Wind power plant optimization control method and control system based on relation clustering
Through relationship clustering and dynamic performance fitting, the wind turbines in the wind farm are clustered into equivalent generators, reducing the control instruction search dimension, solving the problem of slow wind farm optimization control speed in the existing technology, and achieving high efficiency Search and accurate distribution of control instructions.
Patent Information
- Application Number
- CN202411034962.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-10-01
AI Technical Summary
When the installed capacity of existing wind farm optimization control algorithms increases, they face a reduction in optimization speed and an increase in local extreme value traps caused by the high-dimensional search space, and are unable to complete the search for optimal control instructions within an acceptable time.
Cluster the wind turbines in the wind farm into equivalent generators through relationship clustering, reduce the dimension of control instruction search, dynamically fit equivalent performance parameters, establish an N-dimensional control instruction search space, and use particle swarm algorithm to search for the optimal control instructions and perform dynamic control instruction distribution.
It effectively solves the dimension explosion problem when optimizing control instructions for large-scale wind farms, improves the optimization speed, and ensures the accuracy of control instruction distribution.
Smart Images

Figure CN118739434A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of wind farm intelligent control, and specifically provides a wind farm optimization control method and control system based on relationship clustering. Background Art
[0002] As an emerging green energy technology, wind power generation has become an important part of the new power system with new energy as the main body due to its natural pollution-free and carbon-free characteristics. With the continuous development of wind power generation technology, my country's annual average wind turbine installed capacity has always maintained a high growth trend, and the scale of wind turbines contained in wind farms is also expanding. By expanding the installed capacity of wind farms, the installation and operation and maintenance costs of single machines can be effectively reduced, and the utilization rate of wind energy can be improved. However, with the rapid expansion of the installed capacity of wind farms, how to optimize and control the large number of wind turbines in wind farms has become a key factor affecting the power generation capacity and quality of wind farms.
[0003] At present, a common wind farm optimization control algorithm uses a search algorithm based on multi-objective functions and constraints to iteratively search for the optimal control instructions that meet the search objectives in a multi-dimensional search space corresponding to the number of wind turbines. For example, a Chinese invention patent with publication number CN117639082A provides a distribution network multi-objective reactive power optimization method based on an improved quantum particle swarm algorithm. By improving the contraction-expansion factor of the quantum particle swarm algorithm, the algorithm's optimization ability is enhanced, and a node voltage offset and active power loss calculation model of a distribution network with distributed power sources and energy storage systems connected is constructed, as well as a multi-objective reactive power optimization model of the distribution network.
[0004] However, the above-mentioned existing wind farm control methods based on various search algorithms will face new challenges as the installed capacity of wind farms increases: the dimension of the search space will increase synchronously with the sharp increase in the number of wind turbines in the wind farm. For example, when the number of wind turbines in a wind farm reaches about 100 or even higher, the multi-objective optimization speed in the ultra-multidimensional search space will be greatly reduced, and the number of local extreme value traps will also be greatly increased, making it impossible for the above-mentioned existing algorithms to complete the search for optimal control instructions within an acceptable time scale. Summary of the invention
[0005] In order to solve the problems existing in the above-mentioned prior art, the present application provides a wind farm optimization control method based on relationship clustering through an embodiment, comprising the following steps:
[0006] In the first step, based on the relational clustering operation, the M wind turbines in the wind farm are clustered into N equivalent turbines, where M>N>2 and N does not exceed the preset upper limit of the search space dimension D. max, the clustering features of the relationship clustering operation include voltage drop relationship features and electrical relationship features of the M wind turbines;
[0007] The second step is to perform dynamic performance parameter fitting operations on the N equivalent generators respectively to obtain equivalent performance parameters of the N equivalent generators;
[0008] The third step is to establish an N-dimensional control instruction search space of N equivalent generators, determine the objective function and constraints, and search for the optimal control instructions of the N equivalent generators in the N-dimensional control instruction search space, wherein the upper and lower limits of the N-dimensional control instruction search space, the objective function and the constraints are determined based on the equivalent performance parameters of the N equivalent generators;
[0009] The fourth step is to perform dynamic control instruction allocation operations on the N equivalent generators respectively, and allocate the optimal control instruction of each equivalent generator to each wind turbine generator included therein;
[0010] The fifth step is to control the M wind turbines in the wind farm to generate wind power based on the result of the dynamic control command allocation operation.
[0011] Preferably, the voltage drop relationship feature includes local similarity and overall similarity of voltage drop trajectories of any two wind turbines.
[0012] Furthermore, the local similarity and overall similarity of the voltage drop trajectories of any two wind turbines are expressed as follows:
[0013]
[0014] Among them, Δu i (k), Δu j (k) are the voltage drop values of the i-th and j-th wind turbines at the k-th sampling moment, u i (k) are the real-time voltage value of the i-th wind turbine at the k-th sampling moment and the steady-state voltage value before the voltage drop, u j (k) are the real-time voltage value of the j-th wind turbine at the k-th sampling moment and the steady-state voltage value before the drop, respectively. K is the total number of sampling moments. is the local similarity of the voltage drop trajectories of the i-th and j-th wind turbines, is the overall similarity of the voltage drop trajectories between the i-th and j-th wind turbines.
