Power marketing work order monitoring method and system based on intelligent data analysis

Through data preprocessing and geographical location clustering of power marketing work orders, differentiated resource allocation strategies are formulated, which solves the problem of unreasonable resource allocation in the existing technology and improves work order response speed and service quality.

CN118747586APending Publication Date: 2024-10-08GUIGANG POWER SUPPLY BUREAU OF GUANGXI POWER GRID CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410807860.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

The existing power marketing work order monitoring technology is difficult to accurately allocate resources based on the specific characteristics and geographical location of the work order, resulting in unreasonable resource allocation, low efficiency and high error rate.

Method used

By collecting historical power service work order data, preprocessing and classifying it, clustering it based on geographical location to form service areas, formulating resource allocation strategies, performing automatic reminders and rapid dispatching based on work order allocation information, and optimizing marketing service processes and resource allocation strategies.

Benefits of technology

It achieves refined classification and dynamic scheduling of work orders, improves response speed and service quality, rationally allocates marketing service resources, maximizes the efficiency of existing resources, and reduces error and omission rates.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118747586A_ABST
    Figure CN118747586A_ABST
Patent Text Reader

Abstract

The invention discloses an electric power marketing work order monitoring method and system based on intelligent data analysis, and relates to the technical field of data processing, and the method comprises the steps: collecting historical electric power service work order data, and carrying out the preprocessing; dividing the work orders into different categories according to the data features, and setting classification standards for different work order types and priorities; the work orders are clustered according to geographic positions to form a plurality of service areas, and a resource allocation strategy is made according to the geographic positions, work order types and priorities; based on the work order distribution information, automatic urging and rapid scheduling are carried out; and judging and analyzing response delay and missing work orders, and optimizing a marketing service process and a resource allocation strategy. According to the method, refined classification and dynamic scheduling of the power marketing work orders are realized, and the work order response speed and the service quality are greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data processing, and in particular to a method and system for monitoring electric power marketing work orders based on intelligent data analysis. Background Art

[0002] With the rapid development of the power industry, the complexity and diversity of power marketing services are increasing. The traditional power marketing work order management method relies on manual processing and experience judgment, which is not only inefficient, but also has a high error rate and omission rate. In recent years, the development of information technology and intelligent data analysis technology has brought new opportunities for power marketing work order management. By collecting and analyzing a large amount of historical power service work order data, potential patterns and trends can be discovered, thereby optimizing the work order processing process and improving service quality and customer satisfaction. Existing intelligent data analysis technology has achieved certain application results in some fields, but it still faces many challenges in monitoring power marketing work orders.

[0003] Most existing technologies can only achieve basic classification and statistics of work orders, and it is difficult to accurately allocate resources based on the specific characteristics and geographical locations of work orders. Summary of the invention

[0004] In view of the problem that the existing power marketing work order monitoring technology has unreasonable resource allocation, the present invention is proposed.

[0005] Therefore, the problem to be solved by the present invention is how to provide a method and system for forming a service area by clustering geographical locations and formulating a resource allocation strategy.

[0006] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0007] In the first aspect, an embodiment of the present invention provides a method for monitoring electric power marketing work orders based on intelligent data analysis, which includes collecting historical electric power service work order data and performing preprocessing; classifying the work orders into different categories according to data characteristics, and setting classification standards for different work order types and priorities; clustering the work orders by geographic location to form multiple service areas, and formulating resource allocation strategies according to geographic location, work order type and priority; automatically urging and quickly scheduling based on work order allocation information; judging and analyzing response delays and missing work orders, and optimizing marketing service processes and resource allocation strategies.

[0008] As a preferred solution of the power marketing work order monitoring method based on intelligent data analysis described in the present invention, the clustering of work orders by geographic location includes: extracting longitude and latitude coordinates from the original work order data, and if the work order lacks the geographic location, using the geocoding service to supplement the coordinate data based on the associated information, and converting the coordinates into a standardized geographic location description through reverse geocoding.

