Rail transit vehicle and neutral section passing method and control system thereof
By utilizing the existing signal system and frequency detection method of the vehicle, automatic phase transition control in electric locomotives or electric multiple units is achieved, solving the problems of complex equipment and unreliable magnetic signals, simplifying the structure and reducing costs.
Patent Information
- Application Number
- CN202410859108.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-08
AI Technical Summary
When existing electric locomotives or electric multiple units are in the phase transition zone, the equipment is complex and the magnetic signals are not completely reliable, resulting in the problem of automatic phase transition failure.
By utilizing the vehicle's existing signal system, including LKJ signals, Beidou satellite signals, network voltage detection equipment and real-time speed signals, automatic over-phase control is achieved, eliminating the traditional vehicle-mounted phase over-phase device and ground magnetic signal transmitter, and using frequency detection Method to more accurately determine the entry and exit of the phase separation area.
The train structure is simplified, the risk of excessive phase failure caused by unreliable magnetic signals is avoided, the cost is greatly reduced, and more reliable excessive phase control is achieved.
Smart Images

Figure CN118744665A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of rail transit, in particular to a rail transit vehicle and a phase separation method and a control system thereof. Background Art
[0002] At present, when electric locomotives or electric multiple units pass through the phase-splitting area, they generally use an on-board automatic phase-splitting device to detect phase-splitting warning, phase-splitting forced and phase-splitting end signals from the magnetic induction coil, and send the signal to the vehicle control unit (CCU). The CCU controls the vehicle's main switch to open before entering the phase-splitting area and close after passing through the phase-splitting area to achieve automatic phase-splitting control. This method requires the vehicle to be equipped with an automatic phase-splitting device and a magnetic signal transmitter to be installed on the track surface. The equipment is complex and magnetic induction has certain unreliability. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a rail transit vehicle and its phase transition method and control system in view of the deficiencies in the existing technology, so as to solve the problems that the existing vehicle phase transition devices are numerous, the installation is complicated, a magnetic signal transmitter needs to be arranged on the ground, and the magnetic signal is not completely reliable, which may cause automatic phase transition failure.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for passing phase separation of rail transit vehicles, comprising the following steps:
[0005] S1. Determine whether the train speed is valid. If valid, use the current train speed to calculate the distance from the train to the phase separation area; otherwise, if the Beidou satellite signal is valid, use the Beidou satellite signal to calculate the distance from the train to the phase separation area in real time; if both the train speed and the Beidou satellite signal are invalid, switch to the manual phase separation mode;
[0006] S2: If the distance from the train to the phase separation area is less than the preset value, the traction force is reduced. When the traction force is reduced to 0 or the frequency of the network voltage is detected to be out of the normal range, the main breaker is disconnected;
[0007] S3. After the over-phase starts, after the preset delay time t2, it is determined whether the grid voltage has returned to the normal range and the normal duration of the grid voltage reaches the set duration. If so, the main breaker is closed again and the normal operation condition is entered.
[0008] The present invention utilizes the "double bow prohibition" signal sent by the existing LKJ or other vehicle-mounted signal system, the vehicle satellite signal (CMD or vehicle-mounted intelligent center with Beidou function), the network voltage frequency signal sent by the network voltage detection equipment, the real-time speed signal of the vehicle and the effective speed signal of the vehicle to realize the automatic over-phase control function of the vehicle, and can realize over-phase without the help of an over-phase device, thereby solving the problem that the existing over-phase method equipment is complicated to install and needs to arrange a magnetic signal transmitter, resulting in a complex structure, and at the same time solves the problem that the magnetic signal is not completely reliable and may cause the automatic over-phase failure. In step S2, the network voltage frequency exceeds the normal range means that the network voltage frequency is greater than the upper limit preset value f1, or the network voltage frequency is less than the lower limit preset value f2, and the duration reaches the set duration; wherein f1>f2.
