Partitioned power generation and utilization balance analysis and cross-regional support path checking method and system
By dynamically identifying power grid partitions and partition boundaries, combined with load forecast information, real-time monitoring and safety verification of the power generation and consumption balance of power grid zones are realized, which solves the problems of unstable power grid operation and load transfer risks, and improves the intelligence and automation of the power grid. level, ensuring the safety of urban power supply.
Patent Information
- Application Number
- CN202410787172.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-18
AI Technical Summary
Existing technology cannot monitor and optimize the balance of power generation and consumption in power grid zones in real time, resulting in unstable power grid operation and the risk of insufficient power supply and user power loss. Moreover, the load transfer plan lacks safety verification, and there are unpredictable grid risks.
By dynamically acquiring real-time power grid models and data, identifying power grid partitions and partition boundaries, and combining load forecasting and intraday planning information, real-time monitoring and low-margin alarm prompts of partition power generation and consumption balance are achieved, and load transfer auxiliary decision-making and safety verification methods are generated. , Improve the intelligence and automation level of the power grid control system.
It improves the operation stability and reliability of the power grid, reduces the risk of equipment damage, reduces the burden on regulatory personnel, ensures the safety of urban power supply, and achieves coordinated and optimized operation of provincial and local power grids.
Smart Images

Figure CN118739281A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power system regional power generation and consumption balance, and in particular to a regional power generation and consumption balance analysis and cross-region support path verification method and system. Background Art
[0002] The construction of a new power system with new energy as the main body integrates a variety of traditional and new centralized and distributed energy sources such as fire, water, wind, light, and storage. The energy structure is complex and changeable, and the operation and regulation of the power grid face outstanding challenges.
[0003] On the other hand, the provincial urban power grid adopts a hierarchical and zoned regulation and management mode, which is broken down into multiple power supply zones that operate independently. The boundaries of the power grid zones change dynamically with the power grid operation mode. The static zone transfer channels customized according to the conventional operation mode cannot be matched with the current operation mode in real time, and effective load transfer plans cannot be formulated, which will affect the safety, reliability and rationality of the power grid operation.
[0004] At present, the grid dispatchers use manual search methods to calculate the load balance and transfer in different areas. The load transfer causes a sharp increase in load, approaching the power supply limit, which poses certain safety risks to the grid. Taking the megacity grid with 500kV double-ring network strong connection and 220kV sub-division operation as an example, the urban grid is affected by the imbalance of regional power load and grid architecture development. During peak power consumption hours, equipment maintenance or grid failure in bad weather, there is a risk of insufficient power supply capacity or power outage for users.
[0005] The deficiency of the existing technology is that it only relies on grid dispatchers to use offline zoning compilation tools to manually identify grid zoning, perform balance analysis and formulate load transfer strategies. Not only does it lack unified standards and cannot track the status of zoning boundaries in real time, but in actual operation, it also has problems such as cumbersome business operations, low efficiency, and difficulty in achieving coordinated optimization of provincial and local power grids.
[0006] The shortcoming of the prior art 1 (CN114614468B) is that the analysis target of the load transfer analysis method for the distribution network area is only the main transformer and substation where the distribution network needs to transfer the load, and it is not suitable for the load transfer of the main network. The power business scenarios that can be satisfied are relatively limited; and the execution process and final results of the load transfer plan are not safety checked, and it is impossible to issue alarms for load transfer partitioning plans that may cause the base state, N-1 connected transformer thermal stability exceeding the limit and equipment power failure, which will bring unpredictable risks to the power grid. Summary of the invention
[0007] In order to overcome the technical problems existing in the prior art, the present invention provides a method and system for analyzing the power generation and consumption balance of different regions and verifying the cross-region support path. By dynamically acquiring real-time power grid models and data information, the function of dynamic identification of power grid zones and zone boundaries is realized. Combined with the forecast and plan information of the day before, the real-time monitoring of the power generation and consumption balance of different regions in a multi-energy structure and the function of low-margin zone alarm prompt are realized. The risk prediction of power generation and consumption balance within the day is realized, and auxiliary decision-making and safety verification means for energy transfer and load transfer between zones are generated.
[0008] The present invention can meet the requirements of power balance monitoring and supply guarantee under energy diversification, improve resource coordination capabilities, and enhance the online monitoring, analysis and early warning, optimization decision-making and verification and evaluation capabilities of provincial and local integrated regional power generation and supply balance, providing strong support for the coordinated optimization operation of provincial and local power grids. It can significantly improve the intelligence and automation level of the control system and reduce the workload of control personnel.
[0009] The present invention adopts the following technical solution.
