Power distribution network voltage treatment method applied to battery pack energy storage grid-connected device
By classifying the SOC of multiple battery packs and adjusting the SOC during the minimum load period, the problem of battery pack health damage in distribution network voltage management is solved, and the robustness of voltage management and battery pack life are improved.
Patent Information
- Application Number
- CN202411055865.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When the existing technology uses battery pack energy storage to manage the voltage of the distribution network, the scope of management of a single battery pack is limited. When managing multiple battery packs, the status of each battery pack is different, resulting in greater damage to health and performance, and high cost and difficulty. .
By obtaining the SOC of each battery pack in the multi-battery pack, classifying and selecting the appropriate battery pack for management according to the voltage status of the distribution network, the SOC of the battery pack is adjusted during the period of minimum load to reduce health losses.
It effectively reduces the health loss of the battery pack, improves the robustness of voltage management and the service life of the battery pack, and takes into account the flexibility and cost-effectiveness of management.
Smart Images

Figure CN118739318A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power systems, and in particular to a method for regulating voltage in a distribution network applied to a battery group energy storage grid-connected device. Background Art
[0002] Low voltage or voltage fluctuation in the distribution network is quite common. The reasons for this phenomenon are:
[0003] 1) The distribution transformer capacity of the distribution network is insufficient and cannot meet the power demand of the load, resulting in low voltage;
[0004] 2) The materials used for transmission lines are poor and have high resistance, which results in great losses during transmission, especially in long-distance transmission. Upgrading related equipment and transmission lines in the distribution network is too costly and difficult to achieve.
[0005] At present, the main methods for regulating the voltage of the distribution network are to use thyristors to switch power capacitors and battery energy storage. The method of using thyristors to switch power capacitors increases the voltage of the distribution network by providing reactive power to the distribution network. It has a fast response speed, but the disadvantage is that it cannot continuously adjust the grid voltage. Compared with using power capacitors for management, using battery energy storage for management is more flexible and more suitable for scenarios where the grid voltage is continuously adjusted.
[0006] There are two solutions for using battery pack energy storage to manage the voltage of the distribution network: using a single battery pack to manage the voltage and using multiple battery packs to manage the voltage. For the solution of using a single battery pack to manage the voltage of the distribution network: due to the relatively small capacity of a single battery pack, the voltage management range of using a single battery pack to manage the voltage of the distribution network is relatively small; for the solution of using multiple battery packs to manage the voltage of the distribution network: the states of each battery pack in the multiple battery packs are different. Using multiple battery packs to manage the voltage of the distribution network without coordinating the battery packs will cause relatively large damage to the health and performance of the battery packs. Summary of the invention
[0007] In view of the shortcomings of the prior art, the present invention provides a distribution network voltage management method applied to a battery group energy storage grid-connected device. The present invention obtains and classifies the SOC of each battery group in the multi-battery group, selects a battery group that meets the management conditions in combination with the distribution network voltage conditions to manage the distribution network voltage, and adjusts the SOC of each battery group in the multi-battery group during the time period of 0-6 am, which is the minimum load period. The method effectively reduces the health loss of the battery group while ensuring that the device can achieve the distribution network voltage management work.
[0008] The technical solution of the present invention is: a distribution network voltage management method applied to a battery group energy storage grid-connected device, comprising the following steps:
[0009] Obtain the current voltage of the distribution network, and determine the voltage status of the distribution network based on the current voltage value of the distribution network;
[0010] Obtaining the SOC of each battery pack in the multiple battery packs, and classifying the battery packs according to the obtained SOC values of each battery pack;
[0011] According to the current grid voltage status, the battery group classification that meets the treatment conditions is selected, and the energy storage grid-connected device starts to treat the voltage of the distribution network;
[0012] According to the historical operation rules of the distribution network, 0:00-6:00 in the morning is the period of minimum load demand. During 0:00-6:00 in the morning, that is, the period of minimum load demand, the SOC of each battery pack in the multi-battery pack is adjusted.
