Process management system

By designing the process management module and engine of the process management system, the problems of association between processes and projects, progress query and hardware automation identification are solved, the efficiency and automation of process management are achieved, and the information viewing permissions and process progress association of temporary staff are satisfied. need.

CN118735448APending Publication Date: 2024-10-01NUOTE TECH (ZHUHAI) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410829321.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2024-10-01

Smart Images

  • Figure CN118735448A_ABST
    Figure CN118735448A_ABST
Patent Text Reader

Abstract

The invention discloses a process management system, and relates to the field of process management. The process management system comprises a process management module and a process management engine, the process management module comprises a process customization module and a content customization module; the process management engine comprises a data transmission module, a process display module and a process reset module. According to the process management system, all personnel can quickly query processes related to the personnel; a temporary worker can participate in the process through permission setting but cannot check all messages uploaded by the process; a two-dimensional code is utilized to bind the process, and an owner can quickly find the process by scanning the code; part of nodes in the process can be set as hardware, AI can be deployed to the hardware in a low-code mode, and the hardware completes examination and approval through an algorithm and judges whether the nodes are completed or not; and the process is bound with the project progress, so that the project progress can be automatically controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of process management, and in particular to a process management system. Background Art

[0002] Use office software such as DingTalk or Feishu to add manufacturer employees to the system. Then, employees can initiate specific approvals through the relevant permissions that are set. Employees can initiate relevant processes in the office software and upload corresponding materials at the same time. The system background can design the process according to the process; the process is designed in a unified manner; all personnel can see the information uploaded in all steps of the process.

[0003] The above system has the following disadvantages:

[0004] 1. When multiple processes are carried out simultaneously, project management cannot quickly check the progress of different processes;

[0005] 2. The process cannot be bound to the project;

[0006] 3. Temporary staff of manufacturers in the project do not need to view all the information in the process;

[0007] 4. In project management, the project progress cannot be associated with the approval process;

[0008] 5. The nodes in the approval process cannot be combined with hardware other than mobile phones for automated identification;

[0009] Based on the above-mentioned technical problems, the present invention designs a process management system. Summary of the invention

[0010] In view of the deficiencies in the prior art, the present invention provides a process management system that solves the problems that when multiple groups of processes are carried out simultaneously, project management cannot quickly query the progress of different processes; the process cannot be bound to the project; the temporary staff of the manufacturer in the project does not need to view all the information in the process; in project management, the project progress cannot be associated with the approval process; and the nodes in the approval process cannot be combined with hardware other than mobile phones for automatic identification.

[0011] To achieve the above objectives, the present invention is implemented through the following technical solutions: a process management system, including a process management module and a process management engine;

[0012] The process management module includes:

[0013] Process customization module: The process customization module is used to customize multiple links of the project process management process. The project process is approved in the order of multiple links, and the process customization module adds and deletes different links;

[0014] Content customization module: the content customization module customizes and adjusts the content of the customized links of the process customization module;

[0015] The process management engine includes:

[0016] Data transmission module, including software data transmission and hardware data transmission. The data transmission module transmits and stores the data generated in the project process;

[0017] Process display module, which displays the current project process progress;

[0018] Process reset module: during the project process approval, if the approval is passed, the next stage will be carried out; if the approval is not passed, the current approval process of the stage will be reset;

[0019] The process anomaly detection and prediction module analyzes the data in the process through, but not limited to, CNN, VAE, Autoencode, and LSTM models to achieve anomaly detection and prediction;

[0020] The automated decision-making module analyzes and learns the data in the process through but not limited to CNN, VAE, Autoencode, and LSTM models to achieve automated decision-making and optimization.

[0021] Preferably, the process customization module customizes the following project processes:

[0022] Project classification, initiation of approval process, project process management, process approval association and process association, approval notification and process approval, the specific content of these links can be customized through the content customization module;

[0023] The project categories are specifically:

[0024] Projects are categorized and displayed, with the work that needs to be completed displayed in the project categories, and the approval process is also displayed in the corresponding project.

