Accurate positioning and mounting method for cable-stayed bridge main tower steel anchor beam cable guide pipe
By using the precise positioning method of the steel anchor beam and cable duct assembly during the construction of the cable-stayed bridge, and using the total station and hoisting equipment to correct the installation position of the cable duct, the difficulty in data acquisition and poor installation accuracy of the center position of the lower port of the cable duct is solved. problem, achieving the effects of simple construction, high efficiency and low cost.
Patent Information
- Application Number
- CN202411056103.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-10-11
AI Technical Summary
In the construction of cable-stayed bridges, it is difficult to collect data on the center position of the lower port of the steel anchor beam cable duct, with large errors, inconvenient operation, high safety risks, long time consumption, and low installation efficiency, resulting in poor positioning and installation accuracy.
A combination of steel anchor beams, welded cable guides and steel corbels is used. Through total station measurement and lifting equipment adjustment, the intersection of the inclined plane of the lower port of the cable guide is used as a positioning reference point to correct the installation position of the upper and lower ports of the cable guide to ensure installation. Accuracy.
The precise positioning of the cable guide is achieved, the construction difficulty is reduced, the operation is simplified, the construction period is shortened, the installation efficiency is improved, the cost investment is reduced, and the problem of positioning and installation accuracy is solved.
Smart Images

Figure CN118756589A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge engineering, and in particular to a method for accurately positioning and installing a steel anchor beam cable guide tube of a main tower of a cable-stayed bridge. Background Art
[0002] In the field of bridges, long-span cable-stayed bridges that span rivers and valleys are frequently appearing in municipal and highway projects. Cable-stayed bridges consist of three parts: the main tower, the cable and the main beam. Please refer to Figure 1 As an important force-bearing structure connecting the main tower and the main beam, the cable-stayed cable is the focus of control during the construction of the entire cable-stayed bridge. In order to ensure the quality of the cable-stayed cable construction, during the construction of the main tower column, the measurement error value of the overall precise positioning of the steel anchor beam cable guide tube is required to be very small. The positioning measurement work is done at high altitude and is greatly affected by external factors. Therefore, the precise positioning of the cable guide tube has become an important problem in the construction process of the cable-stayed bridge. According to the force characteristics of the cable-stayed cable structure, the precise positioning of the cable guide tube should give priority to ensuring the relative positioning accuracy of the cable guide tube axis and the cable. The relative deviation between the cable tube axis and the cable axis mainly depends on the absolute accuracy of the three-dimensional coordinates of the center of the upper port and the center of the lower port of the cable guide tube. The key to the positioning of the cable guide tube lies in the control of the three-dimensional coordinates of the center of the lower port of the cable guide tube and the axis of the steel anchor beam. In the actual measurement process, it is difficult to accurately mark the theoretical center position of the lower port of the cable guide tube, and the measurement centering rod cannot be directly erected at the center position of the lower port of the cable guide tube, making data collection difficult; due to the limitation of the high-altitude working space, the measurement centering rod is frequently moved, the measurement accuracy cannot be guaranteed, and the safety risk is large, the time is long, and the operation efficiency is low. Summary of the invention
[0003] The purpose of the present invention is to provide a method for accurately positioning and installing a steel anchor beam cable guide tube of a main tower of a cable-stayed bridge, so as to solve the problems of difficulty in collecting data on the center position of the lower port of the steel anchor beam cable guide tube, large errors, inconvenient operation, high safety risks, long time consumption, low installation efficiency, and poor positioning and installation accuracy.
