleaning and cooling the stuffing box assembly with a heat transfer medium, wherein the flushing / cleaning and cooling conduit is in fluid communication with a heat transfer medium feed line.

[0031] According to an embodiment of the present invention, the heat transfer medium is a liquid heat transfer medium.

[0032] According to one embodiment of the present invention, the liquid heat transfer medium is vacuum gas oil.

[0033] According to one embodiment of the present invention, the throttle valve core comprises a set of throttle washers.

[0034] According to an embodiment of the present invention, the set of throttling washers comprises 5 to 2 washers, preferably 3 washers.

[0035] According to one embodiment of the invention, the throttling washers have different flow cross sections and are characterized in that the axes of the openings in the valve body are offset relative to one another.

[0036] According to one embodiment of the present invention, the material of the throttling washer is selected from high-strength materials, including refractory metal carbides, such as tungsten carbide, zirconium carbide, titanium carbide, etc.; ceramics; and hardened steel.

[0037] All advantages provided by the present invention will become apparent from the following detailed description of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 A diagram showing a hydrocracking process according to a preferred embodiment of the present invention is shown.

[0039] Figure 2 Schematic diagram of a separation section according to an embodiment of the present invention.

[0040] Figure 3 is a schematic diagram of a separation section according to another embodiment of the present invention.

[0041] Figure 4 A cross-sectional view of a stuffing box assembly in a pressure reducing valve is shown.

[0042] Figure 5A cross-sectional view of the throttle valve core is shown. DETAILED DESCRIPTION

[0043] The hydrocracking process of the residual oil feedstock is characterized by being carried out under severe conditions of pressure up to 240 bar and temperature up to 500° C. to ensure that the conversion rate of heavy hydrocarbons into light petroleum products is within the range of 88-95wt.%. A key section in the production line is the separation section, because the pressure here drops from about 20 MPa to a level close to atmospheric pressure. More specifically, after the slurry hydrocracking section (in this section, the reaction occurs at a pressure of 18 to 24 MPa), the stream of unconverted hydrocarbons mixed with the hydrocracking additive is directed to a vacuum unconverted residue treatment section (not shown in the figure), through the separation section, and decompression is basically carried out in the separation section.

[0044] Figure 1 A hydrocracking system according to the present invention is schematically shown. The hydrocracking system comprises: a liquid phase hydrocracking section 1, in which at least one liquid phase hydrocracking reactor is provided, and a heavy petroleum feedstock in which appropriate additives and / or catalysts are suspended is subjected to a hydrocracking reaction in the presence of a hydrogen-containing gas; a separation section 2, in which a slurry as a mixture of unconverted residues and a dispersed phase is separated from a gaseous product of liquid phase hydrocracking; a gas phase hydrocracking section 3, which comprises at least one gas phase hydrocracking reactor having a fixed catalyst bed, in which hydrocracking and hydrotreating reactions occur; and a fractionation tower 4, which is designed to fractionate the output product stream of the gas phase hydrocracking section 3 to produce kerosene, a diesel fraction and a hydrogenated vacuum gas oil fraction.

[0045] like Figure 2 or Figure 3 As shown, the separation section 2 includes at least one high-pressure separator 21 and at least one low-pressure separator 22, logistics supply pipelines L1, L2 extending from the high-pressure separator 21 to the low-pressure separator 22, and angle pressure reducing valves V1, V2 that perform the following two functions: reducing the pressure from about 18-24 MPa to about 1.0-1.4 MPa, and adjusting the liquid level in the hot high-pressure separator 21.

[0046] In the hot low-pressure separator 22 , due to throttling of the pressure of the bottom product supplied from the hot high-pressure separator 21 , the liquid phase is separated from the flash gas.

[0047] The supply lines L1, L2 shown may have a high strength protective coating because a highly abrasive medium stream due to a high solids content (15 to 33 wt.%) passes through it at high pressure and temperature. The protective coating may be made of refractory metal carbides, such as tungsten, zirconium and titanium. The most preferred coating is tungsten carbide, which is the best coating for several reasons, in particular because of its good surface coverage, excellent strength characteristics and reasonable price.

