Operation time estimation method and system and computer equipment

By identifying and refining parts and connector information in product operation steps, the operating time of standardized action elements is calculated, which solves the problem that existing technology cannot predict the operating time of new maintenance content, and achieves accurate and timely prediction of new tasks. Appraisal, suitable for a variety of repair and maintenance scenarios.

CN118735484APending Publication Date: 2024-10-01ZHEJIANG GEELY HLDG GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410877661.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing operation time estimation methods cannot estimate the operation time required for maintenance content that is not included in historical data, resulting in the inability to effectively follow up and manage emerging maintenance tasks.

Method used

By identifying and extracting part information and connector information from the operating step text of the product, the operating steps are refined into multiple standardized action elements, and the total operation of each operating step and product is calculated based on the operating time of these action elements. Time, does not depend on historical data.

Benefits of technology

It achieves timely estimation of the operation time of new parts, new processes or new faults. It is more adaptable and suitable for various repair and maintenance tasks, improving the accuracy and credibility of the estimation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735484A_ABST
    Figure CN118735484A_ABST
Patent Text Reader

Abstract

The invention provides an operation time estimation method and system and computer equipment, and relates to the technical field of computers.The method comprises the steps that an obtained operation step text of a product is recognized, part information and connecting piece information in each operation step are extracted, and a plurality of action elements of each operation step are determined; determining the operation time of each action element according to the part information and the connecting piece information; determining the operation time of each operation step according to the operation time of the plurality of action elements; and determining the total operation time of the product according to the operation time of all the operation steps. The method does not depend on historical data, operation time of newly added parts, newly added processes or newly added faults and the like can be estimated in time, and the method is higher in adaptability and beneficial to application and popularization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of computer technology, and in particular to a method, system and computer equipment for estimating operation time. Background Art

[0002] During the use of the product, there may be product failure or damage, which generally requires disassembly and repair to eliminate the failure. In order to better follow up on maintenance tasks and manage the work of maintenance personnel, it is necessary to estimate the disassembly and repair time in advance.

[0003] The existing operation time estimation method mainly records the actual operation content and time consumed as historical data. The next time a similar operation is performed, the time consumed by the similar operation content in the historical data is called to estimate the time required for the upcoming operation. However, when a new structure, process or operation content appears, since there is no similar operation content in the historical data, it is impossible to estimate the time required for the new operation content at this time, which is not convenient for follow-up and management of subsequent work. Summary of the invention

[0004] The problem to be solved by the present invention is that the existing operation time estimation method cannot estimate the operation time required for maintenance content that is not in the historical data.

[0005] To solve the above problems, in a first aspect, the present invention provides a method for estimating operation time, comprising:

[0006] Identify the acquired product operation step text and extract the parts information and connector information in each operation step;

[0007] Determine a plurality of action elements of each of the operation steps according to the part information and the connector information;

[0008] Determine the operation time of each of the action elements according to the part information and the connector information;

[0009] Determining the operation time of each of the operation steps according to the operation time of the plurality of action elements;

[0010] The total operation time of the product is determined based on the operation time of all the operation steps.

[0011] Compared with the prior art, the present invention has the following beneficial effects:

[0012] The present invention provides a method for estimating operation time. The method comprises the following steps: extracting part information and connector information in each operation step by identifying the operation step text of the obtained product, parsing the operation step text, determining multiple action elements of each operation step, not estimating the time in units of one part, refining the operation step into each standardized execution action, determining the operation time of each action element according to the part information and the connector information, and the time value corresponding to the refined action element is more accurate. The operation time of the standardized execution action can be obtained by calculation, and does not depend on the historical data in the database. The operation time of each operation step is determined according to the operation time of multiple action elements, and then the total operation time of the product is determined according to the operation time of all the operation steps. The whole process extracts part information and connector information through text recognition, and refines each operation step into multiple standardized action elements, so that the operation time of each operation step can be obtained by estimated calculation, and does not depend on the historical data. The operation time of newly added parts, newly added processes or newly added faults can be timely estimated. The method has stronger adaptability and is conducive to popularization and use.

[0013] Optionally, the action element includes a connector action element and a part action element; and determining the operation time of each action element according to the part information and the connector information includes:

[0014] Determining the operation time of the connecting component action element according to the connecting component information;

[0015] Based on the part information, the operation time of the part action element is determined.

[0016] Optionally, the connector information includes a connector name, a connector model, and an influencing factor level; and determining the operation time of the connector action element according to the connector information includes:

[0017] Determining, according to the connector name, a connection type of the connector in the connector action element, wherein the connector name corresponds to and matches the connection type;

[0018] According to the connection type, calling a connection estimation model corresponding to the connection component, wherein the connection type corresponds to the connection estimation model;

[0019] The operation time of the connecting component action element is determined according to the connecting component model, the level of the influencing factor and the connection estimation model.

