Static blasting mining method suitable for thick ore body sylvite ore

By using static blasting and cemented filling technology on the potassium salt ore body, combined with hydraulic blasting and artificial ore pillar maintenance, the problems of complex tunnel layout and large surrounding rock disturbance in potash salt mine mining have been solved, and efficient and safe ore mining has been achieved. and groundwater pollution prevention.

CN118745895APending Publication Date: 2024-10-08YUNNAN PHOSPHATE CHEM GROUP CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411074623.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

During the mining process of potassium salt mines, the roadway layout is complex, the surrounding rock is greatly disturbed, and safety is poor, and traditional blasting methods may cause groundwater pollution.

Method used

The static blasting mining method is used to horizontally divide the ore body into panels, arrange different types of tunnels, and adopt static blasting and cementing filling technology, combined with hydraulic blasting and artificial ore pillar maintenance, to achieve safe and effective mining of ore.

Benefits of technology

It simplifies the mining accuracy project, improves mining efficiency, reduces surrounding rock disturbance, avoids groundwater pollution, and improves mining safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745895A_ABST
    Figure CN118745895A_ABST
Patent Text Reader

Abstract

The invention discloses a static blasting mining method suitable for thick ore body sylvite ore. The static blasting mining method comprises the following steps of (1) ore deposit development, (2) panel chamber strip division, (3) strip chamber groove broaching, (4) static blasting ore breaking and (5) ore deposit roof plate management. According to the method, accurate mining engineering arrangement is simple, the chamber production capacity is large, and the stoping efficiency is high; production operation in a limited space in underground mining operation is facilitated; and compared with traditional blasting ore breaking, surrounding rock disturbance is smaller, no toxic or harmful gas is generated in the production process, and the ventilation pressure is small.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mineral mining, and in particular to a static blasting mining method suitable for thick ore body potash mines. Background Art

[0002] Potash mines are evaporative salt mines, which are formed by evaporation, concentration and crystallization of brine from closed or semi-closed salt lakes (sea basins). The thickness of the ore bed is generally 4m to 300m, the inclination of the ore body is generally 1 to 5°, and the average thickness is 20m to 100m. Potash mines are soft rock ore bodies, which are easily dissolved in fresh water. The mechanical strength of the surrounding rock of the roof is low, the stability of the roof is poor, the burial depth of the ore bed is relatively shallow, and the ground is prone to deformation after mining. The room-pillar method, the empty field subsequent filling method and the water solution method are generally used in the mining process for potassium salt mines. For the potassium salt ore bodies mined underground, the old brine in the water solution mining is not strictly sealed or the old brine in the underground solution cavity is recharged, which may overflow and discharge along the cracks or "skylights" to the shallow porous aquifer, causing groundwater pollution; the traditional blasting ore dropping method may cause the cracks in some sections to be connected with the upper water-bearing body, and the water-bearing body will be polluted through the circulation of groundwater; the investment in mechanical ore dropping equipment is large, and the layout of the mining and cutting tunnels is complex.

[0003] For most potash deposits, the thickness is generally uneven, and the thickness of the central area of ​​the ore body can exceed 80m. The ore body generally extends. In the boundary area of ​​the ore body, the thickness of the ore body generally varies between 5 and 30m. For this part of the ore body, because it is in the change section of different lithology and rock mass, and the ore grade fluctuates greatly, the stability of the surrounding rock is poor. If large-scale continuous mining machines are used for mechanized mining, segmented mining is required, the layout of the mining project is complex, and the recovery rate is low. If traditional blasting is used for mining, the surrounding rock disturbance is large and the safety is poor. Summary of the invention

[0004] The invention provides a static blasting mining method suitable for thick ore body potash mine, which solves the problems of complex tunnel layout, large surrounding rock disturbance and poor safety in the prior art mining.

[0005] The thick ore body defined in the present invention patent has a thickness ranging from 10m to 40m. Potash ore is generally a sedimentary rock ore, and the thickness is the vertical thickness.

