Power generation type gas turbine control system working condition adjusting test method based on HIL
By using HIL technology in the power generation gas turbine control system to simulate load changes under different operating conditions and conduct comprehensive control strategies and parameter tests, the shortcomings of existing semi-physical simulation tests under complex load changes are solved and efficient Working condition adjustment test reduces safety risks and test time, and improves test efficiency.
Patent Information
- Application Number
- CN202410860751.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-01
AI Technical Summary
Existing semi-physical simulation tests cannot fully test the functions and performance of the control system under complex load changes of power generation gas turbines, leading to problems such as parameter swings and overshoots. The tests are also risky, time-consuming, and low-efficiency.
The HIL-based power generation gas turbine control system working condition adjustment test method is used to simulate different working conditions by setting the slope and step signal of the load power. Combined with the HIL equipment and digital electronic control cabinet, a comprehensive control strategy and parameter test is carried out, including normal Simulation verification of loading, sudden load increase, normal load reduction, sudden load reduction and emergency load unloading.
It achieves efficient and comprehensive verification of the control system, reduces the safety risks of the entire machine operation, avoids the high risks of semi-physical tests, shortens the test time, improves the test efficiency, and can complete all tests in one test. Early Discover problems and avoid control risks in actual commissioning.
Smart Images

Figure CN118732660A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of power generation type gas turbine control systems, and in particular, relates to a HIL-based power generation type gas turbine control system operating condition adjustment test method. Background Art
[0002] As an important power device, gas turbines compress air through compressors and then enter combustion chambers to fully burn with fuel, generating high-temperature gas that impacts turbine blades, causing the turbine to rotate at high speed to generate energy. Compared with diesel engines and steam turbines, gas turbines are small in size, quick to start, and easy to maintain. Power generation gas turbines can provide power security.
[0003] Power generation gas turbines usually have high requirements for overall maneuverability and need to achieve stability of required operating conditions in the shortest time. Therefore, the control system of the gas turbine must have the ability to enable the gas turbine to operate accurately, reliably and stably according to the control plan under various operating conditions. Faced with the random and complex load adjustment of power generation gas turbines under various operating conditions, such as normal loading, sudden load increase, normal load reduction, sudden load reduction, emergency sudden load unloading, etc., the control system has designed a matching control strategy to achieve the stable control goal of fast speed response and small overshoot.
[0004] If the control system cannot adopt matching strategies in time when responding to various changes in load, it may cause the engine to overheat, overspeed, and other conditions that affect engine safety, or the response speed is too slow to meet the requirements. In order to ensure that the engine can respond quickly and operate stably when the load changes suddenly while meeting safety requirements, it is very necessary to carry out control system simulation verification before the gas turbine whole machine test.
[0005] The simulation test of gas turbine control system generally adopts semi-physical simulation test. Semi-physical simulation test refers to the joint simulation of real-time mathematical simulation and physical simulation by introducing a part of the simulated system (including controller, actuator, sensor, etc.) into the simulation loop in a physical way according to the simulation research content, and describing the rest of the simulated system with mathematical model.
[0006] The current semi-physical test scheme does not take into account the complex changes in the load and cannot fully test the functions and performance of the control system under test conditions, resulting in various problems such as parameter swing and overshoot during the operation of the whole machine.
[0007] This patent designs a hardware-in-the-loop (HIL) simulation test method for the complex changes in the load characteristics of power generation gas turbines, conducts more complete tests on control strategies and control parameters, fully plays the role of test verification, and reduces the safety risks of the entire machine operation.