[0020] Optionally, the connector action element includes a plurality of action sub-elements, the connection prediction model includes a plurality of connection prediction sub-models, and the action sub-elements correspond to the connection prediction sub-models one by one;

[0021] The determining of the operation time of the connecting component action element according to the connecting component model, the influencing factor level and the connection estimation model includes:

[0022] Inputting the connector model and the influencing factor level of the connector corresponding to the action sub-element into the corresponding connection estimation sub-model to determine the operation time of each action sub-element;

[0023] The operation time of the connecting piece action element is determined according to the operation time of each of the action sub-elements.

[0024] Optionally, the part information includes a part name and a part model; and determining the operation time of the part action element according to the part information includes:

[0025] According to the part name, calling the part estimation model corresponding to the part;

[0026] The part model is input into the part estimation model to determine the operation time of the part action element.

[0027] Optionally, the part information includes the number of parts, and the connector information includes the number of connectors; and determining the operation time of each operation step according to the operation time of the plurality of action elements includes:

[0028] Determining the operation time of the connector in each of the operation steps according to the number of connectors and the operation time of the connector action elements;

[0029] Determine the operation time of the parts in each of the operation steps according to the number of parts and the operation time of the action elements of the parts;

[0030] The operation time of each operation step is determined according to the operation time of all the connecting members and the operation time of all the parts in each operation step.

[0031] Optionally, after identifying the acquired operation step text of the product and extracting the parts information and connector information in each operation step, the operation time estimation method further includes:

[0032] Obtaining part information of a newly added part and the connector information required by the newly added part;

[0033] According to the part information of the newly added part and the corresponding connector information, a supplementary operation step is generated, and the operation time of the supplementary operation step is determined.

[0034] Optionally, determining the total operation time of the product according to the operation time of all the operation steps includes:

[0035] Inserting the supplementary operation steps into the operation step text to generate a complete text of the operation steps of the product;

[0036] The total operation time of the product is determined based on the operation time of all the operation steps and the operation time of the supplementary operation steps.

[0037] In a second aspect, the present invention further provides a system for estimating operation time, comprising:

[0038] A text parsing module, used to identify the acquired product operation step text, extract the parts information and connector information in each operation step; and further used to determine multiple action elements of each operation step according to the parts information and the connector information;

[0039] An action element operation estimation module, used to determine the operation time of each action element according to the part information and the connector information;

[0040] An operation step work estimation module, used to determine the operation time of each operation step according to the operation time of the plurality of action elements;

[0041] The product operation estimation module is used to determine the total operation time of the product according to the operation time of all the operation steps.

[0042] In a third aspect, the present invention further proposes a computer device, comprising a memory and a processor, wherein the memory is used to store a computer program, and the processor is used to implement the job time estimation method as described above when executing the computer program.

[0043] The operation time estimation system and computer equipment in the present invention have similar technical effects as the above-mentioned operation time estimation method, and will not be described in detail here. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 A schematic diagram of a process flow of a method for estimating operation time in an embodiment of the present invention;

[0045] Figure 2 A schematic diagram of a curve analysis of a connection estimation sub-model corresponding to a confirmed model in an embodiment of the present invention;

[0046] Figure 3 It is a schematic diagram of a curve analysis of a connection estimation sub-model corresponding to tool alignment in an embodiment of the present invention;

[0047] Figure 4It is a schematic diagram of a curve analysis of a connection prediction sub-model corresponding to a release torque in an embodiment of the present invention;

[0048] Figure 5 It is a schematic diagram of a curve analysis of a connection estimation sub-model corresponding to a disassembly buckle in an embodiment of the present invention;

[0049] Figure 6 It is a structural schematic diagram of a system for estimating operation time in an embodiment of the present invention;

[0050] Figure 7 The figure is a schematic diagram of the structure of a computer device in an embodiment of the present invention. DETAILED DESCRIPTION

[0051] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0052] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein.

[0053] In the description of this specification, the description with reference to the terms "embodiment", "one embodiment" and "one implementation" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or implementation are included in at least one embodiment or implementation of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or implementation. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or implementations in a suitable manner.

[0054] In an optional embodiment of the present invention, Figure 1 As shown, a method for estimating operation time is provided, including:

[0055] S1: Identify the operation step text of the obtained product and extract the parts information and connector information in each operation step.

