High-position landslide debris flow control method based on bottom boundary disturbance and application

By setting up multi-stage spoiler dams on mountain channels and using bottom boundary perturbation technology to interfere with debris flow, the problem of difficulty in controlling high-level and remote debris flow with traditional technology has been solved, and the deceleration and prevention effects of debris flow have been improved.

CN118727784AActive Publication Date: 2024-10-01INST OF EXPLORATION TECH OF CHINESE ACAD OF GEOLOGICAL SCI
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411078166.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-10-01
Estimated Expiration
2044-08-07

AI Technical Summary

Technical Problem

Traditional geological disaster prevention and control technologies are ineffective in the face of high-level and long-range debris flow, and it is difficult to effectively predict and control its changeable and unpredictable movement characteristics, resulting in poor reliability.

Method used

A high-level landslide debris flow control method based on bottom boundary disturbance is adopted. By planning and setting up multi-stage specially designed spoiler dams on the mountain channel, including the foundation body and spoiler body, the multi-segment column structure and arc of the spoiler body are used. The linear shape interferes with the debris flow, breaks the stable state of the fluidized layer, and achieves deceleration and control.

Benefits of technology

It effectively reduces the movement speed and destructive power of debris flow, improves the effect of geological disaster prevention and control, significantly reduces the impact and damage to downstream areas, and protects the safety of life and property.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727784A_ABST
    Figure CN118727784A_ABST
Patent Text Reader

Abstract

The invention provides a high-position landslide debris flow control method based on bottom boundary disturbance and application. According to the method, path information of a mountain channel through which debris flow passes is obtained, and arrangement points of the multi-stage flow control turbulent flow dam are planned and determined on the mountain channel according to preset intervals. The turbulent flow dam is composed of a foundation body and a turbulent flow body, and the turbulent flow body is of a special multi-section type cylinder structure and can disturb debris flow through the unique shape of the turbulent flow body. When the debris flow passes through the turbulent flow dam, a fluidization layer of the debris flow is broken, bottom substances are disturbed and move upwards, internal substances collide with one another, and therefore the movement speed and destructive power of the debris flow are reduced. The method can reliably decelerate and control the debris flow, and the key is to interfere with the formation of the fluidization layer of the debris flow. When the method is used for dealing with high-speed remote debris flow disasters, the method is high in reliability, and therefore the geological disaster prevention and control effect is remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of debris flow geological disaster prevention and control, and in particular to a high-position landslide debris flow control method based on bottom boundary disturbance and its application. Background Art

[0002] Traditional geological disaster control technologies, such as landslide control and mud-rock flow control, play an important role in general geological disaster control, but their control effects are often unsatisfactory when facing geological disasters with high-speed and high-energy characteristics such as high-position long-range debris flows. Therefore, researching and developing a new prevention and control technology for high-speed long-range debris flow disasters is of great significance to improving geological disaster prevention and control capabilities and protecting the lives and property of the people.

[0003] Traditional geological disaster prevention and control technologies usually use physical or engineering measures, such as setting up retaining walls, slope protection, drainage ditches, etc., to slow down the development speed of geological disasters or reduce their destructive power. However, these traditional technologies face many challenges when facing high-altitude and long-range debris flow disasters. A notable feature of high-altitude and long-range debris flows is the complexity of their internal structure, which usually includes a fluidized layer and a non-fluidized layer. The substances in the fluidized layer exhibit a fluid-like motion state with extremely high kinetic energy and potential energy, while the non-fluidized layer is relatively static or moves slowly. This complex internal structure makes the debris flow exhibit changeable and unpredictable characteristics during movement, making it difficult for traditional engineering measures to effectively predict and control it. Therefore, traditional technologies have poor reliability and are difficult to achieve the expected results when preventing and controlling high-speed and long-range debris flow disasters. Summary of the invention

[0004] In view of the problem that traditional geological disaster prevention and control technologies are not effective when facing high-level long-range debris flows, the present invention provides a high-level landslide debris flow control method based on bottom boundary disturbance and its application. Through the bottom boundary disturbance technology, the formation and movement of the fluidized layer in the debris flow are effectively disturbed, the deceleration and control of the debris flow are achieved, and the effect of preventing and controlling geological disasters is significantly improved. To achieve the above purpose, the present invention provides the following technical solutions: The present invention provides a high-position landslide debris flow control method based on bottom boundary disturbance and its application, comprising: Obtain path information of mountain channels through which debris flow moves in the target area; Based on the path information, and according to the preset interval distance, planning and determining the arrangement points of several levels of flow control and spoiler dams on the mountain channel; the flow control and spoiler dams include a base body and a spoiler body; The foundation is fixedly arranged below the ground at the arrangement point to support and stabilize the disturbing body; The spoiler body is fixedly arranged on the upper end surface of the base body; the spoiler body adopts a transversely extending multi-section column structure, including two opposite and parallel bottom surfaces, a horizontal side surface and a curved side surface, and the curved side surface is located vertically above the horizontal side surface; the spoiler body is composed of three continuous parts, namely, a front spoiler part, a middle spoiler part and a rear spoiler part, each of which is a column structure, and the high lines between each part are continuous and consistent, and the high line of each part is perpendicular to the axial plumb plane of the mountain channel; when the front spoiler part intersects with the axial plumb plane of the mountain channel, a first arc line concave in the downstream direction of the mountain channel is formed, when the middle spoiler part intersects with the axial plumb plane of the mountain channel, a second arc line convex in the upper direction of the plumb line is formed, and when the rear spoiler part intersects with the axial plumb plane of the mountain channel, a third arc line concave in the upstream direction of the mountain channel is formed, and the first arc line is tangentially connected to the second arc line, and the second arc line is tangentially connected to the third arc line.