[0015] Furthermore, the electrical relationship characteristic is specifically the equivalent impedance between any two wind turbines as shown in the following formula:
[0016]
[0017] in, is the equivalent impedance between the i-th and j-th wind turbines, Z i,i , Z j,j are the self-impedances of the i-th and j-th wind turbines, respectively, and Z i,j is the mutual impedance between the i-th and j-th wind turbines.
[0018] Preferably, the electrical relationship characteristics are determined by performing unit current injection calculation and two-port network simplification on the node impedance matrix of the M wind turbines in the wind farm.
[0019] Preferably, after clustering the M wind turbines in the wind farm into N equivalent turbines based on the relationship clustering operation in the first step, a clustering optimization operation is further performed, and the clustering optimization operation specifically includes the following steps:
[0020] Determine whether the number of wind turbines included in each of the equivalent generators exceeds the cluster size upper limit Num max , and the number of wind turbines included exceeds Num max The equivalent generator is split into two equivalent generators until the number of wind turbines included in each of the equivalent generators does not exceed Num max .
[0021] Preferably, the cluster size upper limit Num max Determined by the following formula:
[0022]
[0023] Where r1 is a rational number greater than or equal to 2, r2 is an integer greater than or equal to 2, This is a round-up operation.
[0024] Preferably, the equivalent generator is split according to the principle of minimizing the power difference or capacity difference between the two new equivalent generators after the split.
[0025] Furthermore, in the second step, a dynamic performance parameter fitting operation is performed on the N equivalent generators, specifically including the following steps:
[0026] S21, for any nth equivalent generator, determine the fitness index DI of all wind turbines included in the equivalent generator based on the following formula: n :
[0027]
[0028] Among them, Num nis the number of wind turbines included in the nth equivalent generator, are the instantaneous values of active power of the i-th and j-th wind turbines in the n-th equivalent generator at the k-th sampling time point, are the average active power of the i-th and j-th wind turbines in the n-th equivalent generator at the k-th sampling time point, is the geometric distance between the center position of the i-th wind turbine and the n-th equivalent generator in the n-th equivalent generator, for The average value of is the spatial connection weight of the i-th and j-th wind turbines in the n-th equivalent generator, S0 is the sum of the spatial connection weights of all wind turbines in the n-th equivalent generator, They are The coefficient of
[0029] S22, judge DI n Whether it exceeds the preset fitness threshold, if DI n If the preset fitness threshold is exceeded, the equivalent performance parameters of the nth equivalent generator are determined based on the following formula:
[0030]
[0031] If DI n If the preset fitness threshold is not exceeded, the equivalent performance parameters of the nth equivalent generator are determined based on the following formula:
[0032]
[0033] Among them, S eq,n , P eq,n are the equivalent capacity and equivalent active power of the nth equivalent generator, are the capacity and active power of the i-th wind turbine generator in the n-th equivalent generator, are the capacity weight, operating time weight, average wind speed weight and total weight of the i-th wind turbine in the n-th equivalent generator, respectively, and α, β, and γ are weight coefficients;
[0034] S23, replace the equivalent generator and return to execute step S21 until all equivalent generators are traversed.
[0035] Preferably, the control instruction received by each wind turbine generator is an active power setting value, and the fourth step performs a dynamic control instruction allocation operation on the N equivalent generators, specifically including the following steps:
[0036] S41, for any nth equivalent generator, determine the fitness index DI of all wind turbines included in the equivalent generatorn Whether it exceeds a preset fitness threshold, if yes, then the active power setting value is allocated to it based on the actual power generation capacity of all the wind turbines it contains, if no, then the active power setting value is allocated to it based on the actual power generation capacity of all the wind turbines it contains and the total weight;
[0037] S42, replace the equivalent generator and return to execute step S41 until all equivalent generators are traversed.
[0038] Furthermore, the objective function J for searching the optimal control instruction is as follows:
[0039]
[0040] Among them, P loss,n is the active power loss of the nth equivalent generator, U n , U ref,n are the actual voltage and reference voltage of n equivalent generators, P n , P ref,n are the actual output power and reference output power of the nth equivalent generator, respectively, w1, w2, w3 are weight coefficients;
[0041] The constraints in the process of searching for the optimal control instructions include the active power equality constraints, reactive power equality constraints, voltage inequality constraints, active power inequality constraints, reactive power inequality constraints and grid-connected voltage deviation constraints of each equivalent generator.
[0042] Preferably, in the fourth step, a particle swarm search algorithm is used to search for the optimal control instruction, and D max ≤50.
[0043] The present application also provides a wind farm optimization control system based on relationship clustering through an embodiment, including a processor and a storage device, wherein an executable program is stored in the storage device, and when the executable program is executed by the processor, the aforementioned wind farm optimization control method based on relationship clustering can be implemented.
