Multi-subject complex high-frequency load prediction system and method
Multiple linear regression and time series analysis models are combined with user data to generate accurate electricity load coefficients, which solves the problem of insufficient accuracy of traditional prediction methods in high-frequency load environments and improves the operating efficiency and energy utilization of the power system.
Patent Information
- Application Number
- CN202410810685.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional load forecasting methods are difficult to accurately predict the electricity loads of different types of users, especially in high-frequency load environments. They fail to fully consider the specific electricity consumption behaviors and influencing factors of user groups, resulting in insufficient prediction accuracy and affecting the stability of the power system. Operational and energy efficiency.
Use multiple linear regression models and time series analysis models to combine electricity consumption data from residential, commercial and industrial users, including electricity consumption, work and rest time, family size, business hours, equipment operating hours and product quantity, to generate more accurate electricity consumption Load coefficient, and generate the total power load prediction value through correlation analysis, compare the prediction results with the threshold value in real time, and adjust the power supply strategy.
It improves the accuracy and reliability of load forecasting, can respond to the power needs of different user groups in a timely manner, significantly improves the operating efficiency and energy utilization of the power system, and provides support for the intelligent management of the power system.
Smart Images

Figure CN118739284A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of multi-agent load prediction, and in particular to a prediction system and method for multi-agent complex high-frequency loads. Background Art
[0002] The multi-agent complex high-frequency load prediction system is an advanced power management tool specially designed to cope with the increasing complexity and high-frequency data processing requirements in modern power systems. By integrating advanced data analysis technology and prediction models, the system can accurately predict the power load of different types of users, including residential, commercial and industrial users.
[0003] With the development of social economy and the continuous growth of electricity demand, accurately predicting the electricity load of different types of users has become the key to power system management and optimization. Traditional load forecasting methods often rely on a single statistical model and fail to fully consider the specific electricity consumption behaviors and influencing factors of different user groups, resulting in insufficient prediction accuracy. Especially in high-frequency load forecasting, due to the large amount of data and rapid changes, traditional methods are difficult to effectively capture and reflect the dynamic changes of real-time electricity consumption patterns. In addition, the lack of in-depth analysis of the electricity consumption characteristics of residential, commercial and industrial users makes it difficult for load forecasting to adapt to the complex and changing electricity consumption environment, thus affecting the stable operation of the power system and the effective use of energy.
[0004] The above information disclosed in this Background section is only for enhancement of understanding of the background of the present disclosure and therefore it may contain information that does not constitute the prior art that is already known to one of ordinary skill in the art. Summary of the invention
[0005] The purpose of the present invention is to provide a prediction system and method for multi-agent complex high-frequency loads to solve the problems raised in the above background technology.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A multi-agent complex high-frequency load prediction system, comprising:
[0008] The data collection module is used to collect the power load data of different subjects, including the power load data of residential users, the power load data of commercial users and the power load data of industrial users.
[0009] in,
[0010] The electricity load data of residential users include the amount of electricity consumed by residents, their work and rest schedules, the number of family members, and the living area;
[0011] The electricity load data for commercial users include commercial electricity consumption, business hours, and customer traffic;
[0012] The electricity load data of industrial users include industrial electricity consumption, equipment operation time and product quantity;
[0013] A data processing module is used to input the work and rest time, the number of family members and the living area into the multivariate linear regression model to obtain the residential electricity load factor, input the business hours and customer flow into the time series analysis model to obtain the commercial electricity load factor, and perform data processing on the equipment operation time and product quantity to obtain the industrial electricity load factor;
[0014] A data analysis module is used to process the residential electricity consumption and the residential electricity load factor to generate a residential electricity load forecast value, process the commercial electricity consumption and the commercial electricity load factor to generate a commercial electricity load forecast value, process the industrial electricity consumption and the industrial electricity load factor to generate an industrial electricity load forecast value, and perform data processing and correlation analysis on the residential electricity load forecast value, the commercial electricity load forecast value, and the industrial electricity load forecast value to generate a total electricity load forecast value;
[0015] A comparison module, used to compare the total power load forecast value with a preset threshold value, compare the residential power load forecast value with a preset threshold value, compare the commercial power load forecast value with a preset threshold value, and compare the industrial power load forecast value with a preset threshold value;
[0016] The judgment module is used to judge the status of residential power load, commercial power load and industrial power load according to the comparison result.
