Integrated system beam residence scheduling method oriented to task performance requirements
Through the beam residency scheduling method oriented to task performance requirements, combined with time pointer and integrated waveform technology, the resource management problem of multi-beam concurrent tasks in multi-functional integrated systems is solved, resource utilization and scheduling efficiency are improved, and task costs are reduced. The loss rate enhances the real-time and combat performance of the system.
Patent Information
- Application Number
- CN202410726605.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2024-10-01
AI Technical Summary
Existing beam residency scheduling algorithms cannot effectively meet the resource management needs of multi-beam concurrent tasks in multi-functional integrated systems, especially when enemy target movements change dynamically. Traditional single-beam residency scheduling algorithms cannot be directly applied. Moreover, the swarm intelligence method has high computational complexity, insufficient real-time performance and insufficient learning efficiency.
An integrated system beam residency scheduling method oriented to task performance requirements is proposed. Through a time pointer-based method, the number of basic sub-arrays is calculated according to different task types and parameters, integrated waveforms are considered, the array allocation strategy is optimized, and tasks are updated in real time. The front resource requirements are reduced to avoid beam overlap, and resources are dynamically allocated by combining front division and integrated waveform technology.
It improves the resource utilization rate of the multi-functional integrated system, meets the combat performance requirements of each mission, reduces the mission loss rate, achieves more efficient multi-functional integrated beam residency scheduling, and enhances the real-time nature and resource management of the scheduling process. ability.
Smart Images

Figure CN118733216A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of electronic system resource management, and in particular relates to an integrated system beam resident scheduling method oriented to task performance requirements. Background Art
[0002] With the development of modern warfare, combat platforms are facing increasingly complex battlefield situations, and the electromagnetic environment in which they work is also becoming increasingly complex. Therefore, electronic systems such as radar, navigation, friend-or-foe identification, electronic warfare, and communications are gradually developing towards multifunctional integrated systems (see reference, Qi Wenchao, Yang Ruijuan, Li Xiaobai, et al. Research on multifunctional integrated radar task scheduling algorithm [J]. Radar Science and Technology, 2012, 10(2): 150-155. DOI: 10.3969 / j.issn.1672-2337.2012.02.006.). The multifunctional integrated system performs concurrent tasks such as detection, interference, and communication by simultaneously transmitting multiple independent beams. However, the system resources of the multifunctional integrated system, such as time resources, energy resources, and aperture resources, are limited, so an efficient resource management method must be designed (see reference, Liu D, Zhao Y, Cai X, et al. Adaptive scheduling algorithm based on CPI and impact of tasks for multifunction radar. IEEE Sensors Journal, 2019, 19(23): 11205-11212.). The beam residence scheduling problem is one of the sub-problems of resource management. An effective beam residence scheduling algorithm is the key to improving the multifunctional combat capability of the multifunctional integrated system (see reference, Qi Wenchao, Yang Ruijuan, Li Xiaobai, et al. Research on task scheduling algorithm for multifunctional integrated radar [J]. Radar Science and Technology, 2012, 10(2): 150-155. DOI: 10.3969 / j.issn.1672-2337.2012.02.006.).
[0003] The research on beam dwell scheduling problem originated from the beam dwell scheduling of phased array radar. The beam dwell scheduling algorithm of phased array radar is mainly divided into two parts: template-based scheduling algorithm and adaptive scheduling algorithm. However, because the actual situation is complex and changeable, the limited templates in the template library cannot fully take into account all online task requests, so it cannot give full play to the scheduling performance of phased array radar. Compared with the scheduling algorithm based on the template method, the adaptive scheduling algorithm is considered to be a better beam dwell scheduling algorithm (see literature: TAN QQ, CHENG T, LI X. Online adaptive dwell scheduling based on dynamic template for PAR. Journal of Systems Engineering and Electronics, 2021, 32 (5): 1119-1129; T. Cheng, Z. Li, Q. Tan, S. Wang and C. Yue,"Real-Time Adaptive Dwell Scheduling for Digital Array Radar Based on Virtual Dynamic Template," in IEEE Transactions on Aerospace and Electronic Systems, vol.58, no.4, pp.3197-3208, Aug.2022, doi:10.1109 / TAES.2022.3145773;), which can be further divided into the beam dwell scheduling algorithm based on heuristic method and the beam dwell scheduling algorithm based on swarm intelligence algorithm. The beam dwell scheduling algorithm based on heuristic method adopts heuristic rules to solve the beam dwell scheduling optimization problem.The literature (Orman A J, Potts CN, Shahani AK, et al. Scheduling for a multifunction phased array radar system [J]. European Journal of Operational Research, 1996, 90 (1): 13-25), the literature (ZHANG HW, XIE J, ZHENG Z, SHAO L, CHEN T. Variable scheduling interval taskscheduling for phased array radar. Journal of Systems Engineering and Electronics, 2018, 29 (5): 937-946.) and the literature (QUZ, Z. DING Z, P MOO. A Radar Task Scheduling Method Using Random Shifted Start Time with the EST Algorithm. IEEE Radar Conference, 2019: 1-5.) respectively used the working modes of high priority tasks first execution (Higher Priority First, HPF), early deadline tasks first execution (Earliest Deadline First, EDF) and the earliest executable time tasks first execution (Earliest start time first execution) . The three heuristic rule methods are High Priority Earliest Deadline First (HPEDF) and High Priority Earliest Deadline First (HSEDF). All three methods only consider a certain task attribute of radar task request, but fail to consider the multiple attributes of task request comprehensively. The literature (Lu Jianbin, Hu Weidong, Yu Wenxian. Research on real-time task scheduling of multifunctional phased array radar [J]. Journal of Electronics, 2006, 34(4): 732-736) maps the two parameters of comprehensive task working mode priority and deadline to the same level and then weights them, and designs a scheduling algorithm that takes both into account (Higher Priority Earliest Deadline First, HPEDF), which effectively improves the multi-task scheduling performance of the system.