[0009] As a preferred solution of the power marketing work order monitoring method based on intelligent data analysis described in the present invention, the process of formulating the resource allocation strategy is as follows: clustering is performed using the off-cluster coefficient method, and a line graph of K and the sum of squares within the cluster is drawn. The K value at the inflection point is the potential optimal number of clusters, and is used as input to obtain the cluster label of each work order data point, that is, the service area division result; let R be the set of service areas; T be the set of work order types; and P be the set of priorities;

[0010]

[0011] Among them, N r Represents the total number of work orders in service area r; N r,t N represents the number of work orders of type t in service area r; r,p Indicates the number of work orders with priority p in service area r; allocation is based on the number of work orders:

[0012]

[0013] Among them, M represents the total number of the company's existing marketing service personnel; Sr represents the number of service personnel assigned to service area r; r' is another specific service area; the clustering results, resource allocation strategy and work order management system are integrated, and the newly created work orders will be automatically allocated to the corresponding service area according to the geographical location; each area uses a priority scheduling algorithm to allocate work orders based on the type and priority of the work order; the system will monitor the service level of each area in real time, and if there is a serious delay, it will trigger the reallocation of resources between areas.

[0014] As a preferred solution of the power marketing work order monitoring method based on intelligent data analysis described in the present invention, the resource allocation strategy also includes: the objective function is to minimize the average response time of all work orders:

[0015]

[0016] Among them, T avg is the average response time of all work orders; T r is the average response time of work orders in service area r; the constraints include:

[0017]

[0018] S r ≥Smin

[0019]

[0020] Among them, k r is a constant.

[0021] As a preferred solution of the power marketing work order monitoring method based on intelligent data analysis described in the present invention, the automatic follow-up and rapid scheduling based on work order allocation information includes the following steps: setting work order warning rules; performing intelligent work order dispatch; using mobile guidance, and automatically following up.

[0022] As a preferred solution of the power marketing work order monitoring method based on intelligent data analysis described in the present invention, the work order warning rules include: summarizing the core factors affecting the warning time into different dimensions, including work order type, work order priority / severity, applicant identity and involved systems; dividing each rule dimension into segments, and setting preliminary time thresholds for each segmented scenario based on past data and SLA agreement requirements; examining the coordination of rules of different dimensions, and formulating superposition judgment rules for scenarios with cross-impact.

[0023] As a preferred solution of the power marketing work order monitoring method based on intelligent data analysis of the present invention, the intelligent work order dispatching includes: based on the service area division result, calculating the distance between each work order and each regional center:

[0024]

[0025] Among them, (x i ,y i ) is work order W i The position coordinates of r ,y r ) is the service area center C r The location coordinates of the warning work order are assigned to the service area that is closest and has the lowest current load. The specific operations are as follows: Evaluate the work order W i The composite score assigned to service area r:

[0026] F(W i ,r)=α.d+β.L r

[0027] Among them, L r represents the current load of service area r, that is, the number of work orders being processed; α is the distance weight coefficient, β is the load weight coefficient; for each work order, find the service area with the smallest comprehensive score; use a multi-weighted priority queue model for intelligent sorting within the area:

[0028] s(W i )=ω p .p(W i )+ω t .t(W i )

[0029] Where p represents the priority of the work order. The larger the value, the higher the priority. t represents the type of the work order. p is the priority weight; ω t Indicates the weight of the type; for the highest level red warning work order, start the emergency dispatch between regions: for each red warning work order, determine the current load L of the region r to which it belongs r ,If the current load exceeds the threshold, service personnel are drawn from the set of neighboring areas.

[0030] On the second aspect, the present invention proposes the present invention to further solve the problem of unreasonable resource allocation in the existing power marketing work order monitoring technology. The embodiment provides a power marketing work order monitoring system based on intelligent data analysis, which includes: a data acquisition module, which is used to collect historical power service work order data and perform preprocessing; a work order classification module, which is used to classify work orders into different categories according to data characteristics and set classification standards; a clustering module, which is used to cluster work orders according to geographical location to form multiple service areas; a resource allocation strategy module, which is used to formulate resource allocation strategies according to geographical location, work order type and priority; a scheduling module, which is used to automatically urge and quickly schedule based on work order allocation information; an analysis and optimization module, which is used to judge and analyze response delays and missing work orders, and optimize marketing service processes and resource allocation strategies.

[0031] In a third aspect, an embodiment of the present invention provides a computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: when the computer program is executed by the processor, any step of the power marketing work order monitoring method based on intelligent data analysis as described in the first aspect of the present invention is implemented.