[0044] The embodiment of the present application provides a wind farm optimization control method and control system based on relationship clustering. First, through a relationship clustering operation, each wind turbine with similar voltage drop characteristics and electrical relationship characteristics in the wind farm is clustered into several equivalent generators, thereby effectively reducing the dimension of the optimal control instruction search; at the same time, the equivalent performance parameters of each equivalent generator are obtained to improve the accuracy of the control instruction search using the equivalent generator; then the equivalent generators and their equivalent performance parameters obtained in the first two steps are used to search for control instructions; finally, the performance parameters of each wind turbine in each equivalent generator are used again to dynamically allocate instructions to achieve optimal control of each real wind turbine. Through this method, the problem of dimensional explosion of the existing algorithm when optimizing control instructions for wind farms with super-large installed capacity can be effectively solved, and the accuracy of control instruction allocation can be effectively ensured while improving the optimization speed. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 A schematic diagram of a flow chart of a wind farm optimization control method based on relationship clustering provided according to an embodiment of the present application;
[0046] Figure 2a A schematic diagram of the local similarity relationship between voltage drop trajectories of multiple wind turbines provided according to an embodiment of the present application;
[0047] Figure 2b A schematic diagram of the overall similarity relationship between voltage drop trajectories of multiple wind turbines provided according to an embodiment of the present application;
[0048] Figure 3 This is a flow chart of searching for optimal control instructions for each equivalent generator using a particle swarm algorithm in some embodiments of the present application. DETAILED DESCRIPTION
[0049] Hereinafter, the present application will be further described based on preferred embodiments with reference to the accompanying drawings.
[0050] In addition, various components in the drawings are enlarged or reduced in size for ease of understanding, but this practice is not intended to limit the scope of protection of the present application.
[0051] In the description of the embodiments of the present application, it should be noted that if the terms "upper", "lower", "inside", "outside", etc. indicate an orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship in which the products of the embodiments of the present application are usually placed when in use, it is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, in the description of the present application, in order to distinguish different units, the words first, second, etc. are used in this specification, but these are not limited by the order of manufacture, nor can they be understood as indicating or implying relative importance, and their names may be different in the detailed description and claims of the present application.
[0052] The vocabulary in this specification is used to illustrate the embodiments of the present application, but is not intended to limit the present application. It should also be noted that, unless otherwise clearly specified and limited, the terms "disposed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, a direct connection, an indirect connection through an intermediate medium, or a connection between the two elements. For those skilled in the art, the specific meanings of the above terms in this application can be specifically understood.
[0053] The present application provides a wind farm optimization control method based on relationship clustering through an embodiment, such as Figure 1 As shown, the method comprises the following steps:
[0054] In the first step, based on the relational clustering operation, the M wind turbines in the wind farm are clustered into N equivalent turbines, where M>N>2 and N does not exceed the preset upper limit of the search space dimension D. max , the clustering features of the relationship clustering operation include voltage drop relationship features and electrical relationship features;
[0055] The second step is to perform dynamic performance parameter fitting operations on the N equivalent generators respectively to obtain equivalent performance parameters of the N equivalent generators;
[0056] The third step is to establish an N-dimensional control instruction search space of N equivalent generators, determine the objective function and constraints, and search for the optimal control instructions of the N equivalent generators in the N-dimensional control instruction search space, wherein the upper and lower limits of the N-dimensional control instruction search space, the objective function and the constraints are determined based on the equivalent performance parameters of the N equivalent generators;
[0057] The fourth step is to perform dynamic control instruction allocation operations on the N equivalent generators respectively, and allocate the optimal control instruction of each equivalent generator to each wind turbine generator included therein;
[0058] The fifth step is to control the M wind turbines in the wind farm to generate wind power based on the result of the dynamic control command allocation operation.
[0059] In the above steps, first, through the relationship clustering operation, the wind turbines with similar voltage drop characteristics and electrical relationship characteristics in the wind farm are clustered into several equivalent generators, thereby effectively reducing the dimension of the optimal control instruction search; at the same time, the equivalent performance parameters of each equivalent generator are obtained to improve the accuracy of the control instruction search using the equivalent generator; then the equivalent generators and their equivalent performance parameters obtained in the first two steps are used to search for control instructions; finally, the performance parameters of each wind turbine in each equivalent generator are used again to perform dynamic instruction allocation to achieve optimal control of each real wind turbine. Through this method, the problem of dimensional explosion in the existing algorithm when optimizing the control instructions for wind farms with super-large installed capacity can be effectively solved, and the accuracy of control instruction allocation can be effectively ensured while improving the optimization speed.
[0060] Each step is described in detail below with reference to the accompanying drawings.
[0061] [Relationship clustering operation based on voltage drop relationship characteristics and electrical relationship characteristics]
[0062] When clustering different wind turbines in a wind farm, it is necessary to reasonably select the features used for clustering so that the equivalent generators after clustering can effectively reflect the same type of characteristics of the generators.