[0006] The scheme of the present invention is:

[0007] A static blasting mining method applicable to thick ore body potash mines comprises the following steps:

[0008] 1) Ore deposit development

[0009] The ore body is divided into different plate areas horizontally upward for ore mining. On the mining section, three types of tunnels are arranged, namely the upper plate vein tunnel, the lower plate vein tunnel, and the lower plate vein main transportation tunnel. The first short horizontal tunnel, the second short horizontal tunnel, the crushing station, and the connecting tunnel are arranged between the lower plate vein tunnel and the lower plate main transportation tunnel. The connecting tunnel also serves as a ventilation tunnel.

[0010] 2) Division of panel area and mining chamber strips

[0011] The panel layout is adopted, and the panel is divided into strip chambers. The width of the strip chambers is designed within the allowable exposure range; the chambers are mined, and the mining is carried out in sequence or in a continuous manner. After the mining of the strip chamber ore body is completed, cementation filling is carried out. When the water seepage of the filling body reaches a certain strength, the next strip chamber is mined;

[0012] 3) Strip ore room grooving

[0013] The ore is dropped by static blasting. Since the ore will expand in volume after collapse, the ore chute is designed according to the expansion coefficient of potash ore. The ore chute is dropped by segmented micro-difference blasting.

[0014] 4) Static blasting and mine falling

[0015] First, a continuous cutter is used to pull the bottom of the static blasting ore in the lower plate of the ore body; after the bottom pulling is completed, a vertical static blasting hole is drilled from the tunnel in the upper plate ore body by drilling equipment; the rock drilling equipment places a hydraulic blasting pipe into the drill hole in the upper plate of the ore body, starts the hydraulic press to collapse the ore through the expansion force, and the collapsed ore is shoveled to the chute by self-propelled equipment;

[0016] 5) Mine roof management

[0017] The ore body is divided into different mining chambers for mining. After the ore in the strip mining chamber is mined, cementation filling is carried out. The filling material is a mixture of tailings salt, magnesium slurry and rubber powder. Since the working space on the top of the mining chamber is a continuous empty area, when the filling slurry solidifies and is flush with the top working base surface and solidifies, in order to maintain the overall stability of the working space, artificial pillars are placed to maintain the overall stability of the roof. After all the ore in the disk area is mined, the top working space is filled for the second time.

[0018] As a preferred technical solution, the lower plate of the ore body is provided with the main transport tunnel outside the lower plate vein, the tunnel along the lower plate vein, the connecting tunnel, the crushing station and the short horizontal tunnel. The main transport tunnel outside the lower plate vein and the tunnel along the lower plate vein are connected to each other through the connecting road (the connecting road is specifically a ramp, through which mechanical equipment enters the mining working face and also serves as a ventilation tunnel). The short horizontal tunnel includes a first short horizontal tunnel and a second short horizontal tunnel. One end of the second short horizontal tunnel is connected to the main transport tunnel outside the lower plate vein, one end of the first short horizontal tunnel is connected to the transport tunnel along the lower plate vein, and the crushing station is provided at the connecting point between the first short horizontal tunnel and the second short horizontal tunnel.

[0019] As a preferred technical solution, an upper plate along-vein transport lane is arranged in the upper plate vein of the ore body, and the upper plate along-vein transport lane is used as the bottom pulling space, and the ore body is cut longitudinally by a cutting machine as the working space for static blasting in the upper plate. The ore collapsed by static blasting is transported to the crushing chamber by a shovel loader through a short horizontal lane, and the crushed ore is transported to the outside of the well through the main transport lane outside the vein through the crushing chamber by self-transporting equipment.

[0020] As an optimal technical solution, mine ventilation is that fresh air flows from the main transport tunnel outside the lower plate vein through the connecting tunnel and the lower plate along the vein transport tunnel into the production operation space. After the fresh air flows clean the working face, it enters the upper plate dedicated return air duct along the static blasting cutting groove space.