[0017] Furthermore, the work and rest time, family size and living area are input into the multivariate linear regression model to obtain the residential electricity load coefficient, based on the following formula:
[0018] Y m =β0+β1X1+β2X2+β3X3+ò
[0019] Among them, Y m is the residential electricity load coefficient, β0 is the intercept of the model, X1 is the work and rest time, β1 is the regression coefficient of work and rest time, X2 is the number of family members, β2 is the regression coefficient of the number of family members, X3 is the living area, β3 is the regression coefficient of the living area, and ò is the error term.
[0020] Furthermore, the business hours and customer flow are input into the time series analysis model to obtain the commercial electricity load factor, based on the following formula:
[0021] Y s =T t (R1)+S t(R2)
[0022] Among them, Y s is the commercial electricity load factor, R1 is the business hours, T t (R1) is the change of commercial electricity load during business hours, R2 is the customer flow, S t (R2) is the change in customer flow in the electricity load during a specific time period.
[0023] Furthermore, the equipment operation time and product quantity are processed to obtain the industrial electricity load factor, based on the following formula:
[0024]
[0025] Among them, Y g is the industrial electricity load factor, whose value range is [0,1], P is the equipment operation time, Q is the production quantity, α is the weight coefficient of the equipment operation time, δ is the weight coefficient of the product quantity, α=δ=0.5.
[0026] Furthermore, the residential electricity consumption and the residential electricity load factor are processed to generate the residential electricity load forecast value, based on the following formula:
[0027] YC m =Y m XL m
[0028] Among them, YC m is the predicted value of residential electricity load, XL m The amount of electricity consumed by residents;
[0029] The commercial power consumption and commercial power load factor are processed to generate the commercial power load forecast value, based on the following formula:
[0030] YC s =Y s XL s
[0031] Among them, YC s is the commercial electricity load forecast value, XL s is the commercial electricity consumption;
[0032] The industrial power consumption and industrial power load factor are processed to generate the industrial power load forecast value, based on the following formula:
[0033] YC g =Y g XL g
[0034] Among them, YC gis the predicted value of industrial power load, XL g Industrial electricity consumption.
[0035] Furthermore, the residential power load forecast value, commercial power load forecast value, and industrial power load forecast value are subjected to data processing and correlation analysis to generate the total power load forecast value, based on the following formula:
[0036] YC=YC m +YC s +YC g
[0037] Among them, YC is the predicted value of total power load.
[0038] Further, the total power load forecast value is compared with a preset threshold value, the residential power load forecast value is compared with a preset threshold value, the commercial power load forecast value is compared with a preset threshold value, and the industrial power load forecast value is compared with a preset threshold value. According to the comparison results, the situation of the residential power load, the commercial power load and the industrial power load is judged. The process is as follows:
[0039] When YC ≥ YZ, YC m ≥YZ m , Y.C. s <YZ s , Y.C. g <YZ g , the total power load forecast value is greater than or equal to its threshold value, and only the residential power load forecast value is greater than or equal to its threshold value, then only the power supply for residential power consumption needs to be increased;
[0040] When YC ≥ YZ, YC m <YZ m , Y.C. s ≥YZ s , Y.C. g ≥YZ g , if the total power load forecast value is greater than or equal to its threshold value, and only the commercial power load forecast value is greater than or equal to its threshold value, then only the power supply for commercial power needs to be increased;
[0041] When YC ≥ YZ, YC m <YZ m , Y.C. s <YZ s , Y.C. g ≥YZ g , the total electricity load forecast value is greater than or equal to its threshold, and only the industrial electricity load forecast value is greater than or equal to its threshold, then only the power supply for industrial electricity needs to be increased.
