Multi-channel testboard

By designing a multi-channel test bench and using multi-stage valves, thermometers, flow valves and pressure gauges, efficient testing of water-cooled servers is achieved, which solves the problems of long test time and incomplete functions in the existing technology, and improves test efficiency and stability. sex.

CN118746449AActive Publication Date: 2024-10-08HUIZHOU SNOWMAN COOLING EQUIP CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410838578.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-10-08
Estimated Expiration
2044-06-26

AI Technical Summary

Technical Problem

The existing technology lacks a dedicated multi-channel test platform, resulting in the need to test water-cooled servers one by one, which takes a long time and has incomplete functions.

Method used

A multi-channel test bench is designed, including multi-stage valves, thermometers, flow valves and pressure gauges, which can adjust and record the flow, pressure and temperature of each channel, and realize different test functions through different valve controls. Supports testing multiple water-cooled servers at the same time.

Benefits of technology

It improves the efficiency and stability of the test, enhances the applicability and reliability of the test bench, can test multiple water-cooled servers at the same time, reduces test errors, and improves the reliability of data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118746449A_ABST
    Figure CN118746449A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of water-cooling type server testing, and discloses a multi-channel test board which comprises a test board body, a panel is fixedly connected to the front end of the upper portion of the test board body, a plurality of installation frames are fixedly connected to the rear end of the panel, and external ball valves are fixedly connected to the front ends of the upper portions and the lower portions of the installation frames. An input port and an output port are fixedly connected to the middle of the mounting frame, U-shaped pipes are connected between the external ball valves and the input port and between the external ball valves and the output port through pipes, a connecting pipe is connected to the rear end of the external ball valve on the lower side through a pipe, and three-way connecting pieces are connected to the rear end of the external ball valve on the upper side and the other end of the connecting pipe through pipes. The outer side surface of the three-way connecting piece is in pipe connection with a thermometer, the third end of the three-way connecting piece is in pipe connection with a three-way sensing valve, the bottom end of the three-way sensing valve on the lower side is in pipe connection with a flow valve and a filter in sequence, and the top end of the three-way sensing valve on the upper side and the bottom end of the filter are fixedly connected with stainless steel ball valves; according to the invention, the problems that the existing test bench needs to test one by one and the test function is incomplete are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of water-cooled server testing, and in particular relates to a multi-channel testing platform. Background Art

[0002] Many water-cooled servers need to be tested one by one before leaving the factory, but there is currently no multi-channel test platform designed specifically for testing water-cooled servers. Testing each server one by one is too time-consuming. Therefore, the present invention is specially designed for testing multiple water-cooled servers at one time. The flow rate and pressure can be adjusted for each channel. The inlet and outlet water temperature, pressure, and flow rate values ​​of each channel are automatically recorded and saved, and different functions can be achieved by changing the control of the valve. Summary of the invention

[0003] The present invention aims to solve the problems of the prior art that each device needs to be tested and the functions are incomplete, and proposes the following technical solutions:

[0004] A multi-channel test bench comprises a test bench, wherein the upper front end of the test bench is fixedly connected with a panel, the rear end of the panel is fixedly connected with a plurality of mounting frames, the upper and lower front ends of the mounting frames are fixedly connected with external ball valves, the middle of the mounting frames are respectively fixedly connected with an input port and an output port, U-shaped pipes are connected between the external ball valve and the input port and between the external ball valve and the output port, the rear end of the lower external ball valve is connected with a connecting pipe, the rear end of the upper external ball valve and the other end of the connecting pipe are connected with a three-way connector, the outer surface of the three-way connector is connected with a thermometer, the third end of the three-way connector is connected with a three-way sensing valve, the bottom end of the lower three-way sensing valve is connected with a flow valve, the bottom end of the flow valve is connected with a filter, and the top end of the upper three-way sensing valve and the bottom end of the filter are fixedly connected with a stainless steel ball valve.

[0005] As a preferred embodiment of the above technical solution, the lower stainless steel ball valve pipe is connected to a water inlet pipe, the upper stainless steel ball valve pipe is connected to a water outlet pipe, the third end of the three-way sensing valve is connected to a signal sensing valve, the other end of the signal sensing valve is connected to a connecting air pipe, the other end of the lower connecting air pipe is connected to an air inlet pipe, and the other end of the upper connecting air pipe is connected to an air outlet pipe.