[0005] Furthermore, the base body is fixedly arranged at a part below the ground of the arrangement point, including: On the ground of the arrangement point, a number of pile foundation holes are drilled according to predetermined positions and sizes, and corresponding pile foundations are arranged in each hole; the pile foundations are of reinforced concrete structure; A cap with a predetermined shape and size is fixedly arranged at the upper end of the pile foundation; the upper end surface of the cap is ensured to be arranged horizontally, and the cap adopts a reinforced concrete structure; The pile foundation and the cap together constitute the foundation body.

[0006] Furthermore, the method also includes that the second arc line adopts a water drop-shaped curve.

[0007] Furthermore, the method further comprises: laying a steel plate structure on the surface of the curved side surface to increase the abrasion resistance of the surface of the curved side surface.

[0008] Furthermore, the method also includes: along the axial direction of the mountain channel, the horizontal dimensions of the front spoiler, the middle spoiler and the rear spoiler are designed and configured in a ratio of 3:5:2 respectively.

[0009] Furthermore, the method also includes: the radius sizes of the first arc, the second arc and the third arc are designed and configured according to a ratio of 8:5:3 respectively.

[0010] Furthermore, the method also includes: the vertical height of the middle spoiler is half of its horizontal dimension along the axial direction of the mountain channel.

[0011] Furthermore, according to the preset intervals, several layout points of the flow control spoiler dams are planned and determined on the mountain channel, including: Acquiring longitudinal gradient data of the mountain channel; Based on the longitudinal gradient data, determining whether the mountain channel has a section where the mountain channel changes from a gentle slope to a steep slope; If so, the section from gradual to steep is excluded; On the selected mountain channel section, the layout points of several stage flow control spoiler dams are planned and determined according to the preset intervals.

[0012] Furthermore, according to the preset intervals, several layout points of the flow control spoiler dams are planned and determined on the mountain channel, including: Obtaining width data and curvature data of the mountain channel; Based on the width data, determine whether the mountain channel has a section where the narrow channel changes to a wide channel; if so, give priority to selecting the section where the mountain channel changes to a wide channel; Based on the curvature data, determining whether the mountain channel has a straight channel section; if so, giving priority to selecting the straight channel section of the mountain channel; On the selected mountain channel section, the layout points of several stage flow control spoiler dams are planned and determined according to the preset intervals.

[0013] Furthermore, according to the preset intervals, several layout points of the flow control spoiler dams are planned and determined on the mountain channel, including: Acquiring the stratigraphic structure distribution data of the mountain channel; Based on the stratigraphic structure distribution data, determine whether the mountain channel has a bedrock stratigraphic structure section; if so, give priority to selecting the bedrock stratigraphic structure section of the mountain channel; On the selected mountain channel section, the layout points of several stage flow control spoiler dams are planned and determined according to the preset intervals.

[0014] The high-level landslide debris flow control method based on bottom boundary disturbance and its application in the present application have at least the following beneficial effects: First, by arranging multiple levels of specially designed disturbing bodies on the mountain channels, effective disturbance of the debris flow is achieved, breaking the stable state of the fluidized layer and interfering with the formation of the fluidized layer during the movement of the debris flow, thereby achieving the effect of deceleration and reducing destructive force.

[0015] Secondly, through the carefully designed disturbing body structure, especially the first arc line concave toward downstream, the second arc line convex toward upward and the third arc line concave toward upstream, the fluidized layer inside the debris flow is effectively disturbed and destroyed, which further reduces the movement speed and destructive power of the debris flow and improves the effect of preventing and controlling geological disasters. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a flow chart of a high-level landslide debris flow control method based on bottom boundary disturbance provided in an embodiment of the present application; Figure 2 It is a schematic diagram of an implementation method of a high-level landslide debris flow control method based on bottom boundary disturbance provided in an embodiment of the present application; Figure 3 It is a schematic diagram of the principle structure of a flow control spoiler dam provided according to an embodiment of the present application; Figure 4 It is a schematic diagram of the principle structure of another flow control spoiler dam provided according to an embodiment of the present application; Reference numerals: Foundation body-1, foundation body-1, spoiler body-2, front spoiler part-3, middle spoiler part-4, rear spoiler part-5, pile foundation-6, foundation platform-7, fluidized layer-8, non-fluidized layer-9. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0018] The terms "first", "second" and "third" in this application are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. Thus, the features defined as "first", "second" and "third" can explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined. All directional indications (such as up, down, left, right, front, back...) in the embodiments of this application are only used to explain the relative position relationship, movement, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication also changes accordingly. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally also includes steps or units that are not listed, or optionally also includes other steps or units inherent to these processes, methods, products or devices.

[0019] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0020] Example The present application provides a method for controlling flow of high-level landslide debris flow based on bottom boundary disturbance and an embodiment of its application, such as Figure 1 , Figure 2 and Figure 3 As shown. The core principle of the embodiment of the present invention is to interfere with the formation of the fluidized layer 8 during the movement of the debris flow based on the bottom boundary disturbance, so as to achieve the purpose of deceleration. The fluidized layer 8 is a key component in the high-level long-range debris flow, which makes the debris flow have fluid-like properties when moving, with high kinetic energy and potential energy. By setting a multi-stage disturbance dam on the transport path of the debris flow, the stable state of the fluidized layer 8 can be broken. When the debris flow passes through the disturbance dam, the bottom material is disturbed by the dam and moves upward. This movement causes the material inside the fluidized layer 8 to collide, breaking its original fluidized structure and causing it to undergo reverse fluidization. This reverse fluidization effect can effectively reduce the movement speed and destructive power of the debris flow, thereby achieving the purpose of preventing and controlling geological disasters.

[0021] The high-level landslide debris flow control method based on bottom boundary disturbance and its application include the following steps: Step S10, obtaining path information of the mountain channel through which the debris flow moves in the target area; Optionally, the path information refers to the specific path that the debris flow passes through when flowing in the mountain channel, including parameters such as the direction, length, width, etc. The path information is obtained in order to plan the layout points of the flow control and spoiler dams based on this information later.

