Dual active full-bridge converter DAB composite optimization control method based on neural network and fuzzy control

Through a composite optimization method that combines neural network and fuzzy control, the problem of low DAB control accuracy and incomplete optimization of the dual active full-bridge converter is solved, efficient power transmission and automated control are achieved, and the return power and current stress are optimized.

CN118748513APending Publication Date: 2024-10-08TAIYUAN UNIVERSITY OF TECHNOLOGY
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410756539.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

The existing DAB control method of dual active full-bridge converters has problems such as low theoretical model accuracy and incomplete optimization. In addition, the EPS modulation method has incomplete analysis of the working mode, discontinuous working conditions, and single optimization target.

Method used

Using a composite optimization control method based on neural network and fuzzy control, by establishing a theoretical and measured model of a dual active full-bridge converter, combined with transfer learning technology, a double traversal algorithm is designed for optimization, and a fuzzy inference system is used to achieve continuous modulation. Optimize return power and current stress.

Benefits of technology

The actual prediction accuracy of the dual active full-bridge converter DAB is significantly improved, the return power and current stress are optimized, the power transmission efficiency is improved, and the degree of automation is improved, reducing the workload of engineers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118748513A_ABST
    Figure CN118748513A_ABST
Patent Text Reader

Abstract

The invention relates to a dual-active full-bridge converter DAB composite optimization control method based on a neural network and fuzzy control, and the method comprises the steps: building a theoretical mathematical model based on the theoretical analysis of a dual-active full-bridge converter DAB, generating a theoretical model database, collecting the actual measurement data of a dual-active full-bridge converter DAB object, and building an actual measurement database; establishing a dual-active full-bridge converter DAB neural network model based on transfer learning in combination with the thought of transfer learning; designing a double traversal algorithm for optimization according to an optimization target to obtain a discrete optimization phase shifting combination; and finally, based on the obtained discrete optimization phase shifting combination, applying a fuzzy inference system to realize continuous control of the dual active full-bridge converter DAB. The DAB modulation effect of the dual-active full-bridge converter is effectively optimized, the automation degree is high, the backflow power and the current stress of the dual-active full-bridge converter are reduced, and the transmission efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of direct current distribution network, and in particular is a composite optimization control method of a dual active full bridge converter DAB based on neural network and fuzzy control. Background Art

[0002] In recent years, with the popularization of photovoltaic, wind power and other new energy grid-connected power generation and the continuous increase of power load, DC distribution network has received extensive attention. Compared with traditional AC distribution network, DC distribution network has more efficient, reliable and safe power supply capabilities. In DC distribution network, DC transformer has become the core unit of flexible interconnection between DC bus and DC load with advantages such as bidirectional controllable power flow and high-efficiency transmission, while the voltage conversion and power transmission of DC transformer are mainly realized by bidirectional DC-DC converter. Among many bidirectional DC-DC converter topologies, dual active bridge (DAB) isolated DC-DC converter is widely used in DC microgrid, flexible DC distribution and other occasions due to its advantages such as bidirectional energy transmission, high power density and soft switching.

[0003] The most commonly used phase shift modulation method for DAB converters is single phase shift (SPS) modulation. SPS modulation has only one phase shift degree of freedom and is relatively simple to control, but it will generate large return power and current stress when the primary and secondary voltages do not match, increasing system losses. In order to reduce the return power and current stress during DAB operation, extended phase shift (EPS) modulation, dual phase shift (DPS) modulation, and triple phase shift (TPS) modulation have been proposed. Compared with DPS and TPS control, EPS control improves control flexibility and expands the output range of transmission power.

[0004] However, the modulation strategy optimization methods proposed in the prior art for DAB are usually based on the theoretical model of the DAB converter. However, there are certain parameter differences between the DAB theoretical model and its actual model. The modulation strategy optimization method based on the theoretical model is difficult to perfectly adapt to any DAB converter, which will lead to the problem of reduced performance optimization accuracy when the modulation strategy is applied to certain DAB converters. And there are few literature studies on control methods based on offline models to improve the optimization accuracy of actual models. In addition, the existing EPS modulation methods still have problems such as incomplete analysis of working modes, discontinuous working conditions, and single optimization targets. Summary of the invention

[0005] In order to solve the problems of low theoretical model accuracy and incomplete optimization in the existing dual active full bridge converter DAB control method, the present invention provides a dual active full bridge converter DAB composite optimization control method based on neural network and fuzzy control.

[0006] The present invention is implemented by the following technical solution: a dual active full bridge converter DAB composite optimization control method based on neural network and fuzzy control, comprising the following steps:

[0007] Step 1: Based on theoretical analysis, establish the full-mode theoretical mathematical model M of the dual active full-bridge converter DAB T , Theoretical mathematical model M T It includes the ratio of the shift ratio D1 and D2 to the transmission power P, the ratio of the shift ratio D1 and D2 to the return power P under different voltage transfer ratios k. B The shift ratio between D1 and D2 and the current stress F C The universal theoretical mathematical model of the bridge; wherein the displacement ratio D1 is the displacement ratio within the bridge, and the displacement ratio D2 is the displacement ratio between the bridges;

[0008] Step 2: Based on the dual active full-bridge converter DAB full-mode theoretical mathematical model M T Automatically generate the variable shift ratio D1 and D2, transmission power P, return power P B , current stress F C General Theoretical Model Database B T ;

[0009] Step 3: For any dual-active full-bridge converter DAB, collect the transfer ratios D1 and D2, transmission power P, and return power P of the converter under different voltage transfer ratios k. B , current stress F C Data, to establish the actual measurement database B of the dual active full bridge converter DAB R ;

[0010] Step 4: Based on the dual active full-bridge converter DAB general theoretical model database B established in step 2 T , select the shift ratio D1 and D2 as the input of the neural network model, select the transmission power P, the return power P B , current stress F C As the output of the neural network model, a dual active full-bridge converter DAB neural network model M is established based on theoretical data. TN The neural network model belongs to the existing well-known technology, which is an algorithmic mathematical model that imitates the behavioral characteristics of the animal nervous system and is used for distributed parallel information processing.

[0011] Step 5: Based on the actual measurement database B of the dual active full bridge converter DAB established in step 3R , select the shift ratio D1 and D2 as the input of the neural network model, select the transmission power P, the return power P B , current stress F C As the output of the neural network model, a dual active full-bridge converter DAB neural network model M based on measured data is established. RN ;

[0012] Step 6: Based on the actual measurement database B of the dual active full-bridge converter DAB established in step 3 R , select the measured data as the small sample information S for transfer learning, and select the dual active full-bridge converter DAB neural network model M based on theoretical data in step 4 TN As the source domain model M S ; Combine small sample information S with the source domain model M S Perform transfer learning processing and establish a dual active full-bridge converter DAB neural network model M based on transfer learning MN The transfer learning is a well-known technology, which is a process of applying the source domain model trained in the old domain to the new domain and obtaining the target domain model by utilizing the similarities between sample data features, training model structure, and training target tasks.