[0008] Disadvantages of the existing technical solutions:
[0009] a) The verification of operating condition regulation control is insufficient. The semi-physical simulation test mainly verifies all functional items of the system composed of a digital electronic control cabinet, a fuel control device, a gear pump, a guide vane control device, sensors, etc. It mainly verifies control functions such as cold operation, oil seal unsealing control, cleaning control, starting control, stopping control, alarm control, etc. Although it also conducts functional verification on operating condition regulation, it does not design to carry out full operating condition test verification;
[0010] b) The test risk is relatively high. The semi-physical simulation test needs to introduce physical objects such as the fuel system and the test system into the simulation loop. When conducting simulation verification of sudden load increase and sudden load shedding, the safety requirements for the fuel system are relatively high, and the test risk is relatively high;
[0011] c) The test takes a long time and has low efficiency. To conduct one test, all physical objects need to be combined with the simulation system. It is necessary to drive the gear pump with a motor and supply fuel. There are many tools required for the test, and the time taken to simulate the start-up of a gas turbine is relatively long, and the test procedure is cumbersome. Summary of the Invention
[0012] To solve the above problems, the present application provides a method for testing the operating condition regulation of a power generation gas turbine control system based on HIL, including:
[0013] Step S1: Set the control mode of the gas turbine model as feedforward control. In its steady-state power generation mode, set the load power P of the load system model to increase to p MW at a ramp signal of m MW / s, for simulating the normal loading mode; where, 0 < m < a, and a is the minimum power value per second for sudden load increase set in the control plan;
[0014] Step S2: Set the load power P to increase from p MW to full load in a step signal; for simulating entering the sudden load increase mode;
[0015] Step S3: Set the load power P to decrease to q MW at a ramp signal of -n MW / s, for simulating entering the normal load reduction mode, where, 0 < n < c, and c is the minimum power value per second for sudden load reduction set in the control plan;
[0016] Step S4: Set the load power P to decrease to u MW at a ramp signal of -k MW / s, for simulating entering the sudden load reduction mode, where, c < k < d, and d is the minimum power value per second for emergency sudden load shedding set in the control plan;
[0017] Step S5: Set the load power P to decrease from u MW to no-load in a step signal, for simulating entering the emergency sudden load shedding mode; where, b is the minimum power value per second for emergency sudden load shedding set in the control plan;
[0018] Step S6: setting the control mode of the gas turbine model to oil-gas ratio control, setting the diffuser outlet pressure P31 signal fault injection, and setting the load power P to increase from no-load to aMW with a step signal to simulate entering a sudden load increase mode;
[0019] Step S7: restore the diffuser outlet pressure P31 signal, and set the load power P to increase from aMW to full load in a step signal;
[0020] Step S8: setting the diffuser outlet pressure P31 signal fault injection, setting the load power P to decrease from -kMW / s to sMW with a ramp signal, for simulating entering a sudden load reduction mode;
[0021] Step S9: Restore the diffuser outlet pressure P31 signal, set the load power P to decrease from sMW to no-load with a step signal, to simulate entering an emergency sudden load unloading mode, where p, q, u, s are set numerical powers greater than the no-load power and less than the full-load power.
[0022] Preferably, the HIL test system includes: HIL equipment, a digital electronic control cabinet connected to the HIL equipment, and a monitoring host computer connected to the digital electronic control cabinet; wherein the HIL equipment includes a gas turbine model, a load system model, and a fault simulation device; the load system model loads the gas turbine model, and the fault simulation device sends fault instructions to the gas turbine model and the load system model.
[0023] Preferably, after each step, a check is performed to check whether the control effect and the related flag word are established.
[0024] Preferably, in step S2, the load power P is set to increase in sequence from pMW to (p+a)MW, (p+a+a+1)MW, (p+a+a+1+a+2)MW, (p+a+a+1+a+2+a+3)MW, ... until full load with a step signal.
[0025] Preferably, in step S5, the load power P is set to decrease from uMW to (ub)MW, (ubb-1)MW, (ubb-1-b-2)MW, (ubb-1-b-2-b-3), ..., with a step signal until it is reduced to no-load.
[0026] Preferably, step S7 specifically includes: restoring the diffuser outlet pressure P31 signal, setting the load power P to increase in a step signal from aMW to (a+a)MW, (a+a+a+1)MW, (a+a+a+1+a+2), (a+a+a+1+a+2+a+3), ... until full load.