[0013] Optionally, the current voltage of the distribution network is obtained, and the voltage state of the distribution network is determined according to the current voltage value of the distribution network, including:
[0014] The voltage measurement device in the distribution network area is used to obtain the current voltage data U1 of the distribution network, and the current voltage data of the distribution network is transmitted to the energy storage grid-connected device through the communication device. When the energy storage grid-connected device obtains the current voltage data of the distribution network, it starts to judge the voltage state of the distribution network. The judgment expression is as follows:
[0015]
[0016] Among them, Resultu is the judgment result after voltage value judgment, U1 is the current voltage data of the distribution network, and U N It is the rated voltage data of the distribution network.
[0017] When the current voltage data U1 of the distribution network is greater than the rated voltage U N When the current voltage data of the distribution network is less than the rated voltage U N When the current voltage data of the distribution network is equal to the rated voltage U N When the energy storage grid-connected device determines that the voltage of the current distribution network is normal.
[0018] Optionally, obtaining the SOC of each battery pack in the multiple battery packs, and classifying the battery packs according to the SOC values obtained for each battery pack, including:
[0019] Each battery pack in the multi-battery pack contains a SOC prediction module and a communication module. Each battery pack can obtain the SOC data of its own battery pack through the SOC prediction module it carries, and then transmit the SOC value of each battery pack to the energy storage grid-connected device through the communication module.
[0020] After the energy storage grid-connected device obtains the SOC values of each battery pack, it starts to classify the battery packs according to these values. The classification judgment formula is as follows:
[0021]
[0022] Among them, Battery i is the i-th battery pack in the multi-battery pack; SOC i is the SOC value of the i-th battery pack;
[0023] When the SOC of the i-th battery pack is greater than 70%, it means that the battery pack can directly supply power to the grid, thereby increasing the voltage of the grid; when the SOC of the i-th battery pack is less than 30%, it means that the grid can directly charge the battery pack, thereby reducing the voltage of the grid; when the SOC of the i-th battery pack is greater than 50% and less than 70%, the battery pack is classified as standby discharge, which can become the second choice for the grid to supply power or the third choice for the grid to charge it; when the SOC of the i-th battery pack is greater than 30% and less than 50%, the battery pack is classified as standby charge, which can become the second choice for the grid to charge it or the third choice for the grid to supply power.
[0024] As an option, the battery group classification that meets the management conditions is selected according to the current grid voltage status, and the energy storage grid-connected device begins to manage the voltage of the distribution network, including:
[0025] When the voltage of the distribution network is in a low voltage state and the number of battery groups classified as "dischargeable" in the multiple battery groups is not 0, the "dischargeable" battery group is used to supply power to the distribution network; when the voltage of the distribution network is in a low voltage state and the number of battery groups classified as "dischargeable" in the multiple battery groups is 0, and the number of "standby discharge" battery groups is not 0, one of the battery groups classified as "standby discharge" is used to supply power to the distribution network. When the voltage of the distribution network is in a low voltage state and the number of battery groups classified as "dischargeable" in the multiple battery groups is 0, the number of "standby discharge" battery groups is 0, and the number of "standby charge" battery groups is not 0, one of the battery groups classified as "standby charge" is used to supply power to the distribution network. When the voltage of the distribution network rises to the rated voltage, the output power of the energy storage grid-connected device is kept unchanged and communicated with the dispatching center; when the SOC value of the battery group performing the governance work has dropped to 30% before the voltage of the distribution network rises to the rated voltage, the energy storage grid-connected device stops supplying power to the distribution network and communicates with the dispatching center.
[0026] When the distribution network voltage is in an overvoltage state and the number of battery groups classified as "rechargeable" in the multiple battery groups is not 0, use the "rechargeable" battery group to allow the grid to charge it; when the distribution network voltage is in an overvoltage state and the number of battery groups classified as "rechargeable" in the multiple battery groups is 0, and the number of "standby chargeable" battery groups is not 0, use one of the "standby chargeable" battery groups to allow the grid to charge it. When the distribution network voltage is in an overvoltage state and the number of battery groups classified as "rechargeable" is 0, the number of "standby chargeable" battery groups is 0, and the number of "standby dischargeable" battery groups is not 0, use one of the "standby dischargeable" battery groups to allow the grid to charge it. When the distribution network voltage drops to the rated voltage, keep the charging power of the energy storage grid-connected device unchanged and communicate with the dispatching center; when the distribution network voltage has not dropped to the rated voltage and the SOC value of the battery group performing the governance work has risen to 70%, the energy storage grid-connected device stops the grid from charging the battery group and communicates with the dispatching center.