[0010] A first aspect of the present invention provides a method for analyzing power generation and consumption balance in different regions and verifying cross-region support paths, comprising the following steps:
[0011] Step 1, obtain the underlying data, load forecast data, regional load limit list data, interconnection transformer stability limit data and margin alarm threshold values of each zone from external files and database servers; wherein the underlying data includes: real-time power grid model, measurement, parameter and state estimation calculation results; load forecast data includes: day-ahead load forecast and intraday load forecast data;
[0012] Step 2: Dynamically identify the grid partitions based on the real-time grid model and parameters, including the equipment in the partitions, grid partition demarcation points, and the hot standby capacity of the generator / generator-transformer group;
[0013] Step 3: According to the real-time grid measurement and state estimation calculation results, the day-ahead load forecast and intraday load forecast data, and the interconnection transformer stability limit data, the power generation and load data in the sub-zone are counted to predict and monitor the power generation and consumption balance of the sub-zone, and an alarm is issued according to the power generation and load comparison results and the margin alarm threshold value of each sub-zone;
[0014] Step 4: Make auxiliary decisions on load transfer for the partitions that have been alarmed in step 3, form a load transfer plan and a corresponding cross-region support path, and perform base state flow verification, static safety analysis and risk warning. If the power generation and consumption of the partition are still not balanced after cross-region support, derive the controllable load list from the regional power-cutting load list to implement power-cutting;
[0015] Step 5: Display the power generation and consumption balance analysis and cross-regional support path verification results on the front-end data.
[0016] Preferably, dynamically identifying power grid partitions specifically includes:
[0017] Identify the equipment in the partition and determine the partition number according to the connection status with the main transformer. On the basis of the distribution network, the main transformer of the main network substation is equivalent to the generator set, and the topological analysis function of the state estimation program is used to perform electrical island analysis; all distribution network voltage level equipment in the partition share the same partition number with the main transformer in the partition; distribution network voltage level equipment not connected to the main transformer shares the dead island partition number;
[0018] Identify grid partition demarcation points, including two types: disconnected bus tie / bus breakers and disconnected lines;
[0019] Identify the hot standby capacity, traverse all generators and generator-transformer groups belonging to the dead island partition, analyze their operating status, and if the unit / generator-transformer group is in hot standby status, include the capacity of the unit / generator-transformer group in the hot standby capacity of the partition to which its hot standby bus belongs.
[0020] Preferably, when identifying the demarcation point of the power grid partition, when the demarcation point type of the identified power grid partition is a disconnected bus tie / bus branch switch, traverse all disconnected bus tie / bus branch switches, and if the busbars at both ends belong to different partitions, including dead island partitions, define the switch as a partition demarcation point and record the partition numbers on both sides of the demarcation point;
[0021] When the demarcation point type of the identified power grid partition is a disconnected line, traverse all disconnected lines and identify the partitions to which the busbars at both ends of the line belong. If the busbars at both ends belong to different partitions, including dead island partitions, define the line as a partition demarcation point and record the partition numbers on both sides of the demarcation point.
[0022] Preferably, monitoring the power generation and consumption balance of a zone and issuing an alarm specifically includes:
[0023] Statistics on power generation within the sub-area, including real-time power generation value, power generation capacity and power generation capacity including hot standby;
[0024] Count the load in the partition, including real-time value and predicted value;
[0025] The real-time power generation value, power generation capacity, power generation capacity including hot standby, real-time load active power value, and load active power forecast value of the partition are displayed in the form of curves. The load active power forecast value and power generation capacity are automatically compared, and the power generation and consumption balance margin of the partition is calculated based on the difference between the power generation capacity and the load active power forecast value. An alarm is issued for the partition whose power generation and consumption balance margin is lower than the alarm threshold value.
[0026] Preferably, when counting the power generation in the zone, the hot standby active capacity of the peak-shaving natural gas units is summed as the hot standby part of the power generation capacity of the zone with hot standby, and the hot standby or active capacity of the coal-fired units is increased or adjusted in the short term as the hot standby part;
[0027] When counting the load within a partition, the sum of the active loads of all buses in the partition at various time points in the past 24 hours is counted to generate a partition load active curve, and the maximum value of the partition load active curve is used as the predicted peak value of the bus load in the partition.
