Municipal drainage pipeline construction method

Through the combination of pipe support devices and alignment components, and the mechanical structure of bidirectional threaded rods and guide rods, the rapid alignment and splicing of municipal drainage pipes is achieved, solving the problem of difficult alignment of pipe centerlines and improving construction efficiency and stability. .

CN118745765APending Publication Date: 2024-10-08CSCIC INVESTMENT & CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411014047.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

During the construction of municipal drainage pipelines, it is difficult to quickly overlap the center lines of the two pipelines, resulting in limited installation progress.

Method used

Pipe support devices and alignment components are used, and through the cooperation of the two-way threaded rod and the guide rod, the motor drives the two-way threaded rod to rotate, and the movable block and the guide rod slide and cooperate to achieve rapid alignment and splicing of the pipeline; the alignment component passes through the first ring body The sleeve and sliding of the second ring body and the even distribution of the positioning rods ensure the alignment of the pipeline axis and maintain stability through springs and positioning grooves.

Benefits of technology

It significantly speeds up the efficiency of pipeline alignment and splicing, ensures stable alignment of the pipeline axis, avoids changes in the axis during the splicing process, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745765A_ABST
    Figure CN118745765A_ABST
Patent Text Reader

Abstract

The invention discloses a municipal drainage pipeline construction method. The municipal drainage pipeline construction method comprises the following steps that S1, a groove is excavated; s2, a pipeline supporting device is arranged in the groove, and a to-be-installed pipeline is placed on the pipeline supporting device; s3, aligning the two adjacent to-be-mounted pipelines by using a pipeline aligning assembly; s4, after the two pipelines are aligned and spliced, the pipeline supporting device and the alignment assembly are moved, the other pipelines are aligned and spliced, after all the pipelines are aligned and spliced, the pipeline supporting device and the alignment assembly are moved out, and soil is backfilled; the pipeline supporting device comprises a base and fixing blocks, the four fixing blocks are distributed in a rectangular array mode, a two-way threaded rod is rotationally installed between two fixing blocks, a guide rod parallel to the two-way threaded rod is fixed between the other two fixing blocks, and the two-way threaded rod and the guide rod are jointly provided with a movable block. Clamping assemblies are arranged at the two ends of each movable block. The efficiency of axis alignment and mutual splicing of the two pipelines is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pipeline construction, and in particular to a municipal drainage pipeline construction method. Background Art

[0002] Pipeline construction refers to connecting pipe unit sections in sequence and laying them to the supporting position. For municipal drainage pipes, since they are usually located inside the city, they are buried underground. Municipal drainage pipes located underground need to have good corrosion resistance. Drainage pipes are mostly made of pipe unit sections made of concrete materials. During construction, it is necessary to first dig a trench on the ground, and then place the pipe unit sections in the trench in sequence, and then seal the pipe unit sections.

[0003] In the related art, an excavator is first used to dig a trench on the road surface, and the pipe is pushed into the trench. Finally, the flanges of adjacent pipes are connected and locked with bolts. However, it is difficult to quickly align the center lines of the two pipes, which is not conducive to improving the installation progress of the municipal drainage pipe. Therefore, it is necessary to make design improvements to the related art. Summary of the invention

[0004] In order to solve the above problems, the present invention provides a municipal drainage pipeline construction method.

[0005] The above technical objectives of the present invention are achieved through the following technical solutions: A municipal drainage pipeline construction method, comprising the following steps:

[0006] S1, digging trench;

[0007] S2. Install a pipe support device in the trench and place the pipe to be installed on the pipe support device;

[0008] S3, using a pipe alignment component to align two adjacent pipes to be installed;

[0009] S4. After the two pipes are aligned and spliced, move the pipe support device and the alignment assembly to align and splice the remaining pipes. After all the pipes are aligned and spliced, remove the pipe support device and the alignment assembly and backfill the soil.

[0010] Among them, the pipeline support device includes a base and a fixed block fixed on the top of the base, four of the fixed blocks are provided and distributed in a rectangular array, a two-way threaded rod is rotatably installed between two of the fixed blocks, the two-way threaded rod is provided with two sections of threads with equal pitch and opposite rotation direction, a guide rod arranged parallel to the two-way threaded rod is fixed between the other two fixed blocks, a movable block is jointly provided on the two-way threaded rod and the guide rod, the two-way threaded rod passes through the movable block and is threadedly connected, the guide rod passes through the movable block and slides together, two movable blocks are provided and are symmetrically distributed on the two sections of threads of the two-way threaded rod, each of the movable blocks is provided with a clamping assembly for clamping the pipeline at both ends, and a motor for driving the two-way threaded rod is fixed on one of the fixed blocks.