[0013] Step 7: Based on the transfer learning-based dual active full-bridge converter DAB neural network model M established in step 6 MN Double traverse to find the shift ratio combination (D1, D2) that meets the transmission power P requirement; set the optimization target T of this method to ensure the return power P B Minimum case, optimize current stress F C , then according to the optimization target T, the shift ratio combinations (D1, D2) that meet the transmission power P requirements are preliminarily traversed to find multiple shift ratio combinations (D1, D2) that meet the transmission power P; then, the multiple shift ratio combinations (D1, D2) that meet the transmission power P are sequentially traversed to obtain the return power P. B and current stress F C The optimal shift ratio combination (D1, D2) under different working conditions W is found by traversal optimization.

[0014] Step 8: Based on the discrete shift ratio combinations (D1, D2) of the dual active full-bridge converter DAB under different working conditions W obtained by optimizing in step 7, the given transmission power P of the dual active full-bridge converter DAB is generated according to the fuzzy rule theory. ref and the actual transmission power P a The fuzzy rule table between them is used to realize the continuous and accurate modulation of the dual active full-bridge converter DAB by applying the fuzzy inference system FIS.

[0015] Furthermore, step 4 includes the following sub-steps:

[0016] Sub-step 4.1: uniformly select N1 D1s and N2 D2s in the range [0,1] of the shift ratios D1 and D2 to form N1×N2 shift ratio combinations (D1, D2); similarly, the N1×N2 shift ratio combinations (D1, D2) correspond to N1×N2 transmission powers P and return powers P respectively. B and current stress F C combination;

[0017] Sub-step 4.2: Generic theoretical model database B T The generated N1×N2 sets of input and output data are divided into training set (70%), validation set (15%) and test set (15%), and a feedforward neural network is selected to train the dual active full-bridge converter DAB neural network model M based on theoretical data. TN ;

[0018] Sub-step 4.3: By changing the number of fully connected layers of the neural network and the number of corresponding neurons, and adjusting the weights and biases, a dual active full-bridge converter DAB neural network model M based on theoretical data with better training effect is obtained. TN .

[0019] Furthermore, the step 5 includes the following sub-steps:

[0020] Sub-step 5.1: uniformly select N3 D1s and N4 D2s in the range [0,1] of the shift ratios D1 and D2 to form N3×N4 shift ratio combinations (D1, D2); similarly, the N3×N4 shift ratio combinations (D1, D2) correspond to N3×N4 transmission powers P and return powers P respectively. B and current stress F C combination;

[0021] Sub-step 5.2: The measured database B R The generated N3×N4 sets of input and output data are divided into training set (70%), validation set (15%) and test set (15%), and a feedforward neural network is selected to train the dual active full-bridge converter DAB neural network model M based on the measured data. RN ;

[0022] Sub-step 5.3: By changing the number of fully connected layers of the neural network and the number of corresponding neurons, and adjusting the weights and biases, a dual active full-bridge converter DAB neural network model M based on measured data with better training effect is obtained. RN .

[0023] Furthermore, step 6 includes the following sub-steps:

[0024] Sub-step 6.1: Select the source domain model M with better training effect S , and specify the source domain model M S The first two layers of the hidden layer are migration layers, and the structure and parameters (w1b1, w2b2) of the migration layer are retained and migrated to the corresponding layers of the neural network target domain model; the neural network target domain model is the dual active full-bridge converter DAB neural network model M based on transfer learning MN ;

[0025] Sub-step 6.2: Train the neural network target domain model based on the small sample information S, and fine-tune and optimize the structure and parameters (w5b5, w6b6) of the last two layers of the neural network in the neural network target domain model to obtain a transfer learning-based dual active full-bridge converter DAB neural network model M with better prediction effect. MN .

[0026] Furthermore, the step 7 includes the following sub-steps:

[0027] Sub-step 7.1: Based on the transfer learning-based dual active full-bridge converter DAB neural network model M established in step 6 MN Generate a database of discrete transmission power point downward shift ratio combinations (D1, D2), traverse and select the shift ratio combinations (D1, D2) that meet the given transmission power P in the database, perform bubble sorting on the multiple groups of shift ratio combinations (D1, D2) obtained by traversal, and retain the shift ratio combination (D1, D2) with the smallest return power;

[0028] Sub-step 7.2: Determine whether there are multiple groups of return power P B If the shift ratio combination (D1, D2) is zero, the remaining return power P B The smallest shift ratio combination (D1, D2) is the optimal shift ratio combination (D1, D2) under the given transmission power P; if it exists, then traverse these multiple groups of return power P B The current stress F is found by comparing the phase shift combination (D1, D2) with zero phase shift. C The smallest group is the optimal shift ratio combination (D1, D2) under the given transmission power P;

[0029] Sub-step 7.3: Repeat sub-step 7.2 continuously, save the optimal shift ratio combination (D1, D2) under the given transmission power P, and find the optimal shift ratio combination (D1, D2) under all discrete transmission power points.

[0030] Furthermore, the step 8 includes the following sub-steps:

[0031] Sub-step 8.1: Set the fuzzy inference system FIS modulator input is the given transmission power P refand the actual transmission power P a The output is the change in the internal displacement of the bridge △D1 and the change in the inter-bridge displacement △D2; the given transmission power P ref and the actual transmission power P a The fuzzy set domain is set to [0,1], and the fuzzy subsets are {VS, MS, M, MB, VB}, where VS, MS, M, MB, and VB represent very small, medium small, medium, medium large, and very large, respectively; the normalized fuzzy domain of the bridge internal displacement relative change △D1 and the bridge inter-displacement relative change △D2 is [-1,1], and the fuzzy subsets are {NB, NMB, NMS, NS, Z, PS, PMS, PMB, PB}, where NB, NMB, NMS, NS, Z, PS, PMS, PMB, and PB represent negative large, negative medium large, negative medium small, negative small, zero, positive small, positive medium small, positive medium large, and positive large, respectively;

[0032] Sub-step 8.2: The initial membership function of the fuzzy inference system modulator adopts the Gaussian membership function. The membership function divides the input value into 5 word sets. After fuzzy inference, the fuzzy rule 1 of the bridge internal displacement phase change △D1 and the fuzzy rule 2 of the bridge inter-displacement phase change △D2 are obtained. Each fuzzy rule contains 25 rules. The rule table of fuzzy rule 1 is shown in Table 5, and the rule table of fuzzy rule 2 is shown in Table 6.

