Mounting method for built-in siphon rainwater pipe of steel pipe column based on BIM (Building Information Modeling)
Using BIM technology for 3D modeling and collision detection, optimized design and prefabricated component processing, the precise installation of siphon rainwater pipes within steel pipe columns was achieved, solving the problem of inaccurate positioning in traditional methods, improving installation efficiency and quality, and reducing construction costs. risk, improving building performance.
Patent Information
- Application Number
- CN202410814727.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-10-01
AI Technical Summary
The traditional installation method of built-in siphon rainwater pipes in steel pipe columns lacks accurate positioning and installation solutions, which may cause deviations in the siphon rainwater pipes during the installation process and cannot be accurately aligned with the preset holes, which increases the difficulty of installation and may affect the structural performance of the steel pipe columns. .
A BIM-based installation method is adopted to ensure the precise position and path of the siphon rainwater pipe inside the steel pipe column through three-dimensional modeling, collision detection and optimization, prefabricated component processing, positioning and docking, installation connection, water seepage test and welding connection. The advantages of BIM technology enable precise control and optimized design.
It improves installation efficiency and quality, reduces construction difficulty and risks, reduces collisions and conflicts during installation, optimizes the structural layout inside the steel pipe columns, and improves the overall performance of the building.
Smart Images

Figure CN118734398A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building engineering structure construction, and in particular to a BIM-based installation method for a steel pipe column with a built-in siphon rainwater pipe. Background Art
[0002] With the continuous innovation and progress of modern design concepts, building structures are becoming more and more diverse. Especially for high-end construction projects such as large public facilities and commercial buildings, steel structures or steel-concrete structures have become the mainstream structural forms. In these building structures, steel pipe columns not only play an important role in supporting the main structure, but also the new design concept requires that the equipment pipes that were usually exposed in the past be cleverly built into the steel pipe columns. Such a design can not only effectively improve the overall performance of the building, but also greatly improve the appearance of the building, making it neater and more beautiful.
[0003] As an important facility for discharging rainwater from the roof of a building, the positioning and installation quality of the siphonic rainwater pipe in the steel pipe column is particularly important. The traditional method of installing a siphonic rainwater pipe inside a steel pipe column usually only uses the roof water inlet of the siphonic rainwater pipe and the drainage outlet at the bottom of each floor as the final control points, and measures the possible passing positions inside the steel pipe column on the drawing. Subsequently, during the processing of the steel pipe column, holes are reserved on the inner stiffening plate, and then the siphonic rainwater pipe is installed through the holes. This installation method of the siphonic rainwater pipe built into the steel pipe column often has some significant deficiencies and problems. Due to the lack of precise positioning and installation solutions, the siphonic rainwater pipe may deviate during the installation process, resulting in its inability to accurately align with the preset holes. This not only increases the difficulty of installation, but may also have an adverse effect on the structural performance of the steel pipe column. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a BIM-based installation method for a siphonic rainwater pipe built into a steel pipe column, which solves the problem in the prior art that the siphonic rainwater pipe may deviate during the installation process due to the lack of precise positioning and installation solutions, resulting in the inability to accurately align with the preset holes.
[0005] According to an embodiment of the present invention, a method for installing a built-in siphon rainwater pipe in a steel pipe column based on BIM includes the following steps: Step 1, using BIM technology to perform three-dimensional modeling: creating a BIM model including a steel pipe column, a siphon rainwater pipe and other equipment pipes; Step 2, performing pipeline collision detection and optimization: performing collision detection in the BIM model to check the interference between the siphon rainwater pipe and the interior of the steel pipe column and the other equipment pipes, and according to the detection results, optimizing the position of the siphon rainwater pipe or changing the structural layout inside the steel pipe column, determining the optimal path and position of the siphon rainwater pipe inside the steel pipe column through precise calculation and simulation analysis of the model, and determining the internal stiffening plate of the steel pipe column based on the above results. Reserve positions for holes; Step 3: Process and manufacture prefabricated components: According to the structural layout of the steel pipe column and the siphon rainwater pipe in the BIM model, process and manufacture prefabricated components; Step 4: Position and connect the siphon rainwater pipe and other equipment pipes with the steel pipe column; Step 5: Install and connect the siphon rainwater pipe and the other equipment pipes: Install and connect the prefabricated siphon rainwater pipe and the other equipment pipes according to the preset path and position; Step 6: Water seepage test and water flow test for siphon rainwater pipe connection: Carry out water seepage test and water flow test for the siphon rainwater pipe connection to verify the installation quality and functionality of the siphon rainwater pipe; Step 7: Welding connection and flaw detection of steel pipe columns; Step 8: Overall acceptance and delivery.
