Net mold arch building structure for surrounding rock primary support and construction method

By using flexible concrete form bags and metal mesh to form a mesh mold construction structure during the construction of the surrounding rock of the tunnel, the problems of rebound and collapse of shotcrete are solved, construction costs and waste are reduced, and the construction process is simplified and adaptable. .

CN118728434APending Publication Date: 2024-10-01HAINAN UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411083480.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The shotcrete in the early stages of tunnel surrounding rock construction rebounded and collapsed due to construction disturbance, resulting in a large amount of waste and increasing project costs.

Method used

A flexible concrete form bag is used as the concrete formwork, and a metal mesh is set inside and outside the mold bag and fixed with anchor rods to form a mesh molding structure to reduce the rebound of shotcrete.

Benefits of technology

It effectively solves the problems of shotcrete collapse and rebound, reduces construction consumables and costs, and has simple construction technology and strong adaptability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728434A_ABST
    Figure CN118728434A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tunnel surrounding rock supporting, and discloses a net mold arch building structure for surrounding rock primary supporting and a construction method.The net mold arch building structure for surrounding rock primary supporting comprises anchor rods, a metal net, concrete mold bags, a steel arch and backfill concrete.The multiple concrete mold bags are arranged between the anchor rods and the steel arch in an array mode; metal nets are arranged on the inner side and the outer side of the concrete mold bag, the concrete mold bag and the metal nets are anchored to surrounding rock through anchor rods, and the metal net relatively far away from the surrounding rock is connected with the steel arch. A mold bag grouting opening is formed in the side, relatively away from the surrounding rock, of the concrete mold bag, mold bag concrete is poured in the concrete mold bag, and backfill concrete is filled between the concrete mold bag and the surrounding rock at the overbreak position of the surrounding rock. A concrete mold bag is used as a concrete formwork, mold bag concrete is restrained through the concrete mold bag and a metal net, the problems of spallation and springback of sprayed concrete are solved, construction consumables and cost are reduced, the construction technology is simple, and adaptability is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tunnel surrounding rock support, and more specifically, to a mesh formwork structure for initial surrounding rock support. In addition, the present invention also provides a construction method for the mesh formwork structure for initial surrounding rock support. Background Art

[0002] In the initial stage of tunnel surrounding rock construction, anchor rods, steel arch frames and shotcrete are mainly used for reinforcement and support. Among them, shotcrete is the key process to construct the exposed surrounding rock and steel arch frame and other support units into a whole.

[0003] However, due to the influence of tunnel face blasting and its construction disturbance, the shotcrete will still be affected by vibration and rebound and fall. According to statistics from actual engineering practice, the rebound of shotcrete is as high as 40-50%. Even if the rebound of shotcrete is reduced by adding fibers or accelerators, the minimum rebound of shotcrete can still reach 25%, causing a large amount of shotcrete to collapse and waste, increasing the cost of engineering construction and leading to the generation of a large amount of waste concrete.

[0004] In summary, how to further reduce the rebound of shotcrete is a problem that needs to be solved urgently by those skilled in the art. Summary of the invention

[0005] In view of this, the purpose of the present invention is to provide a mesh formwork structure for initial support of surrounding rock, which uses a flexible concrete mold bag as a concrete template, and utilizes the concrete mold bag and metal meshes on both sides to constrain the mold bag concrete, thereby solving the collapse and rebound problems of shotcrete, reducing construction consumables and costs, and having a simple construction process and strong adaptability.

[0006] In addition, the present invention also provides a construction method for the mesh formwork structure used for the initial support of surrounding rock.

[0007] In order to achieve the above object, the present invention provides the following technical solutions:

[0008] A mesh formwork arch structure for initial support of surrounding rock, comprising anchor rods, metal mesh, concrete mold bags, steel arch frames and backfill concrete, wherein a plurality of concrete mold bags are arranged in an array between the surrounding rock and the steel arch frames, the metal mesh is arranged on both the inner and outer sides of the concrete mold bags, the concrete mold bags and the metal mesh are anchored on the surrounding rock by the anchor rods, and the metal mesh relatively far from the surrounding rock is connected to the steel arch frames;

[0009] A mold bag grouting port is provided on a side of the concrete mold bag relatively far from the surrounding rock. The mold bag concrete is poured in the concrete mold bag, and the backfill concrete is filled in the over-excavation of the surrounding rock and between the concrete mold bag and the surrounding rock.