[0063] In the embodiments of the present application, considering that the output and operating conditions of wind turbines are greatly affected by the changes in wind speed and direction at different times and locations, the reliability of their operating conditions determines whether they can provide stable power output for the power grid. Therefore, priority is given to output reliability as the clustering standard, and the optimal control instructions are searched and allocated based on the operating reliability of each equivalent wind turbine. In the present application, the voltage drop relationship characteristics that can characterize the operating reliability of wind turbines are used as the basis for clustering. The voltage drop characteristics of the generator refer to the changing rules of the output voltage of the generator when the load changes. When the load of the generator changes, its output voltage will fluctuate accordingly. This phenomenon is voltage drop.
[0064] Specifically, in the embodiment of the present application, the simulation model of the wind farm can be established by measuring the parameters of the wind farm, and short-term short-circuit faults are set at k sampling moments respectively. Then, based on equations (1-1) and (1-2), the voltage drop values of any two wind turbines i and j at each moment are calculated:
[0065]
[0066] Among them, Δu i (k), Δu j (k) are the voltage drop values of the i-th and j-th wind turbines at the k-th sampling moment, u i (k) are the real-time voltage value of the i-th wind turbine at the k-th sampling moment and the steady-state voltage value before the voltage drop, u j (k) are the real-time voltage value of the j-th wind turbine at the k-th sampling moment and the steady-state voltage value before the drop, respectively, and K is the total number of sampling moments.
[0067] Then, based on equations (2) and (3), the local similarity of the voltage drop trajectories of any two wind turbines is calculated: and overall similarity
[0068]
[0069] is the local similarity of the voltage drop trajectories of the i-th and j-th wind turbines. Its expression is in the form of Chebyshev distance, which is used to characterize the extreme value of the voltage drop degree of different wind turbines. is the overall similarity of the voltage drop trajectories between the i-th and j-th wind turbines. Its expression is in the form of Euclidean distance, which is used to characterize the overall similarity of voltage drops of different wind turbines over a period of time.
[0070] Figure 2a and Figure 2b Taking four wind turbines at different locations and with different operating parameters as an example, the relationship between them is schematically shown. As shown in the figure, due to the different locations of different wind turbines, different wind directions and wind speeds in the wind farms, and different installation specifications and sizes, their capacities and powers are different (the area of the circle represented by each wind turbine in the figure represents its capacity or power). However, the voltage drop characteristics of wind turbines with different capacities or powers may be relatively consistent, that is, their are closer, and thus can be clustered as the same equivalent generator.
[0071] In addition to operational reliability, when clustering multiple wind turbines, the electrical distance between them also needs to be considered, so as to cluster wind turbines with relatively close electrical distances as the same equivalent generator as much as possible. In the embodiment of the present application, the electrical distance between any two wind turbines is characterized by the equivalent impedance between the two and is obtained by the following steps:
[0072] First, each wind turbine generator is regarded as a node, and the node impedance matrix shown in formula (4) is established:
[0073]
[0074] Among them, V1,...,V i ,...,V j ,...,V M Represent the voltage at M wind turbines, Z 1,1 ,...,Z i,i ,...Z j,j ...,Z M,M Represent the self-impedance of M wind turbines, Z i,j , Z j,i represent the mutual impedance between the i-th and j-th wind turbines and between the j-th and i-th wind turbines, respectively, and Z i,j =Z j,i .
[0075] Inject a unit current into node i while ensuring that all other nodes are in an open circuit state. In this case, the injected current can only flow out from node j, and equation (5) can be obtained:
[0076] V i,j =Z j,i (5).
[0077] At this time, Z i,j is equal to the voltage difference between nodes i and j. The electrical distance here only focuses on the electrical connection between nodes i and j, and excludes the influence of other nodes on the voltage difference between the two. In the embodiment of the present application, in order to simplify the calculation of the electrical distance between each wind turbine in the wind farm and improve the efficiency of the calculation, the above node impedance matrix is simplified, and only the input impedance of the two-port network is used as the key parameter to characterize the electrical distance between the nodes, thereby obtaining the equivalent impedance between the i-th and j-th wind turbines as shown in formula (6): Characterized electrical relationship characteristics:
[0078]
[0079] in, is the equivalent impedance between the i-th and j-th wind turbines, Z i,i , Z j,j are the self-impedances of the i-th and j-th wind turbines, respectively, and Z i,j is the mutual impedance between the i-th and j-th wind turbines.
[0080] Obviously, it can be similar to Figure 2a , Figure 2bIn this way, the relationship between the electrical distances of the wind turbines is obtained. The closer the distance, the more similar the impedance characteristics of the two wind turbines are. Accordingly, their power losses during power output are similar.
[0081] The above three relationship characteristics describe the similarity between each wind turbine in terms of operating reliability and power loss from different angles. In some specific embodiments, the relationship characteristics of the above three dimensions can be regarded as distances in three dimensions. According to the degree of aggregation of each wind turbine in the three-dimensional distance space, M wind turbines are clustered into N equivalent generators.