[0006] As a preferred embodiment of the above technical solution, a pressure gauge is fixedly connected to the middle of the panel, a display screen is fixedly connected to the middle of the panel, a ventilation pipe is connected to the middle upper end of the air inlet pipe, and the other end of the ventilation pipe is connected to the rear end of the pressure gauge.

[0007] As a preferred embodiment of the above technical solution, the left side of the test bench is fixedly connected to a connecting box, the inner side of the connecting box is fixedly connected to a fixing frame, the upper inner side of the fixing frame is fixedly connected to a heat exchanger, the upper left end of the heat exchanger is provided with a transfer pipe and a cooling tower return water outlet in sequence from front to back, the upper right end of the heat exchanger is connected to the left end of the outlet pipe, the upper right end of the heat exchanger is provided with a cooling tower water supply port that passes through the top of the connecting box, and the outer surface of the cooling tower water supply port is fixedly connected to an electric three-way valve.

[0008] As a preferred embodiment of the above technical solution, the left end of the connecting box is fixedly connected to the insulation box, the middle part of the upper front end of the insulation box is pipe-connected with a temperature transmitter and a liquid level transmitter from left to right in sequence, the front end of the insulation box is fixedly connected to a water tank level gauge, the middle part of the top end of the insulation box is fixedly connected to a top cover, and a water filling port is provided on the front left side of the top end of the insulation box.

[0009] As a preferred embodiment of the above technical solution, the left end of the air inlet pipe is connected to a connecting pipe, the other end of the connecting pipe is connected to an air guide pipe, the upper end of the air guide pipe is fixedly connected to several pressure reducing valves, the other end of the pressure reducing valve is fixedly connected to an air inlet, and the air inlet is connected to an external air compressor.

[0010] As a preferred embodiment of the above technical solution, a circulation pump is fixedly connected to the upper bottom end of the connecting box, the rear end of the circulation pump is connected to the left end of the water inlet pipe, and the other end of the circulation pump is connected to the inner surface of the insulation box.

[0011] As a preferred embodiment of the above technical solution, a refrigeration pump is fixedly connected to the upper bottom end of the connecting box, the left end of the refrigeration pump is connected to the inner pipe of the insulation box, and the upper end of the refrigeration pump passes through the top pipe of the connecting box and is connected to the water supply port of the chiller.

[0012] As a preferred embodiment of the above technical solution, a control electrical box is provided at the upper end of the bottom of the test bench, the bottoms of the test bench, the connecting box and the insulation box are fixedly connected with casters, the inner right arm of the insulation box is fixedly connected with an electric heating rod, the inner side of the insulation box is fixedly connected with a number of reinforcing ribs and triangular plates, and a chiller return port is provided in the middle right part of the top of the insulation box.

[0013] As a preferred embodiment of the above technical solution, the output ends of the chiller water supply port and the chiller water return port are connected to an external air-cooled chiller, the output ends of the cooling tower water return port and the cooling tower water supply port are connected to an external cooling tower, and the output ends of the input port and the output port are connected to a water-cooled server.

[0014] The beneficial effects of the present invention are:

[0015] At the same time, there are multi-level valves, which can change the overall air and liquid inlet direction by controlling the opening or closing of different valves, so as to achieve different functions, and then perform different tests and cleaning on the water-cooled server, improving the applicability and stability of the test bench;

[0016] By setting up multiple groups of input ports and output ports, multiple water-cooled servers can be tested at the same time, and the data of each channel can be recorded and read separately through the thermometer, flow valve and pressure gauge, thereby improving the working efficiency and test stability of the device. At the same time, large errors can be avoided through rotation testing, thereby improving the reliability of test data. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 Shown is a perspective view of a multi-channel test bench;

[0018] Figure 2 Shown is a front view of a multi-channel test bench;

[0019] Figure 3 Shown is a schematic diagram of some parts in a multi-channel test bench;

[0020] Figure 4 Shown is a schematic diagram of some parts in a multi-channel test bench from another perspective;

[0021] Figure 5 Shown is a schematic diagram of the internal parts of a multi-channel test bench;

[0022] Figure 6 Shown is a schematic diagram of local parts in a multi-channel test bench.