[0022] Preferably, the path information of the mountain channel through which the debris flow moves in the target area is obtained through various means such as on-site survey, drone aerial photography, remote sensing technology, etc., and a detailed topographic map or digital model is drawn, which provides an accurate data basis for the subsequent planning of the layout points of the flow control and spoiler dams.

[0023] Step S20, based on the path information, and according to the preset interval distance, planning and determining the arrangement points of several levels of flow control and spoiler dams on the mountain channel; the flow control and spoiler dams include a base body 1 and a spoiler body 2; Optionally, the flow control and spoiler dam is a structure used to interfere with and control the flow of debris flow. The layout point refers to the specific location of the flow control and spoiler dam on the mountain channel. By planning reasonable layout points, it can be ensured that the flow control and spoiler dam can effectively intercept and disperse the debris flow and reduce its impact on the downstream area.

[0024] Preferably, the layout points of several levels of flow control spoiler dams are planned and determined on the mountain channel according to the path information and the preset interval distance. The setting of the interval distance needs to comprehensively consider the flow rate and velocity of the debris flow and the actual situation of the mountain channel. In this way, the reasonable layout of the flow control spoiler dams can be achieved, and the efficiency of debris flow control can be improved.

[0025] Step S30, fixing the base body 1 below the ground at the arrangement point to support and stabilize the disrupting body 2; Optionally, the base body 1 is a supporting structure of the flow control spoiler dam, responsible for bearing the weight of the spoiler body 2 and the impact force of the debris flow. The fixed setting of the base body 1 can ensure the stability and safety of the spoiler body 2 and prevent it from displacement or collapse under the impact of the debris flow.

[0026] In one possible implementation, a foundation pit is excavated below the ground at the arrangement point, the foundation body 1 is embedded in the foundation pit, and is fixed with concrete or other suitable materials. The design of the foundation body 1 needs to meet sufficient bearing capacity and stability requirements. In this way, a reliable support and stability mechanism is provided for the foundation body 1, ensuring the overall stability and safety of the flow control spoiler dam.

[0027] Step S40, the spoiler body 2 is fixedly arranged on the upper end surface of the base body 1; the spoiler body 2 adopts a transversely extending multi-section column structure, including two opposite and parallel bottom surfaces, a horizontal side surface and a curved side surface, and the curved side surface is located vertically above the horizontal side surface; the spoiler body 2 is composed of three continuous parts: a front spoiler part 3, a middle spoiler part 4 and a rear spoiler part 5, each of which is a columnar structure, and the height lines between each part are continuous and consistent, and the height lines of each part are vertical on the axial plumb plane of the mountain channel; when the front spoiler 3 intersects with the axial plumb plane of the mountain channel, a first arc is formed which is concave toward the downstream direction of the mountain channel; when the middle spoiler 4 intersects with the axial plumb plane of the mountain channel, a second arc is formed which is convex toward the upper direction of the plumb; when the rear spoiler 5 intersects with the axial plumb plane of the mountain channel, a third arc is formed which is concave toward the upstream direction of the mountain channel; the first arc is tangently connected to the second arc, and the second arc is tangently connected to the third arc.

[0028] Optionally, the disrupting body 2 is the main structure of the flow control and disrupting dam, which disturbs and controls the flow of the debris flow through its specific shape and structural design. The setting of the disrupting body 2 can effectively intercept and disperse the debris flow and reduce its impact on the downstream area.

[0029] In one possible implementation, the body 2 is mounted on the upper end surface of the base 1 and fixed by integral molding, welding, bolting or other suitable fixing methods. The design of the body 2 must meet the requirements of a multi-section column structure, including two opposite and parallel bottom surfaces, a horizontal side surface and a curved side surface. Each part is a column structure with continuous and consistent high lines, forming a specific arc shape when intersecting the axial plumb line of the mountain channel.

[0030] By fixing a specially designed disturbing body 2 on the upper end surface of the base body 1, effective disturbance of the debris flow is achieved, thereby breaking the stable state of the fluidized layer 8, achieving bottom boundary disturbance, and interfering with the formation of the fluidized layer 8 during the movement of the debris flow, ultimately achieving the purpose of deceleration.

[0031] Specifically, the design of the disrupting body 2 fully considers the flow characteristics and dynamic principles of the debris flow. Its transversely extending multi-section column structure, especially the design including the first arc line concave toward the downstream, the second arc line convex toward the upward direction, and the third arc line concave toward the upstream direction, makes the debris flow subject to disrupting forces in multiple directions when flowing through the disrupting body 2. These disrupting forces can break the stable structure of the fluidized layer 8 inside the debris flow, causing the internal materials to collide with each other and rearrange.

[0032] When the debris flow hits the front spoiler 3, the first arc design concave toward the downstream causes the debris flow to generate an upward vortex here, thereby disturbing the bottom material and breaking the continuity of the fluidized layer 8. Subsequently, the convex second arc of the middle spoiler 4 further aggravates this disturbance effect, causing the particles in the debris flow to collide with each other more strongly and dissipate energy. Finally, the third arc concave toward the upstream of the rear spoiler 5 helps to guide the debris flow to generate backflow in the upstream direction, further destroying the stability of the fluidized layer 8.

[0033] Through this series of carefully designed disturbance processes, the speed and destructive power of debris flows have been effectively reduced. This deceleration and energy reduction effect is of great significance in geological disaster prevention and control, because it can significantly reduce the impact and damage of debris flows on downstream areas, thereby protecting the safety of people's lives and property.

[0034] In summary, through the cleverly designed structure of the disturbing body 2, the debris flow fluidization layer 8 is effectively disturbed and destroyed, thereby achieving the technical effect of decelerating and reducing the destructive force.