[0010] Preferably, any two adjacent concrete mold bags are connected, and the mold bag grouting ports are evenly arranged along the axial direction of the tunnel.

[0011] Preferably, the concrete mold bag is provided with steel bar mounting holes at both ends in the axial direction of the tunnel, the steel bar mounting holes at both ends of the concrete mold bag are arranged in one-to-one correspondence, and a sleeve for installing longitudinal steel bars is provided between the steel bar mounting holes at both ends of the concrete mold bag.

[0012] Preferably, the sleeves are evenly distributed on the concrete mold bag along the circumferential direction of the tunnel, and the sleeves and the concrete mold bag are an integral structure.

[0013] Preferably, the circumferential length of the concrete mold bag is the same as the arc length of the tunnel vault, the axial length of the concrete mold bag is 1.0-1.5m, and the thickness of the concrete mold bag is 25-30cm.

[0014] Preferably, the anchor rods are evenly arranged along the axial direction of the tunnel, and the axial distance between two adjacent anchor rods is smaller than the axial length of the concrete mold bag.

[0015] Preferably, the axial distance between any two adjacent steel arch frames is smaller than the axial length of the concrete mold bag, and the steel arch frame is not arranged at the connection between two adjacent concrete mold bags.

[0016] A construction method, used for any of the above-mentioned mesh formwork structure for initial support of surrounding rock, comprising:

[0017] According to the design size of the mesh formwork structure, the tunnel surrounding rock is laid out for construction;

[0018] Laying a metal mesh and a concrete mold bag, and fixing the metal mesh and the concrete mold bag with anchor rods;

[0019] Install steel arches and longitudinal reinforcement;

[0020] Inject grout into the concrete mold bag through the mold bag grouting port to pour the mold bag concrete;

[0021] Pressing to adjust the surface shape of the concrete mold bag;

[0022] After the water-permeable and impermeable slurry of the mold bag concrete is solidified, holes are drilled at the over-excavation of the surrounding rock to cast backfill concrete.

[0023] Preferably, the laying of the metal mesh and the concrete mold bag, and fixing the metal mesh and the concrete mold bag with anchor rods, comprises:

[0024] Drill holes on the surrounding rock surface and fill the holes with anchoring agents;

[0025] The metal mesh is arranged on both sides of the concrete mold bag, and the anchor rod is passed through the metal mesh holes of the metal mesh, the anchor rod installation hole of the concrete mold bag and the metal mesh holes of the metal mesh in sequence and then anchored on the surrounding rock.

[0026] Preferably, the type of the mold bag concrete and the type of the backfill concrete are the same, and both are FRP concrete.

[0027] The mesh formwork structure for initial support of surrounding rock provided by the present invention utilizes a flexible concrete mold bag as a concrete template, and constructs it into a mesh formwork structure with a specific shape and strength by injecting concrete into the concrete mold bag. Compared with the traditional shotcrete structure, it not only meets the support strength requirements, but the concrete mold bag and the metal meshes on both sides can play a significant restraining role on the mold bag concrete, and fundamentally solves the collapse and rebound problems of shotcrete, reduces construction consumables and costs, and has a simple construction process and strong adaptability.

[0028] In addition, the present invention also provides a construction method of a mesh formwork structure for initial support of the surrounding rock. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0030] Figure 1 A structural schematic diagram of a specific embodiment of a mesh formwork arch structure for initial surrounding rock support provided by the present invention;

[0031] Figure 2 for Figure 1 A cross-sectional schematic diagram of

[0032] Figure 3 for Figure 1 Schematic diagram of the longitudinal section.

[0033] Figure 1-Figure 3 middle:

[0034] 1-anchor rod; 2-metal mesh; 3-concrete mold bag; 31-mold bag grouting port; 4-mold bag concrete; 5-longitudinal steel bar; 6-steel arch frame; 7-backfill concrete. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] The core of the present invention is to provide a mesh formwork structure for initial support of surrounding rock, using a flexible concrete mold bag as a concrete template, and utilizing the concrete mold bag and metal meshes on both sides to constrain the mold bag concrete, thereby solving the collapse and rebound problems of shotcrete, reducing construction consumables and costs, and having a simple construction process and strong adaptability.

[0037] In addition, the present invention also provides a construction method for the mesh formwork structure used for the initial support of surrounding rock.