[0023] In the figure: 1. Test bench; 2. Panel; 3. Mounting frame; 4. External ball valve; 5. Input port; 6. Output port; 7. U-shaped pipe; 8. Connecting pipe; 9. Three-way connector; 10. Thermometer; 11. Three-way induction valve; 12. Flow valve; 13. Filter; 14. Stainless steel ball valve; 15. Water inlet pipe; 16. Water outlet pipe; 17. Signal induction valve; 18. Connecting air pipe; 19. Inlet pipe; 20. Outlet pipe; 21. Pressure gauge; 22. Display screen; 23. Ventilation pipe; 24. Connecting box; 25. Fixing frame; 26. Change Heater; 27. Transfer pipe; 28. Cooling tower return port; 29. ​​Cooling tower water supply port; 30. Electric three-way valve; 31. Insulation box; 32. Temperature transmitter; 33. Liquid level transmitter; 34. Water tank level gauge; 35. Top cover; 36. Water supply port; 37. Connecting pipe; 38. Air duct; 39. Pressure reducing valve; 40. Air inlet; 41. Circulation pump; 42. Refrigeration pump; 43. Chiller water supply port; 44. Control electrical box; 45. Casters; 46. Electric heating rod; 47. Reinforcement ribs; 48. Triangle plate; 49. Chiller return port. DETAILED DESCRIPTION

[0024] In order to make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments.

[0025] Example 1

[0026] The present invention provides a multi-channel test bench, such as Figure 1-6 As shown, it includes a test bench 1, a panel 2 is fixedly connected to the upper front end of the test bench 1, a plurality of mounting frames 3 are fixedly connected to the rear end of the panel 2, an external ball valve 4 is fixedly connected to the upper and lower front ends of the mounting frame 3, an input port 5 and an output port 6 are respectively fixedly connected to the middle of the mounting frame 3, a U-shaped tube 7 is pipe-connected between the external ball valve 4 and the input port 5 and between the external ball valve 4 and the output port 6, so as to facilitate the opening and closing of the external control test, a connecting pipe 8 is pipe-connected to the rear end of the lower external ball valve 4, a three-way connector 9 is pipe-connected to the rear end of the upper external ball valve 4 and the other end of the connecting pipe 8, a thermometer 10 is pipe-connected to the outer surface of the three-way connector 9, and the temperature and pressure of the inflow and outflow liquid can be detected and recorded, a three-way induction valve 11 is pipe-connected to the third end of the three-way induction valve 9, a flow valve 12 is pipe-connected to the bottom end of the lower three-way induction valve 11, and the size of the inflow and outflow flow can be controlled, and a filter 13 is pipe-connected to the bottom end of the flow valve 12, The liquid sent into the water-cooled server can be filtered. The top of the upper three-way sensing valve 11 and the bottom of the filter 13 are fixedly connected with a stainless steel ball valve 14. The lower stainless steel ball valve 14 is connected with a water inlet pipe 15. The upper stainless steel ball valve 14 is connected with a water outlet pipe 16. The third end of the three-way sensing valve 11 is connected with a signal sensing valve 17. The other end of the signal sensing valve 17 is connected with a connecting air pipe 18. The signal sensing valve 17 can control whether the connecting air pipe 18 is connected to the three-way sensing valve 11. The upper three-way sensing valve 11 can control whether the three-way connector 9, the signal sensing valve 17 and the stainless steel ball valve 14 are connected. The lower three-way sensing valve 11 can control whether the three-way connector 9, the signal sensing valve 17 and the flow valve 12 are connected. The other end of the lower connecting air pipe 18 is connected with an air inlet pipe 19, and the other end of the upper connecting air pipe 18 is connected with an air outlet pipe 20, which is convenient for controlling and stabilizing the overall water inlet and outlet.