[0006] Compared with the prior art, the present invention has the following beneficial effects: the method fully utilizes the advantages of BIM technology, and realizes the precise control of the position of the siphon rainwater pipe inside the steel pipe column through the steps of precise modeling, collision detection, optimized design, construction guidance, prefabricated component processing and production, positioning and docking, installation and connection, quality inspection and acceptance, etc., thus improving the installation efficiency and quality, and reducing the construction difficulty and risk. At the same time, the method can also effectively reduce collisions and conflicts during the installation process, optimize the structural layout inside the steel pipe column, and improve the overall performance of the building.
[0007] Furthermore, in step one: the base points in the BIM model should coincide with the coordinate points of the construction drawings of the implementation project, and the steel pipe columns, the siphon rainwater pipes and the other equipment pipes should be modeled parametrically to facilitate subsequent pipeline collision optimization and model adjustments caused by changes in construction drawings.
[0008] Furthermore, in step 2: when performing pipeline collision detection and optimization, the visualization function of BIM technology is used to highlight the collision parts.
[0009] Furthermore, in step four: when assembling the siphonic rainwater pipe and the steel pipe column, a flexible sleeve is used to protect the siphonic rainwater pipe passing through the reserved hole on the inner stiffening plate, and the end of the siphonic rainwater pipe is sealed with a pipe mouth plug.
[0010] Furthermore, in step 4: after the steel pipe columns are butted, a temporary fixing device is used to temporarily fix the steel pipe columns.
[0011] Furthermore, in step five: the installation and connection method of the siphon rainwater pipe and the pipes of the other equipment is welding or clamp connection.
[0012] Furthermore, in step five: during the process of connecting the siphon rainwater pipe and the other equipment pipes, lanyards and fall arresters are provided for professional construction workers to ensure their construction safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic diagram of the structure of a steel pipe column with a built-in siphon rainwater pipe according to the present invention;
[0014] Figure 2 This is a schematic diagram of the structure of temporary fixation during the installation and docking of the steel pipe column of the present invention;
[0015] In the above drawings: 1-steel pipe column; 2-siphon rainwater pipe; 3-other equipment pipes; 4-inner stiffening plate; 5-pipe mouth plugging; 6-flexible casing; 7-lower steel pipe column; 8-temporary fixing device; 81-ear plate; 82-attachment plate; 83-fixing screw; 84-fixing nut. DETAILED DESCRIPTION
[0016] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0017] The embodiment of the present invention proposes a BIM-based installation method for a steel pipe column built-in siphon rainwater pipe, comprising the following steps:
[0018] Step 1: Use BIM technology to perform 3D modeling. Create a BIM model including steel pipe column 1, siphon rainwater pipe 2 and other equipment pipes 3 according to the design drawings and specifications of the construction project. During the modeling process, the size, material, connection method, etc. of the steel pipe column 1, the siphon rainwater pipe 2 and the other equipment pipes 3 are set in detail according to the actual project requirements to meet the construction requirements.
[0019] Step 2: Perform pipeline collision detection and optimization. Perform collision detection in the BIM model to check the interference between the siphonic rainwater pipe 2 and the interior of the steel pipe column 1 and the other equipment pipes 3. According to the detection results, optimize the position of the siphonic rainwater pipe 2 or change the structural layout inside the steel pipe column 1 to eliminate potential collisions. Through precise calculation and simulation analysis of the model, determine the optimal path and position of the siphonic rainwater pipe 2 inside the steel pipe column 1, and determine the reserved position of the holes on the inner stiffening plate 4 of the steel pipe column 1 based on the above results, to ensure that the siphonic rainwater pipe 2 can be smoothly installed inside the steel pipe column 1 and meet the design requirements and usage functions.