[0027] As an option, it is found from the historical operation law of the distribution network that 0:00-6:00 in the morning is the period of minimum load demand. During the period of 0:00-6:00 in the morning, i.e. the period of minimum load demand, the SOC of each battery pack in the multi-battery pack is adjusted, including:
[0028] The general rule of distribution network load changes is: the load demand is the least between 0-6 a.m., and the load demand of the distribution network continues to increase until the peak from 7 to 11 a.m. After that, the load demand will decrease from 11 noon to 1 p.m., and the load will rise again to the peak between 1-2 p.m. and continue until 9 p.m., after which the load will continue to decrease.
[0029] According to the law of load changes in the distribution network, the load demand is relatively low during the time period from 0:00 p.m. to 6:00 a.m., and the load change caused by connecting the energy storage grid-connected device to the grid has little effect on the voltage of the distribution network. Therefore, the time period from 0:00 p.m. to 6:00 a.m. is selected to adjust the SOC of each battery group in the multi-battery group of the energy storage grid-connected device: in the time period from 0:00 p.m. to 3:00 a.m., half of the battery groups in the multi-battery group are selected for charging in the order of SOC from high to low, so that the SOC of this half of the battery groups eventually reaches the "dischargeable" standard. In the time period from 3:00 a.m. to 6:00 a.m., the remaining battery groups in the multi-battery group are selected for discharge, so that the SOC of the other half of the battery groups eventually reaches the "rechargeable" standard.
[0030] The beneficial effects of the present invention are:
[0031] 1. The present invention selects battery packs with the same SOC classification in multiple battery packs for management, so that the life health damage to the battery pack batteries is reduced when the energy storage grid-connected device performs the distribution network voltage management work;
[0032] 2. When there is no battery group classified with the highest management priority, the present invention can select one of the battery groups classified with the second priority or the third priority for management, thereby taking into account the robustness of the management of the grid-connected device;
[0033] 3. The present invention adjusts the SOC of each battery pack of the grid-connected device during the time period with the least load on the distribution network, so that each battery pack can reach the optimal state of management, and can also increase the service life of the multi-battery pack of the grid-connected device. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 This is a flow chart of a method for voltage management in a power distribution network according to an embodiment of the present invention;
[0035] Figure 2 This is a circuit diagram of a multi-battery energy storage grid-connected device according to an embodiment of the present invention;
[0036] Figure 3 A flowchart for obtaining the SOC of each battery pack in multiple battery packs and classifying each battery pack according to an embodiment of the present invention;
[0037] Figure 4 A flowchart of performing battery pack management work according to an embodiment of the present invention;
[0038] Figure 5 A flow chart for selecting a battery pack that meets the treatment conditions according to an embodiment of the present invention;
[0039] Figure 6 The flowchart is a method for adjusting the SOC of each battery pack in a multi-battery pack during a low-load period according to an embodiment of the present invention. DETAILED DESCRIPTION
[0040] The specific implementation of the present invention will be further described below in conjunction with the accompanying drawings:
[0041] The present invention provides a distribution network voltage control method applied to a battery group energy storage grid-connected device. The method classifies multiple battery groups in the energy storage grid-connected device according to SOC, selects a battery group suitable for control conditions from the multiple battery groups for control according to the current distribution network voltage state, and adjusts the SOC of each battery group in the multiple battery groups during a low-load period to solve the problem of excessive damage to the health and life of the battery group in the process of using the battery group to control the distribution network voltage.
[0042] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] The existing methods of using battery energy storage for grid-connected distribution network voltage management mainly include single battery pack management and multiple battery pack management. Although single battery pack management of distribution network voltage is relatively portable, the management range of distribution network voltage is limited due to the low capacity of a single battery pack; because the capacity of multiple battery packs is relatively high, the management range of distribution network voltage management using multiple battery packs is relatively large, but the existing methods of using multiple battery packs to manage distribution network voltage do not take into account the different states of each battery pack in the multiple battery packs, and the health and life of the multiple battery packs are greatly damaged in the process of managing the distribution network voltage.