[0056] Specifically, the operating step text of the product can be obtained by intercepting from the operating guide or standard operating instructions, or it can be compiled separately in advance by the operator and then uploaded. The format of the operating step text can be a variety of text formats, such as XML files, TXT files or word files. For the recognition of the operating step text, it can be matched and identified through a built-in or external database, or it can be first identified using AI or a text recognition model and then matched and screened with the database. The operating step text of the product is identified, and the part names and the number of parts corresponding to the part names in each operating step that match the equipment part information database are extracted. The equipment part information database includes multiple part names of the equipment. The equipment part information database is set up to perform a certain screening on the identified part names, so that the extracted part names are the names of the parts that really need to be repaired, and they are screened and filtered in advance to reduce interference items. During the text preparation stage of the operation steps, it is necessary to clearly describe the number of parts and part names, as well as the names, models and quantities of connectors required to install the parts. This is because the combined installation of parts relies on connectors to fix the parts. When disassembling parts, what is actually being disassembled is the connectors. A part requires multiple or many types of connectors to be fixed. In this method, under normal circumstances, the estimated time is refined and is no longer timed in units of one part, but in units of one connector. The object of time estimation is changed to the smallest execution object, even if the shape, type or quantity of the parts changes, the types of the smallest execution objects (connectors) used are limited. By analyzing the operating time of the limited types of connectors clearly, and then analyzing the operating time of the part body clearly, the operating time of each operation step can be estimated.

[0057] S2: Determine multiple action elements of each of the operation steps based on the part information and the connector information.

[0058] Specifically, the operation process of each connector includes multiple action elements. For example, the disassembly of bolts can be refined into the following action elements: confirming the model, taking and assembling tools, aligning tools, releasing torque, unscrewing fasteners, placing fasteners and putting tools back, etc. Similarly, the operation process of each part also includes multiple action elements. Therefore, under normal circumstances, after extracting the part information and connector information, the action elements in each operation step can be determined. The action elements corresponding to each connector or part can be pre-stored in the database and can be directly extracted when needed. In addition, if auxiliary operations are required during the operation, such as individual connectors are rusted, they need to be knocked or rusted before they can be disassembled; parts are occasionally stuck during disassembly, and the orientation of the parts needs to be corrected before the parts can be disassembled; or some parts are too large and require borrowing handling equipment to transport the parts. The above-mentioned operations such as knocking the connectors, rusting the connectors, correcting the orientation of the parts, and operating the handling equipment are all auxiliary operations in special cases. Therefore, the action elements may also include the action elements of these auxiliary operations.

[0059] S3: Determine the operation time of each action element according to the part information and the connector information.

[0060] Specifically, the operation steps include connector action elements corresponding to each connector, part action elements corresponding to each part, and auxiliary operation action elements in some special cases. Each action is standardized, and the operation time of the corresponding action elements can be calculated separately according to the part information and connector information. This is equivalent to refining the operation steps and subdividing them into each execution action. As long as the operating tool is replaced or the operation content is changed, it is redefined as an action. The disassembly or installation of a connector is split according to human behavior. The time value corresponding to the refined action is smaller and more accurate. Some actions may only take a few seconds to complete.

[0061] S4: Determine the operation time of each of the operation steps according to the operation time of the plurality of action elements.

[0062] Specifically, by adding up the operation times of multiple action elements refined in each step, the operation time of each operation step can be obtained. Since the action execution may not be so standard during the actual operation process, appropriate adjustments can be made based on the calculated operation time.

[0063] S5: Determine the total operation time of the product according to the operation time of all the operation steps.

[0064] Specifically, for example, the total operation time of the product T nis the operation time of the nth operation step, and n is the number of operation steps contained in the operation step text. After estimating the operation time of each step, add up the operation time of all steps to get the total operation time of the product. For example, a wheel needs to be repaired when it is flat. At this time, the operation steps may include wheel removal, tire removal, tire installation, and wheel installation. Each step requires a certain amount of operation time. To complete the repair of the entire wheel, the time of each repair step needs to be added to get the total repair time. Since the total operation time is an estimated time and may not be consistent with the actual operation time, the final total operation time is used as a reference for daily management, or a floating coefficient is appropriately multiplied on the basis of the total operation time to make the total operation time closer to the actual operation time and increase the credibility of the estimated total operation time.

[0065] In this embodiment, by identifying the obtained operation step text of the product, extracting the part information and connector information in each operation step, parsing the operation step text, determining multiple action elements of each operation step, not estimating the time in units of one part, refining the operation step into each standardized execution action, determining the operation time of each action element according to the part information and the connector information, the time value corresponding to the refined action element is more accurate, and the operation time of the standardized execution action can be obtained by calculation, not depending on the historical data in the database, and determining the operation time of each operation step according to the operation time of multiple action elements, and then determining the total operation time of the product according to the operation time of all the operation steps. The whole process extracts part information and connector information through text recognition, and refines each operation step into multiple standardized action elements, so that the operation time of each operation step can be obtained by estimation and calculation, not depending on historical data, and can timely estimate the operation time of new parts, new processes or new faults, etc. The method has stronger adaptability and is conducive to popularization and use. It can not only be used for maintenance time estimation, but also can be used in daily maintenance, production disassembly and assembly and other operation processes.

