Investment recovery decision analysis method and system for oil and gas field capital construction project

Optimizing the cost recovery strategy of oil and gas field infrastructure projects through artificial intelligence algorithms and mathematical models solves the problem of unintelligent decision-making analysis in the existing technology and achieves a balance between the interests of resource countries and contractors and maximizes returns.

CN118735458APending Publication Date: 2024-10-01HUAYU LANCHUANG TECH (BEIJING) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410881703.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing oilfield construction recovery decision analysis technology cannot provide intelligent decision-making for resource countries and contractors. It does not consider comprehensive conditions and cannot effectively monitor and optimize cost recovery and profit sharing.

Method used

Use artificial intelligence algorithms combined with mathematical models and neural network models to optimize cost recovery strategies, predict production and oil prices through historical data and market forecasts, dynamically adjust recovery strategies, ensure the balance of interests between resource countries and contractors, and build an investment recovery decision-making analysis system.

Benefits of technology

It realizes the automatic calculation of cost recovery conditions and profit sharing, provides resource countries and contractors with intelligent decision-making, maximizes the contractor's income, while meeting the resource sharing requirements of the resource country, and ensuring the balance of interests of both parties.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735458A_ABST
    Figure CN118735458A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of investment recovery decision analysis, and particularly relates to an investment recovery decision analysis method and system for an oil and gas field capital construction project. The method specifically comprises the steps of defining a cost recovery range; setting a cost recovery condition; cost recovery is calculated; the division proportion after cost recovery is analyzed through a mathematical model; limiting conditions of cost recovery are set; the range, proportion and condition of cost recovery are optimized, and benefits of both parties are ensured; and constructing an investment recovery decision analysis system based on the product share contract. According to the invention, intelligent decision recovery conditions and analysis recovery cost are provided for resource countries and contractors.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of investment recovery decision analysis, and in particular relates to an investment recovery decision analysis method and system for oil and gas field infrastructure projects. Background Art

[0002] Cost Recovery is a key economic clause in a Product Sharing Agreement (PSA), which stipulates how the costs invested by the contractor in the process of oil and gas exploration and development are recovered, and under what conditions the contractor can start to obtain profit sharing. There is both cooperation and confrontation between the national oil company and foreign contractors. In order to obtain advanced technology from foreign contractors, it is also necessary to promote the development of the domestic oil industry; strictly monitor the cost of foreign contractors' oil operations and strictly approve the recovery; and recover their own investment as quickly as possible to the maximum extent possible, and try to ensure the stability of their own economic interests. Therefore, the present invention provides an investment recovery decision analysis method and system for oil and gas field infrastructure projects, which provides suggestions for investment decisions of both resource countries and contractors. Summary of the invention

[0003] The present invention provides an investment recovery decision analysis method and system for oil and gas field infrastructure projects, which are used to solve the technical problems that the existing oil field construction recovery consideration conditions are not comprehensive and intelligent decision-making cannot be provided for resource countries and contractors.

[0004] In order to achieve the above object, the technical solution adopted by the present invention is as follows: an investment recovery decision analysis method for oil and gas field infrastructure projects, the method comprising:

[0005] Step 1: Define the scope of cost recovery, including direct costs and indirect costs. The direct costs include drilling fees and equipment purchase fees, and the indirect costs include management fees and consulting fees.

[0006] Step 2: By setting the conditions for cost recovery, it is determined that the contractor will start cost recovery after the oil and gas field exploration is successful and enters the development stage;

[0007] Step 3: Calculate cost recovery, revenue from gasoline sales minus corresponding costs;

[0008] Step 4: Analyze the share ratio after cost recovery through mathematical models to ensure that resource-rich countries gain more benefits from increased production;

[0009] Step 5: Set cost recovery restrictions, such as a cost recovery cap and adjustment mechanism, to protect the interests of resource-rich countries;

[0010] Step 6: Optimize the scope, proportion and conditions of cost recovery to ensure the interests of both parties.

[0011] Step 7: Build an investment recovery decision analysis system based on the product sharing contract;

[0012] Furthermore, the cost recovery algorithm includes:

[0013] Total cost Ctotal calculation formula:

[0014]

[0015] in is the ith direct cost, is the i-th indirect cost, and n is the number of cost items.

[0016] Furthermore, the conditions for cost recovery include:

[0017] Cost recovery start conditions: When the oil and gas field reaches commercial production, the contractor can start to recover costs on a monthly basis;

[0018] Monthly recovery amount M calculation formula:

[0019]

[0020] Where T is the total number of months in the contract period.