[0011] By adopting the above technical solution, the motor drives the bidirectional threaded rod to rotate after working. Since the bidirectional threaded rod is threadedly connected with the movable block, the guide rod and the movable block slide together, so that the two movable blocks are simultaneously close to or away from each other, and the clamping components on the two movable blocks move synchronously with the movable blocks until the pipe to be installed is clamped. Under the action of the alignment component, the axes of the two adjacent pipes to be spliced ​​are overlapped, which speeds up the efficiency of aligning and splicing the two pipes.

[0012] Furthermore, the alignment assembly includes a first ring body that is sleeved on the pipe and cooperates with the pipe, a positioning rod fixed to one side of the first ring body, and a second ring body that is sleeved on the pipe and cooperates with the pipe. The positioning rods are provided in plurality and are evenly distributed about the axis of the first ring body. The positioning rods pass through the second ring body and slidably cooperate with the second ring body.

[0013] By adopting the above technical solution, when aligning the axes of the two pipes, the staff needs to sleeve the first ring body and the second ring body on the outer wall of one of the pipes, and then slide the second ring body so that the second ring body is sleeved on the outer wall of the other pipe. Since the length direction of the positioning rod coincides with the axes of the first ring body and the second ring body, after the second ring body is sleeved on the second ring body, the axes of the two pipes are aligned.

[0014] Further, the first ring body is formed by two first semicircular rings hinged to each other, the hinge axis between the two first semicircular rings is located outside the first semicircular rings, and the free ends of the two first semicircular rings are connected by a connecting assembly, the connecting assembly includes a first U-shaped block fixed to the outside of one of the first semicircular rings, a second U-shaped block fixed to the outside of the other first semicircular ring and staggered with the first U-shaped block, a connecting screw rotatably installed between the side walls on both sides of the first U-shaped block, and a locking nut sleeved on the connecting screw and threadedly connected to the connecting screw, and the diameter of the connecting screw is smaller than the distance between the inner walls on both sides of the second U-shaped block;

[0015] The second ring body is formed by two second semicircular rings hinged to each other, and the connection method between the two second semicircular rings is the same as the connection method between the two first semicircular rings.

[0016] By adopting the above technical solution, after loosening the locking nut, the staff can rotate the connecting screw around the rotating axis between the connecting screw and the first U-shaped block to open the two first semi-circular rings. Similarly, the two second semi-circular rings can be opened, so that the first ring body and the second ring body can be removed from the outside of the pipeline, and the alignment assembly can be moved between the other two pipelines that have not been axially aligned to perform pipeline alignment operations.

[0017] Furthermore, the length of the connecting screw is greater than twice the sum of the thicknesses of the first U-shaped block and the second U-shaped block, a limiting plate is fixed to one end of the connecting screw away from the first U-shaped block, and a rubber gasket is sleeved on the connecting screw and located between the limiting plate and the second U-shaped block.

[0018] By adopting the above technical solution, the limit plate plays a good role in limiting the locking nut, avoiding the situation where the locking nut is lost after being screwed off. The rubber gasket makes the limit plate contact with the second U-shaped block flexibly, reducing the friction damage generated during the process of screwing the locking nut.

[0019] Furthermore, a plurality of positioning grooves are evenly arranged on the outer wall of the positioning rod, and a positioning assembly for fixing to one of the positioning rods is arranged on the second semicircular ring, and the positioning assembly includes a fixing plate fixed on one of the side walls of the second semicircular rings, a positioning plate penetrating the fixing plate and slidingly matched with the fixing plate, an end plate fixed to one end of the positioning plate away from the positioning rod, and a spring fixed between the fixing plate and the end plate, and the positioning plate is plugged into the positioning groove.

[0020] By adopting the above technical solution, under the elastic force of the spring, the positioning plate is plugged into the positioning groove on the positioning rod, so that the position of the second semicircular ring relative to the positioning rod is kept fixed, so that the staff can perform the pipe splicing work after aligning the axes of the two adjacent pipes, thereby ensuring the stability of the second semicircular ring, that is, ensuring that the axis will not change again during the splicing process between the two pipes. By pulling the end plate to separate the positioning plate from the positioning groove, the position of the second semicircular ring relative to the positioning rod can be moved, so that the staff can adjust the position of the second ring body during the process of aligning the axes of the two pipes.