[0025] Preferably, the process anomaly detection and prediction module uses mean square error analysis when performing analysis: where w i is the weight coefficient for each sample data, w i >0, usually 1, range [0,∞], where W is the predicted value, when the predicted value is completely consistent with the true value, it is equal to 0, that is, a perfect model, the larger the error, the larger the value, the smaller the value, the more accurate the machine learning network model, on the contrary, the worse, y^ i is the model prediction value, n is the number of samples, y i It is the actual value. When the W value exceeds the preset threshold, an early warning reminder will be issued.

[0026] Preferably, the approval process is as follows:

[0027] The mobile terminal directly initiates the approval process in the project, and the PC terminal directly links the project when initiating it. Enter the approval name when initiating the project, and then complete the approval according to the steps designed in the process.

[0028] Preferably, the project process management specifically includes the following steps:

[0029] The applicant uploads the drawings, the factory staff confirms, the factory staff uploads the finished pictures, the factory staff uploads the packaging pictures, the pre-shipment confirmation, the pre-receipt confirmation, the on-site installation workers confirm, and the checking personnel confirm;

[0030] The content customization module customizes the content of the above process, and the data transmission module transmits and stores the data generated by the above process. The process display module displays the above process in the project classification. The audit process reset module can reset the failed steps in the steps of applicant uploading drawings, factory staff confirmation, factory staff uploading completed pictures, factory staff uploading packaging pictures, pre-shipment confirmation, pre-receipt confirmation, site installation worker confirmation and verification personnel confirmation.

[0031] Preferably, the process approval association includes:

[0032] Approver association: the person designated in the project process management step is the approver of the node. The approver reviews the past materials and uploads new materials according to the approval requirements of the step;

[0033] Hardware association: set up a hardware approval agency in the project process management step to carry out approval work, and combine hardware equipment with the process management system;

[0034] The hardware association method includes but is not limited to using sensor technology to achieve automatic identification, using camera and image recognition technology to achieve automatic identification, using radio frequency identification technology to achieve automatic identification, and using scanning equipment to achieve automatic identification of barcodes or QR codes, combining hardware with process management systems to achieve data transmission and integration.

[0035] Preferably, the process association includes:

[0036] Approval query: after the approval process is initiated and completed, a QR code is generated. After downloading the QR code, all the data in the approval process is associated. After the user scans the code with a mobile terminal, the approval page is displayed, and the user can approve the process and view the process history.

[0037] Permission management: set permissions to allow temporary staff to view data;

[0038] The approval notice is as follows:

[0039] When the PC end is creating and confirming a project, the content of the project progress is entered. Before the time reaches the time entered in the project progress, the system can automatically create an approval and notify relevant personnel via SMS, email, and the mobile end using the mobile phone system, automatically establishing an approval process;

[0040] The specific approval process is as follows:

[0041] When the approval notice is sent to the specific approver, the approver will approve the specific process until the overall project is completed.

[0042] Preferably, the automated process specification and security risk monitoring of the data input module;

[0043] For a given data electronic job ticket, the data specifications and security risks therein will be automatically analyzed one by one, and all machine learning algorithms required for supervision, the starting conditions, dependent algorithms, output operations and ending conditions of each algorithm will be found. All algorithms will be arranged and executed, and finally the execution results of all algorithms will be output. The corresponding calculation results of whether the job process specifications and security risk items are consistent with the actual algorithm detection will be obtained; the output results will be called by the electronic job ticket management module, and recorded and alarmed according to the user-defined settings.

[0044] Preferably, a computer device comprises a memory, a processor and executable instructions stored in the memory and executable in the processor, wherein the processor implements a process management system when executing the executable instructions.

[0045] Preferably, a computer-readable storage medium stores computer-executable instructions, wherein the executable instructions implement a process management system when executed by a processor.

[0046] The present invention discloses a process management system, which has the following beneficial effects:

[0047] 1. This process management system can quickly query processes among many processes. It is optimized for mobile terminals, so that all personnel can quickly query processes related to themselves; the process is associated with the project for convenient and quick query, and the process is bound by QR code. Everyone can quickly find the process by scanning the code; different roles display different information. For example, the site installer does not need to know the factory production situation. The site installer can participate in the process through permission setting but cannot view all messages uploaded by the process; the node in the approval process can be a certain hardware. When reaching the process, the hardware uses AI algorithm to automatically identify whether the task is completed, and can proceed to the next step after completion; the tasks required by the hardware in the process can be edited in a low-code manner, and the process is bound to the project progress, which can automatically control the project progress.