[0032] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: when the computer program is executed by a processor, it implements any step of the power marketing work order monitoring method based on intelligent data analysis as described in the first aspect of the present invention.

[0033] The beneficial effects of the present invention are that the present invention realizes the reasonable classification of work orders by classifying work orders into different categories according to data characteristics, and setting classification standards for different work order types and priorities, laying the foundation for formulating differentiated processing strategies, and improving the pertinence and efficiency of work order processing; and clustering work orders by geographical location to form multiple service areas, and formulating resource allocation strategies according to geographical location, work order type and priority, realizing the reasonable allocation of limited marketing service resources to different areas, and taking corresponding priority scheduling according to the characteristics of work orders. This data-driven intelligent allocation can maximize the efficiency of existing resources and improve the quality of work order response. The present invention realizes the refined classification and dynamic scheduling of power marketing work orders, greatly improving the response speed and service quality of work orders. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0035] Figure 1 This is a flow chart of the power marketing work order monitoring method based on intelligent data analysis in Example 1.

[0036] Figure 2 This is a structural diagram of the power marketing work order monitoring system based on intelligent data analysis in Example 1. DETAILED DESCRIPTION

[0037] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0038] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0039] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0040] Example 1

[0041] Reference Figure 1 and Figure 2 , which is the first embodiment of the present invention, and provides a method for monitoring power marketing work orders based on intelligent data analysis, comprising the following steps:

[0042] S1: Collect historical power service work order data and perform preprocessing.

[0043] Collect historical power service work order data, including work order number, processing department, processor, user name, request content, transmission time, work order type and other key field information.

[0044] Clean and standardize the data, eliminate outliers and missing values, and convert the data into a unified format.

[0045] S2: Classify work orders into different categories based on data characteristics, and set classification standards for different work order types and priorities.

[0046] Preferably, representative historical work order samples are extracted from the work order system to ensure that various work order situations under different classification dimensions are covered.

[0047] Formulate classification judgment rules:

[0048] Analyze the work orders and develop classification and judgment rules, including: if the work order description contains keywords such as "server", "downtime", "restart", and involves the core business system of the production environment, it will be classified into the "system failure / serious" category; if the work order description contains keywords such as "network", "link", "interruption", and involves the office network system, and it comes from an internal employee report, it will be classified into the "network failure / general" category; if it comes from an important external customer, it will be classified into the "network failure / important" category.

[0049] If the work order description contains keywords such as "account", "authority", "login", and involves the human resources system or financial system, and the application for new permissions or accounts is made, it will be classified into the "Account Permission Change" category; if the application is for temporary emergency permissions and is from a senior manager or above, it will be classified into the "Temporary Permission Application / Expedited" category.

[0050] If the work order description contains keywords such as "print", "scan", "copy", and involves an office equipment system, and only reflects a problem for a single device or department, it will be classified as "hardware failure / low level"; if it involves multiple departments or has a large impact, it will be classified as "hardware failure / general"

[0051] If the work order description contains keywords such as "upgrade" and "new version" and involves core business systems, and the application upgrade cycle is within 3 months, it will be classified as "system upgrade / normal"; if the upgrade cycle is within 2 weeks and the applicant is the department responsible for the system, it will be classified as "system upgrade / expedited".

[0052] If the work order description contains keywords such as "slow access", "lag", "delay", etc., and involves an Internet application system, and the number of people reporting the problem exceeds 50, it will be classified into the "Application performance / collective" category; otherwise, it will be classified into the "Application performance / individual" category.

[0053] S3: Cluster work orders by geographic location to form multiple service areas, and formulate resource allocation strategies based on geographic location, work order type and priority.

[0054] Preferably, GIS technology is used to analyze the geographical distribution of work orders.

[0055] Specifically, geographic location information, i.e., longitude and latitude coordinates, is extracted from the original work order data. For work orders that lack geographic location, the coordinate data can be supplemented using geocoding services based on associated information such as user name / processing department, and the coordinates can be converted into standardized geographic location descriptions (such as provinces, cities, districts, streets, etc.) through reverse geocoding.