[0038] The mesh formwork structure for initial support of surrounding rock provided by the present invention comprises an anchor rod 1, a metal mesh 2, a concrete mold bag 3, a steel arch frame 6 and backfill concrete 7. A plurality of concrete mold bags 3 are arranged in an array between the surrounding rock and the steel arch frame 6. Metal meshes 2 are arranged on both the inner and outer sides of the concrete mold bag 3. The concrete mold bag 3 and the metal mesh 2 are anchored on the surrounding rock by the anchor rod 1. The metal mesh 2 relatively far away from the surrounding rock is connected to the steel arch frame 6.

[0039] A grouting port 31 is provided on the side of the concrete mold bag 3 relatively far from the surrounding rock. The mold bag concrete 4 is poured in the concrete mold bag 3, and backfill concrete 7 is filled in the over-excavation of the surrounding rock and between the concrete mold bag 3 and the surrounding rock.

[0040] It should be noted that the metal mesh 2 relatively far away from the surrounding rock refers to the metal mesh 2 located on the side of the concrete mold bag 3 relatively far away from the surrounding rock.

[0041] Among them, the concrete mold bag 3 is used to pour concrete slurry to form mold bag concrete 4, and then form a mesh mold building structure with the mold bag concrete 4 as the main component; the concrete mold bag 3 can restrain the surface of the mold bag concrete 4, thereby preventing the concrete mold bag 3 from collapsing and rebounding under the influence of the vibration of the face construction.

[0042] The material of the concrete mold bag 3 is determined according to the actual construction needs. It needs to have a certain elasticity to ensure the restraining effect of the concrete mold bag 3 on the mold bag concrete 4, and it needs to have sufficient bearing capacity to prevent the concrete mold bag 3 from being unable to withstand the mass of the concrete slurry. It also needs to have stable chemical properties to prevent the concrete mold bag 3 from reacting with the concrete slurry and causing the concrete mold bag 3 to dissolve.

[0043] The size of the concrete mold bag 3 will not only affect the flow state of the concrete slurry in the concrete mold bag 3, but also affect the construction process of the mesh mold building structure;

[0044] In order to facilitate the laying of the concrete mold bag 3, the circumferential length of the concrete mold bag 3 is usually set to be the same as the arc length of the tunnel arch. Therefore, only one concrete mold bag 3 is provided in the mesh mold structure on the tunnel cross-section. Compared with splicing two or more concrete mold bags 3, the process of adjusting the circumferential position of each concrete mold bag 3 is omitted, which is conducive to simplifying the construction process and improving construction efficiency.

[0045] Taking into account factors such as the pouring effect of the mold bag concrete 4, the axial length of the concrete mold bag 3 is usually set to 1.0-1.5m, and the thickness of the concrete mold bag 3 is 25-30cm. This can not only ensure the flow of concrete slurry in a single concrete mold bag 3 to ensure the pouring quality of the mold bag concrete 4, but also help to reduce the total number of concrete mold bags 3 in the mesh mold building structure, and facilitate the laying and fixing of the concrete mold bags 3.

[0046] In order to enhance the strength of the concrete mold bag 3, metal meshes 2 are provided on the inner and outer sides of the concrete mold bag 3, i.e., the side of the concrete mold bag 3 relatively close to the surrounding rock and the side relatively far away from the surrounding rock. The metal meshes 2 can not only enhance the strength of the concrete mold bag 3 as a concrete formwork, but also enhance the restraint ability of the concrete mold bag 3 on the mold bag concrete 4.

[0047] The specific dimensions of the metal mesh 2, such as the wire diameter and the aperture of the metal mesh, are determined according to the type and size of the tunnel surrounding rock in actual construction, combined with the material and size of the concrete mold bag 3, and will not be repeated here.

[0048] In order to fix the position of the concrete mold bag 3 and prevent it from shifting during the concrete pouring process, the concrete mold bag 3 and the metal mesh 2 are anchored to the surrounding rock by anchor rods 1. The specific type and model of the anchor rods 1 need to be determined according to the type of tunnel surrounding rock in actual construction, and the number and distribution of the anchor rods 1 are determined according to the size of the tunnel surrounding rock in actual construction.

[0049] It should be noted that the concrete mold bag 3 is provided with an anchor rod mounting hole, and both ends of the anchor rod mounting hole are connected to the mold bag body of the concrete mold bag 3 to ensure the sealing of the concrete mold bag 3 and prevent leakage of mortar at the connection.