[0027] Preferably, step S9 specifically includes: restoring the diffuser outlet pressure P31 signal, setting the load power P to decrease from sMW to (sb)MW, (sbb-1)MW, (sbb-1-b-2)MW, (sbb-1-b-2-b-3), ... in a step signal until it is reduced to no load.
[0028] The advantages of the present application include: the HIL-based gas turbine control system operating condition adjustment test design method described in the present invention comprehensively considers the operation mode, control strategy, fault simulation, load simulation, etc. to design the operating condition adjustment test verification method, which not only avoids the high risk of semi-physical physical tests, but also can perform efficient and comprehensive verification of the controller under various operating conditions. The test efficiency is high, all tests can be completed in one test, problems can be discovered at an early stage, and control risks can be avoided during actual test runs. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 This is a test flow chart of a preferred embodiment of the present application;
[0030] Figure 2 This is a composition diagram of a HIL test system in a preferred embodiment of the present application;
[0031] Figure 3 This is a test timing diagram of a preferred embodiment of the present application. DETAILED DESCRIPTION
[0032] In order to make the technical solution and advantages of the present application clearer, the technical solution of the present application will be further described in detail in detail and in detail in conjunction with the accompanying drawings. It can be understood that the specific embodiments described here are only partial embodiments of the present application, which are only used to explain the present application, not to limit the present application. It should be noted that, for the convenience of description, only the parts related to the present application are shown in the accompanying drawings, and other related parts can refer to the general design. In the absence of conflict, the embodiments in the present application and the technical features in the embodiments can be combined with each other to obtain new embodiments.
[0033] like Figure 1-Figure 3 As shown,
[0034] a) HIL test system composition
[0035] The HIL test system consists of Figure 1As shown, the model machine runs the engine model, sensor and actuator model to obtain the performance parameters of the gas turbine such as speed, temperature and pressure, which are collected by the control cabinet, calculated according to the prescribed control law and control plan, and output the fuel system flow signal to the model machine to realize the closed-loop operation simulation of the control system in the hardware in-loop test environment. Through the upper computer of the digital electronic control cabinet, the command is output to the digital electronic control cabinet to control the normal start of the gas turbine model, and the throttle lever is used to control the gas turbine model to gradually increase to the synchronous slow speed; the load system model is manually controlled by the state control device to realize the addition and subtraction of the load on the gas turbine.
[0036] b) Load power introduction method
[0037] After the gas turbine is connected to the grid, it is in the power generation state. According to the different changes in the load system, it is divided into loading and unloading. Among them, according to the different speeds of load change, loading can be divided into normal loading and sudden load increase; load unloading can be divided into normal load reduction, sudden load reduction, and emergency sudden load unloading.
[0038] The inputs of the gas turbine model are generally fuel flow, inlet temperature, inlet pressure, moment of inertia, torque, etc. The magnitude of the torque is affected by the load power, and the formula is as follows:
[0039] T=9549*P / n.
[0040] In the above formula, T is the torque, P is the electrical load power, and n is the gas turbine speed.
[0041] That is, the input of the load model is the electric load power P, and the output (that is, the input of the gas turbine model) is the torque T.
[0042] The way to simulate gas turbine load addition and reduction is to set the given power P as a step signal or a ramp signal. The ramp signal can simulate normal loading, normal load reduction, and sudden load reduction of the load system by setting different starting values, end values, and rising / falling times, while the step signal can simulate sudden load increase and emergency load unloading of the gas turbine.
[0043] c) Experimental design method
[0044] In order to ensure the stability of gas turbine control, the control system usually sets a variety of control modes for selection. The most common control methods for power generation gas turbines when the load changes suddenly are feedforward control and oil-gas ratio control. Among them, feedforward control introduces feedforward regulation on the basis of cascade control to reduce the speed fluctuation caused by load changes, and oil-gas ratio control is controlled according to the power-speed-fuel supply relationship characteristics of the gas turbine.