[0066] In an optional embodiment of the present invention, the action element includes a connector action element and a part action element; and determining the operation time of each action element according to the part information and the connector information includes:

[0067] The operation time of the connecting component action element is determined according to the connecting component information.

[0068] Based on the part information, the operation time of the part action element is determined.

[0069] In this embodiment, for the normal situation where the parts can be disassembled smoothly, that is, no additional auxiliary operation actions are required, the operation time of each connector action element and the operation time of each part action element in the operation steps are estimated one by one. For example, the disassembly of a bolt can be refined into the following action elements: confirming the model, taking and assembling the tool, aligning the tool, releasing the torque, unscrewing the fastener, placing the fastener and putting the tool back, etc. The connector information may include the connector name, model and operating torque, etc., wherein the operating torque can also be obtained by searching the model, and the operating torque can be set in the corresponding power tool, for example, the operating torque is input into the automatic wrench, and the automatic wrench applies force according to this operating torque when disassembling the bolt. Different types of connectors or different models of the same connector have different corresponding action elements, and the time spent on the same action element is also different, so it is necessary to specifically determine the operation time according to the type and model. For parts, if a part wants to be detachably connected to another part, the connector needs to be fixed. After the connector is disassembled, the action elements of the part include determining the part model and removing and placing the part. Since different parts have different sizes, the operation time for removing and placing parts may be different. A time value can be preset based on experience, or a time value can be estimated based on the operation time of parts of the same type.

[0070] In an optional embodiment of the present invention, the connector information includes a connector name, a connector model, and an influencing factor level; and determining the operation time of the connector action element according to the connector information includes:

[0071] According to the connector name, a connection type of the connector in the connector action element is determined, wherein the connector name corresponds to and matches the connection type.

[0072] Specifically, according to the connector name, a connection structure mapping library is queried to determine the connection type corresponding to the connector, wherein the connection structure mapping library includes the connector name and the connection type.

[0073] According to the connection type, a connection prediction model corresponding to the connection component is called, wherein the connection type corresponds to and matches the connection prediction model.

[0074] Specifically, part information may include part names and part quantities, and connector information may include connector names, connector models, and connector quantities. For example, an operation step text: To install three bases, four M8*1.5*15 fixing bolts are required. In this operation step text, the part information is 3 and bases, and the connector information is 4, model M8*1.5*15 and bolts. The operation step text may involve multiple parts and multiple connectors. Connectors may be bolts, screws, snaps, pipes, etc. Different connectors have different connection methods and time consumption, so different connectors require different connection estimation models. According to the name of the connector, the connection estimation model that matches the connector can be called accordingly, or the type of connector can be identified according to the model expression of the connector, so as to call the corresponding connector estimation model. Setting matching connection estimation models for different connectors can make the operation time of each connector more accurately estimated. In addition, since the operation time of a connector is relatively short, even if there is an error in the estimation of the operation time of a connector during the calculation process, the impact on the overall estimation result is relatively small, and the accuracy of the operation time estimation can be guaranteed to a certain extent.

[0075] The operation time of the connecting component action element is determined according to the connecting component model, the level of the influencing factor and the connection estimation model.

[0076] Specifically, a variety of connection estimation models are stored in the database, such as threaded fastener connection estimation model, snap connection estimation model, pipeline connection estimation model, wiring harness connection estimation model and part estimation model, etc. Each estimation model is applicable to the corresponding connector, wherein the part estimation model is used to estimate the time consumed in picking up and placing parts. The connection estimation model is refined, and a more suitable estimation model is used for different connectors, so as to determine the operation time of the connector action element according to the connector model, the level of the influencing factor and the connection estimation model, and the estimation result obtained is more accurate.

[0077] In an optional embodiment of the present invention, the connector action element includes a plurality of action sub-elements, the connection prediction model includes a plurality of connection prediction sub-models, and the connector action sub-elements correspond one-to-one to the connection prediction sub-models.

[0078] The determining of the operation time of the connecting component action element according to the connecting component model, the influencing factor level and the connection estimation model includes:

[0079] The connector model and the influencing factor level of the connector corresponding to the action sub-element are input into the corresponding connection estimation sub-model to determine the operation time of each action sub-element.

[0080] The operation time of the connector action element is determined according to the operation time of each action sub-element. For example, the operation time of each action sub-element is added together to obtain the operation time of the connector action element.