[0021] Furthermore, artificial intelligence algorithms are used to optimize investment recovery, including:

[0022] Step 1: Use historical data and market forecasts to predict the production of oil and gas fields P(t) through machine learning algorithms;

[0023] Step 2: Use optimization algorithms to determine the optimal cost recovery strategy to maximize the contractor's profits while meeting the resource country's share requirements;

[0024] Step 3: Use the neural network model to calculate the future market oil price O(t) and dynamically adjust the recovery strategy to cope with market fluctuations.

[0025] Furthermore, the mathematical model of the division ratio includes:

[0026] The calculation method of the split ratio S(t) is:

[0027] S(t)=f(P(t),R(t),O(t))

[0028] Where f is the share ratio function, P(t) is the output, R(t) is the recovered cost, and O(t) is the oil price;

[0029] The piecewise function describes the change in the share ratio under different production levels, ensuring a balance of interests between resource countries and contractors:

[0030]

[0031] Where P0 and S0 are thresholds, and k is the proportional coefficient.

[0032] An investment recovery decision analysis system for oil and gas field infrastructure projects includes:

[0033] Data entry module for entering PSA-based accounting and production data;

[0034] Cost calculation module, used to calculate direct and indirect costs;

[0035] Recovery condition module, used to set the conditions for cost recovery;

[0036] Mathematical model module, used to calculate cost recovery and profit sharing ratio;

[0037] Artificial intelligence module for optimizing investment payback strategies based on historical data and market forecasts;

[0038] Report generation module, used to generate financial and production reports to meet management and reporting needs.

[0039] Furthermore, the artificial intelligence module is used to maximize the contractor's profits while satisfying the resource country's profit sharing requirements, specifically including:

[0040] STEP1 Constraints:

[0041] Meeting the cost recovery conditions:

[0042] Ensure the split ratio: S(t)=f(P(t),R(t),O(t))

[0043] STEP2 Specific steps:

[0044] (1) Initialize parameters and set initial values ​​P0, S0 and k;

[0045] (2) Construct the objective function: define the objective function F as the contractor’s total revenue;

[0046]

[0047] (3) Iterative optimization: Use gradient descent or genetic algorithm to iteratively adjust the parameters P0, S0 and k to maximize the objective function F;

[0048] (4) Termination condition: reaching the preset maximum number of iterations or the objective function converges.

[0049] STEP3 Neural Network Model:

[0050] Input layer: historical production data (output, oil price, cost).

[0051] Hidden layer: multiple hidden layers, each layer contains several neurons, and uses ReLU activation function.

[0052] Output layer: predict future production P(t) and oil price O(t).

[0053] Furthermore, the training process of the neural network model includes:

[0054] (1) Data preparation: Collect historical production data and standardize it.

[0055] (2) Model construction: Build a multi-layer neural network and set the number of neurons in the input layer, hidden layer, and output layer.

[0056] (3) Loss function: Mean square error (MSE) is used as the loss function.

[0057]

[0058] Where yi is the true value and y^i is the predicted value.

[0059] Furthermore, the Adam optimization algorithm is used to update the parameters.

[0060] Furthermore, the training model is iterative training until the loss function converges.

[0061] Compared with the prior art, the present invention has the following beneficial effects:

[0062] The present invention uses artificial intelligence algorithms to automatically calculate how the costs invested by contractors in the oil and gas exploration and development process can be recovered, and under what conditions they can begin to obtain profit sharing, providing resource countries and contractors with intelligent decision-making recovery conditions and analysis of recovery costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] Figure 1 This is a structural diagram of the investment recovery decision analysis system for oil and gas field infrastructure projects of the present invention. DETAILED DESCRIPTION

[0064] The present invention is described in detail below in conjunction with specific embodiments. The following embodiments will help those skilled in the art to further understand the present invention, but are not intended to limit the present invention in any form. It should be noted that, for those of ordinary skill in the art, several changes and improvements can also be made without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0065] An investment recovery decision analysis method for oil and gas field infrastructure projects, comprising:

[0066] Step 1: Define the scope of cost recovery, including direct costs and indirect costs. Direct costs include drilling fees and equipment purchase fees, and indirect costs include management fees and consulting fees.

[0067] Step 2: By setting the conditions for cost recovery, it is determined that the contractor will start cost recovery after the oil and gas field exploration is successful and enters the development stage;

[0068] Step 3: Calculate cost recovery, revenue from gasoline sales minus corresponding costs;

[0069] Step 4: Analyze the share ratio after cost recovery through mathematical models to ensure that resource-rich countries gain more benefits from increased production;

[0070] Step 5: Set cost recovery restrictions, such as a cost recovery cap and adjustment mechanism, to protect the interests of resource-rich countries;

[0071] Step 6: Optimize the scope, proportion and conditions of cost recovery to ensure the interests of both parties.

