Early warning method and system for landslide-debris flow disaster chain, electronic equipment and medium
By acquiring and calculating topography and material source information, combined with rainfall conditions, a landslide-debris flow disaster chain early warning model is constructed, which solves the problem of insufficient early warning of landslide-debris flow disaster chains in the existing technology and achieves real-time and accurate prediction of landslide-debris flow disaster chain. Early warning.
Patent Information
- Application Number
- CN202411231171.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology lacks early warning models and technical methods for the landslide-debris flow disaster chain. It is mainly based on early warning of a single disaster type and cannot effectively warn the occurrence of the landslide-debris flow disaster chain.
By obtaining terrain element information, source element information and rainfall information, the terrain information entropy and source information entropy are calculated, and combined with rainfall conditions to generate early warning information for the landslide-debris flow disaster chain, a combination of rainfall conditions, terrain, and source conditions is constructed. The landslide-debris flow disaster chain early warning model enables real-time early warning.
It improves the accuracy and timeliness of early warning of landslide-debris flow disaster chain, enables real-time early warning of landslide-debris flow disaster chain based on real-time rainfall indicators of meteorological forecasts, and solves the technical bottleneck of the inability of a single disaster early warning method to warn landslide-debris flow disaster chain. .
Smart Images

Figure CN118736804A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of natural disaster early warning, and in particular to an early warning method and system, electronic equipment and medium for a landslide-mudslide disaster chain. Background Art
[0002] As global climate change intensifies, the frequency, scale and degree of loss of landslide-mudslide disaster chain are on the rise, and early warning of the disaster chain is imminent. However, the current disaster early warning is mainly based on the early warning of single disasters such as landslides and mudslides. There is still a lack of early warning research on the landslide-mudslide disaster chain, and the early warning model and technical method of the landslide-mudslide disaster chain have not yet been established.
[0003] In summary, the technical problems existing in the relevant technologies need to be improved. Summary of the invention
[0004] The main purpose of the embodiments of the present application is to provide a landslide-mudslide disaster chain warning method and system, electronic equipment and medium, which can quickly and accurately warn of the landslide-mudslide disaster chain.
[0005] To achieve the above-mentioned purpose, an embodiment of the present application provides an early warning method for a landslide-mudslide disaster chain, the method comprising the following steps: Get terrain element information of the preset area; Calculating terrain information entropy according to the terrain element information; Acquire the material source element information of the preset area; Calculating the material provenance information entropy according to the material provenance element information; Obtaining rainfall information of the preset area; Constructing the rainfall condition of the landslide-mud flow disaster chain according to the rainfall information; Early warning information of the landslide-mud flow disaster chain in the preset area is generated according to the terrain information entropy, the material source information entropy and the rainfall condition.
[0006] In some embodiments, the calculating terrain information entropy according to the terrain element information includes: Constructing a first elevation map according to the terrain element information; Obtaining a first area-elevation curve on the first elevation map; The terrain information entropy is calculated according to the first area-elevation curve.
[0007] In some embodiments, the calculation formula for calculating the terrain information entropy according to the first area-elevation curve is as follows: ; in, represents the terrain information entropy; S represents the integral value of the first area-elevation curve, ; Represents the first area-elevation curve.
[0008] In some embodiments, the calculating the provenance information entropy according to the provenance element information includes: Constructing a second elevation map according to the provenance element information; Acquire a second area-elevation curve on the second elevation map; The material source information entropy is calculated based on the second area-elevation curve.
[0009] In some embodiments, the formula for calculating the provenance information entropy based on the second area-elevation curve is as follows: ; Wherein, represents the material source information entropy; a and b represent the two integral upper and lower limits of the second area-elevation curve, satisfying ; M represents the second area-elevation curve integral value, ; The polynomial fitting coefficients of the second area-elevation curve are represented.
[0010] In some embodiments, the formula for constructing the rainfall condition of the landslide-mudslide disaster chain according to the rainfall information is as follows: ; Wherein, R represents the rainfall condition, It indicates the forecast rainfall index; Indicates the average annual rainfall in the preset area; represents the actual rainfall before the landslide-mudslide disaster chain occurs; represents the predicted rainfall one hour before the occurrence of the landslide-mudslide disaster chain; represents the coefficient of variation of rainfall in the preset area for one hour; a represents the parameter of the preset area.
[0011] In some embodiments, the generating of the warning information of the landslide-mudslide disaster chain in the preset area according to the terrain information entropy, the material source information entropy and the rainfall condition includes: When the terrain information entropy falls within the first range, the material source information entropy falls within the third range, and the rainfall condition falls within the fifth range, a first warning prompt information is generated, wherein the first warning prompt information indicates that the landslide-mudslide disaster chain will occur in the preset area within a preset time period; When the terrain information entropy falls within the first range, the material source information entropy falls within the fourth range, and the rainfall condition falls within the fifth range, a second warning prompt information is generated, wherein the second warning prompt information is used to indicate that a landslide-mudslide disaster chain will not occur in the preset area within a preset time period, but a flash flood disaster will occur; When the terrain information entropy falls within the first range, the material source information entropy falls within the third range, and the rainfall condition falls within the sixth range, a third warning prompt information is generated, and the third warning prompt information is used to indicate that the landslide-mudslide disaster chain will not occur in the preset area within a preset time period, but a debris flow disaster will occur; When the terrain information entropy falls within the second range, the material source information entropy falls within the fourth range, and the rainfall condition falls within the sixth range, a fourth warning prompt information is generated, and the fourth warning prompt information is used to indicate that the landslide-mudslide disaster chain will not occur in the preset area within a preset time period.