[0004] In view of the non-convex, nonlinear and multi-constrained characteristics of the beam dwell scheduling optimization problem, various swarm intelligence algorithms have been applied to solve this problem, including the particle swarm algorithm based on entropy theory (see the literature ZHANG, HAOWEI, XIE, JUNWEI, GE, JIAANG, et al. An Entropy-based PSO for DAR task scheduling problem [J]. AppliedSoft Computing, 2018, 73862-873. DOI: 10.1016 / j.asoc.2018.09.022.), hybrid particle swarm and genetic algorithm (see the literature ZHANG HW, XIE J, LU WA scheduling method based on a hybrid genetic particle swarm algorithm for multifunction phased array radar. Frontiers of information technology & electronic, 2017, 18 (11): 1806-1816.), simulated annealing algorithm (see the literature F. Meng and K. Tian," Phased-Array Radar Task Scheduling Method for Hypersonic-Glide Vehicles," in IEEE Access, vol. 8, pp. 221288-221298, 2020, doi: 10.1109 / ACCESS.2020.3043338.) and transfer-based reinforcement learning methods (see Akbar S, Adve RS, Ding Z, et al. Transfer-Based DRL for Task Scheduling in Dynamic Environments for Cognitive Radar. IEEE Transactions on Aerospace and Electronic Systems, 2024, 60(1): 31-50.). However, due to the high computational complexity of swarm intelligence methods, the biggest weakness of the beam dwell scheduling algorithm based on swarm intelligence methods is the real-time problem. In addition, the defect of the scheduling algorithm based on reinforcement learning methods is that the learning efficiency depends on the matching degree between the actual scene and the training data scene, and cannot flexibly adapt to the changes in multi-task scenes.
[0005] The above method only considers the single-beam dwell scheduling of the radar system. The multifunctional integrated system can transmit multiple beams at the same time, so the traditional single-beam dwell scheduling algorithm cannot be directly applied to the beam dwell scheduling of the integrated system. In order to solve the beam dwell scheduling problem of the integrated system, the literature (X. Guangran, D. Zicheng, W. Wei and H. Lang, "Multi-beam dwell adaptive scheduling algorithm for helicopter-borne radar," 2014 IEEE 7th Joint International Information Technology and Artificial Intelligence Conference, Chongqing, China, 2014, pp. 401-404, doi: 10.1109 / ITAIC.2014.7065079;) proposed a multifunctional electronic system task scheduling algorithm based on heuristic rules (improved deadline early task priority execution, MEDF). This literature introduces aperture segmentation technology to achieve multi-function. Its principle is to divide a large antenna array into multiple sub-arrays, and use multiple sub-arrays to transmit independent beams to complete concurrent multi-tasks at the same time. The literature (Qi Wenchao, Yang Ruijuan, Li Xiaobai, et al. Research on Task Scheduling Algorithm for Multifunctional Integrated Radar [J]. Radar Science and Technology, 2012, 10(2): 150-155. DOI: 10.3969 / j.issn.1672-2337.2012.02.006.) also introduced aperture segmentation technology, but it adopted a different heuristic rule scheduling algorithm, namely the multi-task parallel EDF (MTPEDF) algorithm. Compared with the heuristic method based on MEDF, it improves the resource utilization of the integrated system and reduces the task loss rate. Considering the specific beam transmission and reception process, the above literatures all allocate fixed array resources to the task to transmit multiple beams to detect the target to obtain task execution benefits. In the actual electronic warfare interaction process, during the movement of the enemy target, the array resources required to execute different types of tasks are different and dynamically changing. Therefore, in the process of considering the scheduling problem of multiple tasks, it is necessary to dynamically allocate system resources based on task performance requirements.
[0006] The literature (Wang Falong, Jiang Ning. Research on multi-target fuzzy multi-stage jamming resource scheduling [J]. Modern Defense Technology, 2015, 43 (02): 122-129 + 136.) divides the system into multiple basic sub-arrays according to the task suppression coefficient and array resource characteristics for the jamming task, and introduces heuristic rules to adaptively select the number of basic sub-arrays required for each task execution. The literature (HENG SY, CHENG T, HE ZS, WANG Y. Adaptive dwell scheduling for simultaneous multi-beam radar system based on array element selection with different polarization characteristics. Digital Signal Processing, 2023, 140: 1051-2004.) considers the polarization characteristics of the array element, converts different types of task indicators such as detection probability, tracking accuracy, interference power density, and bit error rate requirements into a unified transmission power requirement, and then estimates the array element requirements of the task, and then uses a heuristic method to perform beam dwell scheduling on the task to obtain the final task sequence and array element selection results. Among the above-mentioned documents, the document (Wang Falun, Jiang Ning. Research on multi-target fuzzy multi-stage interference resource scheduling [J]. Modern Defense Technology, 2015, 43(02): 122-129+136.) only considered the interference task, and the document (HENG SY, CHENG T, HE ZS, WANG Y. Adaptive well scheduling for simultaneous multi-beam radar system based on array element selection with different polarization characteristics. Digital Signal Processing, 2023, 140: 1051-2004.) emphasized the selection of antennas with different polarization characteristics during the scheduling task, but did not consider the application of integrated waveforms.
