Load management method based on power consumption of power consumer

By using the blockchain network for load regulation in the power grid, the problem of load balancing in the power grid is solved, flexible control and rapid response of the load are achieved, and the stability and efficiency of the power system are improved.

CN118739311AActive Publication Date: 2024-10-01SICHUAN YILAIKE SMART ENERGY CO LTD

Patent Information

Application Number
CN202411082301.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-10-01
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

Existing technology cannot effectively balance the load of the power grid, resulting in a shortage of power generation backup resources and insufficient peak shaving capacity. Moreover, load forecasting based on historical data has the risk of insufficient impact resistance, insufficient system flexibility, and low robustness.

Method used

The blockchain network is used to treat the target power grid, each station area and users as nodes. Each node is equipped with a load regulation strategy. Load data is collected and analyzed in real time. The load regulation ratio of the station area and users is determined through correlation coefficients, and the load is decomposed step by step. , using regulation modes such as time division, operation mode or power outage to achieve flexible control of the load.

Benefits of technology

It achieves precise regulation of power grid load, improves the flexibility and safety of load balancing, can quickly respond to changes in supply and demand, and reduces power system operation risks and costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118739311A_ABST
    Figure CN118739311A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of load management, in particular to a load management method based on power utilization of power consumers, which comprises the following steps: determining subordinate consumers of each transformer area under a target power grid; the target power grid, each transformer area and each user are used as block chain nodes to form a load regulation and control block chain network, and each block chain node is provided with a respective load regulation and control strategy; uploading the real-time load value of each user to the corresponding user node; uploading the sum of the real-time load values of the subordinate users belonging to the same transformer area to a corresponding transformer area node; uploading the real-time power condition of the power grid side and the sum of the real-time load values of all the transformer areas of the load side to a target power grid node; in the load regulation and control block chain network, each block chain node carries out load regulation and control on a power grid, a transformer area and a user step by step according to a respective load regulation and control strategy. According to the invention, the load of each user at the power grid side can be accurately regulated and controlled, and the load balance can be better realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of load management, and more particularly to a load management method based on power consumption of power users. Background Art

[0002] With the large-scale grid-connected use of renewable energy, it is inevitable that the dispatching and operation of the power system will become more difficult, resulting in a shortage of power generation reserve resources and insufficient peak-shaving capacity. As the demand for power supply from all walks of life increases, the requirements for the reliability of power supply from the power grid are also increasing, which greatly increases the risks and costs of power grid operation.

[0003] In the prior art, in order to balance the relationship between load supply and demand, the power grid side guides the load side to change its previous electricity consumption habits by formulating time-of-use electricity price rules. Under the time-of-use electricity price policy, the power supply company provides users with time-varying unit prices to reflect the value of electricity in different periods (including different times of the day or different seasons of the year). Users need to pay attention to changes in electricity prices at all times, which also has a certain impact on the normal production and life of users. This time-of-use electricity price policy cannot achieve effective balance of the power grid load.

[0004] There are also existing technologies that collect historical daily load-related data from electricity users, train deep learning models, and regulate the grid load based on predicted load data. This analysis method based on historical data may be overwhelmed and ignored for larger fluctuations that have occurred in history, and is not well prepared for larger fluctuations in the future. There are risks of insufficient shock resistance, insufficient system flexibility, and low robustness.

[0005] Therefore, how to accurately regulate the load on the grid side to achieve load balance is an urgent problem that technical personnel in this field need to solve. Summary of the invention

[0006] In view of this, the present invention provides a load management method based on the electricity consumption of power users, which can accurately regulate the load of each user on the power grid side and better achieve load balance.

[0007] In order to achieve the above object, the present invention adopts the following technical solution:

[0008] A load management method based on power consumption of power users comprises the following steps:

[0009] Determine the subordinate users of each substation under the target power grid;

[0010] The target power grid, each substation and each user are used as blockchain nodes to form a load control blockchain network. Each blockchain node is set with its own load control strategy.

[0011] Upload the real-time load value of each user to the corresponding user node; upload the sum of the real-time load values ​​of the subordinate users belonging to the same substation to the corresponding substation node; upload the real-time power situation on the grid side and the sum of the real-time load values ​​of each substation on the load side to the target grid node;

[0012] In the load control blockchain network, each blockchain node performs load control on the power grid, substation and user level by level according to its own load control strategy.