[0042] A method for predicting multi-agent complex high-frequency loads, the method is applied to any of the multi-agent complex high-frequency load prediction systems described above, and the specific steps include:
[0043] S1. Collecting electricity load data of different entities, the electricity load data of different entities includes electricity load data of residential users, electricity load data of commercial users and electricity load data of industrial users,
[0044] in,
[0045] The electricity load data of residential users include the amount of electricity consumed by residents, their work and rest schedules, the number of family members, and the living area;
[0046] The electricity load data for commercial users include commercial electricity consumption, business hours, and customer traffic;
[0047] The electricity load data of industrial users include industrial electricity consumption, equipment operation time and product quantity;
[0048] S2. Input the work and rest time, family population and living area into the multivariate linear regression model to obtain the residential electricity load factor, input the business hours and customer flow into the time series analysis model to obtain the commercial electricity load factor, and process the equipment operation time and product quantity to obtain the industrial electricity load factor;
[0049] S3. Process the residential electricity consumption and the residential electricity load factor to generate a residential electricity load forecast value, process the commercial electricity consumption and the commercial electricity load factor to generate a commercial electricity load forecast value, process the industrial electricity consumption and the industrial electricity load factor to generate an industrial electricity load forecast value, process the residential electricity load forecast value, the commercial electricity load forecast value, and the industrial electricity load forecast value to generate a total electricity load forecast value by performing data processing and correlation analysis;
[0050] S4. Compare the total power load forecast value with the preset threshold value, compare the residential power load forecast value with the preset threshold value, compare the commercial power load forecast value with the preset threshold value, and compare the industrial power load forecast value with the preset threshold value;
[0051] S5. According to the comparison results, determine the status of residential electricity load, commercial electricity load and industrial electricity load.
[0052] Compared with the prior art, the present invention has the following beneficial effects:
[0053] The present invention collects and integrates detailed electricity consumption data of residents, commercial and industrial users through the data acquisition module, including key information such as power consumption, work and rest time, family population, living area, business hours, customer flow, equipment operation time and product quantity. The data processing module adopts a multivariate linear regression model and a time series analysis model to accurately predict the power load of residents and commercial users respectively, and at the same time, the power load of industrial users is processed to obtain a more accurate load factor. The data analysis module further integrates these predicted values and generates a total power load prediction value through correlation analysis, thereby improving the accuracy and reliability of the prediction. The comparison module and the judgment module ensure the real-time comparison of the prediction results with the preset threshold, so as to timely adjust the power supply strategy and optimize the allocation of power resources. Therefore, compared with the prior art, the present solution can predict the complex high-frequency load of multiple subjects in a targeted manner, and respond to the power demand of different user groups, significantly improve the operation efficiency and energy utilization of the power system, and provide strong support for the intelligent management of the power system. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] Figure 1 It is a block diagram of the module composition of the present invention;
[0055] Figure 2 It is a schematic diagram of the overall method flow of the present invention. DETAILED DESCRIPTION
[0056] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments.
[0057] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0058] Example:
[0059] See also Figure 1 , the present invention provides a technical solution:
[0060] A multi-agent complex high-frequency load prediction system, comprising:
[0061] The data collection module is used to collect the power load data of different subjects, including the power load data of residential users, the power load data of commercial users and the power load data of industrial users.
[0062] in,
[0063] The electricity load data of residential users include the amount of electricity consumed by residents, their work and rest schedules, the number of family members, and the living area;
[0064] The electricity load data for commercial users include commercial electricity consumption, business hours, and customer traffic;
[0065] The electricity load data of industrial users include industrial electricity consumption, equipment operation time and product quantity;
[0066] A data processing module is used to input the work and rest time, the number of family members and the living area into the multivariate linear regression model to obtain the residential electricity load factor, input the business hours and customer flow into the time series analysis model to obtain the commercial electricity load factor, and perform data processing on the equipment operation time and product quantity to obtain the industrial electricity load factor;
[0067] A data analysis module is used to process the residential electricity consumption and the residential electricity load factor to generate a residential electricity load forecast value, process the commercial electricity consumption and the commercial electricity load factor to generate a commercial electricity load forecast value, process the industrial electricity consumption and the industrial electricity load factor to generate an industrial electricity load forecast value, and perform data processing and correlation analysis on the residential electricity load forecast value, the commercial electricity load forecast value, and the industrial electricity load forecast value to generate a total electricity load forecast value;
[0068] A comparison module, used to compare the total power load forecast value with a preset threshold value, compare the residential power load forecast value with a preset threshold value, compare the commercial power load forecast value with a preset threshold value, and compare the industrial power load forecast value with a preset threshold value;
[0069] The judgment module is used to judge the status of residential power load, commercial power load and industrial power load according to the comparison result.
[0070] In this embodiment, when the work and rest time, family size and living area of the residential user change, the power load data of the residential user will change. The specific reasons are as follows:
[0071] Different work and rest schedules will lead to changes in peak and trough periods of electricity consumption. For example, families who go to bed early and get up early may have higher electricity consumption in the morning and evening, while families who go to bed late and get up late may have higher electricity consumption at night and in the afternoon. Work and rest schedules determine the time and frequency of electrical appliance use. For example, more time at home means more use of lighting equipment, televisions, computers and kitchen appliances. Seasonal influences will also be reflected in changes in work and rest schedules. For example, the longer daytime hours in summer and the increased time spent on evening activities will lead to increased use of air conditioning and lighting equipment.