[0056] Specifically, first check whether there are direct geographic location fields such as longitude and latitude coordinates in the work order data. If so, extract these clear longitude and latitude coordinate data. If not, check whether there are other fields that may contain implicit geographic location information, such as address, city name, etc. For records with missing coordinates in the work order data, extract possible address clues from related fields such as user name and processing department, use the geocoding API to convert these clues into longitude and latitude coordinates, and add the acquired new coordinate data to the original work order data.

[0057] Furthermore, geographic coordinates, i.e., longitude and latitude coordinates, are extracted from the work order data, and the classification results (such as work order type) are digitized into one-hot codes. To solve the problem of poor density clustering effect, the off-pile coefficient method is used to repeatedly run K-Means under different K values, calculate the intra-cluster sum of squares each time, and draw a line graph of K and the intra-cluster sum of squares. The K value at the inflection point is the potential optimal number of clusters.

[0058] The geographic coordinates and other features such as the distribution of work order types are combined to form a feature vector, and K-Means clustering is run. The K value determined in the previous step is used as input to obtain the cluster label of each work order data point, that is, the service area division result.

[0059] Calculate the average coordinate center of each cluster to check whether the regional distribution is reasonable, analyze the homogeneity of features such as work order type and quantity in each cluster, and check whether there are abnormal points / outliers for clusters of poor quality. The feature engineering scheme or clustering parameters can be adjusted appropriately, and the above steps can be repeated.

[0060] For each clustering area, representative geographical markers such as cities and landmarks are extracted, and regional feature descriptions are summarized based on regional characteristics, such as "central city + dominant work order type".

[0061] Visualize clustering results on a map to facilitate manual inspection and adjustment

[0062] Going further, developing a resource allocation strategy includes:

[0063] Let R be the set of service areas, r∈R represents a specific service area; T is the set of work order types, t∈T represents a work order type; P is the set of priorities, p∈P represents a priority.

[0064]

[0065] Among them, N r Represents the total number of work orders in service area r; N r,t N represents the number of work orders of type t in service area r; r,p Indicates the number of work orders with priority p in service region r.

[0066] The initial staffing ratio can be allocated based on the number of work orders:

[0067]

[0068] Among them, M represents the total number of marketing service personnel currently in the company; Sr represents the number of service personnel assigned to service area r; and r' represents another specific service area.

[0069] The objective function is to minimize the average response time of all work orders:

[0070]

[0071] Among them, T avg is the average response time of all work orders; T r is the average response time of work orders in service area r.

[0072] Furthermore, the constraints include:

[0073]

[0074] S r ≥Smin

[0075]

[0076] Among them, k r is a constant that depends on the number of work orders and other characteristics of service region r.

[0077] It can be solved using operations research optimization algorithms such as linear programming and integer programming.

[0078] Based on the deployment results, we further consider the handling of special situations: when temporary peak demand occurs, more resources are temporarily deployed to areas where work order peaks may occur based on work order forecasts; skilled service personnel are assigned first for different work order types; and certain backup resources are reserved to deal with emergencies.

[0079] The clustering results, resource allocation strategies and work order management system are integrated. Newly created work orders will be automatically assigned to the corresponding service areas based on the geographical location. Work orders are allocated within each area based on the work order type and priority using a priority scheduling algorithm. The system will monitor the service level of each area in real time. If serious delays occur, resource reallocation between areas will be triggered. For sudden emergency work orders, reserved emergency resources can be drawn from each area for rapid response.

[0080] Specifically, work order allocation includes the following steps:

[0081] Assume that the order of priority from high to low is p1, p2, ..., p n , among which p1 is the highest, p n Lowest; in each service area r, high-priority work orders are processed first;

[0082]

[0083] Among them, T r,t,p N represents the average processing time of work orders of type t and priority p in service area r; r,t,p represents the number of work orders of type t and priority p in service area r; f r Represents the service rate of a single service personnel in the service area r.

[0084] Set key performance indicators, such as average response time, work order processing satisfaction, etc., track the actual effect of the deployment plan, regularly re-cluster the work orders geographically, dynamically adjust the service area division according to changes in work order distribution, and continuously feed back new work order data to the deployment model to continuously optimize the regional resource allocation.

[0085] S4: Automatically urge and quickly dispatch work orders based on work order allocation information.

[0086] S4.1: Set up work order alert rules.