[0021] As a preferred technical solution, after the strip mine rooms are divided in the above 2), the width of the strip mine rooms for tunnel excavation in the mining area is calculated and determined based on the maximum allowable exposure area. Pillars are reserved between two adjacent mine rooms to temporarily maintain the stability of the roof, and mining operations can be carried out simultaneously between multiple mine rooms.

[0022] As a preferred technical solution, the mining method in 2) adopts a panel layout. According to the distribution area of ​​the ore body, the panel is first divided on the plane. The panel length is between 100 and 150 meters, and the panel width is controlled at 40 to 100 meters. 10 to 15 meters of interval pillars are reserved between the panel areas. After the ore mining and filling on both sides of the panel are completed, the panel interval pillars are mined; after the panel is divided, the mine room is arranged, the length of the mine room is the length of the panel, and the width of the mine room is 6 to 8 meters, which is calculated and set according to the maximum allowable span of the roof.

[0023] As a preferred technical solution, in 2), a concrete hardened waterproof layer is laid at the bottom of the mine room, the concrete thickness is 4 cm, and a seepage pipe is laid in the middle of the mine room floor. The seepage pipe has a main pipe and a branch pipe, and small seepage holes are designed on the pipe surface as a seepage channel.

[0024] As a preferred technical solution, the ore expansion coefficient in 3) is determined by an on-site static blasting test. The on-site static blasting test method is: select a certain size of an overall area of ​​non-collapsed ore body, whose volume is V0, and statically blast the collapsed ore. According to the stacking form of the ore body, the distance from the stacking vertex to the free rolling edge is measured, and the volume of the collapsed ore is calculated by establishing a coordinate system using the calculus method, which is recorded as V1. The expansion coefficient is V1 / V O %.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] (1) For thick potash ore bodies, static blasting is used to mine the entire thick ore body at one time. The mining project layout is simple, the mine room production capacity is large, and the recovery efficiency is high.

[0027] (2) The ore is dropped by hydraulic blasting. Compared with mechanical cutting, the cutting height is not restricted, the ore dropping efficiency is higher, and no complex ore cutting equipment is required during the construction process, which simplifies on-site management.

[0028] (3) Compared with traditional blasting, the surrounding rock disturbance is smaller, no toxic or harmful gases are generated during the production process, and the ventilation pressure is low. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 This is an overall cross-sectional view of the mining method according to Example 1 of the present invention;

[0030] Figure 2 This is an overall top view of the mining method of Example 1 of the present invention;

[0031] Figure 3 This is a mine chute layout diagram of Example 1 of the present invention;

[0032] Figure 4 This is a structural diagram of an artificial pillar mold according to Example 1 of the present invention;

[0033] Figure 5 This is a schematic diagram of hydraulic fracturing principle in Example 1 of the present invention;

[0034] Figure 6 This is a broken tunnel connection diagram of Example 1 of the present invention;

[0035] 1-upper plate vein tunnel, 2-lower plate main transport tunnel outside the vein; 3-lower plate vein transport tunnel; 4-short horizontal tunnel; 5-connecting tunnel; 6-cutting groove space; 7-collapsed loose ore; 8-artificial pillar; 9-isolation pillar; 10-static blasting hole; 11-groove space; 12-scraper; 13-filling body; 14-mine self-propelled equipment; 15-hydraulic pipe; 16-crushing station; 17-fixed column; 18-outer mold; 19-inner filter; 20-bolt fixing hole; 21-carnallite ore body; 22-wedge; 23-wedge block; 24-second short horizontal tunnel; 25-first short horizontal tunnel. DETAILED DESCRIPTION

[0036] In order to make up for the above shortcomings, the present invention provides a static blasting mining method suitable for thick ore body potash mine to solve the problems in the above background technology.

[0037] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific embodiments.