[0004] In order to solve the above technical problems, the present invention provides a method for accurately positioning and installing a steel anchor beam cable guide tube of a main tower of a cable-stayed bridge, comprising:
[0005] Step S1, providing a section of steel anchor beam and its matching two steel brackets and four cable guide tubes, welding two cable guide tubes on each steel bracket according to design requirements, wherein the lower end of the cable guide tube is an inclined surface, and hoisting and assembling the steel anchor beam on the steel bracket welded with the two cable guide tubes and detachably connecting them through bolts to form an assembly assembly of the steel anchor beam, the cable guide tube and the steel bracket;
[0006] Step S2, taking the intersection of the long axis of the ellipse of the plane where the inclined surface of the lower port of the cable guide tube of the assembly is located and the upper part of the inclined surface of the lower port of the cable guide tube as the positioning reference point of the lower port of the cable guide tube, and taking the intersection of the plane where the upper port of the cable guide tube of the assembly is located and the central axis of the cable guide tube as the anchor point of the steel anchor beam;
[0007] Step S3, measuring and setting out the cross installation line of the steel anchor beam on the main tower rigid frame, and assembling the assembly on the main tower rigid frame by hoisting equipment, so that the cross axis of the steel anchor beam of the assembly coincides with the cross installation line on the main tower rigid frame;
[0008] Step S4, setting up a total station, installing a cover plate on the upper port of the cable guide tube of the assembly assembly on the rigid frame of the main tower, setting up a centering rod and a prism at the center of the axis of the upper port of the cable guide tube corresponding to the cover plate, measuring the coordinates of the steel anchor beam anchor point of the upper port of the cable guide tube of the assembly assembly by aligning the total station with the prism, and comparing them with the design coordinates to determine whether the installation position of the steel anchor beam anchor point meets the installation accuracy; if it does not meet the installation accuracy, hoisting and adjusting the assembly assembly as a whole by hoisting equipment until it meets the installation accuracy, so as to correct the installation position of the steel anchor beam anchor point of the upper port of the cable guide tube of the assembly assembly;
[0009] Step S5, using a total station to measure the coordinates (X2, Y2, Z2) of the anchor point of the steel anchor beam at the upper port of each cable guide tube and the coordinates (X, Y, Z) of the positioning reference point of the lower port of each cable guide tube, and determine the elevation deviation value and the transverse bridge deviation value of the lower port of the cable guide tube of the assembly according to formula (1) and formula (2), respectively:
[0010] △z=[(ZR / COS(α)]-[Z2-(X-X2)Tan(α)] (1);
[0011] Δy=Y-[(X2-X) Tan(β)+Y2] (2);
[0012] Among them, △z is the elevation deviation value, Δy is the transverse bridge deviation value, R is the radius of the cable guide tube, α is the vertical angle between the central axis of the cable guide tube and the horizontal plane, and β is the horizontal angle between the central axis of the cable guide tube and the vertical plane;
[0013] Loosen the bolts of the steel anchor beam of the assembly and the steel bracket welded with the cable guide tube, and move the position of the steel bracket relative to the steel anchor beam by the hoisting equipment according to the elevation deviation value and the transverse bridge deviation value, so as to correct the installation position of the positioning reference point of the lower port of the cable guide tube;
[0014] The steel anchor beam of the locking assembly is bolted to the steel bracket welded with the cable guide tube, and the cable guide tube is welded to the main tower rigid frame after the assembly assembly is corrected in the installation position.
[0015] Furthermore, the invention provides a method for accurately positioning and installing a cable guide tube of a cable-stayed bridge main tower steel anchor beam. In step S1, the steel anchor beam is hoisted and assembled on a steel bracket welded with two cable guide tubes by a truck crane on a platform and detachably connected by bolts to form an assembled assembly.
[0016] Furthermore, in the method for accurately positioning and installing the cable guide tube of the steel anchor beam of the main tower of a cable-stayed bridge provided by the present invention, in the step S2, the position of the positioning reference point is marked on the lower end of the cable guide tube of the assembly assembly with a marking pen.
[0017] Furthermore, in the method for accurately positioning and installing the steel anchor beam cable guide tube of the main tower of a cable-stayed bridge provided by the present invention, in the step S3, the assembly assembly is hoisted and assembled on the rigid frame of the main tower by using a tower crane as a hoisting device.
[0018] Furthermore, the present invention provides a method for accurately positioning and installing a cable guide tube for a cable-stayed bridge main tower. In step S4, the assembly assembly is hoisted and adjusted as a whole by using a tower crane as a hoisting device to correct the installation position of the steel anchor beam anchor point at the upper end of the cable guide tube of the assembly assembly.