[0072] Step 7: Build an investment recovery decision analysis system based on the product sharing contract;

[0073] Among them, the cost recovery algorithm includes:

[0074] Total cost Ctotal calculation formula:

[0075]

[0076] in is the ith direct cost, is the i-th indirect cost, and n is the number of cost items.

[0077] The conditions for cost recovery include:

[0078] Cost recovery start conditions: When the oil and gas field reaches commercial production, the contractor can start to recover costs on a monthly basis;

[0079] Monthly recovery amount M calculation formula:

[0080]

[0081] Where T is the total number of months in the contract period.

[0082] Among them, artificial intelligence algorithms are used to optimize investment recovery, including:

[0083] Step 1: Use historical data and market forecasts to predict the production of oil and gas fields P(t) through machine learning algorithms;

[0084] Step 2: Use optimization algorithms to determine the optimal cost recovery strategy to maximize the contractor's profits while meeting the resource country's share requirements;

[0085] Step 3: Use the neural network model to calculate the future market oil price O(t) and dynamically adjust the recovery strategy to cope with market fluctuations.

[0086] Wherein, the mathematical model of the share ratio includes:

[0087] The calculation method of the split ratio S(t) is:

[0088] S(t)=f(P(t),R(t),O(t))

[0089] Where f is the share ratio function, P(t) is the output, R(t) is the recovered cost, and O(t) is the oil price;

[0090] The piecewise function describes the change in the share ratio under different production levels, ensuring a balance of interests between resource countries and contractors:

[0091]

[0092] Where P0 and S0 are thresholds, and k is the proportional coefficient.

[0093] like Figure 1 As shown, an investment recovery decision analysis system for oil and gas field infrastructure projects includes:

[0094] Data entry module for entering PSA-based accounting and production data;

[0095] Cost calculation module, used to calculate direct and indirect costs;

[0096] Recovery condition module, used to set the conditions for cost recovery;

[0097] Mathematical model module, used to calculate cost recovery and profit sharing ratio;

[0098] Artificial intelligence module for optimizing investment payback strategies based on historical data and market forecasts;

[0099] Report generation module, used to generate financial and production reports to meet management and reporting needs.

[0100] Maximize contractor benefits through artificial intelligence modules while meeting resource countries’ share requirements, including:

[0101] STEP1 Constraints:

[0102] Meeting the cost recovery conditions:

[0103] Ensure the split ratio: S(t)=f(P(t),R(t),O(t))

[0104] STEP2 Specific steps:

[0105] (1) Initialize parameters and set initial values ​​P0, S0 and k;

[0106] (2) Construct the objective function: define the objective function F as the contractor’s total revenue;

[0107]

[0108] (3) Iterative optimization: Use gradient descent or genetic algorithm to iteratively adjust the parameters P0, S0 and k to maximize the objective function F;

[0109] (4) Termination condition: reaching the preset maximum number of iterations or the objective function converges.

[0110] STEP3 Neural Network Model:

[0111] Input layer: historical production data (output, oil price, cost).

[0112] Hidden layer: multiple hidden layers, each layer contains several neurons, and uses ReLU activation function.

[0113] Output layer: predict future production P(t) and oil price O(t).

[0114] The training process of the neural network model includes:

[0115] (1) Data preparation: Collect historical production data and standardize it.

[0116] (2) Model construction: Build a multi-layer neural network and set the number of neurons in the input layer, hidden layer, and output layer.

[0117] (3) Loss function: Mean square error (MSE) is used as the loss function.

[0118]

[0119] Where yi is the true value and y^i is the predicted value.

[0120] The Adam optimization algorithm is used to update the parameters.

[0121] The training model is iterative training until the loss function converges.

[0122] During the PSA negotiation process, the scope, proportion and conditions of cost recovery are the focus of the negotiations between the two parties. The contractor hopes to recover as much cost as possible and start profit sharing as soon as possible, while the resource country government hopes to ensure that the country can obtain a reasonable share of the benefits after the contractor recovers the cost. The present invention comprehensively considers the conditions for cost recovery, and uses artificial intelligence algorithms to automatically calculate how the costs invested by the contractor in the oil and gas exploration and development process can be recovered, and under what conditions can the profit sharing be started, so as to provide good decision-making for resource countries and contractors.

[0123] The above describes the specific embodiments of the present invention. It should be understood that the present invention is not limited to the above specific embodiments, and those skilled in the art can make various changes or modifications within the scope of the claims, which does not affect the essence of the present invention. In the absence of conflict, the embodiments of the present application and the features in the embodiments can be combined with each other arbitrarily.