[0021] Furthermore, the clamping assembly includes a cylindrical member fixed to the top of the movable block and a supporting block arranged at the upper end of the cylindrical member, and an arc-shaped groove matching the bottom of the pipe is arranged on the side of the supporting block away from the axis of the cylindrical member.

[0022] Furthermore, the cylindrical member includes a lower cylinder fixed to the top of the movable block and an upper cylinder rotatably mounted on the upper end of the lower cylinder, the upper end of the upper cylinder is provided with a plug-in groove which is plugged into and cooperates with one side of the supporting block, the supporting block and the plug-in groove are both provided with multiple and evenly distributed about the axis of the upper cylinder, and the diameters of the multiple supporting blocks decrease successively along the circumference of the upper cylinder.

[0023] By adopting the above technical solution, the upper column can rotate freely relative to the lower column, so that it is convenient for the staff to rotate the upper column, and the supporting block rotates synchronously with the upper column, so that it is convenient for the staff to replace the supporting block until it matches the outer wall of the pipeline and stops rotating, so that the supporting blocks on the two movable blocks can cooperate and clamp the pipeline.

[0024] Furthermore, a reinforcing nut threadedly connected to the lower cylinder is sleeved on the lower cylinder, and the inner side of the reinforcing nut abuts against the outer wall of the upper cylinder near the lower end of the upper cylinder.

[0025] By adopting the above technical solution, after tightening the reinforcing nut, the top of the reinforcing nut abuts against the bottom of the supporting block, which is beneficial to enhancing the supporting effect of the supporting block on the pipeline.

[0026] In summary, the present invention has the following beneficial effects:

[0027] 1. The application makes the axes of two adjacent pipes to be spliced ​​coincide with each other under the action of the alignment component, thereby speeding up the efficiency of aligning and splicing the two pipes;

[0028] 2. In the present application, when aligning the axes of two pipes, the staff needs to sleeve the first ring body and the second ring body on the outer wall of one of the pipes, and then slide the second ring body so that the second ring body is sleeved on the outer wall of the other pipe. Since the length direction of the positioning rod coincides with the axes of the first ring body and the second ring body, after the second ring body is sleeved on the second ring body, the axes of the two pipes are aligned;

[0029] 3. In this application, under the elastic force of the spring, the positioning plate is plugged into the positioning groove on the positioning rod, so that the position of the second semicircular ring relative to the positioning rod remains fixed, so that the staff can align the axes of the two adjacent pipelines to perform pipeline splicing, thereby ensuring the stability of the second semicircular ring, that is, ensuring that the axis will not change again during the splicing process between the two pipelines. By pulling the end plate to separate the positioning plate from the positioning groove, the position of the second semicircular ring relative to the positioning rod can be moved, so that the staff can adjust the position of the second ring body during the process of aligning the axes of the two pipelines. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 is a schematic diagram of the overall structure of an embodiment of the present invention;

[0031] Figure 2 yes Figure 1 Schematic diagram of the structure after deleting the alignment component;

[0032] Figure 3 is a schematic diagram of a structure for highlighting an alignment component in an embodiment of the present invention;

[0033] Figure 4 yes Figure 3 The enlarged schematic diagram of point A in the middle;

[0034] Figure 5 yes Figure 3 A magnified schematic diagram of point B in the middle.

[0035] In the figure: 1. Alignment component; 11. First ring body; 111. First semicircular ring; 12. Positioning rod; 121. Positioning groove; 13. Second ring body; 131. Second semicircular ring; 2. Base; 21. Fixed block; 211. Bidirectional threaded rod; 212. Guide rod; 213. Motor; 3. Movable block; 4. Clamping component; 41. Cylindrical member; 411. Lower cylinder; 4111. Reinforcement nut; 412. Upper cylinder; 4121. Plug-in groove; 42. Support block; 421. Arc groove; 5. Connecting component; 51. First U-shaped block; 52. Second U-shaped block; 53. Connecting screw; 531. Limiting plate; 532. Rubber gasket; 54. Locking nut; 6. Positioning component; 61. Fixed plate; 62. Positioning plate; 63. End plate; 64. Spring. DETAILED DESCRIPTION

[0036] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application; obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application without making creative work are within the scope of protection of the present application.