[0033] Table 5

[0034]

[0035] Table 6

[0036]

[0037]

[0038] Sub-step 8.3: Randomly select an initial shift phase combination (D1, D2) from the dual active full-bridge converter DAB discrete shift phase combinations (D1, D2) obtained in step 7. 1fi ,D 2fi ) to perform fuzzy control adjustment; taking the bridge shift ratio change △D2 as an example, the entire fuzzy control adjustment process of the fuzzy inference system FIS is explained: when the fuzzy inference system FIS modulator detects a given transmission power P on the input side ref and the actual transmission power P a When, first, the given transmission power P ref and the actual transmission power P a Input membership function to calculate the given transmission power P ref and the actual transmission power P aThe membership degree of each word set; then, fuzzy rule 2 is applied to calculate the output O1, O2…O of each rule N ; Output O1, O2…O for all rules N The weighted average calculation is performed to obtain the bridge displacement phase change △D2, that is:

[0039]

[0040] In the formula, w i is the weight under the i-th rule, O i refers to the output under the i-th rule, N is the total number of rules, and ∑ refers to the summation operation of N variables;

[0041] Finally, the initial bridge displacement phase D is corrected based on the bridge displacement phase change △D2 2fi , the bridge displacement is D 2i ;

[0042] Similarly, the fuzzy control adjustment process of the bridge internal shift phase D1 is the same as the above process, that is, when the fuzzy inference system FIS modulator detects the given transmission power P on the input side ref and the actual transmission power P a When, first, the given transmission power P ref and the actual transmission power P a Input membership function to calculate the given transmission power P ref and the actual transmission power P a The membership degree of each language set. Then, fuzzy rule 1 is applied to calculate the output O1, O2…O of each rule. N Finally, for all the rules output O1, O2…O N The weighted average calculation is performed to obtain the bridge displacement change △D1, and the initial bridge displacement D is corrected. 1fi Get the bridge displacement compared to D 1i ;

[0043] Sub-step 8.4: The bridge shift D obtained by the fuzzy inference system FIS modulator 2i Based on this, an error correction link is added, that is, the given transmission power P of the dual active full-bridge converter DAB is ref The actual transmission power P a The error value is obtained by subtraction, and then the bridge displacement ratio D is obtained after PI adjustment (i.e. proportional-integral adjustment). 2i The correction coefficient α1 is used to obtain the actual bridge displacement D2, namely:

[0044] D2=α1D 2i (Formula 9)

[0045] Sub-step 8.5: Based on the real-time modulation of the discrete shift ratio combination (D1, D2) of the dual active full-bridge converter DAB in sub-steps 8.3 and 8.4, a pulse width modulator is used to realize continuous and optimized modulation of the dual active full-bridge converter DAB under EPS control.

[0046] In summary, if Figure 1 As shown, the control method of the present invention first establishes a theoretical mathematical model based on the theoretical analysis of the dual-active full-bridge converter DAB and generates a theoretical model database, and at the same time collects the measured data of the dual-active full-bridge converter DAB to establish a measured database; then, combining the idea of ​​transfer learning, a dual-active full-bridge converter DAB neural network model based on transfer learning with better prediction effect is established; then, on the basis of the dual-active full-bridge converter DAB neural network model based on transfer learning, a double traversal algorithm is designed according to the optimization target to obtain a discrete optimized shift ratio combination; finally, based on the obtained discrete optimized shift ratio combination, a fuzzy inference system is applied to realize continuous control of the dual-active full-bridge converter DAB.

[0047] Compared with the prior art, the control method of the present invention has the following beneficial effects: 1. Based on the actual measurement data collected from the dual-active full-bridge converter DAB, a dual-active full-bridge converter DAB neural network model based on transfer learning is established in combination with the theoretical data model. Compared with the traditional EPS theoretical model control method, the control method of the present invention can significantly improve the actual prediction accuracy of the dual-active full-bridge converter DAB under small sample measurement conditions; 2. The present invention designs a double traversal algorithm to optimize the full mode of the dual-active full-bridge converter DAB neural network model based on transfer learning. Compared with the existing EPS optimization control method, the control method of the present invention realizes further optimization of the reflux power and current stress of the dual-active full-bridge converter DAB, and improves the power transmission efficiency; 3. Based on the discrete optimization results of the double traversal algorithm optimization, the present invention applies a fuzzy inference system to realize continuous modulation. The control method of the present invention has a high degree of automation, replaces the traditional complex optimization analysis process, reduces the workload of engineers, and is convenient for industrial application and digital realization. In summary, the control method of the present invention effectively optimizes the DAB modulation effect of the dual active full-bridge converter, has a high degree of automation, reduces the reflux power and current stress of the dual active full-bridge converter, and improves the transmission efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 A method flow chart of the control method of the present invention;

[0049] Figure 2 It is the circuit schematic diagram of the dual active full bridge converter DAB;

[0050] Figure 3This is a typical operating waveform of the dual active full-bridge converter DAB under EPS control;

[0051] Figure 4 It is the working waveform diagram of the dual active full bridge converter DAB under the control of various EPS modes;

[0052] Figure 5 The principle block diagram of the dual active full-bridge converter DAB experimental platform built for the present invention;

[0053] Figure 6 The DAB neural network model M of the dual active full-bridge converter based on transfer learning is established in the present invention. MN Schematic diagram;

[0054] Figure 7 A flowchart of the double traversal algorithm for optimization in the present invention;

[0055] Figure 8 It is a control principle block diagram of realizing EPS continuous optimization modulation based on fuzzy inference system in the present invention;

[0056] Fig. 9 This is a graph of the prediction accuracy of the neural network under different data samples in the validation experiment;

[0057] Fig.10 It is a working waveform diagram of the dual active full bridge converter DAB using the control method of the present invention when the transmission power changes suddenly in the verification experiment;

[0058] Fig.11 The experimental waveforms of the dual active full-bridge converter DAB under three control methods at low transmission power in the verification experiment;

[0059] Fig.12 The experimental waveforms of the dual active full-bridge converter DAB under three control methods at high transmission power in the verification experiment;

[0060] Fig.13 This is a comparison of the power transmission efficiency of the dual active full-bridge converter DAB with the transmission power under three control methods in the verification experiment; DETAILED DESCRIPTION

[0061] The technical solution claimed in the present invention is further described below through a relatively specific embodiment. The embodiment is implemented by the dual active full-bridge converter DAB composite optimization control method based on neural network and fuzzy control described in the present invention. The specific steps are as follows:

[0062] Step 1: Based on theoretical analysis, establish the full-mode theoretical mathematical model M of the dual active full-bridge converter DAB T , Theoretical mathematical model M TIt includes the ratio of the shift ratio D1 and D2 to the transmission power P, the ratio of the shift ratio D1 and D2 to the return power P under different voltage transfer ratios k. B The shift ratio between D1 and D2 and the current stress F C A general theoretical mathematical model for the bridge; wherein the displacement ratio D1 is the displacement ratio within the bridge, and the displacement ratio D2 is the displacement ratio between the bridges; specifically comprising the following sub-steps:

[0063] Sub-step 1.1: If Figure 3 As shown in the figure, a typical operating waveform of the dual active full-bridge converter DAB under EPS modulation is shown. In the steady state, the inductor current i L Symmetry will be shown within a period. Figure 3 Under the typical operating conditions shown, the inductor current i L The instantaneous value at each moment in a cycle can be expressed as:

[0064]

[0065] Where, L is the sum of the auxiliary inductance of the dual active full-bridge converter DAB and the leakage inductance of the transformer, n is the transformer ratio, V2 is the output side voltage of the dual active full-bridge converter DAB, and f s is the switching frequency of the dual active full-bridge converter DAB, k is the voltage transfer ratio;

[0066] Then the average transmission power P of the dual active full-bridge converter DAB in the EPS modulation steady state is E for:

[0067]

[0068] Among them, T s is half a switching cycle of the dual active full-bridge converter DAB, U ab is the output voltage of the primary H-bridge, V1 is the input voltage of the dual active full-bridge converter DAB;

[0069] The maximum transmission power P of the dual active full-bridge converter DAB under single phase shift modulation N for:

[0070]

[0071] The average current i of the primary side of the dual active full-bridge converter DAB under the maximum transmission power condition is N for:

[0072]

[0073] P N As the reference value, the per-unit value P of the transmission power under EPS modulation can be obtained by normalizing (Equation 2):

[0074] P=P E / P N =4D2(1-D2)+2D1(1-D1-2D2) (Formula 5)

[0075] Depend on Figure 3 It can be seen that the dual active full-bridge converter DAB is between t1 and t1 * The reflux power is generated during the time. Similarly, the reflux power of this period is integrated and expressed as P N The return power standard value P can be obtained by standardizing the reference value bf :

[0076]

[0077] exist Figure 3 Under the typical operating conditions shown, the inductor current reaches its maximum value at time t0. pk , then the current stress F C The per unit value i G for:

[0078] i G =i pk / i N =2[k(1-D1)+2D1+2D2-1] (Formula 7)

[0079] Sub-step 1.2: The EPS working modes are divided into six types according to the influence of the shift ratios D1 and D2 on the transmission power P. The working waveforms of the dual active full-bridge converter DAB in each mode are as follows: Figure 4 The calculation of the transmission power per unit value in each mode is the same as the solution method in sub-step 1.1, and the specific process will not be repeated. The expression of the transmission power per unit value in each mode is shown in Table 1:

[0080] Table 1

[0081]

[0082] Sub-step 1.3: The return power of the dual active full-bridge converter DAB under EPS modulation is affected by the primary and secondary output voltages and the inductor current. Therefore, the return power has different expressions under different modes and different working conditions of the same mode. The return power is specified as the voltage transfer ratio k (k = V1 / nV2) and the inductor current i L The position of the zero-crossing point is used as the classification condition, and the calculation method of the return power in sub-step 1.1 is used to solve the return power per unit value under different working conditions. The specific expression is shown in Table 2. In the table, the return power under some working conditions not listed is zero;

[0083] Table 2

[0084]

[0085]

[0086] Sub-step 1.4: The current stress of the dual active full-bridge converter DAB under EPS modulation has different expressions in different modes and different working conditions of the same mode. Refer to the classification of the return power classification conditions and use the calculation method of the current stress in sub-step 1.1 to solve the current stress expression under each mode working condition. The specific expression is shown in Table 3:

[0087] Table 3

[0088]

[0089] Step 2: Based on the dual active full-bridge converter DAB full-mode theoretical mathematical model M T Automatically generate the variable shift ratio D1 and D2, transmission power P, return power P B , current stress F C General Theoretical Model Database B T ; Specifically includes the following sub-steps:

[0090] Sub-step 2.1: The sample capacity of the theoretical data model is set to 250, 500, 1000, 2000, and 3000, respectively, and the value is uniformly selected within the range of the shift ratio D1 and D2 according to the size of the sample capacity. Based on the theoretical analysis of each mode of the dual active full-bridge converter DAB under EPS modulation in sub-steps 1.2, 1.3 and 1.4, the method of the present invention chooses to establish a theoretical data model in Matlab.

[0091] Step 3: For any dual-active full-bridge converter DAB, collect the transfer ratios D1 and D2, transmission power P, and return power P of the converter under different voltage transfer ratios k. B , current stress F C Data, to establish the actual measurement database B of the dual active full bridge converter DAB R ; Specifically includes the following sub-steps:

[0092] Sub-step 3.1: Build a dual-active full-bridge converter DAB experimental prototype. By adjusting the prototype parameters, any dual-active full-bridge converter DAB can be realized. The specific circuit structure is as follows: Figure 2 As shown, it includes a high-frequency transformer, a supporting capacitor, an auxiliary inductor, and a primary-secondary H-bridge. In this embodiment, the primary-secondary H-bridge is constructed using CM100DY-24NF IGBT. The specific experimental parameters are shown in Table 4:

[0093] Table 4

[0094]

[0095] Sub-step 3.2: If Figure 5 As shown, an experimental platform is built, which includes a host computer for data processing, and uses sensors to measure the input voltage V1, output voltage V2, and output voltage U of the primary H bridge of the dual active full-bridge converter DAB. ab , inductor current i L And the output current i o The sampling circuit for sampling and the driving circuit of the dual active full bridge converter DAB are used; the sampling data of the sampling circuit are processed by the host computer data to calculate the transmission power P and the return power P of the dual active full bridge converter DAB experimental prototype B , current stress F C Measured data of

[0096] In this embodiment, a USB-5211 data acquisition card, a LA55-P current sensor, and a CHV-50P / 800 voltage sensor are selected to form a sampling circuit of a dual active full-bridge converter DAB; a DA962D2 dual-tube IGBT driver board is selected to form a drive circuit;

[0097] Sub-step 3.3: The sample sizes of the measured data are set to 150, 300, 600, 1200, 2000, and 3000 respectively. According to the size of the sample size, the values ​​are uniformly selected within the range of the shift ratios D1 and D2, and the measured database B of the dual active full-bridge converter DAB under EPS modulation is established based on the measured data collected in sub-steps 3.1 and 3.2. R .

[0098] Step 4: Based on the dual active full-bridge converter DAB general theoretical model database B established in step 2 T , select the shift ratio D1 and D2 as the input of the neural network model, select the transmission power P, the return power P B , current stress F C As the output of the neural network model, a dual active full-bridge converter DAB neural network model M is established based on theoretical data. TN ; Specifically includes the following sub-steps:

[0099] Sub-step 4.1: uniformly select N1 D1s and N2 D2s in the range [0,1] of the shift ratios D1 and D2 to form N1×N2 shift ratio combinations (D1, D2); similarly, the N1×N2 shift ratio combinations (D1, D2) correspond to N1×N2 transmission powers P and return powers P respectively. B and current stress F C combination;

[0100] Sub-step 4.2: Generic theoretical model database B T The generated N1×N2 sets of input and output data are divided into training set (70%), validation set (15%) and test set (15%), and a feedforward neural network is selected to train the dual active full-bridge converter DAB neural network model M based on theoretical data. TN ;

[0101] Sub-step 4.3: By changing the number of fully connected layers of the neural network and the number of corresponding neurons, and adjusting the weights and biases, a dual active full-bridge converter DAB neural network model M based on theoretical data with better training effect is obtained. TN .