[0087] Based on step S2, response time thresholds for different work order types and urgency levels are set. For work orders that exceed the thresholds, different levels of warnings (such as yellow / orange / red warnings) are issued according to the degree of timeout. The warning rules are integrated with the work order management system, and newly created work orders automatically determine whether to trigger a warning.

[0088] Specifically, the core factors affecting the warning time are summarized into different dimensions, such as work order type (system failure, network failure, account authority, etc.); work order priority / severity (serious, general, low level); applicant identity (internal employees, important customers, ordinary customers); involved systems (core systems, support systems, office systems), etc.; divide each rule dimension into reasonable segments, and set preliminary time thresholds for each segmented scenario based on past data, SLA agreement requirements, etc. For example: for a serious failure of the core system, when proposed by internal personnel, the response time is 1 hour for yellow warning, 2 hours for orange, and 4 hours for red; for a general failure of the office system, when proposed by an ordinary customer, the response time is 8 hours for yellow, 16 hours for orange, and 32 hours for red; examine the coordination of rules of different dimensions, and for scenarios with cross-impact, formulate superimposed judgment rules, for example: if an important customer applies for a general failure of the core system, the warning time is halved.

[0089] Develop response processes and responsible persons for different warning levels (yellow, orange, and red). When a warning is issued, the process will be uniformly delivered to the corresponding person in charge or department. Possible response behaviors for the warning include: notifying the assigned processing personnel, automatically upgrading the work order priority, reporting to the work order supervisor or manager, and various automated notifications and reminders.

[0090] Integrate the warning rules into the work order system and conduct simulation runs. For unreasonable warning results, discuss and adjust the rules within the team and repeat the above steps until the warning rules are stable and reasonable.

[0091] S4.2: Perform intelligent work order dispatching.

[0092] Based on the service area division determined in S3, calculate the distance between each work order and each regional center:

[0093]

[0094] Among them, (x i ,y i ) is work order W i The position coordinates of r ,y r ) is the service area center C r The location coordinates of .

[0095] Assign the warning work order to the service area that is closest and has the lowest current load. The specific operations are as follows:

[0096] Evaluation Work Order i The composite score assigned to service area r:

[0097] F(W i ,r)=α.d+β.L r

[0098] Among them, L r It represents the current load of service area r, that is, the number of work orders being processed; α is the distance weight coefficient, and β is the load weight coefficient.

[0099] For each work order, find the service area with the smallest comprehensive score, that is, find the optimal service area for work order allocation based on the distance between the work order and the center of each service area and the current load of each service area.

[0100] A multi-weighted priority queue model is used for intelligent sorting within the region:

[0101] s(W i )=ω p .p(W i )+ω t .t(W i )

[0102] Where p represents the priority of the work order. The larger the value, the higher the priority. t represents the type of the work order. p is the priority weight; ω t Indicates the weight of the type.

[0103] For the highest level red warning work order, start the emergency dispatch between regions: for each red warning work order, determine the current load L of the region r to which it belongs r ,If the current load exceeds the threshold, service personnel are drawn from the set of neighboring areas.

[0104] S4.3: Mobile guidance and automatic reminders.

[0105] Marketing personnel use mobile apps to receive work order tasks. Work orders that are not received or arrived on time will automatically trigger reminders on the app. Service personnel can update the work order status at any time. For delays, the system will automatically generate reminder messages and report them to management personnel.

[0106] The backend management system sets each key node of work order processing, such as order acceptance, departure, arrival, completion, etc. The administrator can view the dynamic progress of all in-transit work orders in real time. For serious delays found, rapid dispatch can be initiated immediately, including allocating the nearest standby personnel for delayed work orders, re-planning the work order priority and personnel allocation in the area, and for unconventional large-scale dispatch requirements, manual intervention can be used to confirm and process them.

[0107] S5: Identify and analyze response delays and missed work orders, and optimize marketing service processes and resource allocation strategies.

[0108] Preferably, all processed historical work order data is extracted from the work order management system, work orders with response delays and omissions are marked, and the marking results are integrated with the original work order data to form a labeled data set.

[0109] Analyze the characteristics of delayed / missing work orders from multiple dimensions, such as: which areas have more serious delays / missing, which types of work orders have more delays / missing, whether there are regular differences in work order creation time, and the work orders related to certain users or service personnel have poor performance; use statistical methods to quantify the impact of different characteristics on delays / missing, and for the main influencing factors, combine domain knowledge to analyze the root causes, such as: resource-scarce areas, insufficient staff during peak hours, insufficient processing capacity for special work order types, and poor performance of individual service personnel.