[0028] Preferably, the zoning load transfer auxiliary decision, safety verification and power restriction specifically include:
[0029] Carry out the first load transfer zone auxiliary decision, traverse the demarcation points of the zones for power generation and consumption balance warning, including bus tie / break switches and boundary lines, calculate the load forecast peak of the bus inside the demarcation point and the power generation and consumption balance margin of the zones outside the demarcation point, and form a load transfer zone plan if the bus load forecast peak is less than the balance margin;
[0030] Carry out the second load transfer zoning auxiliary decision, monitor all the power generation and consumption balance after the implementation of the first load transfer zoning plan, and perform the load transfer zoning auxiliary decision again for the balance warning zone;
[0031] Monitor the power generation and consumption balance after the implementation of the second load transfer partition plan, generate a list of controllable loads in the partition for the balance warning partition, export it to the external batch load control module, and generate partition power restriction statistics;
[0032] The base state flow verification and static safety analysis are carried out on the execution process and final results of all load transfer partitioning schemes, and alarms are issued for load transfer partitioning schemes that may cause base state, N-1 connected transformer thermal stability exceeding the limit and equipment power failure.
[0033] Preferably, the load transfer zoning scheme includes the name of the demarcation point equipment, the name of the zone, the balance margin of the zone, the name of the bus in this zone, and the amount of transferred load; all load transfer zoning schemes are displayed in a list, arranged in reverse order by load transfer capacity.
[0034] Preferably, the load transfer operation is performed according to the demarcation point type. If the demarcation point is a bus tie switch, a bus reversal operation is performed; if the demarcation point is a bus branch switch, a bus branch operation is performed; if the demarcation point is a line, a line operation is performed.
[0035] Preferably, in step 5, web technology with separated front-end and back-end is used to display the main functional results of the system, including: partition information, partition boundary information, partition margin information, partition internal power supply, backup power supply information, load transfer strategy and verification result information between partitions, regional power restriction list information, and global control parameter information.
[0036] A second aspect of the present invention provides a system for analyzing the balance of power generation and consumption in different regions and verifying cross-regional support paths, and the method for analyzing the balance of power generation and consumption in different regions and verifying cross-regional support paths includes:
[0037] Data parsing module, used to obtain data from external files and database servers;
[0038] Dynamic identification of power grid partition module, used to dynamically identify the equipment in the partition, the grid partition demarcation point and the hot standby capacity of the generator / generator-transformer group;
[0039] The sub-area power generation and consumption balance monitoring module is used to collect statistics on power generation and load data within the sub-area, predict and monitor the power generation and consumption balance within the sub-area, and issue alarms based on the power generation and load comparison results;
[0040] The partition load transfer auxiliary decision module is used to make auxiliary decisions on partition load transfer for the alarm partition, export the controllable load list, and perform safety verification on the formed load transfer partition plan and the corresponding cross-zone support path;
[0041] The partition information and load transfer strategy display module is used to display the front-end data of the power generation and consumption balance analysis and cross-region support path verification results;
[0042] The analysis result reading and writing module is used for data exchange between external files, database servers and function execution modules.
[0043] Compared with the prior art, the beneficial effects of the present invention include at least:
[0044] According to the monitoring and load forecasting of power generation and consumption balance in different regions, the present invention realizes dynamic adjustment of the region boundary along with the operation mode of the power grid, dynamically monitors power generation and consumption in different regions, provides effective load transfer strategies and safety verification results for control personnel, improves the stable operation reliability of the power grid, ensures the operation safety of the power supply network in different regions, improves the online monitoring, analysis and early warning, optimization decision-making and verification and evaluation capabilities of the provincial and local integrated power generation and consumption balance in different regions, and provides strong support for the coordinated optimization operation of provincial and local power grids, specifically including:
[0045] (1) Solve the differences in the positioning and solutions of regional problems caused by the differences in the professional level of power grid control personnel. Use unified adjustment standards and standardized operation content to reduce the daily complex and difficult business problems of dispatchers and improve the professional level of personnel.
[0046] (2) Online real-time monitoring and decision-making software replaces offline zoning compilation tools and human experience-based decision-making methods, shortening the processing time from 30 minutes in offline mode to 10 minutes, greatly improving the efficiency of operating mode adjustment, ensuring safe and stable operation of the power grid, reducing the risk of equipment damage, and saving economic costs.
[0047] (3) Further effectively ensure the stability of power grid operation, maintain urban power supply safety and power supply security, and safeguard social livelihood.
[0048] (4) Provide a friendly human-computer interaction interface, using a nine-square grid interface display style with clear functional modules and intuitive and simple. When switching partitions, all monitoring statistics and verification analysis result information can be cascaded and refreshed, and a single-point autonomous query function is provided, while supporting manual triggering of safety verification calculations. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is the functional structure diagram of the power grid regional power generation and consumption balance and cross-regional path verification system;
[0050] Figure 2 It is a functional flow chart for dynamically identifying power grid partitions;
[0051] Figure 3 It is a flow chart of the monitoring and alarm functions of power generation and consumption balance in different areas;
[0052] Figure 4 It is a flow chart of auxiliary decision-making and verification functions for partition load transfer;
[0053] Figure 5 It is a flow chart of a method for analyzing power generation and consumption balance in different regions and verifying cross-region support paths provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0054] In order to make the purpose, technical scheme and advantages of the present invention clearer, the technical scheme of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The embodiments described in this application are only part of the embodiments of the present invention, not all of them. Based on the spirit of the present invention, other embodiments obtained by ordinary technicians in this field without creative work are all within the scope of protection of the present invention.