[0035] It can be seen that in the embodiments of the present invention, the high-level landslide debris flow control method based on bottom boundary disturbance and its application have at least the following technical effects: Firstly, by planning and determining the layout points of flow control and spoiler dams at preset intervals on the mountain channel, a reasonable layout of flow control and spoiler dams was achieved, the efficiency of debris flow control was improved, and the potential harm of debris flow to the downstream was effectively reduced.

[0036] Secondly, by adopting the method of fixing the foundation body 1 below the ground at the arrangement point to support the spoiler body 2, a reliable support and stabilization mechanism is provided for the foundation body 1, ensuring the overall stability and safety of the flow control spoiler dam.

[0037] Furthermore, by adopting the method of fixing a specially designed disturbing body 2 on the upper end surface of the base body 1, effective disturbance of the debris flow is achieved, so that the fluidized layer 8 at the bottom layer moves toward the non-fluidized layer 9 at the upper layer, and causes the internal materials to collide with each other, thereby achieving the reverse fluidization effect of the fluidized layer 8. Thus, the stable state of the fluidized layer 8 is broken, the formation of the fluidized layer 8 during the movement of the debris flow is disturbed, and the effect of deceleration and reducing the destructive force is achieved.

[0038] Finally, through the carefully designed structure of the disturbing body 2, especially the first arc line concave toward the downstream, the second arc line convex toward the upward, and the third arc line concave toward the upstream, the fluidized layer 8 inside the debris flow is effectively disturbed and destroyed, further reducing the movement speed and destructive power of the debris flow and improving the effect of preventing and controlling geological disasters.

[0039] In a preferred embodiment, the foundation 1 is fixedly arranged at the part below the ground of the arrangement point. This embodiment provides a specific method for fixing the foundation 1 at the part below the ground of the arrangement point, which is mainly used in the arrangement technology of high-position landslide debris flow control flow spoiler dam based on bottom boundary disturbance; through this method, it is possible to effectively provide a stable support for the foundation 1 and ensure the overall stability and safety of the flow control spoiler dam; specifically, it includes the following steps: Step S31, drilling a number of pile foundation holes in the ground at the arrangement point according to predetermined positions and sizes, and setting a corresponding pile foundation 6 in each hole; the pile foundation 6 adopts a reinforced concrete structure.

[0040] Optionally, the positions and sizes of the pile foundation holes are determined based on factors such as topography, geological conditions, and the expected impact force of the debris flow, to ensure that the pile foundation 6 can provide sufficient support. Subsequently, a corresponding pile foundation 6 is set in each hole. The pile foundations 6 are reinforced concrete structures with high strength and durability, which can effectively withstand the impact force of the debris flow and transmit these forces to deeper strata.

[0041] Preferably, a hole is drilled at a predetermined position using professional drilling equipment, and the hole diameter and hole depth are set according to the design requirements. Then, concrete is poured into the hole and a steel cage is inserted to form a reinforced concrete pile foundation 6. By setting the reinforced concrete pile foundation 6, the load of the flow control spoiler dam can be effectively transferred to the stable stratum, thereby improving the stability and safety of the flow control spoiler dam.

[0042] Step S32, a cap 7 of a predetermined shape and size is fixedly arranged on the upper end of the pile foundation 6; the upper end surface of the cap 7 is ensured to be arranged horizontally, and the cap 7 adopts a reinforced concrete structure; Optionally, a cap 7 of a predetermined shape and size is fixedly arranged at the upper end of the pile foundation 6, for example, a rectangular parallelepiped shape. The upper end surface of the cap 7 ensures a horizontal setting to provide a stable support surface for the disturbing body 2. The cap 7 also adopts a reinforced concrete structure to ensure its strength and stability. In addition, the height of the cap 7 is designed to be greater than the erosion depth of the debris flow to prevent the debris flow from causing direct impact and damage to the cap 7 and the pile foundation 6.

[0043] Since the cap 7 is a key component connecting the pile foundation 6 and the disturbing body 2, its function is to disperse and transfer the load, while protecting the pile foundation 6 from the direct impact of the debris flow. The height design of the cap 7 takes into account the erosion depth of the debris flow to ensure its effectiveness.

[0044] In a possible implementation, after the pouring of the pile foundation 6 is completed, a cap 7 is constructed at its upper end. The shape and size of the cap 7 are prefabricated or cast on site according to the design requirements. The upper end surface of the cap 7 is ensured to be horizontal by precise construction to meet the installation requirements of the spoiler 2. By setting a reinforced concrete cap 7 with appropriate height and strength, the load of the flow control spoiler dam can be effectively dispersed and transferred to the pile foundation 6, and the pile foundation 6 can be protected from erosion and damage by the debris flow.

[0045] Step S33: the pile foundation 6 and the cap 7 together constitute the foundation body 1.

[0046] Optionally, the pile foundation 6 and the cap 7 together form the foundation body 1. The foundation body 1 is an important component of the flow control spoiler dam, which not only bears the weight of the spoiler body 2 and the impact of the debris flow, but also ensures the overall stability and safety of the flow control spoiler dam.

[0047] Preferably, after the construction of the cap 7 is completed, a quality inspection is performed to ensure that it is firmly connected to the pile foundation 6. In this way, the pile foundation 6 and the cap 7 together form a stable foundation body 1 structure to support the spoiler body 2. By combining the pile foundation 6 and the cap 7 into an integral foundation body 1 structure, the advantages of both can be more effectively utilized to resist the impact and erosion of the debris flow. This combination improves the bearing capacity and stability of the flow control spoiler dam.

[0048] In a preferred embodiment, the second arc is a teardrop-shaped curve.

[0049] Specifically, this embodiment provides a preferred design of the spoiler body 2, wherein the second arc of the middle spoiler portion 4 particularly adopts a water drop-shaped curve. Among them, the "water drop-shaped curve" refers to a smooth, rounded curve shape that gradually shrinks to a tip, similar to the shape of a water drop falling in nature. In this embodiment, this water drop-shaped curve is applied to the middle spoiler portion 4 of the spoiler body 2, that is, the second arc convex to the upper direction of the plumb line formed when it intersects with the axial plumb line of the mountain channel.

