Debris flow disaster peak flow forecasting method based on real-time rainfall monitoring

By using real-time rainfall monitoring data and simple watershed characteristic parameters in debris flow ditches to calculate yields and runoff hydrographs, the problems of low prediction accuracy and parameter complexity in the existing technology are solved, and efficient early warning and forecasting of debris flow disasters are achieved.

CN118736772APending Publication Date: 2024-10-01LANZHOU UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410820095.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing debris flow monitoring and early warning technologies are difficult to accurately predict the occurrence of debris flows in areas lacking long-term monitoring data, and the parameters required for the physical model are too complex, limiting the application of the model.

Method used

Using a method based on real-time rainfall monitoring, the real-time rainfall yield and runoff hydrograph are calculated by calculating four simple watershed characteristic parameters: the watershed curve number CN, the watershed area A, the length of the main ditch in the watershed L, and the average slope Sa of the watershed, and then predicting the peak value. traffic and issue warning information.

Benefits of technology

It improves the prediction accuracy of rainfall-induced debris flow disasters and shortens the forecast time, provides a monitoring and early warning solution for debris flow ditches without historical monitoring data, and enhances the practicality of the monitoring and early warning model.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118736772A_ABST
    Figure CN118736772A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of debris flow monitoring and early warning, in particular to a debris flow disaster peak flow forecasting method based on real-time rainfall monitoring, which only needs to use public data to calculate four simple drainage basin characteristic parameters, namely a drainage basin curve number CN, a drainage basin area A, a drainage basin main channel length L and a drainage basin average slope Sa. On the basis of the rain gauge built in the target debris flow gully, real-time rainfall monitoring data can be read, the runoff yield of real-time rainfall can be calculated, the peak flow of runoff generated in the debris flow gully in the current rainfall event can be predicted, the early warning level of the current debris flow can be judged through the flow threshold value, and early warning information can be issued. The debris flow monitoring and early warning model has the advantages that the prediction precision of debris flow disasters induced by rainfall is effectively improved, the prediction time is shortened, a debris flow monitoring and early warning solution is provided for debris flow gullies without historical monitoring data, and the practicability of the debris flow monitoring and early warning model is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of debris flow monitoring and early warning, and more specifically to a method for predicting the peak flow rate of debris flow disasters based on real-time rainfall monitoring. Background Art

[0002] A debris flow refers to a special torrent of water that carries large amounts of mud, sand and rocks and is triggered by heavy rain, heavy snow or other factors in mountainous areas or other areas with deep valleys and rugged terrain. A debris flow is characterized by suddenness, fast velocity, large flow rate, large mass and strong destructive power.

[0003] The shortcomings of existing debris flow monitoring and early warning technologies: The early warning models used in current debris flow monitoring and early warning technologies are divided into two types: statistical models and physical models. Among them, statistical models are mostly empirical statistical threshold models based on long-term monitoring data. For example, the most widely used rainfall intensity-duration (ID) threshold model cannot accurately establish its threshold model in debris flow ditches without long-term monitoring data. The physical model constructs a hydrological model based on the hydrological parameters of the basin, and determines whether a debris flow will occur based on the runoff generated by rainfall. However, the parameters required by the current physical model are too complex, which limits the application of the model in debris flow ditches where geotechnical parameters are lacking. To this end, we proposed a method that only requires the use of public public data to calculate the basin curve number CN and the basin area A (km 2 ), the length of the main ditch L(m) and the average slope Sa(°) of the basin, the peak flow rate of runoff generated by the current rainfall event in the debris flow ditch can be predicted based on the real-time rainfall monitoring data, the warning level of the current debris flow can be determined by the flow threshold, and warning information can be issued. Summary of the invention

[0004] In order to overcome the above-mentioned defects of the existing debris flow monitoring and early warning technology, the present invention provides a debris flow disaster peak flow forecasting method based on real-time rainfall monitoring to solve the problems existing in the above-mentioned background technology.

[0005] The present invention provides the following technical solution: a method for predicting the peak flow rate of debris flow disasters based on real-time rainfall monitoring, wherein the specific steps of the prediction method are as follows:

[0006] S1: Calculation of flow rate of debris flow gully in real time rainfall;

[0007] S2: Peak flow calculation of the runoff process line of the debris flow gully during the current rainfall event;

[0008] S3: Peak flow classification and warning information release.