[0013] Furthermore, the subordinate users of each substation under the target power grid are determined, including:

[0014] The voltage data collected by all user sub-meters under the target power grid are subjected to correlation analysis to determine the correlation coefficient between the total meter voltage in the substation area and the user sub-meter voltage, and the subordinate users of each substation area are determined based on the correlation coefficient.

[0015] Furthermore, the load control strategy of the target power grid node is:

[0016] When the total load value of each substation on the load side exceeds the rated proportion of the real-time power on the grid side, the excess part will be regarded as the total load that needs to be adjusted and will be decomposed into different substations in proportion;

[0017] Or: When the total load value of each substation on the load side does not exceed the rated proportion of the real-time power on the grid side, but a load adjustment instruction is received, the load adjustment amount in the load adjustment instruction is used as the total load to be adjusted and decomposed into different substations in proportion;

[0018] Or: When the total load value of each substation on the load side exceeds the rated proportion of the real-time power on the grid side and a load adjustment instruction is received at the same time, it is determined whether the excess part is greater than the load adjustment amount in the load adjustment instruction. If it is greater, the excess part is taken as the total load amount that needs to be adjusted and is decomposed to different substations in proportion; otherwise, the load adjustment amount in the load adjustment instruction is taken as the total load amount that needs to be adjusted and is decomposed to different substations in proportion.

[0019] Furthermore, the target grid node decomposes the load to be adjusted into different substations in proportion, including:

[0020] Compare the real-time load value of each substation with the historical average load value of the same period. If the real-time load value of a substation is higher than the historical average load value of the same period, it will be regarded as the substation to be regulated and participate in the subsequent load regulation. Otherwise, it will not participate in the subsequent load regulation.

[0021] Sort the substations to be regulated according to the values ​​of the exceeded loads, and determine the substation load regulation ratio of each substation to be regulated;

[0022] According to the load control ratio of the substation, the total load that needs to be adjusted under the target power grid is decomposed into each substation to be regulated, and the load that needs to be adjusted in each substation is determined.

[0023] Furthermore, the load control strategy of each substation node is:

[0024] Determine the user load regulation ratio of each user in the area to be regulated based on the user's importance, the number of times they participated in load adjustment in the past, and the average of the previous regulation amount;

[0025] According to the user load control ratio, the load that needs to be adjusted in the area to be regulated is decomposed to each user.

[0026] Furthermore, the process of determining the user load regulation ratio of each user in the to-be-regulated area includes:

[0027] The importance of the user, the number of times of previous participation in load adjustment and the average value of previous regulation are used as three correction coefficients respectively, and the weights of the three correction coefficients are determined;

[0028] Divide users into three types: generally important, important, and very important, and determine the correction coefficient of each user's importance;

[0029] Determine the correction coefficient of the number of times each user has participated in load adjustment in the past according to the interval of the number of times the user has participated in load adjustment in the past;

[0030] Determine the correction coefficient of the average value of the previous control amount of each user according to the interval of the average value of the previous control amount of the user;

[0031] For any user, the three correction coefficients of the user are weighted summed to obtain the control priority value of the user;

[0032] According to the control priority value of each user, the user load control ratio of each user in the area to be controlled is determined.

[0033] Furthermore, the load control strategy of each user node includes:

[0034] When a user's subordinate substation does not need to be load-controlled, an hourly load plan for each device is generated for each day of the year based on the user's demand for each device in different time periods in previous years, and the hourly load plan for each device is adaptively adjusted based on changes in the external environment or manually input instructions.

[0035] Furthermore, the load control strategy of each user node also includes:

[0036] When a user's subordinate substation needs to perform load control, different control modes are adopted according to the type of equipment. The control modes include: time-based control, operating mode control or direct power off.

[0037] Furthermore, after load regulation of users, the target grid node continues to determine whether the total load values ​​of each substation on the load side exceeds the rated proportion of the real-time power on the grid side. If so, each blockchain node continues to regulate the load of the grid, substation and user step by step according to its own load regulation strategy until the total load values ​​of each substation on the load side no longer exceeds the rated proportion of the real-time power on the grid side, thus ending this round of regulation.