[0019] Furthermore, the present invention provides a method for accurately positioning and installing the steel anchor beam cable guide tube of the main tower of a cable-stayed bridge. In step S4, a total station is set up on the control point of the forced centering observation pier, the three-dimensional coordinates of the measuring station point and the backsight point are input, and backsight orientation is performed, and a third point is selected to check the orientation accuracy.
[0020] Furthermore, the invention provides a method for accurately positioning and installing a cable guide tube for a cable-stayed bridge main tower. In step S5, a hoist is used as a lifting device to move the installation position of the positioning reference point of the lower port of the steel corbel correction cable guide tube.
[0021] Compared with the prior art, the present invention has the following beneficial effects:
[0022] The invention provides a method for accurately positioning and installing the cable guide tube of the steel anchor beam of the main tower of a cable-stayed bridge. In the assembly assembly formed by hoisting the steel anchor beam on a steel bracket welded with two cable guide tubes and detachably connected by bolts to form the steel anchor beam, the cable guide tube and the steel bracket, the intersection point of the elliptical long axis of the plane where the inclined surface of the lower port of the cable guide tube of the assembly assembly is located and the upper part of the inclined surface of the lower port of the cable guide tube is used as the positioning reference point of the lower port of the cable guide tube, the intersection point of the plane where the upper port of the cable guide tube of the assembly assembly is located and the central axis of the cable guide tube is used as the anchor point of the steel anchor beam, and the whole assembly is connected. The station instrument measures whether the installation position of the anchor point of the steel anchor beam meets the installation accuracy. The assembly assembly is hoisted and adjusted as a whole by hoisting equipment to correct the installation position of the anchor point of the steel anchor beam at the upper port of the cable guide tube of the assembly assembly. The bolts of the steel anchor beam of the assembly assembly and the steel corbel welded with the cable guide tube are loosened. According to the elevation deviation value and the transverse deviation value, the steel corbel is moved relative to the steel anchor beam by hoisting equipment to correct the installation position of the positioning reference point of the lower port of the cable guide tube, thereby achieving precise positioning of the upper and lower ports of the cable guide tube and ensuring the accuracy of its installation position.
[0023] The invention provides a method for accurately positioning and installing the cable guide tube of the steel anchor beam of the main tower of a cable-stayed bridge. In the case where there is no physical point at the center position of the lower port of the cable guide tube, and the lower port of the cable guide tube cannot be measured by installing a centering rod and a prism, resulting in the inability to position, measure and correct the installation position of the lower port of the cable guide tube, resulting in poor installation accuracy of the cable guide tube, the intersection point of the long axis of the ellipse of the plane where the inclined surface of the lower port of the cable guide tube of the assembly assembly is located and the upper part of the inclined surface of the lower port of the cable guide tube is used as the positioning reference point of the lower port of the cable guide tube, so that when the physical point of the lower port of the cable guide tube is determined, the measurement of the positioning reference point is realized, the positioning installation and correction of the lower port of the cable guide tube are realized, the construction difficulty when the cable guide tube is positioned is reduced, the construction operation is simple, the construction period is shortened, the construction process is simple and the cost investment is low, and the problems of difficult collection of the number of the lower ports of the cable guide tube and inaccurate measurement data are solved. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the anchor node structure of the inclined cable;
[0025] Figure 2 It is a schematic diagram of the main structure of the assembly;
[0026] Figure 3 It is the shape diagram of the lower port of the cable catheter;
[0027] Figure 4 It is a schematic diagram of the top view of the assembly;
[0028] Figure 5 It is a schematic diagram of the partial top view of the steel anchor beam;
[0029] Figure 6It is a schematic diagram of the vertical angle of the steel anchor beam anchor point at the upper end of the cable guide;
[0030] Figure 7 It is a schematic diagram of the horizontal angle of the anchor point of the steel anchor beam at the upper end of the cable guide;
[0031] Figure 8 It is a schematic diagram of the total station installation relationship;
[0032] Fig. 9 It is a flow chart of the precise positioning and installation method of the steel anchor beam cable guide tube of the main tower of a cable-stayed bridge;
[0033] As shown in the figure:
[0034] 1. Steel anchor beam, 11. Transverse axis, 12. Longitudinal axis, 2. Steel corbel, 3. Cable guide tube, 31. Center axis, 32. Long axis, 4. Bolt. DETAILED DESCRIPTION
[0035] The present invention is described in detail below in conjunction with the accompanying drawings: The advantages and features of the present invention will become more apparent from the following description. It should be noted that the accompanying drawings are in very simplified form and in non-precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.