[0102] Step 5: Based on the actual measurement database B of the dual active full bridge converter DAB established in step 3 R , select the shift ratio D1 and D2 as the input of the neural network model, select the transmission power P, the return power P B , current stress F C As the output of the neural network model, a dual active full-bridge converter DAB neural network model M based on measured data is established. RN ; Specifically includes the following sub-steps:

[0103] Sub-step 5.1: uniformly select N3 D1s and N4 D2s in the range [0,1] of the shift ratios D1 and D2 to form N3×N4 shift ratio combinations (D1, D2); similarly, the N3×N4 shift ratio combinations (D1, D2) correspond to N3×N4 transmission powers P and return powers P respectively. B and current stress F C combination;

[0104] Sub-step 5.2: The measured database B R The generated N3×N4 sets of input and output data are divided into training set (70%), validation set (15%) and test set (15%), and a feedforward neural network is selected to train the dual active full-bridge converter DAB neural network model M based on the measured data. RN ;

[0105] Sub-step 5.3: By changing the number of fully connected layers of the neural network and the number of corresponding neurons, and adjusting the weights and biases, a dual active full-bridge converter DAB neural network model M based on measured data with better training effect is obtained. RN . Establish the DAB neural network model M of the dual active full-bridge converter based on measured data RN The purpose is to prove that the transfer learning method used in the method described in the present invention can achieve the same level of prediction accuracy with a small amount of measured data, saving time and cost.

[0106] Step 6: Based on the actual measurement database B of the dual active full-bridge converter DAB established in step 3 R , select the measured data as the small sample information S for transfer learning, and select the dual active full-bridge converter DAB neural network model M based on theoretical data in step 4 TN As the source domain model M S Combine the small sample information S with the source domain model M S Perform transfer learning processing and establish a dual active full-bridge converter DAB neural network model M based on transfer learning MN ;like Figure 6 As shown, it specifically includes the following sub-steps:

[0107] Sub-step 6.1: Select the source domain model M with better training effect S , and specify the source domain model M S The first two layers of the hidden layer are migration layers, and the structure and parameters (w1b1, w2b2) of the migration layer are retained and migrated to the corresponding layers of the neural network target domain model; the neural network target domain model is the dual active full-bridge converter DAB neural network model M based on transfer learning MN ;

[0108] Sub-step 6.2: Train the neural network target domain model based on the small sample information S, and fine-tune and optimize the structure and parameters (w5b5, w6b6) of the last two layers of the neural network in the neural network target domain model to obtain a transfer learning-based dual active full-bridge converter DAB neural network model M with better prediction effect. MN .

[0109] Step 7: Based on the transfer learning-based dual active full-bridge converter DAB neural network model M established in step 6 MN Double traverse to find the shift ratio combination (D1, D2) that meets the transmission power P requirement; set the optimization target T of this method to ensure the return power P B Minimum case, optimize current stress F C , then according to the optimization target T, the shift ratio combinations (D1, D2) that meet the transmission power P requirements are preliminarily traversed to find multiple shift ratio combinations (D1, D2) that meet the transmission power P; then, the multiple shift ratio combinations (D1, D2) that meet the transmission power P are sequentially traversed to obtain the return power P. B and current stress F C The optimal shift ratio combination (D1, D2) under different working conditions W is found by traversing optimization. Figure 7 As shown, it specifically includes the following sub-steps:

[0110] Sub-step 7.1: Based on the transfer learning-based dual active full-bridge converter DAB neural network model M established in step 6 MN Generate a database of discrete transmission power point downward shift ratio combinations (D1, D2), traverse and select the shift ratio combinations (D1, D2) that meet the given transmission power P in the database, perform bubble sorting on the multiple groups of shift ratio combinations (D1, D2) obtained by traversal, and retain the shift ratio combination (D1, D2) with the smallest return power;

[0111] Sub-step 7.2: Determine whether there are multiple groups of return power P B If the shift ratio combination (D1, D2) is zero, the remaining return power P B The smallest shift ratio combination (D1, D2) is the optimal shift ratio combination (D1, D2) under the given transmission power P; if it exists, then traverse these multiple groups of return power P B The current stress F is found by comparing the phase shift combination (D1, D2) with zero phase shift. C The smallest group is the optimal shift ratio combination (D1, D2) under the given transmission power P;

[0112] Sub-step 7.3: Repeat sub-step 7.2 continuously, save the optimal shift ratio combination (D1, D2) under the given transmission power P, and find the optimal shift ratio combination (D1, D2) under all discrete transmission power points.

[0113] Step 8: Based on the discrete shift ratio combinations (D1, D2) of the dual active full-bridge converter DAB under different working conditions W obtained by optimizing in step 7, the given transmission power P of the dual active full-bridge converter DAB is generated according to the fuzzy rule theory. ref and the actual transmission power P a The fuzzy rule table between the two is used to realize the continuous and accurate modulation of the dual active full bridge converter DAB by applying the fuzzy inference system FIS. Figure 8 As shown, it specifically includes the following sub-steps:

[0114] Sub-step 8.1: Set the fuzzy inference system FIS modulator input is the given transmission power P ref and the actual transmission power P a The output is the change in the internal displacement of the bridge △D1 and the change in the inter-bridge displacement △D2; the given transmission power P ref and the actual transmission power P aThe fuzzy set domain is set to [0,1], and the fuzzy subsets are {VS, MS, M, MB, VB}, where VS, MS, M, MB, and VB represent very small, medium small, medium, medium large, and very large, respectively; the normalized fuzzy domain of the bridge internal displacement relative change △D1 and the bridge inter-displacement relative change △D2 is [-1,1], and the fuzzy subsets are {NB, NMB, NMS, NS, Z, PS, PMS, PMB, PB}, where NB, NMB, NMS, NS, Z, PS, PMS, PMB, and PB represent negative large, negative medium large, negative medium small, negative small, zero, positive small, positive medium small, positive medium large, and positive large, respectively;

[0115] Sub-step 8.2: The initial membership function of the fuzzy inference system modulator adopts the Gaussian membership function. The membership function divides the input value into 5 word sets. After fuzzy inference, the fuzzy rule 1 of the bridge internal displacement phase change △D1 and the fuzzy rule 2 of the bridge inter-displacement phase change △D2 are obtained. Each fuzzy rule contains 25 rules. The rule table of fuzzy rule 1 is shown in Table 5, and the rule table of fuzzy rule 2 is shown in Table 6.