[0081] Specifically, if the connector is a threaded fastener, its corresponding estimated connection model is a threaded fastener estimated model, and the multiple action sub-elements included in the threaded fastener disassembly action element may be confirmation of the model, taking and assembling tools, tool alignment, releasing torque, screwing out the fastener, placing the fastener and returning the tool, and the multiple action sub-elements included in the threaded fastener installation action element may be confirmation of the model, retrieving and aligning the installation position, tool alignment, screwing the fastener in, fixing torque (i.e. fixing the fastener) and returning the tool. The action of the threaded fastener can be further subdivided into disassembly action elements and installation action elements, and the threaded fastener estimation model can be correspondingly divided into an estimation model corresponding to the disassembly action element and an estimation model corresponding to the installation action element. According to the description of the operation step text, it is determined whether it is in the disassembly process or the installation process at this time, so as to call the corresponding estimation model.

[0082] If the connecting piece is a threaded fastener, the estimation model corresponding to the threaded fastener disassembly action element is as follows:

[0083] T nk拆 =E(Sight)+E(tools_up)+E(Align)+E(Relieve)+E(Tread)

[0084] +E(Put)+E(tools down).

[0085] The estimation model corresponding to the action elements of threaded fastener installation is as follows:

[0086] T nk装 =E(Sight)+E(Take)+E(tools_up)+E(Align)+E(Fasten)+E

[0087] (Tread)+E(tools_down).

[0088] Among them, E(Sight) is the time required to confirm the model, E(tools_up) is the time required to pick up and assemble the tool, E(Align) is the time required to align the tool, E(Relieve) is the time required to release the torque, E(Tread) is the time required to screw out the fastener or the time required to fix the fastener, E(Put) is the time required to place the connector (fastener), E(tools_down) is the time required to put the tool back, E(Take) is the time required to retrieve the connector (fastener) and align it to the installation position, and E(Fasten) is the time required to screw in the fastener. E(Tread)=(π*d*L) / (V*p), d is the thread diameter, L is the actual thread engagement length, V is the operating rate, and p is the pitch. E(Sight), E(Take), E(Align), E(Put), E(tools), E(Relieve), and E(Fasten) are all obtained through statistical analysis using scatter plots measured in actual scenarios. Since the action elements are affected by the external environment, such as the confirmation signal, if the connector is blocked, the line of sight is blocked when observing the connector, and it takes a long time to confirm the signal. Therefore, the execution time of the action element is not fixed, but is related to the degree of influence of environmental factors. For example, the model formula corresponding to a certain action element obtained through analysis is y=a+bx, where the dependent variable y is the time required to execute the action element, the independent variable x is the level of the influencing factor, which can be pre-defined into several levels, a and b are constants obtained through actual statistical analysis, and b represents the influence of the influencing factor on the execution of the action element.

[0089] Similarly, if the connecting piece is a buckle, the estimation model corresponding to the buckle disassembly action element is as follows:

[0090] T nk拆 =E(Sight)+E(tools_up)+E(Align)+E(Remove_clip)+E(Put)

[0091] +E(tools_down).

[0092] The estimation model corresponding to the snap-on installation action elements is as follows:

[0093] T nk装 =E(Sight)+E(Take)+E(Install_clip).

[0094] Among them, E (Remove_clip) is the time required to remove the clip, E (Put) is the time required to place the connector (clip), E (Take) is the time required to retrieve the connector (clip) and align it with the installation position, and E (Install_clip) is the time required to install the clip.

[0095] If the connector is a pipeline, the estimation model corresponding to the pipeline disassembly action element is as follows:

[0096] T nk拆 =E(Sight)+E(tools_up)+E(Align)+E(Remove_pipe)+E(Put)

[0097] +E(tools_down).

[0098] The estimation model corresponding to the pipeline installation action elements is as follows:

[0099] T nk装 =E(Sight)+E(tools_up)+E(Align)+E(Install_pipe)+E(tools_down).

[0100] Among them, E (Remove_pipe) is the time required to remove the pipeline fixing structure, E (Put) is the time required to place the connector (pipe), that is, the time required to remove the pipeline, and E (Install_pipe) is the time required to install the pipeline fixing structure.

[0101] If the connector is a wire harness, the estimation model corresponding to the wire harness disassembly action element is as follows:

[0102] T nk拆 =E(Sight)+E(tools_up)+E(Align)+E(Remove_wire)+E(tools_down).

[0103] The estimation model corresponding to the action elements of harness installation is as follows:

[0104] T nk装 =E(Sight)+E(tools_up)+E(Align)+E(Install_wire)+E(tools_down).

[0105] Among them, E (Remove_pipe) is the time required to disassemble the wiring harness connection structure, E (Put) is the time required to place the connector (pipe), that is, the time required to remove the pipe, and E (Install_pipe) is the time required to install the wiring harness connection structure.