[0044] Therefore, the present invention provides a distribution network voltage management method applied to a battery group energy storage grid-connected device. The current voltage of the distribution network is obtained through the distribution network station metering device and the current voltage data is transmitted to the grid-connected device through communication to determine the current voltage state of the distribution network; the current SOC value of each battery group is obtained through the SOC prediction module of each battery group in the multi-battery group, and each battery group is classified according to the SOC; the battery group classification that meets the management conditions is selected according to the previous current voltage state of the distribution network, and the distribution network voltage is started to be managed: when the battery group to be managed can completely manage the distribution network voltage problem, wait for its management to be completed and communicate with the dispatching center; when the battery group cannot completely manage the distribution network voltage problem, the SOC of the battery group to be managed does not meet the management conditions and stops the management and communicates with the dispatching center. Finally, it is concluded from the historical operation law of the distribution network that 0-6 am is the minimum load demand period, and the SOC of each battery group in the multi-battery group is adjusted during the minimum load demand period from 0-6 am. This method realizes the function of maximizing the reduction of battery health and life loss of multiple battery groups during the management process.
[0045] Please refer to Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 1 A flow chart of a distribution network voltage management method applied to a battery energy storage grid-connected device provided by an embodiment of the present invention; Figure 2It is a circuit diagram of a multi-battery energy storage grid-connected device; Figure 3 A flowchart for obtaining the SOC of each battery pack of multiple battery packs and classifying each battery pack; Figure 4 A flow chart for performing battery pack management work; Figure 5 A flow chart for selecting battery packs that meet the treatment conditions; Figure 6 The present invention is a flow chart for adjusting the SOC of each battery pack in a multi-battery pack during a low-load period.
[0046] In this embodiment, the distribution network voltage management method includes:
[0047] S101, obtaining the current voltage of the distribution network, and determining the voltage state of the distribution network according to the current voltage value of the distribution network;
[0048] This step mainly uses the distribution network substation metering device to collect the current voltage value of the distribution network, and transmits the current voltage value of the distribution network to the energy storage grid-connected device through the communication element. The purpose is to judge the current voltage state of the distribution network through the current voltage value of the distribution network, and prepare for the subsequent classification and coordination with each battery group of multiple battery groups to manage the distribution network voltage.
[0049] S102, obtaining the SOC of each battery pack in the multiple battery packs, and classifying the battery packs according to the SOC values obtained for each battery pack;
[0050] This step mainly uses the SOC prediction module of each battery group in the multi-battery group to predict the SOC value of each battery group, and transmits the SOC prediction value of each battery group to the grid-connected device for classification through the communication module, in preparation for selecting the battery group that meets the treatment conditions according to the voltage state of the distribution network.
[0051] S103, selecting a battery group classification that meets the treatment conditions according to the current grid voltage state, and the device starts to treat the voltage of the distribution network;
[0052] Based on the above steps, this step aims to select battery packs that meet the treatment conditions according to the current voltage state of the distribution network and improve the robustness of the grid-connected device in treating the distribution network voltage, thereby reducing the damage to the life of the battery pack during the treatment process. When the battery pack can completely treat the distribution network voltage problem, the grid-connected device will continue to work until the distribution network voltage problem is completely solved; when the battery pack cannot completely treat the distribution network voltage problem, the grid-connected device will first treat the distribution network voltage, and the battery pack to be treated will stop working if it cannot be treated, and the dispatch center will continue to treat the distribution network voltage.
[0053] S104, it is found from the historical operation law of the distribution network that 0:00-06:00 in the morning is the period of minimum load demand, and the SOC of each battery pack in the multiple battery packs is adjusted during 0:00-06:00 in the morning, that is, the period of minimum load demand.
[0054] This step aims to adjust the SOC of each battery pack of the energy storage grid-connected device during the time period when the distribution network operation burden is the smallest. By adjusting the SOC of each battery pack, the multiple battery packs are in the best management state, preparing for future distribution network voltage management work.