[0038] Example 1

[0039] A static blasting mining method applicable to thick ore body potash mines comprises the following steps:

[0040] 1) Ore deposit development

[0041] The ore body is divided into different plate areas horizontally upward for ore mining. On the mining section, three types of tunnels are arranged, namely the upper plate vein tunnel, the lower plate vein tunnel, and the lower plate vein main transportation tunnel. The first short horizontal tunnel, the second short horizontal tunnel, the crushing station, and the connecting tunnel are arranged between the lower plate vein tunnel and the lower plate main transportation tunnel. The connecting tunnel also serves as a ventilation tunnel.

[0042] The lower wall of the ore body is provided with the lower wall vein outer main transport tunnel 2, the lower wall vein transport tunnel 3, the connecting tunnel 5, the crushing station 16 and the short horizontal tunnel. The lower wall vein outer main transport tunnel 2 and the lower wall vein transport tunnel 3 are connected to each other through the connecting tunnel 5. The short horizontal tunnel includes the first short horizontal tunnel 25 and the second short horizontal tunnel 24. One end of the second short horizontal tunnel 24 is connected to the lower wall vein outer main transport tunnel 2. One end of the first short horizontal tunnel 25 is connected to the lower wall vein transport tunnel 3. The crushing station 16 is provided at the connection between the first short horizontal tunnel 25 and the second short horizontal tunnel 24. The upper wall vein tunnel 1 is arranged in the upper wall vein of the ore body. The upper wall vein tunnel 1 is used as the bottom pulling space. The ore body is cut longitudinally by a cutting machine as the working space for static blasting of the upper wall. Mine ventilation is that fresh air flows from the main transport tunnel 2 outside the lower plate vein through the connecting tunnel 5 and the lower plate vein transport tunnel 3 into the production operation space. After the fresh air washes the working face, it enters the upper plate special return air duct along the cutting groove space 6 of static blasting.

[0043] 2) Division of panel area and chamber strips

[0044] A plate-type layout is adopted, and the plate is divided into strip mine rooms. The width of the strip mine rooms is designed to be within the allowable exposure range. Mining is carried out in the mine rooms in sequence or simultaneously and continuously. After the strip mine room ore body mining is completed, cementation filling is carried out. After the filling body seepage reaches a certain intensity, the next strip mine room is mined. After the strip mine rooms are divided, tunneling is carried out in the mining area. The width of the strip mine rooms is calculated and determined based on the maximum allowable exposure area. Pillars are reserved between two adjacent mine rooms for temporary maintenance of roof stability. Mining operations can be carried out simultaneously between multiple mine rooms.

[0045] The mining method adopts a panel layout. According to the distribution area of ​​the ore body, the panel is first divided on the plane. The panel length is between 100 and 150m, and the panel width is controlled at 40 to 100m. A 10 to 15m interval pillar is reserved between the panel areas. After the ore mining and filling on both sides of the panel are completed, the panel interval pillars are mined; after the panel is divided, the mine room is arranged. The length of the mine room is the length of the panel, and the width of the mine room is 6 to 8m. The specific calculation and design is based on the maximum allowable span of the roof. A concrete hardened waterproof layer is laid at the bottom of the mine room with a concrete thickness of 4cm, and a seepage pipe is laid in the middle of the mine room floor. The seepage pipe has a main pipe and a branch pipe, and the pipe surface is designed with seepage holes as a seepage channel.

[0046] 3) Strip ore room grooving

[0047] The ore is dropped by static blasting. Since the ore will expand in volume after collapse, the ore pulling chute is designed according to the expansion coefficient of potash ore. The ore pulling chute is dropped by segmented micro-difference blasting. The expansion coefficient of ore is determined by on-site static blasting test. The on-site static blasting test method is as follows: select a certain size of the overall area of ​​the uncollapsed ore body, whose volume is V0, collapse the ore by static blasting, measure the distance from the stacking vertex to the free rolling edge according to the stacking form of the ore body, and calculate the volume of the collapsed ore by establishing a coordinate system and using the calculus method, which is recorded as V1. The expansion coefficient is V1 / V O %.