[0038] Furthermore, each blockchain node records and stores the execution process and control results of its own load control strategy in real time.

[0039] It can be seen from the above technical solutions that, compared with the prior art, the present invention has the following beneficial effects:

[0040] 1. The present invention realizes the step-by-step load control of the target power grid, substation and user through the blockchain network, which can not only realize the flexible and orderly control of the load, but also realize the safe storage of the control process data and result data, providing a basis for subsequent load control research.

[0041] 2. The present invention regards the target power grid, each substation and each user as a node of the blockchain network, and each node has its own separate load control strategy, wherein the target power grid can determine the total amount of load that needs to be adjusted based on the current real-time power and load demand, and can also determine the total amount of load that needs to be adjusted according to external instructions, and determine the substations that need to participate in the regulation and the load control ratio according to the current load values ​​of each substation and the historical data of the same period; each substation considers three factors: user importance, the number of times it has participated in load adjustment in the past, and the average of the previous regulation amount, and then determines the load control ratio of each user; each user adopts different load control modes considering the type of each equipment and environmental changes; through the above strategy, the load data can be decomposed and adjusted step by step and quickly, and the supply and demand balance of the power system load can be quickly met. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0043] Figure 1 A flow chart of a load management method based on power consumption of power users provided by the present invention;

[0044] Figure 2 A schematic diagram of the structure of the load regulation blockchain network provided by the present invention;

[0045] Figure 3 A flow chart of the load regulation strategy for the target power grid node provided by the present invention;

[0046] Figure 4 A flow chart of the load control strategy for each substation node provided by the present invention. DETAILED DESCRIPTION

[0047] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0048] like Figure 1 As shown, the embodiment of the present invention discloses a load management method based on power consumption of power users, comprising the following steps:

[0049] S1. Determine the subordinate users of each substation under the target power grid;

[0050] S2. The target power grid, each substation and each user are respectively used as blockchain nodes to form a load control blockchain network, and each blockchain node is respectively set with its own load control strategy;

[0051] S3, upload the real-time load value of each user to the corresponding user node; upload the sum of the real-time load values ​​of subordinate users belonging to the same substation to the corresponding substation node; upload the real-time power situation on the grid side and the sum of the real-time load values ​​of each substation on the load side to the target grid node;

[0052] In the load control blockchain network, each blockchain node performs load control on the power grid, substation and user level by level according to its own load control strategy.

[0053] The above steps are further explained below.

[0054] S1. Determine the subordinate users of each substation under the target power grid, including:

[0055] The voltage data collected by all user sub-meters under the target power grid are subjected to correlation analysis to determine the correlation coefficient between the total meter voltage in the substation area and the user sub-meter voltage, and the subordinate users of each substation area are determined based on the correlation coefficient.

[0056] Since the voltage data of the same phase in the same substation have high similarity, and the voltage data of different substations have low similarity, the Pearson correlation coefficient can be used to measure the relationship between the total meter voltage of the substation and the voltage of the user's sub-meter. The total meter of the substation is selected as the reference meter, and the similarity of the voltage data of the total meter and the sub-meter is compared, so as to divide the total meter and sub-meter in the same substation.

[0057] S2. Build a load control blockchain network and load control strategies for each node.

[0058] In the present invention, the target power grid, each substation and each user are respectively used as blockchain nodes to form a load control blockchain network, and each blockchain node is respectively provided with its own load control strategy.

[0059] like Figure 2 As shown, it is assumed that the target power grid contains a target power grid node and n substation nodes, and each substation node contains a different number of user nodes; data can be transmitted between the n substation nodes and the target power grid node, and all user nodes under each substation node can transmit data to the substation node.

[0060] S3. Step-by-step load control.

[0061] In actual application, the real-time load value of each user is uploaded to the corresponding user node; the sum of the real-time load values ​​of subordinate users belonging to the same substation is uploaded to the corresponding substation node; the real-time power situation on the grid side and the sum of the real-time load values ​​of each substation on the load side are uploaded to the target grid node.