[0007] Based on the above problems, the present invention proposes an integrated system beam resident scheduling method for task performance requirements for a multifunctional integrated system. The algorithm first calculates the number of basic sub-arrays required to achieve the minimum task performance index according to different task types and task parameters, where the array resource requirements of the same task will also change due to the motion characteristics of the target. Then, a time pointer-based method is used to schedule multiple tasks, and the integrated waveform is considered during the scheduling process. In order to avoid the overlap of different task beams on the array, an optimized array allocation strategy is given. The simulation results show that the algorithm proposed in the present invention can realize effective multifunctional integrated beam resident scheduling based on array division and detection-communication integrated waveform. Compared with the existing methods, it can better meet the combat performance requirements of each task, and more efficiently solve the concurrent multi-task conflict problem in the scheduling process, greatly reducing the task loss rate. Summary of the invention
[0008] The present invention provides an integrated system beam resident scheduling method oriented to task performance requirements.
[0009] The task model is Where k is the number of the resident task, te k is the earliest executable time of the resident task, tl k is the deadline of the resident task, dw k is the residence time of the residence task, pri k The working mode priority for the resident task, is the expected performance index of the resident task, where the task model considers radar detection tasks, communication tasks and interference tasks. Taking the tracking task as an example, the task execution performance index is the expected detection probability is the expected transmission direction of the stationary mission beam, R k This is the relative distance between the target corresponding to the task at this time and the integrated system.
[0010] Assume that the current scheduling interval is [t0, t0+SI], where t0 is the start time of the current scheduling interval and SI is the duration of a scheduling interval. There is currently a task queue The application is scheduled to be executed in the scheduling interval, then an integrated system beam dwell scheduling method oriented to task performance requirements includes the following steps:
[0011] Step 1: Set the time pointer tp = t0, the execution task queue Texe is empty, the deletion task queue Td is empty, the delay task queue Tdl is empty, and the integrated waveform execution task queue is Texe JRC Empty, the time pointer matrix of the entire array is Ar tp =t0·1 4·4, and the minimum time pointer of the entire array is min tp =min(Ar tp ), the total array task execution matrix is Ar task =0 4·4 .
[0012] Step 2: Delete from T0 the nodes that satisfy te k >t0+SI tasks, and then delete the tasks that meet tl from the remaining tasks that apply for scheduling k <t0, and add all deleted tasks into Tdl, and record the remaining task queue after pre-screening as T=[T1,T2,...,T N ].
[0013] Step 3: Initialize the task queue Te to be empty, and first delete the tasks that satisfy tl from T. k <all tasks of tp, and add these tasks to Td, and then select from T the tasks that satisfy tl k ≤tp and tp+dw k ≤t0+SI tasks and put them into the task queue Te. If Te is empty, execute step 9, otherwise, execute step 4.
[0014] Step 4: Due to the motion characteristics of multiple targets, the relative distance between the target and the integrated system will change during the scheduling process, and the array resource requirements of the corresponding tasks may be different. Therefore, it is necessary to calculate the array resource requirements of the tasks in real time at a certain analysis time interval. Therefore, according to formula (1), the array resource requirements of different tasks in Te are calculated as follows:
[0015]
[0016] in and Respectively represent the array resource requirements of different tasks and the effective radiation power expected to be obtained by different tasks, N total , P total and G total They represent the total array resources, upper limit of transmit power and transmit gain of the integrated system respectively. The calculation expressions of the expected effective radiated power of radar mission, communication mission and jamming mission are shown in equations (2)-(4).
[0017]
[0018] Among them, for radar tasks, G r is the receiver gain of the multifunctional integrated system, λ r is the wavelength of the detection signal, σ r is the target radar cross-section area, R ris the distance between the integrated system and the target radar, L r is the radar receiver loss, Receiver noise, SNR for all-in-one system r is the signal-to-noise ratio received by the target radar; for communication tasks, G c is the communication receiver gain, λ c is the wavelength of the communication signal, k n is the Boltzmann constant, T0 is the ambient temperature, F n is the noise factor of the communication receiver, B is the communication signal bandwidth, R c is the distance between the integrated system and the communication target, SNR c is the signal-to-noise ratio received by the communication target; for the interference task, P tar G tar is the equivalent target radar power, R j is the distance between the integrated system and the interference target, σ tar is the target radar reflection area, L tar is the comprehensive loss of the target radar transmission feeder, L j Interference transmission feeder loss and interference signal for the integrated system, γ j K is the excitation coefficient of the interference signal to the radar antenna, f is the ratio of the spectrum width of the interference signal to the radar signal, is the interference suppression coefficient. In addition, for radar tasks and communication tasks, there are minimum detection probability and maximum bit error rate indicators for successful scheduling of tasks, which are respectively expressed as and Expressed as, then the signal-to-noise ratio requirements for radar tasks and communication tasks are as shown in equations and,
[0019]
[0020] Where P fa is the false alarm probability.
[0021] Step 5: Initialize the counting variable num_exe of the task execution queue to 0, calculate the comprehensive priority of each task in Te according to formula (7), and arrange the tasks in Te from high to low according to the comprehensive priority.