[0012] To achieve the above-mentioned purpose, another aspect of the embodiment of the present application provides an early warning system for a landslide-mudslide disaster chain, the system comprising: The first module is used to obtain terrain element information of a preset area; The second module is used to calculate terrain information entropy according to the terrain element information; The third module is used to obtain the material source element information of the preset area; The fourth module is used to calculate the material source information entropy according to the material source element information; The fifth module is used to obtain rainfall information of the preset area; The sixth module is used to construct the rainfall condition of the landslide-mud flow disaster chain according to the rainfall information; The seventh module is used to generate early warning information of the landslide-mudslide disaster chain in the preset area according to the terrain information entropy, the material source information entropy and the rainfall conditions.
[0013] To achieve the above object, another aspect of an embodiment of the present application provides an electronic device, including: at least one processor; at least one memory for storing at least one program; When the at least one program is executed by the at least one processor, the at least one processor implements the above method.
[0014] To achieve the above objective, another aspect of an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and the computer program implements the above method when executed by a processor.
[0015] The embodiments of the present application include at least the following beneficial effects: the present application provides a landslide-mudslide disaster chain warning method and system, electronic device and medium, which obtains terrain element information, material source element information and rainfall information of a preset area, calculates terrain information entropy according to the terrain element information, calculates material source information entropy according to the material source element information, and constructs rainfall conditions for the landslide-mudslide disaster chain according to the rainfall information, and then generates warning information for the landslide-mudslide disaster chain in the preset area according to the terrain information entropy, material source information entropy and rainfall conditions, thereby performing landslide-mudslide disaster chain warning; the present application constructs a landslide-mudslide disaster chain warning model that combines rainfall conditions with terrain and material source conditions, which can perform real-time warning of the landslide-mudslide disaster chain based on real-time rainfall indicators of meteorological forecasts, effectively improving the accuracy and timeliness of landslide-mudslide disaster chain warnings. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a flow chart of the early warning method of the landslide-mudslide disaster chain provided by the embodiment of the present application; Figure 2 It is a landslide-mudslide disaster chain early warning triangle matrix diagram provided by an embodiment of the present application; Figure 3 It is a schematic diagram of the sub-basin division result provided in the embodiment of the present application; Figure 4 It is a structural schematic diagram of the early warning system for the landslide-mudslide disaster chain provided in an embodiment of the present application; Figure 5 It is a schematic diagram of the hardware structure of the electronic device provided in the embodiment of the present application. DETAILED DESCRIPTION
[0017] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is further described in detail below in conjunction with the accompanying drawings and examples. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the embodiments of the present application, they are only examples of systems and methods consistent with some aspects of the embodiments of the present application.
[0018] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein are only for the purpose of describing the embodiments of this application and are not intended to limit this application.
[0019] Before describing the embodiments of the present application in detail, some nouns and terms involved in the embodiments of the present application are first described. The nouns and terms involved in the embodiments of the present application are subject to the following interpretations: Disaster chain: After many natural disasters occur, they often induce a series of secondary disasters. This phenomenon is called the continuity of disasters or disaster chain. Various disasters in the disaster chain occur one after another. From the outside, it is an objective phenomenon, but its internal cause may be the phenomenon of energy conservation, energy conversion, transmission and redistribution. For example, after a landslide occurs, it will transform into a debris flow under certain conditions, causing more serious damage. This is called the landslide-debris flow disaster chain.
[0020] Debris flow is a sediment gravity flow with plastic rheological properties and laminar flow state. The support mechanism of its sediment is mainly determined by its plastic rheological properties and is directly related to its yield strength.
[0021] In the embodiment of the present application, the conditions for the formation of the landslide-mudslide disaster chain can be attributed to the three major conditions of terrain, material source and rainfall. Among them, terrain conditions and material source conditions are necessary conditions for the formation of the landslide-mudslide disaster chain, while rainfall conditions are external conditions for the landslide-mudslide disaster chain. When the rainfall conditions are not met, the solid material source will evolve into debris flow under the influence of the terrain; when the solid material source conditions are not met, the water source will evolve into mountain torrents under the influence of the terrain; when the terrain conditions are not met, even if there are sufficient solid material sources and water sources, it is difficult to form a disaster. It can be seen that when a basin has the terrain, material source and rainfall conditions of transformation at the same time, a large-scale landslide-mudslide disaster chain will occur in the preset area.
[0022] In view of this, an early warning method and system for a landslide-mudslide disaster chain, an electronic device and a medium are provided in the embodiments of the present application, which can effectively improve the accuracy and timeliness of the early warning of the landslide-mudslide disaster chain based on the quantitative characteristics of terrain information entropy and material source information entropy and the real-time characteristics of rainfall conditions.