[0048] The temperature T2 of the stream leaving the high-pressure separator 21 can be about 400 to about 460° C. at a pressure of 18 to 22 MPa. In an embodiment of the present invention, it is preferred that the temperature of the inner wall of the supply lines L1, L2 and the internal space of the corresponding valves V1, V2 is as close to the temperature T2 as possible to avoid thermal shock (because thermal shock can cause cracking and damage to the coating). When passing through a stream with high abrasiveness, speed and temperature, even slight damage to the coating may cause the high-pressure circuit to be depressurized, hot petroleum products to overflow into the hydrogen environment, and then catch fire. It should be noted that the presence of coating fragments in the stream is dangerous because they are another factor of erosive wear due to their special strength.

[0049] In order to reduce the risk of damaging the protective coating due to the tendency of refractory metal carbides, in particular tungsten carbide, to degrade due to sudden changes in temperature, the logistics supply lines L1 , L2 may be equipped with a gradual heating system.

[0050] In this embodiment, in the first heating step, the pipeline is electrically heated to a temperature T1' = 230-260°C. This temperature range is achieved using an electric heater. In a specific embodiment, the electric heater can be made in the form of an insulated wire.

[0051] In this case, the subsequent heating of the lines L1, L2 from a temperature T1' to T1, which ranges from about 320°C to about 350°C, preferably not less than 340°C, can be provided by supplying a heat transfer medium. The heat transfer medium is supplied via respective heat transfer medium feed lines L3, L4. Such a heat transfer medium can be at least a part of any stream of the hydrocracking assembly, in particular a vacuum gas oil supplied as a feedstock for gas phase hydrocracking, or a hydrotreated vacuum gas oil.

[0052] The preferred heat transfer medium is a liquid heat transfer medium having a boiling point higher than about 360° C. The heat transfer medium is preferably hydrotreated vacuum gas oil, which is the bottom product of the fractionation tower 4 arranged after the gas phase hydrocracking section 3. The vacuum gas oil of the fractionation tower is preferred because its temperature at the outlet of the fractionation tower has reached 350-380° C., and its appropriate fractionation composition can prevent the hydrotreated vacuum gas oil from boiling at this temperature, while ensuring that the supply pipeline is flushed with deposits caused by coking or dispersed phase deposits.

[0053] The heat transfer medium can be fed through inlet stop valves V3, V4 installed in the heat transfer medium feed pipelines L3, L4. The heat transfer medium is introduced directly into the front of the low-pressure separator 22 through a branch. In this case, the supply pipelines L1, L2 include valves V5, V6, which are installed before the low-pressure separator 22 and just after the position where the heat transfer medium is introduced, and the valves prevent the heat transfer medium from entering the low-pressure separator 22.

[0054] The heat transfer medium flows through the supply pipelines L1, L2 via the pressure reducing valves V1, V2 and flows through at least one outlet stop valve V7, V8, from which the heat transfer medium is discharged into the discharge pipeline. The heat transfer medium flow rate is not more than 1 t / h. The pipeline is heated to a temperature of 320-350°C. The flow rate of the heat transfer medium and its fractionated composition also ensure flushing of the structural elements of the supply pipeline and the pressure reducing valve. Therefore, although for the sake of simplicity, the heating medium stream is referred to as "heat transfer medium" in this article, it should be understood that the same medium preferably also provides a flushing function.

[0055] When a given temperature is reached, preferably using a metering device, in particular a spot thermometer installed on the supply line L1, L2 to control the given temperature, the heat transfer medium is removed from the supply line, and the line is filled with a stream of the bottom product of the high-pressure separator 21, which is a three-phase system: gaseous products, unconverted liquid residues, and used additives and / or catalysts. In addition, in the case of two supply lines L1, L2, one of them, L1 or L2, is designated as a spare supply line. The spare line, L1 or L2, maintains the above-mentioned mode, that is, the heat transfer medium continues to pass through the spare line at a flow rate not exceeding 1t / h, thereby heating the inner wall of the spare line to a temperature T1, so that the line can be quickly put into operation without the risk of damage.

