Road construction drainage structure
By introducing a combination of crushing rollers and grinding discs into the road construction drainage structure, the problem of construction solid waste accumulation affecting drainage efficiency is solved, efficient crushing and discharge of waste is achieved, and the normal operation capability of the drainage structure is improved.
Patent Information
- Application Number
- CN202411048430.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing road construction drainage structure, construction solid waste accumulates on the interception plate, affecting the normal drainage efficiency of the drainage structure.
A road construction drainage structure including a crushing roller and a grinding disc is designed. The large solid waste is processed through the meshing and grinding of the crushing roller, so that it enters the dropping barrel through the screening screen, and is further passed through the rotating rod and grinding disc driven by a waterproof motor. Crush to ensure that the garbage enters the construction drainage pipe to avoid accumulation of solid waste.
It effectively solves the problem of solid waste accumulation, improves the drainage efficiency of the drainage structure, and ensures the normal discharge of water during road construction.
Smart Images

Figure CN118727906A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of road construction, and in particular to a road construction drainage structure. Background Art
[0002] During the road construction process, sewage will be generated and rain and snow will be experienced. Therefore, it is necessary to install a drainage structure at the construction site to facilitate the use of drainage. The construction road drainage structure is one of the important measures to ensure that the road has good drainage performance during the construction and use period. Its main function is to timely and effectively remove the accumulated water on the road construction surface and underground to prevent water damage to the roadbed and pavement structure.
[0003] Since a large amount of gravel and garbage will be generated during road construction, it often flows into the drainage structure along with sewage. Therefore, interception plates are often set in existing road construction drainage structures to screen granular gravel and construction solid waste. As time accumulates, construction solid waste accumulates on the surface of the interception plate, which will affect the normal drainage efficiency of the drainage structure in the long run. Summary of the invention
[0004] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0005] In view of the above problems existing in the existing road construction drainage structure, the present invention is proposed.
[0006] Therefore, the purpose of the present invention is to provide a road construction drainage structure, which is suitable for solving the problem that construction solid waste accumulates on the upper surface of the interception plate over time, which will affect the normal drainage efficiency of the drainage structure in the long run.
[0007] In order to solve the above technical problems, the present invention provides the following technical solutions: a road construction drainage structure, comprising:
[0008] The drainage unit comprises a road drainage well and a drainage well cover matched and installed at the upper opening of the road drainage well, the lower end of the road drainage well is fixedly connected to a construction drainage pipe, and a screening net is laid in the road drainage well;
[0009] The particle crushing unit includes two crushing rollers rotatably installed in a road drainage well and meshing with each other, and a crushing driving source fixedly installed on the outside of the road drainage well for driving the two crushing rollers to rotate, the upper end of the inner wall of the road drainage well is fixedly connected with a symmetrical guide plate, the lower part of the inner cavity of the road drainage well is fixedly provided with a blanking barrel connected with a construction drainage pipe, the upper end of the blanking barrel is fixedly connected with a guide cover, and a connecting plate connected with the guide cover is fixedly installed in the road drainage well, the guide cover is located below the screening net, and the crushing rollers are located above the screening net.
[0010] As a preferred solution of a road construction drainage structure described in the present invention, a support frame is fixedly installed on the inner wall of the lower side of the blanking barrel, a waterproof motor is fixedly installed at the center of the upper side wall of the support frame, the output shaft of the waterproof motor is fixedly connected to a rotating rod, a fixed sleeve on the rotating rod is provided with multiple groups of evenly distributed grinding discs, and multiple groups of evenly distributed grinding sleeves matching the grinding discs are fixedly provided on the inner wall of the blanking barrel.
[0011] As a preferred solution of a road construction drainage structure described in the present invention, the drainage structure also includes a crushing recovery unit, which includes support ears fixedly installed on both sides of the road drainage well and a hollow cylinder fixedly installed at the center of the upper side wall of the support ear, the screening net is arranged obliquely, and the road drainage well and the lower part of the inner cavity of the hollow cylinder are connected through a feed pipe, a recovery hole is opened at the center of the upper end of the drainage well cover, the upper part of the inner cavity of the hollow cylinder is connected to the recovery hole through a recovery pipe, a driving motor is fixedly installed on the lower side wall of the supporting ear, and the output shaft of the driving motor is inserted into the lower end wall of the hollow cylinder and fixedly connected with a spiral conveying rod.