[0048] 2. The process management system uses QR codes to summarize all approval information in the process; when hardware is added to the process, AI can be deployed to the hardware in a low-code manner, and the hardware can determine whether the node is completed; approval is used in project management to link project progress.

[0049] 3. In the process management system, the content customization module can customize the content of the project process, and the data transmission module can transmit and store the data generated by the project process. The process display module can display the project process in the project classification. The audit process reset module can reset the failed steps in the steps of applicant uploading drawings, factory staff confirmation, factory staff uploading completed pictures, factory staff uploading packaging pictures, pre-shipment confirmation, pre-receipt confirmation, installer confirmation and verification personnel confirmation. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0051] Figure 1 It is a schematic diagram of the overall system of the present invention;

[0052] Figure 2 This is a schematic diagram of the process management of the present invention;

[0053] Figure 3 It is a specific schematic diagram of the project process of the present invention. DETAILED DESCRIPTION

[0054] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0055] The embodiment of the present application provides a process management system to solve the problems that when multiple groups of processes are carried out simultaneously, project management cannot quickly query the progress of different processes; processes cannot be bound to projects; temporary staff of manufacturers in the project do not need to view all information in the process; in project management, project progress cannot be associated with the approval process; nodes in the approval process cannot be combined with hardware other than mobile phones for automatic identification. It enables all personnel to quickly query the processes related to themselves; temporary staff can participate in the process through permission settings but cannot view all messages uploaded by the process; use QR codes to bind the process, and everyone can quickly find the process by scanning the code; some nodes in the process can be set as hardware, and the hardware can use algorithms to complete the approval; the process is bound to the project progress, and the project progress can be automatically controlled.

[0056] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0057] The embodiment of the present invention discloses a process management system; Figure 1-3 As shown, it includes a process management module and a process management engine;

[0058] The process management module includes a process customization module and a content customization module;

[0059] The process customization module is used to customize multiple links of the project process management process. The project process is approved in the order of multiple links, and the process customization module can add and delete different links;

[0060] The content customization module customizes and adjusts the content of the process customization module;

[0061] The process management engine includes a data transmission module and a process display module. The data transmission module can transmit and store the data generated in the project process;

[0062] Preferably, the process management module and the process management engine can quickly query the process among many processes, and the mobile terminal is optimized so that all personnel can quickly query the process related to themselves; the process is associated with the project for convenient and quick query, and the QR code is used to bind the process, so that everyone can quickly find the process by scanning the code; different roles display different information, for example, temporary workers on the construction site do not need to know the production situation of the factory, and temporary workers can participate in the process through permission settings, but they cannot view all messages uploaded by the process;

[0063] The process display module can display the current project process progress;

[0064] The process reset module, during the project process approval process, if the approval is passed, the next link will be carried out. If the approval is not passed, the current approval process of the link will be reset. Furthermore, the node in the approval process can be a certain hardware. When reaching the process, the hardware uses AI algorithm to automatically identify whether the task is completed, and after completion, it can proceed to the next step; the tasks that the hardware in the process needs to perform can be edited in a low-code manner, and the process is bound to the project progress, which can automatically control the project progress.

[0065] Example: The process display module can display the current project process progress. It is a visualization tool that can clearly display each stage, task and responsibility allocation of the project. The main functions of the module include:

[0066] Progress tracking: The process display module can update the project progress in real time, so that all relevant personnel can clearly understand the current status of the project.

[0067] Task Management: Through the process display module, project managers can easily assign tasks, track task completion, and ensure that all tasks are carried out according to the predetermined schedule.

[0068] Approval process: The process display module can automate the approval process, reduce manual intervention, and improve approval efficiency.

[0069] Problem solving: If problems arise in the project, the process display module can help the team quickly locate the problem and find a solution.

[0070] Decision support: By analyzing project data, the process display module can provide decision support to project managers and help them make better decisions.

[0071] Communication and collaboration: The process display module can improve the communication and collaboration efficiency of the team, allowing everyone to share information and work together on the same platform.