[0009] Preferably, the specific method for calculating the flow rate of the debris flow ditch in real-time rainfall in S1 is as follows:

[0010] S101: Obtain the public land use type data, soil type data and DEM data of the debris flow gully basin, and calculate the relevant basin characteristic parameters, including the basin curve number CN, basin area A (km 2 ), length of the main channel of the basin L (m), average slope of the basin Sa (°);

[0011] S102: Calculate the relevant basin hydrological parameters, including the basin average slope percentage y (%), flood peak lag time T L (min) and 1mm unit peak flow q (m 3 / s), calculated as:

[0012] y=100tan(S a )

[0013] T L =L 0.8 (25400 / CN–228.6) 0.7 / (106.0455y 0.5 )

[0014] q=1323.45Ay 0.5 / (L 0.8 (25400 / CN–228.6) 0.7 )

[0015] Preferably, the basin curve number (CN) is a parameter describing the soil infiltration performance and runoff characteristics of the basin, and the determination method is as follows:

[0016] S103: assigning corresponding CN values ​​to different land use types in the watershed according to the land use type and CN value comparison table;

[0017] S104: Determine the hydrological soil group according to the stable infiltration rate of different soil types, and obtain the CN value adjustment coefficient corresponding to the different soil types by looking up the table;

[0018] S105: Multiply the CN value of different land use types by the CN value adjustment coefficient of the corresponding soil type to obtain a new CN value.

[0019] Preferably, the specific method for calculating the peak flow of the runoff process line of the debris flow ditch in the current rainfall event in S2 is as follows:

[0020] S201: When it is determined that a rainfall event has started, record the current rainfall event sequence R = [r1, r2, ..., r n ], and then read a new real-time rainfall data each time, update the rainfall event sequence R, until the rainfall event is judged to be over, initialize the parameters, and repeat the cycle.

[0021] S202: Calculate each rainfall amount r in the current rainfall event sequence R n The flow rate Q n (mm), calculated as follows:

[0022] Q n =

[0023] r n ((r n -0.0171CN+2.04)-0.05(25400 / (CN+(100-CN)k1^(-k2((r n -0.0171CN+2.04)^-k3)))-254))^2 / ((r n +0.00001)((r n -0.0171CN+2.04)+0.95(25400 / (CN+(100-CN)k1^(-k2((r n -0.0171CN+2.04)^-k3)))-254)))

[0024] Among them, k1, k2, and k3 are adjustment coefficients, and their default values ​​are 15, 0.15, and 1, respectively. When the rainfall interval monitored by the rain gauge changes or the debris flow area changes, the values ​​need to be adjusted to obtain accurate flow production.

[0025] S203: Calculate the runoff process line of the current rainfall event sequence R. The calculation method is:

[0026] First, according to the principle of unit process line method, the real-time flow production of each rainfall event sequence [Q1, Q2, …, Q n ] runoff process line: J n =[0,0.12Q n φq,0.43Q n φq,0.83Q n φq,Q n φq,0.88Q n φq,0.66Q n φq,0.45Q n φq,0.32Q n φq,0.22Q n φq,0.15Q n φq,0.105Q n φq,0.075Q n φq,0.053Q n φq,0.036Q n φq,0.026Q n φq,0.018Q n φq,0.012Qn φq,0.009Q n φq,0.006Q n φq,0.004Q n φq];

[0027] Where φ is the increase coefficient, which needs to be determined according to the actual situation of the debris flow gully;

[0028] Then, according to the unit line superposition principle, the runoff process line H = [h1, h2, ..., h n+21 ], the calculation method is as follows:

[0029] Appendix 1 Runoff process lines of the current rainfall event sequence

[0030]

[0031]

[0032] S204: Determine that the maximum value in the runoff process line H of the current rainfall event sequence is the peak flow Q max ;

[0033] Preferably, the specific method for grading the peak flow rate of debris flow and issuing warning information in S3 is:

[0034] S301: When it is determined that a rainfall event has started, the rainfall sequence R = [r1, r2, ..., r n ] is counted as m, and the number of rainfall in the current rainfall event sequence R is counted as n;

[0035] S302: Calculate the time T when the debris flow reaches the gully mouth. The calculation method is:

[0036] T=T L -(nm)t

[0037] Where t is the data collection frequency of the rain gauge (min / time);

[0038] S303: Determine peak flow rate Q max If Q max <20, it is judged that there is no debris flow event and no warning information is issued; if Q max ≥20, determine the warning level, issue a warning message, and predict that the debris flow will reach the debris flow gully in about T minutes.