[0027] like Figure 1-6As shown, a pressure gauge 21 is fixedly connected to the middle of the panel 2, and a display screen 22 is fixedly connected to the middle of the panel 2. The display screen 22 is connected to all the electric control valves on the equipment. There is no need to manually adjust the valves, and only different modes need to be selected on the screen. A ventilation pipe 23 is connected to the upper end of the middle of the air inlet pipe 19, and the other end of the ventilation pipe 23 is connected to the rear end of the pressure gauge 21. The high-pressure gas entering the cooling server can be pressure tested, which is convenient for personnel to observe, thereby ensuring that there will be no incorrect pressure. The left side of the test bench 1 is fixedly connected to a connecting box 24, which connects the box A fixing frame 25 is fixedly connected to the inner side of 24, a heat exchanger 26 is fixedly connected to the inner side of the upper part of the fixing frame 25, a transfer pipe 27 and a cooling tower return water port 28 are arranged on the upper left end of the heat exchanger 26 in sequence from front to back, the upper right end of the heat exchanger 26 is connected to the left end of the water outlet pipe 16, a cooling tower water supply port 29 is arranged on the upper right end of the heat exchanger 26, and the cooling tower water supply port 29 is connected to the top of the box body 24. An electric three-way valve 30 is fixedly connected to the outer surface of the cooling tower water supply port 29. By connecting to an external cooling tower, the heat exchanger 26 can cool the hot water that has completed the heat exchange for the cooling server.

[0028] like Figure 1-6 As shown, the left end of the connecting box 24 is fixedly connected to the insulation box 31, and the middle part of the upper front side of the insulation box 31 is connected with a temperature transmitter 32 and a liquid level transmitter 33 in sequence from left to right. The temperature transmitter 32 is a device that can convert physical measurement signals or ordinary electrical signals into standard electrical signal outputs or can output them in the form of communication protocols, and is used to measure and control the temperature parameters in the insulation box 31. The liquid level transmitter 33 can accurately measure and control the volume, liquid height and weight of the water in the insulation box 31. The front end of the insulation box 31 is fixedly connected to a water tank level gauge 34, which can display the liquid level in the insulation box 31 for the convenience of observation by the staff. The top middle part of the insulation box 31 is fixedly connected to There is a top cover 35, and a water replenishment port 36 is set on the front left side of the top of the insulation box 31, which is convenient for replenishing water in the insulation box 31. The left end of the air inlet pipe 19 is connected to a connecting pipe 37, and the other end of the connecting pipe 37 is connected to an air guide pipe 38. The upper end of the air guide pipe 38 is fixedly connected to a plurality of pressure reducing valves 39, and each pressure reducing valve 39 represents a different air pressure, which is convenient for different detections of the cooling server. The other end of the pressure reducing valve 39 is fixedly connected to an air inlet 40, and the air inlet 40 is connected to an external air compressor. A circulating pump 41 is fixedly connected to the upper end of the bottom of the connecting box 24, and the rear end of the circulating pump 41 is connected to the left end of the water inlet pipe 15, and the other end of the circulating pump 41 is connected to the inner surface of the insulation box 31, which is convenient for stable detection of the cooling server.

[0029] like Figure 1-6As shown, a freezing pump 42 is fixedly connected to the upper end of the bottom of the connecting box 24, and the left end of the freezing pump 42 is connected to the inner pipe of the insulation box 31. The upper end of the freezing pump 42 passes through the top pipe of the connecting box 24 and is connected to the water supply port 43 of the chiller, which can reduce the internal temperature of the insulation box 31. A control electric box 44 is provided at the upper end of the bottom of the test bench 1 for installing the required electric control components. The bottoms of the test bench 1, the connecting box 24 and the insulation box 31 are all fixedly connected with casters 45 for easy overall transportation and movement. The inner right arm of the insulation box 31 is fixedly connected with an electric heating rod 46, which can heat the liquid in the insulation box 31. A plurality of reinforcing ribs 47 and triangular plates 48 are fixedly connected to the inner side of 31 to improve the service life and safety of the insulation box 31. A chiller return port 49 is arranged in the middle of the right side of the top of the insulation box 31. The output ends of the chiller water supply port 43 and the chiller return port 49 are connected to an external air-cooled chiller. The output ends of the cooling tower return port 28 and the cooling tower water supply port 29 are connected to an external cooling tower. The output ends of the input port 5 and the output port 6 are connected to a water-cooled server. Through the joint action of the air-cooled chiller, the freezing pump 42 and the electric heating rod 46, the temperature in the insulation box 31 can be constantly adjusted to improve the stability and reliability of the test.