[0116] Table 5

[0117]

[0118]

[0119] Table 6

[0120]

[0121] Sub-step 8.3: Randomly select an initial shift phase combination (D1, D2) from the dual active full-bridge converter DAB discrete shift phase combinations (D1, D2) obtained in step 7. 1fi ,D 2fi ) to perform fuzzy control adjustment; taking the bridge shift ratio change △D2 as an example, the entire fuzzy control adjustment process of the fuzzy inference system FIS is explained: when the fuzzy inference system FIS modulator detects a given transmission power P on the input side ref and the actual transmission power P a When, first, the given transmission power P ref and the actual transmission power P a Input membership function to calculate the given transmission power P ref and the actual transmission power P a The membership degree of each word set; then, fuzzy rule 2 is applied to calculate the output O1, O2…O of each rule N ; Output O1, O2…O for all rules N The weighted average calculation is performed to obtain the bridge displacement phase change △D2, that is:

[0122]

[0123] In the formula, w i is the weight under the i-th rule, O i refers to the output under the i-th rule, N is the total number of rules, and ∑ refers to the summation operation of N variables;

[0124] Finally, the initial bridge displacement phase D is corrected based on the bridge displacement phase change △D2 2fi , the bridge displacement is D 2i ;

[0125] Similarly, the fuzzy control adjustment process of the bridge internal shift phase D1 is the same as the above process, that is, when the fuzzy inference system FIS modulator detects the given transmission power P on the input side ref and the actual transmission power P a When, first, the given transmission power P ref and the actual transmission power P a Input membership function to calculate the given transmission power P ref and the actual transmission power P a The membership degree of each language set. Then, fuzzy rule 1 is applied to calculate the output O1, O2…O of each rule. N Finally, for all the rules output O1, O2…O N The weighted average calculation is performed to obtain the bridge displacement change △D1, and the initial bridge displacement D is corrected. 1fi Get the bridge inward displacement compared to D 1i ;

[0126] Sub-step 8.4: The bridge shift D obtained by the fuzzy inference system FIS modulator 2i Based on this, an error correction link is added, that is, the given transmission power P of the dual active full-bridge converter DAB is ref The actual transmission power P a The error value is obtained by subtraction, and then the bridge displacement ratio D is obtained after PI adjustment (i.e. proportional-integral adjustment). 2i The correction coefficient α1 is used to obtain the actual bridge displacement D2, namely:

[0127] D2=α1D 2i (Formula 9)

[0128] Sub-step 8.5: Based on the real-time modulation of the discrete shift ratio combination (D1, D2) of the dual active full-bridge converter DAB in sub-step 8.3 and sub-step 8.4, the dual active full-bridge converter DAB is continuously and optimally modulated under EPS control by a pulse width modulator. In this embodiment, the pulse width modulator dSPACE2103 is used.

[0129] In order to verify the composite optimization control method of dual active full-bridge converter DAB based on neural network and fuzzy control described in the present invention, the following verification experiment was implemented:

[0130] 1. Comparative experiment of model accuracy based on theoretical data, measured data and transfer learning method

[0131] Taking the transmission power P of the dual-active full-bridge converter DAB as an example, different numbers of theoretical data groups and measured data groups in the full power range of the dual-active full-bridge converter DAB in the EPS modulation mode are used to complete the experimental comparison of the neural network prediction accuracy of the dual-active full-bridge converter DAB under different data models. Model accuracy comparison experiments based on theoretical data, measured data and transfer learning methods are set up respectively, where M1 is a sample combination of 300 theoretical data and 300 measured data, M2 is a sample combination of 1000 theoretical data and 300 measured data, and M3 is a sample combination of 3000 theoretical data and 300 measured data.

[0132] like Fig. 9 (a) shows the prediction accuracy of the neural network under different theoretical data. It can be seen that when the number of theoretical data reaches more than 1000, the accuracy of the data model established by the theoretical data is stable at around 93.7%; Fig. 9 (b) shows the prediction accuracy of the neural network under different measured data. It can be seen that when the number of measured data reaches more than 2000, the accuracy of the data model established by the measured data is stable at around 95.7%; Fig. 9 (c) shows the prediction accuracy of the neural network under transfer learning with different sample combinations. It can be seen that on the basis of 300 measured data, when the number of theoretical data reaches more than 1000, the accuracy of the data model established under the transfer learning method is stable at around 95.6%. From the experimental results, it can be seen that the method of the present invention establishes a dual active full-bridge converter DAB neural network model M based on transfer learning. MN The prediction accuracy of the dual active full-bridge converter DAB can be improved under the condition of small sample measured data, wherein the experimental results of the sample combination M3 fully verify the control method of the present invention.

[0133] 2. Verification experiment of continuous modulation of dual active full-bridge converter DAB under different working conditions under control of the method described in the present invention

[0134] The transmission power of the dual active full-bridge converter DAB is reduced from 1000W to 500W, such as Fig.10 (a) shows the working waveform of the dual active full bridge converter DAB using the control method of the present invention when the power suddenly decreases; the transmission power of the dual active full bridge converter DAB is increased from 1000W to 1500W, as shown in FIG. Fig.10 (b) shows the operating waveform of the dual active full bridge converter DAB using the control method of the present invention when the power suddenly increases. Fig.10 It can be seen that when the transmission power changes, the method of the present invention can achieve continuous modulation of the transmission power of the dual active full-bridge converter DAB.

[0135] 3. Comparative experiment on optimized modulation of dual active full-bridge converter DAB under different working conditions under various control methods

[0136] In order to prove the superiority of the control method of the present invention, the EPS shift ratio optimization control method and the theoretical model optimization control method in the prior art are selected as the comparison technology, and two typical experimental conditions are selected for experiments. The specific experimental results are as follows:

[0137] (1) Set the transmission power of the dual-active full-bridge converter DAB to 200W. The experimental waveforms of the dual-active full-bridge converter DAB under the three control methods are shown in Fig.11 As shown, Fig.11 (a) is the experimental waveform of the dual active full-bridge converter DAB under the control of the EPS shift phase optimization control method. Fig.11 (b) is the experimental waveform of the dual active full-bridge converter DAB under the control of the theoretical model optimization control method. Fig.11 (c) is an experimental waveform diagram of the dual active full bridge converter DAB under the control method of the present invention; Fig.11 It can be seen that when the dual active full bridge converter DAB has low transmission power, the three control methods do not have reflux power. The current stress under the EPS shift optimization control method is 0.3 A, the current stress under the theoretical model optimization control method is 0.28 A, and the current stress under the control method of the present invention is 0.23 A. Therefore, when the transmission power is low, the control method of the present invention can effectively reduce the current stress while ensuring that the reflux power is 0.