[0037] like Figure 1-5 As shown, the embodiment of the present application discloses a municipal drainage pipeline construction method, comprising the following steps:

[0038] S1, digging trench;

[0039] S2. Install a pipe support device in the trench and place the pipe to be installed on the pipe support device;

[0040] S3, using the pipeline alignment component 1 to align two adjacent pipelines to be installed;

[0041] S4. After the two pipes are aligned and spliced, the pipe support device and the alignment component 1 are moved to align and splice the remaining pipes. After all the pipes are aligned and spliced, the pipe support device and the alignment component 1 are moved out and the soil is backfilled.

[0042] Among them, the pipeline support device includes a base 2 and a fixed block 21 fixed on the top of the base 2. There are four fixed blocks 21 and they are distributed in a rectangular array. A bidirectional threaded rod 211 is rotatably installed between two fixed blocks 21. The bidirectional threaded rod 211 is provided with two sections of threads with equal pitch and opposite rotation direction. A guide rod 212 arranged parallel to the bidirectional threaded rod 211 is fixed between the other two fixed blocks 21. A movable block 3 is jointly arranged on the bidirectional threaded rod 211 and the guide rod 212. The bidirectional threaded rod 211 penetrates the movable block 3 and is threadedly connected. The guide rod 212 penetrates the movable block 3 and slides together. The movable block 3 is provided with two and is symmetrically distributed on the two sections of threads of the bidirectional threaded rod 211. A clamping assembly 4 for clamping the pipeline is arranged at both ends of each movable block 3. A motor 213 for driving the bidirectional threaded rod 211 is fixed on one of the fixed blocks 21.

[0043] After the motor 213 starts working, it drives the bidirectional threaded rod 211 to rotate. Since the bidirectional threaded rod 211 is threadedly connected with the movable block 3, the guide rod 212 slides with the movable block 3, so that the two movable blocks 3 are simultaneously close to or away from each other, and the clamping components 4 on the two movable blocks 3 move synchronously with the movable blocks 3 until the pipe to be installed is clamped (there may be a gap between the outer wall of the pipe and the clamping part of the clamping component 4, and an axis alignment operation is required). Under the action of the alignment component 1, the axes of the two adjacent pipes to be spliced ​​are overlapped, which speeds up the efficiency of aligning and splicing the two pipes.

[0044] The alignment assembly 1 includes a first ring body 11 sleeved on and matched with the pipeline, a positioning rod 12 fixed to one side of the first ring body 11, and a second ring body 13 sleeved on and matched with the pipeline. The positioning rods 12 are provided in plurality and are evenly distributed about the axis of the first ring body 11. The positioning rods 12 penetrate the second ring body 13 and slide with the second ring body 13. When aligning the axes of the two pipelines, the staff needs to sleeve the first ring body 11 and the second ring body 13 on the outer wall of one of the pipelines, and then slide the second ring body 13 so that the second ring body 13 is sleeved on the outer wall of the other pipeline. Since the length direction of the positioning rod 12 coincides with the axes of the first ring body 11 and the second ring body 13, after the second ring body 13 is sleeved on the second ring body 13, the axes of the two pipelines are aligned.

[0045] The first ring body 11 is formed by two first semicircular rings 111 hinged to each other, the hinge axis between the two first semicircular rings 111 is located on the outside of the first semicircular rings 111, and the free ends of the two first semicircular rings 111 are connected by a connecting assembly 5, which includes a first U-shaped block 51 fixed to the outside of one of the first semicircular rings 111, a second U-shaped block 52 fixed to the outside of the other first semicircular ring 111 and staggered with the first U-shaped block 51, a connecting screw 53 rotatably installed between the side walls on both sides of the first U-shaped block 51, and a locking nut 54 sleeved on the connecting screw 53 and threadedly connected to the connecting screw 53, and the diameter of the connecting screw 53 is smaller than the distance between the inner walls on both sides of the second U-shaped block 52; the second ring body 13 is formed by two second semicircular rings 131 hinged to each other, and the connection method between the two second semicircular rings 131 is the same as the connection method between the two first semicircular rings 111. After loosening the locking nut 54, the staff can rotate the connecting screw 53 around the rotation axis between the connecting screw 53 and the first U-shaped block 51 to open the two first semi-circular rings 111. Similarly, the two second semi-circular rings 131 can be opened, so that the first ring body 11 and the second ring body 13 can be removed from the outside of the pipeline, and the alignment component 1 can be moved between the other two pipelines that are not axially aligned to perform pipeline alignment operations.