[0056] In addition to reducing the risk of damage due to thermal shock to the protective coating and erosive wear of the supply line, heating the supply line to a specified temperature can also reduce the risk of Figure 4 The risk of damage to the stuffing box seal 7 of the valve shown. If the temperature difference between the supply line and the flow entering it is high, especially when the temperature difference exceeds 140°C, that is, ΔT=T2-T1>140°C, the medium will partially solidify at the wall of the supply line, its velocity will decrease and its viscosity will increase. These effects will cause turbulence in the flow at the valve inlet, which will cause the dispersed phase to penetrate into the gap between the stuffing box seal and the valve body, thereby destroying the stuffing box seal.

[0057] The angle control valves V1, V2 as part of the supply lines L1, L2 are usually double valves, which include a valve body with a vertical inlet and a horizontal outlet, and a plunger for only fully opening or only fully closing the flow passage through the valve. The valve body includes a valve seat made in the form of a venturi nozzle for throttling the flow. The plunger is configured to extend into the valve seat, completely blocking the passage of the flow through the valve, and retract into the stuffing box assembly of the valve, fully opening the passage of the flow through the valve.

[0058] Figure 4 The illustrated stuffing box assembly includes a stuffing box seal 7 which prevents leakage and helps to clean the plunger of working medium deposits.

[0059] Typically, the dual control valve consists of two combined ports, namely a large port and a small port with a smaller capacity than the large port. Both ports have a common inlet. The "open" or "closed" position of each port depends on the degree of conversion provided in the liquid phase reactor. At high conversion rates, 85-95% of the hydrocarbons are converted to lighter volatile fractions, and the liquid phase slowly accumulates in the high-pressure separator 21; the small port is then used to control the level of the liquid phase in the separator 21, which is a slurry of additives and / or catalysts with unconverted residues. If the conversion rate is low, the liquid phase in the high-pressure separator 21 accumulates faster, and the large port is used to control the liquid level of the liquid phase. Both ports can be opened to control the liquid level, for example, at the beginning of a hydrocracking process with a low conversion rate. Alternatively, both ports can be closed at ultra-high hydrocarbon conversion rates to avoid a critical drop in the liquid level in the separator.

[0060] When the liquid level in the separator 21 reaches a predetermined threshold upper limit liquid level, the corresponding liquid level sensor is activated. In response to the sensor signal, the large port is opened. If the slurry liquid level in the separator is effectively lowered by opening the large port, and the predetermined allowable upper limit liquid level is quickly reached, the liquid level suggestion sensor is activated and further adjusted through the small port, while the large port is closed. If the liquid level does not drop or drops slowly, the small port of the valve will be opened additionally. On the contrary, if the conversion rate is high and the liquid phase in the separator 21 accumulates slowly, the large port is not used, but the small port is used to control the liquid level. When the predetermined threshold lower limit liquid level is reached, the corresponding liquid level sensor is triggered and both ports are closed.

[0061] In this case, the valve may be configured to receive a signal from a sensor via a feedback channel and the corresponding port is automatically opened / closed, or the valve is manually adjusted by an operator.

[0062] Therefore, the switching degree directly affects the number of times the valve is closed / opened. In order to reduce the influence of the switching degree on the number of opening / closing times, and to make the pressure reducing valve operate more smoothly, in the present invention, it is preferred that the valve capacity Cv is at least 3, preferably Cv is 4, and even more preferably Cv is 6. In one embodiment, Cv=6 for the large port of the valve, and Cv=4 for the small port.

[0063] The internal components of the pressure relief valve are preferably made of a high strength material, such as a refractory metal carbide, a suitable grade of hardened steel, or have a protective coating of a suitable material.

[0064] See also Figure 2 and Figure 3 , the pressure reducing valves V1, V2 are connected to the supply pipes L5, L6 for the high-pressure flushing medium via valves V11, V12. The flushing medium can be a heat transfer medium or other medium supplied to heat the supply lines L1, L2. In this case, a necessary condition is the temperature of the flushing medium, which must be lower than the autoignition temperature of the working medium, as described below.