[0012] As a preferred solution of the road construction drainage structure described in the present invention, the recovery pipe is arranged in an inclined shape, and the horizontal height of one end of the recovery pipe away from the recovery hole is higher than the horizontal height of the other end of the recovery pipe.
[0013] As a preferred solution of the road construction drainage structure described in the present invention, a support frame is fixedly connected to the upper end of the inner wall of the road drainage well, and the upper side wall of the support frame abuts against the lower side wall of the drainage well cover.
[0014] As a preferred solution of the road construction drainage structure described in the present invention, the upper side wall of the support frame is fixedly provided with multiple groups of evenly distributed positioning protrusions, and the lower side wall of the drainage manhole cover is provided with positioning grooves matching the positioning protrusions.
[0015] As a preferred solution of the road construction drainage structure described in the present invention, the upper side wall of the guide plate is polished and smooth, and the crushing roller is made of manganese steel.
[0016] As a preferred solution of the road construction drainage structure described in the present invention, a motor mounting seat is fixedly installed on the lower side wall of the support ear, and the drive motor is fixedly installed on the motor mounting seat.
[0017] The beneficial effects of the present invention are as follows: gravel and other solid waste generated during road construction enter the two crushing rollers under the guidance of the drainage manhole cover and the guide plate and are meshed with the crushing rollers. The large pieces of solid waste meshed with the crushing rollers are crushed into small pieces and pass through the screening net to fall into the blanking barrel. The output shaft of the waterproof motor drives the rotating rod and multiple grinding discs to rotate, and can grind and crush the small pieces of solid waste at the same time. The ground and crushed solid waste enters the construction drainage pipe and is discharged normally, which effectively solves the defect that gravel and construction solid waste are easily accumulated on the intercepting plate and affects the normal drainage efficiency of the drainage structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0019] Figure 1 This is a schematic diagram of the overall structure of a road construction drainage structure proposed by the present invention;
[0020] Figure 2 A schematic diagram of the internal structure of a road drainage well of a road construction drainage structure proposed by the present invention;
[0021] Figure 3 This is a schematic diagram of the disassembled structure of the support frame and drainage manhole cover of a road construction drainage structure proposed by the present invention;
[0022] Figure 4 A schematic diagram of the particle crushing unit structure of a road construction drainage structure proposed by the present invention;
[0023] Figure 5 This is a schematic diagram of the crushing and recovery unit structure of a road construction drainage structure proposed by the present invention;
[0024] Figure 6 This is a schematic cross-sectional structure diagram of a blanking barrel and a guide cover of a road construction drainage structure proposed by the present invention.
[0025] Description of the drawings: 100 drainage unit, 101 road drainage well, 102 drainage well cover, 103 construction drainage pipe, 104 screening net, 105 support frame, 106 positioning protrusion, 200 particle crushing unit, 201 guide plate, 202 crushing roller, 203 crushing drive source, 204 blanking barrel, 205 guide cover, 206 connecting plate, 207 support frame, 208 waterproof motor, 209 rotating rod, 210 grinding disc, 211 grinding sleeve, 300 crushing recovery unit, 301 support ear, 302 hollow barrel, 303 feed pipe, 304 recovery pipe, 305 drive motor, 306 spiral conveying rod. DETAILED DESCRIPTION
[0026] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0027] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0028] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0029] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the embodiments of the present invention in detail, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0030] Reference Figure 1-Figure 6 , which is an embodiment of the present invention, provides a road construction drainage structure, including: a drainage unit 100, a particle crushing unit 200 and a crushing recovery unit 300.