[0050] In order to support the mold bag concrete 4 in the concrete mold bag 3 and make the thickness of the mold bag concrete 4 relatively uniform, a steel arch frame 6 is provided on the side of the concrete mold bag 3 relatively far away from the surrounding rock. The steel arch frame 6 is connected to the metal mesh 2 located on the side of the concrete mold bag 3 relatively far away from the surrounding rock. The two are usually connected by steel wire binding or welding.

[0051] Taking into account the problem of over-excavation of surrounding rock in actual construction, in order to ensure the stability and reliability of the connection between the mesh formwork structure and the surrounding rock, backfill concrete 7 is filled and poured in the over-excavation of the surrounding rock; in order to avoid obvious stratification between the formwork bag concrete 4 and the backfill concrete 7, which affects the bonding performance between the two, the type of backfill concrete 7 is usually set to be the same as that of the formwork bag concrete 4.

[0052] In this embodiment, a flexible concrete mold bag 3 is used as a concrete formwork. Concrete is injected into the concrete mold bag 3 to construct it into a mesh mold structure with a specific shape and strength. Compared with the traditional shotcrete structure, it not only meets the support strength requirements, but the concrete mold bag 3 and the metal mesh 2 on both sides can play a significant restraining role on the mold bag concrete 4. It also fundamentally solves the collapse and rebound problems of shotcrete, reduces construction consumables and costs, and has a simple construction process and strong adaptability.

[0053] In order to facilitate the pouring of concrete slurry, a mold bag grouting port 31 is required to be provided on the side of the concrete mold bag 3 relatively far away from the surrounding rock, and the concrete slurry is poured into the concrete mold bag 3 through the mold bag grouting port 31; the specific shape of the mold bag grouting port 31 is not limited, and can refer to the pouring hole setting on the concrete template.

[0054] In order to reduce the number of mold bag grouting ports 31 and facilitate the concrete pouring process, preferably, any two adjacent concrete mold bags 3 can be arranged to be connected, and the mold bag grouting ports 31 are evenly arranged along the axial direction of the tunnel.

[0055] Therefore, when the pouring quality of the mold bag concrete 4 allows, the mold bag grouting port 31 can be set only on part of the concrete mold bag 3, without setting the mold bag grouting port 31 on all the concrete mold bags 3, which not only reduces the cost of the concrete mold bag 3, but also facilitates the pouring process.

[0056] In order to enhance the strength of the mesh formwork structure, longitudinal steel bars 5 are provided along the tunnel extension direction. The number, material, type and size of the longitudinal steel bars 5 are determined according to the designed compressive strength of the mesh formwork structure in actual construction.

[0057] In order to prevent the longitudinal steel bars 5 from shifting during the pouring of the mold bag concrete 4, the concrete mold bag 3 is provided with steel bar mounting holes at both ends in the axial direction of the tunnel. The steel bar mounting holes at both ends of the concrete mold bag 3 are arranged one by one, and a sleeve for installing the longitudinal steel bars 5 is provided between the steel bar mounting holes at both ends of the concrete mold bag 3.

[0058] The number, size and distribution of the sleeves are determined according to the number, size and distribution of the longitudinal steel bars 5 in actual construction. In order to ensure that the compressive load strength of the mesh formwork structure in all directions is relatively uniform, the longitudinal steel bars 5 are usually arranged to be evenly distributed along the axial direction of the tunnel. Therefore, the sleeves are evenly distributed on the concrete formwork bag 3 along the axial direction of the tunnel.

[0059] The sleeve is connected to the concrete mold bag 3 through the steel bar installation holes at both ends, which ensures the sealing performance of the concrete mold bag 3 and can significantly reduce the risk of leakage during concrete pouring, which not only facilitates the construction of the mesh mold building structure, but also helps to reduce the waste of concrete and reduce construction costs;

[0060] The sleeve can be connected to the mold bag body of the concrete mold bag 3 by sewing or bonding, or the sleeve and the mold bag body of the concrete mold bag 3 can be set as an integrated structure. The two are integrally formed, which can better avoid the problem of slurry leakage at the connection.

[0061] It should be noted that the material of the sleeve can be the same as that of the concrete mold bag 3, or it can be different from the material of the concrete mold bag 3. However, when the sleeve is integrally formed with the concrete mold bag 3, the material of the sleeve is usually set to be the same as that of the concrete mold bag 3 to reduce the process difficulty and cost.