[0039] Preferably, the warning level is divided into four levels: level one warning, level two warning, level three warning and level four warning;

[0040] in:

[0041] The first level warning is a red warning for extremely large debris flow, with a threshold range of Q max ≥1000,;

[0042] The second-level warning is the orange warning for large debris flow, with a threshold range of 200 ≤ Q max <1000;

[0043] The third level warning is a yellow warning for medium-sized debris flow, with a threshold range of 50≤Q max <200;

[0044] The fourth level warning is a blue warning for small debris flow, with a threshold range of 20≤Q max <50.

[0045] Technical effects and advantages of the present invention:

[0046] The present invention only needs to use the public data to calculate the basin curve number CN, basin area A (km 2 ), length of the main ditch L(m) and average slope Sa(°) of the watershed, it is possible to read real-time rainfall monitoring data based on the rain gauge built in the target debris flow ditch, calculate the real-time rainfall flow rate, predict the peak flow rate of runoff generated by the current rainfall event in the debris flow ditch, determine the warning level of the current debris flow through the flow threshold, issue warning information, and predict how many minutes it will take for the debris flow to reach the debris flow ditch mouth. This effectively improves the forecast accuracy of rainfall-induced debris flow disasters and shortens the forecast time. It provides a solution for debris flow monitoring and early warning for debris flow ditches without historical monitoring data, thereby improving the practicability of the debris flow monitoring and early warning model. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 It is a schematic diagram of the overall process of the present invention;

[0048] Figure 2 This is a video screenshot of the debris flow arriving at the ditch mouth in the Tianjiagou debris flow event in the experimental data of the present invention;

[0049] Figure 3 It is a schematic diagram of the verification result of the Tianjiagou debris flow event in the experimental data of the present invention;

[0050] Figure 4 This is a video screenshot of the peak flow rate of the Tianjiagou debris flow event in the experimental data of the present invention. DETAILED DESCRIPTION

[0051] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with implementation cases. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0052] Embodiment 1

[0053] The present invention provides a method for predicting the peak flow rate of debris flow disasters based on real-time rainfall monitoring. The specific steps of the prediction method are as follows:

[0054] S1: Calculation of flow generation in real-time rainfall in debris flow gullies;

[0055] S2: Peak flow calculation of the runoff process line of the debris flow gully during the current rainfall event;

[0056] S3: Peak flow classification and warning information release.

[0057] Furthermore, the specific method for calculating the flow rate of the debris flow ditch in real-time rainfall in S1 is as follows:

[0058] S101: Obtain the public land use type data, soil type data and DEM data of the debris flow gully basin, and calculate the relevant basin characteristic parameters, including the basin curve number CN, basin area A (km 2 ), length of the main channel of the basin L (m), average slope of the basin Sa (°);

[0059] S102: Calculate the relevant basin hydrological parameters, including the basin average slope percentage y (%), flood peak lag time T L (min) and 1mm unit peak flow q (m 3 / s), calculated as:

[0060] y=100tan(S a )

[0061] T L =L 0.8 (25400 / CN–228.6) 0.7 / (106.0455y 0.5 )

[0062] q=1323.45Ay 0.5 / (L 0.8 (25400 / CN–228.6) 0.7 )

[0063] Furthermore, the basin curve number (CN) is a parameter describing the soil infiltration performance and runoff characteristics of the basin, and the determination method is as follows:

[0064] S103: assigning corresponding CN values ​​to different land use types in the watershed according to the land use type and CN value comparison table;

[0065] S104: Determine the hydrological soil group according to the stable infiltration rate of different soil types, and obtain the CN value adjustment coefficient corresponding to the different soil types by looking up the table;

[0066] S105: Multiply the CN value of different land use types by the CN value adjustment coefficient of the corresponding soil type to obtain a new CN value.