[0022] p k =[(X / 2)+1]·(Np k +Nd k ) / (X+1) (7)
[0023] Among them, X is the number of tasks in Te, Np k Nd is the order of the tasks in Te in descending order of priority. kIt is the sequence number of the tasks in Te sorted from largest to smallest according to their deadlines.
[0024] Step 6: Determine whether it is satisfied and Among them, Ar tp ≤tp represents Ar tp The number of elements in which the current time pointer tp is less than or equal to is the number of basic sub-arrays Ar available on the current array. If the number is satisfied, find the element in Te that satisfies the requirement in descending order of comprehensive priority. And the task with the highest overall priority is T k , and give Te a higher priority than T k The task is removed from Te and T is added k To the execution queue Texe, num_exe = num_exe + 1, and T k Delete from T and Te, and set task T according to formula (8) k The actual execution time,
[0025] st i =tp (8)
[0026] Otherwise, not satisfied and Go to step 9.
[0027] Step 7: Enter T k ,Ar tp ,Ar task and tp, according to the array resource requirements of the task and the current array resource occupancy, T k Select the array beam launch position, that is, the basic sub-array position occupied by the task, and initialize the task array resource demand at this time as
[0028] Step 7-1: Determine whether it is satisfied If satisfied, go to step 7-2, otherwise That is, all the basic sub-array positions required by the task have been allocated, and then go to step 7-6.
[0029] Step 7-2: Find Ar tp Satisfy Ar tp ≤tp basic subarray, and store its position coordinates in aperture free In the collection, at the same time in Ar task Find the one that satisfies Ar task =T k The basic sub-matrix and store its position coordinates in aperture occupy Set, that is, to determine the task T to be analyzed at this time kHave some aperture resources been allocated? occupy Not empty, that is, task T at this time k The aperture resource has been allocated, go to step 7-3, otherwise, if the aperture occupy is empty, that is, task T k If the array resources have not been allocated yet, execute step 7-5.
[0030] Step 7-3: Use equation (9) to calculate the coordinate positions of the idle basic sub-arrays and the coordinates to be assigned to task T k The Euclidean distance between the coordinate positions of some basic sub-arrays,
[0031]
[0032] Where D free(i),occupy Represents the i-th basic sub-array in the idle basic sub-array and the one to be assigned to task T k The Euclidean distance between some basic subarrays and the distance from the aperture free Find D free(i),occupy The coordinates of the basic subarray with the smallest value are added to the aperture collection min In the case of aperture min If there are multiple basic sub-array coordinates in , calculate the aperture min The coordinate positions of each sub-array are related to the center coordinates of the basic sub-array center = (x center ,y center ), as shown in formula (10),
[0033]
[0034] Where D min(i),center Represents aperture min The Euclidean distance between the i-th basic subarray and the center coordinate center of the full array, and from the aperture min Find D min(i),center The basic sub-array coordinate pos with the largest value select As this time to task T k The new coordinates of the basic subarray to be assigned, that is, select the coordinates of the basic subarray to be assigned close to the task and try to select the edge position of the full array on this basis to avoid beam overlap of different tasks. min There is only one basic sub-array coordinate in the task T, which is used as the coordinate to be assigned to task T. k The new coordinates pos of the basic submatrix select .
[0035] Step 7-4: Assume pos select =[xselect ,y select ], then update the relevant parameters according to equations (11)-(14),
[0036] Ar tp (x select ,y select )=tp+tdw k (11)
[0037] min tp =min(Ar tp ) (12)
[0038] Ar task (x select ,y select )=T k (13)
[0039]
[0040] Finally, return to step 7-1.
[0041] Step 7-5: Assumptions Setup and Store the free basic sub-array positions in the four quadrants respectively, according to the aperture free The information determines the number of free basic sub-arrays in each quadrant, and selects the quadrant m with the largest number of free basic sub-arrays for task T. k The array resources are to be allocated, and the calculation is obtained according to formula (10): The most marginal basic sub-array position is used as the one to be assigned to task T k The new coordinates pos of the basic submatrix select , return to step 7-4.
[0042] Step 7-6: Task T k The positions of the required basic subarrays are allocated, and the output Ar tp and Ar task , proceed to step 8.
[0043] Step 8: Enter T k and Te, determine whether there is a task in Te that can be executed with the task T to be executed k Combined into a detection-communication integrated mission for joint execution, that is, two mission beams form an integrated waveform:
[0044] Step 8-1: Determine T k Is it one of the radar mission and communication mission? If so, go to step 8-2. Otherwise, T k Cannot be combined with any task in Te, return to step 6.
[0045] Step 8-2: Add the tasks in the task set Te that satisfy all the constraints in formula (15) to the task set Te′.
[0046]
[0047] in is a constant representing the beam threshold. If Te′ is not empty, go to step 8-3. Otherwise, k Cannot be combined with any task in Te, return to step 6.
[0048] Step 8-3: Calculate the comprehensive priority of each task in Te′ according to formula (3), and select the task T with the highest comprehensive priority in Te′ integrated With task T k Combine and execute, and update the relevant parameters according to equations (16)-(18):
[0049]
[0050] min tp =min(Ar tp ) (17)
[0051] st integrated =tp (18)
[0052] Also add T integrated to the execution queue Texe, and integrated and T k Add to the integrated waveform execution queue Texe JRC , num_exe=num_exe+1, and T integrated Delete from T and Te, and return to step 6.
[0053] Step 9: If the time pointer satisfies tp = min tp , then update tp = tp + Δt, where Δt is a smaller time length, otherwise update the time pointer tp = min tp .