[0055] In view of the incomplete consideration of the existing system architecture and the regional power generation and consumption balance analysis method, the regional power generation load balance calculation and load transfer analysis decision are mostly based on human experience, resulting in the current peak power consumption in some hot spots There are still supply and demand contradictions. At the same time, the cross-regional load transfer scheme that relies on manual experience and offline preparation of transfer channels has certain safety risks to the power grid.
[0056] At the same time, in order to ensure the high-reliability power supply of the power grid in megacities and to build a resilient power grid with the goal of "the main grid cannot be collapsed and the distribution network does not stop power", the provincial power grid 220kV sub-regional power generation and consumption balance analysis and the main distribution network load transfer analysis are integrated. Therefore, the present invention provides a power grid sub-regional power generation and consumption balance and cross-regional support path verification system for provincial and local dispatching and main distribution networks, so as to realize comprehensive sub-regional power generation and consumption balance monitoring and cross-regional path support, improve the calculation standardization and accuracy of load transfer auxiliary decision-making and safety verification, and effectively ensure the power supply reliability of local areas of the power grid and the safety of people's livelihood electricity use.
[0057] like Figure 5 As shown, embodiment 1 of the present invention provides a method for analyzing the power generation and consumption balance of a sub-area and verifying the cross-area support path, which is described by taking a megacity power grid with a 500kV double-ring network and a 220kV sub-area operation as an example, but the scope of protection of the present invention cannot be limited by this, and includes the following steps:
[0058] Step 1: Obtain the underlying data from external files by parsing the standard E-format file, including real-time power grid models, measurements, parameters, and state estimation calculation results; obtain load forecast data from the database server by reading the relational database, including day-ahead load forecast and intraday load forecast data, obtain regional power-cutting load list data and 500kV interconnection transformer stability limit data, and obtain basic low margin alarm threshold values for each partition.
[0059] Step 2: Dynamically identify the grid partitions based on the real-time grid model and parameters. The identification content includes the equipment in the partition, the grid partition boundary point and the hot standby capacity of the 220kV generator / transformer group, such as Figure 2 shown.
[0060] In a preferred but non-limiting embodiment of the present invention, step 2 specifically comprises:
[0061] Step 2.1, based on the 220kV power grid, the main transformer of the 500kV substation is equivalent to a generator set, and the topology analysis function of the state estimation program is used to perform electrical island analysis; the partition number is determined according to the connection status with the main transformer, and all 220kV equipment in the partition shares the same island number, that is, the partition number, with the 500kV main transformer in the partition. 220kV equipment not connected to the 500kV main transformer shares the dead island partition number.
[0062] Step 2.2, identifying the grid partition boundary points, including two types: disconnected bus tie / bus breakers and disconnected lines.
[0063] When the demarcation point type of the identified power grid partition is an open bus tie / bus split switch, traverse all the open 220kV bus tie / bus split switches. If the busbars at both ends belong to different 220kV partitions, including dead island partitions, define the switch as a partition demarcation point and record the partition numbers on both sides of the demarcation point.
[0064] When the demarcation point type of the identified power grid partition is a disconnected line, traverse all disconnected 220kV lines (the apparent power at the AC line end is lower than the threshold value) to identify the partitions to which the busbars at both ends of the line belong. If the busbars at both ends belong to different 220kV partitions, including dead island partitions, define the line as a partition demarcation point and record the partition numbers on both sides of the demarcation point.
[0065] Step 2.3, identify the 220kV hot standby capacity. Specifically, traverse all generators and generator-transformer groups that are not directly connected to the 500kV power source point, that is, belong to the dead island partition, and analyze their operating status. If the unit / generator-transformer group is in hot standby status, the capacity of the unit / generator-transformer group is included in the hot standby capacity of the partition to which its hot standby bus belongs.
[0066] It is understandable that through Figure 2 It can dynamically identify grid partitions and use local topology fast search and positioning technology to identify information inside and outside the grid partitions. It uses two styles, dynamic scatter plot and holographic flow chart, to track and display the boundary connection relationship of the partitions and the changes of plants and stations inside and outside the partitions and boundaries in real time.