[0067] Furthermore, the specific method for calculating the peak flow of the runoff process line of the debris flow ditch in the current rainfall event in S2 is as follows:

[0068] S201: When it is determined that a rainfall event has started, record the current rainfall event sequence R = [r1, r2, ..., r n ], and then read a new real-time rainfall data each time, update the rainfall event sequence R, until the rainfall event is judged to be over, initialize the parameters, and repeat the cycle.

[0069] S202: Calculate each rainfall amount r in the current rainfall event sequence R n The flow rate Q n (mm), calculated as follows:

[0070] Q n =

[0071] r n ((r n -0.0171CN+2.04)-0.05(25400 / (CN+(100-CN)k1^(-k2((r n -0.0171CN+2.04)^-k3)))-254))^2 / ((r n +0.00001)((r n -0.0171CN+2.04)+0.95(25400 / (CN+(100-CN)k1^(-k2((r n -0.0171CN+2.04)^-k3)))-254)))

[0072] Among them, k1, k2, and k3 are adjustment coefficients, and their default values ​​are 15, 0.15, and 1, respectively. When the rainfall interval monitored by the rain gauge changes or the debris flow area changes, the values ​​need to be adjusted to obtain accurate flow production.

[0073] S203: Calculate the runoff process line of the current rainfall event sequence R. The calculation method is:

[0074] First, according to the principle of unit process line method, the real-time flow production of each rainfall event sequence [Q1, Q2, …, Q n ] runoff process line: J n =[0,0.12Q n φq,0.43Q n φq,0.83Q n φq,Qn φq,0.88Q n φq,0.66Q n φq,0.45Q n φq,0.32Q n φq,0.22Q n φq,0.15Q n φq,0.105Q n φq,0.075Q n φq,0.053Q n φq,0.036Q n φq,0.026Q n φq,0.018Q n φq,0.012Q n φq,0.009Q n φq,0.006Q n φq,0.004Q n φq];

[0075] Where φ is the increase coefficient, which needs to be determined according to the actual situation of the debris flow gully;

[0076] Then, according to the unit line superposition principle, the runoff process line H = [h1, h2, ..., h n+21 ], the calculation method is as follows:

[0077] Appendix 1 Runoff process lines of the current rainfall event sequence

[0078]

[0079]

[0080] S204: Determine that the maximum value in the runoff process line H of the current rainfall event sequence is the peak flow Q max ;

[0081] Furthermore, the specific method of the debris flow peak flow classification and warning information release in S3 is:

[0082] S301: When it is determined that a rainfall event has started, the rainfall sequence R = [r1, r2, ..., r n ] is counted as m, and the number of rainfall in the current rainfall event sequence R is counted as n;

[0083] S302: Calculate the time T when the debris flow reaches the gully mouth. The calculation method is:

[0084] T=T L -(nm)t

[0085] Where t is the data collection frequency of the rain gauge (min / time);

[0086] S303: Determine peak flow rate Q max If Q max <20, it is judged that there is no debris flow event and no warning information is issued; if Q max ≥20, determine the warning level, issue a warning message, and predict that the debris flow will reach the debris flow gully in about T minutes.

[0087] Furthermore, the warning level is divided into four levels: level one warning, level two warning, level three warning and level four warning;

[0088] in:

[0089] The first level warning is a red warning for extremely large debris flow, with a threshold range of Q max ≥1000,;

[0090] The second-level warning is the orange warning for large debris flow, with a threshold range of 200 ≤ Q max <1000;

[0091] The third level warning is a yellow warning for medium-sized debris flow, with a threshold range of 50≤Q max <200;

[0092] The fourth level warning is a blue warning for small debris flow, with a threshold range of 20≤Q max <50.