[0082] [Determine the performance parameters of each equivalent generator]
[0083] As previously analyzed and Figure 2a , 2b As shown, the same equivalent generator is formed by a cluster of wind turbines with similar operating reliability and loss characteristics. However, the performance parameters such as the output power, wind turbine capacity and capacitance of each wind turbine may vary greatly. Therefore, in this application, the overall performance parameters of each wind turbine constituting the equivalent generator are dynamically estimated in the second step to accurately reflect the overall behavior of the generator sets in the cluster, so as to improve the accuracy of the control instruction optimization and control instruction allocation described later.
[0084] Specifically, the dynamic performance parameter fitting operation is performed on N equivalent generators, including the following steps:
[0085] S21, for any nth equivalent generator, determine the fitness index DI of all wind turbines included in the equivalent generator based on the following formula: n :
[0086]
[0087] Among them, Num n is the number of wind turbines included in the nth equivalent generator, are the instantaneous values of active power of the i-th and j-th wind turbines in the n-th equivalent generator at the k-th sampling time point, are the average active power of the i-th and j-th wind turbines in the n-th equivalent generator at the k-th sampling time point, is the geometric distance between the center position of the i-th wind turbine and the n-th equivalent generator in the n-th equivalent generator, for The average value of is the spatial connection weight of the i-th and j-th wind turbines in the n-th equivalent generator, S0 is the sum of the spatial connection weights of all wind turbines in the n-th equivalent generator, They are The coefficient of .
[0088] The above-mentioned fitness index evaluates the clustering effect from two perspectives, among which, It is used to characterize the correlation of the capacity / power of each wind turbine in the nth equivalent generator by Pearson correlation coefficient To obtain statistics, The value of is between [0,1]. The larger the value, the higher the correlation between the capacity / power of each wind turbine in the equivalent generator. It is used to characterize the dispersion of the spatial positions of each wind turbine in the nth equivalent generator. The value of is also between [0,1]. The larger the value, the higher the correlation between the spatial positions of the wind turbines. The lower the value, the gradually increasing spatial distance between the wind turbines. At this time, the possibility of differences in wind speed and wind direction among the wind turbines is also gradually increasing. Therefore, the differences in their performance parameters will gradually become more prominent.
[0089] S22, judge DI n Whether it exceeds the preset fitness threshold, if DI n If the preset fitness threshold is exceeded, the equivalent performance parameters of the nth equivalent generator are determined based on the following formula:
[0090]
[0091] If DI n If the preset fitness threshold is not exceeded, the equivalent performance parameters of the nth equivalent generator are determined based on the following formula:
[0092]
[0093] Among them, S eq,n , P eq,n are the equivalent capacity and equivalent active power of the nth equivalent generator, are the capacity and active power of the i-th wind turbine generator in the n-th equivalent generator, are the capacity weight, operating time weight, average wind speed weight and total weight of the i-th wind turbine in the n-th equivalent generator, respectively. α, β and γ are weight coefficients.
[0094] S23, replace the equivalent generator and return to execute step S21 until all equivalent generators are traversed.
[0095] Specifically, when the conditions of each wind turbine in an equivalent generator are not very different, a simple capacity-based equivalence method is used to accumulate the capacity, reactance, etc. of all the wind turbines included in it to obtain their equivalent performance parameters; when the wind turbines show large differences in capacity or wind speed characteristics, simple accumulation or averaging methods are no longer applicable. At this time, weighting is performed based on the capacity characteristics, time characteristics and wind speed characteristics so that the weighted performance parameters can more accurately reflect the overall behavior of all generators in the cluster.
[0096] [Search for the optimal control instructions for each equivalent generator]
[0097] After generating each equivalent generator through the first two steps and obtaining its equivalent performance parameters through dynamic estimation, the third step can be used to establish an N-dimensional search space and use a search algorithm well known to those skilled in the art to search for the optimal control instructions of each equivalent generator.
[0098] For example, in some preferred embodiments, the particle swarm algorithm can be used to search for optimal control instructions. The particle swarm algorithm is a global optimization algorithm based on swarm intelligence. It searches for the optimal solution by simulating the movement of particles in the search space. Its core idea is cooperation and information transmission between individuals. In the particle swarm algorithm, each solution is a particle, and the particles move in the solution space. Each particle has its own position and velocity. The position represents the parameter vector of the solution, and the velocity represents the moving direction and distance of the particle in the solution space. In addition, each particle also saves its individual historical optimal position and the global optimal position of the group.
[0099] Specifically, you can Figure 3 As shown in the figure, each equivalent generator is regarded as a particle. After establishing its control instruction search space (generally, the control instruction received by each wind turbine is its active power setting value), the optimal solution is found by simulating the movement of particles in the search space. During the execution of the algorithm, the particles will search for the optimal solution by updating their speed and position. The speed update is based on the particle's own historical optimal position and the group's global optimal position. The particle adjusts the moving direction and speed based on its own experience and the group's collaborative information. The transmission of this collaborative information is achieved through the mutual influence between particles. In each iteration, the particle analyzes its current speed and position and compares them with the historical optimal solution, selects the best one to keep, and iterates one by one to obtain the optimal position.
