Intelligent soft switching and energy storage system collaborative optimization method and system

Through the collaborative optimization method of intelligent soft switching and energy storage systems, the voltage fluctuation problem caused by wind turbines and solar photovoltaic power generation resources is solved, high-precision voltage control and cost optimization are achieved, and the operating efficiency and economy of the power distribution system are improved.

CN118739244APending Publication Date: 2024-10-01ELECTRIC POWER RES INST OF GUANGXI POWER GRID CO LTD +1
View PDF 0 Cites 9 Cited by

Patent Information

Application Number
CN202410623711.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-20
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Uncertainties in the temporal and spatial distribution of wind turbines and solar photovoltaic power generation resources lead to feeder power fluctuations and voltage violations, making it difficult for traditional voltage regulation devices to achieve high-precision control.

Method used

Adopt the collaborative optimization method of intelligent soft switches and energy storage systems, determine the installation location of intelligent soft switches through improved sensitivity analysis, and establish a mathematical model of site selection and capacity and a system power flow optimization model based on the lowest annual comprehensive cost, which are converted into mixed integers Second-order cone programming model, solved to optimize power distribution systems.

Benefits of technology

It achieves high-precision control of voltage fluctuations, reduces the annual comprehensive cost of the distribution system, improves the system's operating efficiency and planning economy, and significantly reduces network losses and voltage deviations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118739244A_ABST
    Figure CN118739244A_ABST
Patent Text Reader

Abstract

The invention discloses a collaborative optimization method and system for an intelligent soft switch and an energy storage system, and the method comprises the steps: obtaining the data of a power distribution network, determining the installation position of an SOP according to an improved sensitivity analysis method, and enabling the energy storage system to be connected into the power distribution network. And establishing a locating and sizing mathematical model based on the lowest annual comprehensive cost as an upper-layer model in the collaborative planning double-layer model. And establishing a system power flow optimization model as a lower-layer model in the collaborative programming double-layer model, and converting the lower-layer model into a mixed integer second-order cone programming model. And solving the upper-layer model and the mixed integer second-order cone programming model to obtain a planning optimization scheme of the power distribution system. According to the collaborative optimization method and system for the intelligent soft switch and the energy storage system, the strong correlation of SOP and ESS planning configuration can be mined, the effect of cooperation with the ESS on optimized operation of the power distribution system is exerted while the economical efficiency is guaranteed, and the configuration and optimization level of the power distribution system under the background of multi-type source load access is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power distribution networks, and in particular to a method and system for collaborative optimization of an intelligent soft switch and an energy storage system. Background Art

[0002] With the increasing popularity of distributed power sources in distribution networks, traditional distribution networks are gradually developing into active distribution networks. Among them, wind turbines (WT) and solar photovoltaic (PV) resources have large uncertainties in temporal and spatial distribution, which often lead to severe fluctuations in feeder power and voltage violations. However, traditional voltage regulation devices, such as on-load tap-changing transformers (OLTCs) and switchable capacitor banks (CBs), are limited by physical conditions and cannot meet the requirements of high-precision voltage control when voltage fluctuations are frequent. Considering the current active distribution network architecture, source-load output characteristics and their distribution characteristics, it is of great significance to study the optimal distribution system collaborative planning optimization method. Comprehensively considering improving the economy of the distribution system, minimizing its network losses and suppressing voltage over-limit to achieve good distribution system planning is an important issue that needs in-depth research.

[0003] Based on the above problems, the intelligent soft switch (soft open point, SOP) is a new type of intelligent distribution device derived from the above background to replace the traditional tie switch. It can realize continuous active and reactive power flow control between different distribution network feeders. With the access of energy storage system (ESS), it can quickly respond to the voltage and load fluctuations caused by the introduction of distributed power sources. However, most of the current research is to optimize the operation strategy of SOP and ESS for the existing distribution network architecture.

[0004] Through the above research and analysis, it is found that the current coordinated configuration of SOP and ESS has certain limitations and does not fully consider the appropriate SOP site selection and its economy, and the configuration of the optimal distribution network system under the premise of SOP and ESS coordination. Summary of the invention

[0005] In view of the above-mentioned problems, the present invention is proposed.