[0045] The purpose of conducting simulation tests is to ensure that the control strategies under various control modes can be verified, so each control mode should be designed and verified one by one. The design test process is as follows:
[0046] 1) Set the control mode to feedforward control. In the steady-state mode of the power generation state, set the load power P to increase to p MW at a ramp signal of m MW / s (0 < m < a, where a is the minimum power increase per second set in the control plan to meet the sudden load increase), enter the normal loading mode, and check whether the speed closed-loop control effect and the relevant flag words are established;
[0047] 2) Set the load power P to increase step by step from p MW to (p + a) MW, (p + a + a + 1) MW, (p + a + a + 1 + a + 2) MW, (p + a + a + 1 + a + 2 + a + 3) MW, …, until the full load. Enter the sudden load increase mode, check whether the speed closed-loop control effect and the relevant flag words are established, so as to explore the maximum sudden load power value that will not cause an emergency stop under the feedforward control mode during the HIL test, and provide a reference basis for the subsequent overall machine test design;
[0048] 3) Set the load power P to decrease to q MW at a ramp signal of -n MW / s (0 < n < c, where c is the minimum power decrease per second set in the control plan to meet the sudden load decrease), enter the normal load reduction mode, and check whether the speed closed-loop control effect and the relevant flag words are established;
[0049] 4) Set the load power P to decrease to u MW at a ramp signal of -k MW / s (c < k < d, where d is the minimum power per second set in the control plan to meet the emergency sudden load unloading), enter the sudden load decrease mode, and check whether the speed closed-loop control effect and the relevant flag words are established;
[0050] 5) Set the load power P to decrease step by step from u MW to (u - b) MW, (u - b - b - 1) MW, (u - b - b - 1 - b - 2) MW, (u - b - b - 1 - b - 2 - b - 3), …, until it reaches no load (b is the minimum power decrease per second set in the control plan to meet the emergency sudden load unloading). Enter the emergency sudden load unloading mode, check whether the speed closed-loop control effect and the relevant flag words are established, so as to explore the maximum critical power value of the emergency sudden load unloading that will not cause an emergency stop under the feedforward control mode during the HIL test, and provide a reference basis for the subsequent overall machine test design;
[0051] 6) Set the control mode to air-fuel ratio control, set the fault injection of the diffuser outlet pressure P31 signal, and set the load power P to increase from no load to a MW at a step signal. Enter the sudden load increase mode, and check whether the current control effect and the relevant flag words are established, so as to verify the influence of the P31 pressure signal fault on the control mode and the control effect;
[0052] 7) Restore the P31 pressure signal, set the load power P to increase in a step signal from aMW to (a+a)MW, (a+a+a+1)MW, (a+a+a+1+a+2), (a+a+a+1+a+2+a+3), ..., until full load, check the control effect and whether the flag words of each control mode are established, so as to find out the maximum state value of the sudden increase load without emergency stop under the oil-gas ratio control mode during the HIL test, and provide a reference for the subsequent whole machine test design;
[0053] 8) Set the P31 pressure signal fault injection, set the load power P to decrease from -kMW / s to sMW with a ramp signal, enter the sudden load reduction mode, check whether the current control effect and related flag words are established, so as to verify the impact of the P31 pressure signal fault on the control mode and control effect;
[0054] 9) Restore the P31 pressure signal, set the load power P to decrease from sMW to (sb)MW, (sbb-1)MW, (sbb-1-b-2)MW, (sbb-1-b-2-b-3), ..., with a step signal until it is reduced to no-load, enter the emergency sudden load unloading mode, check the oil-gas ratio control effect and whether the relevant flag words are established, so as to explore the maximum critical power value of the emergency sudden load unloading without emergency stop under the oil-gas ratio control mode during the HIL test, and provide a reference for the subsequent whole machine test design;
[0055] 10) To complete this test, you need to conduct the test on each channel separately and fill in the test record after the test.
[0056] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.