[0062] In order to ensure the fixing effect of the anchor rod 1 on the concrete mold bag 3, the anchor rods 1 are usually arranged evenly along the axial direction of the tunnel, and the axial distance between two adjacent anchor rods 1 is less than the axial length of the concrete mold bag 3, so that one concrete mold bag 3 is fixed by at least one anchor rod 1 in the axial direction of the tunnel;

[0063] Of course, according to the axial length of the concrete mold bag 3 in actual construction, when the axial length of the concrete mold bag 3 is large, the number of anchor rods 1 can be appropriately increased to stably fix the concrete mold bag 3.

[0064] In order to ensure the supporting effect of the steel arch frame 6 on the concrete mold bag 3, the axial distance between any two adjacent steel arch frames 6 must be smaller than the axial length of the concrete mold bag 3, and the steel arch frame 6 is usually not arranged at the connection between two adjacent concrete mold bags 3.

[0065] To facilitate the erection of the steel arch frames 6, it is preferred to arrange the steel arch frames 6 to be evenly distributed along the axial direction of the tunnel. The spacing of the steel arch frames 6, the axial distance between the initial steel arch frame 6 farthest from the tunnel face and the concrete mold bag 3, etc., all need to be determined based on the length of the concrete mold bag 3 in actual construction. While ensuring the supporting effect of the steel arch frames 6 on the concrete mold bag 3, the number of steel arch frames 6 is reduced to facilitate construction and reduce costs.

[0066] In addition to the mesh formwork structure for initial surrounding rock support, the present invention also provides a construction method for the mesh formwork structure for initial surrounding rock support disclosed in the above embodiment, the construction method comprising:

[0067] Step S1, constructing the tunnel surrounding rock according to the design size of the mesh formwork structure;

[0068] Step S2, laying the metal mesh 2 and the concrete mold bag 3, and fixing the metal mesh 2 and the concrete mold bag 3 with the anchor rod 1;

[0069] Step S3, installing the steel arch frame 6 and the longitudinal reinforcement 5;

[0070] Step S4, injecting grout into the concrete mold bag 3 through the mold bag grouting port 31 to pour the mold bag concrete 4;

[0071] Step S5, pressing to adjust the surface shape of the concrete mold bag 3;

[0072] Step S6, after the water-permeable and impermeable slurry of the mold bag concrete 4 solidifies, holes are drilled at the over-excavation of the surrounding rock to cast backfill concrete 7.

[0073] It should be explained in step S2 that the metal mesh 2 can be only arranged on the side of the concrete mold bag 3 relatively close to the surrounding rock and relatively far from the surrounding rock, or it can cover the concrete mold bag 3 to form a metal mesh cage structure.

[0074] Preferably, step S2 further comprises:

[0075] Drill holes on the surrounding rock surface and fill the holes with anchoring agents;

[0076] Metal mesh 2 is arranged on both sides of the concrete mold bag 3, and the anchor rod 1 is passed through the metal mesh holes of the metal mesh 2, the anchor rod installation hole of the concrete mold bag 3 and the metal mesh holes of the metal mesh 2 in sequence and then anchored on the surrounding rock.

[0077] It is necessary to explain step S3 that the steel arch frame 6 is connected to the metal mesh 2 relatively far away from the surrounding rock so as to support the metal mesh 2 and the concrete mold bag 3; the longitudinal steel bars 5 are arranged in the concrete mold bag 3, and the longitudinal steel bars 5 are arranged along the axial direction of the tunnel to enhance the compressive strength of the mold bag concrete 4.

[0078] It is necessary to explain step S5 that when the mold bag concrete 4 is not solidified, since the concrete mold bag 3 and the concrete slurry are both flexible structures, the distribution of the concrete slurry in the concrete mold bag 3 can be adjusted by pressing the outer surface of the concrete mold bag 3 relatively away from the surrounding rock, so that the concrete slurry is relatively evenly distributed in the concrete mold bag 3, and the thickness of the mold bag concrete 4 formed by pouring is relatively uniform.

[0079] It is necessary to explain step S6 that after the water-permeable and impermeable slurry of the mold bag concrete 4 solidifies, the pouring of backfill concrete 7 between the mold bag concrete 4 and the over-excavated surrounding rock can not only utilize the mold bag concrete 4 as a pouring template for the backfill concrete 7, but also ensure the bonding effect and bonding strength between the mold bag concrete 4 and the backfill concrete 7.

[0080] Preferably, the type of the mold bag concrete 4 and the type of the backfill concrete 7 can be the same, and both are set to FRP (Fiber Reinforced Plastic, fiber reinforced polymer composite material) concrete, and composite fiber is added to the concrete to enhance the strength and durability of the concrete.