[0006] Therefore, the technical problem solved by the present invention is that wind turbines (WT) and solar photovoltaic (PV) resources have large uncertainties in temporal and spatial distribution, which often lead to severe fluctuations in feeder power and voltage violations. However, traditional voltage regulation devices, such as on-load voltage regulators (OLTCs) and switchable capacitor banks (CBs), are limited by physical conditions and are difficult to meet the requirements of high-precision voltage control when voltage fluctuations are frequent.

[0007] To solve the above technical problems, the present invention provides the following technical solutions: a method for collaborative optimization of intelligent soft switches and energy storage systems, comprising: acquiring distribution network data, determining the installation location of the SOP according to an improved sensitivity analysis method, and connecting the energy storage system to the distribution network.

[0008] A mathematical model for site selection and capacity determination based on the lowest annual comprehensive cost is established as the upper model in the collaborative planning two-layer model.

[0009] A system power flow optimization model is established as a lower model in a collaborative planning double-layer model, and the lower model is converted into a mixed integer second-order cone programming model.

[0010] The upper model and the mixed integer second-order cone programming model are solved to obtain the planning optimization solution of the distribution system.

[0011] As a preferred solution of the intelligent soft switch and energy storage system collaborative optimization method described in the present invention, wherein: the determination of the installation location of the SOP according to the improved sensitivity analysis method includes: performing SOP site selection by improving sensitivity analysis, performing sensitivity calculation between two nodes in time period t, and calculating the sensitivity S of the power change of node i to the voltage of node j in time period t. ji,t It is expressed as:

[0012]

[0013] Among them, δ ji,t represents the traditional sensitivity of node i to node j during period t, v j,t represents the voltage offset weight factor of node j during period t, V j,t represents the voltage of node j during period t, V 0,j,t represents the expected voltage at node j during period t.

[0014] The node improvement sensitivity calculation is expressed as:

[0015]

[0016] Among them, S ji,t represents the sensitivity of the power change of node i to the voltage of node j during period t, τ t represents the weight factor for period t, n ex,t represents the number of nodes in the system where the voltage exceeds the limit during period t, max|V k,t -V 0,k,t |Indicates the maximum node voltage deviation value in the time period.

[0017] The improved sensitivity value between nodes i1 and j1 is calculated to be the largest, and is used as the primary access node of SOP. The improved sensitivity value between nodes i2 and j2 is calculated to be the second largest, so the second SOP best connection point is nodes i2 and j2, and so on.

[0018] As a preferred solution of the collaborative optimization method of the intelligent soft switch and energy storage system described in the present invention, the upper-level model includes, with the lowest annual comprehensive cost of configuring the SOP as the objective function, and with the access location and capacity of the SOP as constraints, a mathematical model for site selection and capacity determination based on the lowest annual comprehensive cost is established as the upper-level model in the collaborative planning two-layer model.

[0019] The objective function is expressed as:

[0020]

[0021] in, represents the annual investment cost of SOP, represents the annual operation and maintenance cost of SOP, C loss Represents the annual power supply loss cost of the distribution network.

[0022] The annual investment cost of SOP is expressed as:

[0023]

[0024] The annual operation and maintenance cost of SOP is expressed as:

[0025]

[0026] The annual power loss cost of the distribution network is expressed as:

[0027]

[0028] Among them, ψ(i) represents the set of neighboring nodes of node i, c SOP represents the unit capacity investment cost of SOP, S SOP,ij represents the capacity of the SOP installed between nodes i and j, y represents the service life of the SOP, β represents the annual operation and maintenance cost coefficient of the SOP, μ represents the annual power supply loss cost coefficient of the distribution network, and n t represents the total number of time periods, Δt represents the duration of each time period, and P i,t represents the injected active power of node i in period t, represents the active power loss of SOP at node i during period t.

[0029] The constraints of the upper model include the access position constraint of SOP and the access capacity constraint of SOP. The access capacity constraint of SOP is expressed as:

[0030] S k,SOP =n k S 0,SOP

[0031] Among them, nk Indicates the number of SOP installations, set n k ≤3.S 0,SOP Indicates the unit installation capacity of SOP.

[0032] As a preferred solution of the collaborative optimization method of the intelligent soft switch and energy storage system described in the present invention, the lower model includes, according to the SOP site selection location given by the upper model, taking the minimum total network loss of the distribution system and the minimum system voltage deviation as the objective function, establishing a distribution network optimization model as the lower model in the double-layer model.