[0050] The use of a water drop-shaped curve can more effectively guide the debris flow and generate stronger vortex and disturbance effects during the flow process. The unique shape of the water drop-shaped curve can make the flow velocity and direction of the debris flow change continuously and smoothly when it flows through here, thereby intensifying the mutual collision and friction between the debris particles, and further breaking the stability of the fluidized layer 8.

[0051] In a possible implementation, the following steps are included: first, according to a predetermined design and calculation, the specific parameters of the water drop-shaped curve are determined, including the starting point, the end point, the maximum convexity position, and the overall smoothness of the curve. Then, when manufacturing the spoiler body 2, a suitable process (such as mold forming, etc.) is used to accurately shape the water drop-shaped curve. During installation, ensure that the middle spoiler portion 4 of the spoiler body 2 accurately corresponds to the mountain channel according to the designed water drop-shaped curve.

[0052] By adopting a water drop-shaped curve design in the middle spoiler 4, this embodiment further enhances the disturbance effect of the flow control spoiler dam on the debris flow. Specifically, this design can make the debris flow produce a more complex flow pattern when flowing through the middle spoiler 4, including more vortices and turbulence, so as to more effectively break the fluidization layer 8 of the debris flow and reduce its movement speed and destructive power. In addition, the smooth transition of the water drop-shaped curve also helps to reduce the direct impact of the debris flow on the spoiler body 2, and prolong the service life of the spoiler body 2.

[0053] In a preferred embodiment, the high-level landslide debris flow control method and application based on bottom boundary disturbance also include: laying a steel plate structure on the curved side surface to increase the abrasion resistance of the curved side surface.

[0054] Specifically, this embodiment provides an optimized high-level landslide debris flow control method based on bottom boundary disturbance and its application, in which a steel plate structure is laid on the curved side surface of the disturbing body 2 to increase its anti-abrasion ability.

[0055] Since the curved side surface of the body 2 is directly impacted and eroded by the high-speed flowing debris particles during the control process of the debris flow, it is necessary to improve the abrasion resistance of the surface of the body 2 in order to enhance the durability and service life of the body 2. Therefore, this embodiment proposes an optimization measure of laying a steel plate structure on the curved side surface.

[0056] In a possible implementation method, the following steps are included: first, according to the shape and size of the curved side surface of the spoiler body 2, a steel plate structure of corresponding shape and size is customized; the thickness and material of the steel plate structure should be selected according to the actual use environment and the expected impact force of the debris flow to ensure that it has sufficient strength and wear resistance. Then, the steel plate structure is subjected to necessary surface treatment, such as anti-rust coating, etc., to improve its corrosion resistance. Then, the surface of the curved side surface of the spoiler body 2 is pretreated to ensure that the surface is flat and clean, which is convenient for laying the steel plate structure. Finally, the steel plate structure is closely laid on the curved side surface, and the steel plate structure can be firmly connected to the spoiler body 2 by welding, bolting or other suitable fixing methods.

[0057] By laying a steel plate structure on the curved side surface of the disruptor body 2, the abrasion resistance of the surface of the disruptor body 2 is improved, thereby extending the service life of the disruptor body 2. At the same time, the structural stability of the disruptor body 2 is enhanced, and its control effect on the debris flow is improved.

[0058] In a preferred embodiment, the high-level landslide debris flow control method and application based on bottom boundary disturbance also include: along the axial direction of the mountain channel, the horizontal dimensions of the front spoiler 3, the middle spoiler 4 and the rear spoiler 5 are designed and configured in a ratio of 3:5:2 respectively.

[0059] Specifically, this embodiment provides a preferred arrangement method for debris flow control flow spoiler dams based on bottom boundary disturbance, wherein the horizontal dimensions of the front spoiler 3, the middle spoiler 4, and the rear spoiler 5 are designed and configured in a ratio of 3:5:2 along the axial direction of the mountain channel. The "horizontal dimension" refers to the width or length of the spoiler in the horizontal direction. In this embodiment, the horizontal dimensions of the front spoiler 3, the middle spoiler 4, and the rear spoiler 5 refer to their respective widths in the axial direction of the mountain channel.

[0060] The ratio of 3:5:2 is designed to better adapt to the flow characteristics and dynamic principles of the debris flow. The smaller size (3 parts) of the front spoiler 3 is conducive to guiding the debris flow into the flow control spoiler dam area, the larger size (5 parts) of the middle spoiler 4 can provide a larger disturbance area, thereby more effectively breaking the fluidization layer 8 of the debris flow, and the smaller size (2 parts) of the rear spoiler 5 is helpful to guide the debris flow to flow out smoothly and reduce the generation of backflow and vortex.

[0061] In this embodiment, by adopting a 3:5:2 ratio design, a more precise and effective control of the debris flow is achieved. The small size design of the front spoiler 3 allows the debris flow to smoothly enter the flow control spoiler dam area, reducing the flow resistance; the large size design of the middle spoiler 4 provides a larger disturbance area, which can more effectively break the fluidization layer 8 of the debris flow, reduce its movement speed and destructive power; the small size design of the rear spoiler 5 helps to guide the debris flow to flow out smoothly, reducing unnecessary vortices and backflows. In summary, this embodiment further optimizes the arrangement method of the flow control spoiler dam by adopting a specific 3:5:2 ratio design, improves the efficiency and effect of debris flow control, and provides a more accurate and reliable technical means for the prevention and control of geological disasters.

[0062] In a preferred embodiment, the high-level landslide debris flow control method and application based on bottom boundary disturbance also include: the radius sizes of the first arc, the second arc and the third arc are designed and configured in a ratio of 8:5:3 respectively.