[0072] Ability to quickly search for processes among many processes, optimized for mobile terminals, so that all personnel can quickly search for processes related to themselves; associate processes with projects for easy and quick search, use QR codes to bind processes, and everyone can quickly find the process by scanning the code; different roles display different information;

[0073] The QR code can be used to bind the process and then to summarize all the approval information in the process. The hardware is added to the process, and AI can be deployed to the hardware in a low-code way. At the same time, the hardware can determine whether the node is completed, and the approval is used to associate the project progress in project management;

[0074] For example, the installation personnel on the construction site do not need to know the production situation of the factory. The installation personnel on the construction site can participate in the process through permission setting, but they cannot view all the messages uploaded by the process. The node in the approval process can be a certain hardware. When reaching the process, the hardware uses AI algorithm to automatically identify whether the task is completed, and can go to the next step after completion.

[0075] The tasks that the hardware in the process needs to perform can be edited using a low-code approach. The process is bound to the project progress and can automatically control the project progress.

[0076] Embodiment, the automated process specification and security risk monitoring of the data input module;

[0077] In the automated processing of the data input module, the data must first be standardized, which includes the accurate input of structured data, semi-structured data, and unstructured data. Data standards not only provide support for technology and management, but also ensure that the quality of information meets the needs of the business process;

[0078] In terms of security risk monitoring, it is necessary to implement risk identification, behavior profiling and risk warning measures in all aspects of data collection, transmission, processing and sharing. In particular, detailed monitoring and management should be carried out in terms of data ontology vulnerability, abnormal data flow trajectory, abnormal data operation behavior and abnormal data access identity.

[0079] The automation process specification of the data input module involves the standardization of data and the structural specification of the flow chart.

[0080] For a given data electronic work order, the data specifications and security risks therein will be automatically analyzed one by one, and all machine learning algorithms required for supervision will be found, as well as the starting conditions, dependent algorithms, output operations and end conditions of each algorithm. All algorithms will be arranged and executed, and finally the execution results of all algorithms will be output, and the calculation results of whether the corresponding work process specifications and security risk items are consistent with the actual algorithm detection will be obtained; these results will be called by the electronic work order management module and recorded, alarmed and other operations will be performed according to the user-defined settings;

[0081] Furthermore, the process customization module customizes the following project processes:

[0082] Project classification, initiation of approval process, project process management, process approval association and process association, approval notification and process approval;

[0083] The above-mentioned links are customized in their specific contents through the content customization module. The content customization module can customize the content of the above-mentioned process, and the data transmission module can transmit and store the data generated by the above-mentioned process. The process display module can display the above-mentioned process in the project classification, and the audit process reset module can be used to reset the failed steps in the steps of applicant uploading drawings, factory personnel confirmation, factory personnel uploading completed pictures, factory personnel uploading packaging pictures, pre-shipment confirmation, pre-receipt confirmation, site installation worker confirmation and verification personnel confirmation.

[0084] Furthermore, project classification specifically displays projects by category, in which the work to be completed is displayed, and the approval process is also displayed in the corresponding project;

[0085] It should be emphasized that the specific steps for initiating the approval process are as follows: the approval process can be initiated directly in the project on the mobile terminal, and the project can be directly associated when initiated on the PC terminal. When the project is initiated, the approval name is entered, and then the approval is completed according to the steps designed in the process.

[0086] Furthermore, project process management specifically includes the following steps:

[0087] The applicant uploads the drawings, the factory staff confirms, the factory staff uploads the finished pictures, the factory staff uploads the packaging pictures, the pre-shipment confirmation, the pre-receipt confirmation, the on-site installation workers confirm, and the checking personnel confirm;

[0088] Furthermore, the process approval association includes approver association and hardware association. In the project process management step, a person can be designated as the approver of the node. The approver will review the past materials and upload new materials according to the approval requirements of the step.

[0089] In the project process management step, a hardware approval agency can be set up to carry out approval work. The hardware can use AI algorithms to determine whether the set conditions are met. For example, the hardware can be connected to a camera to determine whether the item has been moved to the designated location. The AI ​​algorithm can be used to determine whether the node can proceed to the next step and reset the step to return to the previous step.

[0090] Particularly public,process associations include approval query and authority management;

[0091] After the approval process is initiated, a QR code can be generated. After downloading the QR code, all the data in the approval process can be associated. After the user scans the code with a mobile terminal, he can see the approval page, approve the process, and view the process history.

[0092] By setting permissions, you can set the data that temporary staff can view.