Claims
1. A method for regulating the operating conditions of a power generation gas turbine control system based on HIL, characterized in that, it includes: Step S1: Set the control mode of the gas turbine model to feedforward control. In its steady-state power generation mode, set the load power P of the load system model to increase to p MW at a ramp signal of m MW / s to simulate the normal loading mode; where 0 < m < a, and a is the minimum power increase per second set in the control plan to meet the sudden load increase; Step S2: Set the load power P to increase to the full load in a step signal from p MW in sequence to simulate entering the sudden load increase mode; Step S3: Set the load power P to decrease to q MW at a ramp signal of -n MW / s to simulate entering the normal load reduction mode, where 0 < n < c, and c is the minimum power decrease per second set in the control plan to meet the sudden load reduction; Step S4: Set the load power P to decrease to u MW at a ramp signal of -k MW / s to simulate entering the sudden load reduction mode, where c < k < d, and d is the minimum power per second set in the control plan to meet the emergency sudden load shedding; Step S5: Set the load power P to decrease from u MW to no load in a step signal to simulate entering the emergency sudden load shedding mode; where b is the minimum power decrease per second set in the control plan to meet the emergency sudden load shedding; Step S6: Set the control mode of the gas turbine model to fuel-air ratio control, set a fault injection for the diffuser outlet pressure P31 signal, and set the load power P to increase to a MW in a step signal from no load to simulate entering the sudden load increase mode; Step S7: Restore the diffuser outlet pressure P31 signal, and set the load power P to increase to the full load in a step signal from a MW in sequence; Step S8: Set a fault injection for the diffuser outlet pressure P31 signal, and set the load power P to decrease to s MW at a ramp signal of -k MW / s to simulate entering the sudden load reduction mode; Step S9: Restore the diffuser outlet pressure P31 signal, and set the load power P to decrease to no load in a step signal from s MW to simulate entering the emergency sudden load shedding mode; where p, q, u, and s are set numerical powers greater than the no-load power and less than the full-load power.
2. The method for regulating the operating conditions of a power generation gas turbine control system based on HIL according to claim 1, characterized in that, the HIL test system includes: an HIL device, a digital electronic control cabinet connected to the HIL device, and a monitoring host computer connected to the digital electronic control cabinet; where the HIL device includes a gas turbine model, a load system model, and a fault simulation device; the load system model loads the gas turbine model, and the fault simulation device sends fault instructions to the gas turbine model and the load system model.
3. The method for regulating the operating conditions of a power generation gas turbine control system based on HIL according to claim 1, characterized in that, after each step, it is necessary to check whether the control effect and relevant flag words are established.
4. The method for regulating the operating conditions of a power generation gas turbine control system based on HIL according to claim 1, characterized in that, In step S2, the load power P is set to increase in sequence from pMW to (p+a)MW, (p+a+a+1)MW, (p+a+a+1+a+2)MW, (p+a+a+1+a+2+a+3)MW, ... until full load with a step signal.
5. The HIL-based power generation gas turbine control system operating condition adjustment test method according to claim 1, It is characterized in that In step S5, the load power P is set to decrease from uMW to (ub)MW, (ubb-1)MW, (ubb-1-b-2)MW, (ubb-1-b-2-b-3), ..., with a step signal until it is reduced to no-load.
6. The HIL-based power generation gas turbine control system operating condition adjustment test method according to claim 1, It is characterized in that Step S7 specifically includes: restoring the diffuser outlet pressure P31 signal, setting the load power P to increase in a step signal from aMW to (a+a)MW, (a+a+a+1)MW, (a+a+a+1+a+2), (a+a+a+1+a+2+a+3), ... until full load.
7. The HIL-based operating condition adjustment test method for a power generation gas turbine control system according to claim 1, It is characterized in that Step S9 is specifically as follows: restore the diffuser outlet pressure P31 signal, set the load power P to decrease from sMW to (sb)MW, (sbb-1)MW, (sbb-1-b-2)MW, (sbb-1-b-2-b-3), ... in a step signal until it is reduced to no load.