[0033] The objective function of the power flow optimization model based on the lowest network loss and the smallest system voltage deviation is expressed as:

[0034] f=min(f loss +f V )

[0035]

[0036]

[0037] Among them, f loss Indicates the total network loss of the system operation, f V Indicates the minimum voltage deviation. Ω b represents a line branch set, represents the square value of the current in the line between nodes i and j at time t, R ij represents the resistance value of the jth line, T represents the time range period, Ω n Indicates the total number of nodes, represents the square value of the voltage at the ith node, represents the lower limit of the expected voltage range, Indicates the upper limit of the expected voltage range.

[0038] As a preferred solution of the intelligent soft switch and energy storage system collaborative optimization method described in the present invention, the lower model also includes constraints, including SOP operation constraints, distributed power supply output constraints, ESS constraints and power flow constraints.

[0039] As a preferred solution of the intelligent soft switch and energy storage system collaborative optimization method of the present invention, wherein: the conversion of the lower model into a mixed integer second-order cone programming model includes first replacing the square term with a variable to achieve linearization, and Use V s,i and I s,ij express:

[0040]

[0041]

[0042] The voltage deviation function is still nonlinear after variable substitution. The auxiliary variable A is introduced. s,L,i and A s,U,i replace and And add the corresponding inequality constraints:

[0043]

[0044]

[0045] The constraints of SOP, distributed generation, energy storage and system power flow still have quadratic terms after variable substitution, which can be expressed as:

[0046]

[0047]

[0048]

[0049]

[0050]

[0051] The transformed and relaxed expression is expressed as:

[0052]

[0053]

[0054]

[0055]

[0056]

[0057] The underlying model has now been converted to a mixed-integer second-order cone programming problem.

[0058] As a preferred solution of the collaborative optimization method of the intelligent soft switch and energy storage system described in the present invention, the solving of the upper model and the mixed integer second-order cone programming model includes solving the upper model using a particle swarm algorithm based on a compression factor, and using the CPLEX12.10 solver to solve the mixed integer second-order cone programming model obtained by converting the lower model to obtain a planning optimization solution for the distribution system.

[0059] An intelligent soft switch and energy storage system collaborative optimization system, characterized in that: it includes:

[0060] Determine the site selection module, obtain the distribution network data, determine the installation location of the SOP based on the improved sensitivity analysis method, and connect the energy storage system to the distribution network.

[0061] Configure the upper model module and establish a mathematical model for site selection and capacity determination based on the lowest annual comprehensive cost as the upper model in the collaborative planning two-layer model.

[0062] The lower-level model module is configured to establish a system power flow optimization model as the lower-level model in the collaborative planning double-level model, and the lower-level model is converted into a mixed integer second-order cone programming model.

[0063] The solution module solves the upper model and the mixed integer second-order cone programming model to obtain the planning optimization solution of the distribution system.

[0064] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above method when executing the computer program.

[0065] A computer-readable storage medium stores a computer program, which implements the steps of the method described above when executed by a processor.

[0066] The beneficial effects of the present invention are as follows: the present invention configures the configuration model of SOP access to the active distribution network more optimally, better explores the strong correlation between SOP and ESS planning configuration, and while ensuring the economy of the SOP planning scheme, gives full play to its role in coordinating with ESS to optimize the operation of the distribution system, thereby improving the configuration and optimization level of the distribution system under the background of multi-type source and load access. BRIEF DESCRIPTION OF THE DRAWINGS

[0067] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0068] Figure 1 An overall flow chart of a method for collaborative optimization of an intelligent soft switch and an energy storage system provided by the first embodiment of the present invention;

[0069] Figure 2 A flowchart of a solution method of an improved particle swarm algorithm combined with mixed integer second-order cone programming for a collaborative optimization method of an intelligent soft switch and an energy storage system provided by the first embodiment of the present invention;

[0070] Figure 3A schematic diagram of the structure of an improved IEE33 node system for a collaborative optimization method of an intelligent soft switch and an energy storage system provided in accordance with the second embodiment of the present invention. DETAILED DESCRIPTION

[0071] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0072] Example 1

[0073] Reference Figure 1 , Figure 2 , is an embodiment of the present invention, and provides a method for collaborative optimization of an intelligent soft switch and an energy storage system, comprising:

[0074] S1: Obtain distribution network data, determine the installation location of the SOP based on the improved sensitivity analysis method, and connect the energy storage system to the distribution network.