[0093] Use QR codes to summarize all approval information in the process; when hardware is added to the process, AI can be deployed to the hardware in a low-code manner, and the hardware can determine whether the node is completed; approval is used in project management to link project progress.

[0094] For special public applications, the approval notice is as follows:

[0095] The PC side can input the content of the project progress when the project is established and confirmed. Before the time entered in the project progress, the system can automatically establish an approval and notify relevant personnel, and automatically establish an approval process. For example, if procurement is required during the project progress, the procurement-related approval process will be automatically given to the procurement manager before procurement. The manager will know to start procurement and upload relevant data at the same time.

[0096] Furthermore, the specific process approval is as follows:

[0097] When the approval notice is sent to the specific approver, the approver can approve the specific process until the overall project is completed.

[0098] The content customization module can customize the content of the project process, and the data transmission module can transmit and store the data generated by the project process. The process display module can display the project process in the project classification. The audit process reset module can reset the failed steps in the steps of applicant uploading drawings, factory staff confirmation, factory staff uploading completed pictures, factory staff uploading packaging pictures, pre-shipment confirmation, pre-receipt confirmation, site installation worker confirmation and verification personnel confirmation.

[0099] It is possible to quickly query processes among many processes, including optimization for mobile terminals, so that all personnel can quickly query processes related to them; associate processes with projects for easy and quick query, use QR codes to bind processes, and everyone can quickly find the processes by scanning the codes; different roles display different information. For example, temporary workers on construction sites do not need to know the production situation of the factory. Temporary workers can participate in the process through permission settings, but they cannot view messages uploaded by all processes; the node in the approval process can be a certain hardware. When the process is reached, the hardware uses AI algorithms to automatically identify whether the task is completed, and after completion, it can proceed to the next step; the tasks that the hardware in the process needs to perform can be edited in a low-code manner, and the process is bound to the project progress, which can automatically control the project progress.

[0100] The system also includes a process anomaly detection and prediction module that analyzes the data in the process through models such as CNN, VAE, Autoencode, LSTM, etc., for anomaly detection and prediction. When performing analysis, the process anomaly detection and prediction module uses mean square error analysis: 2 , where w i is the weight coefficient for each sample data, w i >0, usually 1, range [0,∞], where W is the predicted value, when the predicted value is completely consistent with the true value, it is equal to 0, that is, a perfect model, the larger the error, the larger the value, the smaller the value, the more accurate the machine learning network model, on the contrary, the worse, y^ i is the model prediction value, n is the number of samples, y i It is the actual value. When the W value exceeds the preset threshold, an early warning reminder will be issued.

[0101] The automated decision-making module analyzes and learns the data in the process through models such as but not limited to CNN, VAE, Autoencode, LSTM, etc., to achieve automated decision-making and optimization.

[0102] A computer device comprises a memory, a processor and executable instructions stored in the memory and executable in the processor. When the processor executes the executable instructions, a process management system is implemented.

[0103] The computer device includes a memory, a processor, and executable instructions stored in the memory and executable in the processor, which can implement a process management system when executed by the processor. A process management system generally refers to a software system that helps an enterprise or organization optimize, automate, and manage its business processes;

[0104] A computer-readable storage medium stores computer-executable instructions, which implement a process management system when executed by a processor.

[0105] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A process management system, characterized in that: Including process management module and process management engine; The process management module includes: Process customization module: The process customization module is used to customize multiple links of the project process management process. The project process is approved in the order of multiple links, and the process customization module adds and deletes different links; Content customization module: the content customization module customizes and adjusts the content of the customized links of the process customization module; The process management engine includes: Data transmission module, including software data transmission and hardware data transmission. The data transmission module transmits and stores the data generated in the project process; Process display module, which displays the current project process progress; Process reset module: during the project process approval, if the approval is passed, the next stage will be carried out; if the approval is not passed, the current approval process of the stage will be reset; The process anomaly detection and prediction module analyzes the data in the process through, but not limited to, CNN, VAE, Autoencode, and LSTM models to achieve anomaly detection and prediction; The automated decision-making module analyzes and learns the data in the process through but not limited to CNN, VAE, Autoencode, and LSTM models to achieve automated decision-making and optimization.