[0093] In this embodiment, the model parameters are proposed to use the public land use type data, soil type data and DEM data based on the debris flow gully basin to calculate the basin curve number CN, basin area A (km 2 ), length of the main channel L(m), average slope Sa(°), and the average slope percentage y(%), flood peak lag time T L (min) and 1mm unit peak flow q (m 3 / s) three basin hydrological parameters; in the flow rate Q n In terms of calculation of (mm), a new calculation formula is proposed, which can calculate the real-time rainfall r based on the real-time monitoring data of the rain gauge built in the target debris flow ditch. n The flow rate Q n(mm), and three adjustment coefficients are set in the formula to adapt to the conditions in different regions; in terms of debris flow disaster warning, it is proposed to divide the peak flow generated by the real-time rainfall event predicted by the present invention into four levels according to the peak flow threshold, and a calculation formula for the time T (min) required for the debris flow to reach the ditch mouth is proposed, which can effectively improve the forecast accuracy of rainfall-induced debris flow disasters and shorten the forecast time. A solution for debris flow monitoring and early warning is provided for debris flow ditches without historical monitoring data, thereby improving the practicability of the debris flow monitoring and early warning model.

[0094] The experimental data are as follows:

[0095] The Tianjiagou debris flow gully is located in Tianjiagou Village, Wudu District, Longnan City, Gansu Province (33.1563N, 105.0097E), with a drainage area of ​​19.02km 2 The terrain height difference is 1680m. The downstream channel has a gradient of about 3° and a width of about 15m; the middle channel has a gradient of about 8° and a width of about 8m; the middle and upper channel has a gradient of about 13° and a width of about 3-5m. Mudslides occur many times every year. The upper reaches are mainly limestone, and slate and phyllite appear in the middle and lower reaches respectively. The vegetation in the basin is mainly artificial arbor forests and shrubs. The vegetation coverage in the upper reaches is higher than that in the middle and lower reaches. A large number of residents live at the mouth of Tianjiagou, posing a huge threat to the lives and property safety of residents.

[0096] A small debris flow occurred in Tianjiagou on July 8, 2023. The rainfall from 16:55 to 18:10 was 14.6 mm, as monitored by the rain gauge installed at the mouth of the ditch. The peak flow rate of the debris flow was estimated to be 22.5 m 3 / s, and the debris flow reached the ditch mouth monitoring point at 17:39, and the debris flow peak reached the ditch mouth monitoring point at 17:42.

[0097] S1: Calculation of flow rate of debris flow gully in real time rainfall;

[0098] S101: Obtain the public land use type data, soil type data and DEM data of the Tianjiagou watershed, and calculate relevant watershed characteristic parameters, including:

[0099] The basin curve number CN is 77.7;

[0100] The drainage area A is 19.02km 2 ;

[0101] The length of the main channel of the basin, L, is 8404m;

[0102] The average slope Sa of the basin is 26.95°.

[0103] S102: Calculate relevant basin hydrological parameters, including:

[0104] y(%), peak hysteresis time T L (min) and 1mm unit peak flow q (m 3 / s):

[0105] The average slope percentage of the basin is y = 100tan (26.95°) = 50.84

[0106] T L =8404 0.8 (25400 / 77.7–228.6) 0.7 / (106.0455×50.84 0.5 )=40

[0107] q=1323.45×50.84 0.5 / (8404 0.8 (25400 / 77.7–228.6) 0.7 )=5.25

[0108] S2: Peak flow calculation of the runoff process line of the debris flow gully during the current rainfall event;

[0109] S201: When it is determined that a rainfall event has started, the current rainfall event sequence R = [0.6, 1.2] is recorded. After that, each time a new real-time rainfall data is read, the rainfall event sequence R is updated until it is determined that the rainfall event has ended.

[0110] R = [0.6, 1.2, 1, 1.4, 4.8, 2, 0.8, 1.8, 0.8, 0.4, 0.2, 0.2, 0, 0.2, 0, 0.2], initialize parameters, and repeat.

[0111] S202: Calculate each rainfall amount r in the current rainfall event sequence R n The flow rate Q n (mm):

[0112] Q n =

[0113] r n ((r n -0.0171CN+2.04)-0.05(25400 / (CN+(100-CN)k1^(-k2((r n -0.0171CN+2.04)^-k3)))-254))^2 / ((r n +0.00001)((r n -0.0171CN+2.04)+0.95(25400 / (CN+(100-CN)k1^(-k2((r n-0.0171CN+2.04)^-k3)))-254)))

[0114] Among them, k1, k2, and k3 are adjustment coefficients, and their default values ​​are 15, 0.15, and 1 respectively.