[0075] It should be noted that the location of the SOP is determined based on the improved voltage sensitivity analysis method, and the access location of the ESS is determined based on the impact of the ESS on the optimal operation of the system. The specific selection basis is:

[0076] The improved sensitivity analysis method first adds a weight factor according to the voltage offset of the node, and modifies the traditional sensitivity to reflect the importance of the voltage offset of the node to the sensitivity calculation. Then, according to the maximum node voltage offset of each time period and the number of nodes with voltage exceeding the limit, the weight is further modified, and the voltage offset of the entire system is considered. The larger the improved sensitivity value calculated after the improvement, the greater the impact of power change on voltage. SOP has flexible power regulation capabilities, so connecting SOP to nodes with larger improved sensitivity values ​​can effectively improve its voltage distribution and the voltage distribution of the entire system. Therefore, the SOP access point can be optimized according to the calculated improved sensitivity value. After the SOP access point is obtained according to the sensitivity value analysis, the ESS is connected to the active distribution network.

[0077] Improve sensitivity analysis for SOP site selection, calculate the sensitivity between two nodes in period t, and the sensitivity S of the power change of node i to the voltage of node j in period t ji,t It is expressed as:

[0078]

[0079] Among them, δ ji,trepresents the traditional sensitivity of node i to node j during period t, v j,t represents the voltage offset weight factor of node j during period t, V j,t represents the voltage of node j during period t, V 0,j,t represents the expected voltage at node j during period t.

[0080] The node improvement sensitivity calculation is expressed as:

[0081]

[0082] Among them, S ji,t represents the sensitivity of the power change of node i to the voltage of node j during period t, τ t represents the weight factor for period t, n ex,t represents the number of nodes in the system where the voltage exceeds the limit during period t, max|V k,t -V 0,k,t |Indicates the maximum node voltage deviation value in the time period.

[0083] The improved sensitivity value between nodes i1 and j1 is calculated to be the largest, and is used as the primary access node of SOP. The improved sensitivity value between nodes i2 and j2 is calculated to be the second largest, so the second SOP best connection point is nodes i2 and j2, and so on.

[0084] Furthermore, the location and capacity of the distribution system can be selected by comprehensively considering the effect of ESS access on reducing network losses and its impact on node voltage deviation, which can be constrained in the implementation process of the particle swarm algorithm through coding.

[0085] S2: Establish a mathematical model for site selection and capacity determination based on the lowest annual comprehensive cost as the upper model in the collaborative planning two-layer model.

[0086] Taking the lowest annual comprehensive cost of configuring SOP as the objective function and the access location and capacity of SOP as constraints, a mathematical model for site selection and capacity determination based on the lowest annual comprehensive cost is established as the upper model in the collaborative planning two-layer model.

[0087] The objective function is expressed as:

[0088]

[0089] in, represents the annual investment cost of SOP, represents the annual operation and maintenance cost of SOP, C loss Represents the annual power loss cost of the distribution network.

[0090] The annual investment cost of SOP is expressed as:

[0091]

[0092] The annual operation and maintenance cost of SOP is expressed as:

[0093]

[0094] The annual power loss cost of the distribution network is expressed as:

[0095]

[0096] Among them, ψ(i) represents the set of neighboring nodes of node i, c SOP represents the unit capacity investment cost of SOP, S SOP,ij represents the capacity of the SOP installed between nodes i and j, y represents the service life of the SOP, β represents the annual operation and maintenance cost coefficient of the SOP, μ represents the annual power supply loss cost coefficient of the distribution network, and n t represents the total number of time periods, Δt represents the duration of each time period, and P i,t represents the injected active power of node i in period t, represents the active power loss of SOP at node i during period t.

[0097] The constraints of the upper model include the SOP access location constraint and the SOP access capacity constraint.

[0098] The SOP access capacity constraint is expressed as:

[0099] S k,SOP =n k S 0,SOP

[0100] Among them, n k Indicates the number of SOP installations, set n k ≤3.S 0,SOP Indicates the unit installation capacity of SOP.

[0101] S3: Establish a system power flow optimization model as the lower model in the collaborative planning two-layer model, and convert the lower model into a mixed integer second-order cone programming model.

[0102] According to the SOP site selection location given by the upper model, the distribution network optimization model is established with the minimum total network loss and the minimum system voltage deviation as the objective function, which serves as the lower model in the two-layer model.