[0063] Specifically, this embodiment describes an optimized high-level landslide debris flow control method and application based on bottom boundary disturbance, wherein the radius sizes of the first arc, the second arc, and the third arc are designed and configured in a ratio of 8:5:3. Among them, the "first arc", "second arc", and "third arc" respectively refer to the arc-shaped structural lines used in different parts of the flow control spoiler dam. These arcs play an important role in determining the shape and streamline when designing and constructing the flow control spoiler dam. The radius size refers to the bending radius of these arcs, which directly affects the curvature of the arc and the overall shape of the flow control spoiler dam.

[0064] The radius size is designed in a ratio of 8:5:3 to make the shape of the flow control spoiler dam more consistent with the dynamic characteristics of the debris flow. The larger first arc radius (8 parts) helps to guide the debris flow to smoothly enter the flow control spoiler dam area, reducing flow resistance and turbulence; the medium-sized second arc radius (5 parts) increases the disturbance of the debris flow in the dam body, helping to break the laminar structure inside it; and the smaller third arc radius (3 parts) is designed to promote the accelerated discharge of the debris flow and prevent it from forming congestion or backflow behind the dam.

[0065] During the design phase, a reference radius size is first determined based on terrain conditions, the expected flow and speed of the debris flow, etc. Then, the radius sizes of the first arc, the second arc, and the third arc are calculated in a ratio of 8:5:3.

[0066] During the construction process, the design of the arc radius is strictly followed to ensure that the shape and size of the flow control spoiler are accurate. Appropriate building materials and processes are used to build the flow control spoiler according to the design shape to ensure that its structure is stable and the flow line is smooth.

[0067] The flow control spoiler dam of this embodiment can more effectively control the movement state of the debris flow by designing the arc radius size in a ratio of 8:5:3. The first arc with a large radius reduces the flow resistance at the entrance, the second arc with a medium radius enhances the disturbance effect inside the dam, and the third arc with a small radius optimizes the outflow conditions behind the dam. Such a design not only improves the flow control efficiency of the flow control spoiler dam, but also reduces the scouring and wear of the dam body by the debris flow, thereby extending the service life of the flow control spoiler dam.

[0068] In a preferred embodiment, the high-level landslide debris flow control method and application based on bottom boundary disturbance also include: the vertical height of the middle spoiler 4 is half of its horizontal dimension along the axial direction of the mountain channel. Figure 4 Another schematic diagram of the principle structure of a flow control spoiler dam provided in the embodiment of the present application is shown in Table 1. The meaning and limitation of the characteristic parameters of the functional components of the flow control spoiler dam provided in the embodiment of the present application are shown in Table 1. Figure 4 As shown in Table 1: Functional components Parameters and meanings Parameter constraints Disruptor 2 B1\B2\B3: widths of different segments of the spoiler structure; R1 / R2 / R3: radius of the curved surface of different segments of the spoiler structure; h: height of the highest point of the spoiler structure; a / b: tangent points when different arc segments meet. B1:B2:B3=3:5:2R1:R2:R3=8:5:32h=B2 Platform 7 H1: Platform 7 height Greater than the depth of disaster erosion Pile foundation 6 H2: Depth of pile foundation 6 B4: Longitudinal spacing of pile foundation 6 Design of anti-overturning stability of flow control and spoiler dam Table 1 Specifically, the high-level landslide debris flow control method based on bottom boundary disturbance in this embodiment specifically defines the proportional relationship between the vertical height of the middle spoiler 4 and its horizontal dimension along the axial direction of the mountain channel. Among them, the "middle spoiler 4" refers to the part of the flow control spoiler dam that plays a major disturbing role, which is usually located in the middle or near the middle of the dam body. Its design purpose is to change the flow state of the debris flow and increase the flow resistance, thereby achieving the effect of flow control. "Vertical height" refers to the size of the middle spoiler 4 in the vertical direction, that is, the distance from the bottom of the dam body to the top of the middle spoiler 4; "horizontal dimension" refers to the width of the middle spoiler 4.

[0069] The vertical height of the middle spoiler 4 is limited to half of its horizontal size, which is based on the in-depth study of the dynamic characteristics of debris flow and the needs of practical engineering applications. This proportional relationship can ensure that the middle spoiler 4 generates appropriate disturbance when the debris flow passes through, which is neither too strong to cause damage to the dam body nor too weak to achieve the expected flow control effect.

[0070] By adopting the proportional relationship described in this embodiment to design the middle spoiler 4, the flow state of the debris flow in the flow control spoiler dam can be optimized, thereby improving the flow control effect; reducing the scouring and wear of the dam body by the debris flow, thereby extending the service life of the flow control spoiler dam; and improving the overall stability and safety of the flow control spoiler dam.

[0071] In a preferred embodiment, planning and determining the arrangement points of a plurality of flow control spoiler dams on the mountain channel according to a preset interval distance comprises the following steps: Step S201, obtaining the longitudinal gradient data of the mountain channel; Step S202, based on the longitudinal gradient data, determining whether the mountain channel has a section where the mountain channel changes from a gentle slope to a steep slope; Step S203: if yes, then exclude the section from gradual change to steep change; Step S204: planning and determining the arrangement points of a plurality of flow control spoiler dams at preset intervals on the selected mountain channel section.

[0072] Specifically, this embodiment provides a method for planning and determining the layout points of flow control and spoiler dams on a mountain channel, which method particularly considers the longitudinal gradient characteristics of the mountain channel and excludes the section from gradual change to steep, so as to ensure that the layout of the flow control and spoiler dams is more scientific and reasonable. Among them, "longitudinal gradient" refers to the rate of change of the elevation of the bottom of the channel along the direction of water flow, that is, the vertical drop per unit length of the channel.

[0073] When arranging flow control and spoiler dams in mountain channels, the longitudinal gradient characteristics of the channels must be considered. The water flow speed is fast and the scouring force is strong in the section where the water flow changes from slow to steep. If flow control and spoiler dams are arranged in such sections, it is easy to cause damage to the dam body and reduce its service life. Therefore, when arranging flow control and spoiler dams, avoiding these unfavorable sections can improve the stability and service life of the flow control and spoiler dams.