[0062] In the load control blockchain network, each blockchain node performs load control on the power grid, substation and user level by level according to its own load control strategy.

[0063] Specifically:

[0064] (1) The load control strategy process of the target power grid node is as follows Figure 3 As shown, the following steps are included:

[0065] 11) When the total load value of each substation on the load side exceeds the rated proportion of the real-time power on the grid side, the excess part will be regarded as the total load that needs to be adjusted and will be decomposed into different substations in proportion;

[0066] Or: When the total load value of each substation on the load side does not exceed the rated proportion of the real-time power on the grid side, but a load adjustment instruction is received, the load adjustment amount in the load adjustment instruction is used as the total load to be adjusted and decomposed into different substations in proportion;

[0067] Or: When the total load value of each substation on the load side exceeds the rated proportion of the real-time power on the grid side and a load adjustment instruction is received at the same time, it is determined whether the excess part is greater than the load adjustment amount in the load adjustment instruction. If it is greater, the excess part is taken as the total load amount that needs to be adjusted and is decomposed to different substations in proportion; otherwise, the load adjustment amount in the load adjustment instruction is taken as the total load amount that needs to be adjusted and is decomposed to different substations in proportion.

[0068] After determining the total amount of load that needs to be adjusted, the target grid node will proportionally decompose the load that needs to be adjusted into different substations. The specific steps include:

[0069] 12) Compare the real-time load value of each substation with the historical average load value of the same period. If the real-time load value of a substation is higher than the historical average load value of the same period, it will be regarded as a substation to be regulated and participate in the subsequent load regulation. Otherwise, it will not participate in the subsequent load regulation.

[0070] 13) Sort the substations to be regulated according to the value of the exceeded load, and determine the substation load regulation ratio of each substation to be regulated;

[0071] 14) According to the load control ratio of the substation, the total load that needs to be adjusted under the target power grid is decomposed into each substation to be controlled, and the load that needs to be adjusted in each substation is determined.

[0072] In the present invention, when the target power grid node is performing load regulation, it not only takes into account the numerical difference between the total real-time load values ​​of each substation on the load side and the real-time power on the power grid side, but also takes into account whether there is an external manual regulation instruction at present, and determines the total load amount that needs to be adjusted in the end by combining the automatically calculated load difference and the fixed load adjustment amount in the external instruction. After determining the total load amount that needs to be adjusted, the substations whose current load values ​​exceed the historical values ​​for the same period are taken as the substations that need to participate in the regulation, and other substations do not participate in the regulation. Finally, the load regulation ratio of each substation is allocated according to the size of the exceeded value. The entire regulation strategy is relatively scientific and flexible.

[0073] (2) The load control strategy process of each substation node is as follows: Figure 4 As shown, the following steps are included:

[0074] 21) Determine the user load regulation ratio of each user in the area to be regulated based on the user's importance, the number of times they participated in load regulation in the past, and the average value of the previous regulation amount;

[0075] Specifically, the process of determining the user load control ratio of each user in the area to be controlled includes:

[0076] The importance of the user, the number of times the user has participated in load adjustment in the past, and the average value of the previous regulation are respectively used as three correction coefficients, and the weights of the three correction coefficients are determined. For example, the weights of the three correction coefficients of the importance of the user, the number of times the user has participated in load adjustment in the past, and the average value of the previous regulation are 0.4, 0.2, and 0.4 respectively;

[0077] Users are divided into three types: generally important, important, and very important. The correction coefficient of the importance of each user is determined. For example, the correction coefficient of generally important users is 0.7, the correction coefficient of important users is 0.4, and the correction coefficient of very important users is 0.1.

[0078] The correction coefficient of each user's previous load adjustment participation times is determined based on the range of the user's previous load adjustment participation times; for example, when the user's previous load adjustment participation times is greater than 6, the correction coefficient is 1; when the user's previous load adjustment participation times is greater than or equal to 1 and less than or equal to 6, the correction coefficient is 0.5; when the user's previous load adjustment participation times is 0, the correction coefficient is 0.

[0079] The correction coefficient of the average of the user's previous control amount is determined according to the range of the user's previous control amount; for example, when the user's previous control amount average is greater than 500, the correction coefficient is 1; when the user's previous control amount average is between 50-500, the correction coefficient is 0.5; when the user's previous control amount average is less than 50, the correction coefficient is 0.