[0103] The objective function of the power flow optimization model based on the lowest network loss and the smallest system voltage deviation is expressed as:

[0104] f=min(f loss +f V )

[0105]

[0106]

[0107] Among them, f loss Indicates the total network loss of the system operation, f V Indicates the minimum voltage deviation. Ω b represents a line branch set, represents the square value of the current in the line between nodes i and j at time t, R ij represents the resistance value of the jth line, T represents the time range period, Ω n Indicates the total number of nodes, represents the square value of the voltage at the ith node, represents the lower limit of the expected voltage range, Indicates the upper limit of the expected voltage range.

[0108] The constraints include SOP operation constraints, distributed generation output constraints, ESS constraints and power flow constraints.

[0109] The conversion of the lower model into a mixed integer second-order cone programming model involves first replacing the square terms with variables to achieve linearization, and Use V s,i and I s,ij express:

[0110]

[0111]

[0112] The voltage deviation function is still nonlinear after variable substitution. The auxiliary variable A is introduced. s,L,i and A s,U,i replace and And add the corresponding inequality constraints:

[0113]

[0114]

[0115] The constraints of SOP, distributed generation, energy storage and system power flow still have quadratic terms after variable substitution, which can be expressed as:

[0116]

[0117]

[0118]

[0119]

[0120]

[0121] The transformed and relaxed expression is expressed as:

[0122]

[0123]

[0124]

[0125]

[0126]

[0127] The underlying model has now been converted to a mixed-integer second-order cone programming problem.

[0128] S4: Solve the upper model and the mixed integer second-order cone programming model to obtain the planning optimization solution for the distribution system.

[0129] The particle swarm algorithm based on compression factor is used to solve the upper model, and the mixed integer second-order cone programming model obtained by converting the lower model is solved using CPLEX12.10 solver to obtain the planning optimization plan of the distribution system.

[0130] Furthermore, the lower-level model has been converted into a mixed integer second-order cone model, which can be solved directly using the CPLEX12.10 commercial solver.

[0131] The particle swarm optimization algorithm (CPSO) based on compression factor is used to solve the upper model. The specific steps are as follows:

[0132] CPSO introduces a compression factor into the traditional PSO algorithm to adjust the speed update of particles. The value of the compression factor decreases with the increase of the number of iterations, which can maintain a larger search range in the early stage of the search to better explore the solution space. In the later stage of the search, the search range is gradually reduced to improve the search accuracy and convergence speed. Its speed update formula becomes:

[0133]

[0134] In the formula, Represents the compression factor.

[0135] The population and each individual are encoded so that the individuals can store the SOP installation location information and capacity information at the same time. The specific method is to divide the position vector of each individual into three segments: the improved sensitivity value between nodes, the SOP installation location, and the number of SOP installations. Therefore, the velocity vector of each individual is also divided into three parts.

[0136] like Figure 2 As shown, the lower model is solved as a sub-function of the particle swarm algorithm for solving the sensitivity value of the upper model, thereby forming a solution method for the particle swarm algorithm nested mixed integer second-order cone programming to solve the double-layer model.

[0137] The above embodiments also include a smart soft switch and energy storage system collaborative optimization system, specifically:

[0138] Determine the site selection module, obtain the distribution network data, determine the installation location of the SOP based on the improved sensitivity analysis method, and connect the energy storage system to the distribution network.

[0139] Configure the upper model module and establish a mathematical model for site selection and capacity determination based on the lowest annual comprehensive cost as the upper model in the collaborative planning two-layer model.

[0140] The lower-level model module is configured to establish a system power flow optimization model as the lower-level model in the collaborative planning two-level model, and the lower-level model is converted into a mixed integer second-order cone programming model.

[0141] The solution module solves the upper model and the mixed integer second-order cone programming model to obtain the planning optimization solution of the distribution system.

[0142] The computer device may be a server. The computer device includes a processor, a memory, an input / output interface (I / O for short) and a communication interface. The processor, the memory and the input / output interface are connected via a system bus, and the communication interface is connected to the system bus via the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data cluster data of a power monitoring system. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal via a network connection. When the computer program is executed by the processor, a method is implemented.

[0143] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory may include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory may include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0144] Example 2

[0145] Reference Figure 3 , which is an embodiment of the present invention, provides a method and system for collaborative optimization of an intelligent soft switch and an energy storage system. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through simulation experiments.