[0081] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0082] The mesh formwork structure and construction method for initial surrounding rock support provided by the present invention are introduced in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present invention, several improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

Claims

1. A mesh formwork structure for initial support of surrounding rock, characterized in that: It comprises an anchor rod (1), a metal mesh (2), a concrete mold bag (3), a steel arch frame (6) and backfill concrete (7), wherein a plurality of concrete mold bags (3) are arranged in an array between the surrounding rock and the steel arch frame (6), the metal mesh (2) is arranged on both the inner and outer sides of the concrete mold bag (3), the concrete mold bag (3) and the metal mesh (2) are anchored to the surrounding rock by the anchor rod (1), and the metal mesh (2) which is relatively far from the surrounding rock is connected to the steel arch frame (6); A mold bag grouting port (31) is provided on a side of the concrete mold bag (3) relatively far from the surrounding rock, and mold bag concrete (4) is poured into the concrete mold bag (3), and the backfill concrete (7) is filled between the concrete mold bag (3) and the surrounding rock at the over-excavation of the surrounding rock.

2. The mesh formwork structure for initial surrounding rock support according to claim 1 is characterized in that: Any two adjacent concrete mold bags (3) are connected, and the mold bag grouting ports (31) are evenly arranged along the axial direction of the tunnel.

3. The mesh formwork structure for initial surrounding rock support according to claim 1 is characterized in that: The concrete mold bag (3) is provided with steel bar installation holes at both ends in the tunnel axial direction, the steel bar installation holes at both ends of the concrete mold bag (3) are arranged in a one-to-one correspondence, and a sleeve for installing longitudinal steel bars (5) is provided between the steel bar installation holes at both ends of the concrete mold bag (3).

4. The mesh formwork structure for initial surrounding rock support according to claim 3 is characterized in that: The sleeves are evenly distributed on the concrete mold bag (3) along the circumferential direction of the tunnel, and the sleeves and the concrete mold bag (3) are an integrated structure.

5. The mesh formwork structure for initial surrounding rock support according to any one of claims 1 to 4, characterized in that: The circumferential length of the concrete mold bag (3) is the same as the arc length of the tunnel vault, the axial length of the concrete mold bag (3) is 1.0-1.5 m, and the thickness of the concrete mold bag (3) is 25-30 cm.

6. The mesh formwork structure for initial surrounding rock support according to any one of claims 1 to 4, characterized in that: The anchor rods (1) are evenly arranged along the axial direction of the tunnel, and the axial distance between two adjacent anchor rods (1) is smaller than the axial length of the concrete mold bag (3).

7. The mesh formwork structure for initial surrounding rock support according to any one of claims 1 to 4, characterized in that: The axial distance between any two adjacent steel arch frames (6) is smaller than the axial length of the concrete mold bag (3), and the steel arch frame (6) is not provided at the connection between two adjacent concrete mold bags (3).

8. A construction method for the mesh formwork structure for initial surrounding rock support as claimed in any one of claims 1 to 7, characterized in that: include: According to the design size of the mesh formwork structure, the tunnel surrounding rock is laid out for construction; Laying a metal mesh (2) and a concrete mold bag (3), and fixing the metal mesh (2) and the concrete mold bag (3) using anchor rods (1); Install the steel arch (6) and the longitudinal reinforcement (5); Injecting grout into the concrete mold bag (3) through the mold bag grouting port (31) to pour the mold bag concrete (4); Pressing to adjust the surface shape of the concrete mold bag (3); After the water-permeable and impermeable slurry of the mold bag concrete (4) solidifies, holes are drilled at the over-excavated part of the surrounding rock to cast backfill concrete (7).

9. The construction method according to claim 8, characterized in that: The laying of the metal mesh (2) and the concrete mold bag (3), and fixing the metal mesh (2) and the concrete mold bag (3) by using anchor rods (1), comprises: Drill holes on the surrounding rock surface and fill the holes with anchoring agents; The metal mesh (2) is arranged on both sides of the concrete mold bag (3), and the anchor rod (1) is passed through the metal mesh holes of the metal mesh (2), the anchor rod installation holes of the concrete mold bag (3) and the metal mesh holes of the metal mesh (2) in sequence and then anchored on the surrounding rock.

10. The construction method according to claim 8, characterized in that: The type of the mold bag concrete (4) is the same as the type of the backfill concrete (7), and both are FRP concrete.