[0138] (2) Set the transmission power of the dual-active full-bridge converter DAB to 1600w. The experimental waveforms of the dual-active full-bridge converter DAB under the three control methods are shown in Fig.12 As shown; among them, Fig.12 (a) is the experimental waveform of the dual active full-bridge converter DAB under the control of the EPS shift phase optimization control method. Fig.12 (b) is the experimental waveform of the dual active full-bridge converter DAB under the control of the theoretical model optimization control method. Fig.12 (c) is an experimental waveform diagram of the dual active full bridge converter DAB under the control method of the present invention; Fig.12It can be seen that only the control method described in the present invention can achieve a return power of 0 for the dual-active full-bridge converter DAB at high transmission power, while the other two control methods have return power, and the return power of the dual-active full-bridge converter DAB under the EPS shift-to-optimization control method is significantly greater than the return power of the dual-active full-bridge converter DAB under the theoretical model optimization control method. Under high transmission power, the current stress under the EPS shift-to-optimization control method is 4.0A, the current stress under the theoretical model optimization control method is 3.8A, and the current stress under the control method described in the present invention is 0.23A. Therefore, under high transmission power conditions, the control method described in the present invention can also effectively reduce the return power and current stress.

[0139] In addition, in order to verify the optimization effect of the control method of the present invention on the power transmission efficiency of the dual active full-bridge converter DAB, a design is made to N By collecting the power P1 emitted by the input side voltage V1 of the dual active full-bridge converter DAB and the power P2 consumed by the output side voltage V2, the power transmission efficiency η = P2 / P1 can be calculated. The power transmission efficiency of the dual active full-bridge converter DAB under the three control methods is compared with the conversion curve of the transmission power as shown in the figure. Fig.13 As shown. Fig.13 It can be seen that when the transmission power is 200W, the converter efficiency of the EPS shift optimization control method is 79%, the converter efficiency under the theoretical model optimization control method is 82%, and the converter efficiency of the control method of the present invention is 88%. The efficiency improvement of the control method of the present invention is particularly obvious at low transmission power. Comparing the three control methods in the full power range, the efficiency of the optimization control method of the present invention is better than the other two control methods.

[0140] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A dual active full bridge converter DAB composite optimization control method based on neural network and fuzzy control, characterized in that: The following steps are involved: Step 1: Based on theoretical analysis, establish the full-mode theoretical mathematical model M of the dual active full-bridge converter DAB T , Theoretical mathematical model M T It includes the ratio of the shift ratio D1 and D2 to the transmission power P, the ratio of the shift ratio D1 and D2 to the return power P under different voltage transfer ratios k. B The shift ratio between D1 and D2 and the current stress F C The universal theoretical mathematical model of the bridge; wherein the displacement ratio D1 is the displacement ratio within the bridge, and the displacement ratio D2 is the displacement ratio between the bridges; Step 2: Based on the dual active full-bridge converter DAB full-mode theoretical mathematical model M T Automatically generate the variable shift ratio D1 and D2, transmission power P, return power P B , current stress F C General Theoretical Model Database B T ; Step 3: For any dual-active full-bridge converter DAB, collect the transfer ratios D1 and D2, transmission power P, and return power P of the converter under different voltage transfer ratios k. B , current stress F C Data, to establish the actual measurement database B of the dual active full bridge converter DAB R ; Step 4: Based on the dual active full-bridge converter DAB general theoretical model database B established in step 2 T , select the shift ratio D1 and D2 as the input of the neural network model, select the transmission power P, the return power P B , current stress F C As the output of the neural network model, a dual active full-bridge converter DAB neural network model M is established based on theoretical data. TN ; Step 5: Based on the actual measurement database B of the dual active full bridge converter DAB established in step 3 R , select the shift ratio D1 and D2 as the input of the neural network model, select the transmission power P, the return power P B , current stress F C As the output of the neural network model, a dual active full-bridge converter DAB neural network model M based on measured data is established. RN ; Step 6: Based on the actual measurement database B of the dual active full-bridge converter DAB established in step 3 R , select the measured data as the small sample information S for transfer learning, and select the dual active full-bridge converter DAB neural network model M based on theoretical data in step 4 TN As the source domain model M S ; Combine small sample information S with the source domain model M S Perform transfer learning processing and establish a dual active full-bridge converter DAB neural network model M based on transfer learning MN ; Step 7: Based on the transfer learning-based dual active full-bridge converter DAB neural network model M established in step 6 MN Double traverse to find the shift ratio combination (D1, D2) that meets the transmission power P requirement; set the optimization goal T of this method to ensure the return power P B Minimum case, optimize current stress F C , then according to the optimization target T, the shift ratio combinations (D1, D2) that meet the transmission power P requirements are preliminarily traversed to find multiple shift ratio combinations (D1, D2) that meet the transmission power P; then, the multiple shift ratio combinations (D1, D2) that meet the transmission power P are sequentially traversed to obtain the return power P. B and current stress F C The optimal shift ratio combination (D1, D2) under different working conditions W is found by traversal optimization. Step 8: Based on the discrete shift ratio combinations (D1, D2) of the dual active full-bridge converter DAB under different working conditions W obtained by optimizing in step 7, the given transmission power P of the dual active full-bridge converter DAB is generated according to the fuzzy rule theory. ref and the actual transmission power P a The fuzzy rule table between them is used to realize the continuous and accurate modulation of the dual active full-bridge converter DAB by applying the fuzzy inference system FIS.

2. The dual active full bridge converter DAB composite optimization control method based on neural network and fuzzy control according to claim 1 is characterized in that: The step 4 includes the following sub-steps: Sub-step 4.1: uniformly select N1 D1s and N2 D2s in the range [0,1] of the shift ratios D1 and D2 to form N1×N2 shift ratio combinations (D1, D2); similarly, the N1×N2 shift ratio combinations (D1, D2) correspond to N1×N2 transmission powers P and return powers P respectively. B and current stress F C combination; Sub-step 4.2: Generic theoretical model database B T The generated N1×N2 sets of input and output data are divided into training set (70%), validation set (15%) and test set (15%), and a feedforward neural network is selected to train the dual active full-bridge converter DAB neural network model M based on theoretical data. TN ; Sub-step 4.3: By changing the number of fully connected layers of the neural network and the number of corresponding neurons, and adjusting the weights and biases, a dual active full-bridge converter DAB neural network model M based on theoretical data with better training effect is obtained. TN .

3. A dual active full bridge converter DAB composite optimization control method based on neural network and fuzzy control according to claim 1 or 2, characterized in that: The step 5 comprises the following sub-steps: Sub-step 5.1: uniformly select N3 D1s and N4 D2s in the range [0,1] of the shift ratios D1 and D2 to form N3×N4 shift ratio combinations (D1, D2); similarly, the N3×N4 shift ratio combinations (D1, D2) correspond to N3×N4 transmission powers P and return powers P respectively. B and current stress F C combination; Sub-step 5.2: The measured database B R The generated N3×N4 sets of input and output data are divided into training set (70%), validation set (15%) and test set (15%), and a feedforward neural network is selected to train the dual active full-bridge converter DAB neural network model M based on the measured data. RN ; Sub-step 5.3: By changing the number of fully connected layers of the neural network and the number of corresponding neurons, and adjusting the weights and biases, a dual active full-bridge converter DAB neural network model M based on measured data with better training effect is obtained. RN .