[0110] Based on the main reasons discovered in the analysis, the existing marketing service processes were sorted out and optimized: the work order classification system was improved, processing specifications were formulated for special types of work orders, a work order processing knowledge base was established, service personnel training was strengthened, audit links were added to key nodes to prevent omissions and delays, on-site processing software and hardware facilities were optimized, operational efficiency was improved, etc.; the optimized new processes were piloted in certain areas / departments, the results were continuously tracked and improvements were made in a cycle.

[0111] Based on the analysis results, we optimized the resource allocation strategy, compared the old and new strategies in a data simulation environment, selected the solution with better overall response quality, and gradually extended the optimized allocation strategy to all service areas.

[0112] This embodiment also provides a power marketing work order monitoring system based on intelligent data analysis, including:

[0113] The data collection module is used to collect historical power service work order data and perform preprocessing; the work order classification module is used to classify work orders into different categories based on data characteristics and set classification standards; the clustering module is used to cluster work orders by geographical location to form multiple service areas; the resource allocation strategy module is used to formulate resource allocation strategies based on geographical location, work order type and priority; the scheduling module is used to automatically urge and quickly schedule based on work order allocation information; the analysis and optimization module is used to judge and analyze response delays and missing work orders, and optimize marketing service processes and resource allocation strategies.

[0114] This embodiment also provides a computer device, which is suitable for the case of a power marketing work order monitoring method based on intelligent data analysis, including: a memory and a processor; the memory is used to store computer executable instructions, and the processor is used to execute computer executable instructions to implement the power marketing work order monitoring method based on intelligent data analysis as proposed in the above embodiment.

[0115] The computer device may be a terminal, and the computer device includes a processor, a memory, a communication interface, a display screen and an input device connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. The display screen of the computer device may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device may be a touch layer covering the display screen, or a key, trackball or touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.

[0116] The present embodiment also provides a storage medium having a computer program stored thereon, which, when executed by a processor, implements the method for monitoring power marketing work orders based on intelligent data analysis as proposed in the above embodiment; the storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, disk or optical disk.

[0117] In summary, the present invention classifies work orders into different categories according to data features, and sets classification standards for different work order types and priorities, thereby achieving reasonable classification of work orders, laying the foundation for formulating differentiated processing strategies, and improving the pertinence and efficiency of work order processing; and clustering work orders by geographic location to form multiple service areas, and formulating resource allocation strategies based on geographic location, work order type and priority, achieving reasonable allocation of limited marketing service resources to different areas, and taking corresponding priority scheduling according to the characteristics of work orders. This data-driven intelligent allocation can maximize the efficiency of existing resources and improve the quality of work order response. The present invention realizes the refined classification and dynamic scheduling of power marketing work orders, greatly improving the work order response speed and service quality.

[0118] Example 2

[0119] Reference Figure 1-2 This is the second embodiment of the present invention. In order to further verify the beneficial effects of the present invention, experimental comparison data between the power marketing work order monitoring method based on intelligent data analysis and manual operation are provided.

[0120] In order to verify the effectiveness of the power marketing work order monitoring method based on intelligent data analysis proposed in the present invention, historical power service work order data from January to June 2023 of a provincial power company were selected for experiments. The experimental preparation work included data collection, preprocessing, feature engineering and other steps.

[0121] First, a total of 50,000 historical work order data were extracted from the power company's work order management system, including key fields such as work order number, processing department, processor, user name, request content, input time, work order type, etc.; Python programming language and pandas library were used to clean and standardize the data, and about 2,000 records of outliers and missing values ​​were deleted, and finally 48,000 valid work order data were obtained.

[0122] Based on the work order description and keywords, work orders are divided into six categories: system failure, network failure, account permission, hardware failure, system upgrade and application performance; each type of work order is further divided into four priorities: severe, important, general and low according to the severity. For example, work orders containing "server downtime" and involving core business systems are classified as "system failure / severe"; work orders containing "network interruption" and from ordinary employees are classified as "network failure / general". In this way, a work order classification system with 24 subcategories was established.