[0065] Supply lines L5, L6 for flushing medium lead to the pressure relief valve, preferably in the stuffing box assembly, and are designed to cool the stuffing box seal and flush the stuffing box seal from stuffing box wear products, particles of the slurry phase flow and coking deposits.

[0066] The stuffing box assembly of the valve is provided with an outlet (not shown) for allowing the flushing medium to flow into the discharge section.

[0067] refer to Figure 4 , supply pipes L5, L6 for flushing medium pass into the pressure reducing valve through supply channels 12, preferably in the stuffing box assembly, and a flushing channel 8 is provided between the valve body 6 and the stuffing box seal 7, and the stuffing box seal comprises a metal sleeve 9 which divides the seal into two parts 7′ and 7″, wherein the sleeve valve core 9 comprises at least two, preferably at least four, and even more preferably six through holes 10 to provide a passage for the flushing medium to the inner space of the stuffing box assembly of the valve. Therefore, the stagnant area of ​​the stuffing box seal and the flushing channel 8 between the metal sleeve 9 and the inner wall of the valve body 6 are flushed. This design is also advantageous because it can prevent the ignition of the medium caused by leakage of the stuffing box, because the flushing medium is not only an agent for cleaning the seal, but also used to form a temperature barrier, thereby ensuring that possible leakage has a temperature below the autoignition point.

[0068] Preferably, just before the valves V1 and V2 are put into operation, a flushing medium is supplied to the stuffing box sealing area to ensure that the temperature of the working medium is reduced to a temperature below its autoignition point, that is, in the present invention, the temperature of the flushing medium in the stuffing box should not exceed 190°C, preferably in the range of 180°C to 186°C. The flushing medium can be any hydrocarbon fluid that can flush the stuffing box seal and the adjacent parts of the valve to prevent the influence of adherent particles of the slurry phase, particles generated by the wear of the stuffing box, and coking deposits. Preferably, the flushing medium is vacuum gas oil.

[0069] The vacuum gas oil used for flushing the stuffing box can be supplied in particular from a feed tank for the gas phase hydrocracking reactor, or from any other vacuum gas oil source. Figure 3 In this case, it is necessary to consider the temperature limitations of the vacuum gas oil supplied for flushing the stuffing box and to ensure that the fractional composition does not boil at the internal temperature of the valve.

[0070] In a particular embodiment, the flushing medium is hydrotreated vacuum gas oil, which is partially removed from the heat transfer medium feed lines L3, L4.Before the insertion point of the pipes L5, L6 into the stuffing box assembly of the valve, a refrigeration machine 11 is provided.

[0071] In order to avoid leakage of the stuffing box assembly, the pressure of the flushing vacuum gas oil is preferably 1-1.5 MPa higher than the pressure of the working medium in the pipeline from the high-pressure separator 21 to the valves V1 and V2, and in particular, should be in the range of 19.8 to 22.0 MPa. In this case, the flushing medium plays the role of a water seal. In order to ensure the water seal function, the flow rate of the flushing medium must increase as the stuffing box wears.

[0072] Preferably, the length of the stuffing box seal does not exceed the stroke length of the valve plunger.

[0073] This is preferred because the risk of the stuffing box being torn off by the plunger is reduced. The risk of the stuffing box being torn off is related to the fact that the plunger head can be dragged away from the stuffing box during its working stroke through the stuffing box, which plunger head is heated at high speed, high temperature and high pressure from the temperature of the working medium passing through the gap between the valve seat and the plunger head. This is caused by the adhesion of the stuffing box material to the plunger. If there is a leakage through the stuffing box, this in turn can lead to ignition of the working medium, because at atmospheric pressure and in the presence of dissolved hydrogen, the temperature of the working medium exceeds the autoignition temperature.