[0115] S203: Calculate the runoff process line of the current rainfall event sequence R:

[0116] First, according to the principle of unit process line method, the real-time flow production of each rainfall event sequence [Q1, Q2, …, Q n ] runoff process line: J n =[0,0.12Q n φq,0.43Q n φq,0.83Q n φq,Q n φq,0.88Q n φq,0.66Q n φq,0.45Q n φq,0.32Q n φq,0.22Q n φq,0.15Q n φq,0.105Q n φq,0.075Q n φq,0.053Q n φq,0.036Q n φq,0.026Q n φq,0.018Q n φq,0.012Q n φq,0.009Q n φq,0.006Q n φq,0.004Q n φq];

[0117] The default value of φ is 1.2;

[0118] Then, according to the unit line superposition principle, the runoff process line H = [h1,h2,…,h 25 ]As shown in the following table:

[0119]

[0120]

[0121] S204: Determine that the maximum value in the runoff process line H of the current rainfall event sequence is the peak flow Q max =21.06m 3 / s;

[0122] S3: Peak flow classification and warning information release;

[0123] S301: When it is determined that a rainfall event has started, the number of rainfall amounts in the current rainfall sequence R = [0.6, 1.2] is counted as m = 2, and the number of rainfall amounts in the current rainfall event sequence R = [0.6, 1.2, 1, 1.4, 4.8] at 17:15 is n = 5;

[0124] S302: The data collection frequency of the rain gauge at the mouth of Tianjiagou is t=5min / time, and the time T when the debris flow arrives at the mouth of the gully is calculated:

[0125] T=40-(5-2)×5=25min

[0126] S303: Determine peak flow rate Q max The threshold range is 20≤Q max <50, the warning level is determined to be level 4, and a level 4 warning is issued as a blue warning for small debris flow, and it is predicted that the debris flow will reach the debris flow gully in about 25 minutes.

[0127] The debris flow was detected by the video monitoring equipment at the gully mouth at 17:39 (attached Figure 2 ), so the method of the present invention prepared to forecast this debris flow event 24 minutes in advance, which is only 1 minute different from the time T=25min predicted by the present invention.

[0128] The complete rainfall event sequence of the Tianjiagou debris flow event is R = [0.6, 1.2, 1, 1.4, 4.8, 2, 0.8, 1.8, 0.8, 0.4, 0.2, 0.2, 0, 0.2, 0, 0.2]. The peak flow rate of the rainfall event predicted by the method of the present invention is 24.17m 3 / s(Attached Figure 3 ), the debris flow process video recording monitored by the ditch mouth video monitoring equipment shows that the debris flow reached its peak at 17:42 (see Appendix Figure 4 ), the estimated peak velocity of the debris flow in the video is 5m / s, and the estimated cross-sectional area in the video is 6m×1.5m / 2=4.5m 2 The peak flow rate estimated by the video is 5×4.5=22.5m 3 / s, which is close to the peak flow rate predicted by the method of the present invention.

[0129] It should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for predicting peak flow rate of debris flow disaster based on real-time rainfall monitoring, characterized by: The specific steps of the forecasting method are as follows: S1: Calculation of flow generation in real-time rainfall in debris flow gullies; S2: Peak flow calculation of the runoff process line of the debris flow gully during the current rainfall event; S3: Peak flow classification and warning information release.

2. A method for predicting peak flow rate of debris flow disasters based on real-time rainfall monitoring according to claim 1, characterized in that: The specific method for calculating the flow rate of the debris flow ditch in real-time rainfall in S1 is as follows: S101: Obtain the public land use type data, soil type data and DEM data of the debris flow gully basin, and calculate the relevant basin characteristic parameters, including the basin curve number CN, basin area A (km 2 ), length of the main channel of the basin L (m), average slope of the basin Sa (°); S102: Calculate the relevant basin hydrological parameters, including the basin average slope percentage y (%), flood peak lag time T L (min) and 1mm unit peak flow q (m 3 / s), calculated as: y=100tan(S a ) T L =L 0.8 (25400 / CN–228.6) 0.7 / (106.0455y 0.5 ) q=1323.45Ay 0.5 / (L 0.8 (25400 / CN–228.6) 0.7 )。 3. A method for predicting peak flow rate of debris flow disasters based on real-time rainfall monitoring according to claim 2, characterized in that: The basin curve number (CN) is a parameter that describes the soil infiltration performance and runoff characteristics of the basin. The determination method is as follows: S103: assigning corresponding CN values ​​to different land use types in the watershed according to the land use type and CN value comparison table; S104: Determine the hydrological soil group according to the stable infiltration rate of different soil types, and obtain the CN value adjustment coefficient corresponding to the different soil types by looking up the table; S105: Multiply the CN value of different land use types by the CN value adjustment coefficient of the corresponding soil type to obtain a new CN value.