[0072] An increase in family size usually leads directly to an increase in electricity demand. For example, a family of four consumes more electricity than a family of two because more people need lighting, cooking, laundry and other activities. An increase in family size leads to an increase in the frequency of use of electrical appliances. For example, the more family members there are, the more frequently appliances such as washing machines, refrigerators and water heaters are used. More family members may require more appliances. For example, children may need additional learning aids and entertainment equipment, while the elderly may need special medical equipment.
[0073] The larger the living area, the greater the demand for heating and cooling, and more electricity is needed to maintain the indoor temperature. For example, the use of air conditioning and heating equipment will increase significantly; larger living areas require more lighting equipment, which will directly increase lighting electricity consumption; larger living areas are usually equipped with more household appliances, such as more TVs, audio equipment, kitchen appliances, etc.; in larger living spaces, appliances may be scattered across multiple rooms, and the use of appliances in each room may be superimposed, thereby increasing the total electricity load.
[0074] In summary, changes in the above factors will not only affect the electricity load of residential users individually, but may also interact with each other to further increase the fluctuation of electricity load. For example, if a family moves to a larger house and adds family members, and has a more active schedule, the electricity load will increase significantly. Therefore, it is very important to consider the impact of these factors in the multivariate linear regression model, which can help more accurately predict the electricity load of residential users.
[0075] On the basis of the above embodiment, the work and rest time, the number of family members and the living area are input into the multivariate linear regression model to obtain the residential electricity load factor, according to the following formula:
[0076] Y m =β0+β1X1+β2X2+β3X3+ò
[0077] Among them, Y mis the residential electricity load coefficient, β0 is the intercept of the model, X1 is the work and rest time, β1 is the regression coefficient of work and rest time, X2 is the number of family members, β2 is the regression coefficient of the number of family members, X3 is the living area, β3 is the regression coefficient of the living area, and ò is the error term.
[0078] Since work and rest time, family size and living area are easily accessible data and have a direct or indirect correlation with residential electricity load, these data can usually be obtained through questionnaires, power company records or public data sets. The multiple linear regression model assumes that there is a linear relationship between the dependent variable (electricity load coefficient) and the independent variables (work and rest time, family size, living area). This assumption is reasonable in many cases because the impact of these variables on electricity load is usually direct and quantifiable.
[0079] Therefore, in residential electricity load forecasting, the multivariate linear regression model can help power companies better understand and predict residential electricity consumption patterns, thereby optimizing grid management and energy distribution.
[0080] A table is listed based on the functional relationship between work and rest time, family population, living area and residential electricity load factor. The table is as follows:
[0081] Residential electricity load forecast factor analysis table
[0082]
[0083] By analyzing the data in the above Excel table, we can see that families with longer work and rest time usually have higher electricity load factors. Analysis of the number of family members shows that there will also be an increase in families with larger populations, which is consistent with the actual situation of household electricity consumption. Therefore, it is possible to identify and predict the impact of population size on electricity load. The analysis also shows that the residents' electricity load factor is consistent with the size of the living area, especially in families with larger living areas, the electricity load factor will increase significantly.
[0084] In this embodiment, when the business hours and customer flow of the commercial user change, the power load data of the commercial user will change. The specific reasons are as follows:
[0085] The extension or shortening of business hours will directly affect the electricity consumption period. For example, if a store extends its business hours, it will increase the usage time of lighting, air conditioning and other equipment, thereby increasing the total electricity consumption. Changes in business hours may lead to the shift of peak electricity consumption periods. For example, commercial users operating at night may reach peak electricity consumption at night, while users operating during the day may reach peak electricity consumption during the day.
[0086] Increased customer flow will lead to an increase in the frequency of equipment use in commercial premises. For example, more customers will require more lighting, air conditioning and elevator services, which will increase electricity consumption. High-flow customer activities may require additional power supply, such as more air conditioning, more frequent elevator use, and more electric equipment use (such as ordering machines, cash registers, etc.). Special events or promotions will significantly increase customer flow, resulting in a temporary increase in electricity load.