[0106] In an optional embodiment of the present invention, the part information includes a part name and a part model; and determining the operation time of the part action element according to the part information includes:

[0107] According to the part name, calling the part estimation model corresponding to the part;

[0108] The part model is input into the part estimation model to determine the operation time of the part action element.

[0109] Specifically, if the handling time of the device (part) body is calculated, the part estimation model corresponding to the device / part disassembly action element is as follows: T nk拆 =E(Sight)+E(Remove_device). The part estimation model corresponding to the device / part installation action element is as follows: T nk装 =E(Sight)+E(Install_device). Among them, E(Remove_device) is the time required to remove and place the device / part, and E(Install_device) is the time required to retrieve and locate the device / part. Different parts may have different corresponding part estimation models, and because the size and weight of the same parts of different models are different, the time spent will be different accordingly. Therefore, it is necessary to comprehensively determine the operation time of the part action element based on the part name and part model.

[0110] It should be noted that for the estimation models of various connectors, such as Figure 2 As shown in Figure 1, the time value of the confirmation model E (Sight) is affected by the level of sight obstruction, and the level of sight obstruction gradually increases from no obstruction, partial obstruction to complete blind operation. Figure 3 As shown in Figure 1, the time values ​​of tool alignment E(Align), placement of connectors E(Put), and retrieving and aligning to the installation position E(Take) are affected by the spatial shielding level, which gradually increases from no interference, partial interference to most interference. Figure 4 As shown in the figure, the release torque E(Relieve) and the time value of screwing the fastener E(Fasten) are affected by the spatial shielding level and the thread diameter. The time to take and assemble the tool E(tools_up) and put the tool back E(tools_down) are constants, which are obtained by statistically averaging in the actual operation process. Figure 5As shown in the figure, the time values ​​of removing the clip E (Remove_clip), installing the clip E (Install_pipe), removing the pipe fixing structure E (Remove_pipe), installing the pipe fixing structure E (Install_pipe), removing the wire harness connection structure E (Remove_wire), and installing the wire harness connection structure E (Install_wire) are affected by the type of connector and the spatial shielding level. Line of sight shielding means that the line of sight cannot directly see the complete connector, and spatial shielding means that the diameter range of the hand operation space is less than 60mm. The smaller the diameter, the higher the shielding level. Figure 2-Figure 5 The estimation model obtained by the analysis is obtained by collecting multiple operation data and then fitting the estimation model through analysis. Even if the type and shape of the parts change, the type of connectors used are the same or similar. The operation time of the new parts can also be estimated by the type and quantity of connectors. Even if new connectors appear, the model of old connectors similar to the new connectors can be selected for approximate calculation. The operation time of a connector is relatively small compared to the total operation time of the product. Therefore, a new connector is calculated using the approximate connector model, which has little effect on the total operation time of the product and can still be estimated.

[0111] In an optional embodiment of the present invention, the part information includes the number of parts, and the connector information includes the number of connectors; and determining the operation time of each operation step according to the operation time of the plurality of action elements includes:

[0112] The operating time of the connectors in each of the operation steps is determined according to the number of connectors and the operating time of the connector action elements.

[0113] The operation time of the parts in each of the operation steps is determined according to the number of parts and the operation time of the part action elements.

[0114] Specifically, the connection / part operation time T nk =E(x 1 )+E(x 2 )+E(x 3 )……+E(x j ), where T nk is the operation time of the kth connector or part in the nth operation step, x j is the jth action element of the kth connector or part, E(x j ) represents the operation time of the jth action element of the kth connector or part, and j is the number of action elements corresponding to the kth connector or part.

[0115] The operation time of each operation step is determined according to the operation time of all the connecting members and the operation time of all the parts in each operation step.

[0116] Specifically, for example, the operation time of each operation step T nk It is the operation time of the kth connector or part in the nth operation step, n is the number of operation steps contained in the operation step text, k is the total number of connectors and parts in each operation step. When there are multiple connectors of the same type, they can be accumulated multiple times or multiplied by a quantity coefficient directly in front of a connector.

[0117] In this embodiment, according to the type of connector, the time required for installing or removing a connector of each type is first calculated, and then the number of connectors of each type is multiplied by the operation time of a connector to obtain the operation time of each connector. A part may require multiple connectors, so the operation time of multiple connectors is added together to obtain the operation time of all connectors corresponding to the part, and then the operation time of the part body is added together to obtain the total operation time of all action elements related to the part. Since an operation step may have operation descriptions for multiple identical parts, the number of parts is added to the number of connectors required for each part to obtain the number of connectors. Since an operation step may also have operation descriptions for multiple different parts, the operation time of all parts and the operation time of all action elements are added together to finally obtain the operation time of an operation step. On the one hand, starting from the operation time of the smallest unit, the operation time of the smallest unit is relatively small as a whole, and even if the estimation error of the operation time of a certain smallest unit has little effect on the operation time of the final product; on the other hand, the operation action of the smallest unit is easier to standardize, so the calculation of its operation time is more accurate, so that the accuracy of the total operation time can be guaranteed.