[0023] The early warning method of the landslide-mudslide disaster chain provided in the embodiment of the present application relates to the field of natural disaster early warning technology. The early warning method of the landslide-mudslide disaster chain provided in the embodiment of the present application can be applied to a terminal, can also be applied to a server, and can also be software running in a terminal or a server. In some embodiments, the terminal can be a smart phone, a tablet computer, a laptop computer, a desktop computer, a smart speaker, a smart watch, and a car terminal, etc., but is not limited to this; the server side can be configured as an independent physical server, or it can be configured as a server cluster or a distributed system composed of multiple physical servers, and can also be configured to provide cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN, and big data and artificial intelligence platforms and other basic cloud computing services. The server can also be a node server in a blockchain network; the software can be an application of the early warning method for implementing the landslide-mudslide disaster chain, etc., but is not limited to the above forms.
[0024] The present application can be used in many general or special computer system environments or configurations. For example: personal computers, server computers, handheld or portable devices, tablet devices, multiprocessor systems, microprocessor-based systems, set-top boxes, programmable consumer electronics, network PCs, minicomputers, mainframe computers, distributed computing environments including any of the above systems or devices, etc. The present application can be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. The present application can also be practiced in distributed computing environments, in which tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules can be located in local and remote computer storage media including storage devices.
[0025] Figure 1 is an optional flow chart of the landslide-mudslide disaster chain early warning method provided in the embodiment of the present application. Figure 1 The method may include but is not limited to steps S110 to S170: Step S110, obtaining terrain element information of a preset area; Step S120, calculating terrain information entropy according to terrain element information; Step S130, obtaining the material source element information of the preset area; Step S140, calculating the material source information entropy according to the material source element information; Step S150, obtaining rainfall information of a preset area; Step S160, constructing the rainfall conditions of the landslide-mudslide disaster chain according to the rainfall information; Step S170: generating early warning information of the landslide-mudslide disaster chain in the preset area according to the terrain information entropy, the material source information entropy and the rainfall conditions.
[0026] In the embodiment of the present application, terrain element information may include but is not limited to multiple interacting elements such as slope, slope direction, watershed area, and valley morphology. The terrain conditions mainly provide certain terrain and energy conditions for the transformation of landslides into debris flows during the transformation of the landslide-mudslide disaster chain. It can be understood that the process of calculating terrain information entropy based on terrain element information can be to construct a first elevation map based on the terrain element information, obtain a first area-elevation curve on the first elevation map, and then calculate the terrain information entropy based on the first area-elevation curve. Among them, the terrain information entropy is shown in formula (1): Formula (1); In the formula, represents terrain information entropy, It is the area-elevation curve (first area-elevation curve). The method for obtaining the first area-elevation curve is as follows: set up for The total area of the basin, for Basin The area above the contour line, The contour line and The height difference of the lowest point in the basin, for The height difference between the highest and lowest points in the basin is for X Axis, for Y Axis, obviously X , Y Take values in the range [0,1], according to the obtained series ( X , Y ) value, with X is the horizontal axis, Y The curve drawn for the ordinate is the first area-elevation curve .
[0027] If the power function Fitting area-elevation curve , then the terrain information entropy can be expressed as shown in formula (2): Formula (2); If the integral value of the first area-elevation curve is known, then It can be expressed as ,Will Substituting into formula (2), the terrain information entropy can be expressed as shown in formula (3): Formula (3); in, represents terrain information entropy, represents the integral value of the first area-elevation curve, , are the power function fitting coefficients.
[0028] In the embodiment of the present application, the terrain information entropy can reflect to a certain extent the difficulty of the formation of the landslide-mudslide disaster chain, the scale of the outbreak, and the intensity of the activity. When (0, 0.111), the basin landform is in its infancy, the erosion capacity is gradually increasing, the basin system tends to be unstable, and debris flow disaster chains are prone to occur; information entropy When the landform information entropy reaches [0.111, 0.2), the basin landform enters the early stage of adulthood, the whole basin becomes increasingly unstable, its endogenous forces grow rapidly, and the confrontation with the external forces becomes increasingly fierce, making it more prone to disaster chains. When the information entropy reaches [0.2, 0.3), the information entropy growth rate gradually slows down, the basin is extremely unstable, erosion and incision are serious, the main channel of debris flow develops vigorously, and the conditions for the outbreak of extremely large and large-scale landslide-debris flow disaster chains are met; when the information entropy reaches [0.2, 0.3], the information entropy growth rate gradually slows down, the basin is extremely unstable, erosion and incision are serious, the main channel of debris flow develops vigorously, and the conditions for the outbreak of extremely large and large-scale landslide-debris flow disaster chains are met; When the information entropy is (0.3, 0.4], the basin enters the late stage of its prime, the internal forces slowly decrease, the landform structure changes from unstable to stable, and the probability of disaster chain occurrence decreases; when the information entropy is (0.3, 0.4), the basin enters the late stage of its prime, the internal forces slowly decrease, the landform structure changes from unstable to stable, and the probability of disaster chain occurrence decreases; At (0.4, ∞), the basin enters the old age, the landform tends to be stable, the erosion capacity is low, the disaster chain disappears, and generally a small-scale disaster chain breaks out, or even no disaster chain. According to the physical meaning of the above information entropy, 0.3 is used as the threshold to identify the terrain conditions for the occurrence of landslide-mudslide disaster chains, that is, information entropy When (0, 0.3), the basin has the terrain conditions for the occurrence of landslide-mudslide disaster chain. When [0.3, ∞), the basin does not have the terrain conditions for the occurrence of landslide-mudslide disaster chain.