[0048] 4) Static blasting and mine falling

[0049] First, a continuous cutter is used to pull the bottom of the static blasting ore in the lower plate of the ore body; after the bottom pulling is completed, a vertical static blasting hole 10 is drilled from the tunnel in the upper plate ore body by drilling equipment; a self-propelled device is placed in the drill hole in the upper plate of the ore body, and the hydraulic blasting device is started to collapse the ore through the expansion force, and the collapsed ore is transported to the crushing station 16 through the first short horizontal lane 25 by a scraper for ore crushing;

[0050] 5) Mine roof management

[0051] The ore body is divided into different mining chambers for mining. After the ore in the strip mining chamber is mined, cementation filling is carried out. The filling material is a mixture of tailings salt, magnesium slurry and rubber powder. Since the working space on the top of the mining chamber is a continuous empty area, when the filling slurry solidifies and is flush with the top working base surface and solidifies, in order to maintain the overall stability of the working space, artificial pillars are placed to maintain the overall stability of the roof. After all the ore in the disk area is mined, the top working space is filled for the second time.

[0052] Taking a potash mine in Laos as an example, the ore layer is a potassium-magnesium salt ore rock with an extremely soluble overall structure, thick-block carnallite rock, carnallite potassium salt rock, hydrochlorite salt rock, and overflowing crystal carnallite rock. The top plate is buried at a depth of 189.15 to 528.30m, with an average of 397.72m, and is a buried type. The thickness is 4.28 to 237.88m, with an average of 87.19m. The occurrence is gentle, the rock mass is dense and complete, and it is extremely soluble. The compressive strength is 7.30 to 9.50Mpa. It belongs to an extremely weak rock group with poor stability; the direct top plate is a thick and blocky halite rock that is easily soluble. The rock is dense, complete, soluble, and fragile. The compressive strength is between 12.6 and 31MPa, with an average of 23.57MPa, and the compressive strength is relatively high. It is a weak rock group with poor stability. The direct basement is a thick and easily soluble blocky rock salt rock with a large thickness. The average thickness of the drilling exposure is 38.76m, and its sedimentary thickness is greater than 258.72m. Its rock structure is complete, does not contain water, has a slightly higher rock mechanical strength, and has good stability.

[0053] The design considerations of the mining method are as follows: 1) The ore layer is soluble in fresh water; 2) Fresh water is not allowed to enter the ore bed, and the stratum stability should be guaranteed; 3) The roof is not allowed to fall, and the mining area should be stable; 4) The degree of mechanization is high, and the equipment is large and efficient.

[0054] Potash ore brittleness analysis: The main ore type of potash ore layer is carnallite. Through indoor test analysis, the average uniaxial compressive strength of the ore layer is 8.92MPa, and the tensile strength is 0.99MPa. According to the calculation of rock brittleness coefficient and brittleness B=σ C / σ t , which is the ratio of compressive strength to tensile strength. After calculation, the brittleness coefficient is 9.01, and it is feasible to use static blasting to remove the mine.

[0055] Analysis of the principle of hydraulic blasting: Carnallite in potash mines is highly brittle, and hydraulic splitting blasting utilizes this feature. Through the principle of wedge force amplification of the splitter, high-pressure hydraulic oil is used as an energy source to supply the pressure oil to the splitting gun. After the splitting gun generates a thrust of dozens of tons, the wedge block 23 in the sharp splitter at the end of the splitting gun pushes the wedge 22 to expand to both sides, thereby splitting the huge carnallite ore body from the inside.