[0030] Working principle: When in use, the electric heating rod 46 is started to heat up the liquid in the heat preservation box 31, and the refrigeration pump 42 is started to drive the liquid in the heat preservation box 31 to exchange with the external air-cooled chiller, which can cool the heat preservation box 31. The electric heating rod 46 and the refrigeration pump 42 are connected and controlled by the temperature transmitter 32, so that the temperature in the heat preservation box 31 can be evenly regulated. The input and output ends of the cooling server are connected to the output port 6 and the input port 5 respectively, and the circulation pump 41 is started. The circulation pump 41 drives the liquid in the heat preservation box 31 to enter the filter from the water inlet pipe 15. 13 and flow valve 12, the flow valve 12 can control the size of the inlet and outlet flow, the filter 13 can filter the liquid sent to the water-cooled server, and the three-way sensing valve 11 and the stainless steel ball valve 14 are controlled by the display screen 22 to complete the closure of the three-way sensing valve 11 to the signal sensing valve 17, so that the liquid enters the cooling server from the stainless steel ball valve 14, the three-way sensing valve 11, the three-way connector 9, the U-shaped pipe 7, the external ball valve 4 and the output port 6 in sequence, flows back from the input port 5 to the outlet pipe 16, and enters the heat exchanger 26 from the outlet pipe 16 for heat exchange, and returns to the cooling tower through the cooling tower The inlet 28 and the cooling tower water supply inlet 29 are connected to the external cooling tower. By controlling the opening and closing of the electric three-way valve 30, the opening and closing of the heat exchange of the heat exchanger 26 can be controlled. After the heat exchange is completed in the heat exchanger 26, the heat enters the insulation box 31 from the transfer pipe 27 to complete the test and circulation. The external air compressor is started to supply gas to the air inlet 40. The pressure is adjusted differently by the pressure reducing valve 39 to change the functionality of the test. The high-pressure gas enters the air inlet pipe 19 from the air guide pipe 38 and the connecting pipe 37. By adjusting the signal sensing valve 17 and the three-way sensing valve 11, the upper side is completed. The stainless steel ball valve 14 and the flow valve 12 are closed, so that the gas enters the cooling server from the output port 6, flows back from the U-shaped tube 7, and then enters the outlet pipe 20 from the external ball valve 4, the three-way connector 9, the three-way sensing valve 11, the signal sensing valve 17 and the connecting air pipe 18 in sequence and is discharged from the left side of the outlet pipe 20, and the residual liquid in the cooling server can be discharged. In the above process, the data can be collected and recorded by the thermometer 10, the pressure gauge 21, the three-way sensing valve 11 and the signal sensing valve 17 to complete the cooling and pressure test of the cooling server.

[0031] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them.

Claims

1. A multi-channel test bench, characterized in that: The test bench (1) comprises a panel (2) fixedly connected to the front end of the upper part of the test bench (1), a plurality of mounting frames (3) fixedly connected to the rear end of the panel (2), an external ball valve (4) fixedly connected to the front ends of the upper and lower parts of the mounting frames (3), an input port (5) and an output port (6) fixedly connected to the middle of the mounting frames (3), a U-shaped pipe (7) is connected between the external ball valve (4) and the input port (5) and between the external ball valve (4) and the output port (6), and a connecting pipe (8) is connected to the rear end of the lower external ball valve (4). The rear end of the external ball valve (4) on the upper side and the other end of the connecting pipe (8) are both connected to a three-way connector (9), the outer surface of the three-way connector (9) is connected to a thermometer (10), the third end of the three-way connector (9) is connected to a three-way sensing valve (11), the bottom end of the three-way sensing valve (11) on the lower side is connected to a flow valve (12), the bottom end of the flow valve (12) is connected to a filter (13), and the top end of the three-way sensing valve (11) on the upper side and the bottom end of the filter (13) are both fixedly connected to a stainless steel ball valve (14).

2. A multi-channel test bench according to claim 1, characterized in that: The stainless steel ball valve (14) on the lower side is connected to a water inlet pipe (15), the stainless steel ball valve (14) on the upper side is connected to a water outlet pipe (16), the third end of the three-way sensing valve (11) is connected to a signal sensing valve (17), the other end of the signal sensing valve (17) is connected to a connecting air pipe (18), the other end of the connecting air pipe (18) on the lower side is connected to an air inlet pipe (19), and the other end of the connecting air pipe (18) on the upper side is connected to an air outlet pipe (20).