4. The method for predicting peak flow rate of debris flow disaster based on real-time rainfall monitoring according to claim 1, characterized in that: The specific method for calculating the peak flow of the runoff process line of the debris flow ditch in the current rainfall event in S2 is as follows: S201: When it is determined that a rainfall event has started, record the current rainfall event sequence R = [r1, r2, ..., r n ], and then read a new real-time rainfall data each time, update the rainfall event sequence R, until the rainfall event is judged to be over, initialize the parameters, and repeat the cycle. S202: Calculate each rainfall amount r in the current rainfall event sequence R n The flow rate Q n (mm), calculated as follows: Q n = r n ((r n -0.0171CN+2.04)-0.05(25400 / (CN+(100-CN)k1^(-k2((r n -0.0171CN+2.04)^-k3)))-254))^2 / ((r n +0.00001)((r n -0.0171CN+2.04)+0.95(25400 / (CN+(100-CN)k1^(-k2((r n -0.0171CN+2.04)^-k3)))-254))) Among them, k1, k2, and k3 are adjustment coefficients, and their default values ​​are 15, 0.15, and 1, respectively. When the rainfall interval monitored by the rain gauge changes or the debris flow area changes, the values ​​need to be adjusted to obtain accurate flow production. S203: Calculate the runoff process line of the current rainfall event sequence R. The calculation method is: First, according to the principle of unit process line method, the real-time flow production of each rainfall event sequence [Q1, Q2, …, Q n ] runoff process line: J n =[0,0.12Q n φq,0.43Q n φq,0.83Q n φq,Q n φq,0.88Q n φq,0.66Q n φq,0.45Q n φq,0.32Q n φq,0.22Q n φq,0.15Q n φq,0.105Q n φq,0.075Q n φq,0.053Q n φq,0.036Q n φq,0.026Q n φq,0.018Q n φq,0.012Q n φq,0.009Q n φq,0.006Q n φq,0.004Q n φq]; Where φ is the increase coefficient, which needs to be determined according to the actual situation of the debris flow gully; Then, according to the unit line superposition principle, the runoff process line H = [h1, h2, ..., h n+21 ], the calculation method is as follows: Appendix 1 Runoff process lines of the current rainfall event sequence S204: Determine that the maximum value in the runoff process line H of the current rainfall event sequence is the peak flow Q max .

5. The method for predicting peak flow rate of debris flow disaster based on real-time rainfall monitoring according to claim 1, characterized in that: The specific method of debris flow peak flow classification and warning information release in S3 is: S301: When it is determined that a rainfall event has started, the rainfall sequence R = [r1, r2, ..., r n ] is counted as m, and the number of rainfall in the current rainfall event sequence R is counted as n; S302: Calculate the time T when the debris flow reaches the gully mouth. The calculation method is: T=T L -(n-m)t Where t is the data collection frequency of the rain gauge (min / time); S303: Determine peak flow rate Q max If Q max <20, it is judged that there is no debris flow event and no warning information is issued; if Q max ≥20, determine the warning level, issue a warning message, and predict that the debris flow will reach the debris flow gully in about T minutes.

6. A method for predicting peak flow rate of debris flow disasters based on real-time rainfall monitoring according to claim 5, characterized in that: The warning levels are divided into four levels: level one warning, level two warning, level three warning and level four warning; in: The first level warning is a red warning for extremely large debris flow, with a threshold range of Q max ≥1000,; The second-level warning is the orange warning for large debris flow, with a threshold range of 200 ≤ Q max <1000; The third level warning is a yellow warning for medium-sized debris flow, with a threshold range of 50≤Q max <200; The fourth level warning is a blue warning for small debris flow, with a threshold range of 20≤Q max <50.

Citation Information

Cited By

  • Mountain torrent early warning method and system based on meteorological data

    CN120823690A