[0146] This embodiment takes the improved IEEE-33 node system structure as a typical embodiment, the voltage level of the example is 12.66kV, and the upper and lower limits of the voltage range are set to V max =1.06pu and V min=0.94pu, the expected voltage range is set to 0.98~1.02pu. Wind turbines are connected at nodes 13 and 30, and solar photovoltaic power generation is connected at nodes 7, 10, 24, and 27, with a capacity of 1000kVA. Considering the high penetration rate of distributed power sources, the active power of 2 wind turbines and 4 photovoltaic generators in this paper reaches 100% penetration level. By solving the configuration of the improved IEEE33 node system, Figure 3 shown.

[0147] The comparison results of the access locations of SOP and ESS and the cost, total loss, and voltage deviation of the distribution system are shown in Tables 1 and 2.

[0148] Table 1 Comparison of costs of different SOP access solutions

[0149]

[0150]

[0151] Table 2 Comparison of total loss and voltage deviation of different SOP access schemes

[0152]

[0153] It can be seen from the above figures, tables and planning strategies that this method can better configure the configuration model of SOP access to the active distribution network, better explore the strong correlation between SOP and ESS planning configuration, and fully play its role in coordinating with ESS to optimize the operation of the distribution system while ensuring the economy of the SOP planning scheme, and improve the planning level of the distribution system under the background of multi-type source and load access. Specifically, in this embodiment, by performing SOP site selection configuration on the improved sensitivity analysis results, and then coordinating with ESS to optimize the distribution network, the annual comprehensive cost of the distribution network is significantly reduced, the total network loss of the system is reduced by 33%, and the average voltage deviation is reduced by 62%. It effectively improves the operating efficiency and planning economy of the system, and has obvious beneficial effects.

[0154] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A method for collaborative optimization of intelligent soft switches and energy storage systems, characterized in that: include: Obtain distribution network data, determine the installation location of the SOP based on the improved sensitivity analysis method, and connect the energy storage system to the distribution network; Establish a mathematical model for site selection and capacity determination based on the lowest annual comprehensive cost as the upper model in the collaborative planning two-layer model; Establishing a system power flow optimization model as a lower model in a collaborative planning two-layer model, and converting the lower model into a mixed integer second-order cone programming model; The upper model and the mixed integer second-order cone programming model are solved to obtain the planning optimization solution of the distribution system.

2. The method for collaborative optimization of intelligent soft switches and energy storage systems according to claim 1, characterized in that: The method for determining the installation location of the SOP according to the improved sensitivity analysis method includes: improving the sensitivity analysis to select the SOP site, performing sensitivity calculation between two nodes in time period t, and calculating the sensitivity S of the power change of node i to the voltage of node j in time period t. ji,t It is expressed as: Among them, δ ji,t represents the traditional sensitivity of node i to node j during period t, v j,t represents the voltage offset weight factor of node j during period t, V j,t represents the voltage of node j during period t, V 0,j,t represents the expected voltage of node j during period t; The node improvement sensitivity calculation is expressed as: Among them, S ji,t represents the sensitivity of the power change of node i to the voltage of node j during period t, τ t represents the weight factor for period t, n ex,t represents the number of nodes in the system where the voltage exceeds the limit during period t, max|V k,t -V 0,k,t | represents the maximum node voltage offset value during the time period; It is calculated that the improved sensitivity value between nodes i1 and j1 is the largest, which is the primary access node of SOP; it is calculated that the improved sensitivity value between nodes i2 and j2 is the second largest, so the second SOP best connection point is nodes i2 and j2, and so on.