4. The dual active full bridge converter DAB composite optimization control method based on neural network and fuzzy control according to claim 3 is characterized in that: The step 6 comprises the following sub-steps: Sub-step 6.1: Select the source domain model M with better training effect S , and specify the source domain model M S The first two layers of the hidden layer are migration layers, and the structure and parameters (w1b1, w2b2) of the migration layer are retained and migrated to the corresponding layers of the neural network target domain model; the neural network target domain model is the dual active full-bridge converter DAB neural network model M based on transfer learning MN ; Sub-step 6.2: Train the neural network target domain model based on the small sample information S, and fine-tune and optimize the structure and parameters (w5b5, w6b6) of the last two layers of the neural network in the neural network target domain model to obtain a transfer learning-based dual active full-bridge converter DAB neural network model M with better prediction effect. MN .

5. A dual active full bridge converter DAB composite optimization control method based on neural network and fuzzy control according to claim 1 or 4, characterized in that: The step 7 comprises the following sub-steps: Sub-step 7.1: Based on the transfer learning-based dual active full-bridge converter DAB neural network model M established in step 6 MN Generate a database of discrete transmission power point downward shift ratio combinations (D1, D2), traverse and select the shift ratio combinations (D1, D2) that meet the given transmission power P in the database, perform bubble sorting on the multiple groups of shift ratio combinations (D1, D2) obtained by traversal, and retain the shift ratio combination (D1, D2) with the smallest return power; Sub-step 7.2: Determine whether there are multiple groups of return power P B If the shift ratio combination (D1, D2) is zero, the remaining return power P B The smallest shift ratio combination (D1, D2) is the optimal shift ratio combination (D1, D2) under the given transmission power P; if it exists, then traverse these multiple groups of return power P B The current stress F is found by comparing the phase shift combination (D1, D2) with zero phase shift. C The smallest group is the optimal shift ratio combination (D1, D2) under the given transmission power P; Sub-step 7.3: Repeat sub-step 7.2 continuously, save the optimal shift ratio combination (D1, D2) under the given transmission power P, and find the optimal shift ratio combination (D1, D2) under all discrete transmission power points.

6. The dual active full bridge converter DAB composite optimization control method based on neural network and fuzzy control according to claim 5 is characterized in that: The step 8 comprises the following sub-steps: Sub-step 8.1: Set the fuzzy inference system FIS modulator input is the given transmission power P ref and the actual transmission power P a The output is the change in the internal displacement of the bridge △D1 and the change in the inter-bridge displacement △D2; the given transmission power P ref and the actual transmission power P a The fuzzy set domain is set to [0,1], and the fuzzy subsets are {VS, MS, M, MB, VB}, where VS, MS, M, MB, and VB represent very small, medium small, medium, medium large, and very large, respectively; the normalized fuzzy domain of the bridge internal displacement relative change △D1 and the bridge inter-displacement relative change △D2 is [-1,1], and the fuzzy subsets are {NB, NMB, NMS, NS, Z, PS, PMS, PMB, PB}, where NB, NMB, NMS, NS, Z, PS, PMS, PMB, and PB represent negative large, negative medium large, negative medium small, negative small, zero, positive small, positive medium small, positive medium large, and positive large, respectively; Sub-step 8.2: The initial membership function of the fuzzy inference system modulator adopts the Gaussian membership function. The membership function divides the input value into 5 word sets. After fuzzy inference, the fuzzy rule 1 of the bridge internal displacement phase change △D1 and the fuzzy rule 2 of the bridge inter-displacement phase change △D2 are obtained. Each fuzzy rule contains 25 rules. The rule table of fuzzy rule 1 is shown in Table 5, and the rule table of fuzzy rule 2 is shown in Table 6. Table 5 Table 6 Sub-step 8.3: Randomly select an initial shift phase combination (D1, D2) from the dual active full-bridge converter DAB discrete shift phase combinations (D1, D2) obtained in step 7. 1fi ,D 2fi ) to perform fuzzy control adjustment; taking the bridge shift ratio change △D2 as an example, the entire fuzzy control adjustment process of the fuzzy inference system FIS is explained: when the fuzzy inference system FIS modulator detects a given transmission power P on the input side ref and the actual transmission power P a When, first, the given transmission power P ref and the actual transmission power P a Input membership function to calculate the given transmission power P ref and the actual transmission power P a The membership degree of each word set; then, fuzzy rule 2 is applied to calculate the output O1, O2…O of each rule N ; Output O1, O2…O for all rules N The weighted average calculation is performed to obtain the bridge displacement phase change △D2, that is: In the formula, w i is the weight under the i-th rule, O i refers to the output under the i-th rule, N is the total number of rules, and ∑ refers to the summation operation of N variables; Finally, the initial bridge displacement phase D is corrected based on the bridge displacement phase change △D2 2fi , the bridge displacement is D 2i ; Similarly, the fuzzy control adjustment process of the bridge internal shift phase D1 is the same as the above process, that is, when the fuzzy inference system FIS modulator detects the given transmission power P on the input side ref and the actual transmission power P a When, first, the given transmission power P ref and the actual transmission power P a Input membership function to calculate the given transmission power P ref and the actual transmission power P a The membership degree of each language set; then, fuzzy rule 1 is applied to calculate the output O1, O2…O of each rule N ; Finally, for all the rules output O1, O2...O N The weighted average calculation is performed to obtain the bridge displacement change △D1, and the initial bridge displacement D is corrected. 1fi Get the bridge displacement compared to D 1i ; Sub-step 8.4: The bridge shift D obtained by the fuzzy inference system FIS modulator 2i Based on this, an error correction link is added, that is, the given transmission power P of the dual active full-bridge converter DAB is ref The actual transmission power P a The error value is obtained by subtraction, and then the bridge displacement D is obtained after PI adjustment. 2i The correction coefficient α1 is used to obtain the actual bridge displacement D2, namely: D2=α1D 2i (Formula 9) Sub-step 8.5: Based on the real-time modulation of the discrete shift ratio combination (D1, D2) of the dual active full-bridge converter DAB in sub-steps 8.3 and 8.4, a pulse width modulator is used to realize continuous and optimized modulation of the dual active full-bridge converter DAB under EPS control.

Citation Information

Cited By

  • DAB optimization modulation method based on artificial intelligence and circuit transient behavior

    CN119254027A

  • Dual-active full-bridge converter optimization control method fused with AI optimization algorithm

    CN119853398A