3. A multi-channel test bench according to claim 2, characterized in that: A pressure gauge (21) is fixedly connected to the middle of the panel (2), a display screen (22) is fixedly connected to the middle of the panel (2), a ventilation pipe (23) is connected to the middle upper end of the air inlet pipe (19), and the other end of the ventilation pipe (23) is connected to the rear end of the pressure gauge (21).

4. A multi-channel test bench according to claim 2, characterized in that: The left side of the test bench (1) is fixedly connected to a connection box (24), the inner side of the connection box (24) is fixedly connected to a fixing frame (25), the upper inner side of the fixing frame (25) is fixedly connected to a heat exchanger (26), the upper left end of the heat exchanger (26) is provided with a transfer pipe (27) and a cooling tower return water port (28) in sequence from front to back, the upper right end of the heat exchanger (26) is connected to the left end of the water outlet pipe (16), the upper right end of the heat exchanger (26) is provided with a cooling tower water supply port (29) penetrating the top of the connection box (24), and the outer side surface of the cooling tower water supply port (29) is fixedly connected to an electric three-way valve (30).

5. A multi-channel test bench according to claim 4, characterized in that: The left end of the connecting box (24) is fixedly connected to a heat preservation box (31); the middle portion of the upper front side of the heat preservation box (31) is pipe-connected with a temperature transmitter (32) and a liquid level transmitter (33) in sequence from left to right; the front end of the heat preservation box (31) is fixedly connected to a water tank liquid level gauge (34); the middle portion of the top end of the heat preservation box (31) is fixedly connected to a top cover (35); and a water supply port (36) is provided on the left front side of the top end of the heat preservation box (31).

6. A multi-channel test bench according to claim 3, characterized in that: The left end of the air inlet pipe (19) is connected to a connecting pipe (37), the other end of the connecting pipe (37) is connected to an air guide pipe (38), the upper end of the air guide pipe (38) is fixedly connected to a plurality of pressure reducing valves (39), the other end of the pressure reducing valve (39) is fixedly connected to an air inlet (40), and the air inlet (40) is connected to an external air compressor.

7. A multi-channel test bench according to claim 5, characterized in that: A circulation pump (41) is fixedly connected to the upper bottom end of the connection box (24), the rear end of the circulation pump (41) is pipe-connected to the left end of the water inlet pipe (15), and the other end of the circulation pump (41) is pipe-connected to the inner surface of the heat preservation box (31).

8. A multi-channel test bench according to claim 5, characterized in that: A refrigeration pump (42) is fixedly connected to the upper bottom end of the connecting box (24), the left end of the refrigeration pump (42) is connected to the inner pipe of the heat preservation box (31), and the upper end of the refrigeration pump (42) passes through the top end of the connecting box (24) and is connected to the water supply port (43) of the chiller.

9. A multi-channel test bench according to claim 7, characterized in that: A control electric box (44) is arranged at the upper end of the bottom of the test bench (1); casters (45) are fixedly connected to the bottoms of the test bench (1), the connection box (24) and the insulation box (31); an electric heating rod (46) is fixedly connected to the inner right arm of the insulation box (31); a plurality of reinforcing ribs (47) and triangular plates (48) are fixedly connected to the inner side of the insulation box (31); and a water return port (49) of a chiller is arranged at the middle right portion of the top end of the insulation box (31).

10. A multi-channel test bench according to claim 9, characterized in that: The output ends of the water chiller water supply port (43) and the water chiller return port (49) are connected to an external air-cooled water chiller, the output ends of the cooling tower water return port (28) and the cooling tower water supply port (29) are connected to an external cooling tower, and the output ends of the input port (5) and the output port (6) are connected to a water-cooled server.

Citation Information

Patent Citations

  • Test platform of water-cooling plate

    CN103134648A

  • Multifunctional universal integrated liquid cooling equipment comprehensive test system

    CN112432797A

  • Multifunctional liquid cooling test device

    CN113758736A

  • Operation and maintenance testing device for liquid-cooled electronic equipment

    CN113905600A

  • Intelligent water-cooling radiator test system and method

    CN114689354A