[0020] Generate construction guidance documents. According to the optimal path and position of the siphonic rainwater pipe 2 in the BIM model and the actual situation of the construction site, generate detailed construction guidance documents, including the installation position, size, construction sequence, construction method and quality requirements of the siphonic rainwater pipe 2. At the same time, formulate safe construction measures to ensure safety during the installation process. The construction guidance document can provide construction personnel with clear installation guidance to ensure the accuracy and efficiency of the installation process.
[0021] Step 3: Process and manufacture prefabricated components. According to the optimized design data of the steel pipe column 1 and the siphon rainwater pipe 2 in the BIM model, process and manufacture prefabricated components. This includes cutting and welding of the steel pipe column 1, reserved holes of the inner stiffening plate 4, and prefabrication and assembly with the siphon rainwater pipe 2. Through precise processing of prefabricated components, it can be ensured that the size, shape and position of the components are consistent with the optimized design data in the BIM model, providing convenience and guarantee for subsequent installation work.
[0022] Step 4: Positioning and docking the steel pipe column 1 with the built-in siphon rainwater pipe 2 and the other equipment pipes 3. At the construction site, the steel pipe column 1 is accurately positioned according to the construction drawings and the construction guidance documents generated by BIM to ensure the docking accuracy with the lower steel pipe column 7 and the internal equipment pipe 4. At the same time, check the position and size of the internal holes of the steel pipe column 1 to ensure that it matches the siphon rainwater pipe 2 and the other equipment pipes 3. During the positioning and docking process, appropriate fixing measures are adopted to ensure the stability and safety of the steel pipe column 1.
[0023] Step 5: Installation and connection of the siphonic rainwater pipe 2 and the other equipment pipes 3. According to the construction guidance document, the prefabricated siphonic rainwater pipe 2 and the other equipment pipes 3 are installed and connected according to the preset path and position. During the installation and connection process, the visualization function of the BIM model is used to perform real-time monitoring and adjustment to ensure the installation quality. At the same time, the data analysis function of the BIM model is used to collect and analyze the data during the installation process to provide strong support for subsequent project management.
[0024] Step six: The siphonic rainwater pipe 2 is connected for water seepage test and water flow test. After the installation is completed, the siphonic rainwater pipe 2 is connected for water seepage test and water flow test to verify the installation quality and functionality of the siphonic rainwater pipe 2. According to the layout of the siphonic rainwater pipe 2 in the BIM model, formulate a corresponding test plan, including test pressure, test time, test personnel, etc. During the test, carefully check the connection parts of the siphonic rainwater pipe 2 to ensure that there is no leakage. At the same time, observe the water flow of the siphonic rainwater pipe 2 to ensure smooth water flow and no blockage. If any problems are found during the test, they should be handled and repaired in a timely manner to ensure the normal operation of the siphonic rainwater pipe 2.
[0025] Step seven: welding connection and flaw detection of the steel pipe column 1. After completing the installation and connection of the siphon rainwater pipe 2 and the other equipment pipes 3, the steel pipe column 1 and the lower steel pipe column 7 are welded together using appropriate welding processes and welding materials according to the construction drawings and the positioning data in the BIM model. During the welding process, pay attention to controlling welding deformation and residual stress to ensure the overall stability of the steel pipe column 1. After welding is completed, perform flaw detection on the weld to detect potential welding defects. Commonly used flaw detection methods include X-ray flaw detection, ultrasonic flaw detection, etc. According to the test results, the weld is repaired or reinforced to ensure that the welding quality of the steel pipe column 1 meets the design requirements.
[0026] Step 8: Overall acceptance and delivery. After completing all installation and testing work, the entire steel pipe column 1 with the built-in siphon rainwater pipe 2 component installation project is accepted as a whole. The acceptance content includes the installation quality of the siphon rainwater pipe 2, the structural performance of the steel pipe column 1, the operation of the equipment pipeline, etc. According to the acceptance results, the existing problems are rectified and improved to ensure that the entire project meets the design requirements and usage functions.