[0054] Step 10: If tp≥t0+SI or T is empty, output parameters Texe, Texe JRC , Tdl, Td and the actual execution time of each execution task queue, the scheduling interval analysis is completed, otherwise, return to step 3.
[0055] Principle of the Invention
[0056] The present invention applies a time pointer method based on array division and integrated waveform technology, and updates the array resource requirements of the task in real time according to different types of task performance indicators to ensure the task execution efficiency. At the same time, this scheduling method also gives a specific scheduling strategy for the array resources in real time, that is, optimizes the array position of the beam corresponding to each task. The array division and integrated waveform technology both improve the resource utilization of the multifunctional integrated system. More importantly, the scheduling algorithm based on heuristic rules ensures the real-time problem solving. The principle is explained below.
[0057] For multi-tasks with motion characteristics, the set of tasks analyzed by the system at each moment is dynamically changing, that is, the total array resource requirements of the task are dynamically changing, so it is key to calculate the array resource requirements of each task based on the target parameter information and performance requirements corresponding to the task. However, different types of tasks have different performance indicator requirements. For radar detection tasks, the system expects to achieve a certain detection probability:
[0058]
[0059] Where P fa is the false alarm probability, SNR r For the detection probability to be greater than or equal to the detection probability threshold In the case of , the target radar needs to obtain the minimum signal-to-noise ratio:
[0060]
[0061] For communication tasks, the system has an expected bit error rate:
[0062]
[0063] Where SNR c When the bit error rate is less than or equal to the bit error rate threshold In this case, the target communication device needs to obtain the minimum signal-to-noise ratio:
[0064]
[0065] For jamming tasks, according to the radar jamming unified equation, the system expects to emit a certain jamming power to achieve the desired suppression effect on the target, where the expected jamming power is As shown in formula (4).
[0066] To ensure efficient resource scheduling, the array resource requirements for the task to be executed must be calculated before task scheduling. Allocating array resources to tasks according to demand can not only ensure the execution efficiency of the task, but also maximize the use of system array resources. At the same time, in order to schedule more and more important tasks as much as possible, the scheduling process of the integrated system needs to meet two major task execution urgency level principles, one is the work mode priority principle, and the other is the deadline principle. A resource scheduling objective function that meets the above scheduling principles is shown in formula (23):
[0067]
[0068] This objective function selects the optimal scheduling result by maximizing the total priority of the scheduled tasks, where N1 is the number of tasks actually scheduled. Due to the system and resource characteristics of the integrated system, the scheduling process has the following constraints: First, each task should be executed within the executable time range, and this specific execution range is [te k ,tl k ]; second, at any time, the sum of the array resources occupied by all resident tasks executed cannot exceed the total amount of system array resources. Third, on the same basic sub-array, the execution time of each resident task cannot overlap. At the same time, because the integrated waveform technology is introduced in the scheduling process, the constraint conditions also need to add the integrated waveform formation conditions of the two tasks: one is that the task types are different and are either communication tasks or radar tasks; the second is that the executable time periods of the tasks have an intersection; the third is that the angle deviation of the task beam is less than the threshold; the fourth is that when task i is the main task in the integrated task, the array resource demand of the subtask j combined with it cannot be greater than the array resource demand of task i. Therefore, the scheduling optimization model design of the present invention is shown in formula (21).
[0069]
[0070] Where N2 is the number of deleted tasks, N3 is the number of delayed tasks, M is the number of tasks executed by the integrated waveform, q is the basic subarray number, u q,k is a Boolean variable. k When occupying the qth basic sub-matrix, u q,k is 1, otherwise it is 0. k For task T k The occupied array resources, A total is the total amount of array resources of the system. The first three inequalities of the scheduling optimization model correspond to the above three constraints. The fourth and fifth inequalities respectively describe the conditions that need to be met for delaying tasks and deleting tasks. The last four inequalities represent the four formation conditions of the integrated waveform.
[0071] This scheduling optimization model is a nonlinear programming problem, and this problem has a huge solution space. First, in order to ensure the maximum utilization of the system array resources, for the multiple tasks that are applied to be executed at the current moment, the array resource requirements of the multiple tasks are first calculated based on the multi-task performance requirements, as shown in step 4. Then the comprehensive priority of each task is calculated, and the tasks with the highest comprehensive priority and array resource requirements that do not exceed the remaining array resources of the system are scheduled first, as shown in steps 5 and 6. At the same time, in the process of scheduling the selected task, it is necessary not only to allocate system array resources to the task, but also to select the array beam emission position according to the array resource requirements of the task and the current array resource occupancy, that is, to select the position of the basic sub-array occupied by the task. The selection process follows the principle of reducing the overlap of beams of different tasks, and it is expected that the beams of the same task are concentrated in the same quadrant, and the beams of different tasks are scattered in different quadrants, which can reduce the impact between beams and improve the execution efficiency of tasks, as shown in step 7. Secondly, in order to further reduce the task loss rate, step 8 introduces integrated waveform technology, that is, after scheduling task A, it is determined whether other tasks currently applying for execution can be merged with task A into a communication-radar integrated task for joint execution, which improves the scheduling success rate of communication tasks with low priority and reduces the total task loss rate of the scheduling process. In summary, the present invention can comprehensively consider the working mode priority and deadline criteria in the scheduling process, and maximize the system resource utilization on the premise of meeting task performance. BRIEF DESCRIPTION OF THE DRAWINGS
[0072] Figure 1 It is the TDR of three algorithms;
[0073] Figure 2 It is the HVR of three algorithms;
[0074] Figure 3 It is the SSRCT of the three algorithms;
[0075] Figure 4 is the task request distribution graph of the proposed algorithm for a scheduling interval;
[0076] Figure 5 It is the task execution distribution graph of the proposed algorithm for a scheduling interval;
[0077] Figure 6 It is the basic sub-array demand graph of multiple tasks in the whole scheduling process of the proposed algorithm;
[0078] Figure 7 It is the system basic sub-array allocation result diagram of the proposed algorithm for a scheduling interval; DETAILED DESCRIPTION
[0079] In the simulation scenario, high-precision tracking tasks, precision tracking tasks, ordinary tracking tasks, communication tasks and interference tasks are considered. High-precision tracking tasks, precision tracking tasks, ordinary tracking tasks and interference tasks are treated as high-priority tasks, while communication tasks are treated as low-priority tasks. The simulation duration is 20s, the scheduling interval is set to 50ms, the ratio of the number of tracking tasks to the number of communication tasks is 1:1, and the ratio of the number of high-precision tracking tasks to the number of precision tracking tasks to the number of ordinary task tracking tasks in the tracking task is 2:3:5, and the interference task is randomly generated in the simulation cycle. The beam dwell task parameters are shown in Table 1.