[0074] In one possible implementation, the following steps are taken: First, the longitudinal gradient data of the mountain channel are obtained through topographic survey or remote sensing technology. These data reflect the slope changes along the channel and are the basis for subsequent analysis.

[0075] Then, based on the obtained longitudinal gradient data, it is determined whether there is a section where the mountain channel changes from gentle to steep. This can be achieved by analyzing the mutation points of the gradient data or using relevant algorithms to identify areas where the slope changes dramatically.

[0076] Secondly, if it is determined that there are sections that change from gentle to steep, these sections will be excluded from the consideration of the layout of the flow control spoiler dam. This is because the hydrodynamic conditions in these sections are complex, which is not conducive to the long-term stable operation of the flow control spoiler dam.

[0077] Finally, after eliminating the sections that change from gentle to steep, the appropriate mountain channel sections are selected. In these sections, the layout points of several levels of flow control and spoiler dams are planned and determined according to the preset interval distance (the interval distance can be adjusted according to the actual situation to ensure that the distribution of flow control and spoiler dams is neither too dense nor too sparse). These layout points should comprehensively consider factors such as water flow conditions, topography, and dam body stability.

[0078] Through the method provided in this embodiment, the layout points of the flow control spoiler dam can be planned and determined more scientifically on the mountain channel. This method not only takes into account the longitudinal gradient characteristics of the channel, but also deliberately avoids the section from slow to steep, thereby effectively improving the stability and service life of the flow control spoiler dam. In addition, through reasonable selection of layout points, the water flow conditions can be optimized, the scouring and destructive effects of the water flow on the dam body can be reduced, and the flow control effect of the flow control spoiler dam can be further improved.

[0079] In a preferred embodiment, planning and determining the arrangement points of a plurality of flow control spoiler dams on the mountain channel according to a preset interval distance comprises the following steps: Step Q201, obtaining the width and curvature data of the mountain channel, for example, by field measurement or remote sensing technology.

[0080] Step Q202, based on the width data, determine whether the mountain channel has a narrow-to-wide section; if so, give priority to selecting the narrow-to-wide section of the mountain channel, because the water flow conditions in these sections are more conducive to the stability and efficiency of the flow control spoiler dam.

[0081] Step Q203, based on the curvature data, determine whether the mountain channel has a straight channel section; if so, give priority to selecting the straight channel section of the mountain channel, because the water flow in a straight channel is relatively stable, which is conducive to the effectiveness of the flow control spoiler dam.

[0082] Step Q204: Plan and determine the layout points of several levels of flow control and spoiler dams in the selected mountain channel section according to the preset intervals. The intervals can be adjusted according to actual conditions to ensure the rationality of the distribution of flow control and spoiler dams.

[0083] Specifically, the method provided in this embodiment comprehensively considers the width variation and curvature of the channel to optimize the layout and effect of the flow control spoiler. Among them, the "width data" refers to the measured value of the width of the channel at different positions, reflecting the width variation of the channel; the "curvature data" describes the curvature of the channel, that is, the curvature or angle of the center line of the channel.

[0084] The width and curvature of the mountain channel have a significant impact on the water flow state. The water flow velocity is usually reduced in the section from narrow to wide, which is conducive to the stable operation of the flow control spoiler dam and the deposition of sediments. The water flow in the straight section of the channel is relatively stable, which is also conducive to the arrangement and performance of the flow control spoiler dam. Therefore, this embodiment optimizes the arrangement of the flow control spoiler dam by comprehensively considering these two factors.

[0085] The method provided in this embodiment can more scientifically select the layout points of the flow control spoiler dam, taking into account the influence of the width change and curvature of the mountain channel on the water flow state. By preferentially selecting the sections where the narrow channel changes to the wide channel and the channel is straight for layout, the stability and flow control effect of the flow control spoiler dam can be improved. In addition, the reasonable selection of the layout point can also reduce the scouring and destructive effect of the water flow on the dam body, and extend the service life of the flow control spoiler dam.

[0086] In a preferred embodiment, planning and determining the arrangement points of a plurality of flow control spoiler dams on the mountain channel according to a preset interval distance comprises the following steps: Step C201, obtain the stratum structure distribution data of the mountain channel, for example, by means of geological exploration or geophysical detection, etc. These data include key information such as lithology, thickness, distribution range, etc. of the stratum, providing important basis for the subsequent selection of layout points.

[0087] Step C202, based on the stratum structure distribution data, determine whether the mountain channel has a bedrock stratum structure section; if so, give priority to selecting the bedrock stratum structure section of the mountain channel. The stability and high bearing capacity of the bedrock stratum can ensure the safe operation of the flow control and spoiler dam.

[0088] Step C203, plan and determine the layout points of several levels of flow control and spoiler dams in the selected mountain channel section according to the preset intervals. The intervals can be adjusted according to the actual situation and engineering design requirements; these layout points should fully consider the terrain, water flow conditions and the functional requirements of the flow control and spoiler dams.

[0089] Specifically, the high-level landslide debris flow control method based on bottom boundary disturbance provided in this embodiment and the application of the stratum structure distribution data based on the mountain channel are used to plan and determine the layout points of the flow control spoiler dam, thereby ensuring the stability and safety of the flow control spoiler dam. Among them, "stratum structure distribution data" refers to data on the composition and characteristics of the stratum below the mountain channel, including information such as lithology, thickness, and distribution; "bedrock stratum structure section" refers to a stratum composed of hard rocks, which usually has a higher bearing capacity and stability.

[0090] The stratum structure of the mountain channel has an important impact on the stability and safety of the flow control spoiler dam. The bedrock stratum structure section can provide a solid foundation for the flow control spoiler dam due to its hard rock and high bearing capacity, reducing the risk of dam instability caused by unstable foundation. Therefore, this embodiment plans the layout points of the flow control spoiler dam by giving priority to the bedrock stratum structure section.