[0029] In an embodiment of the present application, the material source element information may be a source of loose materials for the landslide-mudslide disaster chain, and may include but is not limited to multiple interacting element information such as solid material source reserves, solid material source distribution area, and solid material source thickness. Since the material source for the transformation of the landslide-mudslide disaster chain is mainly landslides induced by heavy rainfall, and the landslide area can reflect the amount of material that can be transformed into the disaster chain, the watershed elevation can reflect the potential energy of the watershed. Therefore, when calculating the material source information entropy based on the material source element information, this embodiment may construct a second elevation map based on the material source element information, obtain a second area-elevation curve on the second elevation map, and then calculate the material source information entropy based on the second area-elevation curve. It can be understood that the material source information entropy can be expressed as shown in formula (4): Formula (4); in, represents the provenance information entropy, It is the landslide area-elevation curve (second area-elevation curve). The method for obtaining the second area-elevation curve is as follows: set up for The total area of the basin, for Basin The landslide area above the contour line, The contour line and The height difference of the lowest point in the basin, for The height difference between the highest and lowest points in the basin is for X Axis, for Y Axis, obviously X , Y Take values in the range [0,1], according to the obtained series ( X , Y ) value, with X is the horizontal axis, Y The curve drawn for the ordinate is the second area-elevation curve .
[0030] If we use polynomial Fitting the second area-elevation curve , then the provenance information entropy can be expressed as shown in formula (5): Formula (5); Where a and b represent the upper and lower limits of the second area-elevation curve, satisfying ; M represents the integral value of the second area-elevation curve, ; Other a0, a1...a n are the polynomial fitting coefficients of the second area-elevation curve.
[0031] In the embodiment of the present application, the material source information entropy can reflect the material source distribution characteristics of the landslide-mudslide disaster chain process, and to a certain extent can reflect the difficulty of the landslide-mudslide disaster chain formation, the scale of the outbreak, and the strength of the activity. When (0, 2.68), it indicates that there are a large number of collapse and landslide sources distributed in the middle and upper reaches of the basin. These sources will be activated again under the action of heavy rainfall and basin confluence to form a debris flow disaster chain, which has the conditions for the outbreak of a large-scale landslide-debris flow disaster chain, which can cause major disasters and serious hazards. When the source information entropy When [2.68, 7.67), it indicates that there are a large number of collapse and landslide sources distributed in the middle and lower reaches of the basin. The terrain in the middle and lower reaches is relatively flat. These sources will start to form a debris flow disaster chain on a smaller scale. Generally, a small-scale disaster chain will occur, which is less harmful. When the source information entropy is At [7.67,∞), there is no landslide source distribution in the basin, and no debris flow disaster chain occurs. According to the physical meaning of the above information entropy, 2.68 is used as the threshold to identify the source conditions for the landslide-debris flow disaster chain, that is, information entropy When (0, 2.68), the basin has the material source conditions for the landslide-mudslide disaster chain to occur. When [2.68,∞), the basin does not have the source conditions for the occurrence of landslide-mudslide disaster chain.
[0032] In the embodiment of the present application, since heavy rainfall is the inducing factor of the landslide-mudslide disaster chain, the present embodiment constructs the rainfall condition of the landslide-mudslide disaster chain as shown in formula (6): Formula (6); Where R represents the rainfall condition, It indicates the forecast rainfall index; Indicates the average annual rainfall in the preset area; It indicates the actual rainfall before the landslide-mudslide disaster chain occurs; It indicates the predicted rainfall one hour before the landslide-mudslide disaster chain occurs; represents the coefficient of variation of rainfall in the preset area for one hour; a represents the parameter of the preset area. Where a takes different constants in different regions, for example, it can take a value of 5.5.
[0033] In the embodiment of the present application, the rainfall condition can reflect the amount of rainfall that causes the landslide-mudslide disaster chain, and to a certain extent can reflect the difficulty of forming the landslide-mudslide disaster chain, the scale of the outbreak, and the strength of the activity. When R ≥ 1.0, it means that the forecast rainfall intensity is large and the previous rainfall is also large, and a large-scale landslide-mudslide disaster chain may occur, which may cause major disasters and serious consequences; when R < 1.0, it means that the forecast rainfall and the previous rainfall are both small, and the probability and risk of the landslide-mudslide disaster chain are very small, or even no landslide-mudslide disaster chain occurs.
[0034] In an embodiment of the present application, after obtaining terrain information entropy, material source information entropy and rainfall conditions, it is possible to judge whether a landslide-mudslide disaster chain will occur in a preset area within a preset time period based on the terrain information entropy, material source information entropy and rainfall conditions, thereby providing a landslide-mudslide disaster chain warning.
[0035] Specifically, when the terrain information entropy falls within the first range, the material source information entropy falls within the third range, and the rainfall condition falls within the fifth range, a first warning prompt information is generated, and the first warning prompt information indicates that the landslide-mudslide disaster chain will occur in the preset area within a preset time period; When the terrain information entropy falls within the first range, the material source information entropy falls within the fourth range, and the rainfall condition falls within the fifth range, a second warning prompt information is generated, and the second warning prompt information is used to indicate that a landslide-mudslide disaster chain will not occur in a preset area within a preset time period, but a flash flood disaster will occur; When the terrain information entropy falls within the first range, the material source information entropy falls within the third range, and the rainfall condition falls within the sixth range, a third warning prompt information is generated, and the third warning prompt information is used to indicate that a landslide-mudslide disaster chain will not occur in a preset area within a preset time period, but a debris flow disaster will occur; When the terrain information entropy falls into the second range, the material source information entropy falls into the fourth range and the rainfall conditions fall into the sixth range, a fourth warning prompt information is generated. The fourth warning prompt information is used to indicate that a landslide-mudslide disaster chain will not occur in a preset area within a preset time period.