[0027] in:
[0028] In step 1: the base points in the BIM model should be consistent with the coordinate points of the construction drawings of the implementation project, and the steel pipe column 1, the siphon rainwater pipe 2 and the other equipment pipes 3 should be parametrically modeled to facilitate subsequent pipeline collision optimization and model adjustments caused by changes in construction drawings. At the same time, the information sharing of BIM technology is used to ensure collaborative design and information communication between various disciplines.
[0029] In step 2: When performing pipeline collision detection and optimization, the visualization function of BIM technology is used to highlight the collision parts and provide a collision report, providing professional technicians with an intuitive optimization basis.
[0030] In step three: The construction guidance document should include a detailed construction node diagram and provide detailed descriptions of the key nodes in the construction process to ensure that construction personnel can accurately understand and implement construction requirements.
[0031] In step 4: during the processing and production of prefabricated components, advanced processing equipment and processes are used to ensure the dimensional accuracy and surface quality of the components. At the same time, when assembling the siphon rainwater pipe 2 with the steel pipe column 1, a flexible sleeve 6 should be used to protect the siphon rainwater pipe 2 passing through the reserved hole on the inner stiffening plate 4 to ensure the safety of the siphon rainwater pipe under earthquake action. In addition, in order to prevent foreign objects from falling into the siphon rainwater pipe 2, the end of the siphon rainwater pipe 2 should be sealed with a pipe mouth plug 5.
[0032] In step five: during the positioning and docking process of the steel pipe column 1, the positioning function of the BIM technology is used to accurately position the steel pipe column 1. At the same time, advanced equipment such as laser rangefinders are used to monitor the docking accuracy in real time to ensure the docking quality. It should be noted that in this step, after the steel pipe column 1 is docked, a temporary fixing device 8 should be used to temporarily fix the steel pipe column. The temporary fixing device 8 includes an ear plate 81, a patch plate 82, a fixing screw 83, and a fixing nut 84. The ear plate 81 and the patch plate 82 have bolt holes, and the ear plate 81 is welded to the outer wall of the steel pipe column 1. During temporary fixation, the bolt hole of the patch plate 82 is aligned with the bolt hole of the ear plate 81, and then the fixing screw 83 is used to pass through the docking bolt hole, and the fixing nut 84 is used to tighten to complete the temporary fixation of the steel pipe column.
[0033] In step 6: to install the siphon rainwater pipe 2 and other equipment pipes 3, professional construction personnel need to enter the steel pipe column 1 through a ladder, first remove the pipe mouth plug 5 of the siphon rainwater pipe 2, and then use welding, clamp connection and other methods to install and connect the siphon rainwater pipe 2 and other equipment pipes 3. In this process, professional construction personnel need to be equipped with hanging ropes and fall arresters to ensure the construction safety of construction personnel.
[0034] In step 7: When conducting the water seepage test and water flow test of the siphon rainwater pipe 2, it is necessary to follow the pre-established test plan to ensure the accuracy and reliability of the test results. During the water seepage test, professional technicians are required to enter the steel pipe column 1 through a ladder to observe and judge the water seepage at the connection of the siphon rainwater pipe 2. At the same time, any problems found should be dealt with in a timely manner to ensure the normal operation of the siphon rainwater pipe.
[0035] In step 8: During the welding connection and flaw detection of the steel pipe column 1, experienced welders and advanced welding equipment are required to ensure welding quality and efficiency. It should be noted that the temporary fixing device 8 provided in step 5 can be removed and the ear plate 81 temporarily fixed on the outside of the steel pipe column 1 can be cut off after the welding of the steel pipe column 1 is completed.
[0036] Step 9: Overall acceptance and delivery is the final stage of the entire project, which requires a comprehensive inspection and evaluation of the entire project to ensure that the project meets the design requirements and usage functions. At the same time, any existing problems should be rectified and improved in a timely manner to ensure the quality of the entire project.