[0009] The existing method of detecting grid voltage is mainly to judge the grid voltage value. For example, when the grid voltage V<15KV is detected for t1 seconds, it is considered to enter the phase separation area. When the grid voltage V>17.5KV lasts for t2 seconds, it is considered to leave the phase separation area. However, the applicant has found that the induced grid voltage in the phase separation area may be greater than 15KV in some cases. The existing method may cause misjudgment and lead to over-phase failure. The present invention adopts a frequency detection method, which can more accurately judge whether the train enters and leaves the phase separation area, thereby further preventing over-phase failure.
[0010] The set time length is 200ms.
[0011] f1=50.5Hz, f2=49.5Hz.
[0012] The preset value is 170m.
[0013] In the present invention, in order to ensure the safety of over-phase separation, before executing the above step S1, the following operation is also performed: determine whether a double-bow prohibition signal is received, and if so, enter step S1.
[0014] As an inventive concept, the present invention also provides a rail transit vehicle over-phase control system, including a memory, a processor and a computer program stored in the memory; the processor executes the computer program to implement the steps of the above method.
[0015] As an inventive concept, the present invention also provides a rail transit vehicle, which adopts the above control system.
[0016] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention eliminates the traditional vehicle-mounted over-phase device and ground magnetic signal transmitter, greatly simplifies the composition of the train, and avoids the risk of over-phase failure caused by unreliable train magnetic signals. It is both simple and reliable, and greatly reduces the cost of train over-phase. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a flow chart of a method for calculating phase zone distance according to an embodiment of the present invention;
[0018] Figure 2 This is a flow chart of the excessive phase disconnection main disconnection control according to an embodiment of the present invention;
[0019] Figure 3 This is a flow chart of judging the end of excessive phase separation according to an embodiment of the present invention. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] The embodiment of the present invention proposes an over-phase control method that does not require an automatic over-phase device and a magnetic signal transmitter. Without adding any new equipment, the "double bow prohibited" signal sent by LKJ or other vehicle-mounted signal systems and the vehicle's satellite signal (CMD or vehicle-mounted intelligent center has Beidou signal) are used to calculate the position of the vehicle from the phase separation zone, and combined with the network voltage frequency signal sent by the network voltage detection equipment, it is determined whether the vehicle enters the phase separation zone to control the opening and closing of the vehicle main breaker, thereby ensuring that the vehicle passes through the phase separation zone smoothly.
[0022] A certain distance before the train enters the phase separation area (for example, 1000 meters and 500 meters before the phase separation area for freight cars, and 1500 meters and 500 meters before the phase separation area for passenger cars), the train's LKJ or other on-board signal systems will receive the "no double bow signal" sent by the ground signal. After receiving the signal, the train begins to use two methods to calculate the train's travel distance and the distance d from the phase separation area in real time.
[0023] Step 1: Calculate the distance to the phase separation zone
[0024] Method 1: Integrate time using current train speed Calculate the train travel distance in real time to obtain the distance to the phase separation zone;
[0025] Method 2: Use satellite positioning signals to calculate the train's position in real time, thereby obtaining the distance from the phase separation zone.
[0026] Step 2: Speed selection
[0027] When the train speed is valid, the result calculated by Method 1 is adopted; when the speed is invalid, if the Beidou signal is normal, the result calculated by Method 2 is adopted; when both the speed signal and the Beidou signal are invalid, switch to the manual neutral section passing mode. Steps 1 and 2 are as Figure 1 shown.
[0028] Step 3: Start of neutral section passing
[0029] When the distance d to the neutral section is less than d1 (d1 is a preset value defined according to the length of the neutral section and the train type, such as 170 meters), the train starts to reduce the traction force. When the traction force is reduced to 0 or the frequency of the network voltage is detected to be outside the normal range, the main breaker is disconnected. Here, through the network voltage detection device of the train, the frequency of the network voltage is detected in real time. Since the train is powered by AC25KV, 50Hz power frequency voltage, the normal frequency deviation range of the network voltage of the traction power supply system is ±0.2Hz (for systems with smaller capacity, the deviation value is relaxed to ±0.5Hz). Therefore, it can be determined whether the train has entered the neutral section through the frequency range of the network voltage. For example, when the detected network voltage frequency f > 50.5Hz or f < 49.5Hz and lasts for 200ms, it is considered that the train has entered the neutral section. Here, the upper preset frequency value is f1, the lower preset frequency value is f2, where f1 > f2, and the duration is set to t1. The flow chart is as Figure 2 shown.