[0036] It is understandable that the first range is , the second range is , the third range is , the fourth range is , the fifth range is , the sixth range is This embodiment constructs the following information entropy based on the terrain information entropy value, material source information entropy value and rainfall condition of the landslide-mudslide disaster chain: Figure 2 The landslide-mudslide disaster chain early warning triangle matrix diagram shown in Figure 1 and the indicator system shown in Table 1: Table 1
[0037] In this embodiment, the rainfall condition R adopts the 1h forecast rainfall, which can be obtained by the forecast rainfall amount. For a large basin, in order to ensure the accuracy of the disaster chain warning, the surface rainfall predicted by radar is generally used to express it; if there is a rainfall station in the basin, the actual rainfall measured at the rainfall station can be used for disaster chain warning. Local 1h rainfall variation coefficient You can consult the local "Runoff Calculation Manual" to obtain the local average annual rainfall. It is expressed as the average of rainfall observations over many years. It is calculated by the sum of the rainfall on the day before the hourly rainfall forecast and the rainfall in the previous 5 days. Based on the above content, this embodiment can predict the rainfall in 1h in real time. , to carry out real-time 1h warning of landslide-mudslide disaster chain, thereby achieving the purpose of refined warning of disaster chain.
[0038] In the example, the deep stream drainage area is about 8.17km 2 The main ditch is about 4400m long, with an average slope of about 137‰, a maximum altitude of about 2141m, a minimum altitude of about 870m, and a relative height difference of about 1271m. Using ArcGIS10.5 software and DEM data, the river network of the catchment grid threshold (cumulative flow) of 500 was extracted, and then the generated river network data was processed by Stream Link, and the basin boundaries were aligned and outlined, and 41 sub-basins of the Shenxigou basin were obtained, such as Figure 3 Through remote sensing images and field investigations, the loose material sources are mainly distributed in 11 sub-basins, namely 0, 1, 2, 4, 7, 10, 15, 16, 17, 32 and 33.
[0039] Based on the above example, the method application process of the embodiment of the present application includes but is not limited to the following steps: Step 1: Calculate the terrain information entropy and terrain condition criteria of the sub-basin: According to the calculation method of terrain information entropy, the area-elevation integral curves and terrain information entropy of 41 sub-basins in Shenxigou Basin were calculated. The steps are as follows: In the first step, ArcGIS 10.5 software was used to analyze the area and elevation of 41 sub-basins in the Shenxigou watershed.
[0040] In the second step, the area and elevation data of the 41 sub-basins in the Shenxigou Basin were imported into Excel for statistical analysis. The elevation proportion of the Shenxigou Basin and the area proportion of the corresponding position were calculated according to the contour interval of 50m, and then a series of (x, y) points were obtained for each sub-basin, where x represents the area proportion and y represents the elevation proportion (the contour interval is 50m).
[0041] In the third step, MATLAB programming was used to fit a series of (x, y) points of the 41 sub-basins in the Shenxigou Basin with curves to obtain the corresponding area-elevation curves (the first area-elevation curves). The fitted area-elevation curves were then integrated to obtain the corresponding area-elevation curve integral value S. Finally, the integral values of the 41 sub-basins were calculated using the formula to obtain the terrain information entropy value, as shown in Table 2.
[0042] In the fourth step, using the terrain discrimination conditions of the landslide-mudslide hazard chain, there are 22 sub-basins with the terrain conditions for the occurrence of landslide-mudslide hazard chain, accounting for 53% of the total number of basins in the study area.