[0080] Table 1. Multifunctional integrated system beam dwell mission parameters
[0081]
[0082] In order to calculate the array resource requirements for various types of tasks, the following relevant parameters are given as shown in Tables 2 to 5:
[0083] Table 2. Other parameters of tracking tasks
[0084]
[0085] Table 3. Other parameters of communication tasks
[0086]
[0087] Table 4. Other parameters of interference task
[0088]
[0089] Table 5. Other parameters of integrated system
[0090]
[0091] To comprehensively evaluate the algorithm performance, we use the task drop ratio (Task Drop Ratio, TDR), the hit value ratio (Hit Value Ratio, HVR), and the success scheduling ratio of communication tasks (Success Scheduling Ratio of Communication Task, SSRCT). The definitions of TDR, HVR, and SSRCT are as follows:
[0092] Task loss rate (TDR): defined as the ratio of the number of lost tasks to the total number of scheduled tasks. It can be expressed as:
[0093] TDR=N drop / N (25)
[0094] Among them, N dropRepresents the total number of lost tasks, and N represents the total number of tasks requested for scheduling.
[0095] Value realization rate (HVR): defined as the ratio of the sum of the value realized by the successfully scheduled tasks to the combined value realized by the requested scheduling tasks. It can be expressed as:
[0096]
[0097] This indicator is used to reflect the proportion of high-priority tasks that are successfully scheduled;
[0098] Successful Scheduling Rate of Communication Tasks (SSRCT): reflects the ratio of the number of successfully scheduled communication tasks to the total number of communication tasks requested for execution. It can be expressed as:
[0099]
[0100] in, Indicates the number of successfully scheduled communication tasks, including communication tasks executed independently and communication tasks executed together with tracking tasks, N communi The total number of communication tasks scheduled for the application.
[0101] An integrated system beam dwell scheduling method oriented to task performance requirements proposed in the present invention is adopted, and the performance is compared with algorithms A and B. Algorithm A is a time pointer algorithm based on aperture segmentation (see literature: Qi Wenchao, Yang Ruijuan, Li Xiaobai, et al. Research on multifunctional integrated radar task scheduling algorithm [J]. Radar Science and Technology, 2012, 10(2): 150-155. DOI: 10.3969 / j.issn.1672-2337.2012.02.006.) and introduces a scenario in which the total array resource demand of the task changes dynamically. Algorithm B is based on the proposed algorithm and does not adaptively allocate system resources to the task according to the dynamically changing array resource demand of the task, but allocates array resources according to the maximum array resource demand of the task applied for scheduling. Figure 1 , Figure 2 , Figure 3 The statistical results of one hundred Monte Carlo simulations are shown in Figure 2.
[0102] Figure 1 is the task loss rate curve. As the number of tracking tasks increases, the task loss rate of the proposed algorithm is lower than that of algorithms A and B. Moreover, the tasks of the proposed algorithm start to be lost when the tracking target is 30, while the tasks of algorithms AB start to be lost when the tracking target is 20, indicating that the task scheduling success rate of this algorithm is high. This shows that the integrated waveform and adaptive allocation system array resources can comprehensively consider the scheduling work mode priority criteria and deadline criteria.
[0103] Figure 2is the value realization rate curve. The value realization rate curve reflects whether high-priority tasks are better executed. From the results in the figure, it can be seen that the downward trend of the HVR curve is basically consistent with the upward trend of the TDR curve, and the value realization rate of the proposed algorithm has been higher than the value realization rates of algorithms A and B, indicating that the proposed algorithm can effectively realize the importance criterion, that is, high-priority tasks are better executed. Different from the curve, the value realization rate of algorithm A is slightly higher than that of algorithm B, indicating that the method of scheduling all current tasks according to the maximum array resource demand of the scheduled task in algorithm B will cause a great waste of system resources, thereby reducing the number of executed tasks and reducing the value realization rate in the scheduling process.
[0104] Figure 3 It can be seen that algorithm A does not introduce the integrated waveform technology, which greatly reduces the successful scheduling rate of low-priority communication tasks. Algorithm B does not make full use of system resources, and although it introduces the integrated waveform technology, it cannot avoid the low communication task scheduling success rate. This shows the superiority of the proposed algorithm in scheduling communication tasks.