[0030] Step 4: End of neutral section passing
[0031] After entering the neutral section, in order to prevent abnormal network voltage from frequently triggering the neutral section entry or exit function, according to the length of the neutral section and the train operation speed range, a time length t2 is preset. During this time, the network voltage detection function is shielded (that is, after the start of neutral section passing, after a delay of t2, the neutral section end judgment is made), and then the network voltage is detected again. When the network voltage returns to the normal range (f2 < f < f1) and lasts for t1, it is considered that the train network voltage has returned to normal. At this time, the main breaker of the train is controlled to be re-closed, and the train enters the normal operation condition. The process is as Figure 3 shown.
[0032] Another embodiment of the present invention also provides a neutral section passing control system for rail transit vehicles, including a memory, a processor, and a computer program stored on the memory; the processor executes the computer program to implement the steps of the method in the above embodiment. The control system of this embodiment can be integrated with the existing control system of the rail transit vehicle, that is, the existing control system of the rail transit vehicle is used to implement the neutral section passing method in the above embodiment to further save costs.
[0033] Another embodiment of the present invention further provides a rail transit vehicle, which adopts the above control system. The rail transit vehicle of the embodiment of the present invention can be an electric locomotive, an electric multiple unit, or other vehicles that require phase separation, and this embodiment does not limit the type of vehicle.
[0034] The embodiment of the present invention eliminates the traditional on-board over-phase device and ground magnetic signal transmitter, greatly simplifies the composition of the train, and avoids the risk of over-phase failure caused by unreliable train magnetic signals. It is simple and reliable, and greatly reduces the cost of using the train.
[0035] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0036] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A method for phase separation of rail transit vehicles, characterized in that: The following steps are involved: S1. Determine whether the train speed is valid. If valid, use the current train speed to calculate the distance from the train to the phase separation area; Otherwise, if the Beidou satellite signal is valid, the distance from the train to the phase separation area is calculated in real time using the Beidou satellite signal; if both the train speed and the Beidou satellite signal are invalid, the system switches to the manual phase separation mode; S2: If the distance from the train to the phase separation area is less than the preset value, the traction force is reduced. When the traction force is reduced to 0 or the frequency of the network voltage is detected to be out of the normal range, the main breaker is opened; S3. After the phase transition begins, after a delay of the preset time t2, it is determined whether the grid voltage has returned to the normal range and whether the normal grid voltage has lasted for the set time. If so, the main breaker is closed again and the system enters normal operation.
2. The method for passing phase separation of rail transit vehicles according to claim 1, characterized in that: In step S2, the network voltage frequency exceeds the normal range means that the network voltage frequency is greater than the upper limit preset value f1, or the network voltage frequency is less than the lower limit preset value f2, and the duration reaches the set time; Where f1>f2.
3. The method for passing phase separation of rail transit vehicles according to claim 2, characterized in that: The set time length is 200ms.
4. The method for passing phase separation of rail transit vehicles according to claim 2, characterized in that: f1=50.5Hz, f2=49.5Hz.
5. The method for passing phase separation of a rail transit vehicle according to any one of claims 1 to 4, characterized in that: The preset value is 170m.
6. The method for passing phase separation of a rail transit vehicle according to any one of claims 1 to 4, characterized in that: Before step S1, the process also includes: determining whether a double-bow prohibition signal is received, and if so, entering step S1.
7. A rail transit vehicle over-phase control system, comprising a memory, a processor and a computer program stored in the memory; characterized in that: The processor executes the computer program to implement the steps of the method according to any one of claims 1 to 6.
8. A rail transit vehicle, characterized in that: It adopts the control system described in claim 7.