2. A process management system according to claim 1, characterized in that: The process customization module customizes the following project processes: Project classification, initiation of approval process, project process management, process approval association and process association, approval notification and process approval, the specific content of these links can be customized through the content customization module; The project categories are specifically: Projects are categorized and displayed, with the work that needs to be completed displayed in the project categories, and the approval process is also displayed in the corresponding project.

3. A process management system according to claim 1, characterized in that: The process anomaly detection and prediction module uses mean square error analysis when performing analysis: where w i is the weight coefficient for each sample data, w i >0, usually 1, range [0,∞], where W is the predicted value, when the predicted value is completely consistent with the true value, it is equal to 0, that is, a perfect model, the larger the error, the larger the value, the smaller the value, the more accurate the machine learning network model, on the contrary, the worse, y^ i is the model prediction value, n is the number of samples, y i It is the actual value. When the W value exceeds the preset threshold, an early warning reminder will be issued.

4. A process management system according to claim 2, characterized in that: The specific approval process is as follows: The mobile terminal directly initiates the approval process in the project, and the PC terminal directly links the project when initiating it. Enter the approval name when initiating the project, and then complete the approval according to the steps designed in the process.

5. A process management system according to claim 2, characterized in that: The project workflow management embodiment specifically includes but is not limited to the following steps: Initiated by the applicant, confirmed by the factory staff, the factory uploaded the completed pictures, the factory uploaded the packaging pictures, confirmed before shipment, confirmed before receipt, confirmed by the installation workers on site and confirmed by the checking personnel; The content customization module customizes the content of the above process, and the data transmission module transmits and stores the data generated by the above process. The process display module displays the above process in the project classification. The audit process reset module can reset the failed steps in the steps of applicant uploading drawings, factory staff confirmation, factory staff uploading completed pictures, factory staff uploading packaging pictures, pre-shipment confirmation, pre-receipt confirmation, site installation worker confirmation and verification personnel confirmation.

6. A process management system according to claim 2, characterized in that: The process approval association includes: Approver association: the person designated in the project process management step is the approver of the node. The approver reviews the past materials and uploads new materials according to the approval requirements of the step; Hardware association: in the project process management step, a hardware approval agency is set up to carry out approval work, and the hardware equipment is combined with any process management system of claims 1-5; The hardware association method includes but is not limited to using sensor technology to achieve automatic identification, using camera and image recognition technology to achieve automatic identification, using radio frequency identification technology to achieve automatic identification, and using scanning equipment to achieve automatic identification of barcodes or QR codes, combining hardware with process management systems to achieve data transmission and integration.

7. A process management system according to claim 2, characterized in that: The process association includes: Approval query: after the approval process is initiated and completed, a QR code is generated. After downloading the QR code, all the data in the approval process is associated. After the user scans the code with a mobile terminal, the approval page is displayed, and the user can approve the process and view the process history. Permission management: set permissions to allow temporary staff and other vendor staff to view data; The approval notice is as follows: When the PC end is creating and confirming a project, the content of the project progress is entered. Before the time reaches the time entered in the project progress, the system can automatically create an approval and notify relevant personnel via SMS, email, and the mobile end using the mobile phone system, automatically establishing an approval process; The specific approval process is as follows: When the approval notice is sent to the specific approver, the approver will approve the specific process until the overall project is completed.

8. A process management system according to claim 7, characterized in that: Automation process specification and security risk monitoring of the data input module; For a given data electronic work order, the data specifications and security risks therein will be automatically analyzed one by one, and all machine learning algorithms required for supervision will be found, as well as the starting conditions, dependent algorithms, output operations and end conditions of each algorithm. All algorithms will be arranged and executed, and the execution results of all algorithms will be output eventually. The calculation results of whether the corresponding work process specifications and security risk items are consistent with the actual algorithm detection will be obtained; The output results will be called by the electronic job ticket management module, and recorded and alarmed according to the user-defined settings.

9. A computer device comprising a memory, a processor, and executable instructions stored in the memory and executable in the processor, characterized in that: When the processor executes the executable instructions, the process management system according to any one of claims 1 to 7 is implemented.

10. A computer-readable storage medium having computer-executable instructions stored thereon, characterized in that: When the executable instructions are executed by a processor, the process management system according to any one of claims 1 to 7 is implemented.