[0067] Step 3: According to the real-time grid measurement and state estimation calculation results, the day-ahead load forecast and intraday load forecast data, and the interconnection transformer stability limit data, the power generation and load data in the sub-zone are counted to predict and monitor the power generation and consumption balance of the sub-zone. According to the power generation and load comparison results and the margin alarm threshold value of each sub-zone, an alarm is issued to the low margin zone, such as Figure 3 shown.
[0068] In a preferred but non-limiting embodiment of the present invention, step 3 specifically comprises:
[0069] Step 3.1, count the power generation in the partition, including the real-time value of power generation, power generation capacity and power generation capacity including hot standby. Specifically, sum the real-time active output of the generator sets in the partition and the real-time active power flow of the 500kV main transformer to count the real-time value of power generation in the partition; sum the active capacity of the generator sets in the partition and the active capacity of the 500kV main transformer to count the power generation capacity of the partition, which represents the real-time power supply capacity; sum the power generation capacity of the partition and all the hot standby active capacity of the partition to count the power generation capacity including hot standby in the partition, which represents the available power supply capacity.
[0070] Further preferably, the hot standby active capacity of the peak-shaving natural gas units is summed up as the hot standby part of the power generation capacity containing hot standby in the zone, and the active capacity of the hot standby or regulated coal-fired units is increased in the short term to supplement the short-term available power supply capacity of the zone.
[0071] Step 3.2, count the load in the partition, including real-time value and predicted value. Specifically, sum the real-time active power values of the 220kV load, 220kV main transformer winding, and 220kV boundary line in the partition, and count the real-time value of the partition load; read the day-ahead load forecast and intra-day load forecast data obtained in step 1, and count the predicted value and predicted peak value of the partition load active power curve in the next 24 hours.
[0072] Further preferably, the sum of active loads of all buses in the partition at various time points in the past 24 hours is counted to generate a partition load active curve, the maximum value of which is the predicted peak value of the bus load in the partition.
[0073] Step 3.3, display the real-time power generation value, power generation capacity, power generation capacity including hot standby, real-time load active power value, and load active power forecast value of steps 3.1 and 3.2 in the form of a curve; automatically compare the load active power forecast value and the power generation capacity, calculate the power generation and consumption balance margin of the partition by the difference between the power generation capacity and the load active power forecast value, and issue an alarm for the partition whose power generation and consumption balance margin is lower than the alarm threshold value.
[0074] Further preferably, when the load active power prediction value exceeds the power generation capacity, a second-level alarm is issued, and when the load active power prediction value exceeds the power generation capacity including hot standby, a first-level alarm is issued.
[0075] It is understandable that through Figure 3 The functions of power generation statistics, load statistics and power generation and consumption balance monitoring within the partition can realize information monitoring and statistics of various types of power supply values (real-time power supply value, real-time power supply capacity, short-term available power supply capacity and available power supply capacity) and load values (real-time load value, 4-hour and 24-hour load forecast) in the partition, provide dynamic change curves and margin lists for balance monitoring, and promptly remind dispatchers that the power generation and consumption balance margin is a negative partition.
[0076] Step 4: Assist decision-making on load transfer for the partitions that were alarmed in step 3, form a load transfer plan and corresponding cross-region support path, and perform base state flow verification, static safety analysis and risk warning. If the power generation and consumption of the partitions are still not balanced after cross-region support, derive the controllable load list from the regional power-cutting load list to execute power-cutting, such as Figure 4 shown.
[0077] In a preferred but non-limiting embodiment of the present invention, step 4 specifically comprises:
[0078] Step 4.1, make the first load transfer zone auxiliary decision, specifically, traverse the demarcation point of the zone for power generation and consumption balance warning, including bus tie / break switch and boundary line, and count the load forecast peak of the bus inside the demarcation point and the power generation and consumption balance margin of the zone outside the demarcation point. If the bus load forecast peak is less than the balance margin, form a load transfer zone plan, including the demarcation point equipment name, zone name, zone balance margin, bus name of this zone, and transfer load.
[0079] Further preferably, all load transfer partitioning schemes are displayed in a list format, arranged in descending order of load transfer capacity.
[0080] Further preferably, the load transfer operation is classified according to the demarcation point type as follows:
[0081] If the dividing point is the bus tie switch, the load transfer zone operation is classified as "bus reversal operation";
[0082] If the dividing point is a busbar switch, the load transfer operation is classified as "busbar operation";
[0083] If the demarcation point is a line, the load transfer zone operation is classified as "line operation".
[0084] Step 4.2, make a second load transfer zoning auxiliary decision, specifically, monitor all power generation and consumption balance situations after the implementation of the first load transfer zoning plan, and return to step 2.3.1 for the balance warning zone to perform the load transfer zoning auxiliary decision again.