[0037] Through the above steps, the present invention realizes the installation of built-in siphon rainwater pipes in steel pipe columns based on BIM. The method makes full use of the advantages of BIM technology, and realizes the precise control of the position of the siphon rainwater pipe 2 inside the steel pipe column 1 through the steps of precise modeling, collision detection, optimized design, construction guidance, prefabricated component processing and production, positioning and docking, installation and connection, and quality inspection and acceptance, thereby improving the installation efficiency and quality, and reducing the construction difficulty and risk. At the same time, the method can also effectively reduce collisions and conflicts during the installation process, optimize the structural layout inside the steel pipe column, and improve the overall performance of the building. In addition, through the visualization function and data analysis function of BIM technology, real-time monitoring and data analysis of the installation process can be realized, providing strong support for subsequent engineering management. Therefore, the present invention has important practical application value for improving the construction quality and efficiency of construction projects. In addition, the invention also has good versatility and extensibility, and can be widely used in the installation of equipment pipelines built into steel pipe columns in various construction projects.
[0038] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.
Claims
1. A BIM-based installation method for a steel column built-in siphon rainwater pipe. It is characterized in that The steps include: Step 1: Use BIM technology for 3D modeling: Create a BIM model including steel pipe columns, siphon rainwater pipes and other equipment pipes; Step 2: Conduct pipeline collision detection and optimization: perform collision detection in the BIM model to check the interference between the siphon rainwater pipe and the interior of the steel pipe column and other equipment pipes. According to the detection results, optimize the position of the siphon rainwater pipe or change the structural layout inside the steel pipe column. Determine the optimal path and position of the siphon rainwater pipe inside the steel pipe column through precise calculation and simulation analysis of the model, and determine the reserved position of the holes on the inner stiffening plate of the steel pipe column according to the above results; Step 3: Processing and manufacturing prefabricated components: Processing and manufacturing prefabricated components according to the structural layout of the steel pipe column and the siphon rainwater pipe in the BIM model; Step 4: Positioning and docking of siphon rainwater pipes and other equipment pipes with steel pipe columns; Step 5: Installation and connection of the siphon rainwater pipe and the other equipment pipes: Install and connect the prefabricated siphon rainwater pipe and the other equipment pipes according to the preset path and position; Step 6: Siphon rainwater pipe connection water seepage test and water flow test: Perform the siphon rainwater pipe connection water seepage test and water flow test to verify the installation quality and functionality of the siphon rainwater pipe; Step 7: Welding connection and flaw detection of steel pipe columns; Step 8: Overall acceptance and delivery.
2. A method for installing a steel pipe column with a built-in siphon rainwater pipe based on BIM as claimed in claim 1, It is characterized in that In the step 1: the base points in the BIM model should coincide with the coordinate points of the construction drawings of the implementation project, and the steel pipe column, the siphon rainwater pipe and the other equipment pipelines should be parametrically modeled to facilitate subsequent pipeline collision optimization and model adjustments caused by changes in construction drawings.
3. The method for installing a steel pipe column built-in siphon rainwater pipe based on BIM as claimed in claim 1, It is characterized in that In the step 2: when performing pipeline collision detection and optimization, the visualization function of BIM technology is used to highlight the collision parts.
4. The method for installing a steel pipe column built-in siphon rainwater pipe based on BIM as claimed in claim 1, It is characterized in that In the step 4: when assembling the siphon rainwater pipe and the steel pipe column, a flexible sleeve is used to protect the siphon rainwater pipe passing through the reserved hole on the inner stiffening plate, and the end of the siphon rainwater pipe is sealed by a pipe mouth plug.
5. The method for installing a steel pipe column built-in siphon rainwater pipe based on BIM as claimed in claim 1, It is characterized in that In the step 4: after the steel pipe columns are butted, a temporary fixing device is used to temporarily fix the steel pipe columns.
6. The method for installing a steel pipe column built-in siphon rainwater pipe based on BIM as claimed in claim 1, It is characterized in that In the step 5: the installation and connection method of the siphon rainwater pipe and the other equipment pipes is welding or clamp connection.
7. A method for installing a steel pipe column with a built-in siphon rainwater pipe based on BIM as claimed in claim 6, It is characterized in that In the step 5: during the process of connecting the siphon rainwater pipe and the other equipment pipes, lanyards and fall arresters are provided for professional construction personnel to ensure the construction safety of the construction personnel.