Claims

1. A method for analyzing investment recovery decisions for oil and gas field infrastructure projects, characterized in that: The method comprises: Step 1: Define the scope of cost recovery, including direct costs and indirect costs. The direct costs include drilling fees and equipment purchase fees, and the indirect costs include management fees and consulting fees. Step 2: By setting the conditions for cost recovery, it is determined that the contractor will start cost recovery after the oil and gas field exploration is successful and enters the development stage; Step 3: Calculate cost recovery, revenue from gasoline sales minus corresponding costs; Step 4: Analyze the share ratio after cost recovery through mathematical models to ensure that resource-rich countries gain more benefits from increased production; Step 5: Set cost recovery restrictions, such as a cost recovery cap and adjustment mechanism, to protect the interests of resource-rich countries; Step 6: Optimize the scope, proportion and conditions of cost recovery to ensure the interests of both parties; Step 7: Build an investment recovery decision analysis system based on the product sharing contract.

2. The investment recovery decision analysis method for oil and gas field infrastructure projects according to claim 1 is characterized in that: in, The cost recovery algorithm includes: The total cost Ctotal calculation formula is: in is the ith direct cost, is the i-th indirect cost, and n is the number of cost items.

3. The investment recovery decision analysis method for oil and gas field infrastructure projects according to claim 1 is characterized in that: The conditions for cost recovery include: Cost recovery start conditions: When the oil and gas field reaches commercial production, the contractor can start to recover costs on a monthly basis; Monthly recovery amount M calculation formula: Where T is the total number of months in the contract period.

4. The investment recovery decision analysis method for oil and gas field infrastructure projects according to claim 1 is characterized in that: in, Use artificial intelligence algorithms to optimize payback, including: Step 1: Use historical data and market forecasts to predict the production of oil and gas fields P(t) through machine learning algorithms; Step 2: Use optimization algorithms to determine the optimal cost recovery strategy to maximize the contractor's profits while meeting the resource country's share requirements; Step 3: Use the neural network model to calculate the future market oil price O(t) and dynamically adjust the recovery strategy to cope with market fluctuations.

5. The investment recovery decision analysis method for oil and gas field infrastructure projects according to claim 1 comprises the following calculation method: in, The mathematical model of the split ratio includes: The calculation method of the split ratio S(t) is: S(t)=f(P(t),R(t),O(t)) Where f is the share ratio function, P(t) is the output, R(t) is the recovered cost, and O(t) is the oil price; The piecewise function describes the change in the share ratio under different production levels, ensuring a balance of interests between resource countries and contractors: Where P0 and S0 are thresholds, and k is the proportional coefficient.

6. An investment recovery decision analysis system for oil and gas field infrastructure projects, characterized in that: The investment recovery decision analysis method for oil and gas field infrastructure projects as described in any one of claims 1 to 5 comprises: Data entry module for entering PSA-based accounting and production data; Cost calculation module, used to calculate direct and indirect costs; Recovery condition module, used to set the conditions for cost recovery; Mathematical model module, used to calculate cost recovery and profit sharing ratio; Artificial intelligence module for optimizing investment payback strategies based on historical data and market forecasts; Report generation module, used to generate financial and production reports to meet management and reporting needs.

7. The investment recovery decision analysis system for oil and gas field infrastructure projects according to claim 6 is characterized in that: in, The artificial intelligence module is used to maximize the contractor's profits while meeting the resource country's share requirements, including: STEP1 Constraints: Meeting the cost recovery conditions: Ensure the split ratio: S(t)=f(P(t),R(t),O(t)) STEP2 Specific steps: (1) Initialize parameters and set initial values ​​P0, S0 and k; (2) Construct the objective function: define the objective function F as the contractor’s total revenue; (3) Iterative optimization: Use gradient descent or genetic algorithm to iteratively adjust the parameters P0, S0 and k to maximize the objective function F; (4) Termination condition: reaching the preset maximum number of iterations or the objective function converges; STEP3 Neural Network Model: Input layer: historical production data (output, oil price, cost). Hidden layer: multiple hidden layers, each layer contains several neurons, and uses ReLU activation function. Output layer: predict future production P(t) and oil price O(t).

8. The investment recovery decision analysis system for oil and gas field infrastructure projects according to claim 7 is characterized in that: in, The training process of the neural network model includes: (1) Data preparation: Collect historical production data and standardize it. (2) Model construction: Build a multi-layer neural network and set the number of neurons in the input layer, hidden layer, and output layer. (3) Loss function: Mean square error (MSE) is used as the loss function. Where yi is the true value and y^i is the predicted value.

9. The investment recovery decision analysis system for oil and gas field infrastructure projects according to claim 8, characterized in that: The optimization algorithm uses Adam to update parameters.

10. The investment recovery decision analysis system for oil and gas field infrastructure projects according to claim 8, characterized in that: The training model is iterative training until the loss function converges.