[0074] Therefore, the length of the stuffing box is smaller than the plunger stroke length, so that the stuffing box can be retained within the seal, thereby preventing the stuffing box from being torn even if the stuffing box sticks to the plunger.

[0075] In a specific embodiment, Figure 4As shown, the seal is divided into two parts 7' and 7", the length of each part is less than the plunger stroke length, and the main seal 7' is not only used for sealing, but also for clearing the working medium product that may adhere to the plunger. When the main seal is worn, it may cause the flushing medium to leak into the working medium. Therefore, it is preferred that the fractionation composition of the flushing medium is close to the fractionation composition of the working medium. The secondary seal 7" completely seals the stuffing box assembly. Due to the flushing medium, the temperature of the secondary seal 7" is significantly lower than the temperature and autoignition point of the working medium. In the present invention, the autoignition point is about 200°C under atmospheric pressure and dissolved hydrogen.

[0076] As described above, while providing a pressure reduction from about 18-24 MPa to about 1.0-1.4 MPa, the valves V1 and V2 at the outlet are subjected to a significant pressure drop. When the pressure drop exceeds 15 MPa, the working medium flows through the gap between the valve seat and the valve plunger at an extremely high speed and boils, which eventually leads to the destruction of the internal parts of the valve and its erosion wear and erosion wear to the downstream pipeline due to the large amount of abrasive particles contained.

[0077] In order to make the operation of the hydrocracking system more reliable, the authors of the present invention have designed a device to reduce the pressure drop across the pressure reducing valve. More specifically, referring to Figure 5 According to the present invention, a throttle valve core 12 is preferably installed at the outlet of the valve, which helps to reduce the sudden pressure drop, which exceeds 15 MPa in the conventional technical solution. In one embodiment, the throttle valve core is made in the form of a set of specially designed throttle washers S1, S2 and S3, which are made of high-strength materials, such as refractory metal carbides, in particular, tungsten, zirconium and titanium; ceramics; and hardened steel, and these throttle washers have variable flow sections, and the axis of the opening in the valve body is offset.

[0078] The valve core comprises gaskets, each of which has a variable flow cross section, wherein on the inlet side, the diameter of the flow cross section exceeds the diameter of the flow cross section on the outlet side. The transition area from the larger diameter to the smaller diameter forms a discrete protrusion in the gasket. In this case, the flow cross section of the larger diameter is preferably not coaxial with the flow cross section of the smaller diameter.

[0079] Each gasket thus has an inlet opening of large diameter and an outlet opening of small diameter, and a discrete projection is formed approximately in the middle of the length of the flow cross section.

[0080] Preferably, the diameter of the larger flow cross section is 2-3 times the diameter of the smaller flow cross section.

[0081] Preferably, the inlet openings of all gaskets are coaxial with the axis of the valve core, but not with each other, and preferably, the outlet openings are neither coaxial with the axis of the valve core nor with each other. In this case, the diameter of the inlet opening of each gasket is the same, while the diameter of the outlet opening of each gasket is different. Thus, the valve core defines a projection of variable height.

[0082] Preferably, the valve core comprises 5 to 2 gaskets, even more preferably 3 gaskets.

[0083] As the flow passes through the valve core, it slows down and hits a variable height protrusion.

[0084] Thus, by reducing the linear flow rate, the pressure drop across the pressure reducing valve can be reduced to between 10 and 8 MPa, thereby preventing the temperature of the slurry in the valve from increasing and, therefore, preventing the liquid phase from boiling. These positive effects contribute to reducing erosive wear and the risk of unconverted residual products adhering to the valve elements, such as asphaltenes, carbenes, carbides and other heavy hydrocarbons.

[0085] Furthermore, by reducing the pressure drop and preventing boiling of the working medium, overheating of the plunger head can be avoided, which in turn contributes primarily to preventing tearing of the stuffing box seal 7 due to adhesion of its material to the valve plunger.

[0086] In this case, as mentioned above, the fragments of the protective coating made of high-strength material are another factor for erosive wear of the valve downstream device. Due to the proposed design of the throttle valve core, the coating fragments can be retained in the protrusion provided by the gasket body with offset axis and through-hole openings of different diameters.