[0105] In order to reflect the specific implementation process of the integrated waveform and task-oriented performance adaptive allocation of system resources in the proposed algorithm, the task scheduling analysis and system basic subarray allocation results for a scheduling interval are given. Taking the 111th SI (5500-5550ms) as an example, the task request distribution graph and task execution distribution graph of this scheduling interval are shown as follows: Figure 4-Figure 5 As shown in Figure 2, it shows that the proposed algorithm eliminates the resource demand conflict of concurrent multi-task requests. Figure 4 It indicates that the task set to be executed includes three different types of tracking tasks and one communication task. Figure 5 In the proposed algorithm, the integrated waveform technology is used to merge the communication task and one of the precision tracking tasks, which reflects the application of integrated waveform in the scheduling process.
[0106] Figure 6 This is a schematic diagram of the array resource requirements of different tasks in the entire simulation process. The figure emphasizes that due to the motion characteristics of the target, the array resource requirements of different resident tasks change dynamically over time. The task-oriented performance of the proposed algorithm requires real-time calculation of the array resource requirements of each task. This can avoid the system allocating too few resources to the task, causing the task to fail to meet the performance indicators, and can also avoid the system allocating too many resources to the task, resulting in a waste of system resources.
[0107] Figure 7The results of the basic sub-array allocation of the system within a scheduling interval are shown, and only the results of the partial moments of change are given. Among them, the blocks of different colors represent different types of tasks, and the entire array is divided into 16 sub-basic sub-arrays. Figure 7 It shows that the system basic sub-array allocation method of the proposed algorithm does allocate array resources to multiple tasks according to the principle of concentrating the same task beam and reducing the overlap of different task beams, which reduces the mutual influence between multiple task beams and thus reduces the scheduling risk.
[0108] In summary, this algorithm realizes the beam dwell scheduling of the multifunctional integrated system oriented to the task performance requirements, ensures low task loss rate and high value realization rate, and basically solves the proposed optimization model. At the same time, it also gives an optimized system basic sub-array allocation method based on the array resource requirements of the task, which improves the task execution efficiency. Finally, this algorithm also considers the integrated waveform, which further reduces the loss rate of communication tasks with low priority.
Claims
1. An integrated system beam dwell scheduling method oriented to mission performance requirements comprises the following steps: Step 1: Set the time pointer tp = t0, the execution task queue Texe is empty, the deletion task queue Td is empty, the delay task queue Tdl is empty, and the integrated waveform execution task queue is Texe JRC Empty, the time pointer matrix of the entire array is Ar tp =t0·1 4·4 , and the minimum time pointer of the entire array is min tp =min(Ar tp ), the total array task execution matrix is Ar task =0 4·4 . Step 2: Delete from T0 the nodes that satisfy te k >t0+SI tasks, and then delete the tasks that meet tl from the remaining tasks that apply for scheduling k <t0, and add all deleted tasks into Tdl, and record the remaining task queue after pre-screening as T=[T1,T2,...,T N ]. Step 3: Initialize the task queue Te to be empty, and first delete the tasks that satisfy tl from T. k <all tasks of tp, and add these tasks to Td, and then select from T the tasks that satisfy tl k ≤tp and tp+dw k ≤t0+SI tasks and put them into the task queue Te. If Te is empty, execute step 9, otherwise, execute step 4. Step 4: Due to the motion characteristics of multiple targets, the relative distance between the target and the integrated system will change during the scheduling process, and the array resource requirements of the corresponding tasks may be different. Therefore, it is necessary to calculate the array resource requirements of the tasks in real time at a certain analysis time interval. Therefore, according to formula (1), the array resource requirements of different tasks in Te are calculated as follows: in and Respectively represent the array resource requirements of different tasks and the effective radiation power expected to be obtained by different tasks, N total , P total and G total They represent the total array resources, upper limit of transmit power and transmit gain of the integrated system respectively. The calculation expressions of the expected effective radiated power of radar mission, communication mission and jamming mission are shown in equations (2)-(4). in, For radar missions, G r is the receiver gain of the multifunctional integrated system, λ r is the wavelength of the detection signal, σ r is the target radar cross-section area, R r is the distance between the integrated system and the target radar, L r is the radar receiver loss, Receiver noise, SNR for all-in-one system r is the signal-to-noise ratio received by the target radar; for communication tasks, G c is the communication receiver gain, λ c is the wavelength of the communication signal, k n is the Boltzmann constant, T0 is the ambient temperature, F n is the noise factor of the communication receiver, B is the communication signal bandwidth, R c is the distance between the integrated system and the communication target, SNR c The signal-to-noise ratio received for the communication target; For the interference task, P tar G tar is the equivalent target radar power, R j is the distance between the integrated system and the interference target, σ tar is the target radar reflection area, L tar is the comprehensive loss of the target radar transmission feeder, L j Interference transmission feeder loss and interference signal for the integrated system, γ j is the excitation coefficient of the interference signal to the radar antenna, K f is the ratio of the interference signal to the radar signal spectrum width, is the interference suppression coefficient. In addition, for radar tasks and communication tasks, there are minimum detection probability and maximum bit error rate indicators for successful scheduling of tasks, which are respectively expressed as