[0085] Step 4.3, monitor the power generation and consumption balance after the implementation of the second load transfer partition plan, generate a list of controllable loads in the partition for the balance warning partition, export it to the external batch load control module, and generate partition power restriction statistics.
[0086] Step 4.4, perform base state flow verification and static safety analysis on the execution process and final results of all load transfer partitioning schemes, check whether the grid components are overloaded and whether the grid voltage level meets the requirements during load transfer partitioning operations, and issue alarms for load transfer partitioning schemes that may cause base state, N-1-connected thermal stability exceeding the limit and equipment power failure.
[0087] It is understandable that through Figure 4 The load transfer strategy and safety verification function provide multiple load transfer channels (busbar / bus-sub switch and AC line segment) for the partitions with balance risks, and complete the safety verification calculation under the external triggering of a single load transfer strategy or multiple strategies; Figure 4 The regional power-cutting statistics function provides two lists of loads to be pulled: oversupply capacity and tight reduction capacity. The power-cutting load classifications of various regions are associated with different regions, making it easy for dispatchers to intuitively grasp the power-cutting information of the regions directly under the local dispatching.
[0088] Step 5: Display the power generation and consumption balance analysis and cross-regional support path verification results on the front-end data.
[0089] Preferably, relying on web technology with separated front-end and back-end, the main functional results of the system are displayed, including: partition information, partition boundary information, partition margin information, partition internal power supply and backup power supply information, as well as load transfer strategy and verification result information between partitions, regional power restriction list information, and global control parameter information such as calculation time and calculation status; adopting a nine-square grid interface display style with clear functional modules and intuitive and simple operation; providing a single-point autonomous query function, and supporting manually triggered safety verification calculations.
[0090] It is worth noting that this embodiment is described using a 500kV / 220kV main distribution network as an example, but the zoned power generation and consumption balance analysis and cross-zone support path verification method of the present invention are also applicable to main distribution networks of other voltage levels, and based on the spirit of the present invention, all fall within the protection scope of the present invention.
[0091] It is understandable that the significant difference between the load transfer analysis method for distribution network area provided by prior art 1 (CN114614468B) and the present invention is that the load transfer analysis for distribution network only provides one load transfer line as the optimal load transfer line for the corresponding distribution network line. The present invention can not only dynamically identify the partitions of the main distribution network of the power grid, but also intuitively display the real-time value of power generation, power generation capacity, power generation capacity including hot standby, real-time value of load active power, and load active power prediction value curve of the partition, realize the balance monitoring and balance warning of power generation and consumption in the partition, and provide multiple partition load transfer decisions and verification results for the partitions with balance risks, which can be used for dispatching and operation personnel to optimize the scheme in combination with the actual operation status of the power grid and avoid the operation risks of the power grid caused by load transfer.
[0092] like Figure 1 As shown, embodiment 2 of the present invention provides a system for analyzing the balance of power generation and consumption in different regions and verifying cross-regional support paths, and the method for analyzing the balance of power generation and consumption in different regions and verifying cross-regional support paths includes:
[0093] Data parsing module, used to obtain data from external files and database servers;
[0094] Dynamic identification of power grid partition module, used to dynamically identify the equipment in the partition, the grid partition demarcation point and the hot standby capacity of the generator / generator-transformer group;
[0095] The sub-area power generation and consumption balance monitoring module is used to collect statistics on power generation and load data within the sub-area, predict and monitor the power generation and consumption balance within the sub-area, and issue alarms based on the power generation and load comparison results;
[0096] The partition load transfer auxiliary decision module is used to make auxiliary decisions on partition load transfer for the alarm partition, export the controllable load list, and perform safety verification on the formed load transfer partition plan and the corresponding cross-zone support path;
[0097] The partition information and load transfer strategy display module is used to display the front-end data of the power generation and consumption balance analysis and cross-region support path verification results;
[0098] The analysis result reading and writing module is used for data exchange between external files, database servers and function execution modules.
[0099] Compared with the prior art, the beneficial effects of the present invention include at least:
[0100] According to the monitoring and load forecasting of power generation and consumption balance in different regions, the present invention realizes dynamic adjustment of the region boundary along with the operation mode of the power grid, dynamically monitors power generation and consumption in different regions, provides effective load transfer strategies and safety verification results for control personnel, improves the stable operation reliability of the power grid, ensures the operation safety of the power supply network in different regions, improves the online monitoring, analysis and early warning, optimization decision-making and verification and evaluation capabilities of the provincial and local integrated power generation and consumption balance in different regions, and provides strong support for the coordinated optimization operation of provincial and local power grids, specifically including:
[0101] (1) Solve the differences in the positioning and solutions of regional problems caused by the differences in the professional level of power grid control personnel. Use unified adjustment standards and standardized operation content to reduce the daily complex and difficult business problems of dispatchers and improve the professional level of personnel.