[0100] In some preferred embodiments, an objective function J as shown in formula (10) can be established to search for optimal control instructions:
[0101]
[0102] Among them, Ploss,n is the active power loss of the nth equivalent generator, U n , U ref,n are the actual voltage and reference voltage of n equivalent generators, P n , P ref,n are the actual output power and reference output power of the nth equivalent generator respectively, and w1, w2, and w3 are weight coefficients.
[0103] In some preferred embodiments, the constraints in the process of searching for the optimal control instruction include those shown in equations (11) to (16):
[0104] Active power equation constraints for each equivalent generator:
[0105] P G,i -U i ∑U j (G i,j cosθ i,j +B i,j sinθ i,j )=0 (11);
[0106] The reactive power equation constraints of each equivalent generator are:
[0107] Q G,i -U i ∑U j (G i,j cosθ i,j -B i,j sinθ i,j )=0 (12);
[0108] Voltage inequality constraints for each equivalent generator:
[0109] U i,min ≤U i ≤U i,max (13);
[0110] Active power inequality constraints of each equivalent generator:
[0111] Q i,min ≤Q i ≤Q i,max (14);
[0112] Reactive power inequality constraints for each equivalent generator:
[0113] P i,min ≤P i ≤P i,max (15);
[0114] Grid-connected voltage deviation constraints:
[0115]
[0116] Among them, U i,min , U i,max is the minimum and maximum value of each equivalent generator voltage; Q i,min , Q i,max is the minimum and maximum value of the reactive power of each equivalent generator; P i,min , P i,max is the minimum and maximum active power of each equivalent generator; G i,j is the conductance between the ith and jth equivalent generators; cosθ i,j is the voltage phase angle difference between the i-th and j-th equivalent generators, U PCC Real-time voltage at the wind farm grid connection point; The voltage control index of the grid connection point issued by the superior dispatcher. is the allowable control error, and the preferred value is 0.01.
[0117] [Dynamic control command allocation to equivalent generators]
[0118] Since the control instructions of N equivalent generators are obtained in the third step, it is necessary to further distribute the optimal control instructions obtained by each equivalent generator to all wind turbines included in it in the fourth step. Obviously, since the performance parameters used to search for control instructions in the third step are obtained by dynamic fitting, the distribution of the obtained control instructions should also follow the same rules.
[0119] Specifically, in the fourth step, the dynamic control instruction allocation operation is performed on the N equivalent generators, including the following steps:
[0120] S41, for any nth equivalent generator, determine the fitness index DI of all wind turbines included in the equivalent generator n Whether it exceeds a preset fitness threshold, if yes, then the active power setting value is allocated to it based on the actual power generation capacity of all the wind turbines it contains, if no, then the active power setting value is allocated to it based on the actual power generation capacity of all the wind turbines it contains and the total weight;
[0121] S42, replace the equivalent generator and return to execute step S41 until all equivalent generators are traversed.
[0122] For example, the above fit index DI n The calculation method of the total weight during parameter fitting has been introduced in detail in the previous article and will not be repeated here.
[0123] [Optimization of cluster quantity and scale]
[0124] Obviously, since the method provided in this application is to cluster wind farms with super-large installed capacity into several equivalent generators through relational clustering operations to effectively reduce the spatial dimension of the optimal search, the number of equivalent generators obtained after clustering and the installed capacity of each equivalent generator will have a key impact on the optimization effect.
[0125] For example, if the number N of equivalent generators after clustering is too large, the dimension of the search space is not effectively reduced, and the meaning of clustering is obviously lost; for another example, when the number N is too large, there will be a large number of wind turbines in each equivalent generator. At this time, a single equivalent motor can no longer accurately reflect the overall characteristics of a large number of wind turbines, resulting in insufficient accuracy of the constraints and objective functions based on the optimization search, and it is also impossible to reasonably distribute the control instructions to each wind turbine.
[0126] Therefore, it is necessary to optimize the clustering process reasonably so that the number of equivalent generators and the scale of wind turbines inside each equivalent generator are controlled within a reasonable range.
[0127] In some preferred embodiments, when the particle swarm search algorithm is used to search for the optimal control instruction in the fourth step, the upper limit D of N is max ≤50, that is, the number of particles used for searching needs to be less than 50 to avoid the search dimension being too high.
[0128] In some preferred embodiments, after clustering the M wind turbines in the wind farm into N equivalent turbines based on the relationship clustering operation in the first step, a clustering optimization operation is also performed. Specifically, the clustering optimization operation includes the following steps:
[0129] Determine whether the number of wind turbines included in each of the equivalent generators exceeds the cluster size upper limit Num max , and the number of wind turbines included exceeds Num max The equivalent generator is split into two equivalent generators until the number of wind turbines included in each of the equivalent generators does not exceed Num max .