[0087] In summary, the changes in the above factors not only affect the electricity load of commercial users individually, but may also interact with each other to further increase the fluctuation of electricity load. For example, if a shopping mall extends its business hours during the holidays and the customer flow increases significantly, the electricity load will increase significantly.
[0088] Based on the above embodiment, the business hours and customer flow are input into the time series analysis model to obtain the commercial electricity load factor, according to the following formula:
[0089] Y s =T t (R1)+S t (R2)
[0090] Among them, Y s is the commercial electricity load factor, R1 is the business hours, T t (R1) is the change of commercial electricity load during business hours, R2 is the customer flow, S t (R2) is the change in customer flow in the electricity load during a specific time period.
[0091] Business hours and customer flow are both correlated with time. Since the business hours of commercial users directly affect the usage time of their electrical equipment, such as lighting, air conditioning, elevators, etc., extended business hours usually mean an increase in electricity consumption; an increase in customer flow will lead to an increase in the frequency of use of equipment in commercial venues, such as more lighting, air conditioning needs, and possible increased elevator use, all of which will increase electricity consumption.
[0092] The time series analysis model has the following characteristics:
[0093] The electricity load may show a certain trend over time. For example, with the increase of commercial activities, the electricity load may gradually increase, which is a trend. The electricity load may show periodic changes in different time periods (such as days, weeks, and months). This change is often related to the periodic fluctuations in business hours and customer flow, and is seasonal.
[0094] Therefore, in commercial electricity load forecasting, time series analysis models can help power companies better understand and predict commercial electricity consumption patterns, thereby optimizing grid management and energy distribution.
[0095] A table is listed based on the functional relationship between business hours, customer flow and commercial electricity load factor. The table is as follows:
[0096] Commercial power load forecast factor analysis table
[0097]
[0098] By analyzing the data in the above Excel table, from the perspective of commercial electricity load factor, the relationship between the commercial electricity load factor and the actual electricity consumption shows a reasonable distribution, which is consistent with the changing trend of actual electricity consumption, indicating that the overall changing trend of electricity load can be accurately captured.
[0099] The specific explanations are as follows: In terms of business hours, the commercial electricity load factor shows a regularity that is consistent with the actual data, that is, commercial venues with longer business hours usually have a higher electricity load factor. Analysis of customer flow shows that the commercial electricity load factor will also increase in commercial venues with more customer flow, which is consistent with the actual situation of commercial electricity consumption.
[0100] In this embodiment, when the equipment operation time and product quantity of the industrial user change, the power load data of the industrial user will change. The specific reasons are as follows:
[0101] The increase in equipment operating time means that the equipment uses electricity for a longer time, resulting in increased power consumption. Different types of equipment have different power requirements. Running high-power equipment for a long time will significantly increase the power load, and long-term operation may require more maintenance. If the efficiency of the equipment decreases, energy consumption will increase.
[0102] As the number of products increases, more equipment and longer operating times are needed to meet production needs. The production process of some products may be particularly power-intensive, such as heavy manufacturing and chemical product production. Different products have different production processes and different electricity requirements. Complex processes usually require more electricity support.
[0103] In summary, the electricity load data of industrial users is significantly affected by the operating time of equipment and the number of products. Understanding the specific reasons for these changes will help industrial users optimize production plans, improve energy efficiency, reduce energy costs, and better manage electricity load.
[0104] On the basis of the above embodiment, the equipment operation time and the product quantity are processed to obtain the industrial electricity load factor, and the formula is as follows:
[0105]
[0106] Among them, Y gis the industrial electricity load factor, whose value range is [0,1], P is the equipment operation time, Q is the production quantity, α is the weight coefficient of the equipment operation time, δ is the weight coefficient of the product quantity, α=δ=0.5.
[0107] A table is listed based on the functional relationship between equipment operation time, product quantity and industrial electricity load factor. The table is as follows:
[0108] Industrial electricity load forecast factor analysis table
[0109] Industrial electricity load factor Equipment operation time Product quantity 0.8 8 1000 0.9 10 1500 0.7 6 800 0.9 12 2000 0.7 9 900
[0110] By analyzing the data in the above Excel table, it can be seen that equipment with longer operating time usually has a higher power load factor. The analysis of the number of products shows that the number of products with a large number will also increase, which is consistent with the actual power consumption of the equipment. Therefore, it is possible to identify and predict the impact of the number of products on the power load.