[0056] Hydraulic blasting construction process: 1. Blasting area measurement: determine the blasting area of ​​the mine room, including the length, width and height, and use measuring tools to measure and lay out the splitting point. First, measure the distance between the splitting point and the free surface to ensure the accuracy of the splitting point. Then, use a level to check the level of the splitting point to ensure the level of the splitting line. According to the measurement results, mark the splitting line on the surface of the potash ore body. You can use a marking tool to mark it and ensure that the mark is clearly visible. The marking tool is chalk or paint;

[0057] 2. Drilling: Observe the rock structure when drilling, and choose the free surface or rock layer position for drilling, with a hole distance of 40 to 60 cm. To ensure the efficiency of drilling, according to the characteristics of the force, the drilling should be perpendicular to the rock surface where the hole is located. It is strictly forbidden to drill oblique holes and shallow holes, and do not drill holes in locations with poor force. Drilling rigs are used for on-site construction drilling.

[0058] 3. Hydraulic splitting construction of splitting machine: insert the splitting gun wedge 23 group of the splitting machine into the drilled hole according to the predetermined splitting direction, and use the hydraulic system on the self-propelled equipment to drive the control valve to the reverse gear, so that the middle wedge 23 extends forward, and the carnallite ore body is cracked within a few seconds. When the middle wedge reaches the end, turn the control valve to the reverse gear and take out the splitting gun.

[0059] Hydraulic blasting device: A hydraulic blasting device suitable for continuous mining, including a hydraulic blasting splitting gun, a mining self-propelled equipment 14, specifically diesel-driven, the self-propelled equipment is equipped with a hydraulic system matching the hydraulic blasting, and during the actual operation, the diesel engine provides power to the hydraulic system through a plunger pump, and the hydraulic system performs hydraulic transmission through a hydraulic oil pipeline. In the actual production process of the mine, for the divided mine rooms, firstly, vertical holes are drilled on the strip mine rooms, and the diameter of the vertical holes is about 40 to 50 mm, and the embodiment is 45 mm; the primary hole depth is controlled at 15 to 18 m, and the embodiment is 17 m; the spacing of the hydraulic static blasting holes is controlled at 40 cm to 60 cm, and can be adjusted according to the blasting effect during the on-site construction process.

[0060] A windable hydraulic blasting and splitting gun, which consists of multiple sections. A single-section hydraulic blasting gun has a set of hydraulic rods, and the sections are connected by flexible hydraulic pipes. The hydraulic pressure is hydraulically transported through the pipes. In the actual production process, the hydraulic output relies on self-propelled equipment, and the hydraulic system equipped on the self-propelled equipment is connected to multiple sets of hydraulic blasting devices. The hydraulic blasting pipe is fixed on the self-propelled equipment by winding, and each self-propelled equipment has four rolls of hydraulic blasting pipe.

[0061] The length of a single-section hydraulic blasting pipe is between 1.5m and 2m. A single hydraulic blasting pipe has multiple hydraulic columns. When the hydraulic self-propelled equipment is started, the hydraulic oil drives the hydraulic columns to work outward under pressure. Under the action of stress, cracks appear in the ore body between the two columns, causing the ore body to collapse and fall. Compared with traditional blasting mining, static blasting has less disturbance to the surrounding rock and no toxic and harmful gases are produced during the production process; compared with mechanical continuous cutting, the static blasting method has higher mining efficiency. Mechanical cutting is affected by the operating radius of the self-propelled equipment, the mining height is limited, and different layers need to be designed in the actual production process, and its efficiency is low; at the same time, potash ore is highly corrosive to mechanical equipment, and the use of continuous cutting machines to cut the ore will cause greater damage to the equipment.

[0062] Before ore mining, the ore block unit is designed. First, the upper plate construction working space is excavated on the top of the mine room. The mining working space is specifically a rectangular tunnel with a height controlled at 3.5 to 5 meters. After the mining working tunnel is excavated, a continuous cutting machine will be used to construct the mining working space to reserve working space for static blasting.