[0080] For any user, the three correction coefficients of the user are weighted and summed to obtain the control priority value of the user; assuming that a user is of general importance, the number of times it has participated in load adjustment in the past is 5, and the average value of the previous control amount is 300, then the control priority value of the user is

[0081] s=0.4*0.7+0.2*0.5+0.4*0.5=0.28+0.1+0.2=0.58.

[0082] According to the control priority value of each user, the user load control ratio of each user in the area to be controlled is determined.

[0083] 22) According to the user load control ratio, the load that needs to be adjusted in the area to be controlled is decomposed to each user.

[0084] (3) The load control strategies of each user node include:

[0085] 31) When a user's upper substation does not need to perform load control, an hourly load plan for each device is generated for each day of the year based on the user's demand for each device in different time periods in previous years, and the hourly load plan for each device is adaptively adjusted based on changes in the external environment or manually input instructions.

[0086] When the user's upper substation does not need to perform load control, the load of each device is orderly controlled according to its own pre-established hourly load plan. During this process, when the external environment changes, such as when the ambient temperature rises or falls, the air-conditioning load is increased or decreased accordingly; when the external light increases or decreases, the lighting load is reduced or increased, etc.

[0087] 32) When a user's subordinate substation needs to carry out load control, different control modes are adopted according to the type of equipment. The control modes include: time-based control, operation mode control or direct power off.

[0088] Among them, the time-based opening and closing control is: for example, the control mode of the water heater is set to turn on from 6:00am to 8:00am, turn off from 8:00am to 11:00am, turn on from 11:00am to 14:00pm, turn off from 14:00pm to 18:00pm, turn on from 18:00pm to 22:00pm, and turn off from 22:00pm to 6:00am.

[0089] The operation mode can be adjusted as follows: for example, changing the air conditioner from cooling to air supply, changing the lighting from white light to soft light, etc.

[0090] Direct power off means directly shutting down unimportant equipment.

[0091] (4) After load regulation of the user, the target grid node continues to determine whether the total load values ​​of each substation on the load side exceeds the rated proportion of the real-time power on the grid side. If so, each blockchain node continues to regulate the load of the grid, substation and user step by step according to its own load regulation strategy until the total load values ​​of each substation on the load side no longer exceeds the rated proportion of the real-time power on the grid side, thus ending this round of regulation.

[0092] In the present invention, each blockchain node records and stores the execution process and control results of its own load control strategy in real time, and builds a distributed database with high security performance, providing a basis for power grid fault analysis and backtracking.

[0093] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0094] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A load management method based on power consumption of power users, characterized in that: The following steps are involved: Determine the subordinate users of each substation under the target power grid; The target power grid, each substation and each user are used as blockchain nodes to form a load control blockchain network. Each blockchain node is set with its own load control strategy. Upload the real-time load value of each user to the corresponding user node; Upload the sum of the real-time load values ​​of subordinate users belonging to the same substation to the corresponding substation node; Upload the real-time power situation on the grid side and the sum of the real-time load values ​​of each substation on the load side to the target grid node; In the load control blockchain network, each blockchain node performs load control on the power grid, substation and user level by level according to its own load control strategy.

2. The load management method based on power consumption of power users according to claim 1 is characterized in that: Determine the subordinate users of each substation under the target power grid, including: The voltage data collected by all user sub-meters under the target power grid are subjected to correlation analysis to determine the correlation coefficient between the total meter voltage in the substation area and the user sub-meter voltage, and the subordinate users of each substation area are determined based on the correlation coefficient.

3. The load management method based on power consumption of power users according to claim 1 is characterized in that: The load control strategy of the target power grid node is: When the total load value of each substation on the load side exceeds the rated proportion of the real-time power on the grid side, the excess part will be regarded as the total load that needs to be adjusted and will be decomposed into different substations in proportion; Or: When the total load value of each substation on the load side does not exceed the rated proportion of the real-time power on the grid side, but a load adjustment instruction is received, the load adjustment amount in the load adjustment instruction is used as the total load to be adjusted and decomposed into different substations in proportion; Or: When the total load value of each substation on the load side exceeds the rated ratio of the real-time power on the grid side, and a load adjustment instruction is received at the same time, it is determined whether the excess part is greater than the load adjustment amount in the load adjustment instruction. If it is greater, the excess part is taken as the total load that needs to be adjusted and is decomposed into different substations in proportion; Otherwise, the load adjustment amount in the load adjustment instruction is used as the total load that needs to be adjusted and is decomposed into different areas in proportion.