[0055] In summary, this embodiment obtains the current voltage value of the distribution network through the metering device of the distribution network station, transmits the current voltage value of the distribution network to the energy storage grid-connected device through communication, and the grid-connected device determines the current voltage state of the distribution network, so as to prepare for the subsequent classification and coordination of the distribution network voltage with the classification of each battery group of multiple battery groups; obtains the SOC of each battery group in the multiple battery groups and classifies the battery groups according to the SOC values of each battery group, so as to prepare for the subsequent selection of battery groups that meet the management conditions according to the distribution network voltage state; after obtaining the classification data of each battery group, the classification of battery groups that meet the management conditions is selected according to the current grid voltage state, and the device starts to manage the voltage of the distribution network; finally, it is concluded from the historical operation law of the distribution network that 0-6 am is the period with the minimum load demand, and the SOC of each battery group in the multiple battery groups is adjusted during the period with the minimum load demand from 0-6 am, so as to prepare for the future distribution network voltage management work. This method fully considers the robustness of the distribution network voltage management and reduces the health life loss of multiple battery groups during the distribution network voltage management process.
[0056] The various embodiments in the specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description.
[0057] Professionals may further appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0058] The above embodiments and descriptions are only for illustrating the principles and best embodiments of the present invention. Without departing from the spirit and scope of the present invention, the present invention may be subject to various changes and improvements, all of which fall within the scope of the present invention to be protected.
Claims
1. A distribution network voltage management method applied to a battery energy storage grid-connected device, characterized in that: include: Obtain the current voltage of the distribution network, and determine the voltage status of the distribution network based on the current voltage value of the distribution network; Obtaining the SOC of each battery pack in the multiple battery packs, and classifying the battery packs according to the obtained SOC values of each battery pack; According to the current grid voltage status, the battery group classification that meets the treatment conditions is selected, and the energy storage grid-connected device starts to treat the voltage of the distribution network; According to the historical operation rules of the distribution network, 0:00-6:00 in the morning is the period of minimum load demand. During 0:00-6:00 in the morning, that is, the period of minimum load demand, the SOC of each battery pack in the multi-battery pack is adjusted.
2. A method for voltage management of a distribution network applied to a battery energy storage grid-connected device according to claim 1, characterized in that: Obtain the current voltage of the distribution network and determine the voltage status of the distribution network based on the current voltage value of the distribution network, including: The voltage measurement device in the distribution network substation is used to obtain the current voltage data U1 of the distribution network, and the current voltage data of the distribution network is transmitted to the energy storage grid-connected device through the communication device. When the energy storage grid-connected device obtains the current voltage data of the distribution network, it starts to judge the voltage state of the distribution network. The judgment expression is as follows: Among them, Resultu is the judgment result after voltage value judgment, U1 is the current voltage data of the distribution network, and U N It is the rated voltage data of the distribution network; When the current voltage data U1 of the distribution network is greater than the rated voltage U N When the current voltage data of the distribution network is less than the rated voltage U N When the current voltage data of the distribution network is equal to the rated voltage U N When the energy storage grid-connected device determines that the voltage of the current distribution network is normal.
3. A method for voltage management of a distribution network applied to a battery energy storage grid-connected device according to claim 1, characterized in that: Obtain the SOC of each battery pack in multiple battery packs, and classify the battery packs according to the SOC values obtained for each battery pack, including: Each battery pack in the multi-battery pack contains a SOC prediction module and a communication module. Each battery pack obtains the SOC data of its own battery pack through the SOC prediction module it carries, and then transmits the SOC value of each battery pack to the energy storage grid-connected device through the communication module.
4. A method for voltage management of a distribution network applied to a battery energy storage grid-connected device according to claim 3, characterized in that: After the energy storage grid-connected device obtains the SOC values of each battery pack, it starts to classify the battery packs according to these values. The classification judgment formula is as follows: Among them, Battery i is the i-th battery pack in the multi-battery pack; SOC i is the SOC value of the i-th battery pack; When the SOC of the i-th battery pack is greater than 70%, the battery pack directly supplies power to the grid to increase the voltage of the grid; When the SOC of the i-th battery pack is less than 30%, the grid directly charges the battery pack to reduce the grid voltage; When the SOC of the i-th battery group is greater than 50% and less than 70%, the battery group is classified as being capable of standby discharge, which is the second choice for power supply by the grid or the third choice for charging by the grid; When the SOC of the i-th battery group is greater than 30% and less than 50%, the battery group is classified as chargeable in standby mode, which is a second choice for the grid to charge the battery group or a third choice for supplying power to the grid.