[0118] In an optional embodiment of the present invention, after the operation step text of the product is identified and obtained, and the part information and connector information in each operation step are extracted, the operation time estimation method further includes:

[0119] The part information of the newly added part and the connector information required by the newly added part are obtained.

[0120] Specifically, the user can enter the name and quantity of the newly added parts through the development window, and correspondingly enter the name, quantity and model of the connectors required for the parts, and can further enter other information such as torque and level of influencing factors.

[0121] According to the part information of the newly added part and the corresponding connector information, a supplementary operation step is generated, and the operation time of the supplementary operation step is determined.

[0122] Specifically, according to the newly added connector information, the connection estimation model corresponding to the newly added connector is called; the part information of the newly added part and the connector information corresponding to the newly added part are respectively input into the estimation model to determine the operation time of the supplementary operation steps.

[0123] In this embodiment, the user can recompile the operation step text or redevelop the system by observing the engineering data or physical structure. For example, a control module and a control module bracket are added to a structure in a device. The two structures are connected by 3 fixing bolts. The user enters the text "control module" in the device name text box of the system development window and the text "control module bracket" in the opponent device name text box. The devices entered in the device name text box and the opponent device name text box are two devices connected to each other. "3" is entered as the number of bolts in the bolt quantity text box, and "M10*2*10" is entered as the bolt model in the bolt model text box. In other parameter text boxes, relevant parameters or influencing factor level information are entered. The above-mentioned input text and value are used as input parameters of the called connection estimation model and participate in the calculation. When generating the supplementary operation steps, the text in the device name text box and the opponent device name text box is automatically picked up, and "A and B are combined and installed" or "A is installed on B" can be generated, and then the information related to the connector is picked up to generate "connector model-connector name-connector quantity", and the two parts of text are combined into an additional operation step. By inputting relevant parameters, the automatic estimation method of the above-mentioned operation time can be supplemented, the flexibility of using the estimation method can be improved, and the database of the estimation method can be continuously supplemented, so that the estimation method has a certain growth potential.

[0124] In an optional embodiment of the present invention, determining the total operation time of the product according to the operation time of all the operation steps includes:

[0125] The supplementary operation steps are inserted into the operation step text to generate a complete operation step text for the product. When the supplementary operation steps are inserted into the operation step text, the user can first specify a position in the operation step text, and then the supplementary operation steps are automatically inserted into the specified position.

[0126] The total operation time of the product is determined based on the operation time of all the operation steps and the operation time of the supplementary operation steps. The product operation step complete text and the product total operation time are sent to other systems and saved in the database, such as to the central control system, for data display, monitoring and analysis.

[0127] In this embodiment, although new parts and their corresponding connectors are added by manual input, the operation time of the connectors is still estimated by the automatic estimation method, which is less affected by human factors, and the results are more accurate and reliable. In addition, the operation step text can be automatically supplemented through the manually input part information and connector information, so that the operation step text is continuously improved and updated, which is convenient for subsequent management and reduces the time for manual text compilation.

[0128] In an optional embodiment of the present invention, Figure 6 As shown, a system for estimating operation time is also provided, including:

[0129] The text parsing module 100 is used to identify the acquired operation step text of the product and extract the parts information and connector information in each operation step; it is also used to determine multiple action elements of each operation step based on the parts information and the connector information.

[0130] The action element operation estimation module 200 is used to determine the operation time of each action element according to the part information and the connector information.

[0131] The operation step work estimation module 300 is used to determine the operation time of each operation step according to the operation time of multiple action elements.

[0132] The product operation estimation module 400 is used to determine the total operation time of the product according to the operation time of all the operation steps.

[0133] The operation time estimation system in the present invention has similar technical effects as the above-mentioned operation time estimation method, which will not be described in detail here.

[0134] In an optional embodiment of the present invention, Figure 7 As shown, a computer device 700 is also proposed, including a memory 702 and a processor 701, wherein the memory 702 is used to store a computer program, and the processor 701 is used to implement the above-mentioned job time estimation method when executing the computer program.

[0135] The computer device in the present invention has a technical effect similar to that of the above-mentioned operation time estimation method, which will not be described in detail here.

[0136] In an optional embodiment of the present invention, a computer-readable storage medium is further proposed, on which a computer program is stored. When the computer program is executed by a processor, the job time estimation method as described above is implemented.

[0137] The computer-readable storage medium in the present invention has a technical effect similar to that of the above-mentioned job time estimation method, which will not be described in detail here.