[0087] The prefabricated valve core design ensures gasket serviceability and component-by-component replacement.

[0088] Furthermore, the throttle valve core of the proposed design is mainly not blocked by the dispersed phase of the slurry, thereby allowing the flow to pass freely.

[0089] An assembly including the stream supply lines L1 , L2 having the pressure reducing valves V1 , V2 and the throttle valve cores installed therein and the heat transfer medium feed lines L3 , L3 is designated as a pressure reducing assembly in the present application.

[0090] Preferably, the pressure relief assembly further comprises supply conduits L5, L6 for a flushing medium for the stuffing box seal.

[0091] The proposed design has all the above advantages and is able to improve the reliability of the entire hydrocracking system, ensuring its stable uninterrupted operation and increasing the turnaround time.

[0092] According to the present invention, the operational stability of the combined hydrocracking assembly refers to the continuous operation in a given mode at a given production rate.

[0093] Example

[0094] The system operates as follows.

[0095] Tar with a flow rate of 185 t / h is mixed with a carbon additive in an amount of about 1.5% based on the weight of the tar. The slurry is fed to a slurry hydrocracking section comprising three liquid phase hydrocracking reactors, wherein a hydrocracking reaction occurs at a pressure of 20 MPa and a temperature of 460°C in the presence of hydrogen. The liquid phase hydrocracking product enters a high pressure separator from the outlet of the last reactor of the GPH section, where the gaseous product is separated from the slurry due to the throttling effect. The gaseous product is directed to a second high pressure separator and then enters a gas phase hydrocracking section. The slurry accumulated in the bottom conical portion of the high pressure separator is discharged into a low pressure separator through a decompression assembly included in the logistics supply line.

[0096] The supply lines L1 , L2 are preheated in a stepwise manner: first, they are electrically heated to 250° C. and then heated to 350° C. using hydrotreated vacuum gas oil. The hydrotreated vacuum gas oil is fed from a fractionation column arranged after the gas phase hydrocracking section.

[0097] The pipelines L1 and L2 are heated as follows: once the first heating temperature of 250°C is reached, the hydrotreated vacuum gas oil at a temperature of about 360°C is fed through the heat transfer medium feed pipelines L3 and L4. To this end, valves V3 and V4 are opened, while valves V5, V6, V9 and V10 are closed. The hydrotreated vacuum gas oil flows through the two logistics supply pipelines and flows out through the discharge valves V7 and V8 until the wall temperature of the logistics supply pipelines L1 and L2 reaches 350°C. After reaching the specified temperature, one of the heat transfer medium feed pipelines L3 is closed by closing the valve V3. Then, the supply pipeline L1 for logistics is discharged and the discharge valve V7 is closed. The slurry logistics supply valve V9 in the high-pressure separator is opened, and the logistics passes through the logistics supply pipeline L1. The temperature of the slurry logistics is 450°C and the pressure is 20MPa. The second pipeline L2 serves as a backup pipeline and is still filled with hydrotreated vacuum gas oil, which continues to flow through the pipeline to the discharge section.

[0098] When the slurry flow passes through the pressure reducing valve V1, it is first throttled at the valve seat outlet shaped like a Venturi nozzle, and then throttled in the throttling valve core installed immediately after the valve. Therefore, the pressure drop on the valve can be reduced as much as possible by gradually reducing the pressure in two steps. The pressure drop on this valve is measured with a local pressure gauge, which is about 8MPa.

[0099] Vacuum gas oil at a temperature of about 90° C. from a gas phase hydrocracking feed tank is supplied to the stuffing box of the pressure reducing valve V1, while flushing and cooling the stuffing box seal.

[0100] When the system was operated in the manner described above, no leakage through the stuffing box was observed during the entire operation period from one scheduled maintenance to the next scheduled maintenance.

[0101] During scheduled maintenance, no damage was recorded to the stuffing box and the internal coating of the valve (including the plunger).