[0043] Table 2 serial number Fitting curve S <![CDATA[H S ]]> 0 <![CDATA[y=(1-x) 1.33 ]]> 0.430 0.275 1 <![CDATA[y=(1-x) 1.74 ]]> 0.365 0.372 2 <![CDATA[y=(1-x) 1.27 ]]> 0.441 0.260 3 <![CDATA[y=(1-x) 1.64 ]]> 0.378 0.351 4 <![CDATA[y=(1-x) 1.09 ]]> 0.479 0.215 5 <![CDATA[y=(1-x) 3.33 ]]> 0.231 0.696 6 <![CDATA[y=(1-x) 1.33 ]]> 0.429 0.275 7 <![CDATA[y=(1-x) 1.24 ]]> 0.447 0.253 8 <![CDATA[y=(1-x) 1.81 ]]> 0.356 0.390 9 <![CDATA[y=(1-x) 2.84 ]]> 0.260 0.607 10 <![CDATA[y=(1-x) 1.29 ]]> 0.438 0.264 11 <![CDATA[y=(1-x) 1.64 ]]> 0.379 0.349 12 <![CDATA[y=(1-x) 2.02 ]]> 0.331 0.436 13 <![CDATA[y=(1-x) 1.13 ]]> 0.470 0.226 14 <![CDATA[y=(1-x) 0.66 ]]> 0.602 0.110 15 <![CDATA[y=(1-x) 2.44 ]]> 0.291 0.526 16 <![CDATA[y=(1-x) 3.90 ]]> 0.204 0.793 17 <![CDATA[y=(1-x) 1.34 ]]> 0.427 0.277 18 <![CDATA[y=(1-x) 2.31 ]]> 0.302 0.499 19 <![CDATA[y=(1-x) 1.22 ]]> 0.450 0.249 20 <![CDATA[y=(1-x) 1.86 ]]> 0.349 0.401 21 <![CDATA[y=(1-x) 1.39 ]]> 0.418 0.291 22 <![CDATA[y=(1-x) 1.21 ]]> 0.452 0.246 23 <![CDATA[y=(1-x) 2.62 ]]> 0.276 0.562 24 <![CDATA[y=(1-x) 1.96 ]]> 0.338 0.423 25 <![CDATA[y=(1-x) 0.60 ]]> 0.623 0.096 26 <![CDATA[y=(1-x) 0.37 ]]> 0.730 0.045 27 <![CDATA[y=(1-x) 1.83 ]]> 0.353 0.394 28 <![CDATA[y=(1-x) 2.12 ]]> 0.320 0.459 29 <![CDATA[y=(1-x) 0.36 ]]> 0.737 0.042 30 <![CDATA[y=(1-x) 0.76 ]]> 0.570 0.132 31 <![CDATA[y=(1-x) 0.58 ]]> 0.633 0.090 32 <![CDATA[y=(1-x) 1.69 ]]> 0.371 0.362 33 <![CDATA[y=(1-x) 0.67 ]]> 0.599 0.111 34 <![CDATA[y=(1-x) 2.12 ]]> 0.321 0.458 35 <![CDATA[y=(1-x) 2.16 ]]> 0.317 0.467 36 <![CDATA[y=(1-x) 1.29 ]]> 0.437 0.265 37 <![CDATA[y=(1-x) 2.81 ]]> 0.263 0.600 38 <![CDATA[y=(1-x) 1.35 ]]> 0.426 0.279 39 <![CDATA[y=(1-x) 1.04 ]]> 0.490 0.203 40 <![CDATA[y=(1-x) 1.04 ]]> 0.490 0.203 Step 2: Calculate the sub-basin source information entropy and source condition criteria: According to the calculation method of material source information entropy, the landslide area-elevation integral curve (second area-elevation curve) and material source information entropy of 41 sub-basins in Shenxigou Basin can be calculated. The specific steps are as follows: In the first step, the spatial distribution of landslide area in Shenxigou watershed was obtained through remote sensing image interpretation and field survey results, which was used as the loose solid source of debris flow conversion; ArcGIS 10.5 software was used to perform statistical analysis on the interpreted landslide area and elevation.
[0044] In the second step, the landslide area and elevation data were imported into Excel for statistical analysis. The elevation proportion and landslide area proportion of the deep stream gully watershed were calculated according to the contour interval of 50 m, and a series of points of 41 sub-basins were obtained, where x represents the landslide area proportion and y represents the elevation proportion (according to the contour interval of 50 m).
[0045] In the third step, MATLAB software was used to fit a series of (x, y) points in the sub-basin of the Shenxigou watershed with polynomials to obtain the corresponding landslide area-elevation curve. The fitted landslide area-elevation curve was then integrated to obtain the integral value M of the landslide area-elevation curve (for sub-basins without collapse landslide solid matter, it was recorded as +∞). Finally, the sub-basin material source information entropy value was calculated, as shown in Table 3.
[0046] In the fourth step, using the material source identification conditions of the landslide-mudslide disaster chain, there are 10 sub-basins that have the material source conditions for the landslide-mudslide disaster chain, accounting for 24% of the total number of basins in the study area.
[0047] Table 3
[0048] Step 3: Calculate the rainfall conditions and criteria of the sub-basin: The rainfall condition is calculated by taking the rainfall event of July 9, 2013 as an example. A rainfall monitoring station is built in Guoquanyangou, the sub-basin of Shenxigou No. 2. The rainfall monitored by this station represents the rainfall situation of the entire basin. Therefore, the rainfall condition R of the entire 41 sub-basins has only one value, which is calculated as follows: From July 7, 2013, heavy rains fell in the Shenxigou basin. On the 9th, the rainfall in the Shenxigou basin reached 244.5 mm, the hourly rainfall before the mudslide reached 32.36 mm, and the previous rainfall reached 276.5 mm; the local multi-year average rainfall is 1200 mm, the 1h rainfall variation coefficient is 0.36, and a is 5.5, then the rainfall condition R of this event is: ; It can be seen that the R value of this rainfall event is relatively large, all >1.0, which means that the rainfall conditions for landslide-mudslide disasters to occur in the entire basin are in place, that is, the probability and risk of a landslide-mudslide disaster chain are very high, and early warning is needed.
[0049] Step 4: Landslide-mudslide disaster chain warning: According to the calculated R value and terrain information entropy and material source information entropy, based on the landslide-mudslide disaster chain warning discrimination model established by the present invention, the spatial warning information distribution of 41 sub-basins under the condition of hourly rainfall of 32.36 mm is shown in Table 4. It can be seen that among the 41 sub-basins, there are 6 sub-basins that need red warnings, 17 that need orange warnings, and 18 that need blue warnings. Because the rainfall conditions R are relatively large this time, there is no situation where debris flow is formed due to insufficient rainfall, so there is no yellow warning level for this warning.