[0031] The drainage unit 100 includes a road drainage well 101 and a drainage well cover 102 matched and installed at the upper opening of the road drainage well 101. The upper end of the inner wall of the road drainage well 101 is fixedly connected with a support frame 105. The upper side wall of the support frame 105 abuts against the lower side wall of the drainage well cover 102. Through the setting of the support frame 105, the drainage well cover 102 can be stably supported. The upper side wall of the support frame 105 is fixedly provided with a plurality of groups of uniformly distributed positioning protrusions 106, and the lower side wall of the drainage well cover 102 is provided with positioning grooves matching the positioning protrusions 106. The coordinated use of the plurality of positioning protrusions 106 and the plurality of positioning grooves improves the stability of the coordination between the drainage well cover 102 and the road drainage well 101. The lower end of the road drainage well 101 is fixedly connected with a construction drainage pipe 103, and a screening net 104 is laid in the road drainage well 101.
[0032] Secondly, the particle crushing unit 200 includes two crushing rollers 202 rotatably installed in the road drainage well 101 and meshing with each other, and a crushing driving source 203 fixedly installed on the outside of the road drainage well 101 for driving the two crushing rollers 202 to rotate. A symmetrical guide plate 201 is fixedly connected to the upper end of the inner wall of the road drainage well 101. The upper side wall of the guide plate 201 is smoothly polished, and the crushing roller 202 is made of manganese steel. The crushing roller 202 made of manganese steel not only has good wear resistance, but also has strong extrusion capacity, which extends the service life of the crushing roller 202. A blanking barrel 204 connected to the construction drainage pipe 103 is fixedly arranged at the lower part of the inner cavity of the road drainage well 101, and a guide cover 205 is fixedly connected to the upper end of the blanking barrel 204, and a connecting plate 206 connected to the guide cover 205 is fixedly installed in the road drainage well 101. The guide cover 205 is located below the screening net 104, and the crushing roller 202 is located above the screening net 104.
[0033] Secondly, a support frame 207 is fixedly installed on the inner wall of the lower side of the blanking barrel 204, and a waterproof motor 208 is fixedly installed at the center of the upper side wall of the support frame 207. The output shaft of the waterproof motor 208 is fixedly connected to a rotating rod 209. A plurality of groups of evenly distributed grinding discs 210 are fixedly sleeved on the rotating rod 209, and a plurality of groups of evenly distributed grinding sleeves 211 matching the grinding discs 210 are fixedly installed on the inner wall of the blanking barrel 204.
[0034] Finally, the crushing recovery unit 300 includes support ears 301 fixedly installed on both sides of the road drainage well 101 and a hollow cylinder 302 fixedly installed at the center of the upper side wall of the support ears 301. The screening net 104 is arranged obliquely, and the road drainage well 101 and the lower part of the inner cavity of the hollow cylinder 302 are connected through a feed pipe 303. A recovery hole is opened at the center of the upper end of the drainage well cover 102. The upper part of the inner cavity of the hollow cylinder 302 is connected to the recovery hole through a recovery pipe 304. The recovery pipe 304 is arranged in an inclined shape, and the horizontal height of the recovery pipe 304 away from the recovery hole is higher than that of the other end of the recovery pipe 304. The horizontal height of the support ear 301 is improved by such an arrangement, which improves the efficiency of the recovery pipe 304 in transporting granular solid construction waste, and effectively solves the defect that construction waste is easily accumulated and blocked in the recovery pipe 304. A driving motor 305 is fixedly installed on the lower side wall of the support ear 301, and a motor mounting seat is fixedly installed on the lower side wall of the support ear 301. The driving motor 305 is fixedly installed on the motor mounting seat. The arrangement of the motor mounting seat improves the connection stability between the support ear 301 and the driving motor 305. The output shaft of the driving motor 305 is inserted into the lower end wall of the hollow cylinder 302 and is fixedly connected with a spiral conveying rod 306.
[0035] During use, the crushed stones and other solid wastes in the road construction process enter the two crushing rollers 202 under the guidance of the drainage manhole cover 102 and the guide plate 201 and are meshed by the crushing rollers 202. The large pieces of solid wastes meshed by the crushing rollers 202 are crushed into small pieces, pass through the screening net 104 and fall into the blanking barrel 204. The output shaft of the waterproof motor 208 drives the rotating rod 209 and the multiple grinding discs 210 to rotate, and can grind and crush the small pieces of solid wastes. The ground and crushed solid wastes enter the construction drainage pipe 103 and are discharged normally, which effectively solves the defect that the crushed stones and construction solid wastes are easily accumulated on the intercepting plate and affect the normal drainage efficiency of the drainage structure.