[0111] On the basis of the above embodiment, the residential electricity consumption and the residential electricity load factor are processed to generate the residential electricity load forecast value, and the formula is as follows:
[0112] YC m =Y m XL m
[0113] Among them, YC m is the predicted value of residential electricity load, XL m The amount of electricity consumed by residents;
[0114] The commercial power consumption and commercial power load factor are processed to generate the commercial power load forecast value, based on the following formula:
[0115] YC s =Y s XL s
[0116] Among them, YC s is the commercial electricity load forecast value, XL s is the commercial electricity consumption;
[0117] The industrial power consumption and industrial power load factor are processed to generate the industrial power load forecast value, based on the following formula:
[0118] YC g =Y g XL g
[0119] Among them, YC g is the predicted value of industrial power load, XLg Industrial electricity consumption.
[0120] On the basis of the above embodiment, the residential power load forecast value, the commercial power load forecast value, and the industrial power load forecast value are subjected to data processing and correlation analysis to generate the total power load forecast value, according to the following formula:
[0121] YC=YC m +YC s +YC g
[0122] Among them, YC is the predicted value of total power load.
[0123] On the basis of the above embodiment, the total power load forecast value is compared with its preset threshold value, the residential power load forecast value is compared with its preset threshold value, the commercial power load forecast value is compared with its preset threshold value, and the industrial power load forecast value is compared with its preset threshold value. According to the comparison results, the situation of the residential power load, the commercial power load and the industrial power load is judged. The process is as follows:
[0124] When YC ≥ YZ, YC m ≥YZ m , Y.C. s <YZ s , Y.C. g <YZ g , the total power load forecast value is greater than or equal to its threshold value, and only the residential power load forecast value is greater than or equal to its threshold value, then only the power supply for residential power consumption needs to be increased;
[0125] When YC ≥ YZ, YC m <YZ m , Y.C. s ≥YZ s , Y.C. g ≥YZ g , if the total power load forecast value is greater than or equal to its threshold value, and only the commercial power load forecast value is greater than or equal to its threshold value, then only the power supply for commercial power needs to be increased;
[0126] When YC ≥ YZ, YC m <YZ m , Y.C. s <YZ s , Y.C. g ≥YZ g , the total electricity load forecast value is greater than or equal to its threshold, and only the industrial electricity load forecast value is greater than or equal to its threshold, then only the power supply for industrial electricity needs to be increased.
[0127] YZ is the threshold of the total power load forecast value, YZ mis the threshold of the predicted value of residential electricity load, YZ s is the threshold of the commercial power load forecast value, YZ g is the threshold of the predicted value of industrial power load.
[0128] The specific values of β1, β2, β3, α and δ in the formula are generally determined by technical personnel in this field according to actual conditions. The essence of this formula is a comprehensive analysis based on weighted summation. Technical personnel in this field collect multiple groups of sample data and set corresponding preset proportional coefficients for each group of sample data. The preset proportional coefficients and the collected sample data are substituted into the formula. Through repeated experiments and parameter adjustments, the accuracy of the model output and the rationality of the results are observed, and these factor coefficients are gradually adjusted. The performance and effect of the model under different parameter settings are compared to find the optimal coefficient combination. The calculated factor coefficients are screened and averaged to obtain the values of β1, β2, β3, α and δ.
[0129] See also Figure 2 , the present invention also provides a technical solution:
[0130] A method for predicting multi-agent complex high-frequency loads, the method is applied to any of the multi-agent complex high-frequency load prediction systems described above, and the specific steps include:
[0131] S1. Collecting electricity load data of different entities, the electricity load data of different entities includes electricity load data of residential users, electricity load data of commercial users and electricity load data of industrial users,
[0132] in,
[0133] The electricity load data of residential users include the amount of electricity consumed by residents, their work and rest schedules, the number of family members, and the living area;
[0134] The electricity load data for commercial users include commercial electricity consumption, business hours, and customer traffic;
[0135] The electricity load data of industrial users include industrial electricity consumption, equipment operation time and product quantity;
[0136] S2. Input the work and rest time, family population and living area into the multivariate linear regression model to obtain the residential electricity load factor, input the business hours and customer flow into the time series analysis model to obtain the commercial electricity load factor, and process the equipment operation time and product quantity to obtain the industrial electricity load factor;
[0137] S3. Process the residential electricity consumption and the residential electricity load factor to generate a residential electricity load forecast value, process the commercial electricity consumption and the commercial electricity load factor to generate a commercial electricity load forecast value, process the industrial electricity consumption and the industrial electricity load factor to generate an industrial electricity load forecast value, process the residential electricity load forecast value, the commercial electricity load forecast value, and the industrial electricity load forecast value to generate a total electricity load forecast value by performing data processing and correlation analysis;
[0138] S4. Compare the total power load forecast value with the preset threshold value, compare the residential power load forecast value with the preset threshold value, compare the commercial power load forecast value with the preset threshold value, and compare the industrial power load forecast value with the preset threshold value;
[0139] S5. According to the comparison results, determine the status of residential electricity load, commercial electricity load and industrial electricity load.