[0102] (2) Online real-time monitoring and decision-making software replaces offline zoning compilation tools and human experience-based decision-making methods, shortening the processing time from 30 minutes in offline mode to 10 minutes, greatly improving the efficiency of operating mode adjustment, ensuring safe and stable operation of the power grid, reducing the risk of equipment damage, and saving economic costs.
[0103] (3) Further effectively ensure the stability of power grid operation, maintain urban power supply safety and power supply security, and safeguard social livelihood.
[0104] (4) Provide a friendly human-computer interaction interface, using a nine-square grid interface display style with clear functional modules and intuitive and simple. When switching partitions, all monitoring statistics and verification analysis result information can be cascaded and refreshed, and a single-point autonomous query function is provided, while supporting manual triggering of safety verification calculations.
[0105] The present disclosure may be a system, a method and / or a computer program product. The computer program product may include a computer-readable storage medium carrying computer-readable program instructions for causing a processor to implement various aspects of the present disclosure.
[0106] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for analyzing power generation and consumption balance in different regions and verifying cross-region support paths, characterized in that: The following steps are involved: Step 1, obtain the underlying data, load forecast data, regional load limit list data, interconnection transformer stability limit data and margin alarm threshold values of each zone from external files and database servers; wherein the underlying data includes: real-time power grid model, measurement, parameter and state estimation calculation results; load forecast data includes: day-ahead load forecast and intraday load forecast data; Step 2: Dynamically identify the grid partitions based on the real-time grid model and parameters, including the equipment in the partitions, grid partition demarcation points, and the hot standby capacity of the generator / generator-transformer group; Step 3: According to the real-time grid measurement and state estimation calculation results, the day-ahead load forecast and intraday load forecast data, and the interconnection transformer stability limit data, the power generation and load data in the sub-zone are counted to predict and monitor the power generation and consumption balance of the sub-zone, and an alarm is issued according to the power generation and load comparison results and the margin alarm threshold value of each sub-zone; Step 4: Make auxiliary decisions on load transfer for the partitions that have been alarmed in step 3, form a load transfer plan and a corresponding cross-region support path, and perform base state flow verification, static safety analysis and risk warning. If the power generation and consumption of the partition are still not balanced after cross-region support, derive the controllable load list from the regional power-cutting load list to implement power-cutting; Step 5: Display the power generation and consumption balance analysis and cross-regional support path verification results on the front-end data.
2. The method for analyzing power generation and consumption balance in different regions and verifying cross-region support paths according to claim 1, characterized in that: Dynamic identification of power grid partitions specifically includes: Identify the equipment in the partition and determine the partition number according to the connection status with the main transformer. On the basis of the distribution network, the main transformer of the main network substation is equivalent to the generator set, and the topological analysis function of the state estimation program is used to perform electrical island analysis; all distribution network voltage level equipment in the partition share the same partition number with the main transformer in the partition; distribution network voltage level equipment not connected to the main transformer shares the dead island partition number; Identify grid partition demarcation points, including two types: disconnected bus tie / bus breakers and disconnected lines; Identify the hot standby capacity, traverse all generators and generator-transformer groups belonging to the dead island partition, analyze their operating status, and if the unit / generator-transformer group is in hot standby status, include the capacity of the unit / generator-transformer group in the hot standby capacity of the partition to which its hot standby bus belongs.
3. The method for analyzing power generation and consumption balance in different regions and verifying cross-region support paths according to claim 2, characterized in that: When identifying the demarcation point of the power grid partition, when the demarcation point type of the identified power grid partition is an open bus tie / bus sub-switch, traverse all the open bus tie / bus sub-switches. If the busbars at both ends belong to different partitions, including dead island partitions, define the switch as the partition demarcation point and record the partition numbers on both sides of the demarcation point. When the demarcation point type of the identified power grid partition is a disconnected line, traverse all disconnected lines and identify the partitions to which the busbars at both ends of the line belong. If the busbars at both ends belong to different partitions, including dead island partitions, define the line as a partition demarcation point and record the partition numbers on both sides of the demarcation point.