[0138] Generally speaking, the computer instructions for implementing the method of the present invention can be carried by any combination of one or more computer-readable storage media. Non-transitory computer-readable storage media can include any computer-readable media except for the signal itself that is temporarily propagating.

[0139] Computer-readable storage media can be, for example, but not limited to, electrical, magnetic, optical, electromagnetic, infrared or semiconductor systems, devices or devices, or any combination thereof. More specific examples of computer-readable storage media (a non-exhaustive list) include: an electrical connection with one or more conductors, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this document, a computer-readable storage medium can be any tangible medium that contains or stores a program that can be used by or in conjunction with an instruction execution system, apparatus or device.

[0140] Program code for performing the operation of the present invention can be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages, such as Java, Smalltalk, C++, C#, and conventional procedural programming languages, such as "C" or similar programming languages, in particular, Python suitable for neural network computing and platform frameworks based on TensorFlow, PyTorch, etc. can be used. The program code can be executed entirely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer, partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet).

[0141] Although the present invention is disclosed as above, the present invention is not limited thereto. Any person skilled in the art can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the scope defined by the claims.

Claims

1. A method for estimating operation time, characterized in that: include: Identify the acquired product operation step text and extract the parts information and connector information in each operation step; Determine a plurality of action elements of each of the operation steps according to the part information and the connector information; Determine the operation time of each of the action elements according to the part information and the connector information; Determining the operation time of each of the operation steps according to the operation time of the plurality of action elements; The total operation time of the product is determined based on the operation time of all the operation steps.

2. The method for estimating operation time according to claim 1, characterized in that: The action elements include connector action elements and part action elements; and determining the operation time of each action element according to the part information and the connector information includes: Determining the operation time of the connecting component action element according to the connecting component information; Based on the part information, the operation time of the part action element is determined.

3. The method for estimating operation time according to claim 2, characterized in that: The connector information includes a connector name, a connector model, and an influencing factor level; and determining the operation time of the connector action element according to the connector information includes: Determining, according to the connector name, a connection type of the connector in the connector action element, wherein the connector name corresponds to and matches the connection type; According to the connection type, calling a connection estimation model corresponding to the connection component, wherein the connection type corresponds to the connection estimation model; The operation time of the connecting component action element is determined according to the connecting component model, the level of the influencing factor and the connection estimation model.

4. The method for estimating operation time according to claim 3, characterized in that: The connector action element includes a plurality of action sub-elements, the connection prediction model includes a plurality of connection prediction sub-models, and the action sub-elements correspond to the connection prediction sub-models one by one; The determining of the operation time of the connecting component action element according to the connecting component model, the influencing factor level and the connection estimation model includes: Inputting the connector model and the influencing factor level of the connector corresponding to the action sub-element into the corresponding connection estimation sub-model to determine the operation time of each action sub-element; The operation time of the connecting piece action element is determined according to the operation time of each of the action sub-elements.

5. The method for estimating operation time according to claim 2, characterized in that: The part information includes a part name and a part model; and determining the operation time of the part action element according to the part information includes: According to the part name, calling the part estimation model corresponding to the part; The part model is input into the part estimation model to determine the operation time of the part action element.

6. The method for estimating operation time according to claim 2, characterized in that: The part information includes the number of parts, and the connector information includes the number of connectors; and determining the operation time of each operation step according to the operation time of the plurality of action elements includes: Determining the operation time of the connector in each of the operation steps according to the number of connectors and the operation time of the connector action elements; Determine the operation time of the parts in each of the operation steps according to the number of parts and the operation time of the action elements of the parts; The operation time of each operation step is determined according to the operation time of all the connecting members and the operation time of all the parts in each operation step.

7. The method for estimating operation time according to claim 1, characterized in that: After the operation step text of the product is identified and the part information and connector information in each operation step are extracted, the following steps are also included: Obtaining part information of a newly added part and the connector information required by the newly added part; According to the part information of the newly added part and the corresponding connector information, a supplementary operation step is generated, and the operation time of the supplementary operation step is determined.

8. The method for estimating operation time according to claim 7, characterized in that: Determining the total operation time of the product according to the operation time of all the operation steps includes: Inserting the supplementary operation steps into the operation step text to generate a complete text of the operation steps of the product; The total operation time of the product is determined based on the operation time of all the operation steps and the operation time of the supplementary operation steps.

9. A system for estimating operation time, characterized in that: include: A text parsing module, used to identify the acquired product operation step text and extract the parts information and connector information in each operation step; It is also used to determine multiple action elements of each of the operation steps according to the part information and the connector information; An action element operation estimation module, used to determine the operation time of each action element according to the part information and the connector information; An operation step work estimation module, used to determine the operation time of each operation step according to the operation time of the plurality of action elements; The product operation estimation module is used to determine the total operation time of the product according to the operation time of all the operation steps.