[0050] Table 4
[0051] Step 5: Verification of early warning results: According to the post-disaster investigation, the sub-basins corresponding to 0, 2, 4 and 7 are Wuxianmiaogou, Guoquanyangou, Huangniganggou and Chenjiapinggou, respectively, and debris flow records have been recorded in these four ditches.
[0052] From the above content, it can be seen that the embodiment of the present application establishes a quantitative criterion for the transformation of landslide into debris flow based on information entropy, introduces a meteorological forecast rainfall index, and constructs a landslide-debris flow disaster chain early warning model and early warning index method that combines rainfall conditions with terrain and material source conditions, thereby realizing real-time early warning of the landslide-debris flow disaster chain, solving the technical bottleneck that the current early warning and forecasting methods for a single disaster type in the disaster field cannot provide early warning and forecast for the landslide-debris flow disaster chain, and realizing refined early warning of the landslide-debris flow disaster chain, providing data support for the early warning and forecasting and disaster prevention and mitigation of the landslide-debris flow disaster chain under the current climate change conditions.
[0053] Reference Figure 4 The embodiment of the present application provides an early warning system for a landslide-mudslide disaster chain, the system comprising: The first module 410 is used to obtain terrain element information of a preset area; The second module 420 is used to calculate terrain information entropy according to terrain element information; The third module 430 is used to obtain the material source element information of the preset area; The fourth module 440 is used to calculate the provenance information entropy according to the provenance element information; The fifth module 450 is used to obtain rainfall information of a preset area; The sixth module 460 is used to construct the rainfall conditions of the landslide-mudslide disaster chain according to the rainfall information; The seventh module 470 is used to generate early warning information of the landslide-mudslide disaster chain in a preset area based on terrain information entropy, material source information entropy and rainfall conditions.
[0054] It can be understood that the contents of the above method embodiments are all applicable to the present system embodiments, the functions specifically implemented by the present system embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0055] The embodiment of the present application also provides an electronic device, the electronic device includes a memory and a processor, the memory stores a computer program, and the processor implements the above-mentioned landslide-mudslide disaster chain warning method when executing the computer program. The electronic device can be any intelligent terminal including a tablet computer, a car computer, etc.
[0056] It can be understood that the contents of the above method embodiments are all applicable to the present device embodiments, the functions specifically implemented by the present device embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0057] See also Figure 5 , Figure 5The hardware structure of an electronic device of another embodiment is illustrated, and the electronic device includes: The processor 510 may be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present application; The memory 520 can be implemented in the form of a read-only memory (ROM), a static storage device, a dynamic storage device, or a random access memory (RAM). The memory 520 can store an operating system and other application programs. When the technical solution provided in the embodiment of this specification is implemented by software or firmware, the relevant program code is stored in the memory 520, and the processor 510 calls and executes the landslide-mudslide disaster chain early warning method of the embodiment of the present application; Input / output interface 530, used to implement information input and output; Communication interface 540, used to realize communication interaction between the device and other devices, which can be realized through wired mode (such as USB, network cable, etc.) or wireless mode (such as mobile network, WIFI, Bluetooth, etc.); bus 550 , which transmits information between various components of the device (e.g., processor 510 , memory 520 , input / output interface 530 , and communication interface 540 ); The processor 510 , the memory 520 , the input / output interface 530 and the communication interface 540 are connected to each other in communication within the device via the bus 550 .
[0058] An embodiment of the present application also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the early warning method for the landslide-mudslide disaster chain is implemented.
[0059] It can be understood that the contents of the above method embodiments are all applicable to the present storage medium embodiments, the functions specifically implemented by the present storage medium embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.
[0060] The memory, as a non-transient computer-readable storage medium, can be used to store non-transient software programs and non-transient computer executable programs. In addition, the memory may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some embodiments, the memory may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0061] The embodiments described in the embodiments of the present application are intended to more clearly illustrate the technical solutions of the embodiments of the present application and do not constitute a limitation on the technical solutions provided in the embodiments of the present application. Those skilled in the art will appreciate that with the evolution of technology and the emergence of new application scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.
[0062] Those skilled in the art will appreciate that the technical solutions shown in the figures do not constitute a limitation on the embodiments of the present application, and may include more or fewer steps than shown in the figures, or a combination of certain steps, or different steps.
[0063] The system embodiments described above are merely illustrative, and the units described as separate components may or may not be physically separated, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the present embodiment.
[0064] Those skilled in the art will appreciate that all or some of the steps in the methods disclosed above, and the functional modules / units in the systems and devices may be implemented as software, firmware, hardware, or a suitable combination thereof.
[0065] The terms "first", "second", "third", "fourth", etc. (if any) in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0066] It should be understood that in the present application, "at least one (item)" means one or more, and "plurality" means two or more. "And / or" is used to describe the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" can mean: only A exists, only B exists, and A and B exist at the same time, where A and B can be singular or plural. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b or c can mean: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", where a, b, c can be single or multiple.