[0036] Please refer to Fig. 9 The embodiment of the present invention provides a method for accurately positioning and installing a steel anchor beam cable guide tube of a main tower of a cable-stayed bridge, which may include the following steps:
[0037] Step S1, please refer to Figure 2 and Figure 4 A steel anchor beam 1 and two steel brackets 2 and four cable guide tubes 3 are provided. Two cable guide tubes 3 are welded on each steel bracket 2 according to design requirements. The lower end of the cable guide tube 3 is an inclined surface. The steel anchor beam 1 is hoisted and assembled on the steel bracket 2 welded with two cable guide tubes 3 and detachably connected by bolts 4 to form an assembly assembly of the steel anchor beam 1, the cable guide tube 3 and the steel bracket 2. The assembly assembly is as follows: Figure 2 and Figure 4 In step S1, the steel anchor beam 1 can be hoisted and assembled on the steel bracket 2 welded with two cable guide tubes 3 by a truck crane on the platform and detachably connected by bolts 4 to form an assembly assembly. At this time, since the assembly assembly is not installed, it cannot be assembled by a tower crane at the cable-stayed bridge construction site.
[0038] Step S2, please refer to Figure 2, the intersection of the long axis of the ellipse of the plane where the inclined surface of the lower port of the cable guide tube 3 of the assembly assembly is located and the upper part of the inclined surface of the lower port of the cable guide tube 3 is used as the positioning reference point B of the lower port of the cable guide tube 3, and the intersection of the plane where the upper port of the cable guide tube 3 of the assembly assembly is located and the central axis of the cable guide tube 3 is used as the steel anchor beam anchor point A. In the step S2, in order to better identify and measure the position of the positioning reference point B, the position of the positioning reference point B is marked on the lower port of the cable guide tube 3 of the assembly assembly with a marker pen, that is, the positioning reference point mark of the lower port of the cable guide tube.
[0039] Step S3, please refer to Figures 4 to 5 , measure and lay out the cross installation line of the steel anchor beam 1 on the main tower rigid frame (not shown), and hoist and assemble the assembly assembly on the main tower rigid frame by hoisting equipment, so that the cross axis of the steel anchor beam 1 of the assembly assembly coincides with the cross installation line on the main tower rigid frame, that is, lay out the cross installation line of the steel anchor beam 1, and hoist the assembly assembly. The cross axis of the steel anchor beam 1 of the assembly assembly includes a transverse axis 11 and a longitudinal axis 12. In step S3, the assembly assembly is hoisted and assembled on the main tower rigid frame by using a tower crane as a hoisting equipment. The tower crane as a hoisting equipment can improve the equipment utilization rate and facilitate the installation of the assembly assembly on the main tower rigid frame at the construction site.