[0130] Num max Determines the maximum installed capacity of each equivalent generator. Preferably, Num max Determined by the following formula (17):
[0131]
[0132] Where r1 is a rational number greater than or equal to 2, r2 is an integer greater than or equal to 2, This is a round-up operation.
[0133] r1 is used to perform a multiplier operation on the mean of the wind turbines contained in each equivalent generator. The smaller r1 is, the smaller the difference between the installed capacity of each equivalent generator is expected to be. r2 is used to directly specify a certain upper limit of the installed capacity to avoid the problem that when the overall installed capacity of the wind farm is large, the installed capacity of a single equivalent generator is too large even if the installed capacity of each equivalent generator is relatively average, resulting in the optimization operation of a single equivalent generator still taking a long time.
[0134] For example, in some specific embodiments, r1 can be set to 2, r2 can be set to 20, and then 2 times the average number of wind turbines included in each equivalent generator can be compared with 20, and the larger value of the two can be determined as Num max , if the number of installed capacity in an equivalent generator exceeds Num max In other embodiments, r1 and r2 may be set according to the scale of the wind farm and the optimal dimension range of the selected optimization algorithm.
[0135] Different rules can be used for max The equivalent generators can be split, for example, according to the principle of minimizing the power difference or capacity difference of the two new equivalent generators after the split, that is, the wind turbines are sorted and allocated according to the power or capacity of each wind turbine, so that the difference in total power or total capacity of the two groups of wind turbines after the split is minimized.
[0136] The following Table 1 is a specific embodiment in which the control method of the present application is used to search for control instructions and a comparison with the search results of a conventional particle swarm algorithm. It can be seen from Table 1 that when using the method of the present application, since wind turbines with similar voltage drop characteristics and impedance characteristics are clustered, the search space dimension for searching for optimal control instructions is greatly compressed, which significantly reduces the search time while accurately controlling each wind turbine.
[0137] Table 1 Comparison results of control instruction search using the proposed method and conventional particle swarm algorithm
[0138]
[0139] The above is a detailed introduction to the steps of the wind farm optimization control method based on relationship clustering provided by the present application. Some embodiments of the present application also provide a wind farm optimization control system based on relationship clustering, which control system includes a processor and a storage device, and an executable program is stored in the storage device. When the executable program is executed by the processor, the aforementioned wind farm optimization control method based on relationship clustering can be implemented.
[0140] The above is a detailed introduction to the specific implementation methods of the present application. For those skilled in the art, several improvements and modifications may be made to the present application without departing from the principles of the present application. These improvements and modifications also fall within the scope of protection of the claims of the present application.
Claims
1. A wind farm optimization control method based on relationship clustering, characterized in that: The following steps are involved: In the first step, based on the relational clustering operation, the M wind turbines in the wind farm are clustered into N equivalent turbines, where M>N>2 and N does not exceed the preset upper limit of the search space dimension D. max , the clustering features of the relationship clustering operation include voltage drop relationship features and electrical relationship features of the M wind turbines; The second step is to perform dynamic performance parameter fitting operations on the N equivalent generators respectively to obtain equivalent performance parameters of the N equivalent generators; The third step is to establish an N-dimensional control instruction search space of N equivalent generators, determine the objective function and constraints, and search for the optimal control instructions of the N equivalent generators in the N-dimensional control instruction search space, wherein the upper and lower limits of the N-dimensional control instruction search space, the objective function and the constraints are determined based on the equivalent performance parameters of the N equivalent generators; The fourth step is to perform dynamic control instruction allocation operations on the N equivalent generators respectively, and allocate the optimal control instruction of each equivalent generator to each wind turbine generator included therein; The fifth step is to control the M wind turbines in the wind farm to generate wind power based on the result of the dynamic control command allocation operation.
2. The wind farm optimization control method based on relationship clustering according to claim 1, characterized in that: The voltage drop relationship characteristics include local similarity and overall similarity of voltage drop trajectories of any two wind turbines.
3. The wind farm optimization control method based on relationship clustering according to claim 2 is characterized in that: The local similarity and overall similarity of the voltage drop trajectories of any two wind turbines are shown in the following formula: Among them, Δu i (k), Δu j (k) are the voltage drop values of the i-th and j-th wind turbines at the k-th sampling moment, u i (k) are the real-time voltage value of the i-th wind turbine at the k-th sampling moment and the steady-state voltage value before the voltage drop, u j (k) are the real-time voltage value of the j-th wind turbine at the k-th sampling moment and the steady-state voltage value before the drop, respectively. K is the total number of sampling moments. is the local similarity of the voltage drop trajectories of the i-th and j-th wind turbines, is the overall similarity of the voltage drop trajectories between the i-th and j-th wind turbines.