[0063] The ore body is divided into strips for mining. Due to the limited exposed area of ​​the roof, different mining rooms are divided during the mining process for ore mining. Ore transportation tunnels are designed on both sides of the bottom of the mining room. Isolation pillars are designed between the mining rooms as filling retaining walls on both sides of the mining room. When the filling body 13 in the mining room exudes water and solidifies to reach the designed strength, the isolation pillars are mined. Static blasting requires ore stacking space and ore cutting grooves. The volume will expand after the ore collapses. Its width is designed according to the rock crushing coefficient of static blasting. For the grooving of the blasting space, the cutting groove is constructed by segmented blasting. First, the ore body is grooved at the bottom of the mining room by self-propelled equipment, and then blast holes are drilled from top to bottom. The blast holes are loaded with emulsion explosives, and the blasting order is from bottom to top.

[0064] Continuous ore dropping operations are carried out in the upper plate of the ore body by means of static blasting. In the upper plate of the ore body, due to the continuous advancement of mining, the exposed area of ​​the roof is getting larger and larger. The roof problem will become more and more serious as the mining progresses. To address this ground pressure problem, artificial mine pillars 8 are used above the ore body strip to control the roof ground pressure. The specific operations are as follows.

[0065] Filling slurry ratio and parameters: According to the requirements of filling mining, the filling body strength is 0.2MPa~2MPa. The filling material has a magnesium oxide content of 97%, tailing salt: magnesium slurry = 1.1:1, rubber powder: magnesium slurry liquid phase = 1:6~1:18,

[0066] The maximum compressive strength of the filling specimen at 3d is between 0.28MPa and 2.30MPa.

[0067] Tailing salt, magnesium slurry and rubber powder are mixed and cemented in a ratio of 1:1.1:6-1:1.1:8 to form a high-strength artificial pillar 8. After the strip is filled, the strip filling body is 2 to 3.5 meters away from the top plate. By placing an artificial pillar mold with a diameter of 3 meters, the artificial pillar mold is a double-layer structure. The inner filter 19 is mainly used for water filtration, and the outer mold 18 is mainly used for supporting and fixing. The single-piece artificial pillar mold is a semicircular structure. The inner side of the two semicircular structures is fixed by a fixed column 17, and the outer side is fixed by bolts. When used, it is spliced ​​into a circular barrel. The diameter of the artificial pillar mold is 3 meters. In the on-site production operation, the artificial pillar mold is first placed on the original filling body, and then the filling slurry is poured into the artificial pillar mold through a pipeline (the old brine is evaporated into magnesium slurry, mixed with tailing salt and cementitious materials to make a high-concentration filling slurry, and transported to the mold). In order to enable the filling body to better connect to the top, an expansion cementitious material is placed at the top. After the artificial pillar 8 is cemented and filled and reaches the expected strength, the artificial pillar mold is removed and the subsequent mining operations are continued.

[0068] For ore bodies collapsed by static blasting, they are transported to the crushing station via short horizontal tunnels by shovel loaders. The crushed ore is transported to the outside of the mine by other mining transportation equipment via short horizontal tunnels and main transportation tunnels outside the vein.

[0069] During mining operations, in order to maintain construction and personnel safety, temporary protection of the roof can be achieved by using anchor net support. The anchor rods are perpendicular to the roof and resin anchor rods are used. The anchor net uses diamond mesh and the anchor rod pre-tightening torque is not less than 150N.m.