[0040] Step S4, please refer to Figure 8 , set up a total station, install a cover plate (not shown) on the upper port of the cable guide tube 3 of the assembly assembly on the rigid skeleton of the main tower, set up a centering rod and a prism at the center of the axis of the upper port of the cable guide tube 3 corresponding to the cover plate, measure the coordinates of the steel anchor beam anchor point A of the upper port of the cable guide tube 3 of the assembly assembly by aligning the total station with the prism, and compare it with the design coordinates to determine whether the installation position of the steel anchor beam anchor point A meets the installation accuracy; if it does not meet the installation accuracy, the assembly assembly is hoisted and adjusted as a whole by hoisting equipment until it meets the installation accuracy, so as to correct the installation position of the steel anchor beam anchor point A of the upper port of the cable guide tube 3 of the assembly assembly. That is, by determining whether the installation position of the steel anchor beam anchor point A meets the installation accuracy, it is determined whether the steel anchor beam installation error is qualified. Figure 8 The equipment at the measuring station in is a total station, and the equipment at the cable guide measuring point is the centering rod and prism of the steel anchor beam anchor point A. In step S4, the assembly assembly is hoisted and adjusted as a whole by a tower crane as a hoisting device to correct the installation position of the steel anchor beam anchor point A at the upper port of the cable guide 3 of the assembly assembly. The tower crane as a hoisting device can improve the equipment utilization rate and facilitate the correct installation of the assembly assembly on the main tower rigid frame at the construction site. In step S4, a total station can be set up on the control point of the forced centering observation pier, the three-dimensional coordinates of the measuring station and the backsight point can be input, and the backsight orientation can be performed, and the third point can be selected to check the orientation accuracy. Figure 8The measuring station in the middle is the control point of the forced centering observation pier.
[0041] Step S5, please refer to Figures 2 to 3 , measure the coordinates (X2, Y2, Z2) of the steel anchor beam anchor point A at the upper port of each cable guide tube 3 and the coordinates (X, Y, Z) of the positioning reference point B at the lower port of each cable guide tube 3 by a total station, and determine the elevation deviation value and transverse bridge deviation value of the lower port of the cable guide tube 3 of the assembly according to formula (1) and formula (2) respectively:
[0042] △z=[(ZR / COS(α)]-[Z2-(X-X2)Tan(α)] (1);
[0043] Δy=Y-[(X2-X) Tan(β)+Y2] (2);
[0044] Among them, △z is the elevation deviation value, Δy is the transverse deviation value, R is the radius of the cable guide tube 3, α is the vertical angle between the central axis of the cable guide tube 3 and the horizontal plane, and β is the horizontal angle between the central axis of the cable guide tube 3 and the vertical plane; the elevation deviation refers to the deviation in the tower height direction, and the transverse deviation is the deviation in the cross-section direction of the steel anchor beam length;
[0045] The bolts 4 of the steel anchor beam 1 of the assembly assembly and the steel bracket 2 welded with the cable guide tube 3 are loosened, and the position of the steel bracket 2 relative to the steel anchor beam 1 is moved by the hoisting equipment according to the elevation deviation value and the transverse bridge deviation value to correct the installation position of the positioning reference point B of the lower port of the cable guide tube 3; that is, if the installation error of the lower port of the cable guide tube is unqualified, the installation position of the lower port of the cable guide tube is corrected by adjusting the position of the steel bracket, and if the installation error of the lower port of the cable guide tube is qualified, it is determined that the installation position of the lower port of the cable guide tube is accurate, that is, the positioning of the cable guide tube is completed;
[0046] The steel anchor beam 1 of the assembly is locked with the bolts 4 of the steel bracket 2 welded with the cable guide tube 3, and the cable guide tube 3 after the assembly assembly is corrected in the installation position is welded to the main tower rigid frame.
[0047] After the cable guide tube of the assembly is welded to the main tower rigid frame, the cable guide tube 3 is cast on the main tower, that is, concrete is cast on the main tower rigid frame to cover the cable guide tube 3 to form the main tower. At this time, the cable guide tube 3 is pre-buried in the main tower.
[0048] In step S5, the hoist is used as a hoisting device to move the steel bracket 2 to calibrate the installation position of the positioning reference point B of the lower end of the cable guide tube 3. At this time, due to the influence of the position of the steel bracket 2 welded with the cable guide tube 3 and the steel anchor beam 1, the tower crane cannot be used to move the steel bracket 2 welded with the cable guide tube 3, so the hoist is used as the hoisting device.