3. The method for collaborative optimization of intelligent soft switches and energy storage systems according to claim 2, characterized in that: The upper model includes, taking the lowest annual comprehensive cost of configuring SOP as the objective function, taking the access location and capacity of SOP as the constraint conditions, establishing a mathematical model of site selection and capacity determination based on the lowest annual comprehensive cost as the upper model in the collaborative planning two-layer model; The objective function is expressed as: in, represents the annual investment cost of SOP, represents the annual operation and maintenance cost of SOP, C loss represents the annual power loss cost of the distribution network; The annual investment cost of SOP is expressed as: The annual operation and maintenance cost of SOP is expressed as: The annual power loss cost of the distribution network is expressed as: Among them, ψ(i) represents the set of neighboring nodes of node i, c SOP represents the unit capacity investment cost of SOP, S SOP,ij represents the capacity of the SOP installed between nodes i and j, y represents the service life of the SOP, β represents the annual operation and maintenance cost coefficient of the SOP, μ represents the annual power supply loss cost coefficient of the distribution network, and n t represents the total number of time periods, Δt represents the duration of each time period, and P i,t represents the injected active power of node i in period t, represents the active power loss of SOP at node i during period t; The constraints of the upper model include SOP access position constraints and SOP access capacity constraints; The SOP access capacity constraint is expressed as: S k,SOP =n k S 0,SOP Among them, n k Indicates the number of SOP installations, set n k ≤3; S 0,SOP Indicates the unit installation capacity of SOP.

4. The method for collaborative optimization of intelligent soft switches and energy storage systems according to claim 3, characterized in that: The lower model includes, according to the SOP site selection location given by the upper model, taking the minimum total network loss of the distribution system and the minimum system voltage deviation as the objective function, establishing a distribution network optimization model as the lower model in the double-layer model; The objective function of the power flow optimization model based on the lowest network loss and the smallest system voltage deviation is expressed as: f=min(f loss +f V ) Among them, f loss Indicates the total network loss of the system operation, f V Represents the minimum voltage deviation; Ω b represents a line branch set, represents the square value of the current in the line between nodes i and j at time t, R ij represents the resistance value of the jth line, T represents the time range period, Ω n Indicates the total number of nodes, represents the square value of the voltage at the ith node, represents the lower limit of the expected voltage range, Indicates the upper limit of the expected voltage range.

5. The method for collaborative optimization of intelligent soft switches and energy storage systems according to claim 4, characterized in that: The lower layer model also includes constraints, including SOP operation constraints, distributed generation output constraints, ESS constraints and power flow constraints.

6. The method for collaborative optimization of intelligent soft switches and energy storage systems according to claim 5, characterized in that: The converting of the lower layer model into a mixed integer second-order cone programming model includes first replacing the square term with a variable to realize linearization, and Use V s,i and I s,ij express: The voltage deviation function is still nonlinear after variable substitution. The auxiliary variable A is introduced. s,L,i and A s,U,i replace and And add the corresponding inequality constraints: The constraints of SOP, distributed generation, energy storage and system power flow still have quadratic terms after variable substitution, which can be expressed as: The transformed and relaxed expression is expressed as: ||[2P ij 2Q ij I s,ij -V s,i ] T ||2≤V s,i +I s,ij The underlying model has now been converted to a mixed-integer second-order cone programming problem.

7. The method for collaborative optimization of intelligent soft switches and energy storage systems according to claim 6, characterized in that: The method for solving the upper model and the mixed integer second-order cone programming model includes solving the upper model using a particle swarm algorithm based on a compression factor, solving the mixed integer second-order cone programming model obtained by converting the lower model using a CPLEX12.10 solver, and obtaining a planning optimization solution for the distribution system.

8. An intelligent soft switch and energy storage system collaborative optimization system using the method according to any one of claims 1 to 7, characterized in that: Determine the site selection module, obtain distribution network data, determine the installation location of the SOP based on the improved sensitivity analysis method, and connect the energy storage system to the distribution network; Configure the upper model module and establish a mathematical model for site selection and capacity determination based on the lowest annual comprehensive cost as the upper model in the collaborative planning two-layer model; Configure a lower-level model module, establish a system power flow optimization model as a lower-level model in a collaborative planning two-level model, and convert the lower-level model into a mixed integer second-order cone programming model; The solution module solves the upper model and the mixed integer second-order cone programming model to obtain the planning optimization solution of the distribution system.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.

Citation Information

Cited By

  • Multi-resource collaborative configuration method for fusion type traction power supply system

    CN118920609A

  • Power distribution network optimization operation method based on modularization mobile energy storage and intelligent soft switch cooperation

    CN121055336A

  • Distributed photovoltaic power distribution network three-stage optimization method considering multi-device cooperation

    CN121307905A

  • Energy storage type intelligent soft switch double-layer optimization site selection method based on improved whale algorithm and second-order cone programming cooperation

    CN121749274A

  • An energy storage type intelligent soft switch double-layer optimization site selection method based on improved whale algorithm and second-order cone programming cooperation

    CN121749274B