[0123] In terms of geographic location clustering, we first used Baidu Map API to geocode work orders with missing geographic coordinates, and completed the longitude and latitude information of about 5,000 work orders. Then, we constructed a feature vector using the longitude and latitude coordinates and features such as the work order type distribution. We used the K-means algorithm for clustering, and determined the optimal cluster number K=8 through the decoupling coefficient method, dividing the work orders in the province into 8 service areas.

[0124] In order to formulate a resource allocation strategy, a linear programming model was constructed. The objective function was set to minimize the average response time of all work orders. The constraints included the number of service personnel in each area, the work order processing capacity, etc. The PuLP library was used to solve the optimization problem and obtain the optimal staffing solution for each service area.

[0125] In terms of automatic expediting and rapid dispatch of work orders, response time thresholds are set according to different work order types and priorities. For example, the response time threshold for serious core system failures is set to 2 hours, and an early warning is triggered when the time exceeds the threshold.

[0126] At the same time, a work order priority queue model based on multi-dimensional weighting was developed to achieve intelligent sorting and dispatching of work orders within the region.

[0127] Finally, all processed work orders are extracted from the system, and work orders with delayed responses and missing work orders are marked to form a labeled data set.

[0128] Through multi-dimensional statistical analysis, the impact of different factors on delays / omissions was quantified, and the marketing service process and resource allocation strategy were optimized accordingly.

[0129] In order to evaluate the effect of this method, the traditional manual scheduling method was selected as the control group, and a one-month comparative test was conducted from July 1 to July 31, 2023. The test results are shown in the following table:

[0130] index Traditional manual scheduling Method of the present invention Improvement Average response time (hours) 5.8 3.2 44.8% Satisfaction with work order processing (%) 82.5 93.7 13.6% Average number of work orders processed per day (orders) 12.3 18.6 51.2% Overtime work order ratio (%) 15.7 6.8 56.7% Resource utilization (%) 68.4 85.2 24.6% Proportion of incorrectly classified tickets (%) 8.9 2.3 74.2% Early warning accuracy (%) none 92.8 not applicable

[0131] By comparing the test data, it can be seen that the power marketing work order monitoring method based on intelligent data analysis proposed in the present invention has significant advantages over the traditional manual scheduling method:

[0132] The average response time of this method is 3.2 hours, which is 44.8% shorter than the 5.8 hours of the traditional method. This is mainly due to the intelligent work order classification and the resource allocation strategy based on geographical location, which enables the work order to be quickly assigned to the most appropriate person to handle it;

[0133] The work order processing satisfaction of this method reached 93.7%, which is 13.6 percentage points higher than that of the traditional method. This reflects that intelligent classification and priority sorting enable important and urgent work orders to be processed more quickly and professionally, improving the user experience.

[0134] After adopting this method, the average number of work orders processed per day increased from 12.3 to 18.6, an increase of 51.2%. This shows that intelligent scheduling and resource optimization configuration have significantly improved work efficiency.

[0135] Through comparative analysis, it can be seen that the method of the present invention has achieved remarkable results in improving work order processing efficiency, enhancing user satisfaction, optimizing resource utilization, etc., especially in terms of work order classification accuracy and early warning mechanism, showing advantages that traditional methods do not have. These improvements not only improve the quality of power marketing services, but also reduce operating costs for power companies and improve the overall service level.

[0136] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A method for monitoring power marketing work orders based on intelligent data analysis, characterized in that: include: Collect historical power service work order data and pre-process it; Classify work orders into different categories based on data characteristics, and set classification standards for different work order types and priorities; Cluster work orders by geographic location to form multiple service areas, and formulate resource allocation strategies based on geographic location, work order type and priority; Automatically urge and quickly dispatch based on work order allocation information; Determine and analyze response delays and missed work orders, and optimize marketing service processes and resource allocation strategies.

2. The method for monitoring power marketing work orders based on intelligent data analysis according to claim 1, characterized in that: Clustering the work orders by geographical location includes: Extract longitude and latitude coordinates from the original work order data. If the work order lacks geographic location, use the geocoding service to supplement the coordinate data based on the associated information, and convert the coordinates into a standardized geographic location description through reverse geocoding.