4. The wind farm optimization control method based on relationship clustering according to claim 1, characterized in that: The electrical relationship characteristic is specifically the equivalent impedance between any two wind turbines as shown in the following formula: in, is the equivalent impedance between the i-th and j-th wind turbines, Z i,i , Z j,j are the self-impedances of the i-th and j-th wind turbines, respectively, and Z i,j is the mutual impedance between the i-th and j-th wind turbines.
5. The wind farm optimization control method based on relationship clustering according to claim 4 is characterized in that: The electrical relationship characteristics are determined by performing unit current injection calculation and two-port network simplification on the node impedance matrix of M wind turbines in the wind farm.
6. The wind farm optimization control method based on relationship clustering according to claim 1, characterized in that: In the first step, after clustering the M wind turbines in the wind farm into N equivalent turbines based on the relationship clustering operation, a clustering optimization operation is also performed. The clustering optimization operation specifically includes the following steps: Determine whether the number of wind turbines included in each of the equivalent generators exceeds the cluster size upper limit Num max , and the number of wind turbines included exceeds Num max The equivalent generator is split into two equivalent generators until the number of wind turbines included in each of the equivalent generators does not exceed Num max .
7. The wind farm optimization control method based on relationship clustering according to claim 6, characterized in that: The upper limit of cluster size Num max Determined by the following formula: Where r1 is a rational number greater than or equal to 2, r2 is an integer greater than or equal to 2, This is a round-up operation.
8. The wind farm optimization control method based on relationship clustering according to claim 6, characterized in that: The equivalent generator is split according to the principle of minimizing the power difference or capacity difference between the two new equivalent generators after the split.
9. The wind farm optimization control method based on relationship clustering according to claim 1, characterized in that: In the second step, a dynamic performance parameter fitting operation is performed on the N equivalent generators, which specifically includes the following steps: S21, for any nth equivalent generator, determine the fitness index DI of all wind turbines included in the equivalent generator based on the following formula: n : Among them, Num n is the number of wind turbines included in the nth equivalent generator, are the instantaneous values of active power of the i-th and j-th wind turbines in the n-th equivalent generator at the k-th sampling time point, are the average active power of the i-th and j-th wind turbines in the n-th equivalent generator at the k-th sampling time point, is the geometric distance between the center position of the i-th wind turbine and the n-th equivalent generator in the n-th equivalent generator, for The average value of is the spatial connection weight of the i-th and j-th wind turbines in the n-th equivalent generator, S0 is the sum of the spatial connection weights of all wind turbines in the n-th equivalent generator, They are The coefficient of S22, judge DI n Whether it exceeds the preset fitness threshold, if DI n If the preset fitness threshold is exceeded, the equivalent performance parameters of the nth equivalent generator are determined based on the following formula: If DI n If the preset fitness threshold is not exceeded, the equivalent performance parameters of the nth equivalent generator are determined based on the following formula: Among them, S eq,n , P eq,n are the equivalent capacity and equivalent active power of the nth equivalent generator, are the capacity and active power of the i-th wind turbine generator in the n-th equivalent generator, are the capacity weight, operating time weight, average wind speed weight and total weight of the i-th wind turbine in the n-th equivalent generator, respectively, and α, β, and γ are weight coefficients; S23, replace the equivalent generator and return to execute step S21 until all equivalent generators are traversed.
10. The wind farm optimization control method based on relationship clustering according to claim 9, characterized in that: The control instruction received by each wind turbine generator is an active power setting value. In the fourth step, a dynamic control instruction allocation operation is performed on the N equivalent generators, which specifically includes the following steps: S41, for any nth equivalent generator, determine the fitness index DI of all wind turbines included in the equivalent generator n Whether it exceeds a preset fitness threshold, if yes, then the active power setting value is allocated to it based on the actual power generation capacity of all the wind turbines it contains, if no, then the active power setting value is allocated to it based on the actual power generation capacity of all the wind turbines it contains and the total weight; S42, replace the equivalent generator and return to execute step S41 until all equivalent generators are traversed.
11. The wind farm optimization control method based on relationship clustering according to claim 9, characterized in that: The objective function J used to search for the optimal control command is as follows: Among them, P loss,n is the active power loss of the nth equivalent generator, U n , U ref,n are the actual voltage and reference voltage of n equivalent generators, P n , P ref,n are the actual output power and reference output power of the nth equivalent generator, respectively, w1, w2, w3 are weight coefficients; The constraints in the process of searching for the optimal control instructions include the active power equality constraints, reactive power equality constraints, voltage inequality constraints, active power inequality constraints, reactive power inequality constraints and grid-connected voltage deviation constraints of each equivalent generator.
12. The wind farm optimization control method based on relationship clustering according to any one of claims 1 to 11, characterized in that: In the fourth step, the particle swarm search algorithm is used to search for the optimal control instruction, and D max ≤50.
13. A wind farm optimization control system based on relationship clustering, comprising a processor and a storage device, wherein an executable program is stored in the storage device, and when the executable program is executed by the processor, the wind farm optimization control method based on relationship clustering as claimed in claim 1 can be implemented.