[0036] Solid waste such as gravel that is still too large after being crushed enters the hollow cylinder 302 under the action of its own gravity, is transported to the top of the hollow cylinder 302 by the spiral conveying rod 306, and then is transported back to between the crushing rollers 202 through the recovery pipe 304 for secondary crushing. No manual screening is required, thereby improving the crushing efficiency of the drainage structure for solid waste such as gravel.
[0037] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A road construction drainage structure, characterized in that: include: A drainage unit (100) comprises a road drainage well (101) and a drainage well cover (102) matched and installed at the upper opening of the road drainage well (101); a construction drainage pipe (103) is fixedly connected to the lower end of the road drainage well (101); and a screening net (104) is laid in the road drainage well (101); The particle crushing unit (200) comprises two crushing rollers (202) rotatably mounted in a road drainage well (101) and meshing with each other, and a crushing driving source (203) fixedly mounted on the outside of the road drainage well (101) and used for driving the two crushing rollers (202) to rotate, wherein a guide plate (201) symmetrically positioned is fixedly connected to the upper end of the inner wall of the road drainage well (101), a blanking barrel (204) connected to a construction drainage pipe (103) is fixedly arranged at the lower part of the inner cavity of the road drainage well (101), a guide cover (205) is fixedly connected to the upper end of the blanking barrel (204), and a connecting plate (206) connected to the guide cover (205) is fixedly mounted in the road drainage well (101), the guide cover (205) is located below a screening net (104), and the crushing rollers (202) are located above the screening net (104).
2. A road construction drainage structure according to claim 1, characterized in that: A support frame (207) is fixedly installed on the inner wall of the lower side of the blanking barrel (204), a waterproof motor (208) is fixedly installed at the center of the upper side wall of the support frame (207), the output shaft of the waterproof motor (208) is fixedly connected to a rotating rod (209), a plurality of groups of evenly distributed grinding discs (210) are fixedly sleeved on the rotating rod (209), and a plurality of groups of evenly distributed grinding sleeves (211) matching the grinding discs (210) are fixedly installed on the inner wall of the blanking barrel (204).
3. A road construction drainage structure according to claim 1, characterized in that: The drainage structure also includes a crushing recovery unit (300), which includes support ears (301) fixedly mounted on both sides of the road drainage well (101) and a hollow cylinder (302) fixedly mounted at the center of the upper side wall of the support ears (301); the screening net (104) is arranged obliquely, and the road drainage well (101) and the lower part of the inner cavity of the hollow cylinder (302) are both connected through a feed pipe (303); a recovery hole is opened at the center of the upper end of the drainage well cover (102); the upper part of the inner cavity of the hollow cylinder (302) is connected to the recovery hole through a recovery pipe (304); a driving motor (305) is fixedly mounted on the lower side wall of the supporting ears (301); the output shaft of the driving motor (305) is inserted into the lower end wall of the hollow cylinder (302) and is fixedly connected to a spiral conveying rod (306).
4. A road construction drainage structure according to claim 3, characterized in that: The recovery pipe (304) is arranged in an inclined shape, and the horizontal height of one end of the recovery pipe (304) away from the recovery hole is higher than the horizontal height of the other end of the recovery pipe (304).
5. A road construction drainage structure according to claim 1, characterized in that: A support frame (105) is fixedly connected to the upper end of the inner wall of the road drainage well (101), and the upper side wall of the support frame (105) abuts against the lower side wall of the drainage well cover (102).
6. A road construction drainage structure according to claim 5, characterized in that: The upper side wall of the support frame (105) is fixedly provided with a plurality of evenly distributed positioning protrusions (106), and the lower side wall of the drainage manhole cover (102) is provided with positioning grooves matching the positioning protrusions (106).
7. A road construction drainage structure according to claim 1, characterized in that: The upper side wall of the guide plate (201) is polished and smooth, and the crushing roller (202) is made of manganese steel.
8. A road construction drainage structure according to claim 3, characterized in that: A motor mounting seat is fixedly mounted on the lower side wall of the support ear (301), and the drive motor (305) is fixedly mounted on the motor mounting seat.