[0046] The length of the connecting screw 53 is greater than twice the sum of the thicknesses of the first U-shaped block 51 and the second U-shaped block 52. A limiting plate 531 is fixed to one end of the connecting screw 53 away from the first U-shaped block 51. A rubber gasket 532 is sleeved on the connecting screw 53 and is located between the limiting plate 531 and the second U-shaped block 52. The limiting plate 531 has a good limiting effect on the locking nut 54, thereby preventing the locking nut 54 from being lost after being screwed off. The rubber gasket 532 allows the limiting plate 531 to flexibly contact with the second U-shaped block 52, thereby reducing friction damage caused during the process of screwing the locking nut 54.

[0047] The outer wall of the positioning rod 12 is evenly provided with a plurality of positioning grooves 121, and the second semicircular ring 131 is provided with a positioning assembly 6 for fixing with one of the positioning rods 12, and the positioning assembly 6 comprises a fixing plate 61 fixed on the side wall of one of the second semicircular rings 131, a positioning plate 62 penetrating and arranged on the fixing plate 61 and slidingly matched with the fixing plate 61, an end plate 63 fixed to one end of the positioning plate 62 away from the positioning rod 12, and a spring 64 fixed between the fixing plate 61 and the end plate 63, and the positioning plate 62 is plugged into the positioning groove 121. Under the elastic force of the spring 64, the positioning plate 62 is plugged into the positioning groove 121 on the positioning rod 12, so that the position of the second semicircular ring 131 relative to the positioning rod 12 is kept fixed, so that the staff can perform the pipe splicing work after aligning the axes of the two adjacent pipes, thereby ensuring the stability of the second semicircular ring 131, that is, ensuring that the axis will not change again during the splicing process between the two pipes. By pulling the end plate 63 to separate the positioning plate 62 from the positioning groove 121 , the second semicircular ring 131 can be moved relative to the positioning rod 12 , so that the staff can adjust the position of the second ring body 13 during the process of aligning the axes of the two pipes.

[0048] In this embodiment, the clamping assembly 4 includes a cylindrical member 41 fixed to the top of the movable block 3 and a support block 42 disposed at the upper end of the cylindrical member 41. The support block 42 is provided with an arc groove 421 that matches with the bottom of the pipe on one side away from the axis of the cylindrical member 41. In order to facilitate the clamping of pipes of different diameters, the cylindrical member 41 includes a lower cylinder 411 fixed to the top of the movable block 3 and an upper cylinder 412 rotatably mounted on the upper end of the lower cylinder 411. The upper end of the upper cylinder 412 is provided with a plug-in groove 4121 that plugs with one side of the support block 42. The support block 42 and the plug-in groove 4121 are provided in multiple and evenly distributed about the axis of the upper cylinder 412. The diameters of the multiple support blocks 42 decrease in sequence along the circumference of the upper cylinder 412. In this embodiment, a reinforcing nut 4111 threadedly connected to the lower column 411 is sleeved on the lower column 411 , and the inner side of the reinforcing nut 4111 abuts against the outer wall of the upper column 412 near the lower end of the upper column 412 .

[0049] The use principle of a municipal drainage pipe construction method in this embodiment is: after the motor 213 starts working, it drives the bidirectional threaded rod 211 to rotate. Since the bidirectional threaded rod 211 is threadedly connected with the movable block 3, the guide rod 212 slides with the movable block 3, so that the two movable blocks 3 are approached or moved away from each other at the same time, and the clamping components 4 on the two movable blocks 3 move synchronously with the movable blocks 3 until the pipe to be installed is clamped. Under the action of the alignment component 1, the axes of the two adjacent pipes to be spliced ​​are coincident, which speeds up the efficiency of aligning and splicing the two pipes.

[0050] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

Claims

1. A municipal drainage pipeline construction method, characterized in that: The steps include: S1, digging trench; S2. Install a pipe support device in the trench and place the pipe to be installed on the pipe support device; S3, using the pipeline alignment component (1) to align two adjacent pipelines to be installed; S4. After the two pipes are aligned and spliced, the pipe support device and the alignment component (1) are moved to align and splice the remaining pipes. After all the pipes are aligned and spliced, the pipe support device and the alignment component (1) are removed and the soil is backfilled. The pipeline support device comprises a base (2) and a fixed block (21) fixed to the top of the base (2), wherein four fixed blocks (21) are provided and arranged in a rectangular array, wherein a bidirectional threaded rod (211) is rotatably mounted between two of the fixed blocks (21), wherein the bidirectional threaded rod (211) is provided with two sections of threads with equal pitch and opposite rotation directions, and a guide rod (212) arranged parallel to the bidirectional threaded rod (211) is fixed between the other two fixed blocks (21), wherein the bidirectional threaded rod (211) and the guide rod (212) are arranged parallel to the bidirectional threaded rod (211). A movable block (3) is commonly arranged on the rod (212); the bidirectional threaded rod (211) penetrates the movable block (3) and is threadedly connected; the guide rod (212) penetrates the movable block (3) and is slidably matched; the movable block (3) is provided with two and symmetrically distributed on two sections of the thread of the bidirectional threaded rod (211); each of the two ends of the movable block (3) is provided with a clamping assembly (4) for clamping the pipeline; and a motor (213) for driving the bidirectional threaded rod (211) is fixed on one of the fixed blocks (21).