4. The load management method based on power consumption of power users according to claim 3 is characterized in that: The steps for the target grid node to proportionally decompose the load to be adjusted to different substations include: Compare the real-time load value of each substation with the historical average load value of the same period. If the real-time load value of a substation is higher than the historical average load value of the same period, it will be regarded as the substation to be regulated and participate in the subsequent load regulation. Otherwise, it will not participate in the subsequent load regulation. Sort the substations to be regulated according to the values ​​of the exceeded loads, and determine the substation load regulation ratio of each substation to be regulated; According to the load control ratio of the substation, the total load that needs to be adjusted under the target power grid is decomposed into each substation to be regulated, and the load that needs to be adjusted in each substation is determined.

5. The load management method based on power consumption of power users according to claim 4 is characterized in that: The load control strategy of each node in the substation area is: Determine the user load regulation ratio of each user in the area to be regulated based on the user's importance, the number of times they participated in load adjustment in the past, and the average value of the previous regulation amount; According to the user load control ratio, the load that needs to be adjusted in the area to be regulated is decomposed to each user.

6. The load management method based on power consumption of power users according to claim 5 is characterized in that: The process of determining the user load regulation ratio of each user in the area to be regulated includes: The importance of the user, the number of times of previous participation in load adjustment and the average value of previous regulation are used as three correction coefficients respectively, and the weights of the three correction coefficients are determined; Divide users into three types: generally important, important, and very important, and determine the correction coefficient of each user's importance; Determine the correction coefficient of the number of times each user has participated in load adjustment in the past according to the interval of the number of times the user has participated in load adjustment in the past; Determine the correction coefficient of the average value of the previous control amount of each user according to the interval of the average value of the previous control amount of the user; For any user, the three correction coefficients of the user are weighted summed to obtain the control priority value of the user; According to the control priority value of each user, the user load control ratio of each user in the area to be controlled is determined.

7. The load management method based on power consumption of power users according to claim 4 is characterized in that: The load control strategies for each user node include: When a user's subordinate substation does not need to be load-controlled, an hourly load plan for each device is generated for each day of the year based on the user's demand for each device in different time periods in previous years, and the hourly load plan for each device is adaptively adjusted based on changes in the external environment or manually input instructions.

8. The load management method based on power consumption of power users according to claim 7 is characterized in that: The load control strategy of each user node also includes: When a user's subordinate substation needs to perform load control, different control modes are adopted according to the type of equipment. The control modes include: time-based control, operating mode control or direct power off.

9. The load management method based on power consumption of power users according to claim 1, characterized in that: After load regulation of users, the target grid node continues to determine whether the total load values ​​of each substation on the load side exceeds the rated proportion of the real-time power on the grid side. If so, each blockchain node continues to regulate the load of the grid, substation and user step by step according to its own load regulation strategy until the total load values ​​of each substation on the load side no longer exceeds the rated proportion of the real-time power on the grid side, thus ending this round of regulation.

10. The load management method based on power consumption of power users according to claim 1, characterized in that: Each blockchain node records and stores the execution process and control results of its own load control strategy in real time.

Citation Information

Patent Citations

  • Power grid load non-inductive regulation and control method

    CN112909934A

  • Power utilization acquisition method based on low-voltage grid type block chain

    CN112910085A

  • Distribution network load flexible regulation and control method and system adopting smart contract

    CN114282750A

  • Multi-type power grid load resource data processing and adjusting method and system

    CN114362212A

  • Intelligent power supply dynamic hierarchical management method

    CN114819750A

Cited By

  • Distributed photovoltaic regulation and control device and method based on four fusible terminals

    CN119921322A

  • Distributed Photovoltaic Regulation Device and Method Based on Four-Fusion Terminal

    CN119921322B