[0102] The hydrocracking system of the present invention is characterized by stable, uninterrupted operation. According to the present invention, the stability of the hydrocracking system is understood as continuous operation in a given mode for at least 4 months at a given performance.

[0103] Industrial tests have shown that the current hydrocracking system has the characteristics of being able to operate stably throughout the period of scheduled maintenance and repairs, and provides a feedstock capacity of up to 2.6 million tons per year, especially tar.

Claims

1. A hydrocracking system for petroleum raw materials, comprising: - a liquid phase hydrocracking (LPH) section comprising at least one LPH reactor; - a gas phase hydrocracking (GPH) section comprising at least one GPH reactor; - a separation section located between the LPH section and the GPH section, comprising at least one high-pressure separator, at least one low-pressure separator, and at least one logistics supply pipeline from the high-pressure separator to the low-pressure separator, wherein the at least one logistics supply pipeline comprises a pressure reducing valve and a throttling valve core arranged in the supply pipeline downstream of the pressure reducing valve; as well as - A heat transfer medium feed line to the logistics supply line and to the pressure reducing valve.

2. The hydrocracking system according to claim 1, wherein: The at least one high pressure separator operates at a pressure in the range of about 18 MPa to about 24 MPa.

3. The hydrocracking system according to claim 1, wherein: The at least one low pressure separator operates at a pressure of about 1.0 MPa to about 1.4 MPa.

4. The hydrocracking system according to claim 1, wherein: The pressure reducing valve is configured to reduce the pressure of a flow, wherein the pressure drop across the pressure reducing valve does not exceed 10 MPa.

5. The hydrocracking system according to claim 1, wherein: The logistics supply line is also equipped with an electric heater.

6. The hydrocracking system according to claim 5, wherein: The supply line is configured to be heated to a temperature T1 and the stream has a temperature T2, wherein ΔT=T2-T1 is about 50 to about 140°C, preferably not more than 110°C, preferably not more than 80°C.

7. The hydrocracking system according to claim 6, wherein: The heating of the at least one supply line is provided in a stepwise manner, i.e., the supply line is first heated to a temperature T1′ by the electric heater and then heated to a temperature T1 by a heat transfer medium, T1>T1′, wherein T1′ is 230-250°C.

8. The hydrocracking system according to claim 1, wherein: The heat transfer medium is a liquid heat transfer medium, and the temperature provided by the heat transfer medium for heating the pipeline is T1 = 320-350°C.

9. The hydrocracking system according to claim 8, wherein: The liquid heat transfer medium is hydrotreated vacuum gas oil.

10. The hydrocracking system according to claim 9, wherein: A fractionation section including a fractionation column is arranged downstream of the GPH section, wherein the hydrotreated vacuum gas oil fed through the liquid heat transfer medium feed line is supplied from the fractionation column.

11. The hydrocracking system according to claim 1, wherein: The at least one supply line includes an inner coating of a refractory metal carbide.

12. The hydrocracking system according to claim 1, wherein: The pressure reducing valve has an inner coating of a refractory metal carbide.

13. The hydrocracking system according to claim 1, wherein: The throttle valve core comprises a set of throttle washers of variable flow cross-section, the axes of the outlet openings of the washers being offset relative to the axes of their inlet openings.

14. The hydrocracking system according to claim 1, wherein: The gasket of the throttle valve core is made of high-strength material, in particular ceramic, hardened steel and refractory metal carbide.

15. The hydrocracking system according to any one of claims 11, 12 or 14, wherein: The refractory metal carbide is selected from tungsten carbide, zirconium carbide and titanium carbide.

16. The hydrocracking system according to claim 1, wherein: The hydrocracking system includes two stream supply lines from the high-pressure separator to the low-pressure separator, wherein one of the lines is a backup line.

17. The hydrocracking system according to claim 16, wherein: The backup supply line is filled with the heat transfer medium.

18. The hydrocracking system according to claim 1, wherein: The pressure reducing valve is equipped with a pipeline for flushing medium.

19. The hydrocracking system according to claim 18, wherein: The pressure reducing valve includes a stuffing box assembly, and the flushing medium enters the stuffing box assembly of the pressure reducing valve.