[0140] In addition, the size of the preset factor coefficient is to quantify each parameter to obtain a specific value. In order to facilitate subsequent comparison, the size of the coefficient depends on the amount of sample data and the preset proportional coefficient initially set by technical personnel in this field for each set of sample data. It is not unique as long as it does not affect the proportional relationship between the parameter and the quantized value.
[0141] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.
[0142] The above embodiments may be implemented in whole or in part by software, hardware, firmware or any other combination thereof. When implemented by software, the above embodiments may be implemented in whole or in part in the form of a computer program product. Those skilled in the art may appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein may be implemented by electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed by hardware or software methods depends on the specific application and design constraints of the technical solution.
[0143] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, and may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0144] The above description is only a specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application.
Claims
1. A multi-agent complex high-frequency load prediction system, characterized in that: include: The data collection module is used to collect the power load data of different subjects, including the power load data of residential users, the power load data of commercial users and the power load data of industrial users. in, The electricity load data of residential users include the amount of electricity consumed by residents, their work and rest schedules, the number of family members, and the living area; The electricity load data for commercial users include commercial electricity consumption, business hours, and customer traffic; The electricity load data of industrial users include industrial electricity consumption, equipment operation time and product quantity; A data processing module is used to input the work and rest time, the number of family members and the living area into the multivariate linear regression model to obtain the residential electricity load factor, input the business hours and customer flow into the time series analysis model to obtain the commercial electricity load factor, and perform data processing on the equipment operation time and product quantity to obtain the industrial electricity load factor; A data analysis module is used to process the residential electricity consumption and the residential electricity load factor to generate a residential electricity load forecast value, process the commercial electricity consumption and the commercial electricity load factor to generate a commercial electricity load forecast value, process the industrial electricity consumption and the industrial electricity load factor to generate an industrial electricity load forecast value, and perform data processing and correlation analysis on the residential electricity load forecast value, the commercial electricity load forecast value, and the industrial electricity load forecast value to generate a total electricity load forecast value; A comparison module, used to compare the total power load forecast value with a preset threshold value, compare the residential power load forecast value with a preset threshold value, compare the commercial power load forecast value with a preset threshold value, and compare the industrial power load forecast value with a preset threshold value; The judgment module is used to judge the status of residential power load, commercial power load and industrial power load according to the comparison result.
2. The multi-agent complex high-frequency load prediction system according to claim 1 is characterized by: The work and rest time, family population and living area are input into the multivariate linear regression model to obtain the residential electricity load factor, based on the following formula: Y m =β0+β1X1+β2X2+β3X3+ò Among them, Y m is the residential electricity load coefficient, β0 is the intercept of the model, X1 is the work and rest time, β1 is the regression coefficient of work and rest time, X2 is the number of family members, β2 is the regression coefficient of the number of family members, X3 is the living area, β3 is the regression coefficient of the living area, and ò is the error term.
3. The multi-agent complex high-frequency load prediction system according to claim 1 is characterized by: Business hours and customer flow are input into the time series analysis model to obtain the commercial electricity load factor, based on the following formula: Y s =T t (R1)+S t (R2) Among them, Y s is the commercial electricity load factor, R1 is the business hours, T t (R1) is the change of commercial electricity load during business hours, R2 is the customer flow, S t (R2) is the change in customer flow in the electricity load during a specific time period.
4. The multi-agent complex high-frequency load prediction system according to claim 1 is characterized by: The equipment operation time and product quantity are processed to obtain the industrial electricity load factor, based on the following formula: Among them, Y g is the industrial electricity load factor, whose value range is [0,1], P is the equipment operation time, Q is the production quantity, α is the weight coefficient of the equipment operation time, δ is the weight coefficient of the product quantity, α=δ=0.