5. A method for controlling the voltage of a distribution network applied to a battery energy storage grid-connected device according to claim 1, characterized in that: According to the current grid voltage status, the battery group classification that meets the treatment conditions is selected, and the energy storage grid-connected device begins to treat the voltage of the distribution network, including: When the distribution network voltage is in a low voltage state and the number of battery packs classified as "dischargeable" in the multiple battery packs is not 0, the "dischargeable" battery packs are used to supply power to the distribution network; When the distribution network voltage is in a low voltage state and the number of battery groups classified as "dischargeable" in the multiple battery groups is 0, and the number of battery groups classified as "standby dischargeable" is not 0, one of the battery groups classified as "standby dischargeable" is used to supply power to the distribution network; When the distribution network voltage is in a low voltage state and the number of battery groups classified as "dischargeable" is 0, the number of battery groups classified as "standby dischargeable" is 0, and the number of battery groups classified as "standby chargeable" is not 0, one of the battery groups classified as "standby chargeable" is used to supply power to the distribution network; When the distribution network voltage rises to the rated voltage, the output power of the grid-connected device is kept unchanged and communicates with the dispatching center; when the distribution network voltage has not yet risen to the rated voltage and the SOC value of the battery pack performing the management work has dropped to 30%, the energy storage grid-connected device stops supplying power to the distribution network and communicates with the dispatching center.
6. A method for voltage management of a distribution network applied to a battery energy storage grid-connected device according to claim 5, characterized in that: When the distribution network voltage is in an overvoltage state and the number of battery packs classified as "rechargeable" in the multiple battery packs is not 0, the "rechargeable" battery pack is used to allow the grid to charge it; When the distribution network voltage is in an overvoltage state and the number of battery groups classified as "rechargeable" in the multiple battery groups is 0, and the number of battery groups classified as "standby chargeable" is not 0, use one of the battery groups classified as "standby chargeable" to let the grid charge it; When the distribution network voltage is in an overvoltage state and the number of battery groups classified as "rechargeable" is 0, the number of battery groups classified as "standby charging" is 0, and the number of battery groups classified as "standby discharge" is not 0, use one of the battery groups classified as "standby discharge" to let the grid charge it; When the distribution network voltage drops to the rated voltage, the charging power of the grid-connected device is kept unchanged and communicated with the dispatching center; When the distribution network voltage has not dropped to the rated voltage and the SOC value of the battery pack performing the management work has risen to 70%, the energy storage grid-connected device stops the grid from charging the battery pack and communicates with the dispatching center.
7. A method for voltage management of a distribution network applied to a battery energy storage grid-connected device according to claim 1, characterized in that: According to the historical operation rules of the distribution network, 0:00-6:00 in the morning is the period of minimum load demand. During the period of minimum load demand, the SOC of each battery pack in the multi-battery pack is adjusted, including: The law of distribution network load change is: the load demand is the least between 0-6 am, and the load demand of the distribution network continues to increase until the peak from 7 am to 11 am. After that, the load demand will decrease from 11 am to 1 pm. At 1-2 pm, the load rises to the peak again and continues until 9 pm. After that, the load continues to decrease.
8. A method for voltage management of a distribution network applied to a battery energy storage grid-connected device according to claim 7, characterized in that: According to the changing law of the distribution network load, the time period from 0:00 pm to 6:00 am is selected to adjust the SOC of each battery group in the multi-battery group of the energy storage grid-connected device: In the time period from 0:00 p.m. to 3:00 a.m., half of the battery packs are selected for charging in the order of SOC from high to low, so that the SOC of the half of the battery packs finally reaches the "dischargeable" standard; During the time period from 3 a.m. to 6 a.m., the remaining battery packs of the multi-battery packs are selected for discharge, so that the SOC of the other half of the battery packs finally reaches the "rechargeable" standard.
Citation Information
Patent Citations
Battery energy storage system peaking cutting and valley filling method with consideration of battery service life
CN102361327A
Power control method of energy storage system
CN105226777A
Battery energy storage power station access control method
CN109861255A
Power distribution network power supply voltage deviation and interruption treatment device and control method thereof
CN115622068A
Combined energy storage priority dynamic response balancing method for alternating current and direct current hybrid micro-grid
CN117833308A
Cited By
Low voltage treatment method and system in power transmission line
CN120749764A