[0049] The embodiment of the present invention provides a method for accurately positioning and installing the cable guide tube of the steel anchor beam of the main tower of a cable-stayed bridge. In the assembly assembly in which the steel anchor beam 1 is hoisted and assembled on the steel bracket 2 welded with two cable guide tubes 3 and detachably connected by bolts 4 to form the steel anchor beam 1, the cable guide tube 3 and the steel bracket 2, the intersection point of the ellipse of the plane where the inclined surface of the lower port of the cable guide tube 3 of the assembly assembly is located and the upper part of the inclined surface of the lower port of the cable guide tube 3 is used as the positioning reference point B of the lower port of the cable guide tube 3, and the intersection point of the plane where the upper port of the cable guide tube 3 of the assembly assembly is located and the central axis of the cable guide tube 3 is used as the anchor point A of the steel anchor beam. The installation position of the anchor point A of the steel anchor beam is measured by a total station to see whether it meets the installation accuracy. The assembly assembly is hoisted and adjusted as a whole by a hoisting device to correct the installation position of the anchor point A of the steel anchor beam at the upper end of the cable guide tube 3 of the assembly assembly. The bolts 4 of the steel anchor beam 1 of the assembly assembly and the steel bracket 2 welded with the cable guide tube 3 are loosened. According to the elevation deviation value and the transverse bridge deviation value, the steel bracket 2 is moved relative to the steel anchor beam 1 by a hoisting device to correct the installation position of the positioning reference point B of the lower end of the cable guide tube 3, thereby achieving accurate positioning of the upper and lower ends of the cable guide tube 3 and ensuring the accuracy of its installation position. In short, the present invention uses the anchor point A of the steel anchor beam at the upper end of the cable guide tube 3 as the reference point, and corrects the installation position of the lower end of the cable guide tube 3 by positioning the reference point B.
[0050] The embodiment of the present invention provides a method for accurately positioning and installing the cable guide tube 3 of the steel anchor beam 1 of the main tower of a cable-stayed bridge. In the case where there is no physical point at the center position of the lower end port of the cable guide tube 3, and the lower end port of the cable guide tube 3 cannot be measured by installing a centering rod and a prism, resulting in the inability to position, measure and correct the installation position of the lower end port of the cable guide tube 3, resulting in poor installation accuracy of the cable guide tube 3, the intersection of the long axis of the ellipse of the plane where the inclined surface of the lower end port of the cable guide tube 3 of the assembly assembly is located and the upper part of the inclined surface of the lower end port of the cable guide tube 3 is used as the positioning reference point B of the lower end port of the cable guide tube 3, so that when the physical point of the lower end port of the cable guide tube 3 is determined, the measurement of the positioning reference point B is realized, the positioning installation and correction of the lower end port of the cable guide tube 3 are realized, the construction difficulty of positioning the cable guide tube 3 is reduced, and the construction operation is simple, the construction period is shortened, the construction process is simple and the cost investment is low, and the problems of difficult collection of the number of the lower end port of the cable guide tube 3 and inaccurate measurement data are solved.
[0051] The present invention is not limited to the above-mentioned specific implementation modes. Obviously, the above-mentioned embodiments are only some embodiments of the embodiments of the present invention, but not all embodiments. Based on the described embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention. Those skilled in the art can make other levels of modifications and changes to the present invention. In this way, if these modifications and changes of the present invention fall within the scope of the claims of the present invention, the present invention is also intended to include these changes and changes.