5.
5. The multi-agent complex high-frequency load prediction system according to claim 1 is characterized by: The residential electricity consumption and the residential electricity load factor are processed to generate the predicted value of the residential electricity load, based on the following formula: YC m =Y m ·XL m Among them, YC m is the predicted value of residential electricity load, XL m The amount of electricity consumed by residents; The commercial power consumption and commercial power load factor are processed to generate the commercial power load forecast value, based on the following formula: YC s =Y s ·XL s Among them, YC s is the commercial electricity load forecast value, XL s is the commercial electricity consumption; The industrial power consumption and industrial power load factor are processed to generate the industrial power load forecast value, based on the following formula: YC g =Y g ·XL g Among them, YC g is the predicted value of industrial power load, XL g Industrial electricity consumption.
6. The multi-agent complex high-frequency load prediction system according to claim 1 is characterized by: The residential power load forecast value, commercial power load forecast value, and industrial power load forecast value are processed and correlated to generate the total power load forecast value. The formula is as follows: YC=YC m +YC s +YC g Among them, YC is the predicted value of total power load.
7. The multi-agent complex high-frequency load prediction system according to claim 1 is characterized by: The total power load forecast value is compared with the preset threshold value, the residential power load forecast value is compared with the preset threshold value, the commercial power load forecast value is compared with the preset threshold value, and the industrial power load forecast value is compared with the preset threshold value. According to the comparison results, the situation of the residential power load, the commercial power load and the industrial power load is judged. The process is as follows: When YC ≥ YZ, YC m ≥YZ m , Y.C. s <YZ s , Y.C. g <YZ g , the total power load forecast value is greater than or equal to its threshold value, and only the residential power load forecast value is greater than or equal to its threshold value, then only the power supply for residential power consumption needs to be increased; when YC≥YZ , YC m <YZ m , Y.C. s ≥YZ s , Y.C. g ≥YZ g , if the total power load forecast value is greater than or equal to its threshold value, and only the commercial power load forecast value is greater than or equal to its threshold value, then only the power supply for commercial power needs to be increased; when YC≥YZ , Y.C. m <YZ m , Y.C. s <YZ s , Y.C. g ≥YZ g , the total electricity load forecast value is greater than or equal to its threshold, and only the industrial electricity load forecast value is greater than or equal to its threshold, then only the power supply for industrial electricity needs to be increased.
8. A method for predicting multi-agent complex high-frequency loads, the method being applied to the multi-agent complex high-frequency load prediction system according to any one of claims 1 to 7, characterized in that: The specific steps include: S1. Collecting electricity load data of different entities, the electricity load data of different entities includes electricity load data of residential users, electricity load data of commercial users and electricity load data of industrial users, Among them, the electricity load data of residential users include residents' electricity consumption, work and rest time, family population and living area; The electricity load data for commercial users include commercial electricity consumption, business hours, and customer traffic; The electricity load data of industrial users include industrial electricity consumption, equipment operation time and product quantity; S2. Input the work and rest time, family population and living area into the multivariate linear regression model to obtain the residential electricity load factor, input the business hours and customer flow into the time series analysis model to obtain the commercial electricity load factor, and process the equipment operation time and product quantity to obtain the industrial electricity load factor; S3. Process the residential electricity consumption and the residential electricity load factor to generate a residential electricity load forecast value, process the commercial electricity consumption and the commercial electricity load factor to generate a commercial electricity load forecast value, process the industrial electricity consumption and the industrial electricity load factor to generate an industrial electricity load forecast value, and perform data processing and correlation analysis on the residential electricity load forecast value, the commercial electricity load forecast value, and the industrial electricity load forecast value to generate a total electricity load forecast value; S4. Compare the total power load forecast value with the preset threshold value, compare the residential power load forecast value with the preset threshold value, compare the commercial power load forecast value with the preset threshold value, and compare the industrial power load forecast value with the preset threshold value; S5. According to the comparison results, determine the status of residential electricity load, commercial electricity load and industrial electricity load.
Citation Information
Patent Citations
Power load control method and system
CN103997044A
User characteristic analysis-based multi-model load prediction method
CN106127360A
Time sequence power load combination prediction method based on multivariate regression and computer readable storage medium
CN110298490A
Power distribution network flexible load prediction method based on multi-factor segmentation
CN110705802A
Electric load prediction method and device, electronic equipment and storage medium
CN115034519A