and Expressed as, then the signal-to-noise ratio requirements for radar and communication tasks are as shown in equations and, Where P fa is the false alarm probability. Step 5: Initialize the counting variable num_exe of the task execution queue to 0, calculate the comprehensive priority of each task in Te according to formula (7), and arrange the tasks in Te from high to low according to the comprehensive priority. p k =[(X / 2)+1]·(Np k +Nd k ) / (X+1) (7) Among them, X is the number of tasks in Te, Np k Nd is the order of the tasks in Te in descending order of priority. k It is the sequence number of the tasks in Te sorted from largest to smallest according to their deadlines. Step 6: Determine whether it is satisfied T k ∈Te and Where |Ar tp ≤tp| represents Ar tp The number of elements in which the current time pointer tp is less than or equal to is the number of basic sub-arrays Ar available on the current array. If the number is satisfied, find the element in Te that satisfies the requirement in descending order of comprehensive priority. And the task with the highest overall priority is T k , and give Te a higher priority than T k The task is removed from Te and T is added k To the execution queue Texe, num_exe = num_exe + 1, and T k Delete from T and Te, and set task T according to formula (8) k The actual execution time, st i =tp (8) Otherwise, not satisfied and Go to step 9. Step 7: Enter T k ,Ar tp ,Ar task and tp, according to the array resource requirements of the task and the current array resource occupancy, T k Select the array beam launch position, that is, the basic sub-array position occupied by the task, and initialize the task array resource demand at this time as Step 7-1: Determine whether it is satisfied If satisfied, go to step 7-2, otherwise That is, all the basic sub-array positions required by the task have been allocated, and then go to step 7-6. Step 7-2: Find Ar tp Satisfy Ar tp ≤tp basic subarray, and store its position coordinates in aperture free In the collection, at the same time in Ar task Find the one that satisfies Ar task =T k The basic sub-array and store its position coordinates in aperture occupy Set, that is, to determine the task T to be analyzed at this time k Have some aperture resources been allocated? occupy Not empty, that is, task T at this time k The aperture resource has been allocated, go to step 7-3, otherwise, if the aperture occupy is empty, that is, task T k If the array resources have not been allocated yet, execute step 7-5. Step 7-3: Use equation (9) to calculate the coordinate positions of the idle basic sub-arrays and the coordinates to be assigned to task T k The Euclidean distance between the coordinate positions of some basic sub-arrays, Where D free(i),occupy Represents the i-th basic sub-array in the idle basic sub-array and the one to be assigned to task T k The Euclidean distance between some basic subarrays and the distance from the aperture free Find D free(i),occupy The coordinates of the basic subarray with the smallest value are added to the aperture collection min If the aperture min If there are multiple basic sub-array coordinates in , calculate the aperture min The coordinate positions of each sub-array are related to the center coordinates of the basic sub-array center = (x center ,y center ), as shown in formula (10), Where D min(i),center Represents aperture min The Euclidean distance between the i-th basic subarray and the center coordinate center of the full array, and from the aperture min Find D min(i),center The basic sub-array coordinate pos with the largest value select As this time to task T k The new coordinates of the basic subarray to be assigned, that is, select the coordinates of the basic subarray to be assigned close to the task and try to select the edge position of the full array on this basis to avoid beam overlap of different tasks. min There is only one basic sub-array coordinate in the task T, which is used as the coordinate to be assigned to task T. k The new coordinates pos of the basic submatrix select . Step 7-4: Assume pos select =[x select ,y select ], then update the relevant parameters according to equations (11)-(14), Ar tp (x select , the select )=tp+tdw k (11) my tp =min(Ar tp ) (12) Ar task (x select ,y select )=T k (13) Finally, return to step 7-1. Step 7-5: Assumptions Setup and Store the free basic sub-array positions in the four quadrants respectively, according to the aperture free The information determines the number of free basic sub-arrays in each quadrant, and selects the quadrant m with the largest number of free basic sub-arrays for task T. k The array resources are to be allocated, and the calculation is obtained according to formula (10): The most marginal basic sub-array position is used as the one to be assigned to task T k The new coordinates pos of the basic submatrix select , return to step 7-4. Step 7-6: Task T k The positions of the required basic subarrays are allocated, and the output Ar tp and Ar task , proceed to step 8. Step 8: Enter T k and Te, determine whether there is a task in Te that can be executed with the task T to be executed k Combined into a detection-communication integrated mission for joint execution, that is, two mission beams form an integrated waveform: Step 8-1: Determine T k Is it one of the radar mission and communication mission? If so, go to step 8-2. Otherwise, T k Cannot be combined with any task in Te, return to step 6. Step 8-2: Add the tasks in the task set Te that satisfy all the constraints in equation (15) to the task set Te′. in is a constant representing the beam threshold. If Te′ is not empty, go to step 8-3. Otherwise, T k Cannot be combined with any task in Te, return to step 6. Step 8-3: Calculate the comprehensive priority of each task in Te′ according to formula (3), and select the task T with the highest comprehensive priority in Te′ integrated With task T k Combine and execute, and update the relevant parameters according to equations (16)-(18): my tp =min(Ar tp ) (17) st integrated =tp (18) Also add T integrated to the execution queue Texe, and integrated and T k Add to the integrated waveform execution queue Texe JRC , num_exe=num_exe+1, and T integrated Delete from T and Te, and return to step 6. Step 9: If the time pointer satisfies tp = min tp , then update tp = tp + Δt, where Δt is a smaller time length, otherwise update the time pointer tp = min tp . Step 10: If tp≥t0+SI or T is empty, output parameters Texe, Texe JRC , Tdl, Td and the actual execution time of each execution task queue, the scheduling interval analysis is completed, otherwise, return to step 3.