[0070] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A static blasting mining method suitable for thick ore bodies of potash mines. Features , including the following steps: 1) Ore deposit development The ore body is divided into different plate areas horizontally upward for ore mining. On the mining section, three types of tunnels are arranged, namely the upper plate vein tunnel, the lower plate vein tunnel, and the lower plate vein main transportation tunnel. The first short horizontal tunnel, the second short horizontal tunnel, the crushing station, and the connecting tunnel are arranged between the lower plate vein tunnel and the lower plate main transportation tunnel. The connecting tunnel also serves as a ventilation tunnel. 2) Division of panel area and mining chamber strips The panel layout is adopted, and the panel is divided into strip chambers. The width of the strip chambers is designed to be within the allowable exposure range. The chambers are mined in sequence or continuously at the same time. After the strip chamber ore body is mined, cementation filling is carried out. When the filling body seepage reaches a certain strength, the next strip chamber is mined. 3) Strip ore room grooving The ore is dropped by static blasting. Since the ore will expand in volume after collapse, the ore chute is designed according to the expansion coefficient of potash ore. The ore chute is dropped by segmented micro-difference blasting. 4) Static blasting and mine falling First, a continuous cutter is used to pull the bottom of the static blasting ore in the lower plate of the ore body; after the bottom pulling is completed, a vertical static blasting hole is drilled from the tunnel in the upper plate ore body by drilling equipment; the self-propelled equipment places a hydraulic blasting device in the drill hole in the upper plate of the ore body, and starts the hydraulic blasting device to collapse the ore through the expansion force. The collapsed ore is transported to the crushing station through the first short horizontal lane by a scraper for ore crushing; 5) Mine roof management The ore body is divided into different mining chambers for mining. After the ore in the strip mining chamber is mined, cementation filling is carried out. The filling material is a mixture of tailings salt, magnesium slurry and rubber powder. Since the working space on the top of the mining chamber is a continuous empty area, when the filling slurry solidifies and is flush with the top working base surface and solidifies, in order to maintain the overall stability of the working space, artificial pillars are placed to maintain the overall stability of the roof. After all the ore in the disk area is mined, the top working space is filled for the second time.

2. A static blasting mining method suitable for thick ore body potash mines as claimed in claim 1, Features: The lower plate of the ore body is provided with the main transport tunnel outside the lower plate vein, the tunnel along the lower plate vein, the connecting tunnel, the crushing station and the short horizontal tunnel. The main transport tunnel outside the lower plate vein and the tunnel along the lower plate vein are connected to each other through the connecting tunnel. The short horizontal tunnel includes a first short horizontal tunnel and a second short horizontal tunnel. One end of the second short horizontal tunnel is connected with the main transport tunnel outside the lower plate vein, one end of the first short horizontal tunnel is connected with the transport tunnel along the lower plate vein, and the crushing station is provided at the connecting point between the first short horizontal tunnel and the second short horizontal tunnel.

3. A static blasting mining method suitable for thick ore body potash mines as claimed in claim 1, Features: An upper plate along-vein transport laneway is arranged in the upper plate vein of the ore body, and the upper plate along-vein transport laneway is used as the bottom pulling space. The ore body is cut longitudinally by a cutting machine to serve as the working space for the upper plate static blasting.

4. A static blasting mining method suitable for thick ore body potash mines as claimed in claim 1, Features: Mine ventilation is that fresh air flows from the main transport tunnel outside the lower plate vein through the connecting tunnel and the lower plate along the vein transport tunnel into the production operation space. After the fresh air washes the working face, it enters the upper plate special return air duct along the static blasting cutting groove space.

5. A static blasting mining method suitable for thick ore body potash mines as claimed in claim 1, Features: In the above 2), after the strip mine rooms are divided, the mining area tunnel is excavated. The width of the strip mine room is determined according to the maximum allowable exposure area. Pillars are reserved between two adjacent mine rooms for temporarily maintaining the stability of the roof. Mining operations can be carried out simultaneously between multiple mine rooms.

6. A static blasting mining method suitable for thick ore body potash mines as claimed in claim 5, Features: The mining method in 2) adopts a panel layout. According to the distribution area of ​​the ore body, the panel is first divided on the plane. The length of the panel is between 100 and 150 meters, and the width of the panel is controlled at 40 to 100 meters. A 10 to 15 meter interval pillar is reserved between the panel areas. After the ore mining and filling on both sides of the panel are completed, the panel interval pillars are mined; after the panel is divided, the mine room is arranged. The length of the mine room is the length of the panel, and the width of the mine room is 6 to 8 meters. The specific calculation and design is based on the maximum allowable span of the roof.