[0091] The method provided in this embodiment can ensure that the flow control spoiler dam is arranged on a stable bedrock stratum with high bearing capacity, thereby significantly improving the stability and safety of the flow control spoiler dam. By preferentially selecting the bedrock stratum structure section for arrangement, the risk of dam body damage caused by foundation problems can be reduced, and the service life of the flow control spoiler dam can be extended.

[0092] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A high-level landslide debris flow control method based on bottom boundary disturbance, characterized in that: include: Obtain path information of mountain channels through which debris flow moves in the target area; Based on the path information, and according to the preset interval distance, planning and determining the arrangement points of several levels of flow control and spoiler dams on the mountain channel; the flow control and spoiler dams include a base body and a spoiler body; The foundation is fixedly arranged below the ground at the arrangement point to support and stabilize the disturbing body; The spoiler body is fixedly arranged on the upper end surface of the base body; the spoiler body adopts a transversely extending multi-section column structure, including two opposite and parallel bottom surfaces, a horizontal side surface and a curved side surface, and the curved side surface is located vertically above the horizontal side surface; the spoiler body is composed of three continuous parts, namely, a front spoiler part, a middle spoiler part and a rear spoiler part, each of which is a column structure, and the high lines between each part are continuous and consistent, and the high line of each part is perpendicular to the axial plumb plane of the mountain channel; when the front spoiler part intersects with the axial plumb plane of the mountain channel, a first arc line concave in the downstream direction of the mountain channel is formed, when the middle spoiler part intersects with the axial plumb plane of the mountain channel, a second arc line convex in the upper direction of the plumb line is formed, and when the rear spoiler part intersects with the axial plumb plane of the mountain channel, a third arc line concave in the upstream direction of the mountain channel is formed, and the first arc line is tangentially connected to the second arc line, and the second arc line is tangentially connected to the third arc line.

2. A high-level landslide debris flow control method based on bottom boundary disturbance according to claim 1, characterized in that: The base body is fixedly arranged at a part below the ground of the arrangement point, including: On the ground of the arrangement point, a number of pile foundation holes are drilled according to predetermined positions and sizes, and corresponding pile foundations are arranged in each hole; the pile foundations are of reinforced concrete structure; A cap with a predetermined shape and size is fixedly arranged at the upper end of the pile foundation; the upper end surface of the cap is ensured to be arranged horizontally, and the cap adopts a reinforced concrete structure; The pile foundation and the cap together constitute the foundation body.

3. The method for controlling high-level landslide debris flow based on bottom boundary disturbance according to claim 1 is characterized in that: It also includes that the second arc line adopts a water drop-shaped curve.

4. The method for controlling high-level landslide debris flow based on bottom boundary disturbance according to claim 1 is characterized in that: Also includes: A steel plate structure is laid on the surface of the curved side surface to increase the abrasion resistance of the curved side surface.

5. The method for controlling high-level landslide debris flow based on bottom boundary disturbance according to claim 1, characterized in that: Also includes: In the axial direction of the mountain channel, the horizontal dimensions of the front spoiler, the middle spoiler and the rear spoiler are designed and configured in a ratio of 3:5:2, respectively.

6. The method for controlling high-level landslide debris flow based on bottom boundary disturbance according to claim 1, characterized in that: Also includes: The radius sizes of the first arc, the second arc and the third arc are designed and configured according to a ratio of 8:5:3 respectively.

7. The method for controlling high-level landslide debris flow based on bottom boundary disturbance according to claim 1, characterized in that: Also includes: The vertical height of the middle spoiler is half of its horizontal dimension along the axial direction of the mountain channel.

8. The method for controlling high-level landslide debris flow based on bottom boundary disturbance according to claim 1, characterized in that: According to the preset intervals, several points for the arrangement of flow control spoiler dams are planned and determined on the mountain channel, including: Acquiring longitudinal gradient data of the mountain channel; Based on the longitudinal gradient data, determining whether the mountain channel has a section where the mountain channel changes from a gentle slope to a steep slope; If so, the section from gradual to steep is excluded; On the selected mountain channel section, the layout points of several stage flow control spoiler dams are planned and determined according to the preset intervals.

9. The method for controlling high-level landslide debris flow based on bottom boundary disturbance according to claim 1, characterized in that: According to the preset intervals, several points for the arrangement of flow control spoiler dams are planned and determined on the mountain channel, including: Obtaining width data and curvature data of the mountain channel; Based on the width data, determine whether the mountain channel has a section where the narrow channel changes to a wide channel; if so, give priority to selecting the section where the mountain channel changes to a wide channel; Based on the curvature data, determining whether the mountain channel has a straight channel section; if so, giving priority to selecting the straight channel section of the mountain channel; On the selected mountain channel section, the layout points of several stage flow control spoiler dams are planned and determined according to the preset intervals.

10. The method for controlling high-level landslide debris flow based on bottom boundary disturbance according to claim 1, characterized in that: According to the preset intervals, several points for the arrangement of flow control spoiler dams are planned and determined on the mountain channel, including: Acquiring the stratigraphic structure distribution data of the mountain channel; Based on the stratigraphic structure distribution data, determine whether the mountain channel has a bedrock stratigraphic structure section; if so, give priority to selecting the bedrock stratigraphic structure section of the mountain channel; On the selected mountain channel section, the layout points of several stage flow control spoiler dams are planned and determined according to the preset intervals.

Citation Information

Patent Citations

  • Plant pile group type debris flow blocking structure

    CN107059891A

  • Mountain front highway water destruction prevention and control method based on flow diversion and restricting theories and flow guide dam

    CN108978578A

  • Collapsed landslide blocking energy dissipation pile array and design method thereof

    CN111809537A

  • Dam body for river control

    JP2004116132A

  • Analysis method for debris flow in motion

    JP2015113567A