20. The hydrocracking system according to claim 18, wherein: The flushing medium is the heat transfer medium.

21. The hydrocracking system according to claim 18, wherein: The flushing medium is different from the heat transfer medium.

22. The hydrocracking system according to claim 18, wherein: The temperature of the flushing medium ensures that the leakage temperature through the stuffing box is below the autoignition point.

23. A method for reducing the pressure in the separation section of a hydrocracking system for a petroleum feedstock according to claim 1, the method comprising the steps of: - heating at least one logistics supply line including a pressure reducing valve to a temperature T1 using a heat transfer medium; - passing a stream having a temperature of T2 through the at least one supply line, wherein ΔT=T2-T1 is about 50 to about 140°C, preferably not more than 110°C, more preferably not more than 80°C, wherein the stream is supplied to the pressure reducing valve at a stream pressure of about 18 to about 20 MPa; and - Providing a passage for the stream through the pressure reducing valve, wherein the pressure is reduced to about 1.0-1.4 MPa, the pressure drop applied across the valve not exceeding 10 MPa.

24. The method according to claim 23, wherein: The pressure reducing valve comprises a stuffing box seal and a flushing passage arranged between the valve body of the pressure reducing valve and the stuffing box seal, wherein the pressure reducing valve is equipped with a flushing medium supply pipeline for cooling and flushing the stuffing box seal, wherein the flushing medium is filled into the stuffing box seal via the flushing passage through the flushing medium supply pipeline.

25. The method according to claim 23, wherein: The supply line is heated stepwise, ie first to a temperature T1 ′ and then to a temperature T1 , wherein T1 > T1 ′.

26. The method of claim 23, wherein: Heating of the stream supply line to temperature T1' is provided by electrical heating, and heating to temperature T1 is provided by a heat transfer medium supplied to the supply line.

27. The method according to claim 23, wherein: One of the at least one supply line is filled with the heat transfer medium during non-use.

28. A decompression assembly in a separation section of a combined hydrocracking system according to any one of claims 1 to 22, comprising: - at least one supply line comprising a pressure reducing valve and a throttle valve core downstream of said valve, said throttle valve core being configured to provide a pressure drop across said pressure reducing valve of not more than 10 MPa, wherein said throttle valve core comprises a set of throttle washers; - a heat transfer medium feed line to the logistics supply line, wherein the logistics supply line is configured to be heated by a heat transfer medium entering the logistics supply line.

29. The assembly of claim 28, wherein: The pressure reducing valve includes a stuffing box assembly and a plunger configured to be retracted into the stuffing box assembly of the valve, wherein the stuffing box assembly includes a stuffing box seal having a length that does not exceed a stroke length of the plunger.

30. The assembly of claim 29, wherein: The stuffing box seal is made in the form of two continuous parts of the stuffing box seal, the length of each part not exceeding the stroke length of the plunger.

31. The assembly of claim 29, wherein: The assembly further comprises a supply conduit for a flushing medium, the supply conduit being configured to supply the flushing medium to a stuffing box assembly of the pressure reducing valve.

32. The assembly of claim 31, wherein: The flushing medium is vacuum gas oil.

33. The assembly of claim 28, wherein: The heat transfer medium is a liquid heat transfer medium.

34. The assembly of claim 33, wherein: The liquid heat transfer medium is hydrotreated vacuum gas oil.

35. The assembly of claim 28, wherein: The set of throttling washers comprises 5 to 2 washers, preferably 3 washers.

36. The assembly of claim 28, wherein: The throttling gasket has a variable flow cross section, and the diameter of the inlet opening of the gasket is greater than the diameter of the outlet opening.

37. The assembly of claim 28, wherein: The axis of the outlet opening of the gasket is offset relative to the axis of its inlet opening.

38. The assembly of claim 28, wherein: The inlet openings of each gasket are coaxial with each other and with the axis of the valve core, while the outlet openings are neither coaxial with each other nor with the axis of the valve core.