3. The method for monitoring power marketing work orders based on intelligent data analysis according to claim 2, characterized in that: The process of formulating the resource allocation strategy is as follows: Clustering is performed using the off-cluster coefficient method, and a line graph of K and the sum of squares within the cluster is drawn. The K value at the inflection point is the potential optimal number of clusters and is used as input to obtain the cluster label of each work order data point, that is, the service area division result; Let R be the set of service areas; T is a set of work order types; P is a set of priorities; Among them, N r Represents the total number of work orders in service area r; N r,t N represents the number of work orders of type t in service area r; r,p Indicates the number of work orders with priority p in service area r; Allocation based on work order quantity: Among them, M represents the total number of marketing service personnel currently in the company; Sr represents the number of service personnel assigned to service area r; r' is another specific service area; Integrate clustering results, resource allocation strategies and work order management systems, and newly created work orders will be automatically assigned to corresponding service areas based on geographic locations; Each area uses a priority scheduling algorithm to allocate work orders based on the type and priority of the work order; The system will monitor the service level of each region in real time, and trigger the reallocation of resources between regions if serious delays occur.

4. The method for monitoring power marketing work orders based on intelligent data analysis according to claim 3, characterized in that: The resource allocation strategy also includes: The objective function is to minimize the average response time of all work orders: Among them, T avg is the average response time of all work orders; T r is the average response time of work orders in service area r; The constraints include: S r ≥Smin Among them, k r is a constant.

5. The method for monitoring power marketing work orders based on intelligent data analysis according to claim 4, characterized in that: The automatic urging and quick dispatching based on the work order allocation information includes the following steps: Set up work order alert rules; Perform intelligent work order dispatching; Use mobile guidance and automatic reminders.

6. The method for monitoring power marketing work orders based on intelligent data analysis according to claim 5, characterized in that: The work order warning rules include: The core factors that affect the warning time are summarized into different dimensions, including work order type, work order priority / severity, applicant identity, and involved systems; Divide each rule dimension into segments and set preliminary time thresholds for each segmented scenario based on past data and SLA agreement requirements; Check the coordination of rules in different dimensions, and formulate superposition judgment rules for scenarios with cross-impact.

7. The method for monitoring power marketing work orders based on intelligent data analysis according to claim 6, characterized in that: The intelligent work order dispatching includes: Based on the service area division results, calculate the distance between each work order and each regional center: Among them, (x i ,y i ) is work order W i The position coordinates of r ,y r ) is the service area center C r The location coordinates of Assign the warning work order to the service area that is closest and has the lowest current load. The specific operations are as follows: Evaluation Work Order i The composite score assigned to service area r: F(W i ,r)=α.d+β.L r Among them, L r represents the current load of service area r, that is, the number of work orders being processed; α is the distance weight coefficient, and β is the load weight coefficient; For each work order, find the service area with the smallest comprehensive score; A multi-weighted priority queue model is used for intelligent sorting within the region: s(W i )=ω p .p(W i )+ω t .t(W i ) Where p represents the priority of the work order. The larger the value, the higher the priority. t represents the type of the work order. p is the priority weight; ω t The weight of the representation type; For the highest level red warning work order, start the emergency dispatch between regions: for each red warning work order, determine the current load L of the region r to which it belongs. r ,If the current load exceeds the threshold, service personnel are drawn from the set of neighboring areas.

8. A power marketing work order monitoring system based on intelligent data analysis, based on the power marketing work order monitoring method based on intelligent data analysis according to any one of claims 1 to 7, characterized in that: include: Data collection module, used to collect historical power service work order data and perform preprocessing; The work order classification module is used to classify work orders into different categories according to data characteristics and set classification standards; Clustering module, used to cluster work orders by geographic location to form multiple service areas; Resource allocation strategy module, used to formulate resource allocation strategies based on geographic location, work order type and priority; The scheduling module is used to automatically urge and quickly schedule work orders based on work order allocation information; The analysis and optimization module is used to determine and analyze response delays and missing work orders, and optimize marketing service processes and resource allocation strategies.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the power marketing work order monitoring method based on intelligent data analysis as described in any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the power marketing work order monitoring method based on intelligent data analysis as described in any one of claims 1 to 7 are implemented.

Citation Information

Cited By

  • Management method of power grid operation maintenance dispatching task

    CN119228086A