2. A municipal drainage pipeline construction method according to claim 1, characterized in that: The alignment assembly (1) comprises a first ring body (11) sleeved on and matched with the pipeline, a positioning rod (12) fixed to one side of the first ring body (11), and a second ring body (13) sleeved on and matched with the pipeline, wherein a plurality of positioning rods (12) are provided and evenly distributed about the axis of the first ring body (11), and the positioning rods (12) penetrate the second ring body (13) and slidably match with the second ring body (13).

3. A municipal drainage pipeline construction method according to claim 2, characterized in that: The first ring body (11) is formed by two first semicircular rings (111) hinged to each other, the hinge axis between the two first semicircular rings (111) is located outside the first semicircular rings (111), and the free ends of the two first semicircular rings (111) are connected by a connecting assembly (5), the connecting assembly (5) comprising a first U-shaped block (51) fixed to the outside of one of the first semicircular rings (111), a second U-shaped block (52) fixed to the outside of the other first semicircular ring (111) and staggered with the first U-shaped block (51), a connecting screw (53) rotatably mounted between the side walls on both sides of the first U-shaped block (51), and a locking nut (54) sleeved on the connecting screw (53) and threadedly connected to the connecting screw (53), the diameter of the connecting screw (53) being smaller than the distance between the inner walls on both sides of the second U-shaped block (52); The second ring body (13) is formed by two second semicircular rings (131) hinged to each other, and the connection method between the two second semicircular rings (131) is the same as the connection method between the two first semicircular rings (111).

4. A municipal drainage pipeline construction method according to claim 3, characterized in that: The length of the connecting screw (53) is greater than twice the sum of the thicknesses of the first U-shaped block (51) and the second U-shaped block (52); a limiting plate (531) is fixed to one end of the connecting screw (53) away from the first U-shaped block (51); and a rubber gasket (532) is sleeved on the connecting screw (53) and is located between the limiting plate (531) and the second U-shaped block (52).

5. A municipal drainage pipeline construction method according to claim 4, characterized in that: The outer wall of the positioning rod (12) is evenly provided with a plurality of positioning grooves (121); the second semicircular ring (131) is provided with a positioning assembly (6) for fixing with one of the positioning rods (12); the positioning assembly (6) comprises a fixing plate (61) fixed on the side wall of one of the second semicircular rings (131); a positioning plate (62) penetrating the fixing plate (61) and slidingly matched with the fixing plate (61); an end plate (63) fixed to one end of the positioning plate (62) away from the positioning rod (12); and a spring (64) fixed between the fixing plate (61) and the end plate (63); the positioning plate (62) is plug-fitted with the positioning groove (121).

6. A municipal drainage pipeline construction method according to claim 5, characterized in that: The clamping assembly (4) comprises a cylindrical member (41) fixed to the top of the movable block (3) and a supporting block (42) arranged at the upper end of the cylindrical member (41); an arc-shaped groove (421) matching with the bottom of the pipe is arranged on the side of the supporting block (42) away from the axis of the cylindrical member (41).

7. A municipal drainage pipeline construction method according to claim 6, characterized in that: The cylindrical member (41) comprises a lower cylinder (411) fixed to the top of the movable block (3) and an upper cylinder (412) rotatably mounted on the upper end of the lower cylinder (411); the upper end of the upper cylinder (412) is provided with a plug-in slot (4121) pluggable with one side of the supporting block (42); the supporting block (42) and the plug-in slot (4121) are both provided with a plurality of and are evenly distributed about the axis of the upper cylinder (412); the diameters of the plurality of supporting blocks (42) decrease in sequence along the circumference of the upper cylinder (412).

8. A municipal drainage pipeline construction method according to claim 7, characterized in that: The lower column (411) is sleeved with a reinforcing nut (4111) threadedly connected to the lower column (411), and the inner side of the reinforcing nut (4111) abuts against the outer wall of the upper column (412) near the lower end of the upper column (412).