[0067] In the several embodiments provided in the present application, it should be understood that the disclosed systems and methods can be implemented in other ways. For example, the system embodiments described above are only schematic. For example, the division of the above units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of systems or units, which can be electrical, mechanical or other forms.
[0068] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0069] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0070] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including multiple instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods of various embodiments of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, referred to as ROM), random access memory (Random Access Memory, referred to as RAM), disk or optical disk and other media that can store programs.
[0071] The preferred embodiments of the present invention are described above with reference to the accompanying drawings, but the scope of the rights of the present invention is not limited thereto. Any modification, equivalent substitution and improvement made by a person skilled in the art without departing from the scope and essence of the present invention should be within the scope of the rights of the present invention.
Claims
1. A landslide-mudslide disaster chain early warning method, characterized in that: The method comprises the following steps: Get terrain element information of the preset area; Calculating terrain information entropy according to the terrain element information; Acquire the material source element information of the preset area; Calculating the material provenance information entropy according to the material provenance element information; Obtaining rainfall information of the preset area; Constructing the rainfall condition of the landslide-mud flow disaster chain according to the rainfall information; Early warning information of the landslide-mud flow disaster chain in the preset area is generated according to the terrain information entropy, the material source information entropy and the rainfall condition.
2. The method according to claim 1, characterized in that: The calculating terrain information entropy according to the terrain element information includes: Constructing a first elevation map according to the terrain element information; Obtaining a first area-elevation curve on the first elevation map; The terrain information entropy is calculated according to the first area-elevation curve.
3. The method according to claim 2, characterized in that The calculation formula for calculating the terrain information entropy according to the first area-elevation curve is as follows: ; in, represents the terrain information entropy; S represents the integral value of the first area-elevation curve, ; Represents the first area-elevation curve.
4. The method according to claim 1, characterized in that: The calculating the material provenance information entropy according to the material provenance element information includes: Constructing a second elevation map according to the provenance element information; Acquire a second area-elevation curve on the second elevation map; The material source information entropy is calculated based on the second area-elevation curve.
5. The method according to claim 4, characterized in that The formula for calculating the material source information entropy according to the second area-elevation curve is as follows: ; Wherein, represents the material source information entropy; a and b represent the two integral upper and lower limits of the second area-elevation curve, satisfying ; M represents the second area-elevation curve integral value, ; The polynomial fitting coefficients of the second area-elevation curve are represented.
6. The method according to claim 1, characterized in that The formula for constructing the rainfall condition of the landslide-mudslide disaster chain according to the rainfall information is as follows: ; Wherein, R represents the rainfall condition, It indicates the forecast rainfall index; Indicates the average annual rainfall in the preset area; represents the actual rainfall before the landslide-mudslide disaster chain occurs; represents the predicted rainfall one hour before the occurrence of the landslide-mudslide disaster chain; represents the coefficient of variation of rainfall in the preset area for one hour; a represents the parameter of the preset area.
7. The method according to claim 1, characterized in that The generating of the warning information of the landslide-mudslide disaster chain in the preset area according to the terrain information entropy, the material source information entropy and the rainfall condition includes: When the terrain information entropy falls within the first range, the material source information entropy falls within the third range, and the rainfall condition falls within the fifth range, a first warning prompt information is generated, wherein the first warning prompt information indicates that the landslide-mudslide disaster chain will occur in the preset area within a preset time period; When the terrain information entropy falls within the first range, the material source information entropy falls within the fourth range, and the rainfall condition falls within the fifth range, a second warning prompt information is generated, wherein the second warning prompt information is used to indicate that a landslide-mudslide disaster chain will not occur in the preset area within a preset time period, but a flash flood disaster will occur; When the terrain information entropy falls within the first range, the material source information entropy falls within the third range, and the rainfall condition falls within the sixth range, a third warning prompt information is generated, and the third warning prompt information is used to indicate that the landslide-mudslide disaster chain will not occur in the preset area within a preset time period, but a debris flow disaster will occur; When the terrain information entropy falls within the second range, the material source information entropy falls within the fourth range, and the rainfall condition falls within the sixth range, a fourth warning prompt information is generated, and the fourth warning prompt information is used to indicate that the landslide-mudslide disaster chain will not occur in the preset area within a preset time period.
8. An early warning system for landslide-mudslide disaster chain, characterized in that: The system comprises: The first module is used to obtain terrain element information of a preset area; The second module is used to calculate terrain information entropy according to the terrain element information; The third module is used to obtain the material source element information of the preset area; The fourth module is used to calculate the material source information entropy according to the material source element information; The fifth module is used to obtain rainfall information of the preset area; The sixth module is used to construct the rainfall conditions of the landslide-mud flow disaster chain according to the rainfall information; The seventh module is used to generate early warning information of the landslide-mudslide disaster chain in the preset area according to the terrain information entropy, the material source information entropy and the rainfall conditions.
9. An electronic device, characterized in that: include: at least one processor; at least one memory for storing at least one program; When the at least one program is executed by the at least one processor, the at least one processor implements the method according to any one of claims 1 to 7.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Red bed region landslide early warning method and application thereof
CN105761436A
Gulley-shaped debris flow early warning method and application thereof
CN106157541A
Debris flow gully identification method and device
CN111241690A
Debris flow early warning method and device
CN111311879A
Early warning method for debris flow induced by combined action of rainfall and temperature rise
CN115083115A