4. The method for analyzing power generation and consumption balance in different regions and verifying cross-region support paths according to claim 1, characterized in that: Monitoring the power generation and consumption balance of each zone and issuing alarms include: Statistics on power generation within the sub-area, including real-time power generation value, power generation capacity and power generation capacity including hot standby; Count the load in the partition, including real-time value and predicted value; The real-time power generation value, power generation capacity, power generation capacity including hot standby, real-time load active power value, and load active power forecast value of the partition are displayed in the form of curves. The load active power forecast value and power generation capacity are automatically compared, and the power generation and consumption balance margin of the partition is calculated based on the difference between the power generation capacity and the load active power forecast value. An alarm is issued for the partition whose power generation and consumption balance margin is lower than the alarm threshold value.
5. The method for analyzing power generation and consumption balance in different regions and verifying cross-region support paths according to claim 4, characterized in that: When calculating the power generation in the zone, the hot standby active capacity of the peak-shaving natural gas units is summed as the hot standby part of the zone's power generation capacity with hot standby, and in the short term, the hot standby or active capacity of the coal-fired units is increased as the hot standby part; When counting the load within a partition, the sum of the active loads of all buses in the partition at various time points in the past 24 hours is counted to generate a partition load active curve, and the maximum value of the partition load active curve is used as the predicted peak value of the bus load in the partition.
6. The method for analyzing power generation and consumption balance in different regions and verifying cross-region support paths according to claim 1, characterized in that: The auxiliary decision-making, safety verification and power restriction of regional load transfer specifically include: Carry out the first load transfer zone auxiliary decision, traverse the demarcation points of the zones for power generation and consumption balance warning, including bus tie / break switches and boundary lines, calculate the load forecast peak of the bus inside the demarcation point and the power generation and consumption balance margin of the zones outside the demarcation point, and form a load transfer zone plan if the bus load forecast peak is less than the balance margin; Carry out the second load transfer zoning auxiliary decision, monitor all the power generation and consumption balance after the implementation of the first load transfer zoning plan, and perform the load transfer zoning auxiliary decision again for the balance warning zone; Monitor the power generation and consumption balance after the implementation of the second load transfer partition plan, generate a list of controllable loads in the partition for the balance warning partition, export it to the external batch load control module, and generate partition power restriction statistics; The base state flow verification and static safety analysis are carried out on the execution process and final results of all load transfer partitioning schemes, and alarms are issued for load transfer partitioning schemes that may cause base state, N-1 connected transformer thermal stability exceeding the limit and equipment power failure.
7. The method for analyzing power generation and consumption balance in different regions and verifying cross-region support paths according to claim 6, characterized in that: Load transfer zoning scheme, including the name of the demarcation point equipment, the name of the zone, the balance margin of the zone, the name of the bus in this zone, and the amount of transferred load; all load transfer zoning schemes are displayed in a list, arranged in reverse order by load transfer capacity.
8. The method for analyzing power generation and consumption balance in different regions and verifying cross-region support paths according to claim 6, characterized in that: Execute load transfer operation according to the demarcation point type. If the demarcation point is a bus tie switch, execute bus reversal operation; if the demarcation point is a bus split switch, execute bus split operation; if the demarcation point is a line, execute line operation.
9. The method for analyzing power generation and consumption balance in different regions and verifying cross-region support paths according to claim 1, characterized in that: In step 5, the front-end and back-end separated web technology is used to display the main functional results of the system, including: partition information, partition boundary information, partition margin information, partition internal power supply, backup power supply information, load transfer strategy and verification result information between partitions, regional power restriction list information, and global control parameter information.
10. A system for analyzing the balance of power generation and consumption in different regions and verifying the inter-regional support path, which runs the method for analyzing the balance of power generation and consumption in different regions and verifying the inter-regional support path as described in any one of claims 1 to 9, characterized in that: include: Data parsing module, used to obtain data from external files and database servers; Dynamic identification of power grid partition module, used to dynamically identify the equipment in the partition, the grid partition demarcation point and the hot standby capacity of the generator / generator-transformer group; The sub-area power generation and consumption balance monitoring module is used to collect statistics on power generation and load data within the sub-area, predict and monitor the power generation and consumption balance within the sub-area, and issue alarms based on the power generation and load comparison results; The partition load transfer auxiliary decision module is used to make auxiliary decisions on partition load transfer for the alarm partition, export the controllable load list, and perform safety verification on the formed load transfer partition plan and the corresponding cross-zone support path; The partition information and load transfer strategy display module is used to display the front-end data of the power generation and consumption balance analysis and cross-region support path verification results; The analysis result reading and writing module is used for data exchange between external files, database servers and function execution modules.
Citation Information
Patent Citations
Online evaluation method and system for provincial power grid adequacy
CN109873421A
Power grid partition load margin calculation method and device considering N-1 reliability
CN113300353A
Safety checking method, system and equipment for power generation and utilization of regional power grid and medium
CN115513952A
Partitioned power generation and utilization balance real-time monitoring and early warning and future state analysis method and system