Claims
1. A method for accurately positioning and installing a steel anchor beam cable guide tube of a main tower of a cable-stayed bridge, characterized in that: include: Step S1, providing a section of steel anchor beam and its matching two steel brackets and four cable guide tubes, welding two cable guide tubes on each steel bracket according to design requirements, wherein the lower end of the cable guide tube is an inclined surface, and hoisting and assembling the steel anchor beam on the steel bracket welded with the two cable guide tubes and detachably connecting them through bolts to form an assembly assembly of the steel anchor beam, the cable guide tube and the steel bracket; Step S2, taking the intersection of the long axis of the ellipse of the plane where the inclined surface of the lower port of the cable guide tube of the assembly is located and the upper part of the inclined surface of the lower port of the cable guide tube as the positioning reference point of the lower port of the cable guide tube, and taking the intersection of the plane where the upper port of the cable guide tube of the assembly is located and the central axis of the cable guide tube as the anchor point of the steel anchor beam; Step S3, measuring and setting out the cross installation line of the steel anchor beam on the main tower rigid frame, and assembling the assembly on the main tower rigid frame by hoisting equipment, so that the cross axis of the steel anchor beam of the assembly coincides with the cross installation line on the main tower rigid frame; Step S4, setting up a total station, installing a cover plate on the upper port of the cable guide tube of the assembly assembly on the rigid frame of the main tower, setting up a centering rod and a prism at the center of the axis of the upper port of the cable guide tube corresponding to the cover plate, measuring the coordinates of the steel anchor beam anchor point of the upper port of the cable guide tube of the assembly assembly by aligning the total station with the prism, and comparing them with the design coordinates to determine whether the installation position of the steel anchor beam anchor point meets the installation accuracy; if it does not meet the installation accuracy, hoisting and adjusting the assembly assembly as a whole by hoisting equipment until it meets the installation accuracy, so as to correct the installation position of the steel anchor beam anchor point of the upper port of the cable guide tube of the assembly assembly; Step S5, using a total station to measure the coordinates (X2, Y2, Z2) of the anchor point of the steel anchor beam at the upper port of each cable guide tube and the coordinates (X, Y, Z) of the positioning reference point of the lower port of each cable guide tube, and determine the elevation deviation value and the transverse bridge deviation value of the lower port of the cable guide tube of the assembly according to formula (1) and formula (2), respectively: △z=[(ZR / COS(α)]-[Z2-(X-X2)Tan(α)] (1); Δy=Y-[(X2-X) Tan(β)+Y2] (2); Among them, △z is the elevation deviation value, Δy is the transverse bridge deviation value, R is the radius of the cable guide tube, α is the vertical angle between the central axis of the cable guide tube and the horizontal plane, and β is the horizontal angle between the central axis of the cable guide tube and the vertical plane; Loosen the bolts of the steel anchor beam of the assembly and the steel bracket welded with the cable guide tube, and move the position of the steel bracket relative to the steel anchor beam by the hoisting equipment according to the elevation deviation value and the transverse bridge deviation value, so as to correct the installation position of the positioning reference point of the lower port of the cable guide tube; The steel anchor beam of the locking assembly is bolted to the steel bracket welded with the cable guide tube, and the cable guide tube is welded to the main tower rigid frame after the assembly assembly is corrected in the installation position.
2. The method for accurately positioning and installing the steel anchor beam cable guide tube of the main tower of a cable-stayed bridge according to claim 1 is characterized in that: In the step S1, a steel anchor beam is hoisted and assembled on a steel bracket welded with two cable guide tubes by a truck crane on a platform and detachably connected by bolts to form an assembled assembly.
3. The method for accurately positioning and installing the steel anchor beam cable guide tube of the main tower of a cable-stayed bridge according to claim 1 is characterized in that: In step S2, the position of the positioning reference point is marked on the lower port of the cable guide tube of the assembly with a marking pen.
4. The method for accurately positioning and installing the steel anchor beam cable guide tube of the main tower of a cable-stayed bridge according to claim 1 is characterized in that: In step S3, the assembly assembly is hoisted and assembled on the main tower rigid frame by using a tower crane as a hoisting device.
5. The method for accurately positioning and installing the steel anchor beam cable guide tube of the main tower of a cable-stayed bridge according to claim 1 is characterized in that: In step S4, the assembly assembly is hoisted and adjusted as a whole by using a tower crane as a hoisting device to correct the installation position of the steel anchor beam anchor point at the upper port of the cable guide tube of the assembly assembly.
6. The method for accurately positioning and installing the steel anchor beam cable guide tube of the main tower of a cable-stayed bridge according to claim 1 is characterized in that: In step S4, a total station is set up on the control point of the forced centering observation pier, the three-dimensional coordinates of the station point and the backsight point are input, and backsight orientation is performed, and the third point is selected to check the orientation accuracy.
7. The method for accurately positioning and installing the steel anchor beam cable guide tube of the main tower of a cable-stayed bridge according to claim 1 is characterized in that: In step S5, a hoist is used as a lifting device to move the installation position of the positioning reference point of the lower port of the steel corbel correction cable guide tube.